1 Defining Project Scope Casey Ayers PMP MBA linkedin.com/in/caseyayers PMP is a registered mark of the Project Management Institute, Inc.
2 Module Overview Overview Project Scope Management Product scope vs. project scope Scope baseline components Overview of Project Scope Management Processes The Plan Scope Management Process
3 The Define Project Scope Process
4 the process of developing a detailed description of the project and product. Project Management Institute, A Guide to the Project Management Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013, Page 120
5 Project s
6 s Included in Scope
7 Project Scope Set 1 Set 2 Set 3 Detailed descriptions of each requirement are included
8 Define Project Scope Planning Project Scope Management Good time to return to early project resources like the project charter Curate requirements to align with core goals and expectations Should be possible to define and describe scope with more detail given information learned up to now
9 Define Project Scope Planning Project Scope Management Existing risk profiles, assumptions and constraints should be analyzed Changes and additions should be made to assumptions as needed
10 Define Project Scope Planning Project Scope Management High-level vision should be as close to final as possible for entirety of scope Must be revisited throughout project to progressively add detail and make changes when necessary
11 The Project Scope Statement
12 The Project Scope Statement Describes project scope, major deliverables, assumptions and constraints Details project deliverables and required work to achieve objectives Enables common understanding of project scope across all key stakeholders
13 The Project Scope Statement May specifically mention scope exclusions when helpful Guides execution of project work Provides a baseline for control of project work
14 Project Scope Statement Components Product Scope Description Acceptance Criteria Deliverables Project Exclusions Focuses on the features, functionality and characteristics of the project s end result What conditions must be met for the project to be considered complete and for deliverables to be accepted? Product or result of project. Must be unique and measurable in some capacity to ensure acceptance criteria can be set in advance Specific list of any requirements that will not be included in scope, where applicable; helpful in keeping expectations clear
15 Project Scope Statement Components Constraints Assumptions Internal and external. Budgets, deadlines and milestones all constraints. Contractual provisions most often considered constraints Key factors accepted as accurate during project planning without proof. Includes information on impacts of assumptions being proven wrong. Greater detail = greater control
16 Project Scope Statement Project Charter Project scope description Acceptance criteria Project deliverables Project exclusions Project constraints Project assumptions Project purpose or justification Measurable project objectives and related success criteria High-level requirements High-level project description High-level risks Summary milestone schedule Summary budget Stakeholder list Project approval requirements Assigned project manager, responsibility and authority level Name and authority of the sponsor or other person(s) authorizing the project charter More Detail Broader Overview Project Management Institute, A Guide to the Project Management Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013, Table 5-1, Page 124
17 Inside the Define Project Scope Process
18 Define Project Scope Planning Project Scope Management Inputs Scope Management Plan Project Charter s Documentation Organizational Process Assets Tools & Techniques Expert Judgment Product Analysis Alternatives Generation Facilitated Workshops Outputs Project Scope Statement Project Documents Updates
19 Define Project Scope Inputs T&Ts Outputs Scope Management Plan: Informs how requirements were collected and how scope should be defined Outlines the level of detail that should be included in scope statement
20 Define Project Scope Inputs T&Ts Outputs Project Charter: High-level description and core characteristics serve as a valuable compass Often includes acceptance information useful in crafting approval guidelines
21 Define Project Scope Inputs T&Ts Outputs s Documentation: Sorts requirements by type, provides assumptions and assists in prioritizing requirements Key to determining which requirements make the cut to become part of final project scope
22 Define Project Scope Inputs T&Ts Outputs Organizational Process Assets: Policies, procedures and templates Previous project files Lessons learned knowledge base
23 Define Project Scope Inputs T&Ts Outputs Expert Judgment: Used to analyze requirements and information. Most useful when reviewing technical requirements and details Consultants Industry groups Others within the organization Professional and technical associations Stakeholders, customers and sponsors Subject matter experts
24 Define Project Scope Inputs T&Ts Outputs Product Analysis: Most useful when a project s output is a product, not a service or other result Product breakdown s analysis Systems analysis Systems engineering Value analysis Value engineering
25 Define Project Scope Inputs T&Ts Outputs Alternatives Generation: Used to develop options related to project execution. Can be useful in ensuring scope and processes present an efficient path to the project s objectives Brainstorming Lateral thinking Analysis of alternatives
26 Define Project Scope Inputs T&Ts Outputs Facilitated Workshops: Helps in building common agreement and understanding of project objectives across functional areas Also helpful in building consensus about what should not be included in project scope
27 Define Project Scope Inputs T&Ts Outputs Project Scope Statement: Key output of this process, serving as the final word on project goals and parameters Product scope description Acceptance criteria Deliverable information Project exclusions Constraints and assumptions
