SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF MALLIABLE CAST IRON PIPE FITTINGS ACCORDING TO IS: 1879:2010 (Third Revision)

Similar documents
2.2 Copies of any records and other connected papers that may be required by the Bureau shall be made available at any time on request.

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF GALVANIZED STEEL BARBED WIRE FOR FENCING ACCORDING ACCORDING TO IS 278:2009 (Fourth Revision)

1.1 All testing apparatus shall be periodically checked and calibrated. Records of such checks/calibration shall be maintained.

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF SELF BALLASTED LAMPS FOR GENERAL LIGHTING SERVICES ACCORDING TO IS 15111(Part 1 & 2):2002

2. TEST RECORDS - All records of tests, inspection and calibration shall be kept in suitable forms approved by the Bureau.

STI /15392 /1 April, 2009

SCHEME OF TESTING AND INSPECTION CERTIFICATION OF PHOSPHORIC ACID, FOOD GRADE ACCORDING TO IS 10508:1983

2. TEST RECORDS - All records of tests, inspection and calibration shall be kept in suitable forms approved by the Bureau.

1.1 All testing apparatus shall be periodically checked and calibrated records of such checks/calibration shall be maintained.

DOC:STI/9573/2 January 2003

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF STEEL WIRE ROPES FOR GENERAL ENGINEERING PURPOSES ACCORDING TO IS 2266:2002 (Fourth Revision)

1.1 All testing apparatus shall be periodically checked and calibrated and records of such checks/calibration shall be maintained.

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF SWITCHES FOR DOMESTIC & SIMILAR PURPOSE ACCORDING TO IS 3854:1997

2.1 All records of tests and inspection shall be kept in suitable forms approved by the Bureau.

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF SWITCH-SOCKET-OUTLETS (NON-INTERLOCK TYPE) ACCORDING TO IS 15787:2008

BUREAU OF INDIAN STANDARDS (CMD II)

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF ALLUMINIUM ALLOY TUBES FOR IRRIGATION PURPOSES; WELDED TUBES ACCORDING TO IS: 7092 (PART I)-1992

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF GRAIN ORIENTED ELECTRICAL STEEL SHEET AND STRIP ACCORDING TO IS 3024:2006 (Second Revision)

DOC:STI/3087/4 September 2006

2. TEST RECORDS - All records of tests, inspection and calibration shall be kept in suitable forms approved by the Bureau.

2. Test Records - All records of tests and analysis shall be kept in suitable forms approved by the Bureau.

BUREAU OF INDIAN STANDARDS CENTRAL MARKS DEPARTMENT-III

2.2 Copies of any records and other connected papers that may be required by the Bureau shall be made available at any time on request.

1.1 All testing apparatus shall be periodically checked and calibrated records of such checks/calibration shall be maintained.

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF TAPER ROLLER BEARINGS ACCORDING TO IS 12102:1987

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF SLUICE VALVE FOR WATER WORKS PURPOSES (50 TO 1200 MM SIZE) ACCORDING TO IS 14846:2000

2. TEST RECORDS - All records of tests, inspection and calibration shall be kept in suitable forms approved by the Bureau.

BUREAU OF INDIAN STANDARDS CENTRAL MARKS DEPARTMENT III

1.1 All testing apparatus shall be periodically checked and calibrated records of such checks/calibration shall be maintained.

2. TEST RECORDS - All records of tests, inspection and calibration shall be kept in suitable forms approved by the Bureau.

2.0 TEST RECORDS - All records of tests and inspection shall be kept in suitable forms approved by the Bureau.

CENTRAL MARKS DEPARTMENT III. Our Ref : CMD-III/16: Mar 2007

1.1 All testing apparatus shall be periodically checked and calibrated. Records of such checks/calibration shall be maintained.

BUREAU OF INDIAN STANDARDS ( CENTRAL MARKS DEPARTMENT-III ) Our Ref: CMD-III/16:

DOC: STI/8783(Part 4/Sec1)/1 August 1998

1.1 All testing apparatus shall be periodically checked and calibrated records of such checks/calibration shall be maintained.

BUREAU OF INDIAN STANDARDS CENTRAL MARKS DEPARTMENT-III

SCHEME OF TESTING AND INSPECTION FOR CERTIFICAATION OF VENEERED DECORATIVE PLYWOOD ACCORDING TO IS 1328:1996 (Third Revision)

1.1 All testing apparatus shall be periodically checked and calibrated and records of such checks/calibration shall be maintained.

