1 Getting good business results Years in the trenches with Microsoft Project Lynn Heatley, PMP Project Management Consultant Home: - preferred LinkedIn: Work: Phone: (work)
2 2 Learning Objectives Which PM practices give best results Project vs. Excel Developing WBS Naming conventions Modeling in Microsoft Project Tasks vs. action items, issues, decisions, risks Estimating Set up resources, dependencies Indicators Weekly status Pick up 1 or 2 tips you can use Warning! This presentation is less about software tips and tricks and more about getting business results.
3 3 Good business results Delivery on schedule, on budget, and Delivery meets users and owner requirements Examples Upgrade 40 production centers - on time, on budget Software company on time, on budget New data center, factory upgrade on time, on budget Oracle EBS - in progress
4 4 Facilitation Vetting Indicators Lessons, action items Inspection
5 5 Contract with project manager & owners Belief in PM, maturity, culture PM education Outputs Performance? Prediction? Schedule. Cost? Functionality? Drives Estimating Level of detail Tools selection
6 6 What do they want & are willing to pay for? Knowledge? LATE tasks FINISH and COST performance Improved performance? FINISH and COST predictions Improved FINISH and COST Impact Cost, Schedule, Functionality, Risk
7 7 Planning maturity, sophistication Draw the line Microsoft Project fields TASK NAME START, FINISH DURATION Assign RESOURCES Assign PREDECESSORS Estimate WORK Assign COST ACTUAL HOURS worked WORK remaining
8 Word Excel Microsoft Project Risk+, other tools Value for scoping, estimating Value for status - hindsight Value for prediction - foresight Effort to develop Effort to maintain Score = (sum of values) / (sum of effort) 8 Tools Excel vs. Project One-time task list X X Maintained Task list X X One-time model w/dependencies m m X Maintained model w/dependencies X Maintained model, dependencies, indicators X X
9 9 Facilitate / elicit tasks, dependencies, estimates ALL the work, from the doers. Talk track What is your definition of done? Why can t this task start now? What drives this task? What else must be done? What could go wrong? Time upfront Plan start work
10 10 Estimating 2, 5, 20, 50, 200, 500 person-hours? Approval tasks. Effective duration driven by DURATION or by UNITS, FIXED WORK < 2 reporting periods in duration. Documentation tasks - template first streamline & simplify, train. Rolling Planning
11 11 Modeling in Project Flexible model Dynamic Scheduling p. 204, Dynamic Scheduling with Microsoft Project 2010, the book by and for professionals. Rodolfo Ambriz, John White Closed network, p. 2-7, p. 9-2, Planning and Scheduling using Microsoft Project Paul E. Harris Do NOT CONSTRAIN any dates. Add MILESTONE tasks with no PREDECESSORS or SUCCESSORS, and CONSTRAIN the START of only the MILESTONE task.
12 12 Microsoft Project CONSTRAINTS Setting a date (typing it in or selecting it from the calendar) sets a CONSTRAINT. START NO EARLIER THAN MUST START ON FINISH NO EARLIER THAN MUST FINISH ON Task Inspector.
13 13
14 14 How Project schedules tasks behind the scenes Duration = Work / Units IN A IF YOU REVISE UNITS IF YOU REVISE DURATION IF YOU REVISE WORK Fixed units task Fixed work task Fixed duration task Duration is recalculated. Duration is recalculated. Work is recalculated. Work is recalculated. Units are recalculated. Work is recalculated. Duration is recalculated. Duration is recalculated. Units are recalculated. HA aspx?CTT=5&origin=HA #top
15 15
16 16 Develop WBS, Complete the model By phase, then by work stream. Start with 1 resource per task. Keep it simple. Generic RESOURCE NAME Add WORK - non-summary tasks. MILESTONES. PREDECESSORS, No PREDs on SUMMARY. Manually scheduled tasks Why can t I start that task now? Let Microsoft Project LEVEL and watch.
17 17 Naming Convention Verb-(adjectives)-noun. Great if deliverable is the (adjective)-noun e.g. Build Conversion 505 Functional Spec. Conduct RPT-302 Functional Test Place order for Gold instance servers Install SRV-022 patch Deliverable(s) for each task inspect-able, easily identified from task name.
18 18 Decisions, Assumptions, Risks Decision process explicit, strong Cost of going slowly made explicit. Risks made explicit. What could go wrong? Assumptions risks Latest date to add resources. A lack of contingency is a risk.
19 19 Get aggressive up front FINISH-START dependencies can actually START before the PREDECESSOR finishes (LEAD). Culture to work on tasks ahead of schedule.
