1 PG&E Integrated Vegetation Management Program for Transmission Line Rightsof-Way and Access Roads (using herbicides and mastication), Eldorado National Forest PURPOSE AND NEED FOR ACTION Pacific Gas and Electric Company (PG&E) is required to manage vegetation that presents a risk to its electric transmission facilities. Various federal and state laws address this requirement, including Federal Energy Regulatory Commission (FERC) license articles, as well as FERC Safety Inspection (Chapter 5), and Public Resources Codes (PRC). Vegetation management is a critical component of ongoing operation and maintenance of PG&E transmission line facilities. The objective for PG&E's proposed use of mastication and herbicides as part of an Integrated Vegetation Management (IVM) program is to promote compatible vegetation (and eliminate incompatible vegetation) within the existing rights-of-way (ROWs) and along a 200 foot hazard tree zone (HTZ) established on each side of the ROW for the French Meadows - Middle Fork ROW (FERC No. 2479). Compatible vegetation is desirable or compatible with the intended use of the ROW. For example, plant species that would never grow sufficiently close to violate minimum clearances with electric conductors such as grasses, forb, and low growing shrubs. Compatible vegetation does not interfere with the safe and reliable transmission of electricity or the inspection and maintenance of facilities. Incompatible vegetation is undesirable or unsafe vegetation and may interfere with the intended use of the ROW now or at any time in the natural lifespan of the plant species. The existing vegetation management options in the ROWs do not include mastication or the use of herbicides and instead rely on manual labor such as pruning and removal of trees and brush species. This is inadequate to maintain control of brush and hardwood species that continuously re-sprout from the roots with increased stem density. The proposed IVM program including herbicide use with mastication in certain locations would promote and establish a more permanent change of vegetation structure within the ROW to maintain lowgrowing, native plant species that pose lower risk of conflicts with the transmission line. An economical and effective IVM program is needed to establish and maintain compatible/desirable plant communities within the transmission corridor and control incompatible species such as noxious or invasive weeds, those species with the potential to grow into and interfere with the conductors, and those brushy species that contribute to fuel loading. The transmission line ROWs and the HTZ along French Meadows-Middle Fork Transmission Line within the ENF require ongoing vegetation management and an integrated vegetation management program that includes the use of herbicides and mastication is intended to result in the most effective, long-term approach for facilities management. The proposed IVM program would improve public service, safety and reliability of the facilities, and reduce the risk of catastrophic wildfires. Herbicide Use and Mastication Vegetation Management Objectives: Improve efficacy of PG&E s vegetation management program and improve safety and reliability of electric transmission service. Prevent massive power outages, blackouts, and disruptions that can lead to injuries and possible fatalities. Comply with federal and state regulations for vegetation management in transmission line ROWs. Promote compatible vegetation within the transmission line corridors. Establish low growing native shrub-forbs-grass cover types in the wire zone and a taller shrub-forb-grass cover types in the border zones. Control incompatible vegetation within the ROW beneath the lines, poles and facilities out to the edge of the ROW.

2 Avoid the dense re-growth resulting from manual and mechanical-only tree and brush removal and subsequent re-sprouting of vegetation while minimizing the need for repeated removal methods. Access Road Management Goals Vegetation along access roads also needs to be maintained to improve site clearance, and site distance and to reduce fire risk from vehicles parked in the dry grass on the side of the road. Project Location The proposed work area footprint incorporates approximately 26 miles of electric transmission line corridor, and 591 ROW acres including an additional 200 foot HTZ along the French Meadows-Middle Fork ROW. The ROWs are variable in width ranging from 40 to 200 feet wide and the treatment area footprint identified in Table 1 below includes the maximum extent of the ROW or wire zone-border zone area. In addition, approximately 11.5 acres of transmission line access roads are proposed for herbicide treatment. These include project roads under Special Use Authorization and PG&E-maintained roads identified in the French Meadows Middle Fork Road Plan and Maintenance Agreement. Table 1 provides a summary of the locations where herbicides are proposed and the attached maps (Maps 1 through 3) display the locations of transmission line facilities and the HTZ. PROPOSED ACTION PG&E proposes the use of mastication and herbicides to maintain the required clearance from power lines (PRC 4293) and to clear (brush) vegetation from around the base of structures in accordance with California PRC 4292 and GO 95. Herbicide use is regulated by the U.S. Environmental Protection Agency (EPA), the California Environmental Protection Agency (CalEPA), Department of Pesticide Regulation (CDPR). Forest Service Handbook (USFS 1994a) guides pesticide-use on National Forest System lands and requires compliance with Forest Service standards and guidelines and other management direction. Herbicide Use Along Transmission Line ROWs: PG&E proposes the use of six herbicides within approximately 591 acres and in the project locations described above and in Table 1 below. Table 2 describes the proposed products and provides a brief description of why each herbicide is being proposed in this project including target species and timing considerations. This includes a broad and diverse group of herbicides with the intent of providing the flexibility and adaptability of vegetation management needs currently and those that may arise in the future. Having access to a wide range of active ingredients and modes of action would allow for the most appropriate herbicides to be prescribed for the control of target vegetation. The use of the most appropriate herbicides for species identified as incompatible within the ROWs, results in greater efficacy of treatments and the need for the least amount of herbicide necessary to achieve management goals. Herbicide prescriptions would assist with herbicide resistance management. All proposed herbicides have been approved by the US Environmental Protection Agency and the California Department of Pesticide Regulation. 2

3 Table 1. Summary of PG&E Proposed Herbicide Use within Transmission Line ROWs and Access Roads on the Eldorado National Forest TOTAL RANGER DISTRICT NAME GEORGETOWN RANGER DISTRICT FRENCH MEADOWS-MIDDLE FORK (FERC) Kilovolt s (kv) Special Use Authorization ID or FERC No. ROW Width (FEET) 60 FERC No Attached Map Number USGS Quadrangle Map 1 USGS Quadrangle: Bunker Hill, Greek Store T-Line Miles ROW Acres Proposed Herbicide Use Work Area Acreage Proposed Herbicide Use Road Acres FRENCH MEADOWS-MIDDLE FORK (FERC - HTZ) MIDDLE FORK #1 60 MIDDLE FORK-GOLD HILL 230 PLACERVILLE RANGER DISTRICT EL DORADO-MISSOURI FLAT #1+ & 2+ AMADOR RANGER DISTRICT NA FERC No (440-40) kv 115 kv SALT SPRINGS-TIGER CREEK 115 GTN156 (Expires 2037) GTN156 (Expires 2037) Special Use Authorization ID or FERC No. PVL177 (Expires 2034) Special Use Authorization ID or FERC No. AMA208 (Expires 2034) ROW Width (FEET) 200 ROW Width (FEET) 80 Map 1 USGS Quadrangle: Bunker Hill, Greek Store Map 1 USGS Quadrangle: Greek Store, Michigan Bluff, Tunnel Hill Map 1 USGS Quadrangle: Georgetown, Greek Store, Michigan Bluff, Tunnel Hill Attached Map Number USGS Quadrangle Map 2 USGS Quadrangle: Pollock Pines, Slate Mountain Attached Map Number USGS Quadrangle Map 3 USGS Quadrangle: Calaveras Dome, Devils Nose, Garnet Hill NA Grand Totals (non-overlapping) Notes on Methodology: Mileage is based on only the portions of Transmission lines within the specified project extents Overlapping Line ROW areas and miles are subtracted from Corridor ROW areas and miles, respectively 1 Areas excluded from proposed herbicide use include locations where there is 100 feet or more of clearance from ground to conductor height. In many cases, this excludes perennial streams in canyons. More detailed maps showing these exclusion areas are available upon request. 3

