Elizabeth River Crossings OpCo, LLC Elizabeth River Tunnels Project Monthly Report Owners and Holders Pursuant to Continuing Disclosure Agreement

Similar documents
Elizabeth River Tunnels Project. ASHE October Technical Meeting ERT Project Overview October 8, 2015

Pattullo Bridge Replacement Project. Cost Report

Northeast Bridge Preservation Partnership Meeting

Highway Construction Program

Downtown Tunnel/Midtown Tunnel/MLK Extension Project

Peninsula Widening. Project Description. Overview of Project Status. Estimated Total Project Cost $4.7 - $7.3 Billion

I-91 Viaduct Public Information Briefing

PROJECT UPDATE SOUTH NORFOLK JORDAN BRIDGE CITIES OF PORTSMOUTH AND CHESAPEAKE, VIRGINIA. April 2012

Transportation Update

MANUAL OF THE STRUCTURE AND BRIDGE DIVISION

PORT OF MIAMI TUNNEL PROJECT Highlights & Where we are today!

APPROACHES AND BRIDGE OVER TYE RIVER (RTE. 29 NBL) RFP QUESTIONS AND ANSWERS-REVISION 2

Responses to questions received following I-526 Wando Bridge closure As of May 31, 2018

Rt. 29 Solutions Project Delivery Advisory Panel. February 18, 2016

PUBLIC INFORMATION MEETING June 24, 2015

ASCE STRUCTURAL ENGINEERING CONFERENCE. Ames Iowa

Maritime Work Plan for the High Rise Bridge Construction

NJDOT Bridge Preservation and Asset Management Strategies. Gerald P. Oliveto, P.E. Roger Estivalletti

Report to the Dulles Corridor Advisory Committee. Proposed Dulles Toll Road Toll Rate Adjustment. October 2018

Ironton Russell Bridge Project

Ironton Russell Bridge Project

Lesner Bridge Replacement

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application

TH 169/TH 494 DESIGN BUILD PROJECT

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT From 06/04/2017 to 06/10/2017

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

STRUCTURE AND BRIDGE DIVISION

PUBLIC WORKS COMMISSION 2018 STREET EXCAVATION PERMIT PROCEDURE

Cedrick T. Fulton President. Solicitation RK-23C. Design-Build Services for New Harlem River Drive Connector Ramp

Ironton Russell Bridge Project

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12

VT 14 East Montpelier Bridge Project Informational Meeting. February 22, 2017

PROJECT: NEW 11kV FEEDER FROM RARAWAI 33/11kV SUBSTATION TO YALALEVU INDUSTRIAL AREA AS PER SCHEME NO. SR38/14

Highway Construction Program

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT From 10/01/2017 to 10/07/2017

Ironton Russell Bridge Project

ARTICLE 1. FIRE LIMITS AND BUILDING REGULATIONS

PROJECT: NASRUP SECTION 1B UNDERGROUND RELOCATION STAGE 4 FROM CH SCHEME: C (FROM WAQADRA SUB TO NATALY JUNCTION)

Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E.

Exhibit A Mn/DOT Contract No

NEW JERSEY DEPARTMENT OF TRANSPORTATION MEMORANDUM

Ironton Russell Bridge Project

Cumberland Viaduct Rehabilitation Project Contract No. AL R Presenter Bob Bofinger MDSHA Office of Structures

PROJECT: RELOCATION OF FEA ASSETS NEW VATUWAQA BRIDGE TRENCHING WORK SUVA SCHEME: C21/14

PROJECT: INCREASE DEMAND FOR UNIVERSITY OF FIJI- KULA STREET SAMABULA SCHEME: G115-15

Review of Plans and Specs from a Constructability Perspective

Ironton Russell Bridge Project

Construction Coordination & Management Planning MassDOT-Highway/MBTA. 495/MetroWest Partnership Briefing July 11, 2018

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT From 04/09/2017 to 04/15/2017

SECTION 10 UTILITIES

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk

Ironton Russell Bridge Project

NORFOLK SOUTHERN RAILWAY COMPANY FILES: BR & BR

THE KOSCIUSZKO BRIDGE PROJECT. The New York State Department of Transportation. Page 1

Engineering & Capital Improvements. Shore Acres Civic Association August 21 st, 2017

MASTER AGREEMENT FOR BRIDGE DESIGN SERVICES SCOPE OF WORK

Dulles Corridor Metrorail Project

Challenges in Urban Tunneling

Constructability Guidelines

DESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION

PROJECT: SUPPLY TO BERRY ROAD APARTMENT - SUVA SCHEME: G43-13

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS, CENTER FOR ENVIRONMENTAL EXCELLENCE, HISTORIC BRIDGES COMMUNITY OF PRACTICE

