1 Copyright 2005 ABB. All rights reserved. CONTENTS Type des. Prep. ATPA / Alicia Bauer 2/9/2006 Doc. kind Work Instruction / Procedure No. of p. Appr. / 1. INTRODUCTION Purpose and scope Target group References Terminology ORGANIZATION Industrial IT Certification Managers Industrial IT Marketing Team ATPA / System Type Test ATPA / Product Line Management / System Focus Team Line Management Third Party Hardware Manager (THM) CERTIFICATION Overview Requirements INFRASTRUCTURE EQUIPMENT Overview Certification / Approval Process Business Decision Verification Approval Publishing & Response to Requestor Certificates Cost coverage Regression Testing Process Calendar Time Overview INTELLIGENT DEVICES Overview Certification Process Business Decision Integration Verification Publication Certificates Regression Testing CONNECTIVITY PACKAGES Overview Certification Process Business Decision Resp. dept ATPA Approved Part no. Title Industrial IT Certification Procedure for Hardware ABB Automation Technologies AB 2PAA en

2 6.2.2 Integration Verification Publication Cost Coverage Regression Testing Certification FAQ s SUMMARY This document describes the process for an independent verification and certification of ABB and 3 rd party hardware that 1) is used as a base for System 800xA (infrastructure equipment), 2) is requested to be approved for particular cases (infrastructure equipment), 3) interoperates with System 800xA, specifically fieldbus devices and other intelligent hardware. Third party infrastructure equipment used by 800xA is mainly PC machines, communication equipment such as switches and routers, and network interface cards (NICs), but can be also printers, modems and graphics cards, etc. Fieldbus devices include those that communicate via one of the standard fieldbus protocols such as Profibus, Foundation Fieldbus and HART. Other intelligent devices include PLC s, DCS s, robot systems and controller based products. The list of approved third party infrastructure equipment will be published through ABB Library and Solutions Bank. The list will have two parts, one listing hardware that will be regression tested towards coming versions of System 800xA, the generally supported hardware, and one part listing the special cases, approved for one particular system version only. All other certified hardware will be issued Industrial IT enabled certificates that will be published through ABB library, Solutions Bank and the Industrial IT Portal. Certified hardware will be regression tested towards each version of System 800xA, with the currently certified version(s) identified on the certificate. ABB Automation Technologies AB 2PAA en - 2

3 1. INTRODUCTION 1.1 Purpose and scope This document describes the process for an independent verification and certification of ABB and 3 rd party hardware that 1) is used as a base for System 800xA (infrastructure equipment), 2) is requested to be approved for particular cases (infrastructure equipment), 3) interoperates with System 800xA, specifically fieldbus devices and other intelligent hardware. Third party infrastructure equipment used by 800xA is mainly PC machines, communication equipment such as switches and routers, and network interface cards (NICs), but can be also printers, modems and graphics cards, etc. Fieldbus devices include those that communicate via one of the standard fieldbus protocols such as Profibus, Foundation Fieldbus and HART. Other intelligent devices include PLC s, DCS s, robot systems and controller based products. Third party hardware shall be verified with System 800xA, including the OCS connectivity options and their possible communication boards as defined by the system architecture. An independent testing and approval procedure is to ensure processing of new versions and new equipment asynchronous to system releases. PC vendors will release their products with a cycle different from the one applied by System 800xA. PCs will go end of life fairly quick after a successor variant is released. Hence, we cannot wait to verify the PC until we have the next release, not even until we have the next service pack. Certification of intelligent and controller based hardware must also happen asynchronously to the system releases. Testing will be completed in an STT environment that is identical to the System 800xA STT setup. The list of approved third party infrastructure equipment will be published through ABB Library and Solutions Bank. The list will have two parts, one listing hardware that will be regression tested towards coming versions of System 800xA, the generally supported hardware, and one part listing the special cases, approved for one particular system version only. All other certified hardware will be issued Industrial IT enabled certificates that will be published through ABB library, Solutions Bank and the Industrial IT Portal. Certified hardware will be regression tested towards each version of System 800xA, with the currently certified version(s) identified on the certificate. 1.2 Target group This document is intended for people carrying out this particular approval, but also for others mainly within the ATPA organizations that need to understand the process. 1.3 References Ref. No Document Id no Title [1] 3BSE Third Party Hardware Test Procedure [2] 3BSE Industrial IT Certification Overview Document [3] 3BSE Industrial IT Architecture Overview ABB Automation Technologies AB 2PAA en - 3

4 Ref. No Document Id no Title [4] 3BSE System 800xA Life Cycle Policy 1.4 Terminology Term CT IIT PLM SFT STT THM Definition Commodity Team Industrial IT Product Line Management System Focus Team System Type Test Third party Hardware Manager 2. ORGANIZATION The Certification process will be designed and implemented by a team of people including Industrial IT Marketing, R&D/SFT and Certification Managers. The basic structure of the organization is as follows: The roles and responsibilities of this team are as follows: ABB Automation Technologies AB 2PAA en - 4

5 2.1 Industrial IT Certification Managers The Industrial IT Certification Managers report to ATPA/SE Sales Support Manager for line management. They will receive input and guidance from IIT Marketing ATPA/PLM/SFT and ATPA / STT. The exact responsibilities for these groups will be detailed below. The responsibilities for the IIT Certification Managers are as follows: Drive the Infrastructure Equipment testing program o Create test plans and test all network equipment o Create test plans for PCs o Test PC requests o Perform 3 rd party hardware manager function (THM, a PLM function) Interface with India on PC testing where necessary Certification program process functions o Create necessary requirements documentation (AJB where should this be posted???) o Issue IIT Certificates o Update IIT Portal with Certification test results 2.2 Industrial IT Marketing Team The Industrial IT Marketing team will provide input to the Certification Managers on the Certification Program as follows: Special requests (infrastructure equipment) Pipeline of hardware products for testing / certification Interface to vendors (Relationship Managers) for hardware (not including infrastructure equipment) The specific responsibilities of the IIT Marketing team with respect to Certification are as follows: Hardware / software partner selection Value proposition development (for each certified product) Marketing communications for program and certified products Websites (inside.abb and abb.com) Monthly status updates with the Certification Managers will be conducted to review current status of the certification pipeline, address issues and roadblocks, and to review the upcoming product testing activities. ABB Automation Technologies AB 2PAA en - 5

6 2.3 ATPA / System Type Test The STT Manager will provide direction to the Certification Managers on topics concerning the Certification test environment. Specific responsibilities include: Framework for testing Approval of test configuration (Certification STT) 2.4 ATPA / Product Line Management / System Focus Team PLM and the SFT will provide input to the Certification Managers mainly concerning the Infrastructure equipment that will be tested for inclusion on the 800xA Supported List. In this capacity, one of the Certification Managers will perform the 3 rd party hardware manager (THM) function for PLM. The specific responsibility of the PLM with respect to Infrastructure equipment includes: Vendor / product selection for supported list Participate in business decision process for special requests Provide infrastructure equipment testing prioritization Establish the infrastructure equipment testing and evaluation process The specific responsibility of the SFT with respect to Infrastructure equipment includes: Technical approval of vendor / product selection for supported list Technical input into product requirements for vendor evaluation 2.5 Line Management The Certification Managers will continue to report to ATPA/SE Sales Support Manager for their line management. The specific responsibility of the line manager is as follows: Issue resolution Activity prioritization Line management functions 2.6 Third Party Hardware Manager (THM) The Third Party Hardware Manager function will be performed by the Certification Manager with dotted line reporting to PLM. The specific responsibility of the THM is as follows: Main contact for infrastructure equipment certification requests Coordination with the expert group for infrastructure equipment vendor and product selection. This expert group is an informal group of resources that can be consulted for technical expertise and product experience. ABB Automation Technologies AB 2PAA en - 6

7 Leads business case analysis and reports results to SFT Scheduling of the certification testing Interface with vendors and requestors ABB Automation Technologies AB 2PAA en - 7

8 3. CERTIFICATION 3.1 Overview The certification process applies to those products and solutions that are interoperable with 800xA and provide the plug and produce functionality that helps customers achieve lower total cost of ownership, improved plant output and reduced risk / improved safety. Once product or connector has been developed and tested by the respective product owner, the certification process is used to verify the interoperability of the product with respect to 800xA. There are four types of products that can be certified as Industrial IT Enabled. Each type of product must pass a verification test in ABB s System Type Test (STT) environment. The four types are Infrastructure Equipment, Fieldbus Devices, Intelligent Hardware and Software Products. Certification requirements for the four types will vary slightly and are described in detail in other documents (see section 3.2). Details of the certification process for the infrastructure equipment, fieldbus devices and intelligent hardware are described in sections 4 and 5 of this document. The process for software certification will be covered in a separate document. 3.2 Requirements The requirements for Industrial IT Certification are defined by a number of documents and procedures and are based on equipment type and function. The requirement guidelines can be found in the following requirements definition documents (by product type): Product Type Requirement Document Electronic Documentation Base Requirement (Note 1) 9AKK100809_H Infrastructure Equipment Verification in STT 3BSE Revision PC/Server Test Doc Network Equipment Verification in STT 3BSE Revision Hardware Connectivity Packages Device Integration Packages Software Switch test spec 1.doc PTT and Verification in STT New document PTT and Verification in STT New document from DIC Interface Requirement Specification IRS Doc. (custom) 3BSE Note 1: Electronic documentation alone is not enough to be Industrial IT Certified, but is still required for Certification. ABB Automation Technologies AB 2PAA en - 8

9 4. INFRASTRUCTURE EQUIPMENT 4.1 Overview The following evaluation and testing process will apply for PCs and network equipment including servers, routers, switches and other equipment that makes up the infrastructure of an 800xA system. The quantity and vendors of certified infrastructure equipment are determined by the 800xA SFT. These will be kept to a minimum to ensure manageability of the test processes. Network equipment identified as part of the 800xA infrastructure (by placement on the Supported List ) will be regression tested with each new version. Special requests for certification of infrastructure equipment can be made for cases including export, environmental conditions, technical solutions etc. These products will not be included on the Supported List, but can be renewed each release upon request. See Section 4.3 for associated costs. 4.2 Certification / Approval Process The process consists of four steps. Business decision: A request to evaluate a new network product is submitted to PLM. The requests can come from the Commodity Team, direct from vendors, channels, ABB internally, or Industrial IT Marketing. A team within PLM will evaluate each request to determine if a product will be suitable to be included on the Supported List, if a Special Request / Test is appropriate or if the request will be denied. Verification: Once a decision has been made to proceed, the product will be verified in the certification test system in Vasteras, Sweden for PCs and all network equipment. Regression testing may be performed in the STT in Bangalore, India for Supported List equipment. Approval: The test result is analyzed and the final approval for use with System 800xA is made by the SFT. Once approved, the requestor will be advised by the assigned Certification Manager. Publishing: ABB Automation Technologies AB 2PAA en - 9

10 For a Supported List product, it will then be added to the list and an Industrial IT Enabled Certificate will be issued. IIT Marketing will add the new product to all applicable websites etc Business Decision The decision to support a new model of hardware is made by Product Line Management (PLM) based on business related. This information may be vendor specific, for example a PC model is going end of life (i.e. being replaced by a new model), or the information can be the business case why a special PC or communication switch is required for a certain customer. PLM has appointed a Third party hardware manager (THM) who is the interface for requests for approval. The Third party hardware manager has an expert group at his disposition. This group has people assigned who know the product areas functionally and business wise, as well as having contacts with the vendors as applicable. This group administrates the requests and drives the decision process. A global coordination team for PC usage exists within ABB, the Commodity Team (CT). Requests for approval of new PC models normally come through the Commodity Team. Special requests normally come directly to the Third party hardware manager, but there are cases where the generally used hardware is also handled directly by the THM. Work flow: A request is received from any of the vendors, from the commodity team, or from the ABB sales organization as a special request. In case of a special request it shall be accompanied by a defined set of information according to this document. The THM, together with the expert group and if applicable other PLMs, analyzes the business case behind the request, and presents a proposed decision to the System Focus Team, including whether the test object will be part of the generally supported hardware or if it is a special request. A preliminary technical feasibility analysis is also made to make sure the test object can be approved to work together with System 800xA. This shall be done to avoid unnecessary effort for testing and other activities, if it can be determined already at an early point that the object lacks capabilities which prevents it from successful approval. This request is brought up at the weekly SFT-meetings through the PLM report. SFT approves (or rejects) the request. If approved, the THM expert group requests verification at the test center. If rejected, the THM feeds back to the requestor (applicable for the special cases only). Note that older models need to be regression tested since upgrade cannot assume previous PC models or switches are swapped out. A PC will be taken out of the supported list, i.e. it will not be tested for an actual system version, when it will no longer be able to support the technical requirements. PLM THM makes this decision, together with the experts group and applicable technical experts. ABB Automation Technologies AB 2PAA en - 10

11 A new PC model on the general supported list is verified against older system versions in order to provide spare parts for the installed base. The level of test required shall be considered by the experts group, and by the certification test center. (Reference Section 1.3 of the System 800xA Life Cycle Policy, Document # 3BSE042159). [4] Once a PC or other infrastructure hardware is on the Supported List, if it needs to be removed then this should be included in the Release Notes of the system version as a Removed Feature in order to alert people about to perform Software Upgrade. In order to ensure addition in Release Note, THM should write a PRC in System Tracker database Commodity Team A global coordination team for PC usage exists within ABB, the Commodity Team (CT). The CT is lead by the Commodity Team Leader. The CT has a review team, which has members from the different industry BAs, including members from PLM and the experts group. The purpose of the team is to coordinate the PC usage within ABB. Note that the Commodity Team will maintain a list of ABB wide PC models supported by various products within ABB, but which are not all supported by System 800xA Special Requests There will also be requests for approval of hardware for specific cases, such as cases where; Export restrictions apply A special communication switch is need The customer s IS-department has a very explicit requirement etc. Certain information has to be provided together with a special request in order for the PLM THM to make the right decision. See section template below. A special request will be approved only if there is a supporting customer business case or where there is no reasonable fallback, i.e. it is not possible to use an already approved hardware model. Cost saving will generally not be accepted as motivation for a special request. Special cases are approved per system version of 800xA software. A new request has to be made, and a new verification, if the object shall be approved for another (newer) system version. Special requests need to be paid by the requestor. A fixed price will be set, excluding possible shipping costs. The hardware vendor should pay for approval of general hardware as part of the Industrial IT Certification. ABB Automation Technologies AB 2PAA en - 11

12 Template The following information needs to be provided with a request for approval. This is required for the special requests, in which case the requestor need to provide this information. In the cases of successor replacement models from the PC vendors, this information is filled in as applicable by the THM and/or the expert group to support the internal handling of the case. This information shall be provided on applicable template and stored in EDMS. The decision status is appended to the file as the process is progressing. What is the object, model number and other identification Type of equipment (PC, switch, NIC, graphics card,.) Are system requirements fulfilled (RAM size, processor speed, etc) Ref system guide. Any concerns from the preliminary technical feasibility analysis. Motivation o Next generation model (successor model to an already approved item) o Business case, ROI. o Fallback investigation why can t an existing model be used? Internally, the following will be documented: PLM THM + expert team comments, date SFT decision to approve/reject the request, date Reference to test record, including possible comments Formal decision/approval, date Verification The verification is performed at the certification test center in Vasteras, Sweden. Regression testing may also be performed at the test center in Bangalore, India. System configurations used are similar to the ones used at the different STT centers. Test descriptions are developed per type of equipment to be tested. The test description is designed for the general test cases for a particular type of equipment. It may occur that additional tests need to be made. This has to be identified by the PLM THM and the expert group, and will be discussed specifically between PLM and the certification test center. The test description, and if required the test configuration, will be adapted for the special case. General test configurations as well as test descriptions shall be approved by STT, PLM and SFT.. Test descriptions are generally maintained by the certification test center where the testing is performed. Normally, general hardware, i.e. the hardware that will be regression tested at coming releases, will stay at the certification test center once tested and approved. This concerns the PC vendors, and the major vendors of communication equipment. The vendor will be asked to support transportation and other logistical services. ABB Automation Technologies AB 2PAA en - 12

13 For special requests the testing will be performed at the certification test center in Vasteras. Transportation of the equipment to/from India creates timing and logistics problems that may be difficult to overcome in the short term Approval The System Focus Team makes the final approval or disapproval of the test object. Work flow:! The PLM THM requests approval by SFT, or proposes rejection due to issues found at the test. This request is brought up at the weekly SFT-meetings through the PLM report.! SFT approves or rejects. Decision goes back to the PLM THM Publishing & Response to Requestor Publication of what hardware is approved for use with System 800xA is made by the THM after approved decisions. The third party support list is a Product Bulletin (Status Report), listing hardware models and which system versions they can be used with. It is distributed through the same channels as regular status reports, i.e. it is published in ABB Library, with the publishing code external subscription, which means it is available to customers who subscribe to Solutions Bank. The third party support list is split in two sections with respect to the support status.! Generally supported: This means the object will be verified (regression tested) with the coming system versions, as long as the object has a technical life time (see further below).! Verified specifically for a system version: This part of the list contains all special requests and for which system version they are verified. No automatic regression test to coming version will be supported. New requests are required to verify an object for a new system version. An important part of publishing the decision is to feed back the response to the requestor of a special request. This is done by the PLM THM, once the updated status reports are available. All approved infrastructure equipment will be considered Industrial IT Enabled with respect to ABB s Industrial IT programs. Once approved, the certified equipment will be issued an IIT Enabled Certificate and appropriate vendor and product information added to the Industrial IT websites Certificates An official certificate shall be issued proving the approval of the object. This certificate shall contain the following: Definition of the tested product, including version Definition of the certification reference, i.e. STT configuration The IIT Enabled certificate is issued by the Certification Manager. ABB Automation Technologies AB 2PAA en - 13

14 4.3 Cost coverage The purpose of selecting and verifying a fixed set of equipment for use within System 800xA is to keep the cost of regression testing at new system versions under control. Special request testing will be charged to the requestor / vendor per individual test agreements. In addition, the vendor will supply equipment for testing that will be returned upon completion of the certification test. The invoice will be sent with the certificate to the requestor once the approval is complete. 4.4 Regression Testing When a new system version is released it has to support also older models since upgrade cannot assume previous PC models or switches are swapped out. This regression test is done in the normal STT configurations as part of the STT for a new system version. When preparing the verification of a new system version, STT needs to look over the configurations with respect to how PCs and communication equipment are used in the different configurations. New machines may be purchased to keep the configurations up to date. With careful planning, new and older models can be kept side by side in order to verify that the software (still) runs on all specified models. At service packs (revisions) and rollups, the same hardware set-up is assumed as when the actual system version was released. However, since new models may have been approved, but not yet installed in STT, there is a small risk changes in a service pack may cause issues with any of the new PCs. The expert group together with STT should analyze this, and if it can be assumed problems can occur either the PC in question is installed in appropriate STT configuration, or the test center in India is asked to verify against the actual machine with the new service pack. In order to provide spare parts for installations made on earlier system versions, and for which the PCs that were installed at that time are end of life and not available for purchase on the market, newer PCs are verified also with older system versions. This regression testing is done in India <we need to set up these procedures not done yet!!> If a new PC model is based on the same chip set, or otherwise is very similar to an already approved model, its approval for new and older system versions or revisions can be made by the PLM THM without specific testing. (Reference Section 1.3 of the System 800xA Life Cycle Policy, Document # 3BSE042159). [4] 4.5 Process Calendar Time Overview The maximum calendar time allowed from request to approved equipment is 8 weeks. This time is spent as follows. Business decision Transportation/logistics Verification Approval & publishing 1 week 1-2 weeks 4-5 weeks 1 week ABB Automation Technologies AB 2PAA en - 14

15 For PCs, assuming ABB can get early information about the release of a new model one month before the model is released to the market, approval for use with System 800xA can be issued about one month after the model becomes available on the market. ABB Automation Technologies AB 2PAA en - 15

16 5. INTELLIGENT DEVICES 5.1 Overview Intelligent devices include those that are able to communicate with a control system via one of the fieldbus protocols including; HART, Foundation Fieldbus or Profibus. These devices have smart capability built into the device that includes things such as: Diagnostic data Process data Time stamping Calibration settings Etc. 5.2 Certification Process The certification process for intelligent devices is as follows: System BU s Customers Industrial IT Marketing Business Decision Integration Verification Publication DIC Consult IT Other 800xA Device Integration Library IIT Enabled Certificate Business decision: The decision to integrate a new intelligent device is made by the System BU s, Industrial IT Marketing and the Device Integration Center (DIC) based on business related information. Integration: The appropriate object type (including DTM, diagnostics, asset monitor, CMMS connectivity, documentation etc.) is developed by the Device Integration Center (DIC), Consult IT (for urgent requests) or third parties (strategic) based on the Device Integration Requirements Document. Verification :The resulting object type is tested in the context of the 800xA system (STT). Object types are tested offline as well as with the real device connected to the system. Publishing: The result of verifying a new device integration package (DIP) is published in the 800xA Device Integration Library and an Industrial IT Enabled certificate is issued Business Decision The business decision to create device integration packages for ABB or external fieldbus devices is based upon input from marketing and the business units. New requests will be prioritized based on business drivers such as number of requests, potential business etc. All requests will be added to the device integration center queue and processed according to the ABB Automation Technologies AB 2PAA en - 16

17 prioritization. Project based requests will be considered, but it is typically not practical to develop device integration packages on a project schedule. Work flow: A request is received via the device integration center (DIC) address (dic@de.abb.com) or through IIT Marketing or the BUs. The request is analyzed and compared to the existing prioritized list. The DIC team also reviews the business case for integration of the device. The request is inserted into the queue based on the business case and the requestor advised by the DIC of the approximate delivery time Integration Creation of the device integration package (DIP) can be done by the Device Integration Center in Bangalore, Consult IT (Germany) or an approved ABB Solution Provider. The following information is required from the requestor prior to developing the DIP: Device DTM (if applicable) DD/CFF for FF devices GSD for Profibus devices Documentation Description for asset monitor The resulting device integration package will include the following properties: Configuration tool (FBB, DTM, CBM etc.) Diagnostic display Asset monitor ACT reporter / viewer Calibration management (DMS) OPC connectivity CMMS messenger Faceplates I/O mapping into controller The integration is done according to a standard procedure with the goal of providing a consistent device integration package for each device. This procedure is managed by the Device Integration Center and is outlined in document number 3BSExxxxxx (need input from Stefan Bollmeyer). The final product of the device integration activity is an object type consisting of the elements listed above. ABB Automation Technologies AB 2PAA en - 17

18 5.2.3 Verification Once the device integration package is created, it is tested in the System 800xA test system (STT) for both ABB and 3 rd party devices. The interoperability of these devices with System 800xA is verified with a series of tests that covers the devices behavior in the system from a user s point of view. These tests include upload, download, access rights, parameterization, forcing, observation and engineering workflow. These tests are performed offline and well as online with the real device connected to the system. Once testing is completed the new device integration package will be added to the device library and released. Work flow:! Upon completion of the device integration package, it is installed into the STT! Verification is conducted.! A test record is produced. The test center is responsible for the formalities around the records as such (templates, approval procedure, etc.).! The Industrial IT Certificate is produced Publication The device library and individual device integration packages are available in the ABB Library and ABB Solutions Bank. A list of the current available device types can be found at (select System 800xA, Device Management, and then Device Integration Center from the Control Systems home page). 5.3 Certificates The Industrial IT Enabled certificates will be issued following the release of each device integration package. The certificates consist of a formal certificate, integration data sheet and System 800xA value proposition. This three part certificate can be found on the Industrial IT Portal on inside.abb. ABB and 3 rd party devices that have been certified may use the Industrial IT symbol on product packaging and marketing materials per the IIT Enabled Symbol Policy (3BSE027626). 5.4 Regression Testing Each device integration package (DIP) will be regression tested with each new release of System 800xA. In the event that the vendor has modified the device, a new device must be provided for testing. ABB Automation Technologies AB 2PAA en - 18

19 6. CONNECTIVITY PACKAGES 6.1 Overview Equipment in the Hardware category can include intelligent non-fieldbus devices, process controllers, power equipment and other. Generally, most hardware will be integrated as an intelligent device or using a connectivity package. Connectivity packages refer to the method of connecting controllers to System 800xA. This integration is typically achieved by developing a package that includes the following types of elements: OPC Server (including OPC DA and AE) Faceplates Graphical elements Template control code Etc. There will normally be desktop tools associated with a connect package (such as configuration or engineering tools, control algorithms, reports etc.). These may be integrated if the business case permits and will follow the requirements and process outlined in the Software Certification Process document. They may also be loosely integrated in an initial phase by configuring web or file aspects in System 800xA. 6.2 Certification Process The certification process for hardware connectivity packages is as follows: ABB Automation Technologies AB 2PAA en - 19

20 Product Identified: Product candidates for connectivity packages can be identified by IIT Marketing, BAU/BU s, project teams or sales. This will normally be a specific product / vendor and will not require market study to determine best vendor choice (because connectivity packages are chosen based on customer request or competitive requirement). Business Case / Customer Project: The requestor must develop the business case and identify customer project prior to the development and certification of a new connectivity package. The business case must account for on-going maintenance and support costs for the entire product lifecycle, including regression testing of each new 800xA system version (i.e. major, minor, service pack, rollup) and potential development changes to remain compatible with 800xA as it evolves with newer technologies. Also a technical expert for the 3 rd party software should be identified and assigned to support the development project and ongoing maintenance and support in order to reduce risk. The business case should normally be reviewed by the requestor with the Certification Manager and Industrial IT Marketing Manager prior to beginning development. Requirement Specification Review: Once the connectivity package business case has been reviewed, the Certification Manager will review the connectivity package Requirements Specification with the developer and requestor. A common specification has been developed to ensure that the connectivity packages are developed in a consistent way and contain similar features and functionality. Implementation Estimate: Based on the specifics of the connectivity package, the Certification Manager or the solution provider may provide an estimate of the time required for development of a compliant connectivity package. Development / Product Testing: The connectivity package product will be developed (by a vendor, ABB development group, or outside consultant) according to the connectivity package Requirement Specification and will take into account all use cases described in the Business Case. Prior to Certification / Integration testing, the connectivity package must be tested by the developer in an 800xA system (product type test). This test will verify proper operation of the product with respect to the Requirements Specification. Certification Test Plan / Testing: The Certification test plan will be developed by the Certification Manager based on the standard connectivity package certification test plan and incorporating any specific features of the individual connectivity package product. Once the connectivity package has passed its product type test, it will be installed in the Certification STT to verify proper operation of the interface points as well as to confirm non-interference with the rest of the 800xA system Business Decision The decision to proceed with the connectivity package will reside with the sponsoring business unit based on customer, project or competitive market need. A market study will not normally be required as this type of integration is driven by customer request or market need (i.e. need a TDC3000 connector to increase market share in pulp and paper) funded by sponsoring business unit. The eventual product owner should be identified during this stage of the process. If ABB will own the connectivity package, a product line manager and development manager must be assigned prior to beginning implementation. Work flow: ABB Automation Technologies AB 2PAA en - 20

21 A request is received from a customer, ABB BU, Industrial IT or 800xA marketing. A business case must be prepared by the requestor or sponsoring BU outlining the market need, value proposition and return on investment. The sponsoring BU and Industrial IT team will analyze the business case. Once a decision has been made, the proposed decision will be presented to PLC and then to the System Focus Team (SFT) including recommendation about product ownership. The SFT will have the option of including the product inside System 800xA as part of the product and formal release process. Preliminary investigation will be done to ensure the technical feasibility of the proposed hardware connectivity package. This shall be done to avoid unnecessary effort and expense of creating a connectivity package that cannot be certified. A customer project must be identified, and customer cooperation committed, prior to beginning integration. Actual process, alarm and event data will be required during development, followed by testing with an actual system during final testing. The request will be brought to SFT through the weekly meeting and PLM report. The final decision will be fed back to the requestor. The IIT Certification Manager will be advised and the connectivity package entered into the queue for eventual verification testing Integration The connectivity package can be developed by a partner vendor, ABB development group or outside consultant. In all cases, it should be designed in accordance with the standard connectivity package requirements and test specification. The requestor and developer must review the proposed design with System 800xA SFT to verify scope, functionality and methodology. Where possible, connectivity packages should maintain a consistent design and should deliver similar data access, alarm and event collection and object type content. Standard commercially available interfaces and /or OPC server should be used in the development where possible. Excessive dependencies on the target controller tools/configuration/setup should be avoided. The final product must complete product type testing (PTT) prior to test in the 800xA STT for installation, verification of operation and final certification. Prior to final certification, testing of the connectivity package in a system containing 800xA and the target controller / hardware must be completed (normally performed on a customer site) Verification Verification of performance with respect to System 800xA is performed at the test center in Vasteras, Sweden or Wickliffe, Ohio, USA. Certification test system configuration is similar to the ones used at the various STT centers. A standard test description has been developed for connectivity packages. Additional tests may be required and those will be defined by the Certification manager in conjunction with the product owner and will incorporate any unique features of the product. ABB Automation Technologies AB 2PAA en - 21

22 In cases where it is not feasible to bring the connected hardware to the test center, testing will be performed at a customer site or using real data files obtained from an actual system. The Certification Manager will determine the appropriate test conditions and location. Work flow: Upon receipt of a certification request for a connectivity package, the Certification manager will provide a checklist for completion. Once the requestor has provided the completed checklist and product documentation, the Certification manager will advise a proposed test date, together with any applicable comments about the test logistics. Product type testing must be performed in a test environment that includes the connected hardware. At a minimum real data files are required for the final verification test in STT. Verification is conducted in an appropriate STT test environment A test report is produced. The Industrial IT Certificate is produced. Both documents are delivered to the requestor and posted on the Industrial IT Portal on inside.abb Publication Once the connectivity package has passed the final Certification / Verification testing, an Industrial IT Enabled Certificate will be issued. The Certificate will then be published on the Industrial IT internal and external websites. Detailed information about the connectivity package and its use cases will also be included on the website. Marketing activities will begin at this point (including things like press announcements, webcasts, etc.). 6.3 Cost Coverage Testing will be charged to the requestor per individual test agreement. In addition, the requestor must arrange for proper test equipment to be available for the product type test and certification test. The invoice will be sent with the certificate to the requestor once the approval is complete. 6.4 Regression Testing Certification testing of connectivity packages is specific for a release of 800xA and the connected hardware. The certificate will state the details of the testing, versions, usage, value propositions etc. Regression testing of the connectivity package will be required for each new version of 800xA or as required by a customer. ABB Automation Technologies AB 2PAA en - 22

23 7. Certification FAQ s Question: How, where and by whom will certification be done? Answer: The certification process includes integration testing and verification of the aspect system in an 800xA test environment (under the supervision of ABB s 800xA system focus team). These two tests will be done by ABB test engineers in Vasteras, Wickliffe or Minden. The product developer may participate in the integration testing. Once verification of proper operation has been completed and the aspect system approved by SFT, an Industrial IT Enabled certificate will be issued by the Industrial IT Marketing Team. Certification of some Infrastructure Equipment (PC s, servers, routers, switches etc.) may be done by the STT in Bangalore, India based on standard test configurations and procedures developed by the SFT. All other infrastructure equipment testing will be done in Vasteras, Sweden. Question: Provide a briefing of how ABB looks at products, product families and their relations. Answer: ABB s process automation business area has created the Industrial IT 800xA extended automation system to address the business needs of our power and automation customers. The 800xA system includes the core technology that empowers our aspect object information model. It is this technology that enables us to efficiently integrate products from ABB and our partners into 800xA to provide even greater functionality and value to our customers. The Industrial IT family of products, those certified for interoperability with 800xA, provide a complete portfolio of products / solutions to address customer problems in each industry. These products include hardware such as transmitters, motors and controllers and software such as CMMS systems, engineering tools and asset management applications. These integrated products behave in a standard way and enable our customers to save time and money through simplified installation, one time data entry and single visualization environment (to name just a few). Question: What is the first step in getting my product Industrial IT enabled (certified). Answer: For Network Equipment products, requests from HP or Dell are submitted directly to the Global Commodity Supply Team. All other requests can be directly either to Industrial IT Marketing or PLM for 800xA. PLM will advise whether a product will be tested for the Supported List, a Special Case or Disapproved. For all other products, requests should be submitted to Industrial IT Marketing. A primary contact will be designated in the United States, Sweden and Germany. Once a request has been made, the market need and business case will be evaluated by an internal evaluation team made up of marketing, business development, sales and SFT. Upon approval, the requestor will enter the Industrial IT Technical Integration Program. This program consists of both technical and marketing requirements (see program document for details). ABB Automation Technologies AB 2PAA en - 23

24 Question: What kind of products will be certified. Answer: ABB will look for product partners with software, hardware or applications that compliment the ABB industry portfolios. Only products that are interoperable with 800xA will be certified. Connectivity packages may be developed and certified that enable close integration of 800xA with various third party controllers. Question: Can I use the Industrial IT Enabled symbol before my testing is complete? Answer: No, before the Industrial IT Enabled symbol can be used by anyone (inside or outside of ABB), the product must pass the integration and verification tests. The guidelines for symbol usage can be found in Document No. 3BSE Question: Our product was certified against AIP2.1. Is a new certification needed and when? Answer: All certified products must be verified after each new 800xA release (regression testing). Any products previously certified against AIP or PPA 2.0 must be recertified towards System 800xA Version 4.0 (and higher). Question: What are the plans for new releases and what impact will these have for integration / certification? Answer: ABB intends to have one major system version (SV) release of 800xA each year (normally in the 4 th quarter). One or two service pack releases (SP) could occur during the second quarter of each year. All certified products will be required to have regression testing done after each major (SV) release. This verification will be done during the first quarter of each year. ABB s goal is for SV release impact on certified products to be minimal. ABB Automation Technologies AB 2PAA en - 24

25 REVISION Rev. ind. Page (P) Chapt. (C) Description Date Dept./Init. A1 All New ATPA /AB ABB Automation Technologies AB 2PAA en - 25

Industrial IT System 800xA Engineering

Industrial IT System 800xA Engineering Industrial IT System 800xA Engineering Overview Features and Benefits Integrated Engineering Environment Supports the engineering of the entire extended automation system - from field device to plant management

More information

Freelance 800F The compact control system

Freelance 800F The compact control system Freelance 800F The compact control system abb Freelance 800F the basis for your success Pursuing the basic idea of providing increased automation at a lower cost, ABB has redefined the class of scalable

More information

New trends in Process Automation for the cement industry

New trends in Process Automation for the cement industry New trends in Process Automation for the cement industry Author: E. Vinod Kumar, ABB Ltd., Bangalore, India 1. Abstract: Process Automation is an important component of modern cement production. The versatility

More information

Evolving Emerson Provox to System 800xA

Evolving Emerson Provox to System 800xA Evolving Emerson Provox to System 800xA Focus your vision In most process industries, the quality of information available to decision-makers makes a big difference to plant performance. For these reasons,

More information

IndustrialIT System 800xA

IndustrialIT System 800xA IndustrialIT System 800xA Advant Controller 160 Overview Features and Benefits Maximum Return on Investment New generations of software and system components provide increased operating efficiency, lower

More information

Productivity. through integration. a productivity-boosting automation solution with an integrating system architecture

Productivity. through integration. a productivity-boosting automation solution with an integrating system architecture Based on ABB s IndustrialIT concept IndustrialIT The realization that today s computer technologies make it possible to integrate all corporate business processes into a single, smoothly working whole,

More information

EDDL. The key to interoperability

EDDL. The key to interoperability EDDL The key to interoperability Welcome Rich Timoney, Fieldbus Foundation Our goal in the EDDL cooperation team is to protect the investment that has been made by our manufacturing members and our automation

More information

Siemens PLM Software. GTAC Services. A guide to support services from the Global Technical Access Center (GTAC) EMEA. siemens.

Siemens PLM Software. GTAC Services. A guide to support services from the Global Technical Access Center (GTAC) EMEA. siemens. Siemens PLM Software GTAC Services A guide to support services from the Global Technical Access Center (GTAC) EMEA siemens.com/gtac Contents 2 The value of software maintenance, enhancements and support

More information

SAP CENTRAL PROCESS SCHEDULING BY REDWOOD: FREQUENTLY ASKED QUESTIONS

SAP CENTRAL PROCESS SCHEDULING BY REDWOOD: FREQUENTLY ASKED QUESTIONS SAP NetWeaver SAP CENTRAL PROCESS SCHEDULING BY REDWOOD: FREQUENTLY ASKED QUESTIONS Exploring the Central Process-Scheduling Software Developed by Redwood Software for SAP NetWeaver As IT landscapes become

More information

Unified control system in power plant TCE approach for implementation in Indian context

Unified control system in power plant TCE approach for implementation in Indian context Unified control system in power plant TCE approach for implementation in Indian context Mr. K.Jayaprakash 1, Ms. M.Rukmani 2 General Manager, Instrumentation & Control Department, Tata Consulting Engineers,

More information

System 800xA. Extending the reach of automation to achieve continuous productivity improvements

System 800xA. Extending the reach of automation to achieve continuous productivity improvements Industrial IT System 800xA Extending the reach of automation to achieve continuous productivity improvements Mark W. Taft The right information, for the right people, at the right time that was what end-users

More information

The Manager s Guide to Controller Replacement: Plan Your Strategy

The Manager s Guide to Controller Replacement: Plan Your Strategy Digital Factory The Manager s Guide to Controller Replacement: Plan Your Strategy usa.siemens.com/modernize The Manager s Guide to Controller Replacement: Plan Your Strategy Digital Factory As a plant

More information

Jack van der horst September 22/23, Asset optimization and management

Jack van der horst September 22/23, Asset optimization and management Jack van der horst September 22/23, 2008 Asset optimization and management Introduction to Asset Management The integration of asset management into operator environment can enhance process uptime while

More information

FDI Technology DIGITAL TRANSFORMATION THROUGH FIELD DEVICE INTEGRATION. ONE device ONE package ALL tools

FDI Technology DIGITAL TRANSFORMATION THROUGH FIELD DEVICE INTEGRATION. ONE device ONE package ALL tools FDI Technology DIGITAL TRANSFORMATION THROUGH FIELD DEVICE INTEGRATION ONE device ONE package ALL tools INTEROPERABILITY: THE KEY TO DIGITAL TRANSFORMATION Value Creation Through Integrating Intelligent

More information

HP Agile Manager. Key Benefits. At a glance. Project Management. Key Software Capabilities. Administration. Enterprise SaaS.

HP Agile Manager. Key Benefits. At a glance. Project Management. Key Software Capabilities. Administration. Enterprise SaaS. Datasheet HP Agile Manager At a glance HP Agile Manager ( AGM ) is an on-demand Software-as-a-Service (SaaS) solution for Agile Project Management. HP Agile Manager software acts as the communication hub

More information

T51 - Maximizing the Efficiency of OEM Skid Equipment in The Connected Enterprise

T51 - Maximizing the Efficiency of OEM Skid Equipment in The Connected Enterprise - 5058-CO900H T51 - Maximizing the Efficiency of OEM Skid Equipment in The Connected Enterprise PUBLIC Agenda What is Smart Manufacturing Integration Challenges / Solution Program Modularity Modularity

More information

Specifying FDT Technology Putting Your Assets to Work!

Specifying FDT Technology Putting Your Assets to Work! Specifying FDT Technology Putting Your Assets to Work! Overview Preventing unplanned shutdowns, reducing downtime, and lowering maintenance costs have been shown to provide significant financial benefits.

More information

The Power of Integration

The Power of Integration WHITE PAPER The Power of Integration Choose an Automation Infrastructure That Will Boost Performance Today and Readily Adapt to Tomorrow s Demands By Keith Larson, VP Content The potential and the power

More information

Totally Integrated Automation Portal

Totally Integrated Automation Portal TIA Portal the new version Totally Integrated Automation Portal One integrated engineering framework for all automation tasks. siemens.com/tia-portal Answers for industry. What customers say USA Crawford

More information

Distributed Control Systems for Industrial Automation ABB. Product PDF Presented by DCScenter.com. For Product Needs:

Distributed Control Systems for Industrial Automation ABB. Product PDF Presented by DCScenter.com. For Product Needs: Advant 800xA Advant OCS Bailey Infi 90 Bailey Net 90 Contronic Master Procontic Procontrol Taylor MOD 30 and Mod 300 Distributed Control Systems for Industrial Automation ABB Product PDF Presented by DCScenter.com

More information

The Maintenance Pro s Guide to Controller Replacement: Plan Your Strategy

The Maintenance Pro s Guide to Controller Replacement: Plan Your Strategy Digital Factory The Maintenance Pro s Guide to Controller Replacement: Plan Your Strategy usa.siemens.com/modernize The Maintenance Pro s Guide to Controller Replacement: Plan Your Strategy Digital Factory

More information

IMATIC PDM. Version 6.0 SP1

IMATIC PDM. Version 6.0 SP1 IMATIC PDM Version 6.0 SP1 SIMATIC PDM A new, standardized approach Customer requirements as a base of the development Before PDM Different programs for operation of the associated field devices and components

More information

Real-time Shopfloor Integration with Oracle Manufacturing Operations Center using Kepware

Real-time Shopfloor Integration with Oracle Manufacturing Operations Center using Kepware G E O M E T R I C CASE STUDY Real-time Shopfloor Integration with Oracle Manufacturing Operations Center using Kepware P E R F O R M A N C E T E S T I N G A N D C E RT I F I C AT I O N F O R R E A L -

More information

PRODUCT CONFORMITY CERTIFICATE

PRODUCT CONFORMITY CERTIFICATE PRODUCT CONFORMITY CERTIFICATE This is to certify that the CEM-DAS / DAA Software Manufactured by: ABB Automation GmbH Stierstädter Strasse 5 60488 Frankfurt am Main Germany has been assessed by Sira Certification

More information

Administering System Center Configuration Manager and Intune (696)

Administering System Center Configuration Manager and Intune (696) Administering System Center Configuration Manager and Intune (696) Deploy and manage virtual applications Prepare virtual applications Sequence applications, install and configure the sequencer environment,

More information

Products Solutions Services. PROFIBUS Process automation with digital fieldbus technology

Products Solutions Services. PROFIBUS Process automation with digital fieldbus technology Products Solutions Services PROFIBUS Process automation with digital fieldbus technology 2 PROFIBUS PROFIBUS solves your application A step ahead with digital communication Process automation Digital communication

More information

Get Proactive With Oracle Support. Denis Jaume Senior Director Software Support

Get Proactive With Oracle Support. Denis Jaume Senior Director Software Support Get Proactive With Oracle Support Denis Jaume Senior Director Software Support Safe Harbor Statement The following is intended to outline our general product direction. It is intended for information purposes

More information

Tableau Software, Inc. Standard Support Policy

Tableau Software, Inc. Standard Support Policy Tableau Software, Inc. Standard Support Policy I. Overview This Software Support Policy ( Support Policy ) describes the policies and procedures under which Tableau Software, Inc. ( Tableau ) provides

More information

SYMPHONY/DCI Enhanced with Industrial IT. The Enterprise Management & Control System for Optimizing Process & Business Operations

SYMPHONY/DCI Enhanced with Industrial IT. The Enterprise Management & Control System for Optimizing Process & Business Operations SYMPHONY/DCI Enhanced with Industrial IT The Enterprise Management & Control System for Optimizing Process & Business Operations Reaching New Levels of Productivity Within ABB s new family of integrated

More information

OPTIMIZING METERING PERFORMANCE

OPTIMIZING METERING PERFORMANCE Connected Industrial OPTIMIZING METERING PERFORMANCE MeterSuite : An Integrated Approach to Oil & Gas Flow Calculation ENTER Optimizing Metering Performance www.honeywellprocess.com 2 Challenging Business

More information

Nexenta Support. Customer Service & Support Program Guide. Date: September Copyright 2018 Nexenta Systems, ALL RIGHTS RESERVED

Nexenta Support. Customer Service & Support Program Guide. Date: September Copyright 2018 Nexenta Systems, ALL RIGHTS RESERVED Nexenta Support Customer Service & Support Program Guide Date: September 2018 Contents Contents... i Introduction... 1 Support Highlights... 1 Standard Support Program... 2 Support Period Timeframe...

More information

The Integrator s Guide to Controller Replacement: Plan Your Strategy

The Integrator s Guide to Controller Replacement: Plan Your Strategy Digital Factory The Integrator s Guide to Controller Replacement: Plan Your Strategy usa.siemens.com/modernize The Integrator s Guide to Controller Replacement: Plan Your Strategy Digital Factory As an

More information

Documents the request as clearly and completely as possible on the Change Request Form Submits request to project manager

Documents the request as clearly and completely as possible on the Change Request Form Submits request to project manager 1 Change Management Roles The Requester, Documents the request as clearly and completely as possible on the Change Request Form Submits request to project manager The Project Manager, Tracks status of

More information

CIM and Business Processes

CIM and Business Processes CIM and Business Processes Agenda n Introduction n Computer Integrated Manufacturing n ANSI ISA 95 n Examples of CIM levels n CIM and data communication n Conclusions Introduction n This lesson will provide

More information

PlantCruise by Experion FOUNDATION Fieldbus Integration

PlantCruise by Experion FOUNDATION Fieldbus Integration Product Information Note PlantCruise by Experion FOUNDATION Fieldbus Integration Honeywell s PlantCruise by Experion FOUNDATION Fieldbus solution delivers outstanding system performance and unparalleled

More information

BluePlant SCADA/HMI Software

BluePlant SCADA/HMI Software BluePlant SCADA/HMI Software www.altus.com.br evolution in automation A new vision of your reality Impressive: high-quality graphics and intuitive configuration Superior: security, redundancy and high

More information

Why upgrade your Innovator environment and how to get there

Why upgrade your Innovator environment and how to get there Why upgrade your Innovator environment and how to get there Tom Turner & James Gehan Services and Customer Success 1 Topics 1 Why to the latest Innovator 11.0 2 How to Get to the latest Innovator 11.0

More information

Find out the answers to the 9 most frequently asked questions about multi-company, which is available only in ajeracomplete.

Find out the answers to the 9 most frequently asked questions about multi-company, which is available only in ajeracomplete. Quick reference? Just the FAQs about multi-company in ajeracomplete Find out the answers to the 9 most frequently asked questions about multi-company, which is available only in ajeracomplete. Contents

More information

Modicon Advance Program Your migration to the future

Modicon Advance Program Your migration to the future Modicon Advance Program Your migration to the future Improve process integrity. Maximize system expandability. Increase automation platform return on investment. Advance your legacy products to state-of-the-art

More information

Automation System Optimization

Automation System Optimization Photo (optional) Automation System Optimization Achieve Superior System Performance After a DCS Migration by: Mike Vernak 2 Automation System Optimization Many process plants have an outdated Distributed

More information

Advanced Information and Control Software Packages for the MICREX-NX

Advanced Information and Control Software Packages for the MICREX-NX Advanced Information and Control Software Packages for the MICREX-NX Takashi Ikeda Masato Nakano 1. Introduction With the development of information technology (IT) recently, control systems have evolved

More information

City of San Mateo Clean Water Program Programmable Logic Controller (PLC) and Human Machine Interface (HMI) Programming Services

City of San Mateo Clean Water Program Programmable Logic Controller (PLC) and Human Machine Interface (HMI) Programming Services ATTACHMENT A SAMPLE SCOPE OF SERVICES PLC & HMI PROGRAMMING City of San Mateo Clean Water Program Programmable Logic Controller (PLC) and Human Machine Interface (HMI) Programming Services December, 2017

More information

ABB Corporate Research. Integrating Automation. Dr. Ulrich Topp Dr. Dirk John ABB - 1

ABB Corporate Research. Integrating Automation. Dr. Ulrich Topp Dr. Dirk John ABB - 1 ABB Corporate Research Integrating Automation Dr. Ulrich Topp Dr. Dirk John ABB - 1 What are we talking about? Scope of Problem: information technology vs automation needs in the domain of integration

More information

YZP : SAUTER Vision Center

YZP : SAUTER Vision Center YZP 480...495: SAUTER Vision Center SAUTER Vision Center: Central building management and visualisation of decentralised installations SAUTER Vision Center (SVC) is a web-based building management solution

More information

The Basics of Industrial IT. One in a series explaining the fundamentals of how we at ABB create value for our customers

The Basics of Industrial IT. One in a series explaining the fundamentals of how we at ABB create value for our customers The Basics of Industrial IT One in a series explaining the fundamentals of how we at ABB create value for our customers ABB is bringing a new technology and way of doing business to our company and our

More information

imvision System Manager Infrastructure Management Software

imvision System Manager Infrastructure Management Software imvision System Manager Infrastructure Management Software imvision System Manager Vision imvision System Manager can provide a complete view of your physical infrastructure, including panels, faceplates,

More information

ProfessionalPLUS Station Software Suite

ProfessionalPLUS Station Software Suite DeltaV Distributed Control System Product Data Sheet September 2017 ProfessionalPLUS Station Software Suite Global database, architected for flexibility and scalability Powerful, graphical engineering

More information

En Pointe Technologies

En Pointe Technologies En Pointe Technologies Entrenched with Experience, Armed with Technology Flexibility in doing business your way En Pointe has served as a national I.T. service provider since 1993. We specialize in fulfillment

More information

Reduce the time & labor to process and archive documents. Reduce document cycle times. Create audit trails of document handling activities

Reduce the time & labor to process and archive documents. Reduce document cycle times. Create audit trails of document handling activities NashuaDocs NashuaDocs works for you: Reduce costs Reduce the time & labor to process and archive documents Minimise shipping costs Enhance productivity Reduce document cycle times Improve accuracy Ensure

More information

PR-09 PlantPAx TM : Field Device Interface and Asset Management. Copyright 2012 Rockwell Automation, Inc. All rights reserved.

