School Assessment Report

Size: px
Start display at page:

Download "School Assessment Report"

Transcription

1 School Assessment Report School: Humphries Elementary School Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/ :35:17 AM FOR OFFICIAL USE ONLY Final

2 School Assessment Report - S. Atlanta Cluster, Humphries Elementary School Table of Contents Executive Summary 3 Condition Budget Summary 3 Suitability Summary 7 Enrollment Projection 9 Buildings 10 Building Name: 1940_1967 Bldg 2030_2031_ Building Condition Budget Summary 11 Building Condition Budget Detail 11 Building Priority 14 Building Condition Deficiencies 15 Building Condition Deficiencies Narrative 16 Building Name: 1994 Bldg Building Condition Budget Summary 23 Building Condition Budget Detail 23 Building Priority 26 Building Condition Deficiencies 27 Building Condition Deficiencies Narrative 28 Building Name: 1996 Bldg 2033_ Building Condition Budget Summary 34 Building Condition Budget Detail 34 Building Priority 37 Building Condition Deficiencies 38 Building Condition Deficiencies Narrative 39 Sites 41 Site Summary 41 Condition Budget Summary: Site 42 Site Deficiencies Budget Detail 43 Site Renewal Schedule 44 Site Priority 44 Site Condition Deficiencies 45 Site Deficiencies Budget Narrative 46 Appendix 1 - Educational Suitability Reports 49 Suitability Report 49 The following reference documents may be viewed at the Atlanta Public Schools ecomet Feedback website under 'Support' tab: Generated: 11/17/ :35:17 AM FOR OFFICIAL USE ONLY Final

3 School Assessment Report - S. Atlanta Cluster, Humphries Elementary School ecomet Glossary UNIFORMAT Definitions Suitability Criteria Score Description Text Generated: 11/17/ :35:17 AM FOR OFFICIAL USE ONLY Final

4 School Assessment Report - S. Atlanta Cluster, Humphries Elementary School Executive Summary School Name: Humphries Elementary School Number of Buildings: 3 Gross Area (SF): 66,228 Replacement Value: $13,677,302 Condition Budget: $2,708,634 Total FCI: 19.80% Suitability Budget: $1,396,667 Total RSLI: 24% Total APSFI: 30.10% Condition Score: Suitability Score: School Score: Summary: The Humphries Elementary School consists of (2) main school building located at 3029 Humphries Drive, in Atlanta, GA. The original campus was constructed in 1940 through 1967 with additions to the main building constructed in 1994 and A separate building on site was constructed in The school campus and site are fairly well maintained in fair overall condition. Roof covering was installed in 1994 / 1996 and has 10 main sections including some smaller sections. Roofing is typically low slope with built-up system and is in fair condition with no reported leaks. Pitch roof is standing seam metal panel system and asphalt compostion shingles both in fair condition with reported repairs needed to deteriorated shingles. (Roofing membrane report and drawings are available on the home page of each school in ecomet on the drop down menu Drawings/Attachments ). Domestic water and sanitary waste systems are original to the building age and are in fair condition except for the 1940_1967 building section have reached the end of life expectancy. HVAC systems were upgraded in 2015 and are in good condition. Electrical service and lighting systems are original to the building age and are in fair condition except for the 1940_1967 building section have reached the end of life expectancy. This report contains condition and adequacy data collected during the 2013 APS Facility Assessment and 2015 Tabletop Assessment. The detailed condition and deficiency statements are contained in this report for each building and site improvements on the campus. Condition Budget Summary Building condition is evaluated based on the functional systems and elements of a building and organized according to the UNIFORMAT II Elemental Classification. The grouping of these systems and elements and applying a current replacement value to them develops a representative building cost model. Cost Models are developed for similar building types and functions. Systems and their elements are evaluated based on their current replacement values, life cycles, installation dates and next renewal dates. Systems and their elements that are within their useful lives are further evaluated to identify current deficient conditions that may have a significant impact on a system s or element's remaining service life, and to determine if they are beyond their predicted useful life. The system's or element's current replacement value is based on RS Means Commercial Cost Data. Generated: 11/17/ :35:10 AM FOR OFFICIAL USE ONLY Final 3

5 School Assessment Report - S. Atlanta Cluster, Humphries Elementary School Following are the cost model's system details for this facility. The Remaining Service Life Index (RSLI), also known as the Condition Index (CI), is calculated as the sum of a renewable system's Remaining Service Life (RSL) divided by the sum of a system's Replacement Value (both values exclude softcost to simplify calculation updates) expressed as a percentage ranging from % (new system) to 0.00% (system expired). The System Condition Index (SCI) is the ratio of a system's current condition deficiency costs to its replacement value - also known as "percent used" ranging from 0 percent to 100 percent or greater due to the addition of the system's renewal premium, the additional costs to prepare for the system's renewal such as demolition costs. The Condition Budget, also known as Condition Needs, represents the budgeted contractor installed costs plus owner's soft costs for the repair, replacement or renewal for a component or system level deficiency. It excludes contributing costs for other components or systems that might also be associated with the corrective actions due to packaging the work. Generated: 11/17/ :35:10 AM FOR OFFICIAL USE ONLY Final 4

6 School Assessment Report - S. Atlanta Cluster, Humphries Elementary School Current Investment Requirement and Condition by Uniformat Classification Uniformat Classification RSLI SCI Condition Budget A10 Foundations 0% 0.00% $0 A20 Basement Construction 0% 0.00% $0 B10 Superstructure 0% 2.47% $41,066 B20 Exterior Enclosure 15% 0.00% $0 B30 Roofing 2% 60.08% $553,141 C10 Interior Construction 56% 0.00% $0 C20 Stairs 0% 0.00% $0 C30 Interior Finishes 47% 5.08% $71,455 D10 Conveying 4% 0.00% $0 D20 Plumbing 7% 23.20% $130,230 D30 HVAC 50% 0.00% $0 D40 Fire Protection 4% 96.04% $297,009 D50 Electrical 1% 74.32% $882,423 E10 Equipment 1% 62.88% $33,984 E20 Furnishings 42% 0.00% $0 G20 Site Improvements 38% 14.60% $162,076 G30 Site Mechanical Utilities 0% % $285,591 G40 Site Electrical Utilities 11% 64.13% $251,659 Total: $2,708,634 Condition Priority Building Condition Budget /Site GSF FCI Priority 1 Priority 2 Priority 3 Priority 4 Priority 5 Total 1940_1967 Bldg 30, % $0 $0 $649,750 $572,594 $136,437 $1,358, _2031_ Bldg , % $0 $0 $367,639 $0 $29,907 $397, Bldg 2033_ , % $0 $0 $122,316 $0 $130,665 $252,982 Site 39.7% $0 $162,076 $285,591 $251,659 $0 $699,326 Total: 66, % $0 $162,076 $1,425,295 $824,253 $297,009 $2,708, Trending Critical (Year 1) $162,076 (5.98%) 5 - Grandfathered Project triggered $297,009 (10.97%) 3 - Necessary (Years 2-5) $1,425,295 (52.62%) 4 - Recommended (Years 6-10) $824,253 (30.43%) School Condition Budget: $2,708,634 Generated: 11/17/ :35:11 AM FOR OFFICIAL USE ONLY Final 5

7 School Assessment Report - S. Atlanta Cluster, Humphries Elementary School Renewal Schedule Systems Current Total Total $2,708,633 $2,018,238 $157,524 $264,026 $458,056 $228,051 $105,870 $347,560 $6,287,958 Substructure Foundations Standard Foundations Special Foundations Slab on Grade Basement Construction Basement Excavation Basement Walls Shell $594,207 $442,455 $83,477 $1,120,139 Superstructure $41,066 $41,066 Floor Construction Roof Construction $41,066 $41,066 Exterior Enclosure $83,477 $83,477 Exterior Walls Exterior Windows $76,936 $76,936 Exterior Doors $6,541 $6,541 Roofing $553,141 $442,455 $995,596 Roof Coverings $553,141 $442,455 $995,596 Roof Openings Interiors $71,455 $615,165 $157,524 $193,369 $237,495 $1,275,008 Interior Construction $237,495 $237,495 Partitions Interior Doors Fittings $237,495 $237,495 Stairs Stair Construction Interior Finishes $71,455 $615,165 $157,524 $193,369 $1,037,513 Wall Finishes $157,524 $193,369 $350,893 Floor Finishes $71,455 $615,165 $686,620 Ceiling Finishes Services $1,309,662 $934,389 $22,393 $5,138 $2,271,582 Conveying $86,995 $86,995 Elevators and Lifts $86,995 $86,995 Escalators and Moving Walks Other Conveying Systems Plumbing $130,231 $410,958 $22,393 $563,582 Plumbing Fixtures $47,155 $404,938 $452,093 Domestic Water Distribution $20,686 $6,208 $26,894 Sanitary Waste $53,254 $16,185 $69,439 Rain Water Drainage $9,136 $6,020 $15,156 Other Plumbing Systems HVAC Energy Supply Heat Generating Systems Cooling Generating Systems Distribution Systems Terminal & Package Units Controls & Instrumentation Systems Testing & Balance Other HVAC Systems/Equip Fire Protection $297,009 $5,138 $302,147 Sprinklers $279,000 $279,000 Standpipes $18,009 $18,009 Fire Protection Specialties Other Fire Protection Systems $5,138 $5,138 Electrical $882,422 $436,436 $1,318,858 Electrical Service/Distribution $90,748 $72,668 $163,416 Lighting and Branch Wiring $454,872 $363,768 $818,640 Communications and Security $280,027 $280,027 Other Electrical Systems $56,775 $56,775 Equipment & Furnishings $33,984 $26,229 $70,657 $104,927 $235,797 Equipment $33,984 $26,229 $60,213 Institutional Equipment $850 $850 Vehicular Equipment Other Equipment $33,134 $26,229 $59,363 Furnishings $70,657 $104,927 $175,584 Fixed Furnishings $70,657 $104,927 $175,584 Special Construction Special Construction Special Structures Integrated Construction Special Construction Systems Special Facilities Building Sitework $699,325 $458,056 $228,051 $1,385,432 Site Preparation Site Clearing Site Demolition and Relocations Site Earthwork Hazardous Waste Remediation Site Improvements $162,076 $458,056 $620,132 Roadways Parking Lots Pedestrian Paving Site Development $162,076 $371,397 $533,473 Landscaping $86,659 $86,659 Site Mechanical Utilities $285,590 $285,590 Water Supply $67,863 $67,863 Sanitary Sewer $137,611 $137,611 Storm Sewer $80,116 $80,116 Heating Distribution Cooling Distribution Fuel Distribution Other Site Mechanical Utilities Site Electrical Utilities $251,659 $228,051 $479,710 Electrical Distribution $169,658 $169,658 Site Lighting $228,051 $228,051 Site Communication and Security $82,001 $82,001 Other Site Electrical Utilities Generated: 11/17/ :35:11 AM FOR OFFICIAL USE ONLY Final 6

