(To be printed on Professional s Letterhead) PRE-CONSTRUCTION MEETING AGENDA (Professional to provide attendance sign-up sheet

Similar documents
Pre-Construction Meeting Minutes

A62 UT PRE-CONSTRUCTION MEETING AGENDA

UNIVERSITY OF KENTUCKY Memorial Hall/College of Law Expansion and Renovation UK Project No

APPENDIX D CONSTRUCTION PHASE CRITERIA

SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS

Pre-Construction Meeting Minutes

A62 PRE-CONSTRUCTION MEETING AGENDA

1.1 THE ARCHITECT S SPECIFICATIONS AND DRAWINGS 1.2 THE BIDDING CONTRACTORS

APPENDIX C - PRECONSTRUCTION MEETING AGENDA

Scope of Work Bid Package C-4 - West Polished Concrete

PRE-INSTALLATION MEETING RECORD

NAPA SANITATION DISTRICT

Scope of Work Bid Package C-8 - West Overhead Doors

Pre-Construction Conference Discussion Guide

Appendix D University of Maine System. Supplementary Requirements to AIA Document B Standard Form of Architect s Services

DIVISION 1- GENERAL REQUIREMENTS

Audio Sessions. Session 5 MEETINGS. Construction Contract Administration Education Program

BABIES "R" US- TOYS R US

Modification: Modify the paragraph by deleting "wastewater and replace it with brine.

DOCUMENT POST BID INTERVIEW

ATTACHMENT D SCOPE OF SERVICES

Manage Deliverables - Construction Step 6 February 2015

ADDENDUM NO. 3. Item 3 NOTICE OF OPPORTUNITY - REPLACE in its entirety with the attached ***REVISED 08/03/2018

INVITATION FOR BID (IFB):

Superintendent Job Description:

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Facilities Planning and Construction (FP&C)

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk

Document Supplementary Conditions State of Ohio Standard Requirements for Public Facility Construction

ADDENDUM NO. 01. Coliseum, Toxicology, Poulton, & MRC Decks Western Carolina University SCO ID: Atlas Engineering Job No.

VILLAGE OF VERNON HILLS REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER AT RISK SERVICES. Part I: Proposal Information

Owner's Representative Scope Matrix - D/B Rev 10/28/2013

Addendum #2 B14/9830. East Campus Student Life/Business Services/DSR Renovation

Capital Projects Group Mechanical Work Commissioning Specification

SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURES

Herrington Architects PC 101 Richard Arrington Jr. Blvd. S. Birmingham, AL phone fax

University of Colorado at Boulder Department of Housing & Dining Services Revised: June 20, 2014

UNC Charlotte Residence Hall Phase XVI Early Site Utilities Package SCO ID: B JPA Project #: 18NCC016

Chapter 6, Construction

UNC Chapel Hill Informal Contracting Guidelines

EXHIBIT A - INSTRUCTIONS TO BIDDERS

Town of Bennington, Vermont Pleasant Street and School Street Sidewalk Installation STP EH08(11)

6494 Latcha Rd. Walbridge, Ohio v: f: Table of Contents

DIVISION 1 GENERAL REQUIREMENTS SECTION PROJECT SCHEDULE

VAE VIEW ELEMENTARY WINDOW REPLACEMENT West 1600 North Layton, UT Specifications. Construction Documents

Flooring Contractor QA/QC Plan Sample Selected pages (not a complete plan)

ROUND LAKE AREA SCHOOLS DISTRICT 116: LIMITED COMMISSIONING GUIDELINES INTRODUCTION

REQUEST FOR PROPOSAL

1. This Section includes administrative and procedural requirements for contract closeout including, but not limited to, the following:

SECTION QUALITY REQUIREMENTS

LSCC MISC. PROJECTS (PACKAGE D) MILLSAP BUILDING ROOF REPLACEMENT Addendum 3

McPherson Contractors, Inc.

TRIAD ENGINEERING CONSULTANTS, INC.

Chapter 1, Introduction

Multi-Institutional Academic Health Science & Research Center Evansville, IN

POSITION DESCRIPTION

TRIAD ENGINEERING CONSULTANTS, INC.

707 Minnesota Ave., Suite 506 Kansas City, Kansas Tel Fax

University of Oklahoma Sarkeys Energy Center Atriums Waterproofing Project mass project no Set no. project manual.

This Addendum is directed to all prime Contract Bidders, and all others to whom Drawings and Specifications have been issued by the Architect.

Specifications. Upgrade Perimeter Security. Dannelly Field

MIRACOSTA COLLEGE. [X] MiraCosta College Bid Opportunities Website /FAX

REQUEST FOR QUALIFICATIONS ARCHITECTURAL

ISU Liberal Arts Chiller Replacement DPW # February 2018

SECTION BID PROPOSAL FORM. Telephone NO: ( ) Facsimile NO: ( ) Oklahoma License NO:

CONSTRUCTION PHASE PROCEDURES

ENTELEN Design-Build, LLC June 29, 2015 SUBJECT: JOB DESCRIPTION PROJECT MANAGER Page 1 of 6

Schendt Engineering Corporation 2912 Beacon Street (719)

CONSTRUCTION DOCUMENTS Part 1

G , Request for Proposal Land Survey

SECTION QUALITY REQUIREMENTS

The construction phase, of course, is the execution of the work as required by the contract documents when the building is finally built.

SECTION SUPPLEMENTARY GENERAL CONDITIONS

SPECIFICATIONS. Permit Set RICHMOND CITY HALL: SUITE 110 RENOVATIONS. City of Richmond, Virginia Architect s Project No

Generator for Maintenance/Police Complex

AGENDA PRE-CONSTRUCTION MEETING

COUNTY OF SAN JOAQUIN

Fire Protection Contractor QA/QC Plan Sample

All subcontractor bidders are responsible for assuring that their subcontractors and vendors are properly apprised of the contents of this Addendum.

GENERAL CONTRACTOR PRE-QUALIFICATION FORM

Town of Brandon, Vermont Brandon Union St. Sidewalk STP EH 05 (4) Request for Qualifications Construction Inspection and Testing Services

GENERAL REQUIREMENTS

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

INTEGRA DATA CENTER POLICIES AND PROCEDURES

EXHIBIT II SCOPE OF CONTRACTOR'S SERVICES

STATEMENT OF WORK FOR HOLIDAY DECORATIONS AT WASHINGTON DULLES INTERNATIONAL AIRPORT WASHINGTON, DC

Owner s Representative SCOPE OF SERVICES

SECTION GENERAL REQUIREMENTS

RANDOLPH COMMUNITY CENTER GYMNASIUM FLOOR REPLACEMENT

Communications Contractor QA/QC Plan Sample

REQUEST FOR QUALIFICATIONS STATEMENT (RFQ) CONSTRUCTION MANAGEMENT AT RISK SERVICES FOR THE GREENWOOD HIGH SCHOOL GYMNASIUM GREENWOOD, SOUTH CAROLINA

Earthworks QA/QC Plan Sample

City of Beverly Hills Building & Safety Division General Notes

ATTACHMENT A. Bid # 6793

SECTION QUALITY CONTROL

CONTRACT SERVICES PHASE 1: PRE-CONSTRUCTION

1. The Meeting Minutes and Sign-In Sheet from the Pre-Bid Meeting held on July 18, 2017 are attached and considered part of the Contract Documents.

FACILITIES MANAGEMENT

SAN ANTONIO WATER SYSTEM PRE-CONSTRUCTION MINUTES

Transcription:

(To be printed on Professional s Letterhead) PRE-CONSTRUCTION MEETING AGENDA (Professional to provide attendance sign-up sheet Project Name: UM Project # Design Professional: Meeting Place: Meeting Time: Attendees: Provide Sign-up Sheet (Name, Company, Address, Telephone, Fax, & Email) Date: UM Project Manager: Other Key UM Personnel: Anticipated NTP Date: Anticipated Completion Date: TURN OFF ALL CELL PHONES PARTICIPANTS 1. Introduce all participants and their roles a. University personnel i. Owner Facilities Planning Contact Information ii. User Group - b. Design Professional(s) personnel i. Architect s Representative Contact Information ii. Engineers Representatives Contact Information c. General Contractor(s) personnel i. Project Manager Contact Information ii. Superintendent Contact Information iii. Others - d. Major Sub-Contractor(s) and their personnel for approval PROJECT CONTRACT COSTS AND DATES 2. Identify Contract Amount Base Bid plus Alternates 3. Verify alternates accepted 4. Review of Allowance and Unit Prices 5. Addenda 6. Notice To Proceed Date 7. Contract Completion Date 8. Liquidated Damages 9. Construction sets of plans available 10. Review of Project s Scope of Work and Schedule a. Project Schedule Time Extensions Phasing of the Work Project limits b. Materials storage, lay down areas and staging areas c. O.S.H.A. - Report all accidents - safety General Contractor's responsibility d. Contractor is reminded of obligation to comply with Mississippi Child Labor Law

PROCEDURAL AND COORIDNATION ITEMS 11. Chain of Command a. All instructions shall go through the Architect. The Architect shall keep Facilities Planning apprised of all information. Only the Architect shall give instruction and clarification to the General Contractor. b. All University/Owner instructions shall be given by Facilities Planning. Any direction given by the Using Department is not final and must be approved by Facilities Planning. If the Architect and/or General Contractor act upon direction given by the User, all actions shall be at the expense of the Architect and/or General Contractor. 12. Project Construction Superintendent and Key Personnel a. Approval of Office Staff and Superintendent Qualifications. b. The Project Construction Superintendent must be approved by the University through the Architect. c. The Project Construction Superintendent must be on site at all times while ANY construction work is occurring. d. The Contractor must not change the Project Construction Superintendent without first receiving approval from the University through the Architect. e. The Contractor must not change any Key Personnel on the project without notifying the Architect. 13. Project Contact List a. Contractor shall provide a list identifying all project personnel and there contact information; including General Contractor, Subs, Professionals, & Owner, 14. Submittals a. Submittal Schedule identifying all submittals required and anticipated submission dates must be provided. b. Submittal Exchange Process c. Shop drawings, format, time to process d. Potential conflict of mechanical and electrical equipment; shop drawings 15. Substitutions a. All substitution requests must be submitted to the Architect within thirty (30) days of Notice To Proceed. 16. Inspections and Testing a. Owner will contract a Third Party Firm to conduct on site materials testing & TAB. b. Advance notice for required inspection c. Above ceiling inspections by Architect, Engineers, Facilities Planning, Facilities Management, Contractors, and Subs d. Other inspections required before work is covered e. Inspection report distribution f. Quality of concrete work; concrete testing g. Inspections before pouring concrete h. Certificate or Substantial Completion/Final Inspection i. General Contractor's Roofing Guarantee-must be submitted with Certificate of j. Substantial Completion 17. Project Meetings a. Progress Cost breakdown & Progress Schedule - submit for approval b. Building Construction and Materials Mock-up Reviews c. Pre-roofing Conference - no roofing materials installed prior to conference d. Weekly Contractor & Sub-Contractor coordination meetings as required e. Monthly Construction Progress Meeting / Owner Architect Contractor Meeting Page 2 of 5

i. First???day of every month at??:?? a.m. or p.m. ii. Contractor will conduct meeting and distribute meeting minutes iii. Must review: Last 30 days of progress, Upcoming 30 days of work, Weather & Labor Report, Schedule & Status Report, Action Item List, RFI Log, Submittal Log, Change Order Log, and Project Issues. iv. This meeting is for Owner/User updates and coordination with the Owner/User. This meeting is NOT for the Contractor to coordinate with the Subcontractors. f. Door Hardware and Keying Meeting 18. Change Orders a. Change Orders - Documentation - no prior work, unless authorized in writing b. For ALL IHL projects, the Change Order must be transmitted to Facilities Planning. Facilities Planning will then send an approval request to IHL. The Change Order cannot be executed by the University until IHL approves the Change Order. c. Change Orders must be provided with detailed cost breakdowns and the written directions or drawings from the Architect that the Contractor used for pricing. d. Contractor must follow mark-up requirements as identified in the Supplementary Conditions. 19. Pay Applications a. Minimum two (2) original copies. b. Method of approving monthly payment requests c. Application for Payment must be submitted at the beginning of every month. The application shall be for the prior month in its entirety. d. AIA Form G702 with FormG703 e. Contractor s letter of statement regarding project schedule, weather days with NOAA backup, and, if necessary, a plan of action to resolve schedule issues f. All applications for payment after the first application must include the Affidavit Certifying Payment to All Subcontractors. g. The first application for payment will not be considered without a complete approved schedule of values, construction schedule, project contact list, and submittal schedule. 20. Sub-Contractor Coordination a. Contractor's duty to coordinate work of separate contractors b. Surveyor to check foundation wall if location critical c. Ready mix plant, file delivery tickets, slump tests, cylinders d. What is expected of masonry work, mortar additive Problems with hollow metal (install proper fire labels) Problems with fire damper installation 21. Utility and Outage Issues a. Coordinate any utilities supplied by Owner b. Coordinate outages and work in existing building with Owner 22. As-Built Documents a. Contractor must maintain, at all times, As-Built Documents. b. Design Professional will review the maintenance of the As-Built Documents at each site visit. c. Accurate As-Built Documents are required as part of Project Close Out Documents. PROJECT SITE 23. Supplementary Conditions Pay close attention to Supplementary Conditions. 24. Work Hours and Non-Interference of University Operations a. See Supplementary Conditions Page 3 of 5

25. Temporary Facilities and Use of Site a. Temporary Utilities per 1.13 of the Supplementary Conditions b. Contractor must provide temporary toilet facilities. The use of existing building toilets or adjacent building toilets is prohibited. c. Dumpsters - Contractor must provide construction dumpster and cannot use facility dumpsters. d. Keeping existing egress and circulation paths open and free from debris e. Routine job clean-up f. Project and other job site signs 26. Excavation a. See Supplementary Conditions no excavation activities of any kind are allowed when the University is officially closed. No Exceptions. b. See Contractor to contact Mississippi One Call, Inc. prior to any digging. c. Contractor to maintain confirmation number from MS One Call. New confirmation must be obtained, at least, every ten (10) days. 27. Site Issues a. Site Boundary and Construction Fence b. Staging and storage No materials or equipment shall be stored within the fence of the Facilities Management Facility. c. Protection of Trees and Plantings d. Crew Parking e. Site Documentation GPS mapping required. f. Site Safety g. Site Security 28. Existing Warranties a. Identify any existing warranties that must be maintained. PROJECT CLOSE OUT 29. Project Close Out Documents a. ALL ITEMS MUST BE RECEIVED BY FACILITIES PLANNING BEFORE Final Payment will be issued. b. See Contract Closeout Specification All Close Out Documents must be submitted per specifications. c. Contractor is responsible for downloading all documents from Submittal Exchange or project management software. d. Warranties e. Operating and Maintenance Manuals f. As-built Drawings g. Other requirements CONSTRUCTION CREW CONDUCT 30. Conduct on Site a. Construction crew members shall conduct themselves professionally. b. There shall be no inappropriate contact with students, faculty, and/or staff. c. Construction crew members must be properly clothed at all times. Shirts must be worn at all times. 31. Photo Identification Tags a. All construction workers and vendors shall wear, at all times, on their upper torso an identification badge, with their photograph, as issued by either their company or the University. The ID badge shall identify the name of the worker and the company by which the worker is employed. ID badges provided by the University may be obtained from the University ID Center at a charge dictated by Contractual Services. Page 4 of 5

32. Use of Tobacco Products a. Use of tobacco products is prohibited in all buildings. b. Smoking is prohibited at all times and at ALL locations on The University of Mississippi Campus. c. All violators will be subject to a fine. 33. Objectionable Conduct a. Any workman who may, because of improper conduct, become objectionable to the University will be promptly and permanently removed by the Contractor at the request of the proper University officials. 34. Miscellaneous Discussion Items: THE DESIGN PROFESSIONAL AND CONTRACTOR SHALL ENSURE MEETING MINUTES WILL ARRIVE AT THE DEPARTMENT OF FACILITIES PLANNING S OFFICE AND OTHER ATTENDEES OFFICES WITHIN FIVE (5) DAYS AFTER THE CLOSE OF THE MEETING. Page 5 of 5