Contents Basic Facts of Cambodia Cambodia Power Sector Overview Major Issues Cambodia Power Industry (Structure) Energy Policy Cambodia Power Developm

Similar documents
IEEJ: April 21 Outline Electricity STATUS in Cambodia Energy Supply and Demand Problem Statement Conclusion 2

Cambodia Power Sector

Ministry of Mines and Energy. Energy Power Plant in Cambodia

Cambodia Power Development

Sustainable Development of Energy and Electricity Policy In Cambodia

For. The Preparatory Study. The Master Plan Study on Hydropower Development in. Cambodia

Cambodian Agrarian Structure Study. Table 1 Basic Indicators of the Agricultural Sector in Cambodia

CAMBODIA BASELINE ASSESSMENT PERSPECTIVE

Number of inhabitants in million population [1]

Cambodia s First Solar Park

SREP/SC.15/5 May 20, Meeting of the SREP Sub-Committee Oaxaca. Mexico Friday, June 17, Agenda Item 5 SREP INVESTMENT PLAN FOR CAMBODIA

Two-Week Training Workshop in Siem Reap Town

Scaling-up Renewable Energy for Low Income Countries Program Investment Plan for the Kingdom of Cambodia

Feasibility Study of Renewable Energy Options for Rural Electrification in Cambodia (REOREC) Publication Reference: EuropeAid/119920/C/SV

PROJECTING INDUSTRIAL POLLUTION

Existing Studies on Rural Electrification & Energy Demand Forecasting in Cambodia

Lesson Learns from Japanese Practices for Urban Waste Utilization

FOOD FORTIFICATION PROJECT

SURVEY ON THE WATER SUPPLY SECTOR IN THE KINGDOM OF CAMBODIA FINAL REPORT

Kingdom of Cambodia. Expert Group Meeting on Regional Cooperation towards Building an Information Society in Asia and the Pacific

2 nd Meeting of JWG on Water Resources of Mekong-Lancang Cooperation 1 st 2 nd March, 2018 in Chiang Rai, Thailand.

Hydrological Model Soil Water & Assessment Tool (SWAT)

AQUACULTURE IN CAMBODIA: TRENDS AND PATTERNS IN RECENT YEARS. Olivier JOFFRE SO Nam CHHENG Phen

Current working list of Cambodian environmental legislation that may be incorporated into the Code, subject to any required modifications

LAND MANAGEMENT AND ADMINISTRATION PROJECT (LMAP)

ANALYSIS OF POLICIES TO ADDRESS CLIMATE CHANGE IMPACTS IN CAMBODIA

World Small Hydropower Development Report 2013

CAMBODIA ENERGY SECTOR

RURAL ELECTRIFICATION WITH PV - MARKET POTENTIAL IN CAMBODIA

Working list of Cambodian environmental legislation that may be incorporated into the Code, subject to any required modifications

6. TECHNICAL STUDY OF 10 PRIORITY PROJECTS

CLEAN POWER ASIA on Policy and incentives to encourage renewable energy development in Cambodia

REPORT ON THE PROGRESS OF SYSTEM OF RICE INTENSIFICATION IN CAMBODIA

THE MASTER PLAN STUDY ON RURAL ELECTRIFICATION BY RENEWABLE ENERGY IN THE KINGDOM OF CAMBODIA FINAL REPORT VOLUME 2: MASTER PLAN

World Bank: GMS Power Market Development

Rural Electrification by Renewable Energy in Cambodia

Renewable Energy Development in Cambodia. Institute of Technology of Cambodia

CAMBODIA FOREST COVER 2016

RBwtiþbRtRbcaMRtImas sþibisnþisuxes,óg niggaharubtßmöenakm<úca ISSUE #7 April June 2012

Electricity Data Collection

ANNEXURE 2 LIST OF PROJECTS

Energy Policy in Lao PDR

The Credibility Gap. and the Need to Bridge it. Increasing the pace of forestry reform. A Briefing Document by Global Witness, May 2001

PRoACC2. (First Draft) Research Proposal. Risk Perception and Livelihoods under Climate Change. in the Mekong Cambodia. Royal University of Phnom Penh

An Analysis of Poverty and Aquatic Resources Use - focusing especially on the Livelihoods of the Poor - in Cambodia

Final Report: Cambodia Assessment Affordable Sanitation in Challenging Areas in Cambodia and Lao PDR, Phase 1

Cambodia s Strategic Program for Climate Resilience (SPCR): Status of Various Projects (as of Oct. 2012)

Investment Information. Stung Treng Province

Services in Cambodia (March 2013)

Rural Electrification Situation in Lao PDR

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Rural Electrification and Transmission Interconnection Project (RETP) Region

Agriculture Financing and Services for Smallholder Farmers

Agriculture Sector Financing and Services for Smallholder Farmers

Regenera'on process analysis of the resin Haix used from Arsenic affected community in Cambodia