8 Final Suitability - S. Atlanta Cluster, Humphries Elementary School Suitability Summary The educational suitability assessment of a school facility is a measure of how well the building(s) and grounds support and enhance the educational programs being offered. The assessment evaluates multiple systems or categories. Some of these are school-wide, like learning environment, while others are focused on specific space types such as art rooms. Some systems or categories are found in all types of schools, such as general classrooms, while others are specific to certain grade configurations, like preschool classrooms. Each school receives an educational suitability score based on a 100 point scale developed as a percentage of possible points for all scored suitability categories. The educational suitability assessment team evaluated the adequacy of the specific space types in each school model, e.g., general classrooms, science rooms, support spaces, etc. The possible score for each space type was weighted based on that space type's proportion of the total area of the school model. Consequently, general classrooms in an elementary school receive more possible points than general classrooms in a high school, since they represent a greater proportion of the total space. Suitability Scoring The suitability scoring system includes additional educational suitability categories that cannot always be weighted based on simple square footage. Some examples of these categories include ease of supervision, learning environment, pedestrian traffic, and others. The weightings of these categories were determined through field work by experienced educators and architects and reflect each category's relative importance in that particular model. The points assigned a specific educational suitability category in one model may differ from another model. A comparison of the points assigned to a specific educational suitability category across models is not appropriate because the size and proportion of spaces will be different based on the type of school. For example, an auditorium is typical at a high school, but elementary and middle schools may have multi-purpose spaces (e.g., "cafegymtoriums"). The points assigned to these spaces are likely to be different. Another aspect of the suitability scoring system is that the weights assigned to the categories are expressed in numbers to two decimal points. This is due to several factors. Using a 100 point scale to review numerous educational suitability systems and categories, many of the point assignments are a fraction of a whole number. Expanding point assignments to two decimals allows the system to reflect the original logic of basing the suitability scoring on square footage and relative importance, and facilitates consistent sums when adding to arrive at a total suitability score. Suitability Budget The budget for correcting educational suitability deficiencies is intended to be used as an estimate for correcting the overall educational suitability needs of a facility and not as a means to develop cost estimates for individual deficiencies. Experience has shown that it is difficult to calculate the cost of correcting items such as classrooms that are sized incorrectly, spaces with inappropriate adjacencies, lack of a variety of teaching and learning spaces, etc. The remediation of these deficiencies can take a variety of forms and requires a design study before accurate cost calculations can be made. A budget was developed for suitability improvements based on the overall suitability score of a particular school and team experience in correcting the overall deficiencies based on that score. Suitability Budget needs for each facility are included in the report and should be used as a starting place for long range planning. Much like a facility condition index, the inverse of the suitability score is a measure of the value of the building which should be reinvested to remediate the deficiencies. The Atlanta Public School Facilities Inventory (APSFI) includes a model which is adequate to develop budget projections for remediating educational suitability deficiencies. The model is as follows: Atlanta Suitability Index = (1.0 - Suitability Score (%)) APSFI x.35 x School Current Replacement Value (CRV) =Total Suitability Budget Needs The APSFI budget projection of 35% of the Current Replacement Value is based on several factors: First, the remediation of educational suitability deficiencies may be accomplished in a number of ways. For instance, remediating a classroom which does not meet the size standard for a given number of students can be "fixed" by, on one extreme, lowering the class size which costs no capital dollars, and on the other extreme, by building a new classroom, which would cost 100% of the replacement cost. Most often, the solution is to carve out some additional space, or combine three classrooms into two by removing the internal walls. Consequently, the cost of remediation is most often less than 100% of the replacement cost and our experience has shown that the 35% factor is an effective planning parameter. Second, the fact that these deficiencies are typically remediated along with building condition deficiencies and often overlap in scope of work and cost. Budgets for both assessments at 100% of the replacement cost would likely result in excessive budgets. Generated: 11/17/ :35:11 AM FOR OFFICIAL USE ONLY Final 7

9 Final Suitability - S. Atlanta Cluster, Humphries Elementary School The report below provides information about the Educational Suitability of this school, based on the Criteria in Appendix 1. Each area was scored 1 through 5, or "NA" with 1 being the high score. Items are scored "NA" if they are not appropriate to that school program (e.g., football fields at an elementary school or preschool at a high school) or are not needed at a school (e.g., no computer lab at a school where every student has a laptop). All scores are shown. However, the suitability deficiency budget reflects only the deficiencies identified with scores of 2 or lower. Suitability Narrative: Humphries Elementary School, a two-story facility, serves pre-k through 5th grade students and provides some special education programs. The students arrive at school transported by cars, five school buses, and on foot. The school provides a staffed parent center. Suitability Category Scoring Summary Task No Task Description Score 4845 Support Spaces Learning Environment General Classrooms Kindergarten Pre-K Self-Contained Special Ed Instructional Resource Rooms Science Music Art Computer Labs P.E Performing Arts Media Center Outside Safety and Security Humphries Elementary School Suitability Budget Total: $1,396,667 Generated: 11/17/ :35:11 AM FOR OFFICIAL USE ONLY Final 8

10 Final Suitability - S. Atlanta Cluster, Humphries Elementary School Enrollment Projection Enrollment projections are merely an estimate of future activity based on the historical data and information provided. These numbers can be highly accurate, but it must be remembered that the numbers are still a projection or estimate. During the implementation of any of the recommendations provided, it is critical that the school reassess these numbers on a regular basis and adjust plans accordingly. Humphries Elementary School Projected Enrollment Grade Kindergarten Subtotal ** EC Students are not used in the development of the projections. Generated: 11/17/ :35:11 AM FOR OFFICIAL USE ONLY Final 9

11 School Assessment Report - S. Atlanta Cluster, Humphries Elementary School, 1940_1967 Bldg 2030_2031_2040 Buildings Building Name: 1940_1967 Bldg 2030_2031_2040 Year Built: 1940 Gross Area (SF): 30,925 Replacement Value: $5,252,613 Repair Cost: $1,358,780 Total FCI: 25.87% Total RSLI: 16% The superstructure of the various buildings are steel frame, load bearing CMU, and wood construction. Floor construction is slab on-grade and wood construction. Roof construction is metal pan deck with lightweight fill, steel framed and wood framed. The exterior enclosure is comprised of walls of brick veneer over CMU. Exterior windows are aluminum frame with operable panes. Exterior doors are hollow metal steel mostly with glazing. Roofing is low slope with built-up, and standing seam metal and fiberglass shingles with no reported leaks. Generated: 11/17/ :35:11 AM FOR OFFICIAL USE ONLY Final 10

12 School Assessment Report - S. Atlanta Cluster, Humphries Elementary School, 1940_1967 Bldg 2030_2031_2040 Building Condition Budget Summary Building condition is evaluated based on the constructed physical elements of a building and organized according to the UNIFORMAT II Elemental Classification. The grouping of these elements is used to construct a building cost model. Models are developed for similar building types and function. Systems are evaluated based on their costs, design life, installation date and predicted next renewal date. Systems that are within their design life are further evaluated to identify current deficient conditions which may have a significant impact on a system s or component's remaining service life. The system value is based on RS Means Commercial Cost Data. Following are the systems detail for this facility. Uniformat Classification RSLI SCI Condition Budget A10 Foundations 0% 0.00% $0 A20 Basement Construction 0% 0.00% $0 B10 Superstructure 0% 5.08% $41,066 B20 Exterior Enclosure 16% 0.00% $0 B30 Roofing 2% % $448,041 C10 Interior Construction 37% 0.00% $0 C20 Stairs 0% 0.00% $0 C30 Interior Finishes 47% 0.00% $0 D10 Conveying 4% 0.00% $0 D20 Plumbing 3% 31.38% $80,102 D30 HVAC 26% 0.00% $0 D40 Fire Protection 1% 96.06% $136,437 D50 Electrical 0% % $626,289 E10 Equipment 0% % $26,847 E20 Furnishings 50% 0.00% $0 Total: $1,358,780 Building Condition Budget Detail Uniformat System Description Unit Price Life Install Year Calc Next Renewal Replacement RSLI SCI Condition Budget A1010 Standard Foundations $ $205, % $0 A1020 Special Foundations $ $10, % $0 A1030 Slab on Grade $ $177, % $0 A2010 Basement Excavation $ $6, % $0 A2020 Basement Walls $ $64, % $0 B1010 Floor Construction $ $472, % $0 B1020 Roof Construction $ $335, % $41,066 B2010 Exterior Walls $ $348, % $0 B2020 Exterior Windows $ $228,862 37% 0.00% $0 B2030 Exterior Doors $ $19,205 37% 0.00% $0 B3010 Roof Coverings $ $407,310 0% 110% $448,041 B3020 Roof Openings $ $14,004 77% 0.00% $0 C1010 Partitions $ $149,240 25% 0.00% $0 C1020 Interior Doors $ $96,426 53% 0.00% $0 C1030 Fittings $ $73,220 50% 0.00% $0 C2010 Stair Construction $ $74, % $0 C3010 Wall Finishes $ $127,234 40% 0.00% $0 C3020 Floor Finishes $ $277,675 5% 0.00% $0 C3030 Ceiling Finishes $ $236, % 0.00% $0 D1010 Elevators and Lifts $ $39,211 5% 0.00% $0 D2010 Plumbing Fixtures $ $182,449 5% 0.00% $0 D2020 Domestic Water Distribution $ $18,805 0% 110% $20,686 D2030 Sanitary Waste $ $48,413 0% 110% $53,254 D2040 Rain Water Drainage $ $5,602 0% 110% $6,162 D3020 Heat Generating Systems $ $106,029 0% 0.00% $0 D3030 Cooling Generating Systems $ $379,702 0% 0.00% $0 D3040 Distribution Systems $ $274, % 0.00% $0 D3060 Controls & Instrumentation $ $62, % 0.00% $0 D3070 Systems Testing & Balance $ $17, % 0.00% $0 D4010 Sprinklers $ $115,631 0% 110% $127,194 D4020 Standpipes $ $8,402 0% 110% $9,242 D4030 Fire Protection Specialties $ $2,801 80% 0.00% $0 D4090 Other Fire Protection Systems $ $15, % $0 Generated: 11/17/ :35:12 AM FOR OFFICIAL USE ONLY Final 11

