National Property Inspections

Similar documents
Property Condition Assessment

Building Inspection Report

Commercial Tax Abatement

Administration Building Needs Assessment

BUILDING CONDITION ASSESSMENT

Overbrook Theater / Fruenthal Foundation Art Center. 1.0 Total Points % 2.1 Building Exterior Elements %

AGILITAS Property Development

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

Inspection Report Seaafood Restaurant Property Address:

Structural Condition Assessment

DL Engineering Inc. Structural / Civil Engineering

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

April 10, Mr. Steven McMahon Manager of Architectural Services East Dollar Tree Stores, Inc. 500 Volvo Parkway Chesapeake, VA 23320

APPENDIX 3C DOMINION HOTEL SPECIFICATIONS

Lighthouse Engineering, L.L.C.

School Assessment Report

Administrative Changes

School Assessment Report

National Property Inspections

Site Bldg Fiscal Yr System Sub-System. Verde Valley Site site 2014/15 Parking Paving. Verde Valley Site site 2014/15 Sidewalks

PROFESSIONAL OFFICE SUITES FOR LEASE PRIYA PROFESSIONAL OFFICE CENTRE 122 CANAL STREET POOLER, CHATHAM COUNTY, GEORGIA 31322

STRUCTURAL ASSESSMENT OBSERVATION REPORT

G703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project

PROPERTY PRESERVATION AND CAPITAL PLANNING

School Assessment Report

Toronto Community Housing Executive Summary 2016/2017. BCA Report. Sample House High FCI

EMERGENCY MANAGEMENT PREPAREDNESS AND ASSISTANCE TRUST FUND ARC 4496 Evaluation Questionnaire

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

School Assessment Report

BUREAU Joe Iuviene, AIA January 20, 2017

Cheldelin Middle School

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

AIRWAYS CROSSING PHASE II BUILDING INFORMATION 5305 McCall Way N.E. T2E 7N7

Edmonton Public School District No. 7

RYAN BIGGS CLARK DAVIS

BUILDING ASSESSMENT REPORT for NMSU GREENHOUSES at NEW MEXICO STATE UNIVERSITY LAS CRUCES, NEW MEXICO

Section I Lompoc Animal Services Executive Summary

Civil Engineering and Architecture Topical Outline

ST. CLOUD, MN 316,000 Square Feet Situated on Acres

Minimum Standards for Construction of Aircraft Hangars MINIMUM STANDARDS FOR CONSTRUCTION OF AIRCRAFT HANGARS

APPENDIX A: HOUSING CONDITION SURVEY METHODOLOGY AND RESULTS

Re.: Dollar Tree D10236 Startown Crossing, Newton, NC Structural Report on Findings, Site Visit (September 21, 2016)

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations

Show how a KM database impacts: cost, time, and quality. Demonstrate how Parametric Design could be used to save time, money, and improve quality

Hartsville Area Schools - Building Evaluations

DeKalb County School District/Elementary Schools Clifton Elementary Final School Assessment Report May 19, 2016

CHAPTER 34 EXISTING BUILDINGS

Section I Santa Rosa Park Executive Summary

Property Condition Assessment (PCA) Checklist c:\users\joseph\documents\hhc\blog\pca cklist template.doc Friday, August 11, 2006

Office Condos. NWC 168th & Cornhusker Omaha, Nebraska Pricing and Availability. Ownership Benefits. Chris Falcone. For Sale or Lease 1,664 SF

ST. CLOUD, MN. 316,000 Square Feet Situated on Acres. For additional information contact:

Inspection of New One- and Two- Family Dwellings

City Of Mendota Construction Procedures

Access: All interior areas of the building were accessible. On the exterior, only the fenced area that houses the generator was not accessible.

PROSPECTUS - REPAIR & ALTERATION WILLIAM J. HOLLOWAY, JR. U.S. COURTHOUSE AND U.S. POST OFFICE - COURTHOUSE OKLAHOMA CITY, OKLAHOMA

Two complete sets of plans that are legible and drawn to conventional scale are required to be submitted with the Building Permit Application Form.

Facility Improvements

260,000 SF Building Profile

Fundamentals of Building Construction: Materials and Methods

3. Appliances - Free Standing x

APPENDIX 3E HAZELWOOD HOTEL SPECIFICATIONS

Darlington Area Schools - Building Evaluations

Corridor Residential Suburban District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

Exhibit A Library Shell Construction

School Assessment Report

Corridor Residential Suburban District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

City of Richmond Zoning Ordinance Page 12-1

EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT

Section I Isla Vista Campus Executive Summary

Assessment Report Burgess Park Gymnasium. Summary

City of Westerville Guide to Commercial Inspections

Dr. Edward Livingston Trudeau Building. 118 Main Street, Saranac Lake, NY. Building Systems Report. June 24, 2018

School Board Work Session Dec. 13, 2016

Administrative Offices

ADDENDUM 2 - JULY 14, 2015

Office Condos. NWC 168th & Cornhusker Omaha, Nebraska Pricing and Availability. Ownership Benefits. Chris Falcone. For Sale or Lease 1,664 SF

1733 TW ALEXANDER DRIVE

Unity Office Building 400 Unity Street Latrobe, PA 15650

Neighborhood Suburban Single-Family District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

CONSTRUCTION COST BREAKDOWN THIS IS FORM CCB

Best value MARK CENTER. Welcome to Mark Center Drive, Alexandria, VA

AN OFFERING OF 1661 EAST OGLETHORPE HIGHWAY FLEMINGTON, LIBERTY COUNTY, GEORGIA PRESENTED BY WHITLEY AND ASSOCIATES, INC.

NALLE ELEMENTARY SCHOOL

Update on FCPS Construction/Renovation Projects. November 2015

Collins Middle School

Darlington Area Schools - Building Evaluations


Project Seismic Vulnerability Assessment For SFCC District Building 33 Gough Street San Francisco, California 94103

School Assessment Report

Construction SliDeRulE Case Studies

COMMERCIAL OR RESIDENTIAL NEW BUILDINGS, REMODELS AND ADDITIONS

REQUIRED RESIDENTIAL PERMITS

No structural deficiencies were observed to the west exterior elevation.

CCIM Central Canada Chapter. Richard Weldon, P.Eng., LEED AP Carson Dunlop Weldon & Associates Ltd. October 5,

Expanding Your Development & Investment Perspectives 159,000 SF Building Profile

Update on FCPS Construction/Renovation Projects. June 2016

Facility Condition Assessment

Morehouse School of Medicine

City of Oviedo Residential Permit Application Guidelines

Transcription:

National Property Inspections Anywhere, USA (325) 382-8754 Property Location 9375 Burt Street Anywhere USA Prepared for John Investor Consultant Al Standard (325) 382-8754 Page 1 of 27

TABLE OF CONTENTS Page # 1 EXECUTIVE SUMMARY 5 1.1 General Description 5 1.2 General Physical Condition 5 1.3 Opinions of Probable Costs 6 1.4 Deviations from the Guide 6 1.5 Recommendations 6 2 PURPOSE AND SCOPE 7 3 SYSTEM DESCRIPTION AND OBSERVATIONS 8 3.1 Overall General Description 8 3.2 Site 8 3.2.1 Topography 8 3.2.2 Storm Water Drainage 8 3.2.3 Access and Egress 9 3.2.4 Paving, Curbing and Parking 9 3.2.5 Flatwork 9 3.2.6 Landscaping and Appurtenances 10 3.2.7 Recreational Facilities 10 3.2.8 Utilities 11 3.2.8.1 Water 11 3.2.8.2 Electricity 11 3.2.8.3 Natural Gas 11 3.2.8.4 Sanitary Sewer 11 3.2.8.5 Storm Sewer 11 3.2.8.6 Special Utility Systems 11 3.3 Structural Frame and Building Envelope 11 3.3.1 Foundation 11 3.3.2 Building Frame 11 3.3.3 Facades or Curtainwall 12 3.3.3.1 Sidewall System 12 3.3.3.2 Fenestration System 12 3.3.3.3 Parapets 12 3.3.4 Roofing 13 3.4 Mechanical and Electrical System 13 3.4.1 Plumbing 13 3.4.1.1 Supply and Waste Piping 13 3.4.1.2 Domestic Hot Water Production 14 3.4.1.3 Fixtures 14 3.4.2 Heating 14 3.4.2.1 Heat Generating Equipment 14 3.4.2.2 Distribution 15 Page 3 of 27

Summary 1. Executive Summary A property condition assessment was performed by National Property Inspections on the Joe Turnkey office building property, located at 9375 Burt Street, Anywhere, USA. The Walk Through Survey was conducted on August 23, 2006, at the time of the walk through four of the five tenant finish spaces were occupied. The subject property is an irregular shaped lot that is approximately 1.23 acres or 53,699 square feet in size with an office building that is approximately 25,650 square feet in size. The lot and building were not measured in the field, the information for the approximate size of the lot and building was gathered from the local County Assessors office. The property is located East of North 94 th Street and South of Burt Street in the central part of Anywhere USA. The legal description of the property is Embassy Tower Lot 4 Bock 0; the property is zoned for commercial use. 1.1 General Description The subject property is a steel post and beam two-storey frame with brick veneer and architectural glass exterior wall finish that faces the East. The building was constructed in 2002 with surface asphalt parking to the East and landscaping around the perimeter of the building and in the parking islands. There is a surface parking lot to the South of the building. Lots are leased for parking from an adjacent building owner, according to the owner, Joe Turnkey. The historical data of the property from the Anywhere County Assessors office showed record of the real estate transfer for the undivided plot May of 1989. The property was a produce farm until the sale in 1989. The plot was developed, subdivided into lots and the subject property was purchased in June of 2001. 1.2 General Physical Condition This is a typical commercial office building. The maintenance appears to be satisfactory. No major structural deficiencies were noted. The drainage and immediate parking area appears to be adequate and in fair condition. Some ponding near the concrete curb is noted. The lot is in need of asphalt sealant and striping. The pedestrian sidewalk on the East side of the building has heaved and will require the replacement of the sealant. The foundation system was not observable due to interior and exterior finish. Based upon the construction data, the assumption is made that the foundation consists of continuous reinforced concrete spread footings at the perimeter and bearing walls, with reinforced concrete slab on grade for the first floor. No obvious deficiencies were observed in the interior or exterior wall envelope (i.e.) cracks or unusual settling. The foundation system appears to be in good condition. Page 5 of 27

The doors and windows appear to be in satisfactory condition. The buildings exterior envelope is structural steel posts and beams with an exterior of brick veneer and glass, and a flat membrane roof. The exterior envelope appears to be in good condition. The plumbing system appears to be in satisfactory condition. The HVAC system appears to be satisfactory at this time, although there are some historical issues regarding the fresh air damper that will need to be monitored to ensure proper operation; routine maintenance needs to be conducted on the rooftop units. The electrical system appears to be in satisfactory condition. 1.3 Opinions of Probable Costs Estimated Costs of Noted Deficiencies. Table 1 Noted Deficiencies Report Reference Current Estimated Cost Replace caulking on pedestrian sidewalks 3.4.5 $2,700 to $3,200 Minor asphalt repairs, clean and apply asphalt 3.2.4 sealant and restripe the parking lot. $12,000 to $14,000 Thorough maintenance needed on roof top HVAC units noted belt squeal and dented fins. 3.4.3.1 Minor repair Maintenance issue Annual inspection of the roof. 3.3.4 Maintenance issue Total Estimated Costs: $14,700 to $17,200 1.4 Deviations from the Guide At the request of our client the fire suppression system and the vertical transportation system were observed but not thoroughly assessed because of state-mandated inspections on these items. No ADA accessibility survey was conducted on the subject property but, observations are noted in the report. 1.5 Recommendations Deferred maintenance items and deficiencies that require immediate attention have been identified in section 1.3. The caulking, the parking lot sealant and the maintenance of the roof top units should be remedied soon. Page 6 of 27

The doors and windows appear to be in satisfactory condition. The buildings exterior envelope is structural steel posts and beams with an exterior of brick veneer and glass, and a flat membrane roof. The exterior envelope appears to be in good condition. The plumbing system appears to be in satisfactory condition. The HVAC system appears to be satisfactory at this time, although there are some historical issues regarding the fresh air damper that will need to be monitored to ensure proper operation; routine maintenance needs to be conducted on the rooftop units. The electrical system appears to be in satisfactory condition. 1.3 Opinions of Probable Costs Estimated Costs of Noted Deficiencies. Table 1 Noted Deficiencies Report Reference Current Estimated Cost Replace caulking on pedestrian sidewalks 3.4.5 $2,700 to $3,200 Minor asphalt repairs, clean and apply asphalt 3.2.4 $12,000 to $14,000 Observations/Comments: The fixtures all appeared to be good condition and working properly at the time of the observation. No deficiencies were obs erved or reported. 3.4.2 Heating 3.4.2.1 Heat Generating Equipment Description: Heat is supplied to the building by ni ne single package gas fired rooftop units. The rigid gas lines to these units are braced off the roof with blocks of wood. No. of units Make Model BTU s 9 Trane YSC120A3RHADEF 250,000 BTU s Observations/Comments: The units were not tested in the heat mode at the time of observation due to high outside temperatures. The units are all four years old and are the same model and size. The units appear to be in good condition. No deficiencies were observed or reported. Page 14 of 27

Appendix A Photographs Grade and landscaping Front Entry Egress Patio/Flatwork Parapet wall and Scuppers Page 24 of 27