ARIANE 6 The new Governance in Ariane world

Size: px
Start display at page:

Download "ARIANE 6 The new Governance in Ariane world"

Transcription

1 ARIANE 6 The new Governance in Ariane world

2 Key objectives for Ariane 6 1. Autonomous access to space for Europe 1. Family of launchers addressing both institutional and commercial markets (scale factor) 2. Implementation of European Preference principles for institutional launch services 2. No more public support to commercial exploitation 3. Increased market share, reduced running costs and total cost of ownership 3. Respecting time-to-market (maiden flight in 2020, full operational capability in 2023) 4. Fast track development plan and simplified management rules for minimized decision time 4. Maximizing commonalities within the European launcher family 5. Common Solid Rocket Motor P120C with Vega-C (implying specific organization) and maximal reuse from A5 (Main stage) and ME (Upper stage) 5. Transferring risks to the Private sector 6. Increasing industrial responsibilities by entrusting a Design Authority to ASL that delivers related warranties. 7. Ensuring continuity between development and exploitation. 8. Commercial exploitation borne by the Private Sector. 2

3 Reference documents on new governance for Ariane 6 Program Memorandum of Understanding concerning the development of the Ariane 6 Launch System Including mainly Objectives (defining general principles of the new governance for Ariane 6) Roles and responsibilities of ESA as Procuring Entity and Launch System Architect, CNES as Launch Base Prime and ASL as Launcher System Prime Contractual principles Main principles of the sharing of risks related to the development of the launcher system High Level Requirements for Ariane 6 Launch System A6-HLR-0-X ESA Including mainly Overarching requirements reflecting Ariane 6 key objectives Mission requirements for institutional and commercial missions Contract principles and industrial policy requirements Management requirements ESA Applicable Documents architecture is reported in annex 3

4 Roles & responsibilities in Ariane 6 development Element Entity Roles & Responsibilities Launcher System Airbus Safran Launche rs Prime Contractor for Launcher Development Design Authority Defines the High level Requirements (HLR) specific to commercial missions Proposes Launcher needs for the launch base to be reflected in interface requirements, including operational requirements. (*) Launch base CNES Prime Contractor for Launch base Development Design Authority Proposes launch base needs to be reflected in interface requirements, including operational constraints. (*) Launch System ESA** Development Procuring Entity Defines the launch system HLR and in particular the HLR specific to institutional missions. Checks compliance with the launch system HLR Accepts the deliverables of the Launcher and Launch Base development contracts Carries out Ariane 6 maiden flight with the support of the Launch Service Provider (***) Launch System Architect Defines the set of Launcher / Launch base interface requirements (IRD) by integrating Launcher System and Launch Base inputs Ensures coherence between Launcher & Launch Base with support from Airbus Safran Launchers and CNES Manages the definition and execution of Launch System validation tests Launch Certification CNES Checks compliance with French Space Operations Act (FSOA - RT/REI) throughout development * Both Prime Contractors also directly coordinate their respective actions ** In its role, ESA will be assisted by other Agencies, notably by CNES as Main ESA Technical Assistant as explained in next slide *** ESA takes the role and responsibility as qualification launch operator in front of French Authority as defined in FSOA 4

5 Innovative features of Ariane 6 development versus previous Ariane developments High Level Requirements (HLR) Instead of detailed technical and management specifications, relying on design choices and management solutions, the development of the Launch System will be based on a set of High Level Requirements (HLR) collecting : Overarching requirements Institutional mission requirements under the responsibility of ESA Commercial mission requirements under the responsibility of Airbus Safran Launchers Management requirements Contract principles and industrial policy requirements Design Authority Both Prime Contractors on their respective perimeters are entrusted with a Design Authority which entails: Responsibility to define the applicable design standards Responsibility to perform design choices and technical trade-offs Signature of the Launcher Qualification Certificate Liable for design and product warranties during development and exploitation phases Visibility given to ESA during development phase Increased accountability This increased autonomy for Airbus Safran Launchers is a counterpart to the transfer of risk, with associated financial consequences linked to the Launcher System development contract (with increased liability compared to previous contracts). In particular, risks linked to shortfalls, state of the art issues will be under its responsibility. 5

6 Focus on Ariane 6 Launch System Architect ESA bears the responsibility of the launch system validation by assuring coherency between Launcher System and Launch Base definitions. This will include responsibility over the interface requirements verification and interface products validation that is achieved through classical methods like analysis, review of design and integrated (combined) tests. Qualification flight campaign is presently deemed to be part of the Launch System check-out in the frame of the Launch System hand-over to Launch Service Provider This function is provided by a dedicated part of the ESA Ariane 6 Project Team, the Launch System Architect team Some specific roles and tasks in the launch system architect responsibility perimeter will be contracted to ASL and CNES Primes to exploit their specific competences in the relevant domain and to foster coherence and synergies with Launcher System and Launch Base products respectively January

7 New contractual principles in Ariane 6 development A payment plan based on a limited number of milestones Launcher system development milestones will be associated with a limited number of deliverables and reviews (to be agreed between the concerned Parties). An indirect payment scheme There will be no more direct payment from ESA to subcontractors Payment by Airbus Safran Launchers to its subcontractors will be put in place, granting visibility to ESA and providing appropriate justifications in case of deviations. Incentive and penalty scheme The launcher system development contract will include an incentive and penalty scheme according to the following two sets of criteria: Development schedule, including maiden flight; Launcher performance, including technical performance, planning, costs and stability of the requirements towards external interfaces (in particular the Launch base). 7