13 School Assessment Report - S. Atlanta Cluster, Humphries Elementary School, 1940_1967 Bldg 2030_2031_2040 Unit Price Install Year Calc Next Renewal Replacement RSLI SCI Condition Budget Uniformat System Description Life Electrical D5010 Service/Distribution $ $66,818 0% 110% $73,500 D5020 Lighting and Branch Wiring $ $334,890 0% 110% $368,379 Communications and Security $ $116,031 0% 110% $127,634 D5030 D5090 Other Electrical Systems $ $51,614 0% 110% $56,775 E1090 Other Equipment $ $24,407 0% 110% $26,847 E2010 Fixed Furnishings $ $57,616 50% 0.00% $0 Total $ $5,252,613 23% 25.87% $1,358,780 Generated: 11/17/ :35:12 AM FOR OFFICIAL USE ONLY Final 12

14 School Assessment Report - S. Atlanta Cluster, Humphries Elementary School, 1940_1967 Bldg 2030_2031_2040 Renewal Schedule Systems Current Total Total $1,358,780 $565,746 $157,524 $193,414 $2,275,464 Substructure Foundations Standard Foundations Special Foundations Slab on Grade Basement Construction Basement Excavation Basement Walls Shell $489,107 $489,107 Superstructure $41,066 $41,066 Floor Construction Roof Construction $41,066 $41,066 Exterior Enclosure Exterior Walls Exterior Windows Exterior Doors Roofing $448,041 $448,041 Roof Coverings $448,041 $448,041 Roof Openings Interiors $314,605 $157,524 $108,241 $580,370 Interior Construction $108,241 $108,241 Partitions Interior Doors Fittings $108,241 $108,241 Stairs Stair Construction Interior Finishes $314,605 $157,524 $472,129 Wall Finishes $157,524 $157,524 Floor Finishes $314,605 $314,605 Ceiling Finishes Services $842,826 $251,141 $1,093,967 Conveying $44,426 $44,426 Elevators and Lifts $44,426 $44,426 Escalators and Moving Walks Other Conveying Systems Plumbing $80,102 $206,715 $286,817 Plumbing Fixtures $206,715 $206,715 Domestic Water Distribution $20,686 $20,686 Sanitary Waste $53,254 $53,254 Rain Water Drainage $6,162 $6,162 Other Plumbing Systems HVAC Energy Supply Heat Generating Systems Cooling Generating Systems Distribution Systems Terminal & Package Units Controls & Instrumentation Systems Testing & Balance Other HVAC Systems/Equip Fire Protection $136,436 $136,436 Sprinklers $127,194 $127,194 Standpipes $9,242 $9,242 Fire Protection Specialties Other Fire Protection Systems Electrical $626,288 $626,288 Electrical Service/Distribution $73,500 $73,500 Lighting and Branch Wiring $368,379 $368,379 Communications and Security $127,634 $127,634 Other Electrical Systems $56,775 $56,775 Equipment & Furnishings $26,847 $85,173 $112,020 Equipment $26,847 $26,847 Institutional Equipment Vehicular Equipment Other Equipment $26,847 $26,847 Furnishings $85,173 $85,173 Fixed Furnishings $85,173 $85,173 Special Construction Special Construction Special Structures Integrated Construction Special Construction Systems Special Facilities Generated: 11/17/ :35:12 AM FOR OFFICIAL USE ONLY Final 13

15 School Assessment Report - S. Atlanta Cluster, Humphries Elementary School, 1940_1967 Bldg 2030_2031_2040 Building Priority Deficiencies by Priority: 5 - Grandfathered Project triggered $136,437 (10.04%) 3 - Necessary (Years 2-5) $649,750 (47.82%) 4 - Recommended (Years 6-10) $572,594 (42.14%) 1940_1967 Bldg 2030_2031_2040 Condition Budget: $1,358,780 Generated: 11/17/ :35:12 AM FOR OFFICIAL USE ONLY Final 14

16 School Assessment Report - S. Atlanta Cluster, Humphries Elementary School, 1940_1967 Bldg 2030_2031_2040 Building Condition Deficiencies Current deficiencies included systems or components that have reached or exceeded their intrinsic useful life or components of the systems that are in need of repair. Systems that have reached the end their intrinsic useful life are identified as current deficiencies and assigned the distress 'Beyond Expected Life'. The following chart includes all current condition deficiencies associated with this facility. Rain Water Drainage $6,162 (.45%) Standpipes $9,242 (.68%) Domestic Water Distribution $20,686 (1.52%) Other Equipment $26,847 (1.98%) Roof Construction $41,066 (3.02%) Sanitary Waste $53,254 (3.92%) Other Electrical Systems $56,775 (4.18%) Electrical Service/Distrib $73,500 (5.41%) Roof Coverings $448,041 (32.97%) Sprinklers $127,194 (9.36%) Communications and Secu $127,634 (9.39%) Lighting and Branch Wiring $368,379 (27.11%) 1940_1967 Bldg 2030_2031_2040 Condition Budget: $1,358,780 Generated: 11/17/ :35:12 AM FOR OFFICIAL USE ONLY Final 15

17 School Assessment Report - S. Atlanta Cluster, Humphries Elementary School, 1940_1967 Bldg 2030_2031_2040 Building Condition Deficiencies Narrative System: B Roof Coverings Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in It has a 20-year service life which expired in Recomm.: The system should be replaced. Location: 1940_1967 Bldg 2030_2031_2040 Distress: Beyond Expected Life Category: Deferred Maintenance Priority: 3 - Necessary (Years 2-5) Condition Budget: $448,041 System: D Domestic Water Distribution Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in It has a 30-year service life which expired in Recomm.: The system should be replaced. Location: 1940_1967 Bldg 2030_2031_2040 Distress: Beyond Expected Life Category: Deferred Maintenance Priority: 4 - Recommended (Years 6-10) Condition Budget: $20,686 Generated: 11/17/ :35:12 AM FOR OFFICIAL USE ONLY Final 16

18 School Assessment Report - S. Atlanta Cluster, Humphries Elementary School, 1940_1967 Bldg 2030_2031_2040 System: D Sanitary Waste Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in It has a 30-year service life which expired in Recomm.: The system should be replaced. Location: 1940_1967 Bldg 2030_2031_2040 Distress: Beyond Expected Life Category: Deferred Maintenance Priority: 4 - Recommended (Years 6-10) Condition Budget: $53,254 System: D Rain Water Drainage Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in It has a 20-year service life which expired in Recomm.: The system should be replaced. Location: 1940_1967 Bldg 2030_2031_2040 Distress: Beyond Expected Life Category: Deferred Maintenance Priority: 3 - Necessary (Years 2-5) Notes: Limited portions of the facility have roof drains - and those that exist have outlived their serviceability. Condition Budget: $6,162 Generated: 11/17/ :35:12 AM FOR OFFICIAL USE ONLY Final 17

19 School Assessment Report - S. Atlanta Cluster, Humphries Elementary School, 1940_1967 Bldg 2030_2031_2040 System: D Sprinklers Analysis: The system is missing. Recomm.: The system should be installed. Location: 1940_1967 Bldg 2030_2031_2040 Distress: Missing Category: Code Compliance Priority: 5 - Grandfathered Project triggered Notes: Facility has no fire protection system. Install per owner standard. Condition Budget: $127,194 System: D Standpipes Analysis: The system is missing. Recomm.: The system should be installed. Location: 1940_1967 Bldg 2030_2031_2040 Distress: Missing Category: Code Compliance Priority: 5 - Grandfathered Project triggered Notes: Facility has no fire protection system. Install per owner standards. Condition Budget: $9,242 Generated: 11/17/ :35:12 AM FOR OFFICIAL USE ONLY Final 18

20 School Assessment Report - S. Atlanta Cluster, Humphries Elementary School, 1940_1967 Bldg 2030_2031_2040 System: D Electrical Service/Distribution Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in It has a 20-year service life which expired in Recomm.: The system should be replaced. Location: 1940_1967 Bldg 2030_2031_2040 Distress: Beyond Expected Life Category: Deferred Maintenance Priority: 4 - Recommended (Years 6-10) Condition Budget: $73,500 System: D Lighting and Branch Wiring Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in It has a 20-year service life which expired in Recomm.: The system should be replaced. Location: 1940_1967 Bldg 2030_2031_2040 Distress: Beyond Expected Life Category: Deferred Maintenance Priority: 4 - Recommended (Years 6-10) Condition Budget: $368,379 Generated: 11/17/ :35:12 AM FOR OFFICIAL USE ONLY Final 19

21 School Assessment Report - S. Atlanta Cluster, Humphries Elementary School, 1940_1967 Bldg 2030_2031_2040 System: D Communications and Security Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in It has a 15-year service life which expired in Recomm.: The system should be replaced. Location: 1940_1967 Bldg 2030_2031_2040 Distress: Beyond Expected Life Category: Deferred Maintenance Priority: 3 - Necessary (Years 2-5) Condition Budget: $127,634 System: D Other Electrical Systems Analysis: The system is missing. Recomm.: The system should be installed. Location: 1940_1967 Bldg 2030_2031_2040 Distress: Missing Category: Reliability Priority: 4 - Recommended (Years 6-10) Notes: No emergency generator, client standard required. Condition Budget: $56,775 Generated: 11/17/ :35:12 AM FOR OFFICIAL USE ONLY Final 20

22 School Assessment Report - S. Atlanta Cluster, Humphries Elementary School, 1940_1967 Bldg 2030_2031_2040 System: E Other Equipment Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in It has a 20-year service life which expired in Recomm.: The system should be replaced. Location: 1940_1967 Bldg 2030_2031_2040 Distress: Beyond Expected Life Category: Deferred Maintenance Priority: 3 - Necessary (Years 2-5) Notes: Kitchen equipment is aging and in need of replacement. Condition Budget: $26,847 Generated: 11/17/ :35:12 AM FOR OFFICIAL USE ONLY Final 21

23 School Assessment Report - S. Atlanta Cluster, Humphries Elementary School, 1994 Bldg 2032 Building Name: 1994 Bldg 2032 Year Built: 1993 Gross Area (SF): 5,970 Replacement Value: $1,125,076 Repair Cost: $397,546 Total FCI: 35.34% Total RSLI: 24% The superstructure of the various buildings are steel frame, load bearing CMU, and wood construction. Floor construction is slab on-grade and wood construction. Roof construction is metal pan deck with lightweight fill, steel framed and wood framed. The exterior enclosure is comprised of walls of brick veneer over CMU. Exterior windows are aluminum frame with operable panes. Exterior doors are hollow metal steel mostly with glazing. Roofing is low slope with built-up, and standing seam metal and fiberglass shingles.with no reported leaks. Generated: 11/17/ :35:12 AM FOR OFFICIAL USE ONLY Final 22