20 20 Vet the model, set BASELINE All tasks vetted by task owners. Workshop with all tech leads and managers. Set BASELINE.
21 21 Special Attention - Indicators Once a project is 10% complete, the over-run at completion will not be less than the current over-run. Once a project is 20% complete, the CPI (Cost Performance Index) will not vary from its current value by more than 10%. During the first 10% - 20% of the duration of the project, special attention to Modeling tasks, duration, work, dependencies Deliverables Performance
22 22 Indicator parameters Requirements, LOC, Modules, Integration Points, Defects Several choices pick one
23 23 Indicators Several choices pick one
24 24 Earned Value Indicator Y-axis can represent: Cumulative Dollars BCWS = Budgeted Cost of Work Scheduled = PV = Planned Value BCWP = Budgeted Cost of Work Performed = EV = Earned Value Cumulative WORK hours Work planned to FINISH Actual work FINISHED Cumulative Tasks Tasks planned to FINISH Actual tasks that FINISHED X-axis represents time weeks or months
25 25 Earned Value Report
26 26 Weekly update meeting Share personalized task list. Option 1 - Leaders update directly. Option 2 - Copy/paste into Excel. Current tasks plus 3 week look ahead. Live plan in status meeting. Inspect deliverables. You may learn something! Discuss, facilitate.
27 27 Weekly model maintenance STATUS DATE Selecting the task TYPE to update. Update % WORK COMPLETE, REMAINING WORK, examine predicted FINISH. One big dividing line past vs. future Let Project split tasks? Save a copy each week Project_Name mpp
28 28 Tasks vs. Action Items, Issues, Risks, Lessons Start with lessons, convert to TASKS Evaluate risks, determine TASKS. Hard tasks early. Decompose high risk tasks. Action Items become tasks if WORK > 20 hours, if high risk, if dependencies Issues are Risks that have occurred.
29 29 Getting off track What happened? Insufficient planning? Poor estimating? Wishful thinking. Over-confidence. Denial. Poor modeling? Poor execution? Insufficient task management, oversight? Check with Correlations
30 30 Getting back on track Silver bullet More resources, productivity will drop near term Crashing - add LEAD to F-S tasks Cut scope / requirements Phased delivery - By site, by business unit Unlikely to be under budget
31 31 Learning Objectives Which PM practices give best results Project vs. Excel Developing WBS Naming conventions Modeling in Microsoft Project Tasks vs. action items, issues, decisions, risks Estimating Set up resources, dependencies Indicators Weekly status Pick up 1 or 2 tips you can use
32 32 Comprehensive tasks / dependencies great facilitation Vetting work stream owners & sponsors Choice and use of indicators Lessons, action items Inspection of deliverables early detection
33 33 Resources Dynamic Scheduling with Microsoft Project 2010, the book by and for professionals. Rodolfo Ambriz, John White, 2011, J. Ross Publishing, ISBN Planning and Scheduling using Microsoft Project Paul E. Harris, 2010, Eastwood Harris publisher, ISBN Systems Engineering Leading Indicators Guide, Version 2.0, January 29, Garry Roedler, Lockheed Martin, Donna H. Rhodes, MIT, Howard Schimmoller, Lockheed Martin, Cheryl Jones, US Army, Guide-Rev Industry.pdf Forecast Scheduling with Microsoft Project Best-Practices for Real-World Projects. Eric Uyttewaal, ProjectPro Publishing; ISBN-10: , ISBN-13:
34 34 Thank you! Lynn Heatley, PMP Project Management Consultant Home: - preferred LinkedIn: Work: Phone: (work)
Guten Tag. (good day)
Guten Tag (good day) Project Management Process Groups Project 4. Integration Management Knowledge Areas 13. Stakeholder Initiating Planning Executing 5. Scope 6. Time 7. Cost 8. Quality 9. Human Resources
More informationPrinciples of Planning for IT Projects
Principles of Planning for IT Projects Introduction Building Timings Exercises Meals & refreshments Mobile Phones Part 1 Setting the Scene 1. Course Objectives 2. Where projects come from 3. What is a
More informationPrinciples of Planning for Building and. by Eastwood Harris Pty Ltd. Introduction Emergency Evacuation. Course Outline.
Principles of Planning for Building and Construction by Eastwood Harris Pty Ltd Introduction Emergency Evacuation Timings Meals Mobile Phones Conduct of course Introductions: Your name Position Experience
More informationAdministration. Welcome to the Eastwood Harris Pty Ltd MICROSOFT PROJECT AND PMBOK GUIDE FOURTH EDITION training course presented by.