Cambodia Post Disaster Needs Assessment

Title: Roadmap towards Effective Flood Hazard Mapping in Cambodia. October 31~December 03, Name: PHENG SEANGMENG

Overview of NAMA and CDM Project Implementation in Cambodia

Lam Du Son Vice President of EVN, Vietnam

Seasonal Pattern of Mean Monthly Rainfall. Battambang Stung Sanker Treng Stung Sanker Pursat Stung Prusat Kompong Speu Prek Thnot Takeo Slakou

South-East Asia Flood Risk Reduction Forum

TRADE, SERVICES AND DEVELOPMENT

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Rural Electrification and Transmission Interconnection Project (RETP) Region

FEASIBILITY STUDY ON ACCESS TO FINANCING FOR RE APPLIANCE FOR RURAL POOR IN CAMBODIA

National Assessment of Cambodia's Main Crop and Fodder Resources

WELCOME TO. The First General Meeting Network of Asian River Basin Organisation

THE MASTER PLAN STUDY ON RURAL ELECTRIFICATION BY RENEWABLE ENERGY IN THE KINGDOM OF CAMBODIA FINAL REPORT VOLUME 4: PRE-FEASIBILITY STUDY

Developing a Regional Roadmap on Energy Connectivity. China Electric Power Planning & Engineering Institute Bangkok

Climate Change Strategic Plan for Public Health

Agriculture Services Programme for Innovation, Resilience and Extension

Experiences with System of Rice Intensification (SRI) in Cambodia. Dr. Georg Deichert and Dr. Yang Saing Koma

CHAPTER 2. Sok Siphana, Chap Sotharith, and Chheang Vannarith Cambodian Institute for Cooperation and Peace

Ex-Ante Evaluation. Japanese ODA Loan

ACIAR Project Report 03 AH/2010/046 Cattle Market Chain in South-East of Cambodia

Aquatic agricultural systems in Cambodia: National situation analysis

Final Report Chapter 3 The Power Sector 3. THE POWER SECTOR

Thailand Power Development Plan (PDP 2007)

Agricultural training and education in Cambodia

Roleang Chrey Headworks Rehabilitation Sub-project

Reference material (The 4th workshop material)

Forestry Department Food and Agriculture Organization of the United Nations

Current status and Development plan for Grid Small Hydro Power in Thailand

Resettlement Due Diligence Report. CAM: Urban Water Supply Project Kampot Subproject

CAMBODIA HIGHLIGHTS. 12.7% year on year. Overview This. 22.5% higher. than in May Thai A1 Super. respectively. The. Index. not seen. in 2011.

Economic Development and Service Delivery of Sub-national Government in Battambang Province

Chapter 10. Lao PDR Country Report. September 2016

Implementation Status & Results Cambodia Demand for Good Governance Project (P101156)

Wastewater Management in Cambodia. Presenter: Mr. Meng Kro Cambodia Representative

Sustainable biomass technology enhances Cambodia s rice milling sector

Expanding irrigated agriculture in the floodplains of Cambodia. Prepared by Ponh Sachak for the 4 th Regional Stakeholder Forum

Outlook for Energy Market in Asia (India and ASEAN)

Cambodia. National Institute of Statistics of Cambodia 2. World Bank Assessment 2006 Report 3. Asian Development Bank, 2006

Study on the Potential for. One Window Service Office Models. for Rural Districts in Cambodia. Final Report. December 2011

FAO/WFP CROP AND FOOD SECURITY UPDATE MISSION TO CAMBODIA REPORT. 17 April 2012

Mekong River. Tonle Sap Lake. Basin Group. Basin Group. Code River basin Area (km²)

Chapter 7 Investigation of Framework on Establishment of Open Paddy Market

Discharge and Sediment Monitoring Project Regional meeting 14 January 2009 Presented by Ms. Iwona Conlan

The Current Status of Environmental Criteria for Hydropower Development in the Mekong Region A Literature Compilation

Profiles of 12 proposed Mainstream developments in the LMB

Water Governance in Cambodia: From Centralized Water Governance to Farmer Water User Community

Synergies and Trade-offs with Intensification of Rice and Livestock Production in Cambodia

Transcription:

TRAINING AND DIALOGUE PROGRAMS IEEJ: August 2012 All Right Reserv IEEJ : June 2012 Energy Policy (B) June 3, 2012 to June23, 2012 IEEJ, Japan Mr. Phan Bunthoeun (Cambodia) Ministry of Industry, Mines and Energy 1

Contents Basic Facts of Cambodia Cambodia Power Sector Overview Major Issues Cambodia Power Industry (Structure) Energy Policy Cambodia Power Development Plan 2