PR-09 PlantPAx TM : Field Device Interface and Asset Management. Copyright 2012 Rockwell Automation, Inc. All rights reserved. PR-09 PlantPAx TM : Field Device Interface and Asset Management Copyright 2012 Rockwell Automation, Inc. All rights reserved. Agenda Process Device Architectures Integration Office Process Instruments

More information

Cindy Bloodgood Honeywell Trace. Improve Productivity and Reduce Manual Activities

Cindy Bloodgood Honeywell Trace. Improve Productivity and Reduce Manual Activities Cindy Bloodgood 2018 Honeywell Trace Improve Productivity and Reduce Manual Activities What is Honeywell Trace? Trace is a process control documentation solution that allows.. Full documentation of all

More information

CHAPTER 2: IMPLEMENTATION PHASES AND OFFERINGS

CHAPTER 2: IMPLEMENTATION PHASES AND OFFERINGS CHAPTER 2: IMPLEMENTATION PHASES AND OFFERINGS Objectives Introduction The objectives are: Describe the purpose of the phase planning activity, preconditions, and deliverables in the implementation methodology.

More information

System 800xA with AC 870P We like it large

System 800xA with AC 870P We like it large System 800xA with AC 870P We like it large ABB Contents Page Industrial IT from the field to control level 3 System 800xA with AC 870P 4 System architecture 6 Automation with highly reliable controllers

More information

Process Automation. Process Analytical Technology Executive Summary for the Life Sciences Industry

Process Automation. Process Analytical Technology Executive Summary for the Life Sciences Industry Automation Analytical Technology Executive Summary for the Life Sciences Industry Why ABB? A Quality by Design (QbD) approach using Analytical Technology (PAT) requires more than a collection of analyzers

More information

Total Support for SAP HANA Appliances

Total Support for SAP HANA Appliances Statement of Work for Services 1. Scope of Work Total Support for SAP HANA Appliances IBM will provide the services specified in this Statement of Work: "IBM Total Solution Support for SAP In- Memory Appliances

More information

IBM Clinical Trial Management System for Sites

IBM Clinical Trial Management System for Sites Service Description IBM Clinical Trial Management System for Sites This Service Description describes the Cloud Service IBM provides to Client. Client means the contracting party and its authorized users

More information

Enterprise Asset Management STREAMLINE FACILITY MAINTENANCE OPERATIONS & REDUCE COSTS

Enterprise Asset Management STREAMLINE FACILITY MAINTENANCE OPERATIONS & REDUCE COSTS Enterprise Asset Management STREAMLINE FACILITY MAINTENANCE OPERATIONS & REDUCE COSTS Dematic Sprocket ENTERPRISE ASSET MANAGER (EAM) Dematic Sprocket is the facility solution for maximizing the productivity

More information

Optanix Platform The Technical Value: How it Works POSITION PAPER

Optanix Platform The Technical Value: How it Works POSITION PAPER Optanix Platform The Technical Value: How it Works POSITION PAPER Table of Contents The Optanix Clean Signal... 3 Active IT Managed Services... 4 Data Acquisition and Monitoring... 6 The Ingestion Engine...

More information

Technology Leadership in Leasing Implementing a New World in Leasing

Technology Leadership in Leasing Implementing a New World in Leasing Technology Leadership in Leasing Implementing a New World in Leasing Equipment Leasing Association 2002 Annual Convention October 14, 2002 10:30 am Noon Scott Thacker Senior Director Oracle Leasing Solutions

More information

UNIFI 1.5 : Simplifying Qualification and Validation June 2012

UNIFI 1.5 : Simplifying Qualification and Validation June 2012 UNIFI 1.5 : Simplifying Qualification and Validation June 2012 2011 Waters Corporation 1 Waters Regulated Bioanalysis System Solution Sample Preparation Solutions Best in class ACQUITY UPLC I-Class The

More information

MSOW Development Update

MSOW Development Update 8/14/2013 MSOW Development Update Presented by: Rob Zoldan, Senior Vice President Development 1. Development Staff 2. Recently Released Features 3. Development Projects 1 Database Administrators: SQL Server

More information

Instrumentation & Controls. Siemens Power Plant Automation -- SPPA-T3000. Technical Highlights. The New Benchmark in Control.

Instrumentation & Controls. Siemens Power Plant Automation -- SPPA-T3000. Technical Highlights. The New Benchmark in Control. Instrumentation & Controls Siemens Power Plant Automation -- SPPA-T3000 Technical Highlights The New Benchmark in Control Power Generation The new benchmark for Distributed Control Systems Developed to

More information

Electronic Requisition Approval and Workflow System for XA Users

Electronic Requisition Approval and Workflow System for XA Users MKA MKASSOC.COM HELPING COMPANIES IMPROVE BUSINESS PERFORMANCE 616-532-5006 Electronic Requisition Approval and Workflow System for XA Users A Business Case: $21,000 a Month There is a SIGNIFICANT BUSINESS

More information

The new BioPAT MFCS 4

The new BioPAT MFCS 4 The new BioPAT MFCS 4 Developed for the Process Designed for You! turning science into solutions Page 1 Contents 1 Overview 2 3 4 Features & Highlights Good to know Outlook Page 2 Overview BioPAT MFCS

More information

Information Technology Services Project Management Office Operations Guide

Information Technology Services Project Management Office Operations Guide Information Technology Services Project Management Office Operations Guide Revised 3/31/2015 Table of Contents ABOUT US... 4 WORKFLOW... 5 PROJECT LIFECYCLE... 6 PROJECT INITIATION... 6 PROJECT PLANNING...

More information

smar Softwares AssetView Web-based Online Plant Asset Management Software

smar Softwares AssetView Web-based Online Plant Asset Management Software smar Softwares Web-based Online Plant Asset Management Software Web-based Online Plant Asset Management Software Fea eatur tures es Totally integrated with SYSTEM302; All components in one tool; Device

More information

ANCHOR ISO9001:2008 RPR-007 MARINE SERVICES ADDITIONAL PROCEDURE PRODUCT REALISATION

ANCHOR ISO9001:2008 RPR-007 MARINE SERVICES ADDITIONAL PROCEDURE PRODUCT REALISATION PRODUCT REALISATION Document Control Revision History PAGE REASON FOR CHANGE REV. REVIEWER / AUTHORISED BY: RELEASE DATE: ALL NEW DOCUMENT A J.BENTINK 5/08/2016 Revision Approval: J.BENTINK Signature:

More information

Integrating People, Processes and Information

Integrating People, Processes and Information Integrating People, Processes and Information ArchestrA System Platform Your Industrial Operating System In today s challenging times, you need to drive more performance from your assets, collaborate better

More information

Understanding modular automation

Understanding modular automation Understanding modular automation Answers to the most commonly asked questions for those entering the world of modular automation Large-scale automation systems have been at the heart of production line

More information

AGILENT SPECIFICATIONS INFORMATICS SOFTWARE SUPPORT AND SERVICES SILVER-LEVEL

AGILENT SPECIFICATIONS INFORMATICS SOFTWARE SUPPORT AND SERVICES SILVER-LEVEL AGILENT SPECIFICATIONS INFORMATICS SOFTWARE SUPPORT AND SERVICES SILVER-LEVEL The following terms set forth the specifications under which Agilent will provide support and services to customers who are

More information

Because you re reading this book, we can safely assume that the products

Because you re reading this book, we can safely assume that the products Chapter 1: Understanding Project Server In This Chapter Discovering Project Server Determining whether you need Project Server Planning the implementation of Project Server Because you re reading this

More information

From Peachtree to Microsoft Dynamics GP: A move that makes sense for growing businesses GROW

From Peachtree to Microsoft Dynamics GP: A move that makes sense for growing businesses GROW From Peachtree to Microsoft Dynamics GP: A move that makes sense for growing businesses GROW ACHIEVE Microsoft Dynamics GP: A smart move for your growing business You ve worked hard to build your business,

More information

NetSuite OpenAir Mobile for iphone User Guide Version 2.2

NetSuite OpenAir Mobile for iphone User Guide Version 2.2 NetSuite OpenAir Mobile for iphone User Guide Version 2 General Notices Attributions NetSuite OpenAir includes functionality provided by HighCharts JS software, which is owned by and licensed through Highsoft