BUREAU OF INDIAN STANDARDS (Central Marks Department - III) Our Ref : CMD-III/16: Oct 2006

CENTRAL MARKS DEPARTMENT-III. Our Ref.:CMD-III/16:

SCHEME OF TESTING AND INSPECTION FOR CERIFICATION OF SISAL ROPES PART 1 UNTARRED VARIEITES ACCORDING TO IS 1321(Part 1):2003 (Fourth Revision)

1.1 All the testing apparatus shall be periodically checked and calibrated and records of such checks/calibration maintained.

Doc: STI/1223(Section-2)/5 Oct 2003

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF SILVERED GLASS MIRRORS FOR GENERAL PURPOSES ACCORDING TO IS :

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF COPPER SULPHATE ACCORDING TO IS :

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF RESPIRATORY PROTECTIVE DEVICES FULL FACE MASKS ACCORDING TO IS 14166:1994

(अन भ ग अध क र ) (स ए ड -3)

BUREAU OF INDIAN STANDARDS (Central Marks Department III) Our ref: CMD-III/16: November 2007

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF FLAVOURED MILK ACCORDING TO IS 4709: 1968

BUREAU OF INDIAN STANDARDS (CENTRAL MARKS DEPARTMENT-III)

1.1 All the testing apparatus shall be periodically checked and calibrated and records of such checks/calibration maintained.

2.0 TEST RECORDS- All records of tests and inspection shall be kept in suitable forms approved by the Bureau of Indian Standards.

BUREAU OF INDIAN STANDARDS (Central Marks Department-III) Our Ref : CMD-III/16: October 2008

BUREAU OF INDIAN STANDARDS CMD-II

SPECIFICATION ACCORDING TO IS

1.2 All the testing equipment shall be periodically checked and calibrated and records of such checks/ calibration maintained.

Doc: STI/1166/6 July 2008

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF TITANIUM DIOXIDE, ANATASE, FOR PAINTS ACCORDING TO IS :

CENTRAL MARKS DEPARTMENT-III

BUREAU OF INDIAN STANDARDS CENTRAL MARKS DEPARTMENT-III

2. Test Record - All records of analysis and tests shall be kept in suitable forms approved by the Bureau of Indian Standards.

CENTRAL MARKS DEPARTMENT II. Ref: CMD-II/16:

CENTRAL MARKS DEPARTMENT-II. Our Ref: CMD-II/16: Subject: Information of revised version of Alumino-Ferric as per IS 299.

1.1 All testing apparatus shall be periodically checked and calibrated records of such checks/calibration shall be maintained.

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF BORAX ACCORDING TO IS 1109:1980

1.1 All the testing apparatus shall be periodically checked and calibrated and records of such checks/calibration maintained.

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF HAND OPERATED STIRRUP-TYPE SPRAYER ACCORDING TO IS 1971:1996 (Fifth Revision)

GUIDELINES FOR IMPLEMENTATION OF IS 13334(PART 1):2014

CENTRAL MARKS DEPARTMENT-2. Ref: CMD-2/16:

2. TEST RECORDS - All records of tests, inspection and calibration shall be kept in suitable forms approved by the Bureau.

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF PLASTIC FEEDING BOTTLES ACCORDING TO IS : 1999 (Incorporating Amendment No.

CMD-II(Legal) CMD-II/16:

क न द र य म ह व भ ग भ स द भ- स ए ड -III/16: IS

1.1 All testing apparatus shall be periodically checked and calibrated and records of such checks/calibration shall be maintained.

1.1 All the testing apparatus shall be checked periodically and records of such checks shall be maintained.

(ड चद र ) ञ न क ई (स ए ड -3)

2. Test Records - All records of analysis and tests shall be kept in suitable forms approved by the Bureau of Indian Standards.

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF SHAVING CREAMS ACCORDING TO IS ( Incorporating Amendment No.

CENTRAL MARKS DEPARTMENT-3. Our Ref: CMD-3/16: Subject: STI as per IS 13714: 1993 DUNNAGE PALLETS-WAREHOUSING

2. 0 Test Records - All records of analysis and tests shall be kept in suitable forms approved by the Bureau of Indian Standards.

2. 0 Test Records - All records of analysis and tests shall be kept in suitable forms approved by the Bureau of Indian Standards.

CENTRAL MARKS DEPARTMENT-II

CENTRAL MARKS DEPARTMENT-II

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF ORDINARY PORTLAND CEMENT, 33 GRADE ACCORDING TO

2. TEST RECORDS: All records of tests and analysis shall be kept in suitable forms approved by the Bureau.

CENTRAL MARKS DEPARTMENT (FCT) Ref: CMD-II/16:2933 (Part 1)

CENTRAL MARKS DEPARTMENT (FCT) Ref: CMD-II/16:

BUREAU OF INDIAN STANDARDS (CENTRAL MARKS DEPARTMENT-III) Our Ref: CMD-III/16:1239(Pt 1) 11 Oct 2004

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF 53 GRADE ORDINARY PORTLAND CEMENT ACCORDING TO IS:

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF TOOTH PASTE ACCORDING TO IS 6356: 2001 (Third Revision)

Subject: Implementation of IS 9798:2013 Low Pressure Regulators for use with Liquefied Petroleum Gas (LPG) Specification (Second Revision).