24 School Assessment Report - S. Atlanta Cluster, Humphries Elementary School, 1994 Bldg 2032 Building Condition Budget Summary Building condition is evaluated based on the constructed physical elements of a building and organized according to the UNIFORMAT II Elemental Classification. The grouping of these elements is used to construct a building cost model. Models are developed for similar building types and function. Systems are evaluated based on their costs, design life, installation date and predicted next renewal date. Systems that are within their design life are further evaluated to identify current deficient conditions which may have a significant impact on a system s or component's remaining service life. The system value is based on RS Means Commercial Cost Data. Following are the systems detail for this facility. Uniformat Classification RSLI SCI Condition Budget A10 Foundations 0% 0.00% $0 A20 Basement Construction 0% 0.00% $0 B10 Superstructure 0% 0.00% $0 B20 Exterior Enclosure 13% 0.00% $0 B30 Roofing 0% % $105,100 C10 Interior Construction 64% 0.00% $0 C30 Interior Finishes 46% 47.56% $71,455 D20 Plumbing 7% 81.94% $50,129 D30 HVAC 43% 0.00% $0 D40 Fire Protection 9% 95.37% $29,907 D50 Electrical 0% % $133,818 E10 Equipment 0% % $7,137 E20 Furnishings 50% 0.00% $0 Total: $397,546 Building Condition Budget Detail Uniformat System Description Unit Price Life Install Year Calc Next Renewal Replacement RSLI SCI Condition Budget A1010 Standard Foundations $ $48, % $0 A1020 Special Foundations $ $2, % $0 A1030 Slab on Grade $ $41, % $0 A2010 Basement Excavation $ $1, % $0 A2020 Basement Walls $ $15, % $0 B1020 Roof Construction $ $78, % $0 B2010 Exterior Walls $ $81, % $0 B2020 Exterior Windows $ $53,604 30% 0.00% $0 B2030 Exterior Doors $ $4,557 30% 0.00% $0 B3010 Roof Coverings $ $95,546 0% 110% $105,100 C1010 Partitions $ $34,990 79% 0.00% $0 C1020 Interior Doors $ $22,631 48% 0.00% $0 C1030 Fittings $ $17,224 50% 0.00% $0 C3010 Wall Finishes $ $29,815 50% 0.00% $0 C3020 Floor Finishes $ $64,959 0% 110% $71,455 C3030 Ceiling Finishes $ $55, % 0.00% $0 D2010 Plumbing Fixtures $ $42,868 0% 110% $47,155 D2020 Domestic Water Distribution $ $4,325 30% 0.00% $0 D2030 Sanitary Waste $ $11,277 30% 0.00% $0 D2040 Rain Water Drainage $ $2,703 0% 110% $2,974 D3020 Heat Generating Systems $ $24,794 0% 0.00% $0 D3030 Cooling Generating Systems $ $83,651 0% 0.00% $0 D3040 Distribution Systems $ $116, % 0.00% $0 D3060 Controls & Instrumentation $ $14, % 0.00% $0 D3070 Systems Testing & Balance $ $4, % 0.00% $0 D4010 Sprinklers $ $27,188 0% 110% $29,907 D4030 Fire Protection Specialties $ $695 80% 0.00% $0 Other Fire Protection D4090 Systems $ $3,476 67% 0.00% $0 Electrical D5010 Service/Distribution $ $15,680 0% 110% $17,248 D5020 Lighting and Branch Wiring $ $78,630 0% 110% $86,493 Communications and Security $ $27,343 0% 110% $30,077 D5030 E1020 Institutional Equipment $ $772 0% 110% $850 E1090 Other Equipment $ $5,716 0% 110% $6,287 E2010 Fixed Furnishings $ $13,362 50% 0.00% $0 Generated: 11/17/ :35:12 AM FOR OFFICIAL USE ONLY Final 23

25 School Assessment Report - S. Atlanta Cluster, Humphries Elementary School, 1994 Bldg 2032 Unit Install Calc Next Condition Uniformat System Description Price Life Year Renewal Replacement RSLI SCI Budget Total $ $1,125,076 31% 35.34% $397,546 Generated: 11/17/ :35:12 AM FOR OFFICIAL USE ONLY Final 24

26 School Assessment Report - S. Atlanta Cluster, Humphries Elementary School, 1994 Bldg 2032 Renewal Schedule Systems Current Total Total $397,546 $38,020 $105,870 $50,355 $591,791 Substructure Foundations Standard Foundations Special Foundations Slab on Grade Basement Construction Basement Excavation Basement Walls Shell $105,100 $83,477 $188,577 Superstructure Floor Construction Roof Construction Exterior Enclosure $83,477 $83,477 Exterior Walls Exterior Windows $76,936 $76,936 Exterior Doors $6,541 $6,541 Roofing $105,100 $105,100 Roof Coverings $105,100 $105,100 Roof Openings Interiors $71,455 $38,020 $25,463 $134,938 Interior Construction $25,463 $25,463 Partitions Interior Doors Fittings $25,463 $25,463 Stairs Stair Construction Interior Finishes $71,455 $38,020 $109,475 Wall Finishes $38,020 $38,020 Floor Finishes $71,455 $71,455 Ceiling Finishes Services $213,854 $22,393 $5,138 $241,385 Conveying Elevators and Lifts Escalators and Moving Walks Other Conveying Systems Plumbing $50,129 $22,393 $72,522 Plumbing Fixtures $47,155 $47,155 Domestic Water Distribution $6,208 $6,208 Sanitary Waste $16,185 $16,185 Rain Water Drainage $2,974 $2,974 Other Plumbing Systems HVAC Energy Supply Heat Generating Systems Cooling Generating Systems Distribution Systems Terminal & Package Units Controls & Instrumentation Systems Testing & Balance Other HVAC Systems/Equip Fire Protection $29,907 $5,138 $35,045 Sprinklers $29,907 $29,907 Standpipes Fire Protection Specialties Other Fire Protection Systems $5,138 $5,138 Electrical $133,818 $133,818 Electrical Service/Distribution $17,248 $17,248 Lighting and Branch Wiring $86,493 $86,493 Communications and Security $30,077 $30,077 Other Electrical Systems Equipment & Furnishings $7,137 $19,754 $26,891 Equipment $7,137 $7,137 Institutional Equipment $850 $850 Vehicular Equipment Other Equipment $6,287 $6,287 Furnishings $19,754 $19,754 Fixed Furnishings $19,754 $19,754 Special Construction Special Construction Special Structures Integrated Construction Special Construction Systems Special Facilities Generated: 11/17/ :35:13 AM FOR OFFICIAL USE ONLY Final 25

27 School Assessment Report - S. Atlanta Cluster, Humphries Elementary School, 1994 Bldg 2032 Building Priority Deficiencies by Priority: 5 - Grandfathered Project triggered $29,907 (7.52%) 3 - Necessary (Years 2-5) $367,639 (92.48%) 1994 Bldg 2032 Condition Budget: $397,546 Generated: 11/17/ :35:13 AM FOR OFFICIAL USE ONLY Final 26

28 School Assessment Report - S. Atlanta Cluster, Humphries Elementary School, 1994 Bldg 2032 Building Condition Deficiencies Current deficiencies included systems or components that have reached or exceeded their intrinsic useful life or components of the systems that are in need of repair. Systems that have reached the end their intrinsic useful life are identified as current deficiencies and assigned the distress 'Beyond Expected Life'. The following chart includes all current condition deficiencies associated with this facility. Institutional Equipment $850 (.21%) Rain Water Drainage $2,974 (.75%) Other Equipment $6,287 (1.58%) Electrical Service/Distribution $17,248 (4.34%) Sprinklers $29,907 (7.52%) Roof Coverings $105,100 (26.44%) Communications and Se $30,077 (7.57%) Plumbing Fixtures $47,155 (11.86%) Lighting and Branch Wiring $86,493 (21.76%) Floor Finishes $71,455 (17.97%) 1994 Bldg 2032 Condition Budget: $397,546 Generated: 11/17/ :35:13 AM FOR OFFICIAL USE ONLY Final 27

29 School Assessment Report - S. Atlanta Cluster, Humphries Elementary School, 1994 Bldg 2032 Building Condition Deficiencies Narrative System: B Roof Coverings Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in It has a 20-year service life which expired in Recomm.: The system should be replaced. Location: 1994 Bldg 2032 Distress: Beyond Expected Life Category: Deferred Maintenance Priority: 3 - Necessary (Years 2-5) Condition Budget: $105,100 System: C Floor Finishes Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in It has a 20-year service life which expired in Recomm.: The system should be replaced. Location: 1994 Bldg 2032 Distress: Beyond Expected Life Category: Deferred Maintenance Priority: 3 - Necessary (Years 2-5) Condition Budget: $71,455 Generated: 11/17/ :35:13 AM FOR OFFICIAL USE ONLY Final 28

30 School Assessment Report - S. Atlanta Cluster, Humphries Elementary School, 1994 Bldg 2032 System: D Plumbing Fixtures Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in It has a 20-year service life which expired in Recomm.: The system should be replaced. Location: 1994 Bldg 2032 Distress: Beyond Expected Life Category: Deferred Maintenance Priority: 3 - Necessary (Years 2-5) Condition Budget: $47,155 System: D Rain Water Drainage Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in It has a 20-year service life which expired in Recomm.: The system should be replaced. Location: 1994 Bldg 2032 Distress: Beyond Expected Life Category: Deferred Maintenance Priority: 3 - Necessary (Years 2-5) Condition Budget: $2,974 Generated: 11/17/ :35:13 AM FOR OFFICIAL USE ONLY Final 29

31 School Assessment Report - S. Atlanta Cluster, Humphries Elementary School, 1994 Bldg 2032 System: D Sprinklers Analysis: The system is missing. Recomm.: The system should be installed. Location: 1994 Bldg 2032 Distress: Missing Category: Code Compliance Priority: 5 - Grandfathered Project triggered Notes: Facility has no fire protection system. Install per owner standard. Condition Budget: $29,907 System: D Electrical Service/Distribution Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in It has a 20-year service life which expired in Recomm.: The system should be replaced. Location: 1994 Bldg 2032 Distress: Beyond Expected Life Category: Deferred Maintenance Priority: 3 - Necessary (Years 2-5) Condition Budget: $17,248 Generated: 11/17/ :35:13 AM FOR OFFICIAL USE ONLY Final 30

32 School Assessment Report - S. Atlanta Cluster, Humphries Elementary School, 1994 Bldg 2032 System: D Lighting and Branch Wiring Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in It has a 20-year service life which expired in Recomm.: The system should be replaced. Location: 1994 Bldg 2032 Distress: Beyond Expected Life Category: Deferred Maintenance Priority: 3 - Necessary (Years 2-5) Condition Budget: $86,493 System: D Communications and Security Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in It has a 15-year service life which expired in Recomm.: The system should be replaced. Location: 1994 Bldg 2032 Distress: Beyond Expected Life Category: Deferred Maintenance Priority: 3 - Necessary (Years 2-5) Condition Budget: $30,077 Generated: 11/17/ :35:13 AM FOR OFFICIAL USE ONLY Final 31