REQUEST FOR PROPOSALS

SAN ANTONIO STREET BRIDGE AT COMAL RIVER. Open House

I-395 Reconstruction MDX SR Improvements I-95 Concrete Pavement Reconstruction

May 26, Required Attendance Yes_X_ No MEMORANDUM. Mr. Don Silies Attn: Mr. John Jacobs. Salvija Hofheimer. Project Showing

I-64 Pavement Rehabilitation

Glenmore Causeway Upgrades Project. Calvin T. McClary, P. Eng., Manager, Transportation Engineering, ISL Engineering and Land Services Ltd.

Safe, innovative, quality construction since Riding on the Strength

Dulles Corridor Enterprise Financial Update Dulles Corridor Advisory Committee Meeting

August 9, Required Attendance Yes_X_ No MEMORANDUM. Mr. Don Silies Attn: Mr. John Jacobs. Salvija Hofheimer. Project Showing

TOWN OF LABRADOR CITY FORM OF TENDER TLC SUPPLY & INSTALLATION OF CONCRETE FLOOR

Roadway Surfaces and Traffic Control Elements

Preliminary Project Assessment

Manor Expressway Project PROGRESS REPORT

ANSWERS TO QUESTIONS RECEIVED THROUGH 11:00 A.M. ON JANUARY 4, 2019:

Feasibility Assessment Study

Conceptual Design Report

PILLAR PAGE 3

Millennium Line Broadway Extension Project. Cost Report

PENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION

Lesner Bridge Replacement

Implementing Asset Management: WSDOT s Experience

CITY OF SAFETY HARBOR 750 MAIN STREET, SAFETY HARBOR, FLORIDA PHONE: 727/ FAX: 727/

Maryland Transportation Authority (MDTA)

Transportation Investment Corporation 2015/ /18 SERVICE PLAN

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT From 02/26/2017 to 03/04/2017

Second Avenue Subway

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0

Plessis Road Twinning and Grade Separation at CN Redditt Subdivision: Design Challenges and Innovative Solutions

STATUS REPORT Congestion-Relief Program. Steve Gillen Illinois Asphalt Pavement Association March 12, 2007

REQUEST FOR PROPOSALS

Whittier Bridge/I-95 Improvement Project. Public Information Meeting

Construction Update. April 2016

Phase 2 Exposition Metro Line Project

395 Express Lanes Project Design-Build Procurement Industry Outreach. March 23, 2016

ATTACHED/DETACHED GARAGE BUILDING PERMIT APPLICATION

Kevin Abt Chief Engineer Virginia Port Authority

ARROWS RANSPORTATION LAN

Transcription:

Elizabeth River Crossings OpCo, LLC Elizabeth River Tunnels Project Monthly Report Owners and Holders Pursuant to Continuing Disclosure Agreement November 2015 From: Greg Woodsmall, Chief Executive Officer, Elizabeth River Crossings OpCo, LLC Date: December 23, 2015 The following information provided by Elizabeth River Crossings OpCo, LLC ( ERC or the Company ) recaps progress and current status of the Elizabeth River Tunnels Project as of November 30, 2015. The report provides a high-level summary of project activities and status based on the Continuing Disclosure Agreement. Sections 1. Summary of Construction schedule to Substantial Completion of New Project Assets 2. Summary Progress Report 3. Material Change Orders to Design Build or Tolling Contract 4. Financial 5. Company Certificate for Adequate Funds

Page 2 of 7 1. Summary of Construction Schedule to Substantial Completion The existing Downtown Tunnel Rehabilitation and MLK Extension schedule have negative float variances between the Current Update and the Previous Schedule Update. The existing Midtown Tunnel Rehabilitation and New Midtown Tunnel schedules all remain on target. The negative float variance related to the existing Downtown Tunnel Rehabilitation is not due to delay in the work. Instead, it is a result of adding the Control Room Rehabilitation to the schedule. The MLK Extension has been delayed because of site access issues related to pile testing for the bridge above Norfolk Portsmouth Belt Line Railroad. A summary of key milestones in the design-build construction schedule showing the Contractor s current forecast of substantial completion for each major activity of construction is included below: 2. Summary Progress Report A brief summary of O&M and Tolling update is provided below. a. Operations and Maintenance The Company staffing level remains steady, with 118 individuals, who worked a total of 18,465 hours. In November, ERC responded to 57 vehicle accidents involving impacts to travel lanes; this being a decrease from the 68 recorded in prior month. Response time for these incidents was 3.6 minutes, with the disabled vehicles being cleared in 9.1 minutes on average. These times continue to be well within the Comprehensive Agreement requirements