28 Define Project Scope Inputs T&Ts Outputs Project Document Updates: Refinement and finalization of scope often affects Stakeholder register s documentation s traceability matrix
29 Module Review: Defining Project Scope Filters requirements Provides order and prioritization Adds detail to each included requirement May be progressively elaborated, though highlevel requirements for whole project should be included at the outset
30 Module Review: Project Scope Statement Describes project scope, major deliverables, assumptions and constraints Fosters common understanding of project scope by all key stakeholders Guides execution and control of project work
31 Module Review: Define Project Scope Inputs include scope management plan, project charter, requirements documentation and organizational process assets Tools & Techniques include expert judgment, product analysis, alternatives generation and facilitated workshops Outputs include the project scope statement and project documents updates
32 Creating a Work Breakdown Structure
hello sä-läm Salâm good-bye kh -dä hä -f z
Salâm s Project Management Process Groups Project Integration Management Knowledge Areas Stakeholders Initiating Planning Executing Scope Time Cost Quality Human Resources Communications Risk Procurement
More informationNEW HORIZONS ONLINE LIVE
NEW HORIZONS ONLINE LIVE WELCOME TO Certified Associate of Project Management (CAPM ) Fifth Edition PMBOK Guide - Please configure your audio: Meeting Audio Setup Wizard The Project Life Cycle Overview
More informationThe 9 knowledge Areas and the 42 Processes Based on the PMBoK 4th
The 9 knowledge Areas and the 42 Processes Based on the PMBoK 4th www.pmlead.net PMI, PMP, CAPM and PMBOK Guide are trademarks of the Project Management Institute, Inc. PMI has not endorsed and did not
More informationProject Stakeholder Management
Jambo (Swahili) Project Management Process Groups Project 4. Integration Management Initiating Planning Executing 5. Scope Monitoring & Controlling Closing Knowledge Areas 6. Time 7. Cost 8. Quality 9.
More informationProject Scope Management
Assalam-o-alaikum Project Management Process Groups Project Integration Management Knowledge Areas Initiating Planning Executing Scope Time Cost Quality Human Resources Communications Monitoring & Controlling
More informationOverview of A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition
Overview of A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition Topics for Discussion PMI Foundational Standards Harmonization of PMI s Foundational Standards Top 10 changes
More informationPMI Scheduling Professional (PMI-SP)
PMI Scheduling Professional (PMI-SP) E X A M I N AT I O N CO N T E N T O U T L I N E Project Management Institute PMI Scheduling Professional (PMI-SP) Exam Content Outline Published by: Project Management
More informationS O Seminar Objective
Introduction to Project Management Welcome! Presenter: Bob Hull CalACT Conference September 202 S O Seminar Objective To provide an overview of project management processes and provide some skills, tools
More informationTestkings PMP 705q. PMI PMP. Project Management Professional v5
Testkings PMP 705q Number: PMP Passing Score: 800 Time Limit: 120 min File Version: 14.5 PMI PMP Project Management Professional v5 This is my first share of braindumps questions. Very helpful study center
More informationGUIDE TO THE CHANGES IN PMP simpl learn i
GUIDE TO THE CHANGES IN PMP- 2015 simpl learn i Table of contents Introduction the purpose of this manual 1 New Tasks: Initiating 3 New Tasks: Planning 4 New Tasks: Executing 6 New Tasks: Monitoring and
More informationInitiation Group Process. Planning Group Process
Initiation Group Process Develop Project Charter Project statement of work Expert judgment Project charter Business case Contract (if third party project) EEF: government/industry standards, organizational
More informationGuten Tag. (good day)
Guten Tag (good day) 4.5 Perform Integrated Change Control How a person may percieve change: paideiagroup.com 4.5 Perform Integrated Change Control Consider what change is: Crossing unknown territory Departing
More informationProject Management Concepts, Tools & Techniques
Project Management Concepts, Tools & Techniques Course ISI-1438 5 Days Instructor-led, Hands on Introduction This highly interactive 5 day, instructor-led workshop is designed to give participants a solid
More informationProject Management Professional (PMP) Exam Prep Course 00 PMP Application & Exam
Project Management Professional (PMP) Exam Prep Course 00 PMP Application & Exam Slide 1 Application & Exam Types of Questions PM Basics Ten Knowledge Areas Professional Responsibility Practice Exams Slide
More informationUnit 11: Stakeholder Management (PMBOK Guide, Chapter 13)
(PMBOK Guide, Chapter 13) Stakeholder management identifies people, groups, and organizations that could impact or be impacted by the project. The topic has increased in importance with each new edition
More informationIntegration Mgmt / Initiating Process Group 4.1 Develop Project Charter
1 Mgmt / Initiating Process Group 4.1 Develop Project Charter Project statement of work Business Case Contract Enterprise environmental factors Project charter Expert judgement 26/02/2013 18:22:56 1 2
More informationProgram Management Professional (PgMP)
Program Management Professional (PgMP) E X A M I N AT I O N CO N T E N T O U T L I N E Project Management Institute Program Management Professional (PgMP ) Examination Content Outline April 2011 Published
More informationProject Communications Management
Project Communications Management Study Notes PMI, PMP, CAPM, PMBOK, PM Network and the PMI Registered Education Provider logo are registered marks of the Project Management Institute, Inc. 2013 PMstudy.com.
