Maps are enclosed of the larger areas to be included in the projects. The area in yellow are the proposed areas.

ODOT District Pavement General Notes P401: ITEM PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN

REQUEST FOR PROPOSAL Asphalt & Concrete Repair

Allen & Sherriff Architects, Inc Yonge Street, S202, Richmond Hill, Ontario L4C 5K9 Tel: Fax: File Ref.

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

ADDENDUM # 01. Date: 5/4/2018. Pickens Area Bus Office Repaving Project. IFB Number:

PART 7 COMMUNICATIONS, LIGHTING, TRAFFIC CONTROL, POWER

ADDENDUM NO. 1. Date: April 9, 2018 for. Library Building Waterproofing Project Irvine Valley College - BID No. 344

ADDENDUM NO. 2 TO PROPOSAL AND CONTRACT DOCUMENTS RUSSELL REGIONAL AIRPORT ROME, GEORGIA RUNWAY 1/19 OVERLAY FLOYD COUNTY BID NO.

SECTION ASPHALT PAVING

BITUMEN-SET PRECAST CONCRETE PAVING SLABS

SECTION ASPHALT PAVING

SECTION ASPHALTIC CONCRETE PAVING

April 1, CITY OF PORTSMOUTH Public Works Department. Bid # Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS

Stanford University Facilities Design Guidelines SECTION SEAL COATS. C. Section : Traffic Striping and Pavement Markings

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION ASPHALT PAVING AND SURFACING

ASPHALTIC CONCRETE PAVING SECTION

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director

Public Works Department 305 West Third Street, East Wing, Third Floor Oxnard, California Tel

NOTICE TO OFFERORS ADDENDUM NO. 2 WASTE COLLECTION SITE DEVELOPMENT PLAN FOR THE COUNTY OF SHENANDOAH

SECTION ASPHALT PAVING

2014 Capital Project Phase 3 Grand Island Central School District Cannon Design Project No SECTION PAVING PART 1 - GENERAL

ADDENDUM NO. 2 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2015 Capital Works 2015-Tender-02

[ADD / DELETE / MODIFY FOLLOWING ITEMS AS APPROPRIATE TO THE PROJECT:]

Student Services & Classroom Addition

SECTION SUBSURFACE INVESTIGATION

COMMUNITY PLAZA WAY ASPHALT PAVEMENT OVERLAY ADDENDUM NO.1 UPPER SKAGIT INDIAN TRIBE PAGE 1

KANSAS TURNPIKE AUTHORITY KTA CONTRACT NO Mill and Superpave overlay I-35 (KTA) from MM 13 to MM 26.8 ADDENDUM NO. 1

ADDENDUM. DATE: 10/12/15 BROADWAY CROSSWALKS IMPROVEMENT PROJECT CONTRACT No: BID DATE: 10/27/15 ADDENDUM No: 1

Section 3 Specification 3.20 Slurry Seal TABLE OF CONTENTS

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

DOCUMENT BID DOCUMENT

SECTION PAVING AND SURFACING

SECTION 12 INDEX CONCRETE CURBS AND GUTTERS

SECTION FLEXIBLE PAVING

SPECIAL SPECIFICATION 2042 Decorative Colored Pattern Concrete Paving

SECTION FIRE HYDRANTS

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices.

A. Testing Laboratory Services: Section B. Excavation, Site Fill and Rough Grading: Section Sub-Base Course Material (If requested).

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

ITEM 252 IN-PLACE FULL DEPTH COLD FLEXIBLE PAVEMENT RECYCLING

Addendum No: 1. Closing Time: 2:00 P.M., December 14, 2018 Opening Time: 2:01 P.M., December 14, 2018 CITY OF WACO

Extraction and Sieve Analysis ( µm minus) Forming Marshall Specimens, Field Method

ADDENDUM NO Refer to Specifications Section Alternates. Clarifications to alternate descriptions are as follows:

MICRO-SURFACING - OPSS 336

BID NO VOLUME II. Date Due: May 7, 2018 at 10:30am

Revision No. 14. September Engineering & Construction Services Division Standard Specifications for Road Works. Revised/New (Insert) TS No.