4 Table 2. Product, Target Species and Timing HERBICIDE (Trade Names 1 ) Aminopyralid (Milestone, Milestone VM or equivalent) Clopyralid (Transline or equivalent) Glyphosate (Accord, Rodeo or equivalent) Imazapyr (Chopper or equivalents) Triclopyr (Amine Formulation, Garlon 3A) Triclopyr (Ester Formulation, Garlon 4 Ultra or Forestry Garlon XRT) Adjuvant MSO Surfactant/Diluent (Hasten, Competitor (aquatic formulation) WHY NEEDED? TARGET SPECIES TIMING Effective as a selective pre- and post- emergent control of brush and broadleaf weeds. Selective post-emergent herbicide for control of specific broadleaf weeds. Very low use rate. Less potential for unintended impact compared to other herbicides. Ideal for native grass release. Key component of any IVM program that includes herbicides. Versatile, compatible, broad spectrum of use. Superior efficacy on brush and specific perennial grasses. Low use rates. Very specific application methods such as basal, frill and ultralow volume foliar. Selective control of brush and broadleaf species. Highly versatile. Broad spectrum and multiple application methods. Aquatic labeling. Selective control of brush and broadleaf species. Highly versatile. Effective for a number of species. Requires specific application methods including basal and dormant stem. Year-round application efficacy. Trade Names for Analyses Preferred surfactant and diluents. Necessary for all herbicide applications. Yellow starthistle, Rush skeletonweed, Italian thistle, Scotch Broom, & other resprouting species (pre-emergent to bolting for thistles & broadleaf forbs; summer to fall for brush TYPICAL APPLICATION TIME PERIOD Fall - Spring Yellow starthistle rosette to bolting Fall - Spring Scotch Broom, yellow starthistle, Oaks, Madrones, Manzanita, and other resprouting species Rush skeletonweed, yellow starthistle, scotch broom, Oaks, Madrones, Maples, Manzanita, and other resprouting species Scotch Broom, Oaks, Madrones, Maples, Manzanita, Blackberry, and other resprouting species Scotch Broom, Oaks, Madrones, Maples, Manzanita, Blackberry, and other resprouting species Spreader-Penetrator when target plants are actively growing when target plants are actively growing when target plants are actively growing when target plants are actively growing through the fall as plants begin to shut down Spring - Fall Year Round Spring Late Fall Spring Late Fall Year Round 1 Application rates not to exceed recommended label rate. 4

5 Table 2. Product, Target Species and Timing HERBICIDE (Trade Names 1 ) Marker Dye (Colorfast Purple) Non-ionic Surfactant (R-11) WHY NEEDED? TARGET SPECIES TIMING Necessary to identify precise applications of herbicide for public safety. Preferred surfactant for annual forbs and grasses. Marker Dye Spreader- Sticker TYPICAL APPLICATION TIME PERIOD Year Round Year Round The inclusion of herbicides to the IVM program would more effectively maintain a low growing grass, forbs, and shrub complex immediately under the conductors (wires) with a taller shrub complex adjacent to conductors and extending out to the edge of the ROW. In line with the American National Standard Institute s (ANSI) A300 Part 7 Standard Practices for IVM on Utility Rights-of-Way and the Utility Arborist Association s IVM Best Management Practices (BMPs). This management strategy is known as a wire zone-border zone vegetation management strategy as depicted below. The "wire zone" refers to the segment of the ROW directly beneath the transmission wires where the poles and facilities are located plus a minimum of 10 feet on both sides. The "border zone" encompasses the remainder of the ROW on both sides of the wire zone and extends from the wire zone to the edge of the ROW. The proposed vegetation management program is developed to manage for compatible species and herbicides would be used consistent with those management objectives. Typically this vegetation structure would take 5 to 7 years to establish with the use of herbicides. Herbicide Use Along Access Roads: Approximately 11.5 acres of transmission line access roads are proposed for herbicide treatment. These include project roads under Special Use Authorization and PG&E-maintained roads identified in the French Meadows Middle Fork Road Plan and Maintenance Agreement. The attached maps display the approximate locations of access roads proposed for treatment and Table 1 summarizes access road acres proposed for treatment, which are organized by Ranger District. PG&E proposes the use of herbicides to define and maintain clearance adjacent to the roadbeds of critical access roads and to designate pullouts along the roadways. The access roads are critical to PG&E for year-round maintenance of facilities. The types of herbicides, schedule and other conditions would be the same as those described above in Table 2 and under proposed treatment methods below for the transmission line ROWs. Mastication: PG&E proposes the use of mastication within approximately 161 acres inside the transmission line ROWs that are under Special Use Authorization (SUA). Mastication would be used on flatter slopes < 35%, which are accessible by road and where it is necessary to clear segments of ROW that are overgrown with larger and dense vegetation to re-establish or maintain corridors. PG&E is proposing the same mastication methods for the transmission lines under SUA as those already approved in the French Meadows Transmission Line (FMTL) corridor on the ENF. The acreage proposed for mastication by transmission line ROW is provided in Table 3 below. VEGETATION TREATMENT METHODS Proposed Equipment and Treatment Methods for the Application of Herbicides The California Department of Pesticide Regulation issues Agricultural Pest Control Adviser (PCA) Licenses which are required of any person who offers a recommendation on herbicide use, who holds himself/herself forth as an authority on agricultural use, or who solicits services or sales for agricultural use. For this proposed action, 5

