Addendum # 4 August 9, 2018

Similar documents
Addendum # 3 August 3, 2018

ADDENDUM NO. 2. November 8, For: Wawona Hotel Heating Replacement CIF 5013

ADDENDUM NO. 2 HAMILTON MUNICIPAL AIRPORT THE VILLAGE OF HAMILTON, MADISON COUNTY, NEW YORK SECURITY SUBSTATION CONSTRUCTION

CHARLES COUNTY GOVERNMENT ITB NO WAKEFIELD PUMPING STATION UPGRADE

Table of Contents NOTE:

PURCHASING DEPARTMENT

Gibbs Morrison Cultural Center Site Improvements. Bid # ADDENDUM No. 1. July 25, 2017

CONSTRUCTION SPECIFICATION FOR GROUNDING

Addendum #2 Bid Opportunity RFP to Replace the Township of Wellesley s Fire Station #2. Closing Date: Friday, January 25, :00 hrs.

CITY OF OAK CREEK SINGLE FAMILY & TWO-FAMILY CONSTRUCTION/PERMIT REQUIREMENTS

THE CITY OF WALTHAM MASSACHUSETTS PURCHASING DEPARTMENT PHASE III RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING CONDOMINIUMS AND CONDOMINIUMS

The Homeowner s Building Application Checklist for Constructing a Residential Addition

Via Internet Posting 14 pages

SOLICITATION ADDENDUM

NOTICE OF ADDENDUM TO BID DOCUMENTS ADDENDUM NO. 2 September 10, 2018 BAKERSFIELD COLLEGE, VETERANS RESOURCE CENTER CONSTRUCTION PROJECT

INSPECTION REQUIREMENTS Page 1 of 5. JOB SITE ADDRESS posted during entire construction process.

Addendum #4 To Request for Proposal For Rackham Relocations: Project / Dated December 13, 2018

BUILDING PERMIT APPLICATION DECK. Address: City: Postal Code: Address: City: Postal Code: Address: City: Postal Code: Deck Size Construction Value $

Administrative Changes

Basement Renovation Guide For Residential Dwellings

SPECIAL INSPECTION AND TESTING AGREEMENT

Questions and Answers Construction of New Amenities At Folly Beach County Park

SPECIAL INSPECTION AGREEMENT FORM

Spring Lake Public Schools. Spring Lake, MI. March RE: High School Storage Buildings

HURON PUBLIC WORKS BUILDING HURON, SOUTH DAKOTA BID NO R

ADDENDUM NO. 1 FOR RENOVATIONS TO LINCOLN ANIMAL SHELTER RFP # February 1, 2018

THE CORPORATION OF THE TOWNSHIP OF HAMILTON HOME BUILDER S GUIDE PART I MUNICIPAL BUILDING REQUIREMENTS

Inspection requests submitted by 2:30pm will be scheduled for the following business day unless otherwise requested.

CITY OF PORTSMOUTH, NEW HAMPSHIRE GREENLAND WELL PUMP STATION REPLACEMENT ADDENDUM NO. 1

RENOVATION OF THE VIA BUILDING FOR THE GUELPH TRANSIT TERMINAL FROM THE PRE- QUALIFIED GENERAL CONTRACTORS Reference Number:

PLANNING, PROPERTY AND DEVELOPMENT DEPARTMENT. Construction requirements for LOWER LEVEL DEVELOPMENT. in residential dwellings

ROUTT COUNTY REGIONAL BUILDING DEPARTMENT 136 * P.O.

Building Department Informational Handout

BUREAU Joe Iuviene, AIA January 20, 2017

Addendum #3 To Request for Proposal For Rackham Relocations: Project / Dated December 13, 2018

Statement of Special Inspections 2013 CBC

ADDENDUM NO. 2 Consisting of 3 pages and Attachments

PLANNING DEPARTMENT 701 OCEAN STREET, 4 TH FLOOR, SANTA CRUZ, CA (831) FAX: (831)

INSPECTION TIMING CHECKLIST FOR RESIDENTIAL FRAME BUILDING PRIOR TO INSPECTION REQUEST

C o u n t y o f F a i r f a x, V i r g i n i a

Module number 3 provides an on-line, self-paced training seminar on chapter 4, foundations and chapter 5, floors from the residential code of ohio.