Page 3 of 7 In the month of November emphasis was placed on planning and training for the maintenance department. ERC s crews and subcontractor participated in training to prepare for the winter weather. Snow routes were updated along with ERC s Snow Operations Plan. The Downtown Tunnel Norfolk Approach roadway lighting contract is underway, lighting foundations and conduits have been installed. Also progressing this month is the safety rail replacement project at the Portsmouth side of the Downtown Tunnel. Currently, there are several major projects in the design phase which include Downtown Tunnel Pump Room retrofit, Downtown Tunnel Vent Building renovations and reroofing Portsmouth Plaza and West Vent Building. The bid package for multiple bridge structure repairs is being prepared; work is planned to commence in 2016. b. Traffic and Revenue The average daily traffic for the month of November 2015 was 91,001 vs budget of 103,222 and roughly 2.6% below November 2014. Cash flow from revenues resulted in a year to date negative variance of $10.7 million compared to budget of $87.3 million. In the month, approximately 269,000 invoices, violation notices, and final notices were sent to customers. This level of activity reflects steady state operations. Overdue customer accounts were transferred to collections agent, Linebarger Goggen Blair & Sampson, LLP and 5,000 collection letters were sent out on November 25 th. A further 115,000 initial letters will be sent out to individual and corporate customers during December 2015. Weekly communications and progress meetings continue with VDOT to address any tolling system issues and in particular any that may affect E-ZPass operations. c. Design-Build Construction Work SKW Constructors ( SKW ) Project Planning / Design o Design work is substantially complete. Marine Work o Tunnel Element backfilling is nearing completion. o Extension of the permanent steel bulkhead has been completed in Norfolk which will provide a protective barrier around Element 11. All concrete filled steel pilings were placed along the outside of the wall for additional protection.

Page 4 of 7 Tunnel Outfitting o Outfitting of the tunnel interior continued this month including, installation of topping concrete slabs, roadway barrier, installation of mechanical and electrical equipment, and installation of fire protection boards. o The remaining steel bulkhead located in the Norfolk Cut and Cover is scheduled for removal in December. o Installation of support struts and brackets in the roadway section for future installation of permanent lighting has progressed through Element 11. Tunnel Approaches o Portsmouth Approach: large section of the approach road to the new Midtown Tunnel and over height turnaround to Route 58 Westbound has been completed. Portsmouth Tunnel Support Building construction has progressed with the majority of the work inside the building which includes install of electrical conduit and water mains. o Norfolk Approach: work has progressed with work in the crossover and the approach connection to Route 58. Final invert section and all of the walls for the mainline Boat Section have been completed. Foundation and drainage for the roadwork to connect the tunnel has been installed. The floodgate has been installed with the upper steel support structure completed to the point the floodgate could be lowered into place from the top of the structure if severe flooding is forecasted. Rehabilitation of Existing Tunnels Westbound Downtown Tunnel o VDOT has provided concurrence regarding Interim Substantial Completion of the Westbound Downtown Tunnel Rehabilitation Work. Eastbound Downtown Tunnel o Interim Substantial Completion has been declared by contractor and joint inspection walkthrough was completed this month. ITS conduit and cabinet foundation work continues on both the east and west sides of the Downtown Tunnel. Existing Midtown Tunnel o Evaluation process continues in preparation for the rehabilitation of the tunnel. MLK Extension o The Critical Path continues to be through the MLK Mainline Bridge with girder erection, deck construction, barriers, and minor finishing items which are being closely monitored by all parties.