6 Licensed Pest Control Advisors would manage and prepare all recommendations for the use of herbicides. All herbicides proposed for use have been approved by the Environmental Protection Agency (EPA) and California Department of Pesticide Regulation (CDPR) and they are recommended by CDPR. The PCA recommendations would be established annually based on vegetation management needs and as part of obtaining annual Eldorado National Forest Pesticide Use Permits. The PCA recommendations would be strictly adhered to at all times. PG&E would also coordinate as needed with the appropriate County Agricultural Commissioners and all PCAs would be registered within El Dorado, Placer and Amador Counties. The majority of applications (approximately 95%) would be manual, made with backpack application equipment. Crew sizes can range from 4 to 12 depending on ROW width and prescribed application methods. Work crews would consist of a foreman who is a qualified licensed applicator (QAL). Additionally, an independent Pest Control Advisor (PCA) would be on site to oversee the application for the duration of the project. Herbicide mixing would be limited to areas inside the ROW, and completed in accordance with stream buffer widths to be defined in the Design Criteria and in accordance with the manufacturer s labels. A licensed PCA prepares in advance a site specific prescription for the use of herbicides for every project. Prescription of a herbicide would result from pre-application site visits to assess conditions and determine the best method of vegetation control. Site assessments include several environmental and biological factors. These factors include but are not limited to the following: existing vegetation composition, topography, soil type, hydrologic features, surrounding wildlife, including Threatened and Endangered species, domestic animals, livestock, resident adjacency, apiaries, and proximity to and volume of recreational use. Based on the site assessment, the PCA would prescribe the appropriate method of control including herbicide. Specific to the herbicide prescription, the advisor describes the appropriate active ingredient and formulation, application rate, timing and application method for each location. The annual Pesticide Use Permits submitted to the ENF for approval would identify specific active ingredients, target species, and locations to be applied. Four-wheel-drive pickup trucks and specially fitted service trucks are proposed to carry herbicides, water, crew and other equipment necessary for applications. All-terrain vehicles (ATVs) would be used to a limited extent for transporting crews to remote worksites, serving as a smaller satellite batch tank, and in some instances for application using a hand wand or quad mounted low boom for applications to roads or other areas appropriate for use of mechanized application equipment. Proposed application methods include foliar, basal, cut stump, frill, or hack and squirt, and soil applied preemergent; both selective and non-selective. These application methods are described below. Foliar Backpack Application: Involves spraying an herbicide from a backpack sprayer, where the herbicide application is directed towards target vegetation or areas of infestation. Spray nozzle is no more than 24 inches above target vegetation. This method can be selective or non-selective, depending on the type of herbicide used and specific type of application. For example, the broadleaf selective herbicide triclopyr is most effective when applied to target vegetation (e.g., broadleaf weedy species) in active growth. The mode of action is such that broadleaf species are controlled without affecting desirable grass species. A non-selective herbicide such as glyphosate can provide selective control through the use of low-volume, directed backpack applications directly to target species, or by timing the application at undesirable vegetation after non target plant species have gone to seed. Basal Stem Application: Selective systemic application method using backpack sprayers. An herbicide would be diluted in an oil carrier (e.g., Imazapyr (bi-phasal) or Triclopyr ester with modified seed oil [MSO] as a diluent) and applied to the lower 12 to 18 inches of the target woody plant. The combination of herbicide and oil penetrates the bark providing the desired control. Basal stem applications are most effective between the months of June and November, but may applied year-round specifically during the plant dormancy period when woody stems are void of leaves and more accessible. 6

7 Cut-Stump Application: Used to prevent woody species from re-sprouting. After trees and brush are manually/mechanically cut with a chainsaw or loppers, the stumps are treated with herbicide. Cut-stump treatments can be made year-round. This type of application is target specific with a low risk of run-off or drift. Applications are made using a back pack, hand can or hand held wick device. Frill, or Hack and Squirt Application: A selective control method used for woody plant species. In this application method, a frill or hack is made with a hatchet into the woody cambium and a small amount of undiluted herbicide is injected into the frill using a 1-quart handheld spray bottle. The herbicide gradually translocates to the roots and stems. Proposed Equipment and Treatment Methods for Mastication The equipment to be used for mastication includes large, steel tracked boom-type machines or small, frontmounted tracked or rubber-tired mastication equipment.tracked boom-type machines are highly maneuverable, and rotating booms cover a wide swath, reducing the number of passes required by the machine, thereby reducing ground impacts. Treating material can occur in a single action or it can take two to three passes with the head over the small trees or brush. Chips are left on the ground creating a mat of residue material for the machine to travel across. Small, front-mounted tracked or rubber-tired mastication machines are ideal for covering large areas of flatter slopes with smaller diameter woody debris and vegetation. This type of masticator/shredder is ideal for low impact operations in the Project area. Smaller, tracked equipment generally exerts very low ground pressure, often less than a human footprint. Table 3 provides a summary of the PG&E proposed mastication acres. Table 3. Summary of PG&E Proposed Mastication Use within Transmission Line ROWs on the Eldorado National Forest APPROXIMATE ACRES PROPOSED NAME OF TRANSMISSION LINE FOR MASTICATION Salt Springs-Tiger Creek 76 Middle Fork #1 10 Middle Fork-Gold Hill 45 El Dorado-Missouri Flat #1+ & PREVIOUSLY APPROVED ACRES NAME OF TRANSMISSION LINE PROPOSED FOR MASTICATION French Meadows Where feasible. No acreage limit identified. VEGETATION MANAGEMENT SCHEDULE AND MAINTENANCE GUIDELINES This vegetation management program proposes the use of mastication and herbicides annually to control vegetation within PG&E Transmission Line ROWs and along access roads. Once approved, the program would remain in effect for 10 years with applications for Pesticide Use Permits submitted annually as per by the Special Use Easements. The annual submittals would include a list of facilities and proposed herbicide treatments to be used that year and the timing of treatments. This program would be updated as necessary to meet regulatory requirements and to incorporate additional analysis, if warranted. At a minimum, after 10 years of program implementation a review would be conducted to determine whether further analysis is recommended. Depending 7

8 on the results of this 10 year review, a letter to the file would be made part of the NEPA Project Record stating any changes to the recommendations for future use of herbicides. It is anticipated that treatment activities would be most intense the first two years of implementation to achieve control of overgrown vegetation. After the first two years and once unwanted vegetation is under control, it is anticipated the level of treatment activities to maintain control would decrease. Maintenance would occur every one to seven years depending on field conditions. PG&E would continue to perform annual routine line clearance patrols to identify vegetation that is or would be a compliance issue within months (see PRC 4292, 4293, CPUC GO 95, and/or ISO Guidelines). Herbicides would be used as needed to maintain the ROWs in the desired condition to the standards defined as wire zone/border zone method, see above. Rights-of-Way The Forest Service approval for vegetation clearing is conducted as part of the annual operating plans for the ROWs and in accordance with the Special Use Easements. In cleared areas, the first selective backpack foliar herbicide application would occur when the vegetation reaches appropriate size, typically one growing season following clearing. In areas that are manually cleared with a cut stump herbicide application at the time of clearing, the first selective backpack foliar herbicide application typically occurs one to four years after the initial clearing when the vegetation reaches appropriate size. For both backpack foliar and cut stump herbicide applications, the next application typically occurs three to five years later, with the ultimate goal being between five and seven years. Access Roads The Forest Service approval for clearing access roads is conducted as part of the Road Use Agreement. As described above for the ROWS, in cleared areas the first selective backpack foliar herbicide application would occur when the vegetation reaches appropriate size, typically one growing season following clearing. In areas that are manually cleared with a cut stump herbicide application at the time of clearing, the first selective backpack foliar herbicide application typically occurs one to four years after the initial clearing when the vegetation reaches appropriate size. For both backpack foliar and cut stump herbicide applications, the next application typically occurs three to five years later, with the ultimate goal being between five and seven years. 8

Chemical Side Trim Applications. Your guide to using herbicides to control trees in vegetation management applications.

Chemical Side Trim Applications. Your guide to using herbicides to control trees in vegetation management applications. Chemical Side Trim Applications Your guide to using herbicides to control trees in vegetation management applications. 1 About the treatment Trees can pose a special challenge for vegetation managers.

More information

Don t get off base with basal bark treatment. Stephen F. Enloe Center for Aquatic and Invasive Plants

Don t get off base with basal bark treatment. Stephen F. Enloe Center for Aquatic and Invasive Plants Don t get off base with basal bark treatment Stephen F. Enloe Center for Aquatic and Invasive Plants Technical aspects to cover Targets Tools Oil carriers Herbicides Timing (Non) target injury Quiz Time!