CENTRAL MARKS DEPARTMENT-2

ALUMINIUM CONDUCTORS FOR OVERHEAD TRANSMISSION PURPOSES

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF MALT EXTRACT ACCORDING TO IS 2404 : 1993

स ल न प ए, (द सर स श धन) (स श धन 1 स 6 श "मल)

MARKS DEPARTMENT-III. ROs/BOs may also propose the implementation date in view of revision of Indian

CENTRAL MARKS DEPARTMENT II. Subject: Implementation of revised Indian Standard Specification for Nitric Acid

(अAण प छक यल ) व D. ब (क.म.0व. 2) CENTRAL MARKS DEPARTMENT-2. Our Ref: CMD-2/16:

2. Test Record - All records of analysis and tests shall be kept in suitable forms approved by the Bureau of Indian Standards.

Transcription:

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF MALLIABLE CAST IRON PIPE FITTINGS ACCORDING TO IS: 1879:2010 (Third Revision) 1. LABORATORY: A laboratory shall be maintained which shall be suitably equipped and staffed where different tests given in the specification shall be carried out in accordance with the methods given in the specification. 2. TEST RECORDS: All records of tests, inspection and calibration shall be kept insuitable forms approved by the Bureau. 2.1 All testing apparatus/measuring instruments shall be periodically checked andcalibrated and records of such checks/calibration shall be maintained. 2.2 Copies of any records and other connected papers that may be required by the Bureau shall be made available at any time on request. 3. QUALITY CONTROL: It is recommended that, as far as possible, Statistical Quality Control (SQC) methods may be used for controlling the quality of the product during production as envisaged in this Scheme [See IS 397 (Part I) to IS 397 (Part 4)]. 3.1 In addition, effort should be made to gradually introduce a Quality Management System in accordance with IS/ISO 9001. 4. STANDARD MARK: The Standard Mark, as given in Column (1) of the First Schedule of the license, shall be cast on each fitting and shall also be stenciled on each package of fittings or on the label attached to it, provided always that the pipe fittings so marked conform to the requirements of the specification. 4.1 MARKING: Each fitting shall be marked with the manufacturer s name or trade mark and the size designation. 4.2 In addition, each package containing the fittings shall carry the following information: a) Manufacturer s name or trade mark; b) Control unit or lot number which will enable to trace back the production from the factory records; c) Designation of fittings (Ref. Clause 5 of IS 1879:2010); and d) License number (CM/L..). Page 1 of 5

5. LEVELS OF CONTROL: The tests, as indicated in Table 1 attached and at the levels of control specified therein, shall be carried out on the whole production of the factory which is covered by this scheme and appropriate records and charts maintained in accordance with paragraph 2 above. All the production which conforms to the Indian Standards and covered by the license shall be marked with certification mark of the Bureau. 5.1 CONTROL UNIT/LOT NUMBER: For the purpose of this scheme all the pipe fittings heat treated together in one annealing chamber shall be taken as a control unit. 5.2 TEST BARS: All test bars shall be cast separately. Test bars shall be cast in green or dry sand moulds of the same material as the moulds used for castings they represent. 5.2.1 Nine test bars shall be cast from each control unit, and shall in all cases undergo the melleablizing treatment together with the castings they represent. A set of three samples each shall be put in three different heating zones (i.e beginning, middle and far end) of the annealing furnace. 5.2.2 RETEST : In case of failure of the sample tested for tensile tests as above two more samples pertaining to the same heating zone, of which the sample failed, shall be tested. In case of any failure observed again in testing the batch shall be rejected. 5.3 GALVANIZING: Three samples from the material galvanized in a shift, one each being taken in the beginning, middle and end of the shift shall be tested for conformity to IS 4759. In case of failure two more samples of the same shall be taken and tested for the requirement. If both pass, the material shall be considered as suitable for certification marking; otherwise rejected and standard mark from fittings defaced. 5.4 All rejected pipe fittings in a control unit shall be stored separately and it shall be ensured that the standard mark has been defaced by grinding, before they leave the works. 5.5 While processing the fittings from one stage to another, care shall be taken so that the fittings of one control unit do not get mixed up with those of the other. 5.6 In respect of all other clauses of the specification the factory will maintain appropriate control and checks to ensure that their product conforms to the various requirements of this specification. 6. REJECTIONS - A separate record shall be maintained giving information relating to the rejection of production not conforming to the requirements of the specification and the method of its disposal. Such material shall in no case be stored together with that conforming to the specification. 7. SAMPLES - The licensee shall supply, free of charge, the samples required in accordance with the Bureau of Indian Standards (Certification) Regulations 1988, as subsequently amended, Page 2 of 5

from his factory or godowns. The Bureau shall pay for the samples taken by it from the open market. 8. REPLACEMENT - Whenever a complaint is received soon after the goods with Standards Mark have been purchased and used, and if there is adequate evidence that the goods have not been misused, defective goods are replaced free of cost by the licensee in case the complaint is proved to be genuine and the warranty period ( where applicable ) has not expired. The final authority to judge conformity of the product to the Indian standards shall be with the Bureau. The firm shall have own complaint investigation system as per IS/ISO 10002. 8.1 In the event of any damage caused by the goods bearing the Standard Mark, or claim being filed by the consumers against BIS Standards Mark and not "conforming to" the relevant Indian Standard, entire liability arising out of such non conforming product shall be of the licensee and BIS shall not in any way be responsible in such cases. 9. STOP MARKING - The marking of the product shall be stopped under intimation to the Bureau if, at any time, there is any difficulty in maintaining the conformity of their product to the specification, or the testing equipment goes out of order. The marking may be resumed as soon as the defects are removed under intimation to the Bureau. 9.1 The marking of the product shall be stopped immediately if directed to do so by the Bureau for any reason. The marking may then be resumed only after permission by the Bureau. The information regarding resumption of markings shall also be sent to the Bureau. 10. PRODUCTION DATA - The licensee shall send to BIS as per the enclosed proforma-1 to be authenticated by a Chartered Accountant, a statement of quantity produced, marked and exported by him and the trade value thereof at the end of each operative year of the licence. Table 1... Page 3 of 5

Cl. 6.1 & 6.2 8.1 & 8..2 7 & 8.3 TEST DETAILS Requirements Test Method Material (tensile test) Threads and Alignment of Threads Dimension chamfering and Clause IS 1879:2010 MALLEABLE CAST IRON PIPE FITTINGS TABLE 1 LEVELS OF CONTROL (Para 5 of the Scheme of Testing and Inspection) Reference LEVELS OF CONTROL No. of Control Frequency Samples Unit IS 14329 Three One control unit IS 554 (Gauge as per IS 8999) Suitable templates Micrometer and Gauges One One hour s production of each designation of pipe fittings at each threading machine. 10 Galvanizing IS 4759 Three Fittings galvanised in one shift 9 Freedom from defects. 11 Pressure Test 11.1 (B 2.4 & Table 30) 12. Compression Test Visual Each Pipe IS 1879:2010 As per Table 30 12.1 -do- Three One Control Unit. REMARKS See para 5.2 of this scheme. If a sample fails, the production of pipe fittings during the hour prior to drawl of that sample on that particular machine shall be considered as not fit to be covered with ISI Mark. However, all the production of the previous one hour may be sorted out by checking each piece and those found failing, shall be rejected. All the fittings threaded after this failure shall be tested till five consecutive samples pass and thereafter the frequency of one sample every hour may be resumed. See para 5.3 of this scheme. Criteria of Conformity as per Table 30 of ISS In case of any failure two more samples so prepared, shall be further tested in case of any failure in retest, the control unit shall not be marked with the standard mark. Page 4 of 5

PERFORMA - 1 PROFORMA FOR OBTAINING PRODUCTION DETAILS Period covered Name of Licensee CM/L No. Name of Articles (s) Grade/Type/Size/Variety/Class/Rating IS No. 1.1 Brand/Trade/Name(s) of BIS Certification Marked Products 2.0 Total production of the articles(s) Licensed for certification marking 2.1 Total production of the article(s) Conforming to Indian Standard 3.0 Production covered with BIS Certification Mark and its Value a) Quantity b) Value (Rs.) 3.1 Brand Name used on production covered under BIS Certification Mark 3.2 Calculation of marking fee on unit-rate basis; Marking Fee per unit a) Unit b) Quantity covered with BIS Certification Mark c) Marking fee rounded off in whole rupees as obtained by applying unit rates given in (a) on quantity given in (b) Note: Incase a clause is not applicable, suitable remarks may be given against it. 4.0 Quantity not covered with BIS Certification Mark. If any, and the reasons for such non-coverage 4.1 Brand Name under with non certified goods were sold 5.0 Quantity Exported with BIS Standard Mark and its value 5.1 Brand Name under which BIS Certified goods are exported 6.0 Authentication by Chartered Accountant Page 5 of 5