EAST CENTRAL REGIONAL WATER RECLAMATION FACILITY PROCESS WATER SYSTEM PROJECT Addendum No. 2 Attachment B Contract Document Revisions Specifications: TABLE OF CONTENTS ADDENDUM NO. 2 Attachment B Contract Document Revisions 1 ECRWRF
This Page Intentionally Left Blank ADDENDUM NO. 2 Attachment B Contract Document Revisions 2 ECRWRF
EAST CENTRAL REGIONAL WATER RECLAMATION FACILITY BID DOCUMENTS TABLE OF CONTENTS VOLUME 1 DIVISIONS 1 10 DIVISION 1 GENERAL REQUIREMENTS 01010 Summary of Work 01020 Construction Sequencing/Constraints 01025 Measurement and Payment 01035 Modification Procedures 01040 Coordination 01070 Abbreviations 01090 Reference Standards 01200 Project Meetings 01300 Submittals 01400 Quality Control 01450 Special Inspections 01510 Temporary Utilities 01520 Maintenance of Utility Operations During Construction 01530 Protection of Existing Facilities 01540 Demolition and Removal of Existing Structures and Equipment 01541 Field Engineering 01550 Site Access and Storage 01560 Temporary Environmental Controls 01590 Field Office, Equipment and Services 01600 Materials and Equipment 01660 Equipment Testing and Plant Startup 01700 Project Closeout 01720 Project Record Drawings 01730 Operation and Maintenance Manuals 01740 Warranties and Bonds DIVISION 2 SITEWORK 02050 Demolition 02100 Clearing and Grubbing 02200 Earthwork 02222 Excavation and Backfill for Utilities 02230 Rock Base Course 11934-008-STOC_Bid Documents TOC-1 ECRWRF
DIVISION 2 SITEWORK (Continued) 02240 Dewatering 02276 Temporary Erosion and Sedimentation Control 02369 Steel Sheet Piling 02500 Surface Restoration 02513 Type S Asphaltic Concrete Paving 02523 Sidewalks, Driveways, and Curbs 02580 Pavement Marking and Traffic Signs 02667 Hydraulic Structures Testing DIVISION 3 CONCRETE 03100 Concrete Formwork 03200 Concrete Reinforcement 03290 Joints in Concrete 03300 Cast-in-Place Concrete 03315 Grout 03350 Concrete Finishes 03370 Concrete Curing 03400 Precast Concrete, General 03480 Precast Concrete Manholes, Handholes and Vaults 03605 Flowable Fill 03732 Concrete Repairs DIVISION 4 MASONRY (NOT USED) DIVISION 5 METALS 05010 Metal Materials 05035 Galvanizing 05050 Metal Fastening 05120 Structural Steel 05140 Structural Aluminum 05500 Metal Fabrications 05510 Metal Stairs 05515 Ladders 05520 Handrails and Railings 05531 Gratings, Floor Plates and Access Hatches 11934-008-STOC_Bid Documents TOC-2 ECRWRF
05540 Castings 05830 Bearing Devices and Anchoring DIVISION 6 WOOD AND PLASTICS 06100 Rough Carpentry DIVISION 7 THERMAL AND MOISTURE PROTECTION 07190 Vapor Barrier 07920 Sealants and Caulking DIVISION 8 DOORS AND WINDOWS (NOT USED) DIVISION 9 FINISHES 09800 Specialty Concrete Coating 09900 Painting and Coating DIVISION 10 SPECIALTIES 10400 Identifying Devices 11934-008-STOC_Bid Documents TOC-3 ECRWRF
VOLUME 2 DIVISIONS 11 15 DIVISION 11 EQUIPMENT 11000 Equipment General Provisions 11100 Pumps, General 11136 Submersible Chemical Sump Pump 11143 Horizontal Centrifugal Pumps 11179 Vertical Turbine Pumps 11212 Submersible Pumps 2 11337 Automatic Self-Cleaning Inline Strainer 11440 Chemical pumps, Metal Body 11501 High Density Crosslinked Polyethylene Storage Tanks and Coagulant Tote 11550 Positive Displacement Blower Packages 11623 Deep Bed Gravity Filters Refurbishment and Upgrades 11624 Backwash Supply