More information

Bush Honeysuckle Control Options and Strategies

Bush Honeysuckle Control Options and Strategies Bush Honeysuckle Control Options and Strategies Ron Rathfon, Extension Forester Zach Lowe, Assistant Professor, Restoration Ecology Southern Indiana CWMA Selecting Control Methods Suite of invasive species

More information

Then apply herbicide to the cambium layer, around the entire circumference.

Then apply herbicide to the cambium layer, around the entire circumference. Eradicating Eucalyptus, Acacia, and Other Invasive Trees Ken Moore ken@wildwork.org -March 2008 While most of these methods may work by themselves on some tree and shrub species, weedy species almost always

More information

FOREST HERBICIDES July 2015 Revised David J. Moorhead, Extension Forester!!

FOREST HERBICIDES July 2015 Revised David J. Moorhead, Extension Forester!! July 2015 Revised David J. Moorhead, Extension Forester S FOR SITE PREPARATION metsulfuron methyl 3 to 4 oz. Add 0.25% by volume surfactant for improved control. For loblolly and slash pine only. Use lower

More information

Trimec Lawn Weed Killer is a herbicide that controls more than 230 listed broadleaf weeds in cool- and warm-season lawns.

Trimec Lawn Weed Killer is a herbicide that controls more than 230 listed broadleaf weeds in cool- and warm-season lawns. Trimec Lawn Weed Killer (#2217-539) Trimec Lawn Weed Killer is a herbicide that controls more than 230 listed broadleaf weeds in cool- and warm-season lawns. 2. What is the application rate? Rates may

More information

Vegetation Management Plan

Vegetation Management Plan Vegetation Management Plan TABLE OF CONTENTS SECTION TITLE PAGE NUMBER 1. INTRODUCTION 2 2. SAFETY 3 3. RELIABILITY 3 4. VEGETATION MANAGEMENT GUIDELINES 4 5. NEW RIGHT OF WAY GUIDELINES 6 6. VEGETATION

More information

Herbicides in Forestry Factors That Influence How Herbicides Work. Bill Pickens Conifer Silviculturalist North Carolina Forest Service

Herbicides in Forestry Factors That Influence How Herbicides Work. Bill Pickens Conifer Silviculturalist North Carolina Forest Service Herbicides in Forestry Factors That Influence How Herbicides Work Bill Pickens Conifer Silviculturalist North Carolina Forest Service Plant physiology, bio chemistry, agronomy, research, environmental

More information

Suggested Maintenance Practices for Roadside Weed and Brush Problems

Suggested Maintenance Practices for Roadside Weed and Brush Problems Suggested Maintenance Practices for Roadside Weed and Brush Problems Circular E-958 January 2017 Oklahoma Cooperative Extension Service Division of Agricultural Sciences and Natural Resources Oklahoma

More information

PROJECT INFORMATION AMEREN POWERLINE RECONSTRUCTION PROJECT April 2014

PROJECT INFORMATION AMEREN POWERLINE RECONSTRUCTION PROJECT April 2014 PROJECT INFORMATION AMEREN POWERLINE RECONSTRUCTION PROJECT April 2014 The United States Forest Service (USFS), Shawnee National Forest (SNF), is analyzing a request from Ameren Services (Ameren), a group

More information

FOREST HERBICIDES. David J. Moorhead, Extension Forester REMARKS & PRECAUTIONS HERBICIDES FOR SITE PREPARATION

FOREST HERBICIDES. David J. Moorhead, Extension Forester REMARKS & PRECAUTIONS HERBICIDES FOR SITE PREPARATION FOREST S David J. Moorhead, Extension Forester Rodeo 5.4 lb ai/ gal Various trade names 3-4 oz 2-8 oz 1.5-7.5 qt Directed/spot spray 0.75-10% by volume 2-10 qt Directed/spot spray 0.75-10% by volume 3

More information

Black locust is a fast-growing tree

Black locust is a fast-growing tree M A N A G E M E N T O F A3924-17 Black locust (Robinia pseudoacacia) I N V A S I V E P L A N T S I N W I S C O N S I N Brendon Panke and Mark Renz Invasive plants can thrive and aggressively spread beyond

More information

Appendix B: Aquatic Herbicide Application Methods

Appendix B: Aquatic Herbicide Application Methods Appendix B: Aquatic Herbicide Application Methods William T. Haller: University of Florida, Gainesville FL; whaller@ufl.edu Introduction All pesticide labels contain very specific information regarding

More information

Use and Characteristics of Herbicides for Non-crop Weed Control

Use and Characteristics of Herbicides for Non-crop Weed Control 1 Use and Characteristics of Herbicides for Non-crop Weed Control Pesticide Education Program This publication is intended primarily as a study guide for applicators seeking certification in Pennsylvania

More information

Babcock Ranch Community Invasive Species Integrated Management

Babcock Ranch Community Invasive Species Integrated Management Babcock Ranch Community Invasive Species Integrated Management Creating Lower Maintenance, Costeffective Land Management Babcock Ranch Location Charlotte & Lee County 91,361-acres 73,575-acres public ownership

More information

El Dorado County COMMUNITY WILDFIRE PROTECTION PLAN Community Tab for ROYAL EQUESTRIAN ESTATES FIRE SAFE COUNCIL ACTIVITIES

El Dorado County COMMUNITY WILDFIRE PROTECTION PLAN Community Tab for ROYAL EQUESTRIAN ESTATES FIRE SAFE COUNCIL ACTIVITIES El Dorado County COMMUNITY WILDFIRE PROTECTION PLAN Community Tab for ROYAL EQUESTRIAN ESTATES FIRE SAFE COUNCIL ACTIVITIES Prepared for Inclusion in the: EL DORADO COUNTY FIRE SAFE COUNCIL Community Wildfire

More information

Telegraph Forest Management Project

Telegraph Forest Management Project Telegraph Forest Management Project Black Hills National Forest Northern Hills Ranger District Lawrence and Pennington Counties, South Dakota Proposed Action and Request for Comments March 2008 Table of

More information

When the land division tree preservation requirements apply

When the land division tree preservation requirements apply INFORMATION GUIDE Tree Preservation on Your Land Division Site The land division process provides the flexibility and opportunity to promote creative site design that considers multiple objectives, including

More information

Forest Service Weed Management Accomplishments & Challenges

Forest Service Weed Management Accomplishments & Challenges Forest Service Weed Management Accomplishments & Challenges Pacific Northwest Invasive Plant Council November 2013 Shawna L. Bautista US Forest Service Portland, OR Overview Forest Service Weed Management

More information

Primer on Chemical Vegetation Management in Florida Pine Plantations 1

Primer on Chemical Vegetation Management in Florida Pine Plantations 1 CIR 1477 Primer on Chemical Vegetation Management in Florida Pine Plantations 1 Anna Osiecka, Jarek Nowak, and Alan Long 2 The use of weed-control chemicals for vegetation management in forestry has increased

More information

Fontana Project Scoping Record August 2013

Fontana Project Scoping Record August 2013 Fontana Project Scoping Record August 2013 The Cheoah Ranger District, Nantahala National Forest, is conducting an interdisciplinary analysis of a proposed project, called the Fontana Project, in Graham