33 School Assessment Report - S. Atlanta Cluster, Humphries Elementary School, 1994 Bldg 2032 System: E Institutional Equipment Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in It has a 20-year service life which expired in Recomm.: The system should be replaced. Location: 1994 Bldg 2032 Distress: Beyond Expected Life Category: Deferred Maintenance Priority: 3 - Necessary (Years 2-5) Condition Budget: $850 System: E Other Equipment Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in It has a 20-year service life which expired in Recomm.: The system should be replaced. Location: 1994 Bldg 2032 Distress: Beyond Expected Life Category: Deferred Maintenance Priority: 3 - Necessary (Years 2-5) Condition Budget: $6,287 Generated: 11/17/ :35:13 AM FOR OFFICIAL USE ONLY Final 32

34 School Assessment Report - S. Atlanta Cluster, Humphries Elementary School, 1996 Bldg 2033_2050 Building Name: 1996 Bldg 2033_2050 Year Built: 1996 Gross Area (SF): 29,333 Replacement Value: $5,537,056 Repair Cost: $252,982 Total FCI: 4.57% Total RSLI: 32% The superstructure of the various buildings are steel frame, load bearing CMU, and wood construction. Floor construction is slab on-grade and wood construction. Roof construction is metal pan deck with lightweight fill, steel framed and wood framed. The exterior enclosure is comprised of walls of brick veneer over CMU. Exterior windows are aluminum frame with operable panes. Exterior doors are hollow metal steel mostly with glazing. Roofing is low slope with built-up, and standing seam metal and fiberglass shingles with no reported leaks. Generated: 11/17/ :35:13 AM FOR OFFICIAL USE ONLY Final 33

35 School Assessment Report - S. Atlanta Cluster, Humphries Elementary School, 1996 Bldg 2033_2050 Building Condition Budget Summary Building condition is evaluated based on the constructed physical elements of a building and organized according to the UNIFORMAT II Elemental Classification. The grouping of these elements is used to construct a building cost model. Models are developed for similar building types and function. Systems are evaluated based on their costs, design life, installation date and predicted next renewal date. Systems that are within their design life are further evaluated to identify current deficient conditions which may have a significant impact on a system s or component's remaining service life. The system value is based on RS Means Commercial Cost Data. Following are the systems detail for this facility. Uniformat Classification RSLI SCI Condition Budget A10 Foundations 0% 0.00% $0 A20 Basement Construction 0% 0.00% $0 B10 Superstructure 0% 0.00% $0 B20 Exterior Enclosure 16% 0.00% $0 B30 Roofing 6% 0.00% $0 C10 Interior Construction 66% 0.00% $0 C20 Stairs 0% 0.00% $0 C30 Interior Finishes 49% 0.00% $0 D10 Conveying 4% 0.00% $0 D20 Plumbing 12% 0.00% $0 D30 HVAC 79% 0.00% $0 D40 Fire Protection 1% 96.17% $130,665 D50 Electrical 3% 24.64% $122,316 E10 Equipment 5% 0.00% $0 E20 Furnishings 24% 0.00% $0 Total: $252,982 Building Condition Budget Detail Uniformat System Description Unit Price Life Install Year Calc Next Renewal Replacement RSLI SCI Condition Budget A1010 Standard Foundations $ $196, % $0 A1020 Special Foundations $ $9, % $0 A1030 Slab on Grade $ $170, % $0 A2010 Basement Excavation $ $6, % $0 A2020 Basement Walls $ $62, % $0 B1010 Floor Construction $ $453, % $0 B1020 Roof Construction $ $321, % $0 B2010 Exterior Walls $ $333, % $0 B2020 Exterior Windows $ $219,357 37% 0.00% $0 B2030 Exterior Doors $ $18,596 37% 0.00% $0 B3010 Roof Coverings $ $390,516 5% 0.00% $0 B3020 Roof Openings $ $13,283 37% 0.00% $0 C1010 Partitions $ $142,696 81% 0.00% $0 C1020 Interior Doors $ $92,221 53% 0.00% $0 C1030 Fittings $ $70,209 50% 0.00% $0 C2010 Stair Construction $ $70, % $0 C3010 Wall Finishes $ $121,823 50% 0.00% $0 C3020 Floor Finishes $ $265,278 5% 0.00% $0 C3030 Ceiling Finishes $ $226, % 0.00% $0 D1010 Elevators and Lifts $ $37,572 5% 0.00% $0 D2010 Plumbing Fixtures $ $174,954 5% 0.00% $0 D2020 Domestic Water Distribution $ $18,216 37% 0.00% $0 D2030 Sanitary Waste $ $46,300 37% 0.00% $0 D2040 Rain Water Drainage $ $5,313 5% 0.00% $0 D3020 Heat Generating Systems $ $101,329 0% 0.00% $0 D3030 Cooling Generating Systems $ $171,539 0% 0.00% $0 D3040 Distribution Systems $ $262, % 0.00% $0 D3050 Terminal & Package Units $ $748, % 0.00% $0 D3060 Controls & Instrumentation $ $59, % 0.00% $0 D3070 Systems Testing & Balance $ $16, % 0.00% $0 D4010 Sprinklers $ $110,817 0% 110% $121,899 D4020 Standpipes $ $7,970 0% 110% $8,767 D4030 Fire Protection Specialties $ $2,657 80% 0.00% $0 D4090 Other Fire Protection Systems $ $14, % $0 Generated: 11/17/ :35:13 AM FOR OFFICIAL USE ONLY Final 34

36 School Assessment Report - S. Atlanta Cluster, Humphries Elementary School, 1996 Bldg 2033_2050 Unit Price Install Year Calc Next Renewal Replacement RSLI SCI Condition Budget Uniformat System Description Life Electrical D5010 Service/Distribution $ $64,137 5% 0.00% $0 D5020 Lighting and Branch Wiring $ $321,066 5% 0.00% $0 Communications and Security $ $111,197 0% 110% $122,316 D5030 E1090 Other Equipment $ $23,150 5% 0.00% $0 E2010 Fixed Furnishings $ $55,409 25% 0.00% $0 Total $ $5,537,056 45% 4.57% $252,982 Generated: 11/17/ :35:13 AM FOR OFFICIAL USE ONLY Final 35

37 School Assessment Report - S. Atlanta Cluster, Humphries Elementary School, 1996 Bldg 2033_2050 Renewal Schedule Systems Current Total Total $252,982 $1,452,492 $226,006 $103,791 $2,035,271 Substructure Foundations Standard Foundations Special Foundations Slab on Grade Basement Construction Basement Excavation Basement Walls Shell $442,455 $442,455 Superstructure Floor Construction Roof Construction Exterior Enclosure Exterior Walls Exterior Windows Exterior Doors Roofing $442,455 $442,455 Roof Coverings $442,455 $442,455 Roof Openings Interiors $300,560 $155,349 $103,791 $559,700 Interior Construction $103,791 $103,791 Partitions Interior Doors Fittings $103,791 $103,791 Stairs Stair Construction Interior Finishes $300,560 $155,349 $455,909 Wall Finishes $155,349 $155,349 Floor Finishes $300,560 $300,560 Ceiling Finishes Services $252,982 $683,248 $936,230 Conveying $42,569 $42,569 Elevators and Lifts $42,569 $42,569 Escalators and Moving Walks Other Conveying Systems Plumbing $204,243 $204,243 Plumbing Fixtures $198,223 $198,223 Domestic Water Distribution Sanitary Waste Rain Water Drainage $6,020 $6,020 Other Plumbing Systems HVAC Energy Supply Heat Generating Systems Cooling Generating Systems Distribution Systems Terminal & Package Units Controls & Instrumentation Systems Testing & Balance Other HVAC Systems/Equip Fire Protection $130,666 $130,666 Sprinklers $121,899 $121,899 Standpipes $8,767 $8,767 Fire Protection Specialties Other Fire Protection Systems Electrical $122,316 $436,436 $558,752 Electrical Service/Distribution $72,668 $72,668 Lighting and Branch Wiring $363,768 $363,768 Communications and Security $122,316 $122,316 Other Electrical Systems Equipment & Furnishings $26,229 $70,657 $96,886 Equipment $26,229 $26,229 Institutional Equipment Vehicular Equipment Other Equipment $26,229 $26,229 Furnishings $70,657 $70,657 Fixed Furnishings $70,657 $70,657 Special Construction Special Construction Special Structures Integrated Construction Special Construction Systems Special Facilities Generated: 11/17/ :35:13 AM FOR OFFICIAL USE ONLY Final 36

38 School Assessment Report - S. Atlanta Cluster, Humphries Elementary School, 1996 Bldg 2033_2050 Building Priority Deficiencies by Priority: 3 - Necessary (Years 2-5) $122,316 (48.35%) 5 - Grandfathered Project triggered $130,665 (51.65%) 1996 Bldg 2033_2050 Condition Budget: $252,982 Generated: 11/17/ :35:13 AM FOR OFFICIAL USE ONLY Final 37

39 School Assessment Report - S. Atlanta Cluster, Humphries Elementary School, 1996 Bldg 2033_2050 Building Condition Deficiencies Current deficiencies included systems or components that have reached or exceeded their intrinsic useful life or components of the systems that are in need of repair. Systems that have reached the end their intrinsic useful life are identified as current deficiencies and assigned the distress 'Beyond Expected Life'. The following chart includes all current condition deficiencies associated with this facility. Standpipes $8,767 (3.47%) (48.35%) Sprinklers $121,899 (48.18%) Communications an $122, Bldg 2033_2050 Condition Budget: $252,982 Generated: 11/17/ :35:14 AM FOR OFFICIAL USE ONLY Final 38

40 School Assessment Report - S. Atlanta Cluster, Humphries Elementary School, 1996 Bldg 2033_2050 Building Condition Deficiencies Narrative System: D Sprinklers Analysis: The system is missing. Recomm.: The system should be installed. Location: 1996 Bldg 2033_2050 Distress: Missing Category: Code Compliance Priority: 5 - Grandfathered Project triggered Notes: Facility has no fire protection system. Install per owner standard. Condition Budget: $121,899 System: D Standpipes Analysis: The system is missing. Recomm.: The system should be installed. Location: 1996 Bldg 2033_2050 Distress: Missing Category: Code Compliance Priority: 5 - Grandfathered Project triggered Notes: Facility has no fire protection system. Install per owner standard. Condition Budget: $8,767 Generated: 11/17/ :35:14 AM FOR OFFICIAL USE ONLY Final 39

41 School Assessment Report - S. Atlanta Cluster, Humphries Elementary School, 1996 Bldg 2033_2050 System: D Communications and Security Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in It has a 15-year service life which expired in Recomm.: The system should be replaced. Location: 1996 Bldg 2033_2050 Distress: Beyond Expected Life Category: Deferred Maintenance Priority: 3 - Necessary (Years 2-5) Condition Budget: $122,316 Generated: 11/17/ :35:14 AM FOR OFFICIAL USE ONLY Final 40