Tank 11642 Diaphragm-type Metering Pump (Hypochlorite and Filter Backup Coagulant Feed) DIVISION 12 FURNISHINGS (NOT USED) DIVISION 13 SPECIAL CONSTRUCTION (NOT USED) DIVISION 14 CONVEYING SYSTEMS (NOT USED) DIVISION 15 MECHANICAL 15000 Basic Mechanical Requirements 15006 Ductile Iron Pipe 15008 PVC/CPVC Pipe 15012 Steel Pipe 15020 Pipe Supports 15030 Piping and Equipment Identification Systems 15095 Valves, General 15100 Valve Operators and Electric Valve Operators 15101 Butterfly Valves 15104 Ball Valves 15105 Check Valves 11934-008-STOC_Bid Documents TOC-4 ECRWRF
15108 Gate Valves 15109 Plug Valves DIVISION 15 MECHANICAL (Continued) 15114 Miscellaneous Valves and Appurtenances 15115 PVC/CPVC Valves 15170 Electric Motors 15390 Schedules 15995 Pipeline Testing and Disinfection 11934-008-STOC_Bid Documents TOC-5 ECRWRF
DIVISION 16 ELECTRICAL VOLUME 3 DIVISIONS 16 17 AND APPENDICES 16000 Basic Electrical Requirements 16055 Power System Studies 16111 Conduit 16118 Underground Electrical 16123 Low Voltage Conductors and Cables 16130 Boxes 16141 Wiring Devices 16170 Grounding and Bonding 16190 Hangers and Supports 16195 Electrical-Identification 16440 Enclosed Switches 16482 Motor Control Centers Modifications 16495 Variable Frequency Motor Controllers 16500 Outdoor LED Lighting DIVISION 17 INSTRUMENTATION 17000 Control and Information System Scope and General Requirements 17015 Preliminary Design Review 17030 Control and Information System Submittals 17040 Control and Information System Training Requirements 17050 Tools, Supplies, and Spare Parts, General 17060 Signal Coordination Requirements 17070 Control and Information System Testing - General 17071 Factory Acceptance Test 17072 Field Testing 17073 Final Acceptance Test 17080 Quality Assurance 17100 Control and Information System Hardware, General 17120 Programmable Logic Controllers 17125 Operator Interface Units 17185 Networks 17190 Uninterruptible Power Systems 17200 Control and Information System Software Requirements 17500 Enclosures, General 17510 Cabinets and Panels 17520 Field Panels 17550 Panel Instruments and Accessories 17560 Surge Protection Devices 17600 Unpowered Instruments, General 11934-008-STOC_Bid Documents TOC-6 ECRWRF
17650 Pressure Gauges DIVISION 17 INSTRUMENTATION (Continued) 17670 Level Switches (Suspended Float Type) 17675 Pressure Switches 17681 Temperature Gauges 17698 Instrumentation and Control System Accessories 17700 Powered Instruments, General 17701 Magnetic Flow Meters 17711 Thermal Dispersion Flow Switches 17740 Ultrasonic Level Measurement Systems 17760 Pressure Indicating Transmitters 17800 Analytical Instruments, General 17801 ph Analyzers 17821 Turbidity Monitoring Systems (Low Range) 17831 Chlorine Analyzers 17900 Schedules and Control Descriptions, General 17910 Instrument Schedules 17920 Control System Input/Output Schedule 17950 Functional Control Descriptions APPENDIX A 1 1. Reclaimed Water Production System - Conformed Drawings, dated January 2001, by CDM. 1 REFERENCES 1. Geotechnical (Soils) Engineering Report Reference reports as noted on the structural drawings can be provided upon request. 2. Subsurface Utilities Investigation Reference SUI reports can be provided upon request; refer to yard piping drawings for conflict tables. 11934-008-STOC_Bid Documents TOC-7 ECRWRF