Welcome to the Eastwood Harris Pty Ltd MICROSOFT PROJECT AND PMBOK GUIDE FOURTH EDITION training course presented by Paul E Harris Administration Evacuation Timings, meals and facilities Mobile phones
More informationForecast Scheduling Microsoft Project Online 2018
Forecast Scheduling Microsoft Project Online 2018 Best Practices for Real-World Projects Eric Uyttewaal, PMP President ProjectPro Corporation Published by ProjectPro Corporation Preface Publishing Notice
More informationPMP Exam Preparation Course Project Time Management
Project Time Management 1 Project Time Management Processes Define Activities Sequence Activities Estimate Activity Resources Estimate Activity duration Develop Schedule Control Schedule In some projects,
More informationSample book with one chapter
99 Tricks and Traps for Microsoft Project 2013, 2016 & 2019 The Casual User s Survival Guide By Paul E Harris of Eastwood Harris Pty Ltd Copyright 2019 by Eastwood Harris Pty Ltd. No part of this publication
More informationProject Forecast Survey Results Good Scheduling Practices June 2016
Good Scheduling Practices 5 June 6 Good Scheduling Practices 5 June 6 Executive Summary There is a saying failing to plan is planning to fail, but what if the plan itself is a failure? The scheduling of
More informationP6 Instructors Sample Presentation
Welcome to the Eastwood Harris Pty Ltd Primavera P6 Versions 8.1 to 8.4 Professional and Optional Client 3 day training course PMI REP No 3001 Course Number PP6 Page 2 Page 4 Administration Evacuation
More informationPROJECT TIME MANAGEMENT Powered by POeT Solvers Limited
PROJECT TIME MANAGEMENT 1212 Powered by POeT Solvers Limited PLANNING DEFINE ACTIVITIES MONITORING & CONTROLLING 6.1 Plan Schedule Mgt 6.7 Control Schedule 6.2 Define Activities 6.3 Sequence Activities
More informationPMP EXAMINATION PREP CHAPTER 6 SCHEDULE MANAGEMENT. PMP Exam Prep
PMP EXAMINATION PREP CHAPTER 6 SCHEDULE MANAGEMENT PMP Exam Prep PROJECT SCHEDULE MANAGEMENT Page 223 Schedule Management Process : Contains 6 of the 49 total processes Plan Schedule Management Define
More informationProject Time Management
Project Time Management Project Time Management Project Time Management includes the processes required to manage timely completion of the project. Plan schedule management The process of establishing
More informationThe Planning Process Group
Assalam-o-alaikum Project Management Process Groups Project Integration Management Knowledge Areas Initiating Planning Executing Scope Time Cost Quality Human Resources Communications Monitoring & Controlling
More informationWhat's New - Task Planning
What's New - Task Planning by Dale Howard and Gary Chefetz With this chapter, teach yourself how to use Microsoft Project 2010 s new manual scheduling feature. This self-paced study guide includes hands-on
More informationApplication Of A Project Planning Methodology In Construction Work
ISSN: 2278 0211 (Online) Application Of A Project Planning Methodology In Construction Work Boskee Sharma Research Scholar Lakshmi Narain College of Technology, Bhopal, India Mr. K.N. Labh Reader Indian
More informationWelcome to the Eastwood Harris Pty Ltd PRINCE2 TM Revised 2009 and Microsoft Project 2010 training course
Welcome to the Eastwood Harris Pty Ltd PRINCE2 TM Revised 2009 and Microsoft Project 2010 training course Administration Evacuation Timings, meals and facilities Mobile phones and emails Introductions
More informationWelcome to the Eastwood Harris Pty Ltd Primavera P6 Versions 8.2 EPPM Web Tool 2 day training course Enterprise Portfolio Project Management
Welcome to the Eastwood Harris Pty Ltd Primavera P6 Versions 8.2 EPPM Web Tool 2 day training course Enterprise Portfolio Project Management Page 2 Copyright Eastwood Harris Pty Ltd IMPORTANT POINTS FOR
More informationFor the PMP Exam using PMBOK Guide 5 th Edition. PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc.