8 Principle for the definition of a Governance scheme in exploitation for Ariane 6 - ESA Resolution for Access to Space The Resolution on Europe s access to Space adopted on 02/12/2014 introduces principles for an agreement on A6 Exploitation governance to be concluded between the concerned parties in 2016 and underlines: On Private side : ASL will bear all commercial market risks during exploitation without support from Member States under the understanding that ASL will control the commercial exploitation of the launch service when On Public side : a number of launches will be contracted per year by different institutional actors in Europe that consider as a collective priority and an individual benefit to use competitive European-developed launchers. The preparation of an agreement among European institutions is necessary to mandate ESA to negotiate with the future launch service provider a collective framework contract for launch services procurement to be signed in 2018 confirming the guaranteed prices and related conditions. The number of institutional launches is not defined in the Resolution. A number of 5/year was considered by ESA and Airbus DS and SAFRAN during the Ministerial Conference preparation as a realistic assumption from both Public and Private perspective January

9 ANNEX: Ariane 6 Documents Specification s applicable Tree to Ariane 6 Development Programme Launch Service Ins0tu0onal Needs - ESA Member States - InsVtuVonal Missions Synergies (e.g. VEGA) Launch System HLR (MRD data in a5achment) JV Commercial Needs Launch System (Level 0) IRD 1/3 LS / Payload SRD- 1* Launcher System ST- 0 DF- 0 DV- 0 CONOPS- 0 IRD 1/2 SRD- 2* A6 Launch Base IRD 2/3 Launcher System LSPC ST- 1 DF- 1 / DV- 1 Standards Launcher System needs for ½ interface ICD- 1/2** Launch Base needs for ½ interface ST- 2 DF- 2 DV- 2 A6 Launch Base **ICD- 1/2: This document is managed by ESA throughout the development phase. Set of requirements for Launcher System Set of requirements for Launch Base * SRD- 1 and SRD- 2 could be defined in a unique document 9

10 Thank You For Your Attention

GALILEO JOINT UNDERTAKING

GALILEO JOINT UNDERTAKING GALILEO Research and Development Activities First call Activity C Introduction of GALILEO services using EGNOS STATEMENT OF WORK GJU/03/100/issue2/OM/ms Issue 2 100 issue2 6th FP C SOW 1 TABLE OF CONTENTS

More information

Ariane 6 Launch System Operational Concept Main Drivers

Ariane 6 Launch System Operational Concept Main Drivers SpaceOps Conferences 28 May - 1 June 2018, 2018, Marseille, France 2018 SpaceOps Conference 10.2514/6.2018-2489 Ariane 6 Launch System Operational Concept Main Drivers Pier Domenico Resta 1, Julio A. Monreal

More information

AIRBUS SAFRAN LAUNCHERS. First HR lessons learned 3 months after Day 1 Congrès RH Octobre 2016

AIRBUS SAFRAN LAUNCHERS. First HR lessons learned 3 months after Day 1 Congrès RH Octobre 2016 AIRBUS SAFRAN LAUNCHERS First HR lessons learned 3 months after Day 1 Congrès RH Octobre 2016 We are entering a new era of space: with our ground-breaking industrial approach, we can provide access to

More information

Space engineering. Technical requirements specification. ECSS-E-ST-10-06C 6 March 2009

Space engineering. Technical requirements specification. ECSS-E-ST-10-06C 6 March 2009 ECSS-E-ST-10-06C Space engineering Technical requirements specification ECSS Secretariat ESA-ESTEC Requirements & Standards Division Noordwijk, The Netherlands Foreword This Standard is one of the series

More information

ACCEPTO - Airbus DS Command & Control EGS-CC based Product line for Tests and Operations

ACCEPTO - Airbus DS Command & Control EGS-CC based Product line for Tests and Operations ACCEPTO - Airbus DS Command & Control EGS-CC based Product line for Tests and Operations Workshop on Simulation for European Space Programmes (SESP) 24-26 March 2015 ESA-ESTEC, Noordwijk, The Netherlands

More information

ARTES Competitiveness & Growth Full Proposal. Requirements for the Content of the Technical Proposal. Part 3A Product Specification

ARTES Competitiveness & Growth Full Proposal. Requirements for the Content of the Technical Proposal. Part 3A Product Specification ARTES Competitiveness & Growth Full Proposal Requirements for the Content of the Technical Proposal Part 3A Product Specification Statement of Applicability and Proposal Submission Requirements Applicable

More information

Space project management

Space project management ECSS-M-ST-10C Rev. 1 Space project management Project planning and implementation ECSS Secretariat ESA-ESTEC Requirements & Standards Division Noordwijk, The Netherlands Foreword This Standard is one of

More information

Attachment J-4 Milestone Acceptance Criteria and Payment Schedule

Attachment J-4 Milestone Acceptance Criteria and Payment Schedule Attachment J-4 Milestone Acceptance Criteria and Payment Schedule Page 1 of 7 For Base, CLIN 001: Milestone Payment Event Integrated System Baseline Review (ISBR) Milestone Objective: At a NASA and Contractor

More information

The next generation of geostationary telecommunication platform

The next generation of geostationary telecommunication platform NEOSAT / ARTES 14 The next generation of geostationary telecommunication platform 13/11/2012 Rationale for NEOSAT Satellite systems represent 50% sales for ESA member states industry (3.1 B ). Telecommunications

More information

GALILEO JOINT UNDERTAKING

GALILEO JOINT UNDERTAKING GALILEO Research and development activities First call Activity B Galileo Local Component Development STATEMENT OF WORK GJU/03/099/issue2/OM/ms Issue 2 099 issue2 6th FP B SOW 1 TABLE OF CONTENT INTRODUCTION