Basic Facts of Cambodia Country area 181,035 sq. km Population 14 million IEEJ: August 2012 All Right Reserv GDP/capita $900. GDP by sectors, Agriculture 31%, Industry 26%, Service 43% Hydro power potential about 10,000 MW, at present capacity < 10% used 3

Cambodia Power Sector Overview Electricity demand growth 16% Annual energy consumption per capita 190 kwh Electrification 35% Capacity supply 635 MW Electricity supply 2,675 GWh 4

5

6

7

Major Issues IEEJ: August 2012 All Right Reserv Lack of Policy and Legal Framework Access to Financing of Renewable Energy Devices Lack of Information on Market Characteristics and Resource Potential Institutional Capacity for Planning, Implementation and Maintenance General planning for interconnected system Rural electrification Improving quality of electricity network Energy efficiency and conservation 8

Cambodia Power Industry Royal Government of Cambodia Electricity Authority of Cambodia Ministry of Industry, Mines and Energy Ministry of Economic and Finance Regulation Policy Maker Owner Cambodia s Electricity Business REE IPP PEC EDC Ownership of EDC Policy, Planning, Technical Standard Tariff, License, Financial Performance, Enforce the regulations, Rule and Standard. 9

Energy Policy To provide an adequate supply of energy throughout Cambodia at reasonable and affordable price, To ensure a reliable and secured electricity supply at reasons price, which facilitates investment in Cambodia and development of national economy, To encourage exploration and environmentally and socially acceptable development of energy resources needed for supply to all sectors of Cambodia economy, To encourage the efficient use of energy and to minimize the detrimental environmental affects resulted from energy supply and consumption. 10

Policy Target 100% of villages have access to electricity services by 2020, 70% of rural households have access to quality electricity services by 2030. 11

IEEJ: Cambodia Power Development Plan August 2012 All Right Reserv (Cambodia Power Sector Strategy) Power demand forecasting by year 2020, with the annual demand growth rate of 11% the peak demand in the country would increase to 1,700 MW in the base case scenario. Base Case 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Peak in Main Grid [MW] 351 495 587 710 814 925 1,093 1,217 1,332 1,452 Peak in Whole country [MW] 671 762 856 961 1,078 1,203 1,322 1,439 1,567 1,699 Energy in Main Grid (GWh) 1,940 2,735 3,244 3,919 4,499 5,112 6,038 6,724 7,357 8,019 Energy in Whole country (GWh) 3,400 3,914 4,453 5,050 5,717 6,424 7,099 7,753 8,466 9,205 12

No. Generation Expansion Plan Fuel Type Install Capa.MW COD 1 Kamchay Hydro Power Plant Hydro 194.1 2011 2 Kirirom III Hydro power Plant Hydro 18 2012 3 Stung Atay Hydro Power Plant Hydro 120 2013 4 200 MW Coal Power Plant (I) in Sihanouk Province Phase 1 Coal 100 2013 5 Stung Tatay Hydro Power Plant Hydro 246 2013 2014 6 Lower Stung Russei Chrum Hydro Power Plant Hydro 338 2013 7 700 MW Coal Power Plant (II) Phase 1 Coal 270 2014 8 700 MW Coal Power Plant (II) Phase 2 Coal 100 2016 9 700 MW Coal Power Plant (II) Phase 3 Coal 100 2017 10 200 MW Coal Power Plant (I) in Sihanouk Province Phase 2 Coal 135 2016 11 Lower Se San II Hydro Power Plant Hydro 400 2016 12 700 MW Coal Power Plant (II) Phase 4 Coal 100 2018 13 Stung Chay Areng Hydro Power Plant Hydro 108 2017 14 700 MW Coal Power Plant (II) Phase 5 Coal 100 2019 15 Add 700 MW Coal Power Plant at Offshore Coal 200 2020 16 Sambor Hydro Power Plant Hydro 450/2600 2019 17 Coal Power Plant (III) or Gas Power Plant Coal/Natural Gas 400 2020 18 Stung Treng Hydro Power Plant Hydro 900 2020 Total 4,279.1 (6,429.1) 13

Hydro Power Site IEEJ: August 2012 All Right Reserv Oddar Meanchey Banteay Meanchey Siemreap Preah Vihear ( Stung Treng Stung Treng Sekong ( ( L.Sesan II L.Srepok II ( ( L.Sesan III Ratanak Kiri ( L.Srepok III ( Prek Liang II Prek Liang I Prek liang IA ( 72% L.Srepok IV Pailin 27% ( ( ( St.battambong I St.battambong II St. Meteuk I ( St. Meteuk III Battambang ( St.pursat I St. Meteuk II St. Atay St.pursat II USt. russei chrum MSt. russei chrum Pursat Kampong Thom 1% Kampong Chhnang ( St.tatay LSt. russei ( chrum Koh Kong St.chay Areng Kep II Phnom Penh Prek thnot Kandal Kampong Speu Prey Veng Kirirom III Kirirom I St.piphot Kam Chay ( Bokor Planteau Coal 700MW Coal 400MW " Sihanoukville " Kampot Coal 200MW " Kep Takeo ( Stungsen Kampong Cham ( Sambor Svay Rieng Prek ter II Kratie Prek ter I Mondul Kiri Prek ter III Prekpor I Upper prek ter Prek chhlong II Legend Large>=100MW Medium>=10MW " Coal Power Plant 14