For the PMP Exam using PMBOK Guide 5 th Edition PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc. 1 Contacts Name: Khaled El-Nakib, MSc, PMP, PMI-RMP URL: http://www.khaledelnakib.com
More informationLeading Indicators for Systems Engineering Effectiveness Presentation for NDIA SE Conference October 28, 2009
Leading Indicators for Systems Engineering Effectiveness Presentation for NDIA SE Conference October 28, 2009 Garry Roedler Lockheed Martin 1 Growing Interest in SE Effectiveness Questions about the effectiveness
More informationMicrosoft Managing Projects with Microsoft Project
Microsoft 70-343 Managing Projects with Microsoft Project 2013 http://killexams.com/exam-detail/70-343 A. Enter a status date for the task. B. Enter 0 in remaining duration. C. Reschedule uncompleted work
More informationWelcome to the Eastwood Harris Pty Ltd Primavera P6 Version 7 and Earlier Versions 3 day training course
Welcome to the Eastwood Harris Pty Ltd Primavera P6 Version 7 and Earlier Versions 3 day training course PMI REP No 3001 Course Number PP6 Administration Evacuation Timings and meals Facilities Mobile
More informationP6 Instructors Sample Presentation
NEW PICKIE REQUIRED Administration Evacuation procedure Facilities, timings and meals Mobile phones & Emails Introductions: Your name, The types of projects you are involved in, Your experience in scheduling
More informationCSU Project Management Certificate Program. Project Scope Management
CSU Project Management Certificate Program Project Scope Management Instructor: George Angel eaglebusiness@hotmail.com 303-678-9466 1 Scope gone wild! client wants what? 2 Project Scope Management Agenda
More informationPMBOK Guide Fifth Edition Pre Release Version October 10, 2012
5.3.1 Define Scope: Inputs PMBOK Guide Fifth Edition 5.3.1.1 Scope Management Plan Described in Section 5.1.3.1.The scope management plan is a component of the project management plan that establishes
More informationThe Agile PMP Teaching an Old Dog New Tricks
The Agile PMP Teaching an Old Dog New Tricks Why are we here today? What is Project Management? When will the project be done? How much will it cost? Do we all agree on what done looks like? What are the
More informationExam Code: Number: Passing Score: 800 Time Limit: 120 min File Version: 35.4.
Exam Code:74-343 Number: 74-343 Passing Score: 800 Time Limit: 120 min File Version: 35.4 http://www.gratisexam.com/ Exam Code:74-343 Exam Name:Managing Projects with Microsoft Project 2013 Testinside
More informationS O Seminar Objective
Introduction to Project Management Welcome! Presenter: Bob Hull CalACT Conference September 202 S O Seminar Objective To provide an overview of project management processes and provide some skills, tools
More informationExam Code: Number: Passing Score: 800 Time Limit: 120 min File Version: 35.4.
Exam Code:74-343 Number: 74-343 Passing Score: 800 Time Limit: 120 min File Version: 35.4 http://www.gratisexam.com/ Exam Code:74-343 Exam Name:Managing Projects with Microsoft Project 2013 Examsoon QUESTION
More informationDemystifying Microsoft Project
Demystifying Microsoft Project With Melissa Esquibel, MCT Copyright 2015 Melissa P Esquibel LLC. All rights reserved. Unauthorized duplication prohibited. Microsoft, Project, Excel, SharePoint, PowerPoint,
More informationFrom Planning to Baseline
OFFICIAL INDUSTRY ASSOCIATION FOR MICROSOFT OFFICE PROJECT From Planning to Baseline Presented By: Steve M. Clark Project Manager Edwards Industries, LLC. 1 Typical Comments Some interesting tidbits about
More informationWelcome to the Eastwood Harris Pty Ltd Primavera P6 Versions 8.1 & 8.2 Professional and Optional Client 3 day training course SAMPLE SLIDE SHOW
Welcome to the Eastwood Harris Pty Ltd Primavera P6 Versions 8.1 & 8.2 Professional and Optional Client 3 day training course SAMPLE SLIDE SHOW PMI REP No 3001 Course Number PP6 Page 2 Page 4 Administration
More informationCourse Outline. TEC D 205 Engineering Tech Project Planning Olympic College Bremerton, WA. Week 1 Chapter 4: DEFINING THE PROJECT
Course Outline TEC D 205 Engineering Tech Project Planning Week 1 Chapter 4: DEFINING THE PROJECT 1. Step one: Defining the Project Scope A. Employing a Project Scope Checklist 1. Project objective 2.
More informationMSP Ongoing Use Tips & Tricks. Your Guides: Rob Greca and Jenn Rinella
MSP Ongoing Use Tips & Tricks Your Guides: Rob Greca and Jenn Rinella Agenda Introduction Opening and Saving a Project Schedule Projects Master and Subprojects Baselines Cost Data Resources Allocation,
More informationThe Basics 7. Introduction 8 Project Management 9 What s New? 10 Version Comparison 12 The Gantt Chart 14 Getting Help 15 Summary 16
Contents Contents 1 2 3 4 The Basics 7 Introduction 8 Project Management 9 What s New? 10 Version Comparison 12 The Gantt Chart 14 Getting Help 15 Summary 16 User Interface 17 User Interface 18 File 20
More informationMicrosoft Project Tips & Tricks. Project Solutions Group, Inc.