More information

DOING BUSINESS WITH ESA. The ESA Procurement Process and advise to bidders in the tendering process

DOING BUSINESS WITH ESA. The ESA Procurement Process and advise to bidders in the tendering process DOING BUSINESS WITH ESA The ESA Procurement Process and advise to bidders in the tendering process Nathalie Boisard Contract Officer EO Ground Segment & Application Procurement Service ESRIN Ljubljana,

More information

GALILEO JOINT UNDERTAKING

GALILEO JOINT UNDERTAKING GALILEO Research and Development Activities First call Activity D Application Market Development STATEMENT OF WORK GJU/03/102/issue3/OM/ms Issue 3 102 issue3 6 th FP D SOW 1 TABLE OF CONTENTS 1. INTRODUCTION

More information

CALL FOR APPLICATIONS Payload Preparation Facilities Activity (EPCU) STATEMENT OF WORK

CALL FOR APPLICATIONS Payload Preparation Facilities Activity (EPCU) STATEMENT OF WORK CALL FOR APPLICATIONS Payload Preparation Facilities Activity (EPCU) STATEMENT OF WORK This Call for Applications is a translation into English of the essential elements of the contract notice published

More information

Iris Annex. (Prepared by the European Space Agency) V1.1, 1/10/2008

Iris Annex. (Prepared by the European Space Agency) V1.1, 1/10/2008 Iris Annex (Prepared by the European Space Agency) V1.1, 1/10/2008 The task descriptions referring to the ESA Iris Programme are presented for the purpose of coordination and better understanding of interface

More information

e-sens white paper D3.4 Preliminary Proposal for a governance body Instruments Deliverable 3.4, version 3

e-sens white paper D3.4 Preliminary Proposal for a governance body Instruments Deliverable 3.4, version 3 e-sens white paper D3.4 Preliminary Proposal for a governance body Instruments Deliverable 3.4, version 3 Abstract of the Deliverable 3.4, version 3: The deliverable D3.4v3 presents a concrete proposal

More information

Construction Documents Education Program

Construction Documents Education Program PLANNING AND PRE-DESIGN THE CONSTRUCTION SPECIFICATIONS INSTITUTE 110 South Union Street, Suite 100 Alexandria, VA 22314-3351 www.csinet.org CDEP 1.0.1: 03-1 Copyright Materials This presentation is protected

More information

GENERIC QUALITY ASSURANCE REQUIREMENTS FOR: BUILT TO PRINT ITEMS, ITEMS TO STANDARD AND OFF THE SHELF ITEMS

GENERIC QUALITY ASSURANCE REQUIREMENTS FOR: BUILT TO PRINT ITEMS, ITEMS TO STANDARD AND OFF THE SHELF ITEMS GENERIC QUALITY ASSURANCE REQUIREMENTS FOR: BUILT TO PRINT ITEMS, ITEMS TO STANDARD AND OFF THE SHELF ITEMS APPLICABLE FOR: AIRBUS DEFENCE AND SPACE - SPACE BUSINESS UNIT ORBITAL ISSUE: 02c RELEASE DATE:

More information

S pace projects are marked by their high

S pace projects are marked by their high Procurement Eric Morel de Westgaver, Pieter van Beekhuizen & Stefano M. Fiorilli ESA Procurement Department, Directorate of Resources Management, ESTEC, Noordwijk, The Netherlands S pace projects are marked

More information

Space Project Management

Space Project Management EUROPEAN COOPERATION FOR SPACE STANDARDIZATION Space Project Management Configuration Management Secretariat ESA ESTEC Requirements & Standards Division Noordwijk, The Netherlands Published by: Price:

More information

Time to Build! What to Expect On Your Upcoming Design and Construction Journey PRESENTED TO

Time to Build! What to Expect On Your Upcoming Design and Construction Journey PRESENTED TO Time to Build! What to Expect On Your Upcoming and Journey PRESENTED TO Christopher is an award-winning architect with more than 20 years of diversified architectural experience in design of projects from

More information

Terms of Reference (TOR) Project Manager. Annex

Terms of Reference (TOR) Project Manager. Annex Terms of Reference (TOR) Project Manager Annex A. Project Title: Achieving Kuwait 2035 Vision Towards Persons with Disability Project This assignment is under the framework of the Project: Achieving Kuwait

More information

JASON 1 : LESSONS LEARNED FROM THE DEVELOPMENT AND 1 YEAR IN ORBIT

JASON 1 : LESSONS LEARNED FROM THE DEVELOPMENT AND 1 YEAR IN ORBIT JASON 1 : LESSONS LEARNED FROM THE DEVELOPMENT AND 1 YEAR IN ORBIT Thierry Lafon JASON 1 Satellite Manager, Centre National d Etudes Spatiales 18 avenue Edouard Belin - 31401 Toulouse cedex 4 France thierry.lafon@cnes.fr

More information

DIAS Overview JRC Ispra, 17-Mar-2017

DIAS Overview JRC Ispra, 17-Mar-2017 DIAS Overview JRC Ispra, 17-Mar-2017 Simon Jutz, Head Copernicus Space Office, Earth Observation Programmes Directorate simon.jutz@esa.int Slide 2 1 Sentinel-2B launched on 6 March 2017 from Kourou Very

More information

DATA ITEM DESCRIPTION

DATA ITEM DESCRIPTION DATA ITEM DESCRIPTION Title: HUMAN SYSTEMS INTEGRATION PROGRAM PLAN Number: Approval Date: 20070404 AMSC Number: N7716 Limitation: N/A DTIC Applicable: N/A GIDEP Applicable: N/A Office of Primary Responsibility:

More information

THE WAY UP The European Launch Provider for Small Satellites

THE WAY UP The European Launch Provider for Small Satellites THE WAY UP The European Launch Provider for Small Satellites Since commencing operations in March 2002, Eurockot Launch Services GmbH has performed a dozen launches for a variety of institutional and

More information

Space project management

Space project management -M-10B EUROPEAN COOPERATION FOR SPACE STANARIZATION Space project management Project breakdown structures Secretariat ESA-ESTEC Requirements & Standards ivision Noordwijk, The Netherlands Published by:

More information

PRACTICE NO. PD-ED-1273 PAGE 1 OF 7 QUANTITATIVE RELIABILITY REQUIREMENTS USED AS PERFORMANCE-BASED REQUIREMENTS FOR SPACE SYSTEMS.

PRACTICE NO. PD-ED-1273 PAGE 1 OF 7 QUANTITATIVE RELIABILITY REQUIREMENTS USED AS PERFORMANCE-BASED REQUIREMENTS FOR SPACE SYSTEMS. PAGE 1 OF 7 PREFERRED RELIABILITY PRACTICES PERFORMANCE-BASED REQUIREMENTS FOR SPACE SYSTEMS Practice: Develop performance-based reliability requirements by considering elements of system performance in

More information

ANNOUNCEMENT OF OPPORTUNITY. For the launch with the SPACE RIDER Re-usable Free Flyer Platform integrated with VEGA C

ANNOUNCEMENT OF OPPORTUNITY. For the launch with the SPACE RIDER Re-usable Free Flyer Platform integrated with VEGA C ANNOUNCEMENT OF OPPORTUNITY For the launch with the SPACE RIDER Re-usable Free Flyer Platform integrated with VEGA C Reference VG-AO-0-D-30000-ESA Issue/Revision 1 Date of Issue 10/04/2018 Status Approved

More information

CONSTRUCTION DOCUMENTS Part 1

CONSTRUCTION DOCUMENTS Part 1 Audio Presentation Session 4 CONSTRUCTION DOCUMENTS Part 1 Project Delivery Education Program Construction Document Technology (CDT) Preparatory Course 2011 The Construction Specifications Institute www.csinet.org

More information

ECSS. Space engineering

ECSS. Space engineering -E-40B Draft 1 EUROPEAN COOPERATION FOR SPACE STANDARDIZATION Space engineering Software This document is a draft standard circulated for review and comments. It is therefore subject to change and may

More information

Deadline for tenders: 22 September 2016

Deadline for tenders: 22 September 2016 Call for tender for the validation of the Measurement Systems and the synthesis report on the measurement campaigns (one test bench and two field tests) in order to standardize an automated HCl (Hydrogen

More information

Space engineering. System engineering general requirements. ECSS-E-ST-10C 6 March 2009

Space engineering. System engineering general requirements. ECSS-E-ST-10C 6 March 2009 ECSS-E-ST-10C Space engineering System engineering general requirements ECSS Secretariat ESA-ESTEC Requirements & Standards Division Noordwijk, The Netherlands Foreword This Standard is one of the series

More information

Design criteria and procedures of space structures

Design criteria and procedures of space structures Space structures Design criteria and procedures of space structures Prof. P. Gaudenzi Università di Roma La Sapienza, Rome Italy paolo.gaudenzi@uniroma1.it 1 THE STRUCTURAL DESIGN PROCESS Many factors

More information

COAA EPCM CONTRACT PHILOSOPHY. COAA EPCM Contract Committee

COAA EPCM CONTRACT PHILOSOPHY. COAA EPCM Contract Committee COAA EPCM CONTRACT PHILOSOPHY COAA EPCM Contract Committee 1. Introduction The COAA EPCM Contract Committee, consisting of owner, contractor and affiliate members, has developed a standard form EPCM Contract

More information

AfDB New Procurement Policy: Training Program for the Bank s Procurement Staff

AfDB New Procurement Policy: Training Program for the Bank s Procurement Staff 11 AfDB New Procurement Policy: Training Program for the Bank s Procurement Staff AUDIT EXECUTION Selecting Audit Samples and Evidence Requirements Sample 2 Sample is a part or proportion of the whole

More information

Number: DI-HFAC-81743A Approval Date: Office of Primary Responsibility: AS/AIR 4.6 Applicable Forms: N/A

Number: DI-HFAC-81743A Approval Date: Office of Primary Responsibility: AS/AIR 4.6 Applicable Forms: N/A DATA ITEM DESCRIPTION Title: HUMAN SYSTEMS INTEGRATION PROGRAM PLAN Number: Approval Date: 20110421 AMSC Number: N9190 Limitation: N/A DTIC Applicable: N/A GIDEP Applicable: N/A Office of Primary Responsibility:

More information

International Monitoring, Verification and Enforcement Conference

International Monitoring, Verification and Enforcement Conference International Monitoring, Verification and Enforcement Conference LONDON 14-16 JUNE, 2010 ENERGY BALANCE SITUATION 2005-2008 Total Primary Energy Supply [ktoe] Ktoe Heat 2500 2000 Solar Energy Electricity

More information

Project Management. Business Administration 458. Enterprise IT Governance Professor Michael J. Shaw. By: Michael Pantazis

Project Management. Business Administration 458. Enterprise IT Governance Professor Michael J. Shaw. By: Michael Pantazis Project Management Business Administration 458 Enterprise IT Governance Professor Michael J. Shaw By: Michael Pantazis Contents Introduction...3 Project Management Definition...3 Triple Constraint Model...3

More information

A. Project Description

A. Project Description Annex -1- Terms of Reference (TOR) For an Assignment Requiring the Services of a National Individual to be engaged through an Individual Contract (National IC) Project Name: Peace building in Lebanon,

More information

PROFESSIONAL PRACTICE 544

PROFESSIONAL PRACTICE 544 PROFESSIONAL PRACTICE 544 April 20, 2015 Contracting Methods Alternative Project Delivery Methods Michael J. Hanahan, Esq. Schiff Hardin LLP 233 S. Wacker, Ste. 6600 Chicago, IL 60606 312-258-5701 mhanahan@schiffhardin.com

More information

WORK PLAN AND IV&V METHODOLOGY Information Technology - Independent Verification and Validation RFP No IVV-B

WORK PLAN AND IV&V METHODOLOGY Information Technology - Independent Verification and Validation RFP No IVV-B 1. Work Plan & IV&V Methodology 1.1 Compass Solutions IV&V Approach The Compass Solutions Independent Verification and Validation approach is based on the Enterprise Performance Life Cycle (EPLC) framework

More information

Commercial Policy Group Guideline No 2 - Incentivisation Of Contractor Performance

Commercial Policy Group Guideline No 2 - Incentivisation Of Contractor Performance Commercial Policy Group Guideline No 2 - Incentivisation Of Contractor Performance SUMMARY The following broad principles are to be pursued, in the area of incentivisation in order to help to implement

More information

Design and AIV for New Space New Rules (components for nano/micro satellite)

Design and AIV for New Space New Rules (components for nano/micro satellite) Design and AIV for New Space New Rules (components for nano/micro satellite) Stephan Roemer Head of Space Project Development and Space Sales Astro- und Feinwerktechnik Adlershof GmbH 1 Berlin, Germany

More information

Meeting sponsor s criteria : strategy to collaborate, engage and deliver

Meeting sponsor s criteria : strategy to collaborate, engage and deliver Meeting sponsor s criteria : strategy to collaborate, engage and deliver Frédérique Couttet Clinical Trial Manager 4th Annual Outsourcing in Clinical Trials Europe Brussels, Switzerland, May 21 22, 2014

More information

The experience of the Italian Regulatory Authority for Electricity and Gas with Tradable White Certificates

The experience of the Italian Regulatory Authority for Electricity and Gas with Tradable White Certificates Energy Efficiency Policy for End-Users Public Hearing European Economic and Social Committee CNEL 9 July 2009 The experience of the Italian Regulatory Authority for Electricity and Gas with Tradable White

More information

A robust management system for JOINT EUROPEAN DEFENCE PROGRAMMES

A robust management system for JOINT EUROPEAN DEFENCE PROGRAMMES A robust management system for JOINT EUROPEAN DEFENCE PROGRAMMES Opinion No.7 2016 Previous Opinions Opinion No.1 on Aviation accidents, technical and legal responsibility Opinion No.2 on the Proposed

More information

JOB ORDER CONTRACTING (JOC)

JOB ORDER CONTRACTING (JOC) JOB ORDER CONTRACTING (JOC) A LEAN Best Management Practice for Efficient Construction Project Delivery All product and company names are trademarks or registered trademarks of their respective holders.

More information

Annex II. Technical Specifications. Operational Systems Diagnostics Engineering Services. ITER_D_ SD8PNK v.1.3

Annex II. Technical Specifications. Operational Systems Diagnostics Engineering Services. ITER_D_ SD8PNK v.1.3 Annex II Technical Specifications Operational Systems Diagnostics Engineering Services ITER_D_ SD8PNK v.1.3 Table of Contents 1 PURPOSE...2 2 SCOPE...2 3 DEFINITIONS...2 4 REFERENCES...2 5 ESTIMATED DURATION...3

More information

GALILEO Research and Development Activities. Second Call. Area 1A. Statement of Work

GALILEO Research and Development Activities. Second Call. Area 1A. Statement of Work GALILEO Research and Development Activities Second Call Area 1A GNSS Introduction in the Road Sector Statement of Work Rue du Luxembourg, 3 B 1000 Brussels Tel +32 2 507 80 00 Fax +32 2 507 80 01 www.galileoju.com

More information

Project Management Auditing Guide

Project Management Auditing Guide Project Management Auditing Guide Index Page 1.0 Objective 4 2.0 Risks 4 3.0 Safeguards and Controls 3.1.Project Characteristics 4 3.2.Quality in Project Management Process 4 3.3.Strategic Processes 5

More information

Project Agreements, Risk Management and Litigation Risk Sean Ralph, General Counsel, Sasol Canada Phil Scheibel, Partner, Rose LLP

Project Agreements, Risk Management and Litigation Risk Sean Ralph, General Counsel, Sasol Canada Phil Scheibel, Partner, Rose LLP Project Agreements, Risk Management and Litigation Risk Sean Ralph, General Counsel, Sasol Canada Phil Scheibel, Partner, Rose LLP Canadian Energy Law Foundation March 1, 2013 11:00 a.m. 12:00 p.m. Introduction

More information

REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT at RISK SERVICES FOR THE BECKER COUNTY JAIL DETROIT LAKES, MN

REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT at RISK SERVICES FOR THE BECKER COUNTY JAIL DETROIT LAKES, MN REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT at RISK SERVICES FOR THE BECKER COUNTY JAIL DETROIT LAKES, MN Introduction Becker County is issuing a RFQ for Construction Management at Risk Services

More information

United Nations Children s Fund (UNICEF) Supply Division, Copenhagen, Denmark

United Nations Children s Fund (UNICEF) Supply Division, Copenhagen, Denmark United Nations Children s Fund (UNICEF) Supply Division, Copenhagen, Denmark Request for offers for individual consultancy for the Establishment of Professional Learning and Development Plan UNICEF Supply

More information

The Role of Energy Service Companies (ESCOs) in Energy Performance Contracting (EPC) IEE project TRANSPARENSE

The Role of Energy Service Companies (ESCOs) in Energy Performance Contracting (EPC) IEE project TRANSPARENSE The Role of Energy Service Companies (ESCOs) in Energy Performance Contracting (EPC) IEE project TRANSPARENSE Dr. KONSTANTINOU Kostas, Director of Local Development, ANATOLIKI S.A Thessaloniki, November

More information

HOW TO INTEGRATE SPACE DEBRIS ISSUE INTO THE ENVIRONMENTAL ASSESSMENT OF SPACE MISSIONS?