More informationMBP1123 Project Scope, Time and Cost Management Prepared by Dr Khairul Anuar
MBP1123 Project Scope, Time and Cost Management Prepared by Dr Khairul Anuar L2 Project Scope Management www.notes638.wordpress.com Project Scope Management Scope initiation/planning Scope definition Issue
More informationIntroduction to Project Management
Introduction to Project Management University Business Institute Amir Dabirian Vice President for Information Technology/CIO March 21 st, 2012 2 The Man Month Men and months are interchangeable commodities
More informationPMP Study Guide. Amol Kshirsagar, PMP. "PMI, PMP and PMBOK Guide are registered marks of the Project Management Institute, Inc.
2016 PMP Study Guide Amol Kshirsagar, PMP "PMI, PMP and PMBOK Guide are registered marks of the Project Management Institute, Inc. PMP Study Guide What it covers High-level essence of A Guide to the Project
More informationErrata 1 st Printing. Errata 2 nd Printing
Errata 1 st Printing NOTE: The following errata only pertain to the first printing of the PMBOK Guide Fifth Edition. In order to verify the print run of your book (or PDF), refer to the bottom of the copyright
More informationPROJECT SCOPE MANAGEMENT PLAN TEMPLATE
PROJECT SCOPE MANAGEMENT PLAN TEMPLATE This template guides you through each stage of preparing an effective scope management plan that ensures success. With this plan you clearly state the exact work
More informationPMP PMBOK 5 th Edition Course Agenda
PMP PMBOK 5 th Edition Course Agenda 1. Introduction to PMP Course Certification What are PMI and PMP Application Requirements for the PMP Exam Guidelines to Fill Up the PMP Application About the PMP Exam
More informationPM tutor. The Business Case, SOW and The Project Charter. Presented by Dipo Tepede, PMP, SSBB, MBA. Empowering Excellence
PM tutor Empowering Excellence The Business Case, SOW and The Project Charter Presented by Dipo Tepede, PMP, SSBB, MBA This presentation is copyright 2009 by POeT Solvers Limited. All rights reserved.
More informationPART THREE: Work Plan and IV&V Methodology (RFP 5.3.3)
PART THREE: Work Plan and IV&V Methodology (RFP 5.3.3) 3.1 IV&V Methodology and Work Plan 3.1.1 NTT DATA IV&V Framework We believe that successful IV&V is more than just verification that the processes
More informationUnderstanding Agile from a PMP s Perspective! Exploding the myth that Agile is not in the PMBOK
Understanding Agile from a PMP s Perspective! 1 Agile experts claim their best practices are outside the PMBOK Guide but that has no basis in fact! Fact As early as PMBOK Guide 2000 Edition, it identified
More informationNote: See the text itself for full citations.
Note: See the text itself for full citations. Describe the importance of creating plans to guide project execution, and list several planning processes and outputs for project integration and scope management
More informationOutline. Introduction. Lectures. Course Information Instructor & Students. All slides & more will be available at:
Marek Ł. Michalski, PhD, MBA Faculty of Management AGH University of Science and Technology Marek.Michalski@zarz.agh.edu.pl www.agh.edu.pl/mlmichal rev. 2013.03.07 Outline Introduction Course Information
More informationCourse outline Introduction to project management The project management process groups Project initiation
Course outline Introduction to project management The project management process groups Project initiation Total Quality Project Management 2 Many organizations today have a new or renewed interest in
More informationFor the PMP Exam using PMBOK Guide 5 th Edition. PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc.