Power projects under construction No. Power Project Install Capa.MW IA/PPA/LA Company Country COD Achievement 1 Kirirom III 18 BOT CETIC China 2012 95% 2 Coal Power Plant 100 BOO CEL Malaysia 2013 20% 3 Atay Hydro 120 BOT CHD China 2013 49% 4 Coal Power Plant 270 BOO CIIDG China 2014 10% 5 LSt. Russei Chhrum 338 BOT China Huadian China 2014 40% 6 Tatay Hydro 246 BOT Sinohydro China 2015 40% 7 Coal Power Plant 270 BOO CIIDG China 2016 15

No. Transmission Expansion Plan Distance (Km) Grant/ Invest Year 1 230 kv, Takeo Kampot, (construct substation in Kampot), 87 KFW 2011 2 230 kv, Steung Treng Loa PDR, (construct substation in Steung Treng), 56 WB 2014 3 110 kv, Kampong Cham Viet Nam, (construct 3 substations: Kampong Cham, Soung, Pongnearkreak ), 68 WB 2010 4 230 kv, Kampot Sihanouk Ville 82 ADB & JBIC 2013 5 230 kv, Phnom Penh Kampong Chhnang Pursat Battambong, (construct 3 substations: Kampong Chhnang, Pursat, Battambong), 310 CYC 2012 6 230 kv, Pursat Osom, (construct 1 substation in Osom Commune), 175 CYC 2012 7 230 kv, Kampong Cham Kratie, 110 CUPL 2013 8 230 kv, Kratie Stung Treng, 126 INDIA 2015 9 230 kv, Phnom Penh Kampong Cham, 110 CUPL 2012 10 220 kv, Phnom Penh Sihanoukville, along national road 4, (construct 1 substation in Sre Ambil) 220 CHMC 2013 11 115 kv, East Phnom Penh Neakleung Svay Rieng, (construct 2 substations: Neakleung, Svay Rieng) 120 2014 12 230 kv, Stung Tatay Hydro Osom substation, 15 CHMC 2015 13 115 kv, West Phnom Penh East Phnom Penh ( construct substation GS4 at South Phnom Penh) 20 WB 2015 14 230 kv, Stung Chay Areng Hydro North Phnom Penh (NPP) substation 145 CUPL 2017 15 230 kv, Stung Chay Areng Osom substation 60 CSG 2017 16 230 kv, Kampong Cham Kampong Thom Siem Reap, (construct 1 substation in Kampong Thom) 250 KTC 2019 17 500 kv, Loa PDR (Ban Sok) Steung Treng Vietnam (Tay Ninh), (construct substation in Steung Treng) 220 ADB 2019 Total Transmission Line 2,174 16

Loa PDR Thailand Oddar Meanchey Banteay Meanchey Preah Vihear Stung Treng Ratanak Kiri Siemreap Battambang Pailin Kampong Thom Pursat Kratie Mondul Kiri Year 2007 2009 2011 2011 2012 2013 2014 2015 2017 2019 2020 Osom Substation Koh Kong Tatay St.Chhay Areng Sihanoukville Kampot Kep Kampong Chhnang Kampong Cham Phnom Penh Kandal Kampong Speu Prey Veng Svay Rieng Takeo Vietnam Provincial/town Substation Hydro Power T/L 500 kv T/L 230 kv T/L 115 kv Import/Export 17

Power trade with neighboring countries Import from Vietnam at high voltage 230 kv 100 MW by year 2009 to serve southern grid and Phnom Penh Import from Thailand at 115 kv starting 2007 to serve northern grid up to 80 MW Import from Vietnam to Kampong Cham Province at high voltage 115 kv with capacity 60 MW by 2010 Import from Lao to Stung Treng Province at 115 kv with capacity until 60 MW by 2010 9 Cross border 22 MV links from Vietnam 10.25 MW and 8 from Thailand about 15.5 MW to serve Cambodian communities close to the border (2008) 12 Cross border 22 MV links from Vietnam 22.7 MW and 8 from Thailand about 22.5 MW to serve Cambodian communities close to the border (2009) 18

Interesting Subjects Energy Policy in Japan Energy Demand and Supply in Japan Energy Balance Table Energy Demand Prediction Technique Hydropower Plant Thermal Power Plant (Coal & Gas) Nuclear Power Plant 19

Thank you for your attention BCS Contact : report@tky.ieej.or.jp 20