HOW TO INTEGRATE SPACE DEBRIS ISSUE INTO THE ENVIRONMENTAL ASSESSMENT OF SPACE MISSIONS? HOW TO INTEGRATE SPACE DEBRIS ISSUE INTO THE ENVIRONMENTAL ASSESSMENT OF SPACE MISSIONS? Thibaut Maury (1) (2), Jonathan Ouziel (1), Philippe Loubet (2), Maud Saint-Amand (1), Guido Sonnemann (2) (1) Airbus

More information

THE WAY UP The European Launch Provider for Small Satellites

THE WAY UP The European Launch Provider for Small Satellites THE WAY UP The European Launch Provider for Small Satellites Since commencing operations in March 2002, Eurockot Launch Services GmbH has performed a dozen launches for a variety of institutional and

More information

A. Section includes administrative and procedural requirements for substitutions.

A. Section includes administrative and procedural requirements for substitutions. SPECIFICATIONS NO. XX-XX-XXX-XX SECTION 01 25 00 - SUBSTITUTION PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary

More information

Space engineering ECSS. Ground systems and operations Part 2: Document requirements definitions (DRDs) ECSS-E-70 Part 2A EUROPEAN COOPERATION

Space engineering ECSS. Ground systems and operations Part 2: Document requirements definitions (DRDs) ECSS-E-70 Part 2A EUROPEAN COOPERATION -E-70 Part 2A EUROPEAN COOPERATION FOR SPACE STANDARDIZATION Space engineering Ground systems and operations Part 2: Document requirements definitions (DRDs) Secretariat ESA-ESTEC Requirements & Standards

More information

The Development of Public Private Partnership Projects Impact on the In-House Counsel

The Development of Public Private Partnership Projects Impact on the In-House Counsel International In-house Counsel Journal Vol. 4, No. 13, Autumn 2010, 1 The Development of Public Private Partnership Projects Impact on the In-House Counsel OUAHIDA BENDJEDOU Legal Counsel, Bouygues Construction,

More information

DRONE ENABLE Towards a common framework for UTM The Italian experience. Montreal, 22 September 2017

DRONE ENABLE Towards a common framework for UTM The Italian experience. Montreal, 22 September 2017 DRONE ENABLE Towards a common framework for UTM The Italian experience Montreal, 22 September 2017 Presentation 1. Setting the scene 2. Italian implementation of UTM 3. First achievements 4. Roadmap for

More information

ECI: Two-Stage Contracts

ECI: Two-Stage Contracts ECI: Two-Stage Contracts Client and Contractor Considerations Michael Creedon Special Counsel ECI in Infrastructure and Major Projects Summit 2010 Sydney, 17 June 2010 Sessions Outline Introduction /

More information

Iris Public Event summary & activities in Salzburg, 5 February 2013

Iris Public Event summary & activities in Salzburg, 5 February 2013 Iris Public Event summary & activities in 2013 Salzburg, 5 February 2013 Summary: SESAR inputs foreseen during 2013 SESAR Deployment scheme 1. Approval of the governance scheme 2. Development of guidance

More information

1 Introduction Reasons for Selecting EUROCKOT EUROCKOT Photograph Gallery...1-4

1 Introduction Reasons for Selecting EUROCKOT EUROCKOT Photograph Gallery...1-4 Chapter 1 Introduction Table of Contents 1 Introduction...1-1 1.1 Reasons for Selecting EUROCKOT...1-4 1.2 EUROCKOT Photograph Gallery...1-4 List of Figures Figure 1-1 Shareholders in the EUROCKOT joint

More information

NAVISAT. Certification Study - Phase 2. Initial Requirement Baseline

NAVISAT. Certification Study - Phase 2. Initial Requirement Baseline NAVISAT Certification Study - Phase 2 Initial Requirement Baseline Written by Responsibility + handwritten signature if no electronic workflow tool Jean Pierre Ollivier-Henry Matthieu Dabin NAVISAT Verified

More information

Professional Practice 544

Professional Practice 544 Spring Semester 2017 Professional Practice 544 Michael J. Hanahan Partner Schiff Hardin LLP 233 S. Wacker, Ste. 6600 Chicago, IL 60606 312-258-5701 mhanahan@schiffhardin.com Schiff Hardin LLP. All rights

More information

Common Myths and Best Practices. By Gr e g o r y A. Ga r r e t t

Common Myths and Best Practices. By Gr e g o r y A. Ga r r e t t Common Myths and Best Practices By Gr e g o r y A. Ga r r e t t 16 Contract Management October 2009 Examining 10 common myths and several best practices of risk management can help you apply an effective

More information

Professional Practice 544

Professional Practice 544 Spring Semester 2018 Professional Practice 544 Michael J. Hanahan Partner Schiff Hardin LLP 233 S. Wacker, Ste. 6600 Chicago, IL 60606 312-258-5701 mhanahan@schiffhardin.com Schiff Hardin LLP. All rights