More information

Distributed Control Systems for Industrial Automation ABB. Product PDF Presented by DCScenter.com. For Product Needs:

Distributed Control Systems for Industrial Automation ABB. Product PDF Presented by DCScenter.com. For Product Needs: Advant 800xA Advant OCS Bailey Infi 90 Bailey Net 90 Contronic Master Procontic Procontrol Taylor MOD 30 and Mod 300 Distributed Control Systems for Industrial Automation Product PDF Presented by DCScenter.com

More information

Leverage Rockwell Automation s industry expertise

Leverage Rockwell Automation s industry expertise Discrete Machine Performance Solution Computer and Software bundled for Continuous Solution Improvement Technical Data Leverage Rockwell Automation s industry expertise through packaged solutions powered

More information

MICROSOFT BUSINESS SOLUTIONS GREAT PLAINS. Release 7.5 Extensions

MICROSOFT BUSINESS SOLUTIONS GREAT PLAINS. Release 7.5 Extensions MICROSOFT BUSINESS SOLUTIONS GREAT PLAINS Release 7.5 Extensions M Business Solutions Pursue Your Business Vision with Confidence Designed for rapid time to benefit and low cost of ownership, Microsoft

More information

efacility - Maintenance Management System

efacility - Maintenance Management System efacility - Maintenance Management System SIERRA ODC Private Limited 1.1 Maintenance Management System efacility - Maintenance Management System efacility an outstanding Tool, which acts as a powerful

More information

FileBound AP Demo Overview

FileBound AP Demo Overview FileBound AP Demo Overview AP Process Overview The main mission of any accounts payable department is to pay vendors, service providers, and employee expenses based on the established rules of the organization

More information

You can t manage what you don t measure

You can t manage what you don t measure You can t manage what you don t measure With the increased cost and complexity of maintenance management, you need to know where your maintenance dollars are going and why. CMMS/EAM software allows you

More information

Passit4Sure.OG Questions. TOGAF 9 Combined Part 1 and Part 2

Passit4Sure.OG Questions. TOGAF 9 Combined Part 1 and Part 2 Passit4Sure.OG0-093.221Questions Number: OG0-093 Passing Score: 800 Time Limit: 120 min File Version: 7.1 TOGAF 9 Combined Part 1 and Part 2 One of the great thing about pass4sure is that is saves our

More information

Xerox IntegratedPLUS Automated Color Management. Automated Color Management. Cloud Based, Accurate and Productive

Xerox IntegratedPLUS Automated Color Management. Automated Color Management. Cloud Based, Accurate and Productive Xerox IntegratedPLUS Automated Color Management Xerox IntegratedPLUS Automated Color Management Cloud Based, Accurate and Productive Take color accuracy to new heights. With Xerox IntegratedPLUS Automated

More information

Environmental Data Cube Support System (EDCSS) Roles and Processes. 20 August 2013

Environmental Data Cube Support System (EDCSS) Roles and Processes. 20 August 2013 Environmental Data Cube Support System (EDCSS) Roles and Processes 20 August 2013 Table of Contents Overview... 3 EDCSS Support Staff... 5 Systems Engineer... 5 Project Workflow Manager Admin... 5 Provider

More information

Remedy Change Management 4.0

Remedy Change Management 4.0 Remedy Change Management 4.0 User s Guide October November 1999 1999 CM-40B-UG-01 CM-400-UG-01 1991 1999 by Remedy Corporation. All rights reserved. This documentation may not be copied in whole or in

More information

What Do You Need to Ensure a Successful Transition to IoT?

What Do You Need to Ensure a Successful Transition to IoT? What Do You Need to Ensure a Successful Transition to IoT? As the business climate grows ever more competitive, industrial companies are looking to the Internet of Things (IoT) to provide the business

More information

BACSOFT IOT PLATFORM: A COMPLETE SOLUTION FOR ADVANCED IOT AND M2M APPLICATIONS

BACSOFT IOT PLATFORM: A COMPLETE SOLUTION FOR ADVANCED IOT AND M2M APPLICATIONS BACSOFT IOT PLATFORM: A COMPLETE SOLUTION FOR ADVANCED IOT AND M2M APPLICATIONS What Do You Need to Ensure a Successful Transition to IoT? As the business climate grows ever more competitive, industrial

More information

Solution Manager Content for Dock Appointment Scheduling

Solution Manager Content for Dock Appointment Scheduling Solution Manager Content for Dock Appointment Scheduling PUBLIC Document Version: 2013_SP39 November 8, 2013 Solution Manager Content for Dock Appointment Scheduling 2013_SP39 1 Copyright Copyright 2013

More information

Asset Tracking Solutions. Partial Controls and Features

Asset Tracking Solutions. Partial Controls and Features Partial Controls and Features Cloud Hosting and Data Storage- No servers required - Allows you to focus on running your business. GPS On scan GPS location data captured Audit Data Timestamped to ensure

More information

Automation and Drives OSEA Totally Integrated Automation SIMATIC. Process Automation. Exceeding requirements of a DCS

Automation and Drives OSEA Totally Integrated Automation SIMATIC. Process Automation. Exceeding requirements of a DCS and Drives OSEA - 2008 SIMATIC Process Exceeding requirements of a DCS 2 Siemens your DCS supplier Process Reliability of a major enterprise More than 150 successful years of SIEMENS One of worldwide leading

More information

Questions to ask your vendor

Questions to ask your vendor CHOOSING A CONTENT SERVICES PLATFORM Questions to ask your vendor A guide to identifying not only what the product can do, but how it does it Congratulations on taking the first steps to make your organization

More information

Certified Training Centre Bareld Bruining

Certified Training Centre Bareld Bruining FOUNDATION Fieldbus Projects Certified Training Centre Bareld Bruining FOUNDATION Fieldbus Project and Documentation Project realization Traditional engineering versus project costs 100 0 1 2 3 4 5 6 7

More information

Application Overview. System 800xA Application Libraries ProBase Library

Application Overview. System 800xA Application Libraries ProBase Library Application Overview System 800xA Application Libraries ProBase Library Features and Benefits Today s processing industries are experiencing increased demands to reduce schedules and costs, while maintaining

More information

Guardian Support for Syncade Smart Operations Management Suite

Guardian Support for Syncade Smart Operations Management Suite Guardian Support for Syncade Smart Operations Management Suite Risk management Lifecycle management Incident management Service Data Sheet Gain extended value and flexibility to get the most out of your

More information

GROW. From Intuit QuickBooks to Microsoft Dynamics GP: A move that makes sense for growing businesses

GROW. From Intuit QuickBooks to Microsoft Dynamics GP: A move that makes sense for growing businesses GROW From Intuit QuickBooks to Microsoft Dynamics GP: A move that makes sense for growing businesses QuickBooks has basic accounting functions, but what Microsoft Dynamics GP offers is the ability to stay

More information

HP Cloud Maps for rapid provisioning of infrastructure and applications

HP Cloud Maps for rapid provisioning of infrastructure and applications Technical white paper HP Cloud Maps for rapid provisioning of infrastructure and applications Table of contents Executive summary 2 Introduction 2 What is an HP Cloud Map? 3 HP Cloud Map components 3 Enabling

More information

About Oracle Primavera P6 Enterprise Project Portfolio Management

About Oracle Primavera P6 Enterprise Project Portfolio Management P6 EPPM System Architecture Data Sheet Release 15.1 March 2015 Contents About Oracle Primavera P6 Enterprise Project Portfolio Management... 5 Working with the Oracle Primavera P6 EPPM Suite... 6 For

More information

Sage 300 ERP 2014 Get more done.

Sage 300 ERP 2014 Get more done. Sage 300 ERP 2014 Get more done. Get more done by connecting your business, providing a better customer experience, and increasing revenue. New web and mobile functionality: driving better customer experiences

More information

Customer Service Portal Overview

Customer Service Portal Overview Customer Service Portal Overview July 2017 https://portal.sita.aero Introduction The SITA customer service portal aims to unify the web channel and act as the single entry point for customer users to access

More information

CEMAT based on process control system SIMATIC PCS 7. cemat

CEMAT based on process control system SIMATIC PCS 7. cemat CEMAT based on process control system SIMATIC PCS 7 cemat CEMAT the sophisticated control concept with a real future CEMAT is a control system specifically designed for cement plants and has been well

More information