For the PMP Exam using PMBOK Guide 5 th Edition PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc. 1 Contacts Name: Khaled El-Nakib, MSc, PMP, PMI-RMP URL: http://www.khaledelnakib.com
More informationPROJECT MANAGEMENT REVEALED
PROJECT MANAGEMENT REVEALED TRAINING BOOK SECOND EDITION BY IO4PM www.io4pm.org COPYRIGHT INTERNATIONAL ORGANIZATION FOR PROJECT MANAGEMENT Dedication To all of the IO4PM students, thank you for inspiring
More informationSUSE Unified Delivery Process
Guide www.suse.com SUSE Unified Delivery Process What Is the SUSE Unified Delivery Process? The SUSE Unified Delivery Process is a solution delivery process based on the IBM* Rational Unified Process*
More informationProject Plan. CxOne Guide
Project Plan CxOne Guide CxGuide_ProjectPlan.doc November 5, 2002 Advancing the Art and Science of Commercial Software Engineering Contents 1 INTRODUCTION... 1 1.1 DELIVERABLE PURPOSE... 1 1.2 LIFECYCLE...
More informationProject Cost Management
PMBOK Overview A Guide to the Body of Knowledge (PMBOK), created by the Institute (PMI), is the sum of knowledge within the profession of project management. The complete Body of Knowledge includes proven
More informationAACE Planning and Scheduling Professional (PSP) Certification Preparation Training Course Brochure and Competency Matrix
AACE Planning and Scheduling Professional (PSP) Certification Preparation Training Course Brochure and Competency Matrix INDEX: 1. Course Description 2. Course Development 3. Certifications offered by
More informationPMP in the Real World. Scott Bailey, MBA, PMP, SSGB
PMP in the Real World Scott Bailey, MBA, PMP, SSGB PMP in the Real World Webinar purpose To understand the relevance of the PMI PMP certification and its influence on the success or failure of projects
More informationA Guide to Critical Success Factors in Agile Delivery
IBM Global Business Services, U.S. Federal May 6, 2016 A Guide to Critical Success Factors in Agile Delivery Paul Gorans, Agile Competency Lead, IBM GBS Federal A bit about me 6 Years USAF: NSA Operations,
More informationA Guide to the Project Management Body of Knowledge (PMBOK Guide) Sixth Edition Errata 3 rd Printing
A Guide to the Body of Knowledge (PMBOK Guide) Sixth Edition Errata 3 rd Printing NOTE: The following errata only pertain to the first and second printing of the PMBOK Guide Sixth Edition. In order to
More informationGuten Tag. (good day)
Guten Tag (good day) Project Management Process Groups Project 4. Integration Management Knowledge Areas 13. Stakeholder Initiating Planning Executing 5. Scope 6. Time 7. Cost 8. Quality 9. Human Resources
More informationRequirements Engineering and Software Architecture Project Description
Requirements Engineering and Software Architecture Project Description Requirements Engineering Project Description This project is student-driven. There will be external sponsors, users, and others that
More informationProject Management Overview 4/17/2013 1
Project Management Overview 4/17/2013 1 Without Project Management 4/17/2013 2 Without Project Management 4/17/2013 3 What is a Project? A temporary and one-time endeavor undertaken to create a unique
More informationInformation Technology Project Management, Sixth Edition. Note: See the text itself for full citations. More courses at cie-wc.edu
Management, Sixth Edition Note: See the text itself for full citations. More courses at cie-wc.edu Understand the importance of good project scope management Discuss methods for collecting and documenting
More informationCertificate IV in Project Management Student Assessment Guide
Overview The assessment for the Certificate IV in Project Management comprises Team Assignment Development of a detailed Project Management Plan for chosen case study - 30% for blended classes Individual
More informationQuizzes for 1 st Study Group Session
Quizzes for 1 st Study Group Session General 1. Business analysis is performed: a. Sequentially and in order. b. According to logical relationships (dependencies). c. Iteratively or simultaneously. d.