More information

Oracle Services Procurement

Oracle Services Procurement Oracle Services Procurement Oracle Services Procurement is the application that enables complete control and oversight for services spending. It is a key component of Oracle Advanced Procurement, the integrated

More information

Hiring the Right Consultant

Hiring the Right Consultant Hiring the Right Consultant Jill Marilley, PE, HDR Ravyn Whitewolf, PE, PMP, City of Blaine John Carpita, PE, MRSC Welcome to the Webinar John Carpita, P.E. Public Works Consultant MRSC jcarpita@mrsc.org

More information

COMMISSION OF THE EUROPEAN COMMUNITIES COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL

COMMISSION OF THE EUROPEAN COMMUNITIES COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL EN EN EN COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 29.5.2009 COM(2009) 247 final COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL Final evaluation of the implementation

More information

Passit4Sure.OG Questions. TOGAF 9 Combined Part 1 and Part 2

Passit4Sure.OG Questions. TOGAF 9 Combined Part 1 and Part 2 Passit4Sure.OG0-093.221Questions Number: OG0-093 Passing Score: 800 Time Limit: 120 min File Version: 7.1 TOGAF 9 Combined Part 1 and Part 2 One of the great thing about pass4sure is that is saves our

More information

Terms of reference. Recruitment of a consultant for the Functional Assessment of Public Administration Structure in Cabo Verde

Terms of reference. Recruitment of a consultant for the Functional Assessment of Public Administration Structure in Cabo Verde Terms of reference Recruitment of a consultant for the Functional Assessment of Public Administration Structure in Cabo Verde 1. CONSULTING INFORMATION Title PUBLIC ADMINISTRATION REVIEW Department/Unit:

More information

New Reliability Prediction Methodology Aimed at Space Applications. Briefing Meeting with Industry

New Reliability Prediction Methodology Aimed at Space Applications. Briefing Meeting with Industry New Reliability Prediction Methodology Aimed at Space Applications Briefing Meeting with Industry Luigi Bianchi Head of Dependability and Safety Assurance Section ESA/ESTEC Product Assurance and Safety

More information

Space product assurance

Space product assurance ECSS-Q-ST-10C Space product assurance Product assurance management ECSS Secretariat ESA-ESTEC Requirements & Standards Division Noordwijk, The Netherlands Foreword This Standard is one of the series of

More information

Terms of Reference (TOR)

Terms of Reference (TOR) CONFÉRENCE DES NATIONS UNIES SUR LE COMMERCE ET LE DÉVELOPPEMENT UNITED NATIONS CONFERENCE ON TRADE AND DEVELOPMENT Terms of Reference (TOR) External Evaluation of Development Account Project 1415 AX Support

More information

Connoisseur Solutions Project Procurement Management

Connoisseur Solutions Project Procurement Management Project Procurement Management Project Procurement Management Processes necessary to purchase or acquire products, services or results needed from outside the project team. Procurement Management Processes

More information

GAIA. GAIA Software Product Assurance Requirements for Subcontractors. Name and Function Date Signature 15/09/05 15/09/05 15/09/05 15/09/05 15/09/05

GAIA. GAIA Software Product Assurance Requirements for Subcontractors. Name and Function Date Signature 15/09/05 15/09/05 15/09/05 15/09/05 15/09/05 Title Page : i Software Product Assurance Requirements for Subcontractors Name and Function Date Signature Prepared by D.MUNCH Prime Contractor SPA Manager 15/09/05 Verified by D.PERKINS E-SVM PA Manager

More information

Commercial & Industrial Custom Incentive Program

Commercial & Industrial Custom Incentive Program About This Application UGI Electric offers incentives for cost-effective custom energy efficiency improvements to help businesses reduce energy use by improving the efficiency of their equipment and facility.

More information

Guidelines for Procurement of Professional Aerial Imagery, Photogrammetry, Lidar and Related Remote Sensor Based Geospatial Mapping Services

Guidelines for Procurement of Professional Aerial Imagery, Photogrammetry, Lidar and Related Remote Sensor Based Geospatial Mapping Services Guidelines for Procurement of Professional Aerial Imagery, Photogrammetry, Lidar and Related Remote Sensor Based Geospatial Mapping Services EXECUTIVE SUMMARY These Guidelines were prepared by the ASPRS

More information

Chapter 4 State Requirements for Educational Facilities Section 4.1

Chapter 4 State Requirements for Educational Facilities Section 4.1 providential cause, other impending danger to life safety, or pursuant to Section 1013.46(1)(b), F.S., the board can declare an emergency, can negotiate a contract with a design-build firm, design professional,

More information

Statement of Work. Quality Management System (including data management and record keeping) development and implementation in Moldova

Statement of Work. Quality Management System (including data management and record keeping) development and implementation in Moldova Statement of Work Quality Management System (including data management and record keeping) development in Moldova 1. Scope: The Statement of Work (SoW) describes the requirements for development and implementation

More information

National Disclosure Summit

National Disclosure Summit www.pwc.com National Disclosure Summit Best Practices in implementing a coordinated Global Transparency Program February 7, 2014 Agenda Global transparency overview Your path to a global transparency program

More information

ARTES Competitiveness & Growth Full Proposal. Requirements for the Content of the Business Plan. Part 2

ARTES Competitiveness & Growth Full Proposal. Requirements for the Content of the Business Plan. Part 2 ARTES Competitiveness & Growth Full Proposal Requirements for the Content of the Business Plan Part 2 Statement of Applicability and Proposal Submission Requirements Applicable Domain(s) Space Segment

