ANSWERS TO QUESTIONS RECEIVED THROUGH 1:00 PM ON MAY 24, 2018:

Similar documents
DECEMBER 5, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $5,000,000) Bids

FEBRUARY 13, 2019 AT 2:00 P.M. (EASTERN) (Estimated Cost: $9,000,000.00) Bids. Kokosing Construction Company, Inc. $8,623,609.96

General Info Number: PROJECT NO Description: REPAIRS AND RESURFACING INTERCHANGE 209 MILEPOST TRUMBULL COUNTY, OHIO

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25

Bids JANUARY 10, 2019 AT 2:00 P.M. (EASTERN) (Estimated Cost: $29,000,000.00) Miller Bros. Const., Inc. $27,699,031.59

ANSWERS TO QUESTIONS RECEIVED THROUGH 12:00 PM ON MAY 15, 2018:


OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION ADDENDUM NO. 1 PROJECT NO ANSWERS TO QUESTIONS RECEIVED THROUGH 12:00 PM ON DECEMBER 29, 2015

ADDENDUM #1 ISSUE DATE: WEDNESDAY, MARCH 16, 2016 BID DATE: TUESDAY, MARCH 22, 2016 AT 12:00 PM (NOON)

Franklin County Engineer's Office - Highway Design FRA-Hamilton Road Bid Tabulation

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000)

PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING. December 14, 2018

General Info. Number: PROJECT NO

Maine Turnpike Authority

ANSWERS TO QUESTIONS RECEIVED THROUGH 11:00 A.M. ON JANUARY 4, 2019:

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT Pavement Rehabilitation Clear Zone Improvements MM 64.4 to MM 68.5

PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING. March 9, 2018

QUESTIONS AND ANSWERS THROUGH 10:00 PM DECEMBER 15, 2015

Maine Turnpike Authority

PROPOSAL KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS COUNTY ROAD PROJECT NO NW Golf Club Hill Road Culvert Replacement To the Honorable Board of Co

CITY OF ALBANY Public Works Department ADDENDUM #1 ST , MAIN STREET REHABILITATION

OKLAHOMA TURNPIKE AUTHORITY JUNE 7, 2018 SCHEDULE OF BID ITEMS EOC JP 26422(10) INTERCHANGE AT I-40

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION

PAY QUANTITY NOTES INCLUDES CU. YDS. FOR DRIVEWAYS, RETURNS, DIKES, AND MISCELLANEOUS EARTHWORK WHERE NO QUANTITY IS SHOWN ON P & P SHEETS.

Maine Turnpike Authority

Maine Turnpike Authority

TABULATION OF BIDS DODGE CITY REGIONAL AIRPORT DODGE CITY, KANSAS RECONSTRUCT RUNWAY 14-32: SUMMARY PROJECT NO.: AIP

PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING. October 19, 2017

DOCUMENT ADDENDA AND MODIFICATIONS

MAINE DEPARTMENT OF TRANSPORTATION BID DATE OF OPENING : CALL ORDER : CONTRACT ID : PROJECTS STP-1277(700)S

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

OHIO DEPARTMENT OF TRANSPORTATION JERRY WRAY, DIRECTOR DATE : 02/14/97 PAGE : TABULATION OF BIDS

BID TABULATION ( BIDS OPENED MONDAY, APRIL 24, 1:00 P.M. ) CONSTRUCT PARALLEL TAXIWAY - PHASE 3 HABERSHAM COUNTY AIRPORT, CORNELIA, GEORGIA

PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING. April 21, 2016

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director

NOTICE TO BIDDERS ADDENDUM NO. 3. Dated: March 25, 2019 SAP

PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING. April 9, 2015

ODOT District Pavement General Notes P401: ITEM PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN

MAY 11, 2017 T-MC-107A & T-MC-107B1

Acknowledgment: Each bidder shall indicate in the place provided for the same on the Proposal Form his acknowledgment of receipt of this Addendum.