INDEX DESCRIPTION MATERIALS CONSTRUCTION MEASUREMENT PAYMENT 10

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

SPECIFICATIONS FOR BONDED WEARING COURSE

507 SLURRY SEAL AND MICRO-SURFACING 1 of 8 CATEGORY 500 PAVING SECTION 507 SLURRY SEAL SECTION 507 SLURRY SEAL AND MICRO-SURFACING

SUBJECT: ITB , Oxford Road Complete Street Improvements Project ADDENDUM #1

DOCUMENT ADDENDA AND MODIFICATIONS

STANDARD SPECIFICATIONS SECTION PAVEMENT REQUIREMENTS

PAY QUANTITY NOTES INCLUDES CU. YDS. FOR DRIVEWAYS, RETURNS, DIKES, AND MISCELLANEOUS EARTHWORK WHERE NO QUANTITY IS SHOWN ON P & P SHEETS.

SECTION RIGHT-OF-WAY DAMAGE REPAIRS PART 1 - GENERAL PART 2 - MATERIALS AND METHODS

(ENGLISH UNITS) FILE:

Statement of Quantities

Addendum No. 3 page 1

1. Payment for concrete sidewalks is on square foot basis. a. Limits for measurement for trench excavation as follows:

DRIVEWAYS & CURB CUTS (INCLUDING DRIVEWAY EXTENSIONS) BUILDING PERMIT APPLICATION

SECTION CURB, COMBINATION CURB AND GUTTER, AND MONOLITHIC MEDIAN. 1. Bituminous concrete pavement; Section

PAVEMENT MARKINGS. Presented by: Tom Clayton Director of Training and Member Services CAPA/RMAEC

SECTION BITUMINOUS CONCRETE PAVING AND ATHLETIC SURFACING. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

The work required for this project includes, but is not limited to, the following items, not listed in order of execution.

INDEX DESCRIPTION MATERIALS CONSTRUCTION MEASUREMENT PAYMENT 6

THE ANTICIPATED SEQUENCE OF EVENTS ARE AS FOLLOWS, BUT THE CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS

Special Provision for Hot-Mix Asphalt Prime Coat

KU Medical Center 2018 PAVEMENT RESTORATION PROJECT Project No May 4, 2018

ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2017-Tender Capital Works

CITY OF LAKEVILLE STANDARD SPECIFICATIONS FOR STREET CONSTRUCTION FOR PUBLIC USE TO BE MAINTAINED BY THE CITY SECTION 4

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25

Section CONCRETE SIDEWALKS. 1. Payment for concrete sidewalks is on square foot basis.

Renfrew Victoria Hospital ASPHALT TACK COATS Section Professional Building Page 1 Albert Street

SSL-175. Specifications

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION

DESIGN GUIDELINE FLUID-APPLIED WATERPROOFING

ADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013

Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # PROJECT SPECIFICATIONS TABLE OF CONTENTS

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section CEMENT STABILIZED BASE COURSE. 1. Foundation course of cement stabilized crushed stone.

SECTION BITUMINOUS CONCRETE PAVEMENT

INVITATION TO BID BID FORM

ADDENDUM NO. 1. ISSUED: March 23, 2018 PROJECT: Aurora, Indiana. BID DATE: March 27, 2018

SECTION B1 BITUMINOUS CONCRETE PAVING GENERAL

INDEX DESCRIPTION MATERIALS APPROVAL FOR BASE COURSE CONSTRUCTION MEASUREMENT PAYMENT 6

SACRAMENTO COUNTY ASPHALT RUBBER HOT MIX-GAP GRADED (ARHM-GG):

ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2015 Capital Works 2015-Tender-02

SECTION ASPHALT PAVEMENT

100-2 Materials. (Greenbook) The ingredients of the slurry shall conform to the following:

ADDENDUM No. 1. The purpose of Addendum No. 1 to Bid No Milling, Paving, Sidewalk/Curbing Repairs is to answer the following questions.