More information

School of Forest Resources and conservation

School of Forest Resources and conservation School of Forest Resources and conservation Daniel B. Warnell School of Forestry and Natural Resources Forestry, Wildlife, Water and Soil Resources, Fisheries and Aquaculture, Natural Resource Recreation

More information

Chapter 13: Wildlife and Vegetation

Chapter 13: Wildlife and Vegetation Chapter 13: Wildlife and Vegetation Introduction and Setting Nevada County contains an extremely wide range of plants, animals and habitat types. With topographic elevations ranging from 300 feet in the

More information

EFFICACY OF HERBICIDE TREATMENTS FOR CONTROLLING RESIDUAL SPROUTING OF TREE-OF-HEAVEN

EFFICACY OF HERBICIDE TREATMENTS FOR CONTROLLING RESIDUAL SPROUTING OF TREE-OF-HEAVEN EFFICACY OF HERBICIDE TREATMENTS FOR CONTROLLING RESIDUAL SPROUTING OF TREE-OF-HEAVEN Daniel Bowker and Jeff Stringer 1 Abstract. Tree-of-heaven (Ailanthus altissima [Mill.] Swingle) is one of the most

More information

Introduction. Methodology for Analysis

Introduction. Methodology for Analysis 1 Medicine Lake Caldera Vegetation Treatment Project Scenic Report Prepared by: /s/gary Kedish Natural Resources Specialist for: Big Valley and Doublehead Ranger Districts Modoc National Forest February

More information

Proposed Wildlife Habitat Restoration Project At Walking Iron Wildlife Area August 6, 2015

Proposed Wildlife Habitat Restoration Project At Walking Iron Wildlife Area August 6, 2015 Proposed Wildlife Habitat Restoration Project At Walking Iron Wildlife Area August 6, 2015 Walking Iron County Wildlife Area is 898 acres situated in the Town of Mazomanie between Walking Iron County Park

More information

Multiflora Rose Edition Jerry Doll and Mark Renz

Multiflora Rose Edition Jerry Doll and Mark Renz June 2007 Multiflora Rose- 2007 Edition Jerry Doll and Mark Renz Multiflora rose is a perfect example of a good idea gone awry. Promoted and planted in the Midwest and Eastern United States as a living

More information

Invasive Plant Management Final Report 2016 for the Village of Belcarra by the Invasive Species Council of Metro Vancouver

Invasive Plant Management Final Report 2016 for the Village of Belcarra by the Invasive Species Council of Metro Vancouver Invasive Plant Management Final Report 2016 for the Village of Belcarra by the Invasive Species Council of Metro Vancouver Submitted to: Submitted by: Larry Scott, Village of Belcarra lgscott@belcarra.ca

More information

Treatments for preventing and controlling Scotch broom

Treatments for preventing and controlling Scotch broom Treatments for preventing and controlling Scotch broom Timothy B. Harrington, PNW Research Station Olympia, WA Four-year-old invasion Acknowledgements Thanks for collaboration and support from: Forest

More information

GRU Storm Hardening Report to the Florida Public Service Commission Pursuant to Rule , F.A.C. Calendar Year 2014

GRU Storm Hardening Report to the Florida Public Service Commission Pursuant to Rule , F.A.C. Calendar Year 2014 1) Introduction GRU Storm Hardening Report to the Florida Public Service Commission Pursuant to Rule 25-6.0343, F.A.C. Calendar Year 2014 a) Gainesville Regional Utilities (GRU) b) 4747 N. Main Street

More information

GRIZZLY FLATS COMMUNITY WILDFIRE PROTECTION PLAN. REVIEW and UPDATE MARCH 2012

GRIZZLY FLATS COMMUNITY WILDFIRE PROTECTION PLAN. REVIEW and UPDATE MARCH 2012 GRIZZLY FLATS COMMUNITY WILDFIRE PROTECTION PLAN REVIEW and UPDATE MARCH 2012 Prepared by: Grizzly Flats Fire Safe Council Signature Page The agencies listed below have reviewed this 2012 Review and Update

More information

SKIBO PROJECT SCOPING REPORT Laurentian Ranger District, Superior National Forest

SKIBO PROJECT SCOPING REPORT Laurentian Ranger District, Superior National Forest SKIBO PROJECT SCOPING REPORT Laurentian Ranger District, Superior National Forest I. Introduction The Laurentian Ranger District of the Superior National Forest is proposing management activities within

More information

SOUTH FORK AMERICAN RIVER (CHILI BAR), CALIFORNIA

SOUTH FORK AMERICAN RIVER (CHILI BAR), CALIFORNIA Hydropower Project Summary SOUTH FORK AMERICAN RIVER (CHILI BAR), CALIFORNIA CHILI BAR HYDROELECTRIC PROJECT (P-2155) Photo Credit: PG&E This summary was produced by the Hydropower Reform Coalition and

More information

Keefer Pasture Drift Fence Project. Challis-Yankee Fork Ranger District Salmon-Challis National Forest

Keefer Pasture Drift Fence Project. Challis-Yankee Fork Ranger District Salmon-Challis National Forest Keefer Pasture Drift Fence Project Challis-Yankee Fork Ranger District Salmon-Challis National Forest PROPOSED ACTION The Challis-Yankee Fork Ranger District proposes construction of approximately.11 miles

More information

Pennsylvania Department of Transportation District 8-0 Rest Area Site G Specifications for Landscaping and Lawn Maintenance

Pennsylvania Department of Transportation District 8-0 Rest Area Site G Specifications for Landscaping and Lawn Maintenance Revised 2/15 Pennsylvania Department of Transportation District 8-0 Rest Area Site G Specifications for Landscaping and Lawn Maintenance 1. DESCRIPTION The contractor shall furnish all equipment, personnel

More information

Five Year Vegetation Management Plan

Five Year Vegetation Management Plan Five Year Vegetation Management Plan 2009-2013 3/30/2009 National Grid is committed to the protection and enhancement of the environment, always seeking new ways to minimize the environmental impacts of

More information

WEED CONTROL IN GRASS PASTURES AND HAYFIELDS (Including bermudagrasses, bahiagrasses, fescues, and other perennial pasture grasses)

WEED CONTROL IN GRASS PASTURES AND HAYFIELDS (Including bermudagrasses, bahiagrasses, fescues, and other perennial pasture grasses) WEED CONTROL IN GRASS PASTURES AND HAYFIELDS (Including bermudagrasses, bahiagrasses, fescues, and other perennial pasture grasses) Patrick E. McCullough, Extension Agronomist-Weed Science NEWLY SPRIGGED

More information

Extended Detention Basin Maintenance Plan for [[== Insert Project Name ==]]

Extended Detention Basin Maintenance Plan for [[== Insert Project Name ==]] Extended Detention Basin Plan for [[== Insert Project Name ==]] [[== Insert Date =]] Project Address and Cross Streets Assessor s Parcel No.: Property Owner: Phone No.: Designated Contact: Phone No.: Extended

More information

Site Preparation: The First Step to Regeneration

Site Preparation: The First Step to Regeneration Site Preparation: The First Step to Regeneration People have been clearing land for agricultural purposes for centuries. They recognized early that weeds, brush, and stones had to be removed if crops were

More information

Rhododendron: control best practice.