Ohio Department of Transportation

Division IV Section 4100 Measurement and Payment PUBLIC WORKS DEPARTMENT

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 04/03/17 Comp. Dt: 10/06/17


MERCED COUNTY CAMPUS PARKWAY SEGMENT 2

ADDENDUM #1 Village of Hawthorn Woods Darlington Drive Culvert Replacement Date: January 29, 2018

ITEM QUANTITY UNITS UNIT PRICE AMOUNT. Contractor Construction Staking 1.0 Lump Sum

YES, we received Addendum No. 1

04/19/2010 NEW YORK STATE DEPARTMENT OF TRANSPORTATION PAGE 1 DIVISION OF CONSTRUCTION CONSTRUCTION CONTRACT ESTIMATE (CONR20)

ODOT District Bridge General Notes B405: OBJECT MARKERS AND STRUCTURE/CULVERT IDENTIFICATION SIGNS

Proposer shall make note of and/or incorporate all changes listed below into the requested

ADDENDUM NO. ONE REHABILITATION OF TAXIWAY G AND RECONSTRUCTION OF TAXIWAY D FOR THE TRENTON-MERCER AIRPORT AB

STEUBEN COUNTY DEPARTMENT OF PUBLIC WORKS. 3 East Pulteney Square Bath, New York 14810

ODOT District Roadway General Notes R401: LINEAR GRADING R402: ITEM RESHAPING UNDER GUARDRAIL R403: CURB RAMPS / DETECTABLE WARNINGS

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director

Contractor Construction Staking 1.0 Lump Sum. Granular Backfill (Wingwalls) (Set Price) 1.0 Cu.Yds $50.00 $ Mobilization 1.

Lump Sum L.S. (15") EA

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT

Project # Brown County PCN i40h Replace Section Line Road Culvert

Ohio Department of Transportation - Prebid Questions

Electrical Work. NOV Embankments Over Swamps and Compressible Soils

Mainelli Wagner & Associates, Inc.

Company Page 1 of 13

Please note the requirement for alternate bids as described in Section 3 of the Instructions to Bidders portion of the contract specifications.


KANSAS TURNPIKE AUTHORITY KTA CONTRACT NO Mill and Superpave overlay I-35 (KTA) from MM 13 to MM 26.8 ADDENDUM NO. 1

ODOT Design & Construction Requirements for MSE Walls

Kansas Department of Transportation DISTRICT 1. Project(s): 089 U / HSIP-U231(701) Min: Max:

Whatcom County Bid ADDENDUM NO. 2 West Badger Road / Bertrand Creek Bridge #50 Replacement CRP Federal Aid BRS-2037(107)

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO COLORADO CENTER BICYCLE/PEDESTRIAN BRIDGE OVER I-25

February Page 1

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2017-Tender Capital Works

New Jersey Department of Transportation DATE : 05/17/12 PAGE : TABULATION OF BIDS

Appendix B Sample Plan Notes

Request for Proposal (RFP) Bid No: VJ Addendum No. 2

SUBJECT: ADDENDUM #1 IFB # Taxiway A Rehabilitation - Bid Package 1 at Myrtle Beach International Airport (MYR) NOTICE of REVISIONS:

14 ITEM GRANULAR EMBANKMENT, A C 7 ITEM 659-6" TOPSOIL 13 NORMAL SECTION 1 (TYP) 1 (TYP) VARIES

PLAN PREPARATION GUIDE CHAPTER 3 QUANTITY COMPUTATIONS AND INFORMATION

:00 PM CST. McDonald Construction Inc of Slidell $1,002, Magee Excavation & Development LLC $1,

SECTION PAYMENT PROCEDURES

BID FORM. TxDOT CSJ No. 1507JNCTN. Project Description: T-Hangar Development Project. Bid by: Name of Bidder. Address: Address:

ADDENDUM NO. 1. 1:30 PM, Thursday, September 14, 2017 (Not Changed)

SECTION BID FORM. Garfield Street Drainage Improvements

Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # PROJECT SPECIFICATIONS TABLE OF CONTENTS

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director

New Jersey Department of Transportation DATE : 10/21/10 PAGE : TABULATION OF BIDS

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0

CONTRACT ID : COMPLETION DATE : 09/15/08 =========

SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work

Ohio Department of Transportation - Prebid Questions

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum

New Jersey Department of Transportation DATE : 04/10/12 PAGE : TABULATION OF BIDS

ADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013

SPECIAL NOTES FOR CONTRACT. Bidding Requirements and Conditions. Specifications Governing this Project

BID TAB CONTRACTOR GRAND TOTAL ENGINEER ESTIMATE $ 2,119, CIVIL CONSTRUCTION, LOW BIDDER $ 2,059,244.21

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

CITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION Edition

Acknowledgment: Each bidder shall indicate in the place provided for the same on the Proposal Form his acknowledgment of receipt of this Addendum.