Microsoft Project Tips & Tricks Project Solutions Group, Inc. Objectives Formatting & Printing Gantt Charts Leveling Resources Calculating Costs & Pricing Information Collecting & Entering Project Actuals
More informationThe Basics of Schedule Planning It s About Communication
The Basics of Schedule Planning It s About Communication www.edwps.com 6085 Marshalee Drive, Suite 140 Elkridge, MD 21075 800.556.2506 The Basics of Schedule Planning It s About Communication Copyright
More informationMastering Microsoft Project 2010
Course 50413B: Mastering Microsoft Project 2010 Page 1 of 10 Mastering Microsoft Project 2010 Course 50413B: 2 days; Instructor-Led About this Course This two-day instructor-led course provides students
More informationThrough Collaboration with the Business Analyst & Project Manager. Hosted by Michael Kennedy Senior Consultant, DevelopMentor
Managing Scope Through Collaboration with the Business Analyst & Project Manager Hosted by Michael Kennedy Senior Consultant, DevelopMentor Presented by Dave Bieg Executive Vice President, DevelopMentor
More informationDefining Project Scope
Defining Project Scope Casey Ayers PMP MBA CaseyAyers.com @caseyayers linkedin.com/in/caseyayers PMP is a registered mark of the Project Management Institute, Inc. Module Overview Overview Project Scope
More information17/12/1437. Lecture. Project Scope Management. Lecture 4. Project Management Knowledge Areas Section 3 Chapter 5. Project Scope Management.
17/12/137 Project Management Knowledge Areas Section 3 Chapter 5 Project Scope Management 2 of 33 1 17/12/137 Quick Re-cab Plan Scope Management Collect Requirement Define Scope Create WBS Validate Scope
More informationEXHIBIT 2-2-C SCHEDULES
EXHIBIT 2-2-C SCHEDULES PART 1 GENERAL 1.01 SUMMARY A. The Work specified in this section consists of furnishing transportation, labor, materials, equipment, and incidentals necessary for preparation,
More informationProject Management Professional (PMP) Exam Prep Course 4 - Project Integration Management
Project Management Professional (PMP) Exam Prep Course 4 - Project Integration Management Slide 1 Project Integration Management Looking Glass Development, LLC (303) 663-5402 / (888) 338-7447 4610 S. Ulster
More information1. What are the five major processes associated with every project? These are the same as the five Process Groups according to the PMBOK.
CTC/ITC 310 Program Management California State University Dominguez Hills Instructor: Howard Rosenthal Final Exam Dec. 7, 2017 All questions are 4 points unless indicated otherwise Answer Key 1. What
More informationAppendix. Process Inputs and Outputs
3601cA.fm Page 493 Wednesday, October 26, 2005 12:47 AM Appendix A Process and Throughout this book, PMP: Management Professional Study Guide, 3rd Edition, I ve discussed the inputs and outputs to the
More informationMicrosoft Project 2010 Project Essentials Planning, Communicating, Tracking
Infinite Possibilities - Measurable Results Microsoft Project 2010 Project Essentials Planning, Communicating, Tracking Robert Happy, PMP, MCT, MCTS Project Management Practice Inc. www.pm-practice.com
More informationVersion Comparison. Getting Started Project Planning. Feature Key:
Version Comparison Version Comparison The table below introduces the new features of 2010 and Project. It also shows features initially included in previous versions that have been improved in Project
More informationSchedule Adherence a useful measure for
Schedule Adherence a useful measure for project management Walt Lipke PMI - Oklahoma City Chapter +1 405 364 1594 $$ waltlipke@cox.net www.earnedschedule.com 1 2 7 3 4 5 8 6 EV SV(t) AT Time PV PD BAC
More informationKristin Fitzgerald Director, Global Project and Alliance Management, Merck & Co, Inc.
Kristin Fitzgerald Director, Global Project and Alliance Management, Merck & Co, Inc. Kris%n s Background BS Behavioral Neuroscience - Lehigh University MBA Monmouth University Merck Career PMP Certification
More informationQ&As. Managing Projects with Microsoft Project Pass Microsoft Exam with 100% Guarantee
74-343 Q&As Managing Projects with Microsoft Project 2013 Pass Microsoft 74-343 Exam with 100% Guarantee Free Download Real Questions & Answers PDF and VCE file from: 100% Passing Guarantee 100% Money
More informationCommunity. Prepared. Supervised. Gaza,
ISLAMIC UNIVERSITY OF GAZA Community Services and Continuing Education Deanship Community Development Institute Scheduling & Analysis the project of manufacturing seismic boxes by Microsoft Project and
More informationV3 Pension Administration System Solution April 2013 First Quarter Board Update
V3 Pension Administration System Solution April 2013 First Quarter Board Update Agenda Project Overall Status Update PASS V3 Project Status Gantt Chart PASS V3 Project Milestones Project First Quarter
More informationDeltek Cobra. Cost Management Made Easy. deltek.com/cobra
Deltek Cobra Cost Management Made Easy deltek.com/cobra 04 Better Project Management 05 Solve Your Top Challenges 07 The Deltek Cobra Difference 10 Deltek Cobra Features 15 Latest Technology Deltek Cobra
More informationPROJECT SCOPE MANAGEMENT. 1 Powered by POeT Solvers Limited
PROJECT SCOPE MANAGEMENT 1 www.pmtutor.org Powered by POeT Solvers Limited At the end of this training, our goal is for you to: Be able to define the term scope Be able to identify primary sources who
More informationMicrosoft Project 2010 Core Essentials
Infinite Possibilities - Measurable Results Microsoft Project 2010 Core Essentials Robert Happy, PMP, MCT, MCTS Project Management Practice Inc. (PMPI) www.pmpractice.com Who Is Robert Happy, PMP, MCTS,
More informationTHE PMP EXAM PREP COURSE
THE PMP EXAM PREP COURSE Session 2 PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. www.falconppm.com Agenda 9:00 10:15 Practice the PMP Questions 10:15 10:30 Break 10:30
More informationP6 Instructors Sample Presentation
NEW PICKIE REQUIRED Course Objectives This course objectives are to teach participants: Introduction to the user interface, How to plan projects without resources, Filters, layouts and printing, Baselines,
More informationManaging Projects with MS Project 2010
Aptech Ltd. Version 1.0 Page 1 of 13 Table of Contents A B C D E F G H I J K L M N O P Q R S T U V W X Y Z Aptech Ltd. Version 1.0 Page 2 of 13 Accrual Actuals Allocation Assignment Assignmenttimephased
More informationPMP. Processexam.com. PMI Project Management Professional. Exam Summary Syllabus Questions
PMP PMI Project Management Professional Processexam.com Exam Summary Syllabus Questions Table of Contents Keys to success in PMP Exam on PMI Project Management Professional... 2 PMI PMP Certification Details:...
More informationDesign, Development and Implementation (DDI) Project Management Plan (PMP)
Design, Development and Implementation (DDI) Project Management Plan (PMP) Department of Financial Services Date: 11/15/2018 Revision: V1.0 Revision History Version Date Revision Notes 1.0 11/15/2018 Accepted
More information2.0 SCHEDULE DEVELOPMENT
Filed: 0-0- Exhibit D Tab Page of 0 0 0 PROGRAM SCHEDULE.0 OVERVIEW The ability to validate, integrate, oversee and ultimately to retain control over the program schedule is one of the key factors that
More informationLCS International, Inc. PMP Review. Chapter 3 Developing the Project Scope Statement. Presented by David J. Lanners, MBA, PMP
PMP Review Chapter 3 Developing the Project Scope Statement Presented by David J. Lanners, MBA, PMP These slides are intended to be used only in settings where each viewer has an original copy of the Sybex
More informationTime Management PLANNING
Time Management 6.1 Plan Schedule Management: The process of establishing policies, procedures and documentation for planning, developing, managing, executing and controlling the project schedule # Schedule
More informationMicrosoft Excel or Microsoft Project? Why Microsoft Office Project 2007 is Easier and More Effective for Managing Projects
Microsoft Excel or Microsoft Project? Why Microsoft Office Project 2007 is Easier and More Effective for Managing Projects Summary: Using the right tool gives project managers a distinct advantage when
More informationParametric Project Monitoring and Control: Performance-Based Progress Assessment and Prediction
Parametric Project Monitoring and Control: Performance-Based Progress Assessment and Prediction Presented by: Mike Ross, Chief Engineer Galorath Incorporated 100 North Sepulveda Boulevard Suite 1801 El
More informationAfter solving all the case studies, please forward your answers to for an extra credit.
CASE STUDIES Course Case Studies The case studies are designed to give you a glimpse of real life projects. Please give yourself enough time to solve each case study. After solving all the case studies,
More informationIntroduction to Project Management
Introduction to Project Management University Business Institute Amir Dabirian Vice President for Information Technology/CIO March 21 st, 2012 2 The Man Month Men and months are interchangeable commodities
More informationChapter 3 Managing Systems Projects
Chapter 3 Managing Systems Projects Harry J. Rosenblatt. (2014). Systems Analysis and Design, 10 th Edition, International Edition. Course Technology, Cengage Learning. Modified by Nichnan K., 2013 Systems
More information1 P a g e Contents About this Workbook...3 Project Management Ethics and Professional Responsibility...4 Organizational Project Management Maturity...5 The Project Management Office...7 Choosing the Right
More informationProject Management Professionals
A COLLECTION OF INTERVIEW QUESTIONS FOR Project Management Professionals When interviewing a Project Manager, it s important to set up the discussion for the first couple of minutes in an open dialogue.
More informationPROJECT INTEGRATION MANAGEMENT. 1 Powered by POeT Solvers LImited
PROJECT INTEGRATION MANAGEMENT 1 www.pmtutor.org Powered by POeT Solvers LImited MAJOR PROJECT DOCUMENTS Before we begin Integration, let's summarize the project's major documents: ALL are formally approved
More informationBest Practices In IS/IT Project Management
Best Practices In IS/IT Project Management PMI Tallahassee Chapter June 01, 2009 IV&V Stories How To Assess a Task List Prepared by: Dr. Mark L. Huston, PMP 1 Introduction Welcome It is an Honor to Be
More informationIntroduction to Project Management (PM101) Course 6 Scope and Requirements
Introduction to Project Management (PM101) Course 6 Scope and Requirements Slide 1 Slide 2 The Importance of Scope & Requirements Definition Approximately 56% of software defects can be traced to scope
More informationMSP How to guide session 3 (Updating)
MSP How to guide session 3 (Updating) 1. Introduction Some people think planning ends once they gain agreement and pin up the schedule on the wall. On larger projects the schedule follows a defined update
More informationPMP Exam Preparation Course Project Scope Management
Project Scope Management 1 Product Scope Product scope The features and functions that are to be included in your products or service or result of the project. Completion is measured against the product
More informationSchedule Adherence a useful measure for project management 1
Schedule Adherence a useful measure 1 By Walt Lipke PMI Oklahoma City Chapter Abstract: Earned Value Management (EVM) is a very good method of project management. However, EVM by itself cannot provide
More informationHow To Manage a Troubled Project GTC Center for Project Management, All Rights Reserved
How To Manage a Troubled Project GTC 2007 1 How To Manage a Troubled Project 2 Logistics Start and finish Breaks and lunch Morning: one 15-minute break Lunch: 60 minutes Afternoon: one 15-minute break
More informationSenior Design Documentation Library
Project Charter Department of Computer Science and Engineering The University of Texas at Arlington Taekwondo Match Management System TK Force Team Members: Richard Sherrill Robert Castillo David Odhiambo
More informationIT Project Management. Essentials of IT project management 25 Sep 2017
IT Project Management Essentials of IT project management Accenture@NTNU 25 Sep 2017 ? 2 Essentials of IT project management 3 Definitions What do we mean by Project? A project is a temporary discrete
More informationCH (5) Hot Topics Scope Management
CH (5) Hot Topics Scope Management 1 CH ( 5 ) Scope Management 1 Introduction This knowledge area requires you to understand six processes, as described in the book PMP plan scope management, collect requirements,
More informationTactical Guide for Building a PMO How to Run a Successful PMO. Welcome Everyone!
Running a Successful PMO Tactical Guide for Building a PMO How to Run a Successful PMO Welcome Everyone! Bill Dow, PMP Experienced Speaker/Presenter Author Importance of Project 1. Building a PMO Communicatio
More informationThe Project Planning Process Group
3 The Project Planning Process Group............................................... Terms you ll need to understand: Activity Activity attributes Activity list Activity on arrow diagram (AOA) Activity
More information1 - Introduction to Microsoft Project Describe how Project relates to the discipline of Project management.
55205 Mastering Microsoft Project 2016 The course begins with the basic concepts and leads students through all the functions they ll need to plan and manage a small to medium-size project, including how
More informationLeading Indicators for Systems Engineering i Effectiveness
Leading Indicators for Systems Engineering i Effectiveness Presentation for System and Software Technology Conference April 27, 2010 Garry Roedler Lockheed Martin Version SYSTEMS ENGINEERING LEADING INDICATORS
More informationPMI EXAM PgMP Program Management Professional (PgMP)
PMI EXAM PgMP Program Management Professional (PgMP) Total Questions: 342 Practice exams also include self assessment and reporting features! 1 Question: 1 Your program has 121 stakeholders that you'll
More informationA Xymphonic Systems White Paper Anyplan Product Overview
A Xymphonic Systems White Paper Anyplan Product Overview http://anyplan.co Page 1 2014 Xymphonic Systems AS Contents Contents... 2 Introduction... 2 Who Uses Anyplan?... 3 Common Features, Common Resources...