Rhododendron: control best practice. Rhododendron: control best practice. Colin Edwards Forest Research Technical Seminar 11 th June, 2008. Inveraray, Argyll. Current methods of control Fewer Approved Herbicides Herbicide Hazard classification

More information

Agricultural/Rural Riparian Buffer Analysis

Agricultural/Rural Riparian Buffer Analysis Agricultural/Rural Riparian Buffer Analysis December 2014 Executive Summary The Agricultural/Rural Riparian Buffer Analysis was developed from a 2014 analysis of current requirements for the riparian areas

More information

Utility Right of Way Management: Potential for Expanded Integrated Vegetation Managment in California

Utility Right of Way Management: Potential for Expanded Integrated Vegetation Managment in California The University of San Francisco USF Scholarship: a digital repository @ Gleeson Library Geschke Center Master's Projects and Capstones Theses, Dissertations, Capstones and Projects Spring 5-16-2014 Utility

More information

GENERAL GUIDELINES FOR CONDUCTING THREATENED AND ENDANGERED SPECIES SURVEYS IN THE PINELANDS AREA. March 25, 2006 INTRODUCTION

GENERAL GUIDELINES FOR CONDUCTING THREATENED AND ENDANGERED SPECIES SURVEYS IN THE PINELANDS AREA. March 25, 2006 INTRODUCTION GENERAL GUIDELINES FOR CONDUCTING THREATENED AND ENDANGERED SPECIES SURVEYS IN THE PINELANDS AREA March 25, 2006 INTRODUCTION This document is intended to provide general guidance for use in conducting

More information

SPRAYER CALIBRATION LAB To be able to repeat successful procedures and minimize expenses.

SPRAYER CALIBRATION LAB To be able to repeat successful procedures and minimize expenses. Notes for TPSS/PEPS 481 Lab 9: Sprayer calibration. Page 1 of 7. SPRAYER CALIBRATION LAB 9 A. Why is calibration important 1. To obtain the performance of a pesticide as specified on the product label.

More information

Storrie and Rich Fire Areas Invasive Plant Treatment Project

Storrie and Rich Fire Areas Invasive Plant Treatment Project United States Department of Agriculture Forest Service Storrie and Rich Fire Areas Invasive Plant Treatment Project Final Environmental Assessment Mt. Hough Ranger District, Plumas National Forest, Plumas

More information

Cogongrass (Imperata cylindrica) Biology, Ecology, and Management in Florida Grazing Lands 1

Cogongrass (Imperata cylindrica) Biology, Ecology, and Management in Florida Grazing Lands 1 SS-AGR-52 Cogongrass (Imperata cylindrica) Biology, Ecology, and Management in Florida Grazing Lands 1 B. A. Sellers, J. A. Ferrell, G. E. MacDonald, K. A. Langeland, and S. L. Flory 2 Cogongrass is found

More information

Improving Hardwood Timber Stands

Improving Hardwood Timber Stands Improving Hardwood Timber Stands Extension Bulletin E-1578, December 1991 By Russell P. Kidd and Melvin R. Koelling Department of Forestry More than 10.4 million of Michigan's 18.9 million acres of forest

More information

All driveways shall have a separate site plan when the application is submitted.

All driveways shall have a separate site plan when the application is submitted. Driveway Submittal Requirements All driveways shall have a separate site plan when the application is submitted. Within 24 hours of application submittal, all proposed driveways shall: be addressed with

More information

The 1/128th of an Acre Sprayer Calibration Method 1

The 1/128th of an Acre Sprayer Calibration Method 1 AE5 The 1/128th of an Acre Sprayer Calibration Method 1 Richard P. Cromwell 2 The 1/128th of an acre method for calibrating sprayers is based on the fact that the spray volume in ounces applied to an area

More information

Russian Olive. Weeds of Nebraska. Biology Identification Distribution. Robert Wilson and Mark Bernards Extension Weeds Specialists

Russian Olive. Weeds of Nebraska. Biology Identification Distribution. Robert Wilson and Mark Bernards Extension Weeds Specialists University of Nebraska Lincoln Extension EC167 Weeds of Nebraska Olive Russian Olive Robert Wilson and Mark Bernards Extension Weeds Specialists Biology Identification Distribution Control 1 RussianOlive

More information

CHEAT MOUNTAIN WILDLIFE HABITAT ENHANCEMENT

CHEAT MOUNTAIN WILDLIFE HABITAT ENHANCEMENT United States Department of Agriculture Forest Service Monongahela National Forest Greenbrier Ranger District Box 67 Bartow, WV 24920 304-456-3335 CHEAT MOUNTAIN WILDLIFE HABITAT ENHANCEMENT USDA Forest

More information

Sudbury to Hudson Transmission Reliability Project Frequently Asked Questions (FAQs)

Sudbury to Hudson Transmission Reliability Project Frequently Asked Questions (FAQs) Sudbury to Hudson Transmission Reliability Project Frequently Asked Questions (FAQs) June 2, 2016 revised Project Overview Eversource is proposing to construct a new 115-kilovolt (kv) transmission line

More information

1. GENERAL DESCRIPTION OF LAND USE / COVER TYPES (SEE GENERAL DESCRIPTIONS ON PAGE 7) A 2. ADJACENT LANDS & EASEMENTS 3. FAMILY AGRICULTURAL LEGACY

1. GENERAL DESCRIPTION OF LAND USE / COVER TYPES (SEE GENERAL DESCRIPTIONS ON PAGE 7) A 2. ADJACENT LANDS & EASEMENTS 3. FAMILY AGRICULTURAL LEGACY CONSERVATION EASEMENT PROJECT: COUNTY: NAME OF LANDOWNER: CELL/OFFICE PHONE: NAME OF FARM / SITE MANAGER: CELL/OFFICE PHONE: GENERAL DESCRIPTION OF LAND USE / COVER TYPES (SEE GENERAL DESCRIPTIONS ON PAGE

More information

Extending the Duration of Annual, Biennial, and Perennial Weed Control with Esplanade Tank Mixes

Extending the Duration of Annual, Biennial, and Perennial Weed Control with Esplanade Tank Mixes Department of Bioagricultural Sciences and Pest Management Fort Collins, Colorado 80523-1177 Extending the Duration of Annual, Biennial, and Perennial Weed Control with Esplanade Tank Mixes Final Report

More information

Cheatgrass fuels rangeland fires.