Transcription:

ADDENDUM NO. 3 PROJECT NO. 43805 (PART A & B) PAGE 2 ANSWERS TO QUESTIONS RECEIVED THROUGH :00 PM ON MAY 24, 208: Q#32 Addendum # answered Question #7 indicating that an average depth of 3 feet for the length of the culvert was used to quantify the excavation quantities; however, it is believed that some of this excavation is quantified in bid item #32 Excavation. Cross Sections have been run through the bike path and the culvert quantifying the Cubic Yards of Excavation to the bottom of concrete for the bike path structure. Please clarify whether the Excavation will be paid under Bid Item #32 Excavation or Bid Item #98 Unclassified Excavation. Also, please adjust quantities as required. A#32 The Bid Item #98 unclassified excavation quantity has been revised to 342 CU. YD. to account for the excavation paid for by Bid Item #32 Excavation. General Summary Plan Sheet 3 of 57, Structure Estimated Quantities Plan Sheet 43 of 57 and the Bid Schedule of Items have been revised through this Addendum 3. Q#33 Addendum # answered Question #9 regarding Work Zone Pavement Markings and the last sentence of the answer states that Part B is done separately, as indicated. However, Part B does not have any bid items set up for Work Zone Pavement Markings and no notes indicating where the Work Zone Pavement Markings is to be paid. Please clarify. A#33 Please see the MAINTAINING TRAFFIC note on Plan Sheet 6 of 57, Section VI. PAYMENT stating that Payment for Maintenance of Traffic Items, unless specified separately, shall be paid for under the lump sum bid for Item 64 Maintaining Traffic, which shall include all labor, equipment, materials, and incidentals required to complete the work as detailed in the plan. Q#34 Bid Item #22 MicroSilica Modified Concrete Overlay (Variable Thickness), Material Only is set up on the bid sheet to be paid by the Square Yard; however, Supplemental Specification 848 states that this item will be paid by the Cubic Yard. Please change the bid sheet to pay for this item by the Cubic Yard. A#34 The correct unit for Item #22 MicroSilica Modified Concrete Overlay (Variable Thickness), Material Only is CU. YD. The Bid Schedule of Items has been revised through this Addendum 3. Q#35 The existing/asbuilt construction drawings for the Turnpike Bridges over the Mill Creek Bikeway M.P. 223.0 still have not been posted online. Please post these drawings. A#35 The existing/asbuilt construction drawings for the Turnpike Bridges over the Mill Creek Bikeway M.P. 223.0 are provided with this Addendum 3 in accordance with IB 2..4. Q#36 In Addendum #, answer to Question #9 states to access the project along the northeastern side of the Ohio Turnpike RightofWay and that the contractor must take every precaution and care to prevent any interference or damage to the CenturyLink s fiber optic cable. Does

ADDENDUM NO. 3 PROJECT NO. 43805 (PART A & B) PAGE 3 the Ohio Turnpike or Century Link have any information on the depth of the fiber optic cable between Kirk Rd and the Mill Creek Bikepath? Are there any asbuilt drawings on this cable that could be posted online? A#36 The AsBuilt drawing for the CenturyLink fiber optic cable is provided For Information Only through this Addendum 3 in accordance with IB 2..4. Bidders are directed to Special Provision SP7 for additional details and provisions regarding CenturyLink s fiber optic cable. Q#37 Would the Turnpike allow Project laydown and field office trailer at Salt Dome MP 29.0 EB? A#37 The existing paved area near the salt dome at Eastbound MP 29 may be used for field office trailer location. The existing laydown area at the Westbound MP 29 area may be used for equipment and material storage during the project. The Contractor must restore the property to its condition immediately preceding its use, as approved by the Chief Engineer. Q#38 Is precast coping allowed on top of the MSE wall? A#38 As provided in ODOT Supplemental Specification 840.06.K, precast coping is not permitted on the MSE wall. Receipt of Addendum No. 3 Project No. 43805 (PART A & B) is hereby acknowledged: (Firm Name) (Signature) (Printed Name) (Date) BIDDERS MUST RETURN THE ABOVE ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM NO. 3 WITH THEIR BID.