42 School Assessment Report - S. Atlanta Cluster, Humphries Elementary School, Site Sites Site Summary Condition Budget: $699,326 Site Acreage Total FCI: 39.68% Replacement Value: $1,762,557 Total RSLI: 26% Condition Score: Site: SITE NARRATIVE Humphries Elementary School was constructed in phases from 1940 through 1967 and additions to the main school building were constructed in 1993 and Campus site features include paved driveways and parking lots, pedestrian pavement, flag pole, landscaping, retaining walls, practice field and fencing. Site mechanical and electrical features include water, sewer, natural gas, and site lighting. This report contains condition and adequacy data collected during the2013 APS Facility Assessment. The detailed condition and deficiency statements are contained in this report for each building and site improvements on the campus. Generated: 11/17/ :35:14 AM FOR OFFICIAL USE ONLY Final 41

School Assessment Report

School Assessment Report School Assessment Report School: Sutton Middle School (Powers Ferry) Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:32:59 AM FOR OFFICIAL USE ONLY Final School

More information

School Assessment Report

School Assessment Report School Assessment Report School: KIPP Vision Report: Dec 15, 14 Condition Assessment: Suitability Assessment: Generated: 12/15/14 12:33:33 PM Final School Assessment Report - Charter Schools, KIPP Vision

More information

School Assessment Report

School Assessment Report School Assessment Report School: Morningside Elementary School Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:29:07 AM FOR OFFICIAL USE ONLY Final School Assessment

More information

School Assessment Report

School Assessment Report School Assessment Report School: Morningside Elementary School Report: Dec 15, 2014 Condition Assessment: Suitability Assessment: Generated: 12/15/2014 12:11:31 PM FOR OFFICIAL USE ONLY Final School Assessment

More information

School Assessment Report

School Assessment Report School Assessment Report School: Carver High School Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:37:23 AM FOR OFFICIAL USE ONLY Final School Assessment Report

More information

School Assessment Report

School Assessment Report School Assessment Report School: Cascade Elementary School Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:37:55 AM FOR OFFICIAL USE ONLY Final School Assessment

More information

DeKalb County School District/Stadiums Avondale Stadium Final School Assessment Report May 20, 2016

DeKalb County School District/Stadiums Avondale Stadium Final School Assessment Report May 20, 2016 DeKalb County School District/Stadiums Avondale Stadium Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition Summary

More information

The GLOBE Academy at Heritage School

The GLOBE Academy at Heritage School DeKalb County School District/Leased/Charter The GLOBE Academy at Heritage School Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary

More information

DeKalb County School District/Elementary Schools Clifton Elementary Final School Assessment Report May 19, 2016

DeKalb County School District/Elementary Schools Clifton Elementary Final School Assessment Report May 19, 2016 DeKalb County School District/Elementary Schools Clifton Elementary Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition

More information

Hatton Drive Warehouse

Hatton Drive Warehouse DeKalb County School District/Leased/Charter Hatton Drive Warehouse Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 3 School Condition

More information

Show how a KM database impacts: cost, time, and quality. Demonstrate how Parametric Design could be used to save time, money, and improve quality

Show how a KM database impacts: cost, time, and quality. Demonstrate how Parametric Design could be used to save time, money, and improve quality Executive Summary: Thesis Proposal Final Draft The following pages contain a final draft of the thesis proposal for the South Baltimore District Court House. The basic layout consists of focusing on Knowledge

More information

Former Truancy Center

Former Truancy Center DeKalb County School District/Vacant Former Truancy Center Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 3 School Condition Summary

More information

Appendix J - Custom Uniformat for EDU Migration

Appendix J - Custom Uniformat for EDU Migration Appendix J - Custom Uniformat for EDU Migration Nr. MTC Uniformat for VFA.facility Life (Years) Weight (1-100) Out of Scope Cost Y/N 1 A Substructure 150 N 2 A10 Foundations 150 N 3 A1010 Standard Foundations

More information

School Without Walls

School Without Walls INITIAL YEAR BUILT 1938 BUILDING AREA 59,400 SF CURRENT PROGRAM CAPACITY 304 ENROLLMENT 2008 276 WARD 1 PROPOSED PROGRAM CAPACITY 400 SCHOOL WITHOUT WALLS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

NALLE ELEMENTARY SCHOOL

NALLE ELEMENTARY SCHOOL INITIAL YEAR BUILT 1950 BUILDING AREA 83,900 SF CURRENT PROGRAM CAPACITY 460 ENROLLMENT 2008 372 WARD 7 PROPOSED PROGRAM CAPACITY 400 Site Plan NALLE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

Timberglen Recreation Center Summary

Timberglen Recreation Center Summary Timberglen Recreation Center Summary Address Building Purpose 3810 Timberglen Road Dallas, TX 75287 Recreation Center Original Year of Construction 2003 Building Area 15,000 SF Inspection Date August 2,

More information

SEATON ELEMENTARY SCHOOL

SEATON ELEMENTARY SCHOOL INITIAL YEAR BUILT 1969 BUILDING AREA 65,000 SF CURRENT PROGRAM CAPACITY 428 ENROLLMENT 2008 280 WARD 2 PROPOSED PROGRAM CAPACITY 325 Site Plan SEATON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

LEWIS ELEMENTARY SCHOOL

LEWIS ELEMENTARY SCHOOL INITIAL YEAR BUILT 1962 BUILDING AREA 49,500 SF CURRENT PROGRAM CAPACITY 550 ENROLLMENT 2008 288 WARD 1 PROPOSED PROGRAM CAPACITY 450 Site Plan LEWIS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

Lake Highlands North Recreation Center Summary

Lake Highlands North Recreation Center Summary Lake Highlands North Recreation Center Summary Address Building Purpose 9940 White Rock Trail Dallas, TX 75238 Recreation Center Original Year of Construction 1971 Building Area 33,036 SF Inspection Date

More information

MAURY ELEMENTARY SCHOOL

MAURY ELEMENTARY SCHOOL INITIAL YEAR BUILT 1886 BUILDING AREA 46,800 SF CURRENT PROGRAM CAPACITY 276 ENROLLMENT 2008 238 WARD 6 PROPOSED PROGRAM CAPACITY 325 Site Plan MAURY - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

RAYMOND EDUCATION CAMPUS

RAYMOND EDUCATION CAMPUS INITIAL YEAR BUILT 1924 BUILDING AREA 73,600 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 302 WARD 1 PROPOSED PROGRAM CAPACITY 600 Site Plan RAYMOND - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

DAVIS ELEMENTARY SCHOOL

DAVIS ELEMENTARY SCHOOL INITIAL YEAR BUILT 1943 BUILDING AREA 71,100 SF CURRENT PROGRAM CAPACITY 507 ENROLLMENT 2008 227 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan DAVIS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-

More information

NOYES EDUCATION CAMPUS

NOYES EDUCATION CAMPUS INITIAL YEAR BUILT 1930 BUILDING AREA 49,700 SF CURRENT PROGRAM CAPACITY 321 ENROLLMENT 2008 337 WARD 5 PROPOSED PROGRAM CAPACITY 450 Site Plan NOYES - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-8

More information

Facility Condition Assessment

Facility Condition Assessment Citywide Facility Condition Assessment Report of Facility Condition Assessment For 1601 Manhattan Beach Boulevard, Manhattan Beach, CA September 4, 2013 (Rev A) Provided By: Faithful+Gould, Inc. Provided

More information

STUART-HOBSON MIDDLE SCHOOL

STUART-HOBSON MIDDLE SCHOOL INITIAL YEAR BUILT 1927 BUILDING AREA 105,900 SF CURRENT PROGRAM CAPACITY 460 ENROLLMENT 2008 399 WARD 6 PROPOSED PROGRAM CAPACITY 450 Site Plan STUART-HOBSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

POWELL ELEMENTARY SCHOOL

POWELL ELEMENTARY SCHOOL INITIAL YEAR BUILT 1925 BUILDING AREA 38,500 SF CURRENT PROGRAM CAPACITY 304 ENROLLMENT 2008 319 WARD 4 PROPOSED PROGRAM CAPACITY 325 Site Plan POWELL - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-3

More information

SHEPHERD ELEMENTARY SCHOOL

SHEPHERD ELEMENTARY SCHOOL INITIAL YEAR BUILT 1932 BUILDING AREA 79,700 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 355 WARD 4 PROPOSED PROGRAM CAPACITY 400 Site Plan SHEPHERD - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

LASALLE - BACKUS EDUCATION CAMPUS

LASALLE - BACKUS EDUCATION CAMPUS INITIAL YEAR BUILT 1957 BUILDING AREA 63,000 SF CURRENT PROGRAM CAPACITY 406 ENROLLMENT 2008 349 WARD 4 PROPOSED PROGRAM CAPACITY 425 Site Plan LASALLE - BACKUS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

WATKINS ELEMENTARY SCHOOL

WATKINS ELEMENTARY SCHOOL INITIAL YEAR BUILT 1962 BUILDING AREA 69,300 SF CURRENT PROGRAM CAPACITY 578 ENROLLMENT 2008 550 WARD 6 PROPOSED PROGRAM CAPACITY 550 Site Plan WATKINS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Thurgood Marshall Recreation Center Summary

Thurgood Marshall Recreation Center Summary Thurgood Marshall Recreation Center Summary Address Building Purpose 5150 Mark Trail Way Dallas, TX 75232 Recreation Center Original Year of Construction 1970 Building Area 21,300 SF Inspection Date August

More information

WILKINSON ELEMENTARY SCHOOL

WILKINSON ELEMENTARY SCHOOL INITIAL YEAR BUILT 1976 BUILDING AREA 144,900 SF CURRENT PROGRAM CAPACITY 508 ENROLLMENT 2008 451 WARD 8 PROPOSED PROGRAM CAPACITY 600 Site Plan WILKINSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Facility Condition Assessment

Facility Condition Assessment Citywide Facility Condition Assessment Report of Facility Condition Assessment For City of Manhattan Beach 1600 Marine Avenue, Manhattan Beach, CA September 4, 2013 (Rev A) Provided By: Faithful+Gould,

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % 8/11/ Building Rating System Percent Site: 1.0 Total 0 163 82% Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 92 92% 2.3 Structural 0 91 91% 2.4 Building Envelope 0 84 84% 2. Interior

More information

K.B. Polk Recreation Center Summary

K.B. Polk Recreation Center Summary K.B. Polk Recreation Center Summary Address Building Purpose 6801 Roper Street Dallas, TX 75209 Recreation Center Original Year of Construction 1988 Building Area 14,305 SF Inspection Date July 20, 2016

More information

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN INITIAL YEAR BUILT 1935 BUILDING AREA 47,200 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 418 WARD 6 PROPOSED PROGRAM CAPACITY 450 Site Plan LOGAN - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION HS

More information

Harry Stone Recreation Center Summary

Harry Stone Recreation Center Summary Harry Stone Recreation Center Summary Address Building Purpose 2400 Millmar Drive Dallas, TX 75228 Recreation Center Original Year of Construction 1957 (Expansion 2013) Building Area 22,281 SF Inspection

More information

LECKIE ELEMENTARY SCHOOL

LECKIE ELEMENTARY SCHOOL INITIAL YEAR BUILT 1970 BUILDING AREA 65,000 SF CURRENT PROGRAM CAPACITY 471 ENROLLMENT 2008 321 WARD 8 PROPOSED PROGRAM CAPACITY 400 Site Plan LECKIE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

Facilities Feasibility Study Matthew A. Henson ES Condition Assessment

Facilities Feasibility Study Matthew A. Henson ES Condition Assessment Summary of Findings The Matthew A. Henson ES Facility located at 1600 N. Payson Street in Baltimore, Maryland, was built in 1964. It comprises 75,228 gross square feet. The total current deficiencies for

More information

PATTERSON ELEMENTARY SCHOOL

PATTERSON ELEMENTARY SCHOOL INITIAL YEAR BUILT 1945 BUILDING AREA 78,300 SF CURRENT PROGRAM CAPACITY 368 ENROLLMENT 2008 463 WARD 8 PROPOSED PROGRAM CAPACITY 500 Site Plan PATTERSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

SPACE TYPE: OUTSIDE PARKING (STRUCTURE) SPACE TYPE: OUTSIDE PARKING (STRUCTURE) Construction Criteria The unit costs for Outside Parking (Structure) space types are based on the construction quality and design features in the following table.

More information

Facilities Feasibility Study Frederick Douglass HS Condition Assessment

Facilities Feasibility Study Frederick Douglass HS Condition Assessment Summary of Findings The Frederick Douglass HS Facility located at 2301 Gwynns Falls Parkway in Baltimore, Maryland, was built in 1927. It comprises 194,249 gross square feet. The total current deficiencies

More information

Building Information Modeling (BIM) Execution Plan

Building Information Modeling (BIM) Execution Plan 10/19/2017 for [Stanford Project Name] [Stanford Project Number] Developed by [Primary A/E] TABLE OF CONTENTS USE OF THE BIM EXECUTION PLAN... 3 1. PROJECT INFORMATION... 3 2. PROJECT SCHEDULE AND MILESTONES...

More information

0B MAGNOLIA HALL. Scale: 1:110. Date: Feb Time: 7:40 pm. User: brady. 10 ft

0B MAGNOLIA HALL. Scale: 1:110. Date: Feb Time: 7:40 pm. User: brady. 10 ft 0B 2 m 1:110 7:40 pm. 01 5 m 1:230 7:38 pm. 02 5 m 1:230 7:38 pm. 03 5 m 1:230 7:45 pm. Facility Profile ( FP-1 ) City: State: Country: Address: Stories: Attic: Basement: Glassboro New Jersey United States

More information

BARNARD ELEMENTARY SCHOOL

BARNARD ELEMENTARY SCHOOL INITIAL YEAR BUILT 2002 BUILDING AREA 67,000 SF CURRENT PROGRAM CAPACITY 520 ENROLLMENT 2008 329 WARD 4 PROPOSED PROGRAM CAPACITY 450 Site Plan BARNARD - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Toronto Community Housing Executive Summary 2016/2017. BCA Report. Sample House High FCI

Toronto Community Housing Executive Summary 2016/2017. BCA Report. Sample House High FCI BCA Report Porfolio Development Size Construction TCHC - All Op Units Scattered Units (CHU 20),005 Sq.Ft. 925 Floor Above Grade 2 Divisional Units Page of 43 Description This dwelling unit is a detached

More information

Section I Lompoc Animal Services Executive Summary

Section I Lompoc Animal Services Executive Summary Section I Lompoc Animal Services Executive Summary In 2013-2014, the Consultant conducted initial facility condition assessment data collection at the County of Santa Barbara, with specific attention to

More information

Evansville Public Schools. Facility Assessment Report January 28, 2 , General Building Data

Evansville Public Schools. Facility Assessment Report January 28, 2 , General Building Data Evansville Public Schools Facility Assessment Report January 28, 2, 2013 SGN/Wendel Architects, Design Tree Engineering and R.A. Morton Construction Managers were retained by the Evansville Public School

More information

DENNIS TOWNSHIP FEASIBILITY STUDY

DENNIS TOWNSHIP FEASIBILITY STUDY DENNIS TOWNSHIP FEASIBILITY STUDY October 29, 2015 TABLE OF CONTENTS I. INTRODUCTION II. EXECUTIVE SUMMARY III. GENERAL FACILITY DATA A. Primary School B. Elementary / Middle School IV. FACILITIES ASSESSMENT

More information

Sub-Section A Lompoc County Offices Executive Summary

Sub-Section A Lompoc County Offices Executive Summary Facility Condition Assessment 2014 Sub-Section A Lompoc County Offices Executive Summary The Lompoc County Offices was assessed for deficiencies, and each building system and site was assigned a condition

More information

APPLICATION AND CERTIFICATE FOR PAYMENT

APPLICATION AND CERTIFICATE FOR PAYMENT AND CERTIFICATE FOR PAYMENT TO OWNER: MASTER TEMPLATE - SAVE PROJECT FILE 1 DATE: 10/5/2012 PERIOD TO: ARCHITECT: PROJECT NO: CONTRACTOR'S FOR PAYMENT Application is made for payment, as shown below, in

More information

MCER Study for Little Powder K-8

MCER Study for Little Powder K-8 MCER Study for Little Powder K-8 CCSD #1 Little Powder K-8 Weston, WY Wyoming School Facilities Department Cheyenne, WY TSP, Inc. Sheridan, WY May 16, 2016 Table of Contents Introduction 3 Goals and Objectives

More information

Health Life Safety Survey and Master Facilities Plan

Health Life Safety Survey and Master Facilities Plan Health Life Safety Survey and Master Facilities Plan Community Presentation Board Meeting June 22, 2015 June 22, 2014 Board Presentation Overview and Summary of the Health Life Safety Survey and Master

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % 8/11/ Building Rating System Percent Site: 1.0 Total 0 9 8 Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 82 82% 2.3 Structural 0 7 7% 2.4 Building Envelope 0 47 47% 2. Interior

More information

Section I Carpinteria Executive Summary

Section I Carpinteria Executive Summary Section I Carpinteria Executive Summary In 2013-2014, the Consultant conducted initial facility condition assessment data collection at the County of Santa Barbara, with specific attention to Carpinteria

More information

PLUMMER ELEMENTARY SCHOOL

PLUMMER ELEMENTARY SCHOOL INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

BALLOU SENIOR HIGH SCHOOL

BALLOU SENIOR HIGH SCHOOL INITIAL YEAR BUILT 1960 BUILDING AREA 271,300 SF CURRENT PROGRAM CAPACITY 1565 ENROLLMENT 2008 9-12 (1,252) STAY (753) WARD 8 PROPOSED PROGRAM CAPACITY 1200 Site Plan BALLOU - 1 PROPOSED PROGRAM PROFILE

More information

Overbrook Theater / Fruenthal Foundation Art Center. 1.0 Total Points % 2.1 Building Exterior Elements %

Overbrook Theater / Fruenthal Foundation Art Center. 1.0 Total Points % 2.1 Building Exterior Elements % 8/13/ Building Rating System Percent Site: 1.0 Total 0 9 8 Building: 2.1 Building Exterior Elements 0 64 64% 2.2 Accessibility 0 66 66% 2.3 Structural 0 77 77% 2.4 Building Envelope 0 4 4% 2. Interior

More information

National Property Inspections

National Property Inspections National Property Inspections Anywhere, USA (325) 382-8754 Property Location 9375 Burt Street Anywhere USA Prepared for John Investor Consultant Al Standard (325) 382-8754 Page 1 of 27 TABLE OF CONTENTS

More information

Section I Isla Vista Campus Executive Summary

Section I Isla Vista Campus Executive Summary Section I Isla Vista Campus Executive Summary In 2013-2014, the Consultant conducted initial facility condition assessment data collection at the County of Santa Barbara, with specific attention to the

More information

EASTERN HIGH SCHOOL. Site Plan East Capitol Street, N.E., Washington, DC INITIAL YEAR BUILT 1923

EASTERN HIGH SCHOOL. Site Plan East Capitol Street, N.E., Washington, DC INITIAL YEAR BUILT 1923 INITIAL YEAR BUILT 1923 BUILDING AREA 288,800 SF CURRENT PROGRAM CAPACITY 1,425 ENROLLMENT 2008 565 WARD 6 PROPOSED PROGRAM CAPACITY 1,100 Site Plan EASTERN - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Facilities Feasibility Study Laurence G. Paquin Building Condition Assessment

Facilities Feasibility Study Laurence G. Paquin Building Condition Assessment Summary of Findings The Laurence G. Paquin Building Facility located at 2200 SINCLAIR LANE in Baltimore, Maryland, was built in 1975. It comprises 65,666 gross square feet. The total current deficiencies

More information

G703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project

G703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project Billing Requirements G703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project Sitework / Paving Excavation and Grading Labor

More information

Hartsville Area Schools - Building Evaluations

Hartsville Area Schools - Building Evaluations Darlington County School District Darlington, South Carolina August 8, 2012 Hartsville Area Schools - Building Evaluations School Name: Principal: Grade Levels: Site Size: Student Population: Staff Size:

More information

Sub-Section A Santa Maria Metro Executive Summary

Sub-Section A Santa Maria Metro Executive Summary Sub-Section A Santa Maria Metro Executive Summary The Santa Maria Metro was assessed for deficiencies, and each building system and site was assigned a condition code that reflects the overall usability

More information

GARFIELD ELEMENTARY SCHOOL

GARFIELD ELEMENTARY SCHOOL INITIAL YEAR BUILT 1910 BUILDING AREA 58,908 SF CURRENT PROGRAM CAPACITY 446 ENROLLMENT 2008 278 WARD 8 PROPOSED PROGRAM CAPACITY 400 Site Plan GARFIELD - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Facility Condition Assessment

Facility Condition Assessment Citywide Facility Condition Assessment Report of Facility Condition Assessment For Hamilton and Pool Pump Building 203 El Bonito Drive, Novato, CA March 4, 2013 Provided By: Faithful+Gould, Inc. Provided

More information

Sub-Section A New Cuyama Executive Summary

Sub-Section A New Cuyama Executive Summary Sub-Section A New Cuyama Executive Summary The New Cuyama complex was assessed for deficiencies, and each building system and site was assigned a condition code that reflects the overall usability of the

More information

CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS

CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS (August 28, 2018) PIERCE HALL IMPROVEMENTS PROJECT NO. 950511-950532 UNIVERSITY OF CALIFORNIA, RIVERSIDE PREQUALIFICATION PROCESS ALL

More information

The Report: Priority 1 thru 5 $ 2,124,417 Lifecycle Years 1 thru 3 ½ $ 384,097 New Construction $ 2,451,568 Less Redlined Items $ 43,534

The Report: Priority 1 thru 5 $ 2,124,417 Lifecycle Years 1 thru 3 ½ $ 384,097 New Construction $ 2,451,568 Less Redlined Items $ 43,534 Building Condition Assessment Facilities Feasibility Study 106 - Sam Houston Elementary Educational Needs $ 2,451,568 Safety & Security Needs $ 588,049 Exterior Needs $ 622,503 Interior Needs $ 703,790

More information

Edmonton Public School District No. 7

Edmonton Public School District No. 7 EXECUTIVE SUMMARY 1. Overall Impressions The 1966 non-core school has actively pursued an ongoing maintenance and upgrade program to improve a number of past problem areas within the school. Extensive

More information

Beckley-Saner Recreation Center Summary

Beckley-Saner Recreation Center Summary Beckley-Saner Recreation Center Summary Address Building Purpose 114 West Hobson Avenue, Dallas, TX 75224 Recreation Center Original Year of Construction 1949 Building Area 34,510 SF Inspection Date July

More information

CEFPI Monthly Meeting

CEFPI Monthly Meeting CEFPI Monthly Meeting LISD School Construction Cost Information Background Information School Cost Information How Does LISD Compare? Other District Comparisons Background Information Cost Discussion Type

More information

Darlington Area Schools - Building Evaluations

Darlington Area Schools - Building Evaluations Darlington County School District Darlington, South Carolina August 2, 2012 Darlington Area Schools - Building Evaluations School Name: Cain Elementary School Observed By: Creed/Carter Principal: Grade

More information

Darlington Area Schools - Building Evaluations

Darlington Area Schools - Building Evaluations Darlington County School District Darlington, South Carolina August 2, 2012 Darlington Area Schools - Building Evaluations School Name: Brunson-Dargan Observed By: Creed/Carter Principal: Mrs. Ada O Sindab

More information

CENTENNIAL SCHOOL DISTRICT

CENTENNIAL SCHOOL DISTRICT CENTENNIAL SCHOOL DISTRICT Middle School Feasibility Study Project PLANNING STUDY PRESENTATION 24 May 2016 Middle School Master Planning Process 1. Familiarized team with existing middle schools and sites

More information

Property Condition Assessment

Property Condition Assessment Property Condition Assessment Pewaukee, WI 53072 Inspection Date: 1/6/15 Prepared For: Report Number: Prepared By: Shamrock Building Inspection Consultants LLC N29 W29951 Shel-Mar Dr. Pewaukee, WI 53072

More information

Hartsville Area Schools - Building Evaluations

Hartsville Area Schools - Building Evaluations Darlington County School District Darlington, South Carolina August 8, 2012 Hartsville Area Schools - Building Evaluations School Name: West Hartsville Elementary Observed By: Cannon/Carter Principal:

More information

ADDENDUM 2 - JULY 14, 2015

ADDENDUM 2 - JULY 14, 2015 7/9/2015 The Professional(s) of Record above has signed for the following specification sections: DIVISION 1 GENERAL REQUIREMENTS Section 01 10 00 Summary of Work Section 01 25 00 Substitution Procedures

More information

WALKER-JONES EDUCATION CAMPUS

WALKER-JONES EDUCATION CAMPUS INITIAL YEAR BUILT 2009 BUILDING AREA 123,750 SF CURRENT PROGRAM CAPACITY 509 ENROLLMENT 2008 189 WARD 6 PROPOSED PROGRAM CAPACITY 750 Site Plan WALKER-JONES - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

MANHATTAN COLLEGE STUDENT COMMONS

MANHATTAN COLLEGE STUDENT COMMONS MANHATTAN COLLEGE STUDENT COMMONS BUDGET CHECK USING GILBANE S COSTADVISOR MODEL OCTOBER 29, 2010 Introduction: Gilbane developed this CostAdvisor Model of the proposed new Manhattan College Student Commons

More information

TABLE OF CONTENTS Page

TABLE OF CONTENTS Page TABLE OF CONTENTS Page Executive Summary i Facility Profile and Summary 1 Section 1 Site Conditions 4 Section 2 Building Exterior 7 Section 3 Building Interior 11 Section 4 Mechanical Systems 14 Section

More information

CONSTRUCTION COST BREAKDOWN THIS IS FORM CCB

CONSTRUCTION COST BREAKDOWN THIS IS FORM CCB CONSTRUCTION COST BREAKDOWN Property Owner s Name or Borrowers Name Brief Description of Project John Homeowner Build single family residence Property Address Property City Property Zip Code 4625 Jillbarr

More information

Mills Elementary School Site Summary

Mills Elementary School Site Summary 1 Mills Elementary School Site Summary Address 6201 Davis Lane Austin, TX 78749 Number of Permanent Campus Facilities 1 Original Year of Construction 1998 Total Campus Building Area (combined) 81,368 SF

More information

AGILITAS Property Development

AGILITAS Property Development Hartmann Commons offered by For Infomation and Leasing Mr. Seth T. McDowell 1614 16th Avenue South Nashville, Tennessee 37212 Voice 615-327-8788 Fax 615-327-8789 Hartmann Commons Agilitas Property Development

More information

Seattle Public Schools Building Excellence IV Projects Under Construction

Seattle Public Schools Building Excellence IV Projects Under Construction Seattle Public Schools Building Excellence IV Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 13 Genesee

More information

Section I Santa Rosa Park Executive Summary

Section I Santa Rosa Park Executive Summary Facility Condition Assessment 2014 Section I Santa Rosa Park Executive Summary In 2013-2014, the Consultant conducted initial facility condition assessment data collection at the County of Santa Barbara,

More information

SUFFIELD PUBLIC SCHOOLS Suffield, Connecticut

SUFFIELD PUBLIC SCHOOLS Suffield, Connecticut SUFFIELD PUBLIC SCHOOLS Suffield, Connecticut DATE: January 30, 2018 TO: FROM: RE: Karen Berasi Bill Hoff Board Approval of Final Spaulding Roof Cost Estimates and Plans The Board of Education approved

More information

Tech Assignment 1 University Medical Center of Princeton. Plainsboro Road, Township of Plainsboro, New Jersey

Tech Assignment 1 University Medical Center of Princeton. Plainsboro Road, Township of Plainsboro, New Jersey Tech Assignment 1 University Medical Center of Princeton Plainsboro Road, Township of Plainsboro, New Jersey David Bodnar CM Chris Maget 10/5/2009 Table of Contents Executive Summary...3 Project Schedule

More information

< 15% 15 to 25% 25 to 45% 45 to 60% > 60% Buildings Minimal Current Capital Funding Required. Systems

< 15% 15 to 25% 25 to 45% 45 to 60% > 60% Buildings Minimal Current Capital Funding Required. Systems Facility Condition Assessment Summary Report This report provides a summary of the Facility Condition Index (FCI) value of a school facility and select major building systems. The FCI calculation represents

More information

Update on FCPS Construction/Renovation Projects. June 2016

Update on FCPS Construction/Renovation Projects. June 2016 Update on FCPS Construction/Renovation Projects Squires Elementary -- Renovation Architect: General Contractor: JRA Architects D.W. Wilburn, Inc. GC Contract Sum: $12,166,000 Total Project Cost: $15,207,000

More information

Belington Elementary School Grades PK 5

Belington Elementary School Grades PK 5 Barbour County Schools Comprehensive Educational Facilities Plan 2010-2020 Belington Elementary School Grades PK 5 Blackwood Associates, Inc. / MSES consultants, Inc. / Roy Blizzard and Associates Belington

More information

Section I Rocky Nook Park Executive Summary

Section I Rocky Nook Park Executive Summary Facility Condition Assessment 2014 Section I Rocky Nook Park Executive Summary In 2013-2014, the Consultant conducted initial facility condition assessment data collection at the County of Santa Barbara,

More information

Section I Jalama Beach Park Executive Summary

Section I Jalama Beach Park Executive Summary Section I Jalama Beach Park Executive Summary In 2013-2014, the Consultant conducted initial facility condition assessment data collection at the County of Santa Barbara, with specific attention to Jalama

More information

TEXAS A&M ENGINEERING

TEXAS A&M ENGINEERING TEXAS A&M ENGINEERING 312 Jack K. Williams Administration Building I 3126 TAMU I College Station, Texas 77843-3126 M. Katherine Banks, Ph.D., P.E. Vice Chancellor and Dean of Engineering Director, Texas

More information

Invitation to Bid. RLS Construction Group requests your firm to submit a quotation on the following project:

Invitation to Bid. RLS Construction Group requests your firm to submit a quotation on the following project: RLS CONSTRUCTION GROUP Phone: 717-502-6680 Fax: 717-502-6681 www.rlscg.com Invitation to Bid RLS Construction Group requests your firm to submit a quotation on the following project: Project: Location:

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % BartelsRode Gymnasium 8/11/ Building Rating System Percent Site: 1.0 Total 0 13 77% Building: 2.1 Building Exterior Elements 0 8 8% 2.2 Accessibility 0 74 74% 2.3 Structural 0 76 76% 2.4 Building Envelope

More information

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION PROPOSED MAIN ENTRY - EXTERIOR RENDERING

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION PROPOSED MAIN ENTRY - EXTERIOR RENDERING PROPOSED MAIN ENTRY - EXTERIOR RENDERING EXISTING SITE AERIAL PHOTOGRAPH 6TH STREET NW PEDESTRIAN ACCESS School access to existing alley leads students through vehicular path CHAIN LINK ENCLOSED PARKING

More information

Hartsville Area Schools - Building Evaluations

Hartsville Area Schools - Building Evaluations Darlington County School District Darlington, South Carolina August 8, 2012 Hartsville Area Schools - Building Evaluations School Name: Southside Early Childhood Observed By: Cannon/Carter Principal: Grade

More information

Technical Assignment 1

Technical Assignment 1 Westinghouse Electric Company Nuclear Power Engineering Campus Technical Assignment 1 Construction Project Management Mark Speicher Advisor: Dr. David Riley October 5 th, 2009 09 TABLE OF CONTENTS EXECUTIVE

More information

Building Assessment Report

Building Assessment Report Building Assessment Report Building: HH.5 Main Report: Apr 25, 23 Building Assessment Report - HH.5 Main Table of Contents HH.5 Main Executive Summary Photo Album 5 System Listing 6 Renewal Schedule 7

More information