Cheatgrass fuels rangeland fires. A Burning Issue: Cheatgrass fuels rangeland fires. Control the weeds that fuel wildfires with herbicide www.bettervm.basf.us.com Cheatgrass infestation increases the frequency of major rangeland wildfires

More information

Storrie and Rich Fire Areas Invasive Plant Treatment Project

Storrie and Rich Fire Areas Invasive Plant Treatment Project United States Department of Agriculture Forest Service Storrie and Rich Fire Areas Invasive Plant Treatment Project Environmental Assessment Mt. Hough Ranger District, Plumas National Forest, Plumas County,

More information

Herbicidal weed control

Herbicidal weed control Oregon State University Herbicidal weed control Dr. James Altland Total weed management program Effective weed control Sanitation Weed seed Weeds in noncropland areas Herbicide management Maintain chemical

More information

Pesticide Use CONTENTS. The Benefits of Guidelines...3 Considerations...4

Pesticide Use CONTENTS. The Benefits of Guidelines...3 Considerations...4 Pesticide Use 1 Introduction...3 Pesticide Use CONTENTS The Benefits of Guidelines...3 Considerations...4 Planning...5 Incorporating Integrated Pest Management Strategies...5 Characteristics Affecting

More information

Practice Plan for Sparta Mountain Wildlife Management Area (WMA) Stand 33: Restore Old Growth

Practice Plan for Sparta Mountain Wildlife Management Area (WMA) Stand 33: Restore Old Growth Practice Plan for Sparta Mountain Wildlife Management Area (WMA) Stand 33: Restore Old Growth This practice plan addresses a general activity provided for in year 2017-2018 of the management schedule within

More information

Simulating Regeneration Dynamics in Upland Oak Stands

Simulating Regeneration Dynamics in Upland Oak Stands Simulating Regeneration Dynamics in Upland Oak Stands Powered By Powered by: USDA Forest Service Southern Research Station Dr. David Loftis Powered By Powered by: Regen for Excel is a simulation model

More information

EVEREST 70% WATER DISPERSIBLE GRANULAR HERBICIDE CAUTION

EVEREST 70% WATER DISPERSIBLE GRANULAR HERBICIDE CAUTION Page 1 of 5 SUPPLEMENTAL LABELING FOR DISTRIBUTION AND USE ONLY WITHIN THE STATE OF IDAHO EVEREST 70% WATER DISPERSIBLE GRANULAR HERBICIDE EPA Reg. No. 66330-49 EPA For Application on Kentucky Bluegrass

More information

SHAREHOLDER FIREWOOD PROCEDURE

SHAREHOLDER FIREWOOD PROCEDURE SHAREHOLDER FIREWOOD PROCEDURE Ahtna Shareholders have two options for firewood harvesting: Commercial Firewood - Firewood harvested on Regional and former Village Corporation lands to be sold for monetary

More information

The Importance of Adjuvant Use with Alfalfa Herbicides

The Importance of Adjuvant Use with Alfalfa Herbicides The Importance of Adjuvant Use with Alfalfa Herbicides Mick Canevari, University of California Cooperative Extension San Joaquin County Introduction Postemergence foliar applied herbicides are used extensively

More information

ARBORIST REPORT. Report History: Report 1 New design

ARBORIST REPORT. Report History: Report 1 New design Community Development Department City of Saratoga 13777 Fruitvale Avenue Saratoga, California 95070 ARBORIST REPORT Application No. ARB15-0025 Prepared by Kate Bear, City Arborist Site: 21459 Saratoga

More information

Aerial Application for Right-of-Ways, Forestry, and Natural Areas Weed Control

Aerial Application for Right-of-Ways, Forestry, and Natural Areas Weed Control Aerial Application for Right-of-Ways, Forestry, and Natural Areas Weed Control 2016 Aquatic Weed Control Short Course Coral Springs, FL Pat Minogue, Ph.D., R.F. Associate Professor of Silviculture University

More information

New Forest Technologies

New Forest Technologies New Forest Technologies 2008 Forest Landowner Association Chicago, IL April 10, 2008 Jim Bean Forestry Marketing Manager BASF Corporation 0 Agenda New Chemistry New Programs 1 The Next Generation of Herbicide

More information

A brief introduction to general terms and concepts related to the forestry learning objectives

A brief introduction to general terms and concepts related to the forestry learning objectives A brief introduction to general terms and concepts related to the forestry learning objectives The profession embracing the science, art, and practice of creating, managing, using, and conserving forests

More information

Integrated Vegetation Management Plan

Integrated Vegetation Management Plan Integrated Vegetation Management Plan For Transmission Rights-of-way # 105-977-2010/2015 Issued: July 2010 Copyright British Columbia Hydro, July 2010 BC Hydro Vegetation Management Department POB 49260,

More information

Valent U.S.A. Corporation 2016 Thiobencarb Compliance Packet

Valent U.S.A. Corporation 2016 Thiobencarb Compliance Packet Valent U.S.A. Corporation 2016 Thiobencarb Compliance Packet Contents Water hold table from CDPR Recommended Permit Conditions for Rice Pesticides EPA endangered species bulletins for entire affected area,

More information

Aquatic Plant Management Society Weed Science Society of America

Aquatic Plant Management Society Weed Science Society of America Aquatic Plant Management Society Weed Science Society of America Aquatic Plant Management Society Weed Science Society of America Aquatic Plant Management Society Resistance Stewardship in APM Whitepaper

More information

Appendix C Weed Management Plan

Appendix C Weed Management Plan Weed Management Plan This page intentionally left blank C-i Contents 1.0 Introduction... C-1 1.1 Summary of Contacts... C-1 1.2 Plan Purpose... C-1 1.3 Goals and Objectives... C-1 1.4 BLM Policy... C-1

More information

Public Lands Management A Local Perspective on Public Lands Grazing

Public Lands Management A Local Perspective on Public Lands Grazing Public Lands Management A Local Perspective on Public Lands Grazing Presented by Dan Macon High Sierra Resource Conservation & Development Council November 8, 2005 Introduction/Overview Personal/Professional

More information

TOWN OF WAYLAND MASSACHUSETTS CONSERVATION COMMISSION

TOWN OF WAYLAND MASSACHUSETTS CONSERVATION COMMISSION TOWN OF WAYLAND MASSACHUSETTS 01778 CONSERVATION COMMISSION TOWN BUILDING 41 C0CHITUATE ROAD TELEPHONE: (508) 358-3669 FAX: (508) 358-3606 Wayland s Wetlands and Water Resources Bylaw CHAPTER 194 (D-768)

More information

Introduction. Methodology for Analysis

Introduction. Methodology for Analysis Scenic Report Prepared by: /s/gary Kedish Natural Resources Specialist for: Warner Mountain Ranger District Modoc National Forest January 20, 2016 Introduction This report focuses on the Visual Quality

More information

CHAPTER 7: TREE PROTECTION DURING CONSTRUCTION 7.1 TREE PROTECTION AREAS

CHAPTER 7: TREE PROTECTION DURING CONSTRUCTION 7.1 TREE PROTECTION AREAS CHAPTER 7: TREE PROTECTION DURING CONSTRUCTION Urban trees need to be protected from damage to maximize their health, safety, benefits and functionality. Mature, young and newly transplanted trees need

More information

Intake Adjuvant. (Container)

Intake Adjuvant. (Container) (Container) Intake Adjuvant A Spray Tank Adjuvant to improve the spreading and wetting of herbicide products on broadleaf and cereal crops and for use in forage grass, Range and Pasture and non-crop Industrial

More information

STATE OF VERMONT PUBLIC SERVICE BOARD

STATE OF VERMONT PUBLIC SERVICE BOARD STATE OF VERMONT PUBLIC SERVICE BOARD Docket No. 7970 Petition of Vermont Gas Systems, Inc., requesting a Certificate of Public Good pursuant to 30 V.S.A. 248, authorizing the construction of the Addison

More information

Restoration Theory and Practice

Restoration Theory and Practice Restoration Theory and Practice An Overview PCAP 2014 Native Prairie Restoration/Reclamation Workshop January 29 th, 2014 Regina, Sk Larry K. Gabruch Native Plant Solutions, Saskatoon OVERVIEW Project