OTNP223_GS.dwg; 5/23/8 3:09pm 20 LUMP LUMP SUM CLEARING AND GRUBBING 202 636 SY PAVEMENT REMOVED 202,05 FOOT GUARDRAIL REMOVED 202 8 EACH BRIDGE TERMINAL ASSEMBLY REMOVED 202 2 EACH CATCH BASIN OR INLET REMOVED 202 504 FOOT FENCE REMOVED 203,923 CY EXCAVATION 203 7,332 CY EMBANKMENT 204 4,85 SY SUBGRADE COMPACTION ROADWAY REFERENCE NO. 204 00 CY EXCAVATION OF SUBGRADE 204 00 CY EMBANKMENT 304,38 CY AGGREGATE BASE 606,35 FOOT GUARDRAIL, TYPE MGS, WITH LONG STEEL POSTS 606 2 EACH ANCHOR ASSEMBLY, TYPE E 607 566 FOOT FENCE, TYPE 47, AS PER PLAN 5 609 790 FOOT ASPHALT CONCRETE CURB, TYPE 607 95 FOOT FENCE REMOVED AND REBUILT 630 2 EACH REMOVAL OF GROUND MOUNTED SIGN AND REERECTION EROSION CONTROL SP 3 LUMP LUMP SUM SWPPP MANAGEMENT 659 4 EACH SOIL ANALYSIS TEST 659,372 CY TOPSOIL 659 3,927 SY SEEDING AND MULCHING 659 96 SY REPAIR SEEDING AND MULCHING 659 96 SY INTERSEEDING 659.0 TON COMMERCIAL FERTILIZER 659.0 ACRE LIME 659 M GAL WATER 832 383 SY DITCH EROSION CONTROL PROTECTION, TYPE A 832 30,000 EACH EROSION CONTROL DRAINAGE SP 605,580 FOOT 6" SHALLOW PIPE UNDERDRAINS WITH FABRIC WRAP (D=30") SP 605 790 FOOT 6" BASE PIPE UNDERDRAINS WITH FABRIC WRAP (D=8") 6 00 FOOT 6" CONDUIT, TYPE F, 707.33 6 EACH CATCH BASIN ADJUST TO GRADE 6 2 EACH CATCH BASIN RECONSTRUCTED TO GRADE, AS PER PLAN 5 6 4 EACH PRECAST REINFORCED CONCRETE OUTLET 6 EACH INLET RECONSTRUCTED TO GRADE 204 3 HOUR PROOF ROLLING SP 302,388 CY ASPHALT CONCRETE BASE, PG 6422 PAVEMENT SP 304,48 CY AGGREGATE BASE SP 402 245 CY ASPHALT CONCRETE INTERMEDIATE COURSE, PG 7022 (FR) SP 404 75 CY ASPHALT CONCRETE SURFACE COURSE, USING CRUSHED SLAG, PG 7022 (FR) 407 582 GALLON NONTRACKING TACK COAT 62 0 EACH RAISED PAVEMENT MARKER REMOVED SP 62 0 EACH RAISED PAVEMENT MARKER (WHITE) SP 626 7 EACH BARRIER REFLECTOR 642 7.46 MILE EDGE LINE, 6" 642 3.73 MILE LANE LINE, 6" SPECIAL 7.46 MILE SONIC NAP ALERT PATTERN (SNAP) TRAFFIC CONTROL MAINTENANCE OF TRAFFIC REFERENCE NO. 64 LUMP LUMP SUM MAINTAINING TRAFFIC, MISC.: MILL CREEK BIKEWAY DETOUR 7 64 2 EACH WORK ZONE IMPACT ATTENUATOR FOR 24" WIDE HAZARDS (BIDIRECTIONAL) 64 2 EACH WORK ZONE CROSSOVER LIGHTING SYSTEM 64 480 DAY PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN 6 SP 404 20 CU YD ASPHALT CONCRETE FOR MAINTAINING TRAFFIC ON CROSSOVERS, PG 6422 64 5 EACH REPLACEMENT SIGN SP 64 8,640 HOUR ZONE PERSON SP 64C 6.00 MILE REMOVAL OF PAVEMENT MARKING SP 622 LUMP LUMP SUM 32" TEMPORARY PORTABLE BARRIER (WITHOUT GLARE