City of Westerville Guide to Commercial Inspections

ADDENDUM NO Refer to Specifications Section Alternates. Clarifications to alternate descriptions are as follows:

STATEMENT OF SPECIAL INSPECTION FORM

THE CORPORATION OF THE TOWNSHIP OF HAMILTON HOME BUILDER S GUIDE PART I MUNICIPAL BUILDING REQUIREMENTS

Borough of Doylestown Building and Zoning Department

Tiger Drylac Canada Inc. Batching Room and Storage Addition 110 Southgate Drive, Guelph, ON December 4, 2017

Residential Building Permits

Hansen Pole Buildings Planning Guide. Toll Free / Toll Free FAX

LISTING INFORMATION OF Mitek Design No. MCI/WI SPEC ID: MiTek Canada, Inc. 100 Industrial Road Bradford, ON L3Z 3G7 Canada

Project: Lake Creek Village Apartments Project No: 0547

******************************************************************************

RAPID STRUCTURAL ASSESSMENT REPORT

Port KC RFP NORTHLAND PARK BUILDING V

Statement of Special Inspections Michigan Building Code 2012 (MBC 2012)

SECTION TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS. ADD the following sections: Commissioning Requirements...

BUILDING PERMIT APPLICATION CITY OF SIDNEY BUILDING INSPECTION DEPARTMENT

Request for Quotation 4664Q General Contractor Building Improvements and Infrastructure Replacement at Richmond Ice Centre - Addendum Two

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)

ONE AND TWO FAMILY DWELLING PERMIT APPLICATION REQUIREMENTS

legend. #1 is a gas relief valve? If so does Enbridge supply with station?

SECTION ADDENDUM NUMBER ONE

ADDENDUM #1 TO THE SPECIFICATION FOR THE CONSTRUCTION OF THE 115KV STONEBREAK RD. TRANSITION STATION THE TOWN OF MALTA AND A PORTION OF THE 115KV

TOWN of LAKESHORE SUBDIVISION DEVELOPMENT PLAN CHECKLIST

Michael Teller, CBI Consulting Inc. Gymnasium & Auditorium Restoration at South Middle School

Residential Building Inspections

SITE PLAN (Existing) 18'-10" Existing Deck 15'-9" 26'-0" Existing Stairs 43'-11" Cantilever 1' wide 42'-0" 50.0ft

ARCHITECTURAL TECHNOLOGY & DESIGN DESSIN ET TECHNOLOGIE ARCHITECTURALE POST-SECONDARY NIVEAU POSTSECONDAIRE

HILLVIEW ELEMENTARY ADDITIONS AND ALTERATIONS Grove City Area School District

RESIDENTIAL NEW CONSTRUCTION PLAN REVIEW CHECKLIST

INVITATION TO TENDER ( ITT ) NO. PS SKYLIGHT REPLACEMENT: VANCOUVER CITY HALL & ART GALLERY LOBBY ADDENDUM NO. 1

Installation. Resilmount A237R. Installation Instructions. Furring channel sound isolation clip

INDIANA COUNTY Office of Planning and Development 801 Water Street Indiana, PA (724) Fax (724)

CODE COMPLIANCE GUIDELINE GENERAL BUILDING

Town of Kingsville. Building Department

Transmittal. Oshawa, ON L1H 7K7. Mr. Kevin Jones DC - Design Services Durham College Whitby Campus Weston Grant for Farming Expansion

A D D E N D U M T O B I D PRE-ENGINEERED METAL BUILDING

Supplemental Plan Correction Sheet for LA Residential Code Prescriptive Design (2014 LARC)

DISTRICT OF TOFINO BARRS MOUNTIAN RESERVOIR REPLACEMENT PROJECT. Attached, please find Addendum # 1 for the above noted project.

MMI PREPARATORY SCHOOL LIBRARY FREELAND, PA BID CLARIFICATION NO. 3 JULY 19, 2011

Addendum 2 Bid No & 12-5

Typical Deck Details. Shenandoah County, Virginia. Based on the 2012 Virginia Residential Code

CITY OF BATAVIA DECK CONSTRUCTION REQUIREMENTS

SPECIAL INSPECTION AGREEMENT

HILLSBOROUGH TOWNSHIP CODE ENFORCEMENT

SUBMITTAL REQUIREMENTS FOR SINGLE FAMILY DWELLINGS

This Addendum consists of:

STANDARD RESIDENTIAL DECK DETAILS

ANY SPECIFICATION DRAWINGS OR DATED PRIOR TO SEPTEMBER 2015 WILL NOT BE HONORED.

PRESENTATION PLAN A MODEL COMPARISON FLOOR CONSTRUCTION

Wood Decks Zoning and construction requirements for open non-sheltered wood decks for residential dwellings

Addendum 1 Resort Lifestyle Communities- Office Addition

RFI REPLY. Project: Palm Coast Readiness Center Date: 07/22/16 Flagler County, Florida Comm. No.: 09005

THE CORPORATION OF THE TOWNSHIP OF HAMILTON HOME BUILDER'S GUIDE PART I MUNICIPAL BUILDING REQUIREMENTS

Uncovered Decks & Porches

NEWS LETTER MARCH 27, 2009

$ Plan Review Fee when Permit Application is submitted BASEMENT REMODEL BUILDING PERMIT APPLICATION. Status Sticker OFFICIAL USE ONLY

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

The Homeowner s Building Application Checklist for Constructing a Residential Sundeck

C ITY OF D ARIEN Community Development Department 1702 Plainfield Road Phone: (630) Fax: (630)

Transcription:

Addendum # 4 August 9, 2018 Richards Consulting & Associates Limited R.R.3 Red Deer, Alberta T4N 5E3 Phone: 403-886-2919 Fax: 403-886-2733 PROJECT: Connector Building Phase 2, Lac La Biche, Alberta THIS ADDENDUM FORMS PART OF, AND WILL BE ADDED TO, THE FINAL SET OF DRAWINGS FOR THIS PROJECT. THE PROJECT WILL NOT BE CONSIDERED COMPLETED, AND THE ENGINEER SHALL NOT SUPPLY A CERTIFICATE OF COMPLETION FOR AN OCCUPANCY PERMIT, UNTIL THE FOLLOWING REQUIREMENTS HAVE BEEN MET. ACKNOWLEDGMENT OF THE RECEIPT OF THIS ADDENDUM SHALL BE SENT TO RICHARDS CONSULTING & ASSOCIATES LIMITED. 1. Page A5.0 of the provided drawing set floor specification is to include 1 x1 x18 ga hat channel placed at 12 o.c. in all areas where drywall is to be secured to the underside of the specified open web steel joists. The hat channel is to be secure to the open web steel joists using 2-#10-1-1/2 tek screw per joist location. 2. Page S3.0, drawing C-C and page S4.2, drawings 1 and 2 have both been adjusted to correctly show the column continuing through the floor structure up to the ceiling. Detail 3 has been added to sheet S4.2 to clarify how the beams supporting the floors will be attached to the columns. 3. Revised Clarification Letter End of Addendum

RICHARDS CONSULTING AND ASSOCIATES LTD. 27317 Twp Rd 372, Red Deer, Alberta T4E 1N9 Specializing in the design and structural engineering of commercial, industrial, agricultural and residential wood, precast and steel frame buildings. CS-31-2018-01 Phone: 403-886-2919 Fax: 403-886-2733 DATE: August 9, 2018 PROJECT: Lac La Biche County Center Maintenance Shop & Connector Building Phase 2 RCA #: 17216 RE: BID SUBMISSION DATE: CLARIFICATION REGARDING TENDER PACKAGE CS-31-2018-01 AUGUST 13, 2018 BY 2:00 pm 1. When can we expect drawings for the exhaust air relocation? Addendum #3 will be issued the Aug 3, 2018 addressing this question. 2. Will there be a frame design or mounting instructions for the exhaust air? Frame design will be issued as part of addendum #3 3. Is the oil/grit separator being supplied by others? The oil/grit separator is a basic 6 ft diameter settling manhole. It is to be provided by contractor. 4. Can we be provided with specs for the oil/grit separator? The specified oil and grit separator is intended to be a typical 6-0 diameter manhole with a settlement chamber at it s base as per the provided invert elevations on drawing M1 by CWC Chapman. 5. Will the existing buried facilities under the proposed building be relocated by County? Yes 6. Is it possible to get a 7-day extension on the bid? A 7-day extension has been issued as part of Addendum #2, the bid closing date has been extended to Aug 14, 2018 at 2:00 pm 7. Is there a copy of a Geotech report that would be made available to us? The existing Geotechnical Report will be made available to all parties by Aug 3, 2018 8. Who is responsible for the installation of the transformer? Who is supplying it? Who will be responsible for the transformer ground grid and the conduits that need to be ran to the fence line? The contractor is to supply and install the conduits to fence line and from the base into the building CDP and install the ground grid and Tx base. Utility to supply and install transformer.

9. Please see attached typical underground utilities trench detail for confirmation on bedding and compaction requirements. 10. The question was asked as to who is responsible to provide appliances for the proposed connector building facility. The County of Lac La Biche is responsible to provide all facility appliances. This includes the indicated laundry machines, micro waves, cooking appliances, dish washer and the fridges. 11. Are the aprons to be full length on both sides of the building or only door pads outside the man doors on the east wall? The concrete aprons are intended to be full length of the building inclusive of the shop and connector building on both the east and west sides of it. 12. There is a column or two by the east stairwell can I assume these will be field welded and fastened into the existing grade beam. The stair supporting columns on the east side of the facility can be field welded and fastened into the existing grade beam. 13. Please confirm if the grade beam/floor slab insulation needs to be placed in the areas that butt up to existing building. It seems like cost savings could be made. The under-slab insulation is not required in the areas which adjoin the existing structures. Best Regards Michael Richards P. Eng AUGUST 9, 2018 RCA 17216