More information

Mechanical Site Preparation

Mechanical Site Preparation Mechanical Site Preparation 1 Mechanical Site Preparation Introduction...3 CONTENTS The Benefits of Guidelines...3 Considerations...5 Design Outcomes To Maintain Soil Productivity...6 Planning...7 Planning

More information

CONSERVATION COMMISSION TOWN OF NEW LONDON, NH

CONSERVATION COMMISSION TOWN OF NEW LONDON, NH Japanese Knotweed Early Summer - Great Smoky Mountains National Park Resource Management Archive, USDI National Park Service, Bugwood.org A Growing Problem Japanese Knotweed, a large and extremely aggressive

More information

Managing noxious brush and weed

Managing noxious brush and weed E-629 1/13 Controlling Brush with Herbicides to Increase Ranch Profits Megan Clayton, Mac Young, Robert Lyons and Steven Klose* Managing noxious brush and weed species using herbicides can improve forage

More information

Sections:

Sections: DIVISION 15: NATURAL RESOURCES REGULATIONS CHAPTER 9-1500 NATURAL RESOURCES REGULATIONS: INTENT AND ORGANIZATION 9-1500.1 Title and Intent. 9-1500.2 Organization. 9-1500.1 TFlZE AND INTENT. Division 15

More information

Sample Timber Sale Agreement

Sample Timber Sale Agreement Sample Timber Sale Agreement I (Name) of (Address), hereinafter called the Contractor, agree to purchase from: (Name) of (Address), hereinafter called the Seller, the designated timber from the area described

More information

El Dorado Water & Power Authority. El Dorado Water Reliability Project

El Dorado Water & Power Authority. El Dorado Water Reliability Project El Dorado Water & Power Authority 1 WELCOME El Dorado Water Reliability Project EIR SCOPING MEETING El Dorado Water & Power Authority is implementing the El Dorado Water Reliability Project as a component

More information

Forsythe II Project. September 2015

Forsythe II Project. September 2015 Forsythe II Project September 2015 The Boulder Ranger District (BRD) of the Arapaho and Roosevelt National Forests is proposing vegetation treatments on 3,840 acres of National Forest System (NFS) lands

More information

HERBICIDE USE, AN ASSESSMENT OF HUMAN HEALTH AND ECOLOGICAL RISK

HERBICIDE USE, AN ASSESSMENT OF HUMAN HEALTH AND ECOLOGICAL RISK HERBICIDE USE, AN ASSESSMENT OF HUMAN HEALTH AND ECOLOGICAL RISK FOR DANIEL BOONE NATIONAL FOREST Prepared by: ROBERT SITZLAR, FOREST SILVICULTURIST DAVID TAYLOR, FOREST BOTANIST April 2015 2 USDA NON-DISCRIMINATION

More information

SW-74 SERENOVA PRESERVE SITES 2, 3, 4, 8 MITIGATION PLAN

SW-74 SERENOVA PRESERVE SITES 2, 3, 4, 8 MITIGATION PLAN SW-74 SERENOVA PRESERVE SITES 2, 3, 4, 8 MITIGATION PLAN BACKGROUND INFORMATION Project SWIM? Aquatic Control? Exotic Control? Mitigation Bank? Type No No No No Mitigation Restoration and enhancement Type

More information

Blanche Park Reservoir Decision Notice and Finding of No Significant Impact

Blanche Park Reservoir Decision Notice and Finding of No Significant Impact Blanche Park Reservoir Decision Notice and Finding of No Significant Impact U.S. Forest Service Grand Mesa, Uncompahgre, and Gunnison National Forests Delta County, Colorado INTRODUCTION The Grand Mesa

More information

Wildlife Management Intensity Standards

Wildlife Management Intensity Standards Habitat Control Practices Required Intensity Description Grazing Management The planned manipulation of livestock numbers and grazing intensities to increase food, The planned manipulation of livestock

More information

TYPE 2 TREE CONSERVATION PLAN PREPARATION AND REVIEW CHECKLIST

TYPE 2 TREE CONSERVATION PLAN PREPARATION AND REVIEW CHECKLIST TYPE 2 TREE CONSERVATION PLAN PREPARATION AND REVIEW CHECKLIST The TCP2 is required to follow an approved TCP1 and for any application that requires an FSD. At the Type 2 phase, final decisions are made

More information

PART VI BID SPECIFICATIONS BID NO. 2496

PART VI BID SPECIFICATIONS BID NO. 2496 PART VI BID SPECIFICATIONS BID NO. 2496 CLARK COUNTY Scope: The purpose of this Bid is to secure a contractor for providing general maintenance activities at designated parks that have been newly constructed

More information

Big Hill Insect and Disease Project Proposed Action

Big Hill Insect and Disease Project Proposed Action Big Hill Insect and Disease Project Proposed Action Project Background and 2014 Farm Bill The Big Hill Insect and Disease project on the Challis-Yankee Fork Ranger District of the Salmon-Challis National

More information

Management of Established Grass Stands for Early Successional Habitat

Management of Established Grass Stands for Early Successional Habitat Management of Established Grass Stands for Early Successional Habitat In the beginning 4-5 years after establishment Introduced Cool-Season Native Warm-Season Which field would wildlife prefer to walk

More information

Proposed Action Report Big Creek WBP Enhancement Project

Proposed Action Report Big Creek WBP Enhancement Project Proposed Action Report Big Creek WBP Enhancement Project USDA Forest Service Cascade Ranger District Boise National Forest Valley County, Idaho July 2013 PURPOSE AND NEED FOR THE PROPOSED ACTION The encroachment

More information

Overall Instructions

Overall Instructions Farm Evaluation Survey Overall Instructions This Farm Evaluation Survey is prepopulated with member information you provide to the Coalition. If any information is incorrect, please indicate the correct

More information

Small NEPA Scoping Letter April 2017 Fremont - Winema National Forest

Small NEPA Scoping Letter April 2017 Fremont - Winema National Forest Project Proposals 1) Van Hulzen Private Land Access [Klamath RD] Proposed Category: 36 CFR 220.6(e) (3) Approval, modification, or continuation of minor special uses of NFS lands that require less than

More information

Great References. NY and PA Pest Mgt. for Grapes Weeds of the Northeast

Great References. NY and PA Pest Mgt. for Grapes  Weeds of the Northeast Great References NY and PA Pest Mgt. for Grapes http://ipmguidelines.org/grapes/ Weeds of the Northeast www.cdms.net The Label Publications and handouts aren t a substitute for the actual product label.

More information

Aiming for Sustainable Ecoregions & Their Habitats

Aiming for Sustainable Ecoregions & Their Habitats Longleaf Pine Forest Establishment Hub The Forest Stewardship Program is designed to integrate forest management objectives of sustaining quality native timber, native wildlife populations, soil & water

More information

Decision Notice and Finding of No Significant Impact

Decision Notice and Finding of No Significant Impact Decision Notice and Finding of No Significant Impact Gold Lake Bog Research Natural Area Boundary Adjustment and Nonsignificant Forest Plan Amendment #53 USDA Forest Service Middle Fork Ranger District,

More information