SCREEN) SP 622 LUMP LUMP SUM 32" TEMPORARY PORTABLE BARRIER (WITH GLARE SCREEN) SP 626A 3,940 EACH CONSTRUCTION ZONE MARKER, ONEWAY MODEL, WHITE SP 626A 3,940 EACH CONSTRUCTION ZONE MARKER, ONEWAY MODEL, YELLOW 630 6 EACH SIGNING MISC.: ADDITIONAL SIGNS, GROUND MOUNTED, AS DIRECTED BY THE ENGINEER SPECIAL 38,080 FOOT "SNAP" MILL AND FILL SPECIAL LUMP LUMP SUM EXISTING CROSSOVER TO BE CLOSED/REOPENED 606 EACH ANCHOR ASSEMBLY, TYPE T LIGHTING 625 800 FOOT NO. 8 AWG CABLE 625 450 FOOT CONDUIT, ", 725.04 625 350 FOOT CONDUIT, ", 725.05 625 2 EACH LUMINAIRE, MISC.: BIKEWAY CULVERT LIGHTING 625 450 FOOT TRENCH, 24" DEEP 625 EACH PULLBOX, 725.08 625 2 EACH JUNCTION BOX 625 LUMP POWER SERVICE, AS PER PLAN, PS 36 625 LUMP POWER SERVICE, AS PER PLAN, PS2 36 SP 64 LUMP LUMP SUM MAINTAINING TRAFFIC SP 69 LUMP LUMP SUM FIELD OFFICE SP 623 LUMP LUMP SUM CONSTRUCTION LAYOUT SURVEY 624 LUMP LUMP SUM MOBILIZATION GENERAL STRUCTURES SP 202 LUMP LUMP SUM PORTIONS OF STRUCTURE REMOVED SP 202 2 343 SY APPROACH SLAB REMOVED 503 342 CY UNCLASSIFIED EXCAVATION, AS PER PLAN 47 SP 509 205,8 POUND EPOXY COATED REINFORCING STEEL 5,263 CY CLASS QC CONCRETE 5 EACH CONCRETE, MISC.: MOCKUP PANEL 5 864 SF CONCRETE, MISC.: FORMLINER 52,005 SY SEALING OF CONCRETE SURFACES, AS PER PLAN (PERMANENT GRAFFITI PROTECTION) 47 52 2,06 SY TYPE 2 WATERPROOFING 52,005 SY SEALING, MISC.: STAINING OF CONCRETE SURFACES 56 70 SF " PREFORMED EXPANSION JOINT FILLER 58,027 CY POROUS BACKFILL WITH FILTER FABRIC 58 584 FOOT 6" PERFORATED CORRUGATED PLASTIC PIPE 58 8 FOOT 6" NONPERFORATED CORRUGATED PLASTIC PIPE, INCLUDING SPECIALS SP 527 LUMP LUMP SUM FALSEWORK, TEMPORARY BRACING AND PROTECTIVE STRUCTURES DESIGN AGENCY NO. REVISIONS BY DATE CHECKED DESIGNED ADDENDUM # VDT 5/5/8 CNB AAF 43805B PROJECT SP 536,005 SY CONCRETE WEATHERPROOFING 2 ADDENDUM #3 VDT 5/23/8 6 26 FOOT CONDUIT, TYPE A, PRECAST REINFORCED ARCH SECTIONS, AS PER PLAN (20'SPAN X 0' RISE) 840 6,57 SF MECHANICALLY STABILIZED EARTH WALL 840 2,89 CY WALL EXCAVATION 840 690 SY FOUNDATION PREPARATION 840 4,37 CY SELECT GRANULAR BACKFILL 840 704 FOOT 6" DRAINAGE PIPE, PERFORATED CORRUGATED PLASTIC PIPE 840 8 FOOT 6" DRAINAGE PIPE, NONPERFORATED CORRUGATED PLASTIC PIPE 840 38 FOOT CONCRETE COPING 840 4 DAYS ONSITE ASSISTANCE 840 5,830 SF AESTHETIC SURFACE TREATMENT 840 LUMP LUMP SUM SGB INSPECTION AND COMPACTION TESTING IN CHARGE DRAWN 3 57 DBM CNB 4/27/8 DATE: OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION

04_OTMP223_EQ.dwg; 5/23/8 3:pm DESIGN AGENCY NO. REVISIONS BY DATE CHECKED DESIGNED PROJECT ESTIMATED QUANTITIES MP 223.0 SP 202 LUMP LUMP SUM PORTIONS OF STRUCTURE REMOVED LUMP SP 202 343 SQ. YD. APPROACH SLAB REMOVED 343 CULVERT MSE WINGWALL # MSE WINGWALL# 2 MSE WINGWALL #3 MSE WINGWALL #4 REFERENCE SHEET 503 342 2 CU. YD. UNCLASSIFIED EXCAVATION, AS PER PLAN 342 2 8 SP 509 205,8 POUND EPOXY COATED REINFORCING STEEL 205,8 5,263 CU. YD. CLASS QC CONCRETE,263 5 EACH CONCRETE, MISC.: MOCKUP PANEL 5 864 SQ. FT. CONCRETE, MISC.: FORMLINER 864 52,005 SQ. YD. SEALING OF CONCRETE SURFACES, AS PER PLAN (PERMANENT GRAFFITI PROTECTION) 73 263 2 295 62 8 52 2,06 SQ. YD. TYPE 2 WATERPROOFING 2,06 52,005 SQ. YD. SEALING, MISC.: STAINING OF CONCRETE SURFACES 73 263 2 295 62 56 70 SQ. FT. " PREFORMED EXPANSION JOINT FILLER 70 58,027 CU. YD. POROUS BACKFILL WITH FILTER FABRIC,027 58 584 FOOT 6" PERFORATED CORRUGATED PLASTIC PIPE 584 58 8 FOOT 6" NONPERFORATED CORRUGATED PLASTIC PIPE, INCLUDING SPECIALS 8 SP 527 LUMP LUMP SUM FALSEWORK, TEMPORARY BRACING AND PROTECTIVE STRUCTURES LUMP SP 536,005 SQ. YD. CONCRETE WEATHERPROOFING 73 263 2 295 62 6 26 FOOT CONDUIT, TYPE A, PRECAST REINFORCED ARCH SECTIONS, AS PER PLAN (20'SPAN X 0' RISE) 26 3 & 8 840 6,57 SQ. FT. MECHANICALLY STABILIZED EARTH WALL 2,089 852 2,348,228 840 2,89 CU. YD. WALL EXCAVATION 850 29 933 87 840 690 SQ. YD. FOUNDATION PREPARATION 25 96 235 44 840 4,37 CU. YD. SELECT GRANULAR BACKFILL,407 522,669 773 840 704 FOOT 6" DRAINAGE PIPE, PERFORATED CORRUGATED PLASTIC PIPE 240 90 24 33 840 8 FOOT 6" DRAINAGE PIPE, NONPERFORATED CORRUGATED PLASTIC PIPE 2 2 2 2 840 38 FOOT CONCRETE COPING 04 44 04 66 840 4 DAYS ONSITE ASSISTANCE 840 5,830 SQ. FT. AESTHETIC SURFACE TREATMENT,843 764 2,27,096 840 LUMP LUMP SUM SGB INSPECTION AND COMPACTION TESTING LUMP LUMP LUMP LUMP ADDENDUM # VDT 5/5/8 IN CHARGE DRAWN ESTIMATED STRUCTURE QUANTITIES OHIO TURNPIKE OVER MILL CREEK BIKEWAY 43805B CJP GTK 4 2 ADDENDUM #3 VDT 5/23/8 43 57 CJP MTO M.P. 223.0 MAHONING COUNTY 4/27/8 DATE: 8 OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION