1 Get Project Requirements Right the First Time: Use Cases for Business Requirements Presenter: Lalig J. Musserian, PMP

2 Basic Premises Doing a poor job on requirements up front will have a domino effect of major problems later in the project Project Managers and Business Analysts can work together through the full life cycle to prevent requirements problems from damaging or destroying the project

3 High Level Projects Phases Concept Plan/ Design Execution Approval / Closeout Clear Objectives Resources needed Business / Regulatory needs Client Specs High Level Use Cases Verification of Scope of Project Minimize risks & errors in understanding Confirmation of project objectives Proof of Concept Phase Sometimes very costly Long duration Iterative Process Fulfills the objectives? Deliverable Traceable to Project Objectives?

4 Risk at the Epicenter

5 Risk Distribution

6 Cumulative Risk Impacts

7 What is a requirement? Definition of what is required: what does the end user want or need? A requirement should also include a quality or a performance demand A Project has specific requirements usually initiated to solve a business problem

8 How do we collect Requirements? How do we A Business Requirements Document (BRD) is a specific deliverable in the Project Initiation Phase A BRD identifies Business objectives, a Business Overview and a requirements Overview A BRD also lists Assumptions, Constraints, and Project Dependencies A good BRD would also clearly identify out of scope items so no confusions later Make sure the Business, technology partners and stakeholders Sign-Off on the BRD

9 Why Do Projects Fail? Why Do Projects Fail? Lack of qualified resources 3% Other 1% Communication problems 14% Inadequate risk management 17% Poor requirements definition 50% Poor scope control 15% Source: ESI International survey of 2,000 industry professionals, 2005.

10 Relative Cost to Correct a Defect Relative Cost of Fixing a Defect Requirements Design Code Development Testing Acceptance Testing Operation Project Life Cycle

11 Details in a BRD Requirement Number Requirement Name User: Customer, Representative, Manager, etc. Description of Requirement Priority: 1,2,3 Comments or Outstanding Questions Any know issues to date Define non-functional requirements, e.g. performance

12 High Level Use Cases One of the best approaches to developing requirements Should plan Use Cases at a high level at the very beginning at project initiation Very useful in determining project scope Help establish traceability to the Business requirements Document (BRD)

13 Components of Use Cases Actors, Events and Scenarios Normal, alternate and exception scenarios Identification of relationships and crossreferences to other use cases Linking of these use cases to other systems or applications Validation process through reviews and quality inspections

14 Use Case Framework Assigned to: Use Case Name: Use Case Number: Use Case Description: Primary Actor (s): Subsystems: Tools Impacted (Scope): John Doe Rep Creates/Modifies Goal UC.4.7 This use case describes the process by which a new account for an existing or new customer is performed Customer, Customer Service Rep edb, ALM, Retail, OneView Application Name Preconditions & Guarantees: 1. Reps must be logged in and authenticated. 2. Customers are authenticated via IVR and Rep interaction. Trigger(s): 1. Rep creates new Customer Contact for account opening: Rep selects either Open New Account for New Customer, or Add account for existing customer Rep modifies existing Successful Post Conditions: 1. New account can be viewed on the screen and account number assigned 2. New account can be viewed under Customer Relationship screen Failed Post Conditions: Assumptions: Constraints: Rep cannot see new account name and number Related Use Cases Requirements R1.2, R1.3, R.1.5

15 Activity Diagram Rep Views Existing Customer Info- Scenario A Rep System Rep logs into the Customer Information Screen on ABC System Existing Customer? Yes Yes No No Yes Note: See UC.10.3 xyz No Yes No Note: Ability to view Account History in new Accounts UI will not be included until next Iteration Note: new Customer List UI Wirefranes will be included in the Iteration 3 Yes Is Group currently opened by Another Rep? No Note: See Appendix for screen shot of Group Lock warning for this scenario View Group Lock Warning Message, select ok to load Group Renders Group display as read-only Locks Group so it can only be edited by user initiating retrieve. View Group Summary Page No Are there any missing accounts? Note: This is an indication that the Customer SSN does not match Note: If multiple groups are open, newly launched group will be the one in focus Yes View Group Summary Page and Pop-Up Display Pop-Up to user indicating which active accounts are not showing in the Customer account list(s) Note: See Appendix for screen shot of existing application warning for this scenario End

16 Sample Use Case Documentation Actor s Action System Response 1. The actor has clicked on View Customer Account Page on the home page 1. Customer Account Page is displayed 2. The actor enters customer SSI 2. Detail List of customer accounts is displayed 3. The actor selects specific account 3. Account Balances and last 10 transactions is displayed 4. The actor selects from the following options: Close Account, Add New signer or inquire about transactions 3. The actor selects one of the options and hits save 4. Account closing screen, New signatory screen or transaction inquiry screen is displayed 5. Confirmation of transaction appears 4. The actor clicks confirm button 6. System messages that the transaction was saved 5. The actor clicks end button 7. System brings actor back to home page

17 Use Case Driven Development Development concept in short time boxes or Iterations- typically within 3-4 weeks As Use Cases are documented and signed-off, they can be passed to the Development Team for coding and testing Real time communication (think: Bullpen or War Room) vs. volumes of written documents Mini-increments of software implementation At the end of every release, the project team reevaluates priorities Use Cases can be effective in leveraging some Agile Development concepts Linking of these use cases to other systems or applications Validation process through reviews and quality inspections Working Software is the primary metric for assessing success

18 Questions?

Prerequisites It is recommended that the participants have a working knowledge of traditional Business Analysis tasks and techniques.

Prerequisites It is recommended that the participants have a working knowledge of traditional Business Analysis tasks and techniques. BA31 - Unified Modeling Language (UML) for Business Analysts This course will provide Business Analysts with new capabilities to improve their skills with using visual modeling techniques to document requirements.

More information

Managing Business Requirements:

Managing Business Requirements: Managing Business Requirements: Implementing Best Practices to Reduce Risk, Rework and Recriminations 2008 March 19 th Jim Foreman, PMP 703-558-4106 jforeman@esi-intl.com Top 5 IT Disasters of All Time

More information

Using Business Analysis to Meet IT Challenges. UW Tech Talks February 14, 2018 Piet Niederhausen, Enterprise Business Architect, UW-IT

Using Business Analysis to Meet IT Challenges. UW Tech Talks February 14, 2018 Piet Niederhausen, Enterprise Business Architect, UW-IT Using Business Analysis to Meet IT Challenges UW Tech Talks February 14, 2018 Piet Niederhausen, Enterprise Business Architect, UW-IT Overview 2 > Typical IT challenges > What is business analysis and

More information

Description: The customer logs into an ATM machine and withdraws a desired amount of cash.

Description: The customer logs into an ATM machine and withdraws a desired amount of cash. UC1: Withdraw Cash Description: The customer logs into an ATM machine and withdraws a desired amount of cash. Primary Actor: Customer Stakeholders and Interests: - Customer: Wants quick, accurate withdrawal

More information

Systems Analysis for Business Analysts (3 Day)

Systems Analysis for Business Analysts (3 Day) www.peaklearningllc.com Systems Analysis for Business Analysts (3 Day) This is a basic course to help business analysts understand the basics of systems analysis. This course is ideal for people who are

More information

Inception. Describe the vision and business case for this project. Determine if the enterprise should build or buy the necessary system.

Inception. Describe the vision and business case for this project. Determine if the enterprise should build or buy the necessary system. Inception What needs to be done? Describe the vision and business case for this project. Determine if the project is feasible. Determine if the enterprise should build or buy the necessary system. Make

More information

Appendix. Process Inputs and Outputs

Appendix. Process Inputs and Outputs 3601cA.fm Page 493 Wednesday, October 26, 2005 12:47 AM Appendix A Process and Throughout this book, PMP: Management Professional Study Guide, 3rd Edition, I ve discussed the inputs and outputs to the

More information

Transfer and Load 2017 Tax Calculator from WebLocker

Transfer and Load 2017 Tax Calculator from WebLocker Transfer and Load 2017 Tax Calculator from WebLocker (Federal and State) Important Note! If you process Payroll on your DIS Business System, you must be on Release 14V9 or higher before running any of

More information

V&V = the Verification and Validation of Deliverables

V&V = the Verification and Validation of Deliverables V&V = the Verification and Validation of Deliverables Verification and validation (V&V) are separated in the PMBOK Guide, but should be viewed as two integrated elements in the process of creating value

More information

Seller Guide Walmart Marketplace Onboarding

Seller Guide Walmart Marketplace Onboarding Seller Guide Walmart Marketplace Onboarding Seller Onboarding Process Introduction This document outlines the steps for Walmart Marketplace seller onboarding. Please review it carefully and contact Partner

More information

BA Toolkit Top Visual Models for Complete Business Analysis

BA Toolkit Top Visual Models for Complete Business Analysis BA Toolkit Top Visual Models for Complete Business Analysis Presenter: Elizabeth Larson, PMP, CBAP, CSM Co Principal and CEO Watermark Learning Presenter Biography CBAP, PMP, PMI PBA, CSM Extensive BA

More information

Project vs Operation. Project Constraints. Pankaj Sharma, Pankaj Sharma,

Project vs Operation. Project Constraints. Pankaj Sharma, Pankaj Sharma, Project vs Operation PROJECTS OPERATIONS Temporary Ongoing Unique Repetitive Closes after attaining the objectives Objective is to sustain business Prototyping the new car model Assembly line production

More information

CMS Online Version 4.11 December Copyright 2018 International Human Resources Development Corporation

CMS Online Version 4.11 December Copyright 2018 International Human Resources Development Corporation CMS Online Version 4.11 December 2018 Copyright 2018 International Human Resources Development Corporation Introducing New and Improved CMS Online Product Features Cloud-based User-friendly interface SQA

More information

Testing Masters Technologies

Testing Masters Technologies 1. How will you receive the project requirements? A. The finalized SRS will be placed in a project repository; we will access it from there 2. What will you do with SRS? A. SRS stands for software requirement

More information

1. Introduction Purpose Scope Definitions and Acronyms References Documents Figures and models 4

1. Introduction Purpose Scope Definitions and Acronyms References Documents Figures and models 4 Table of Contents 1. Introduction 2 1.1. Purpose 2 1.2. Scope 2 1.3. Definitions and Acronyms 3 1.4. References 3 1.4.1 Documents 3 1.4.2 Figures and models 4 2. Overall Description 5 2.1. Product perspective

More information

Easy-Commission QuickBooks Online Import Guide Version 2.1

Easy-Commission QuickBooks Online Import Guide Version 2.1 Easy-Commission QuickBooks Online Import Guide Version 2.1 Contents 1. Introduction 2. Import Diagrams a. Data mapping diagram b. Conversion diagram 3. Steps involved in QuickBooks Online import a. One

More information

OED ProPath. Project Life Cycle Processes. Product Development Life Cycle Processes

OED ProPath. Project Life Cycle Processes. Product Development Life Cycle Processes Getting Started Legend Life Cycle Integration Change Request Project Life Cycle Processes Business Analysis (BUS) Project Planning (PRP) Project Launch (PRL) Project Closure (PRC) Project Monitoring and

More information

CxC Studio 151 Inventory System

CxC Studio 151 Inventory System CxC Studio 151 Inventory System Team 2 Richard Clark, Lindsay Haley, Jordan James, & Benjamin McCoy Phases 1 & 2 ISDS 4125 October 6, 2014 Page 1 Table of Contents Executive Summary... 3 Requirements Analysis...

More information

CMS Online Version 4.10 September Copyright 2018 International Human Resources Development Corporation

CMS Online Version 4.10 September Copyright 2018 International Human Resources Development Corporation CMS Online Version 4.10 September 2018 Copyright 2018 International Human Resources Development Corporation Introducing New and Improved CMS Online Product Features Cloud-based User-friendly interface

More information

What Every Manager Needs to Know About Project Management in 2018

What Every Manager Needs to Know About Project Management in 2018 What Every Manager Needs to Know About Project Management in 2018 Introduction Course Agenda Why is the PMBOK Guide-6th edition so different from previous versions? What Are Some Tools I Can Use Today

More information

Pepperi Plugin for SAP Business One

Pepperi Plugin for SAP Business One Pepperi Plugin for SAP Business One April. 2015 Ver 1.1 Contents 1 Introduction...4 1.1 System Requirements... 4 1.2 Glossary... 4 2 System Architecture...5 3 Overview...6 3.1 Installation and Setup...

More information

CMS Online Version 4.8 March Copyright 2017 International Human Resources Development Corporation

CMS Online Version 4.8 March Copyright 2017 International Human Resources Development Corporation CMS Online Version 4.8 March 2018 Copyright 2017 International Human Resources Development Corporation Introducing New and Improved CMS Online Product Features Cloud-based User-friendly interface SQA Program

More information

Elizabeth Larson, CBAP, PMP, CSM CEO, Watermark Elizabeth Larson

Elizabeth Larson, CBAP, PMP, CSM CEO, Watermark Elizabeth Larson Elizabeth Larson, CBAP, PMP, CSM CEO, Watermark Learning info@watermarklearning.com Enhanced 1 Performance. Enduring Results. @e_larson Elizabeth Larson Describe the essential models to use during requirements

More information

Software Engineering II - Exercise

Software Engineering II - Exercise Software Engineering II - Exercise April 29 th 2009 Software Project Management Plan Bernd Bruegge Helmut Naughton Applied Software Engineering Technische Universitaet Muenchen http://wwwbrugge.in.tum.de

More information

Appendix C: MS Project Software Development Plan and Excel Budget.

Appendix C: MS Project Software Development Plan and Excel Budget. 1. Introduction. Appendix C: MS Project Software Development Plan and Excel Budget. Project: PickUp Game App The Project plan for this Application consist of 76 days; In this plan is defined how long each

More information

TABLE OF CONTENTS DOCUMENT HISTORY

TABLE OF CONTENTS DOCUMENT HISTORY TABLE OF CONTENTS DOCUMENT HISTORY 5 UPDATE 17D 5 Revision History 5 Overview 5 Optional Uptake of New Features (Opt In) 6 Update Tasks 6 Feature Summary 7 Demand Management 9 Forecast Unique Demand Segments

More information

USER GUIDE Advertiser

USER GUIDE Advertiser USER GUIDE Advertiser Automate Streamline Expedite Synergize Simplify Web Based Partner Program to: Your Proofing Workflow Using XpanceNET XpanceNET automates the creation and distribution of electronic

More information

Requirements Engineering and Software Architecture Project Description

Requirements Engineering and Software Architecture Project Description Requirements Engineering and Software Architecture Project Description Requirements Engineering Project Description The project is student-driven. There will be external sponsors, users, and others that

More information

Overview of A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition

Overview of A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition Overview of A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition Topics for Discussion PMI Foundational Standards Harmonization of PMI s Foundational Standards Top 10 changes

More information

5.0 Creating Invoices in PowerTrack

5.0 Creating Invoices in PowerTrack 5.0 Creating Invoices in PowerTrack 5.1 Bringing up the Invoice Entry Screen After you log into PowerTrack and access Transactions (section 2.3), you will be presented with a screen that will allow you

More information

Inspection Process for Inventory and Consumable Material

Inspection Process for Inventory and Consumable Material Table of Contents Objectives... 2 Enterprise Roles... 2 Scenario... 2 Selection of Inspection Lots... 3 Locating and Displaying the Correct Inspection Lot... 4 Items Procured for Inventory... 5 Items Procured

More information

Goals and Performance Evaluation Process for USS and Unclassified Administrative & Professional Employees Performance Document Line Manager

Goals and Performance Evaluation Process for USS and Unclassified Administrative & Professional Employees Performance Document Line Manager This walks line managers through the process of completing the performance evaluation for their direct reports for the Goals & Performance Evaluation Process. Audience: NOTE: HRS Web Resources: USS Employees

More information

Barcode Generation for Supplier Invoice User Manual. Launch Date:

Barcode Generation for Supplier Invoice User Manual. Launch Date: Barcode Generation for Supplier Invoice User Manual Launch Date: 04.08.2015 User Supplier Manual Capacity - TradewithTVS Management Slide 1 of 28 How to Login TradewithTVS Go to website Login Screen will

More information

Project Selection. Request for information systems are typically motivated by one of the following three general objectives :

Project Selection. Request for information systems are typically motivated by one of the following three general objectives : Project Selection Reasons for project proposals Request for information systems are typically motivated by one of the following three general objectives : Solve a problem An activity, process or function

More information

A new CAMP feature. eworkorder Configuration Basic Enhanced Elite

A new CAMP feature. eworkorder Configuration Basic Enhanced Elite eworkorder: ENHANCED A new CAMP feature The eworkorder feature of CAMP MTX is very flexible, accommodating a wide variety of operational requirements. This document provides an overview of the system settings

More information

SDHEJ Enterprises. Kitchen Buddy. Hilary Boone Thomas Daman Eric Milano Jonathon Morales. ISDS 3100 Fall 2013

SDHEJ Enterprises. Kitchen Buddy. Hilary Boone Thomas Daman Eric Milano Jonathon Morales. ISDS 3100 Fall 2013 SDHEJ Enterprises Kitchen Buddy Hilary Boone Thomas Daman Eric Milano Jonathon Morales ISDS 3100 Fall 2013 November 14, 2013 1 Table of Contents Executive Summary... 3 Context Level DFD... 4 Level 0 DFD...

More information

AGILE TEST MANAGEMENT WITH VISUAL STUDIO

AGILE TEST MANAGEMENT WITH VISUAL STUDIO AGILE TEST MANAGEMENT WITH VISUAL STUDIO any companies are implementing an agile methodology, but often still have waterfall based tools. We ve been working on several agile projects, one of which we collaborate

More information

Costpoint 7 Employee Instructions Vighter Medical Group, LLC

Costpoint 7 Employee Instructions Vighter Medical Group, LLC Costpoint 7 Employee Instructions Vighter Medical Group, LLC April 2, 2018 Time Collection Employee Instructions 1. Open your web browser and go to the following address (Note: the address is case sensitive):

More information

Practical Agile: Hands-on application of agile principles and practices to turn business concepts into deliverable, value based components

Practical Agile: Hands-on application of agile principles and practices to turn business concepts into deliverable, value based components Practical Agile: Hands-on application of agile principles and practices to turn business concepts into deliverable, value based components Mark Ferraro, CapTech Consulting mferraro@captechconsulting.com

More information

Measuring Business Value with Agile

Measuring Business Value with Agile Measuring Business Value with Agile Transforming Rhetoric into Reality Definitions from dictionary.com: Rhetoric - 6. the art of making persuasive speeches; oratory. Reality - 7. something that constitutes

More information

The 9 knowledge Areas and the 42 Processes Based on the PMBoK 4th

The 9 knowledge Areas and the 42 Processes Based on the PMBoK 4th The 9 knowledge Areas and the 42 Processes Based on the PMBoK 4th www.pmlead.net PMI, PMP, CAPM and PMBOK Guide are trademarks of the Project Management Institute, Inc. PMI has not endorsed and did not

More information

Requirements for an MDM Solution

Requirements for an MDM Solution Requirements for an MDM Solution A proven approach for how to gather, document, and manage requirements for a Master Data Management solution from Inception through Implementation by Vicki McCracken Copyright

More information

ACCEPTANCE TEST PLAN. Docket Course Scheduling. For. Version 1.0 February 5, 2013

ACCEPTANCE TEST PLAN. Docket Course Scheduling. For. Version 1.0 February 5, 2013 ACCEPTANCE TEST PLAN For Docket Course Scheduling Version 1.0 February 5, 2013 Developed by Robert Brown Nathal Fonseka Max Haley Michael Kovalichik Joseph Nelson Basil Nyachogo Raymond Selfridge Prepared

More information

Software Engineering Modern Approaches

Software Engineering Modern Approaches Software Engineering Modern Approaches Chapter : Software Process Eric Braude and Michael Bernstein Maintenance Testing The Software Development Lifecycle Implementation Design Phase most relevant to this

More information

PMI Scheduling Professional (PMI-SP)

PMI Scheduling Professional (PMI-SP) PMI Scheduling Professional (PMI-SP) E X A M I N AT I O N CO N T E N T O U T L I N E Project Management Institute PMI Scheduling Professional (PMI-SP) Exam Content Outline Published by: Project Management

More information

Time Entry on Behalf of Employee

Time Entry on Behalf of Employee Time Entry on Behalf of Employee In this topic Managers will learn how to enter time for an employee. This feature can be used in the event an employee is away or unable to enter time, Managers can enter

More information

1 Descriptions of Function

1 Descriptions of Function Customer Communications Portal Management Telecommunications Issues 1 Descriptions of Function Issues confronting an Energy Company s Management Systems responsible for management of Telecommunications

More information

Scrum, Creating Great Products & Critical Systems

Scrum, Creating Great Products & Critical Systems Scrum, Creating Great Products & Critical Systems What to Worry About, What s Missing, How to Fix it Neil Potter The Process Group neil@processgroup.com processgroup.com Version 1.2 1 Agenda Scrum / Agile

More information

Employer Self Service Portal. Employer Self-Service Handbook AASIS Employer Users Version

Employer Self Service Portal. Employer Self-Service Handbook AASIS Employer Users Version Employer Self Service Portal Employer Self-Service Handbook AASIS Employer Users Version June 2017 Blank Page Contents OVERVIEW... 5 How to Use This Manual...7 ESS Roles and Tasks...8 Accessing COMPASS

More information

Managing System Performance

Managing System Performance Managing System Performance System performance directly affects users. Centralized operations are easier to measure than complex networks and client/server systems. Various statistics can be used to assess

More information

Requirements elicitation: Finding the Voice of the Customer

Requirements elicitation: Finding the Voice of the Customer Requirements elicitation: Finding the Voice of the Customer Establishing customer requirements for a software system Identify sources of user requirements on your project Identify different classes of

More information

<PROJECT NAME> PROJECT MANAGEMENT PLAN

<PROJECT NAME> PROJECT MANAGEMENT PLAN PROJECT MANAGEMENT PLAN Version VERSION HISTORY [Provide information on how the development and distribution of the Project Management Plan was controlled and tracked.

More information

CSE 435 Software Engineering. Sept 14, 2015

CSE 435 Software Engineering. Sept 14, 2015 CSE 435 Software Engineering Sept 14, 2015 What is Software Engineering Where Does the Software Engineer Fit In? Computer science: focusing on computer hardware, compilers, operating systems, and programming

More information

DCC Kronos Supervisor Handbook

DCC Kronos Supervisor Handbook Logging in You can log into Kronos through MYDCC. Select the Working @ DCC tab and then click on the Kronos link located in the upper left hand corner of the screen. If you use the MYDCC portal, you will

More information

DRAFT How to Use SAP Activate Content in SAP Solution Manager 7.2

DRAFT How to Use SAP Activate Content in SAP Solution Manager 7.2 DRAFT How to Use SAP Activate Content in SAP Solution Manager 7.2 1. INVESTIGATE SAP S/4HANA BEST PRACTICE CONTENT IN SAP SOLUTION MANAGER 7.2 2 1.1. Set up a solution in SAP Solution Manager 7.2 2 1.2.

More information

Clockwise by GHG. QuickBooks Import Tool Documentation and FAQ. (desktop version only)

Clockwise by GHG. QuickBooks Import Tool Documentation and FAQ. (desktop version only) Clockwise by GHG QuickBooks Import Tool Documentation and FAQ (desktop version only) Clockwise Timekeeping by GHG Corporation September 4, 2016 CONTENTS... 0 Contents... 1 Section I. Prerequisites... 2

More information

Innovative Customer Engagement Hub

Innovative Customer Engagement Hub Innovative Customer Engagement Hub VHT has been a pioneer in bridging CX and business results gaps for over 20 years. Our solutions deliver service across all channels and enable you to focus on customer

More information

Software Development Life Cycle:

Software Development Life Cycle: Software Development Life Cycle: The systems development life cycle (SDLC), also referred to as the application development life-cycle, is a term used in systems engineering, information systems and software

More information

Lesson 13. Estimating and Progress Invoicing

Lesson 13. Estimating and Progress Invoicing QUICKBOOKS 2016 STUDENT GUIDE Lesson 13 Estimating and Progress Invoicing Copyright Copyright 2016 Intuit, Inc. All rights reserved. Intuit, Inc. 5601 Headquarters Drive Plano, TX 75024 Trademarks 2016

More information

Dropping Lowest Score from a Total Column

Dropping Lowest Score from a Total Column Dropping Lowest Score from a Total Column SUPPORT elearning Grade Center Through a simple 4-step process, instructors can automate their Grade Center to evaluate and drop a student s lowest grade from

More information

Supplier Portal - Create

Supplier Portal - Create Title Supplier Portal Create Advanced Shipping Notification Document Number Author Lee Setter Version 8 SP-ASN-CRT Create ASN Publish Date July 6, 2015 Last Revised Date October 24, 2017 Standard Work

More information

PMP TRAINING COURSE CONTENT

PMP TRAINING COURSE CONTENT PMP TRAINING COURSE CONTENT SECTION1: INTRODUCTION PMI, PMP AND PMBOK What is PMI, PMP, and PMBOK? What do I get out of PMP? How do I get certified? Exam qualifications and PM experience Guidelines to

More information

Interface Monitoring App

Interface Monitoring App Build Your Own SAP Fiori App in the Cloud Final Assignment Interface Monitoring App Companies that use multiple systems in their environment use interfaces to connect them and allow data and document flow

More information

Project Integration Management

Project Integration Management Project Integration Management Presented by Project Masters Inc. *Throughout this presentation, we reference and recognize the following trademarks, service marks, and copyrights of the Project Management

More information

MBS Textbook Exchange, Inc. Systems Training Textbook Procedures Quick Reference

MBS Textbook Exchange, Inc. Systems Training Textbook Procedures Quick Reference MBS Textbook Exchange, Inc. Systems Training Textbook Procedures Quick Reference A Quick Reference of Common Application Processes 1 ARC - Textbook Procedures The instructions are based on the minimum

More information

Case Study: How to Eliminate Flaws of Waterfall and Agile Development Processes Using a Hybrid Model

Case Study: How to Eliminate Flaws of Waterfall and Agile Development Processes Using a Hybrid Model Case Study: How to Eliminate Flaws of Waterfall and Agile Development Processes Using a Hybrid Model Agile Waterfall Hybrid Model The Waterfall Model has been the ideal choice for software development.

More information

Comp435 Object-Oriented Design. Requirements and Use Cases. Requirements Analysis. Outline. Requirements Analysis. Requirements change

Comp435 Object-Oriented Design. Requirements and Use Cases. Requirements Analysis. Outline. Requirements Analysis. Requirements change Comp435 Object-Oriented Design Requirements and Use Cases Week 2 Computer Science PSU HBG 1 3 Outline Requirements Analysis Types of Requirements Requirements in Iterative Development Requirements Artifacts

More information

ExamsLabs. Latest Study Materials, Valid Dumps - ExamsLabs

ExamsLabs.   Latest Study Materials, Valid Dumps - ExamsLabs ExamsLabs http://www.examslabs.com/ Latest Study Materials, Valid Dumps - ExamsLabs Exam : ISEB-SWT2 Title : ISTQB-BCS Certified Tester Foundation Level Vendor : ISEB Version : DEMO Get Latest & Valid

More information

Turning Clients Into Creative Team Partners. inmotionnow

Turning Clients Into Creative Team Partners. inmotionnow Turning Clients Into Creative Team Partners inmotionnow 888.462.8044 919.678.8118 sales@inmotionnow.com www.inmotionnow.com Turning Clients Into Creative Team Partners According to the 2014 Creative Industry

More information

CCI Online Management System (OMS) Documentation Section: HR

CCI Online Management System (OMS) Documentation Section: HR CCI Online Management System (OMS) Documentation Section: HR 1.1.Getting Started...2 1.2.Adding a New Employee...2 1.3.Editing & Submitting Employees...5 1.3.1 Editing Employee Information...7 7 1.3.2

More information

USER GUIDE Sales Representatives

USER GUIDE Sales Representatives USER GUIDE Sales Representatives Automate Streamline Expedite Synergize Simplify Web Based Partner Program to: Your Proofing Workflow Using XpanceNET XpanceNET automates the creation and distribution of

More information

Software Development Methodologies. CSC 440: Software Engineering Slide #1

Software Development Methodologies. CSC 440: Software Engineering Slide #1 Software Development Methodologies CSC 440: Software Engineering Slide #1 Topics 1. The Waterfall Model 2. Agile Software Development 3. The Unified Process 4. Object-Oriented Analysis and Design 5. The

More information

User Guide. User Guide. Inside the User Guide:

User Guide. User Guide. Inside the User Guide: User Guide Inside the User Guide: Getting Started 2 Dashboard 2 Help Section 3 Reports 3 Administration 4 Processing a New I-9 Form 5 Option 1 5 Option 2 9 Option 3 12 Option 4 13 Completing Section 2

More information

BHS Billing Unit requires all the providers to review the three important screens prior to releasing the encounters to billing.

BHS Billing Unit requires all the providers to review the three important screens prior to releasing the encounters to billing. Log in to SanWITS Enter your Agency and Facility- Click GO BHS Billing Unit requires all the providers to review the three important screens prior to releasing the encounters to billing. Note: All client

More information

Standards Harmonization Process for Health IT

Standards Harmonization Process for Health IT Evaluation of Standards Harmonization Process for Health Information Technology Contract HHSP23320054105EC Standards Harmonization Process for Health IT Document Number: HITSP 06 N 89 May 30, 2006 Date:

More information

CMS Online Version 4.6 October Copyright 2017 International Human Resources Development Corporation

CMS Online Version 4.6 October Copyright 2017 International Human Resources Development Corporation CMS Online Version 4.6 October 2017 Copyright 2017 International Human Resources Development Corporation Introducing New and Improved CMS Online Product Features Cloud-based User-friendly interface SQA

More information

Keeping Software Designs In-line with Requirements

Keeping Software Designs In-line with Requirements A technical discussion of integration between IBM Rational RequisitePro 2003 and IBM Rational XDE Developer v2003 June, 2003 Rev. 1.00 Keeping Software Designs In-line with Requirements Integration between

More information

Purchase Order/Goods Received Notes

Purchase Order/Goods Received Notes Purchase Order/Goods Received Notes Electronic Ordering. When you want to create an order from one of your suppliers either using the Pico or directly from the backoffice machine, the order details are

More information

Requirements Analysis

Requirements Analysis Requirements Analysis Analysis and Design? Analysis emphasizes an investigation of the problem and requirements, rather than a solution. Analysis = requirements analysis + object analysis. Requirement

More information

A Guide to the Business Analysis Body of Knowledge (BABOK Guide), Version 2.0 Skillport

A Guide to the Business Analysis Body of Knowledge (BABOK Guide), Version 2.0 Skillport A Guide to the Business Analysis Body of Knowledge (BABOK Guide), Version 2.0 by The International Institute of Business Analysis (IIBA) International Institute of Business Analysis. (c) 2009. Copying

More information

Quantifying the Value of Investments in Micro Focus Quality Center Solutions

Quantifying the Value of Investments in Micro Focus Quality Center Solutions Dynamic Value Brief Application Delivery Management Quantifying the Value of Investments in Micro Focus Quality Center Solutions Manage software testing and IT quality management with consistent processes

More information

Nexsure Training Manual - CRM. Chapter 12

Nexsure Training Manual - CRM. Chapter 12 Nexsure Training Manual - CRM Audits In This Chapter Adding an Audit Updating the form Invoicing the Audit Tracking the Audit Posting the Audit Adding an Audit Audits are processed on policies where an

More information

"Charting the Course... Application Lifecycle Management Using Visual Studio 2010 (Agile) Course Summary

Charting the Course... Application Lifecycle Management Using Visual Studio 2010 (Agile) Course Summary Description Course Summary This three-day, instructor-led course provides students with the knowledge and skills to effectively use the Application Lifecycle Management (ALM) tools found in Visual Studio

More information

Immunization Information Systems:

Immunization Information Systems: Planning for Consumer Access to Immunization Information Systems: A Multi-state Effort 2014 Public Health Informatics Conference Atlanta, GA April 30, 2014 Table of Contents Introduction and Background

More information

Tabs3 Quick Start Guide

Tabs3 Quick Start Guide Tabs3 Quick Start Guide Tabs3 Quick Start Guide Copyright 2017 Software Technology, LLC 1621 Cushman Drive Lincoln, NE 68512 (402) 423-1440 Tabs3.com Tabs3, PracticeMaster, and the pinwheel symbol ( )

More information

How to correct/add a Proof of Use after the mark has been verified

How to correct/add a Proof of Use after the mark has been verified How to correct/add a Proof of Use after the mark has been verified Trademark Clearinghouse 31/03/2016 Version 1.1 Contents 1. Introduction... 3 2. Adding Proof of Use to a verified Trademark Record...

More information

Introduction. Scope Management Approach. Roles and Responsibilities. Processes included in Scope Management are:

Introduction. Scope Management Approach. Roles and Responsibilities. Processes included in Scope Management are: Introduction Scope Management involves the management of techniques that make sure that the project comprises a Processes included in Scope Management are: 1. Collect Requirements In this process, project

More information

ELECTRONIC I 9 REFERENCE GUIDE

ELECTRONIC I 9 REFERENCE GUIDE ELECTRONIC I 9 REFERENCE GUIDE 1 st Edition Table of Contents THINGS TO REMEMBER... 2 PREPARATION FOR I 9 COMPLETION... 2 CREATING AN I 9 FORM... 3 LOGGING ON TO START THE FORM I 9... 3 COMPLETING THE

More information

Use cases. Paul Jackson. School of Informatics University of Edinburgh

Use cases. Paul Jackson. School of Informatics University of Edinburgh Use cases Paul Jackson School of Informatics University of Edinburgh Use cases An important part of any requirements document for a system is a description of the system s behaviour from the viewpoint

More information

Appoint, Change and Terminate (ACT) Documentation Termination Document

Appoint, Change and Terminate (ACT) Documentation Termination Document Termination Document The Termination Document is used to TERMINATE an employee s primary assignment from the University. This document reason will terminate ALL ASSIGNMENTS held by the employee. When terminating

More information

Partner Licensing Portal for. MSP Partners Release 2.0

Partner Licensing Portal for. MSP Partners Release 2.0 Partner Licensing Portal for Release Notes ZixCorp is pleased to present the newest version of the Partner Licensing Portal. This document describes the new features and process changes occurring in Release

More information

How To Manage a Troubled Project GTC Center for Project Management, All Rights Reserved

How To Manage a Troubled Project GTC Center for Project Management, All Rights Reserved How To Manage a Troubled Project GTC 2007 1 How To Manage a Troubled Project 2 Logistics Start and finish Breaks and lunch Morning: one 15-minute break Lunch: 60 minutes Afternoon: one 15-minute break

More information

Provides insights on relevant content development to ensure there will be sufficient assets available for the insights identified

Provides insights on relevant content development to ensure there will be sufficient assets available for the insights identified Programmatic campaigns require a new way of thinking and doing. This 5-step framework provides a collaborative, agile process to help marketers and agencies successfully execute data-driven creative for

More information

Qualifying Life Events Online Enrollment Guide For changes related to birth, adoption or placement for adoption

Qualifying Life Events Online Enrollment Guide For changes related to birth, adoption or placement for adoption Qualifying Life Events Online Enrollment Guide For changes related to birth, adoption or placement for adoption Where do I go to request a change related to a birth, adoption or placement for adoption?

More information

A semaphore telegraph, optical telegraph, shutter telegraph chain, Chappe telegraph, or Napoleonic semaphore is a system of conveying information by

A semaphore telegraph, optical telegraph, shutter telegraph chain, Chappe telegraph, or Napoleonic semaphore is a system of conveying information by (Semaphore) A semaphore telegraph, optical telegraph, shutter telegraph chain, Chappe telegraph, or Napoleonic semaphore is a system of conveying information by means of visual signals, using towers with

More information

Requirements Analysis

Requirements Analysis Objectives Classify categories of requirements Requirements Analysis Define the principles of iterative requirements analysis Learn about use cases and their elements Define system sequence diagrams for

More information

Value-Based Verification and Validation Guidelines

Value-Based Verification and Validation Guidelines Value-Based Verification and Validation Guidelines Keun Lee, Monvorath Phongpaibul, Barry Boehm Center for Software Engineering, University Southern California {keunlee, phongpai, boehm}@usc.edu Technical

More information

Mastering Software. Project Requirements. A Framework for Successful Planning, Development & Alignment. Barbara Davis J.ROSS?

Mastering Software. Project Requirements. A Framework for Successful Planning, Development & Alignment. Barbara Davis J.ROSS? Mastering Software Project Requirements A Framework for Successful Planning, Development & Alignment Barbara Davis J.ROSS? / PUBLISHING Table of Contents Dedication Preface About the Author iii xiii xix

More information

Table of Contents Members Overview Viewing Customer Contracts How to find a Member Membership Maintenance...

Table of Contents Members Overview Viewing Customer Contracts How to find a Member Membership Maintenance... Table of Contents Table of Contents... 1 Members Overview... 2 Viewing Customer Contracts... 3 How to find a Member... 5 Membership Maintenance... 7 Personal Details... 7 Marketing Info... 7 Create New...

More information

Version Countries: US, CA. Setup and User Manual (include user demo scenarios in red) For Microsoft Dynamics 365 Business Central

Version Countries: US, CA. Setup and User Manual (include user demo scenarios in red) For Microsoft Dynamics 365 Business Central Version 1.0.0.0 Countries: US, CA Setup and User Manual (include user demo scenarios in red) For Microsoft Dynamics 365 Business Central Last Update: January 11, 2019 Contents App Description... 3 Demo

More information