More informationP6 Version 8.2 to 8.4 EPPM Web Power Sample Point Slide Show
THIS SLIDE REQUIRES NEW PICTURE Welcome to the Eastwood Harris Pty Ltd Primavera P6 Version 8.4 EPPM Web Tool 2 day training course Enterprise Portfolio Project Management Page 2 Administration Evacuation
More informationRiskyProject Lite 7. Getting Started Guide. Intaver Institute Inc. Project Risk Management Software.
RiskyProject Lite 7 Project Risk Management Software Getting Started Guide Intaver Institute Inc. www.intaver.com email: info@intaver.com Chapter 1: Introduction to RiskyProject 3 What is RiskyProject?
More informationEVALUATION COPY. Unauthorized Reproduction or Distribution Prohibited THE OCCASIONAL PROJECT MANAGER
THE OCCASIONAL PROJECT MANAGER 2016 by Systemation. ALL RIGHTS RESERVED. No part of this book may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying
More informationPROJECT EXECUTION PLANNING FOR COST AND SCHEDULE MANAGERS
PROJECT EXECUTION PLANNING FOR COST AND SCHEDULE MANAGERS ALLEN C. HAMILTON PMP CCE Project Management Associates LLC 3 Totten Way, Suite 110 Morris Plains, New Jersey 07950 USA Telephone: +1 973 984-1853
More informationAGENCY FOR STATE TECHNOLOGY
AGENCY FOR STATE TECHNOLOGY PROJECT RISK & COMPLEXITY ASSESSMENT TOOL Risk & Complexity Assessment Model for State Information Technology Projects Purpose: In order to determine the level of risk associated
More informationPresented by. H. Wynnlee Crisp
Presented by H. Wynnlee Crisp Presented by H. Wynnlee Crisp 3213 W. Main Ste. 218 Rapid City, SD 57702-2314 hwcrisp@aol.com (425) 681-7887 CONTENTS Managing Project Schedules Part 1: Schedule Management
More informationUnderstanding Agile from a PMP s Perspective! Exploding the myth that Agile is not in the PMBOK
Understanding Agile from a PMP s Perspective! 1 Agile experts claim their best practices are outside the PMBOK Guide but that has no basis in fact! Fact As early as PMBOK Guide 2000 Edition, it identified
More informationCan I change an activity from an 8-hour workday to a 10-hour workday in my schedule?
Can I change an activity from an 8-hour workday to a 10-hour workday in my schedule? During a Primavera P6 training class this month, a student asked me: If a client wants to see the difference in the
More informationUltimate Study Guide: Foundations Microsoft Project Dale A. Howard Gary L. Chefetz
Ultimate Study Guide: Foundations Microsoft Project 2010 Dale A. Howard Gary L. Chefetz Ultimate Study Guide: Foundations Microsoft Project 2010 Copyright 2010 Chefetz LLC dba MSProjectExperts Publisher:
More informationPlaner ET 2011 professional. Programming time-location Economic planning
Planer ET 2011 professional Programming time-location Economic planning Planer ET 2011 standar (for Studies Departments) Time-Location Diagram Import from Microsoft Project and Primavera Project Management
More informationWhat Can CMMI Learn From the PMBOK?
What Can CMMI Learn From the PMBOK? SSTC 2006 1-44 May 2006 Wayne Sherer U.S. Army ARDEC Sandy Thrasher, PMP Anteon Corporation Page 1 Outline Overview Considerations for Comparison High Level Comparison
More informationContent Break-up & Methodology for awarding Contact Hours / PDUs
N.I.T.E - Project Management Professional (PMP) Exam Prep Course Content Break-up & Methodology for awarding Contact Hours / PDUs This course is based on Project Management Book of Knowledge PMBOK Guide
More informationOverview of A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition Changes
Overview of A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition Changes PMI -- Project Management Institute» Leading global association for the project management profession»
More informationThe Basics of ITIL Help Desk for SMB s
The Basics of ITIL Help Desk for SMB s This three-step process will provide you the information necessary to understand ITIL, help you write your strategic IT plan and develop the implementation plan for
More information