Page 5 of 7 o The MLK portion of the project is progressing per the schedule and additional float was gained this month as the schedule continues to be refined. Total MLK project progress is at 63% with substructure work nearing. o Superstructure work continues with pedestrian bridge. Scheduled to be erected next month. o Completed tasks: footer, column, and cap work with the exception of the bridge widening over the NPBL railroad. 3. Description of any Material Change Orders to Design-Build or Tolling Contract a. Design-Build Contract Certified Work to Date o The total amount certified at November 30, 2015 was $1,227.1 million, with $19.9 million certified in the month. The amount paid by ERC to SKW as of the date of this report is $1,207.1 million. The material Change Orders issued to date are as follows: Change Order 1 - $5.2 million. An increase of $8.3 million was anticipated in the financial close model as a result of financial close being achieved on April 13, 2012. Also included were $3.1 million of credits related to insurance premiums payable by the Company and a contribution to the construction costs of the Company s offices. This is between ERC and the Contractor and does not affect funding from the Department or Lenders. Change Order No. 2 - $22.1 million for lighting, fire alarm system, and replacement of the AM/FM and Highway Advisory Radio antennas and cabling which was brought forward from post Substantial Completion of the New Project Assets following execution of the Additional Work Options in the Design and Build Contract there is no change to the overall funding requirement as this work would otherwise have been funded at substantial completion as part of the Major Maintenance Reserve. This is between ERC and SKW and does not affect the funding from the Department or Lenders. Change Order No. 5 - $1,931,271 for the revised WB DTT tunnel rehabilitation closure schedule. This change order has been funded by VDOT. Change Order No.6 - $672,767 SCADA System Improvements Excess Rehabilitation Costs. Change Order No. 7 - $1,260,694 for WB DTT Excess Rehabilitation Costs Change Orders No. 8, 13, 17, 18, 20, 21, 23, 25, 26, 27 and 30 credit of $1,751,024 of Fuel Adjustment through October 31, 2015 funded to VDOT. Change Order No. 9 - $535,958 for EB DTT Excess Rehabilitation Costs Change Order No. 11 - $1,328,000 for increased quantity of Jet Fans - Excess Rehabilitation Costs.

Page 6 of 7 Change Order No.12 - $1,522,007 Global Settlement has been executed to resolve seventeen long standing issues - funded by VDOT. Change Order No. 16 - $17,000 March 14 th EBDTT 8am to 8pm Opening funded by VDOT. Change Order No. 24 - $63,000 December 12 th Weekend Cancelation funded by VDOT. Change Order No. 28 - $27,000 Pedestrian Bridge Corrosion Protection funded by VDOT. 4. Financial b. Tolling Contract Following the elimination of MLK tolling a Tolling Contract Change Order is required but has not been executed at the time of this report. Pursuant to our letters of July 31, 2015 and August 26, 2015, 3M has acknowledged in their letter to ERC dated December 3, 2015 that a default has occurred under the Tolling Contract. As reported previously 3M has appointed Cognizant to complete the outstanding work required to achieve final acceptance. Cognizant has provided significant resources and is proceeding diligently to provide enhanced system functionality, including a financial database restructuring. In view of 3M s demonstrated improved commitment to complete the project, ERC is working with 3M to achieve final acceptance by fall 2016. Total project costs (pre sales revenue or public funds equivalent) for the period from commencement of the project to November 30, 2015 ( PTD ) are $1,545.7 million compared to budget of $1,567.4 million resulting in positive variance of $21.8 million. The month of November 2015 and eleven months to November 2015 ( YTD ) show positive variances of $793k and $19.1 million, respectively compared to budget. These variances are mostly timing with respect to the Design-Build Contract. 5. Certificate from the Company regarding adequacy of Funds Available The Certificate is appended to this report as Attachment 1.

Page 7 of 7 Attachment 1 Elizabeth River Crossings OpCo, LLC Certificate of Adequate Funding to Completion

CERTIFICATE OF ELIZABETH RIVER CROSSINGS November 2015 $663,750,000 Virginia Small Business Financing Authority Senior Lien Revenue Bonds (Elizabeth River Crossings Opco, LLC Project), Series 2012 Deutsche Bank Trust Company Americas, as Collateral Agent Trust & Securities Services Mail Stop: MSNYC60-2715 60 Wall Street, 27th Floor New York, NY 10005-2836 Attention: Municipal Trust Department TIFIA Joint Program Office (HITJ), as TIFIA Lender Federal Highway Administration Room E64-301 1200 New Jersey Avenue, SE Washington, DC 20590 Attention: Director With a copy to: Federal Highway Administration Virginia Division Office 400 North 8 th Street, Suite 750 Richmond, Virginia 23219-4825 Attention: Division Administrator Ladies and Gentlemen: Any capitalized term used herein but not defined in this Certificate shall have the respective meanings assigned to such terms in that certain Collateral Agency Agreement. Elizabeth River Crossings Opco, LLC hereby certifies that the remaining costs of the Work under the Design Build Contract and under the Tolling Contract do not exceed the amount of funds available to the Collateral Agent for such purpose (as shown in the most recent statement of the Collateral Agent). [signature page follows] OHSUSA:750226700.2

Date: December 23, 2015 Anthony Evans Authorized Representative of Elizabeth River Crossings Opco, LLC OHSUSA:750226700.2