More information

for non-annex I Parties on establishing and maintaining institutional arrangements for preparing national communications and biennial update reports

for non-annex I Parties on establishing and maintaining institutional arrangements for preparing national communications and biennial update reports Toolkit for non-annex I Parties on establishing and maintaining institutional arrangements for preparing national communications and biennial update reports MITIGATION, DATA AND ANALYSIS PROGRAMME on

More information

CHAPTER 11 MISSION INTEGRATION AND MANAGEMENT

CHAPTER 11 MISSION INTEGRATION AND MANAGEMENT CHAPTER 11 MISSION INTEGRATION AND MANAGEMENT 11.1 Introduction In order to ensure the launch mission proceeds in a smooth way, CGWIC has implemented a standard approach through a single interface. This

More information

INTRODUCTION TO QUALITY ASSURANCE

INTRODUCTION TO QUALITY ASSURANCE INTRODUCTION TO QUALITY ASSURANCE Basic Quality Terminology No more definitions...please! Page 1 Quality is the degree to which a specific product conforms to a design or specification H.L. Gilmore Product

More information

WM2012 Conference, February 26 March 1, 2012, Phoenix, Arizona, USA. Improving DOE Project Performance Using the DOD Integrated Master Plan 12481

WM2012 Conference, February 26 March 1, 2012, Phoenix, Arizona, USA. Improving DOE Project Performance Using the DOD Integrated Master Plan 12481 Improving DOE Project Performance Using the DOD Integrated Master Plan 12481 Glen B. Alleman, DOD Programs, Project Time & Cost and Michael R. Nosbisch, Managing Principle, Western Region, Project Time

More information

Quality Assurance Agreement for MonLog GmbH suppliers Gewerbepark Aunkrichen Aunkirchen / Vilshofen

Quality Assurance Agreement for MonLog GmbH suppliers Gewerbepark Aunkrichen Aunkirchen / Vilshofen Page 1 of the Quality Assurance Agreement between MonLog GmbH and Suppliers Quality Assurance Agreement for MonLog GmbH suppliers Gewerbepark Aunkrichen 4 94474 Aunkirchen / Vilshofen The following Quality

More information

Paris Committee on Capacity-building

Paris Committee on Capacity-building Paris Committee on Capacity-building 11-13 May 2017 First meeting of the Paris Committee on Capacity-building Bonn, Germany, 11 13 May 2017 Background paper on the implementation of the 2016 2020 capacity-building

More information

REUSABLE TOOLSET FOR AN EASY-TO-BUILD PAYLOAD CONTROL CENTRE

REUSABLE TOOLSET FOR AN EASY-TO-BUILD PAYLOAD CONTROL CENTRE REUSABLE TOOLSET FOR AN EASY-TO-BUILD PAYLOAD CONTROL CENTRE Anne-Lise CAMUS CNES 18 Avenue Edouard Belin, 31401 TOULOUSE cedex 9 Tel: 33 (0) 5.61.27.46.41 anne-lise.camus@cnes.fr OVERVIEW 1. The context

More information

Certificate IV in Project Management Student Assessment Guide

Certificate IV in Project Management Student Assessment Guide Overview The assessment for the Certificate IV in Project Management comprises Team Assignment Development of a detailed Project Management Plan for chosen case study - 30% for blended classes Individual

More information

CONSTRUCTION MANAGER

CONSTRUCTION MANAGER The South African Council for the Project and Construction Management Professions CONSTRUCTION MANAGER IDENTIFICATION OF WORK AND SCOPE OF SERVICES FOR CONSTRUCTION MANAGERS REGISTERED IN TERMS OF THE

More information

Framework Contract for the acquisition of studies supporting Multisource Analytical Assessments

Framework Contract for the acquisition of studies supporting Multisource Analytical Assessments Framework Contract for the acquisition of studies supporting Multisource Analytical Assessments Procurement Procedure Reference SATCEN-RP-03/18 Annex 2 to the invitation to submit a request to participate

More information

Euro-Interlocking Handover Workshop

Euro-Interlocking Handover Workshop Euro-Interlocking Handover Workshop Handover To INESS Emmanuel Buseyne, PM INESS Paris 30. May 2008 Euro-Interlocking 30. May 2008 1 Content 1- Summary of the current situation 2- INESS objectives 4- Implementation

More information

United Nations Development Programme (UNDP) FOR THE

United Nations Development Programme (UNDP) FOR THE United Nations Development Programme (UNDP) CALL FOR EXPRESSIONS OF INTEREST AND PREQUALIFICATION FOR THE CONSTRUCTION AND REHABILITATION OF IRRIGATION SYSTEMS IN LEBANON UNDP Lebanon invites interested

More information

Construction Family of Documents

Construction Family of Documents Construction Family of Documents The EJCDC Construction Family Documents (C-Series) is intended for engineered construction projects. The current edition (2013) is endorsed by both the Construction Specifications

More information

Procurement Under the New Requirements 1

Procurement Under the New Requirements 1 Requirements 1 Procurement under the New Requirements 1 Why This Session Is Needed New provisions in Uniform Guidance Changes to conflict of interest requirements in Uniform Guidance Distinctions between

More information

Belgium-Brussels: HOME/2015/ISFP/PR/DRUG/0062 Waste water analysis report on the stimulant illicit drug markets in the EU 2016/S

Belgium-Brussels: HOME/2015/ISFP/PR/DRUG/0062 Waste water analysis report on the stimulant illicit drug markets in the EU 2016/S 1 / 6 This notice in TED website: http://ted.europa.eu/udl?uri=ted:notice:254272-2016:text:en:html Belgium-Brussels: HOME/2015/ISFP/PR/DRUG/0062 Waste water analysis report on the stimulant illicit drug

More information