ADDENDUM #4 FOR THE WEST VALLEY FACILITIES INCREMENT 2 REPLACEMENT PROJECT WEST VALLEY COLLEGE

Specification for Asphalt Paving for the Los Angeles Department of Water & Power DS Street Improvement

STANMYRE + NOEL Architects, P.C Preston White Drive, Suite 104 Reston, VA v f

A. Florida Department of Transportation (DOT) "Standard Specifications for Road and Bridge Construction" 1991 Edition.

BSS 200 Synthetic Track Surfacing System System Specifications

5-02 BITUMINOUS SURFACE TREATMENT

CONSTRUCTION SPECIFICATION FOR SLURRY SEAL

Transcription:

ADDENDUM NO. 1 Date: Lot 3 Improvements Project BID No. 352 South Orange County Community College District General-All project documents including contract documents, drawings, and specifications, shall remain unchanged with the exception of those elements added, revised, deleted, or clarified by this addendum. CONTENTS ADDENDUM ITEMS INDEX PAGE 1 ITEMS: 1-1 Questions and Answers PAGE 2 1-2 Revised Bid Documents PAGE 3 1-3 Job Walk Sign-In Sheet Attached This part of the page left intentionally blank Page 1 of 7

1-1 Questions and Answers Q1: Is there any asbestos or lead in this building? A1: No known hazardous materials are present in project building. Should the contractor encounter Unknown Conditions, reference General Conditions, specifically Section 4.2 Project Knowledge, to perform the work. Q2: What is the thickness of concrete slab we are to remove? A2: There is no as-built drawings for the project site. It is presumed to be 4-6. Q3: Is there rebar in the concrete? (Can you core the existing to see?) A3: There is no as-built drawings for the project site. The College has no ability/means to core. Q4: Seal coat is applied 30 days after Asphalt Paving, and in our professional opinion unnecessary. Freshly laid asphalt contains enough primer and sealant in the mix itself to be resistant to the elements for roughly 2-4 years. At which point seal coat is applied to rejuvenate the surface of the asphalt from mostly sun damage. Do you still want seal coat? A4: Requirement for seal coat has been removed. Supplemental Conditions, Specifications Section 32 12 00 - FLEXIBLE PAVING SURFACE TREATMENT, and Section 31 00 00 - PAVEMENET MARKINGS were revised to omit this requirement. Q5: The seal coat can t apply before 30 days of paving. Therefore, job can t be complete by 8/19/18 as required. Please advise. A5: Requirement for seal coat has been removed. Supplemental Conditions, Specifications Section 32 12 00 - FLEXIBLE PAVING SURFACE TREATMENT, and Section 31 17 23 - PAVEMENET MARKINGS were revised to omit this requirement. Page 2 of 7

1-2 Revised Bid Documents 1-2.1 The initial Bid Documents included Supplemental Conditions, dated June 22, 2018 From: Revise Exhibit 2, II EXPANDED DESCRIPTION to omit the requirement for Seal Coat: CLARIFICATIONS AND ADDITIONAL REQUIREMENTS: The following are additional clarifications and requirements for the Contractor to include during the execution of the work shown in the Contract Documents. Scope of Work: Contractor to remove and dispose of metal warehouse o Electrical feed to the building will be removed by owner prior to the start of this project o Refrigerant in HVAC unit will be recovered by owner prior to the start of this project to allow for the removal and disposal of the HVAC System Remove and dispose approximately 6,000 sq. ft. of asphalt and substrate to a depth of 7 Remove and dispose approximately 2,600 sq. ft. of concrete and substrate to a depth of 7, o Irrigation will need to be repaired or rerouted if encountered Install header board at landscaped areas where needed Install, grade, and compact approximately 4 of #2 CMB base throughout the 8600 sq. ft. area Install 3 of new asphalt to a smooth finish on top of the 8600 sq. ft. gravel to surrounding grade finish Extend concrete swale on the North East side(approx.. 54 L x 3 w) so that it connects to the existing curb gutter Seal coat new asphalt using Industrial Top Guard or equal. Create and paint a new parking stall layout to maximize the space usage including traffic arrows Provide and install 4 wide concrete stops with rebar anchors at each of parking stalls created To: CLARIFICATIONS AND ADDITIONAL REQUIREMENTS: Page 3 of 7

The following are additional clarifications and requirements for the Contractor to include during the execution of the work shown in the Contract Documents. Scope of Work: Contractor to remove and dispose of metal warehouse o Electrical feed to the building will be removed by owner prior to the start of this project o Refrigerant in HVAC unit will be recovered by owner prior to the start of this project to allow for the removal and disposal of the HVAC System Remove and dispose approximately 6,000 sq. ft. of asphalt and substrate to a depth of 7 Remove and dispose approximately 2,600 sq. ft. of concrete and substrate to a depth of 7, o Irrigation will need to be repaired or rerouted if encountered Install header board at landscaped areas where needed Install, grade, and compact approximately 4 of #2 CMB base throughout the 8600 sq. ft. area Install 3 of new asphalt to a smooth finish on top of the 8600 sq. ft. gravel to surrounding grade finish Extend concrete swale on the North East side(approx.. 54 L x 3 w) so that it connects to the existing curb gutter Seal coat new asphalt using Industrial Top Guard or equal. Create and paint a new parking stall layout to maximize the space usage including traffic arrows Provide and install 4 wide concrete stops with rebar anchors at each of parking stalls created 1-2.2 The initial Bid Documents included Specifications Section 32 12 00 - FLEXIBLE PAVING SURFACE TREATMENT Revise Section 2.2.E to omit the requirement/reference for Seal Coat: From: 2.2 ASPHALT CONCRETE PAVING A. Asphalt concrete shall be Type B, conforming to Section 39 of the CDT Standard Specifications. B. Paving asphalt binder shall be performance grade 64-10, conforming to Section 92 of the CDT Standard Specifications. Page 4 of 7

C. Aggregate grading shall be ¾ maximum, medium as specified in Section 39 of the CDT Standard Specifications. D. Liquid asphalt for prime coat shall be Grade SC-70 in conformance with Section 93 of the CDT Standard Specifications. E. Asphaltic emulsion for paint binder and fog seal coat shall be emulsified asphalt, Type SS-lh, conforming to Section 94 of the CDT Standard Specifications. To: 2.2 ASPHALT CONCRETE PAVING A. Asphalt concrete shall be Type B, conforming to Section 39 of the CDT Standard Specifications. B. Paving asphalt binder shall be performance grade 64-10, conforming to Section 92 of the CDT Standard Specifications. C. Aggregate grading shall be ¾ maximum, medium as specified in Section 39 of the CDT Standard Specifications. D. Liquid asphalt for prime coat shall be Grade SC-70 in conformance with Section 93 of the CDT Standard Specifications. E. Asphaltic emulsion for paint binder and fog seal coat shall be emulsified asphalt, Type SS-lh, conforming to Section 94 of the CDT Standard Specifications 1-2.3 The initial Bid Documents included Specifications Section 32 17 23 PAVEMENT MARKINGS Revise Section 3.2.B to omit the requirement/reference for Seal Coat: From: 3.2 REMOVAL OF STRIPES A. All stripes and pavement markings not in conformance with the proposed striping plan shall be removed by sandblasting. Painting-out black paint will not be allowed unless specifically indicated on the drawings. B. After removal of paint, apply fog seal coat of SS-lh emulsified asphalt per Section 94 of the CDT Standard Specifications to all asphalt surfaces affected by the removal operations. The fog seal coat must be given ample time to dry prior to the initial painting application. To: 3.2 REMOVAL OF STRIPES A. All stripes and pavement markings not in conformance with the proposed striping plan shall be removed by sandblasting. Painting-out black paint will not be allowed unless specifically indicated on the drawings. Page 5 of 7

B. After removal of paint, apply fog seal coat of SS-lh emulsified asphalt per Section 94 of the CDT Standard Specifications to all asphalt surfaces affected by the removal operations. The fog seal coat must be given ample time to dry prior to the initial painting application. This part of the page left intentionally blank Page 6 of 7

1-3 Job Walk Signs in Sheet Page 7 of 7