More informationPROJECT SCOPE MANAGEMENT
PROJECT SCOPE MANAGEMENT CREATE WBS Process by process group Planning 5.1 Plan Scope Management 5.2 Collect Requirements 5.3 Define Scope 5.4 Create WBS Monitoring and Controlling 5.5 Validate Scope 5.6
More informationProject Management. Objectives 3/17/2015. David Borrill, MT, MBA, PMP
Project Management David Borrill, MT, MBA, PMP Objectives Nobody falls asleep or walks out. Presentation of some of the main points in the management of projects in the healthcare environment. Everybody
More informationAgricultural Projects
Development and Management of Agricultural Projects Introduction Communicate Product Quality and Risk Developing a Project Ten (10) Steps To Creating a Project Plan March 11 th 2017 Facilitated by Arnold
More informationProject Management Professional (PMP)
Project Management Professional (PMP) E X A M I N AT I O N CO N T E N T O U T L I N E Project Management Institute Project Management Professional (PMP) Examination Content Outline June 2015 Published
More informationProject Management Best Practices at LAUSD. July 30, Bill Wherritt
Project Management Best Practices at LAUSD July 30, 2008 Bill Wherritt I have never seen anyone save time by doing the work in the wrong order, or by skipping required steps. If there isn't time to do
More informationPrimavera P6 R8.3 Professional Fundamentals Training Course Outline
Course Overview Prescience Technology is an Oracle Platinum Partner and specialist provider of Primavera Services. This Prescience course introduces the user to Oracle Primavera P6 version 8.3 Professional
More informationProject Management for Non-Profits What s in it for you? Benefits of Improved Project Management (PM) Skills, Techniques and Processes.
Project Management for Non-Profits What s in it for you? Benefits of Improved Project Management (PM) Skills, Techniques and Processes Nov 2014 1 Overview What is a project? Impact on organizational results
More information7.11b: Quality in Project Management: A Comparison of PRINCE2 Against PMBOK
by Peter Whitelaw, Rational Management Pty Ltd, Melbourne Introduction This comparison takes each part of the PMBOK and provides comments on what match there is with elements of the PRINCE2 method. It's
More informationSoftware Engineering II - Exercise
Software Engineering II - Exercise April 29 th 2009 Software Project Management Plan Bernd Bruegge Helmut Naughton Applied Software Engineering Technische Universitaet Muenchen http://wwwbrugge.in.tum.de
More information8. Assess strategies to manage organizational change. 8.1 Identify the role of knowledge management process in a project.
UNIT II STUDY GUIDE Project Governance and Team Course Learning Outcomes for Unit II Upon completion of this unit, students should be able to: 5. Describe the process of leadership when leading project
More informationMonthly IV&V Assessment Report (December 1 31, 2015)
Monthly IV&V Assessment Report (December 1 31, 2015) Department of Financial Services Date: 01/13/2016 Version 1.0 Table of Contents Department of Financial Services Executive Summary... 4 Project... 4
More informationTeaching Project Management to Healthcare Professionals: A Much Needed Skill
Teaching Project Management to Healthcare Professionals: A Much Needed Skill Kathy Schwalbe, Ph.D., PMP Augsburg College Cynthia LeRouge, Ph.D., MS, CPA Saint Louis University Objectives Describe the growing
More informationManagement of Software Development Projects
Page 10 Oeconomics of Knowledge, Volume 3, Issue 2, 2Q, Spring 2011 Management of Software Development Projects Felician ALECU, PhD, University Lecturer Department of Economic Informatics Academy of Economic
More informationRequirements Analysis and Design Definition. Chapter Study Group Learning Materials
Requirements Analysis and Design Definition Chapter Study Group Learning Materials 2015, International Institute of Business Analysis (IIBA ). Permission is granted to IIBA Chapters to use and modify this
More informationPMP Sample Questions. 1. In face-to-face interactions, how is most information conveyed?
PMP Sample Questions 1. In face-to-face interactions, how is most information conveyed? A. By the tone of voice B. By the words spoken C. By body language D. By the location. 2. A report is a reflective
More informationPMI - Minnesota August 14, Oh no - PMO. Presented by: Michael Vinje - PMP.
PMI - Minnesota August 14, 2007 Oh no - PMO Presented by: Michael Vinje - PMP 1 mvinje@trissential.com 2005 All Rights Reserved. Agenda Presentation Objective PMO Background & Survey What The Experts Said
More informationProject Management Professional (PMP) Boot Camp
Project Management Professional (PMP) Boot Camp According to the Project Management Institute, the world's leading association for the project management profession: "PMP Certification is the profession's
More informationPMP Sample Questions Click here for PMP Questions. Question No : 1 Which of the following is an output of Define Scope?
PMP Sample Questions www.techfaq360.com Click here for 1600+ PMP Questions Question No : 1 Which of the following is an output of Define Scope? A. Accepted deliverables B. Change Requests C. Project document
More informationUpgrade to Legacy Billing System
Group Project, Alpha Group Bob Young, Group Leader Olga Botero Mike Lamb Cynthia Thompson Tim Watkins Professor Gigi Smith Project Planning, Execution, and Closure PM610-1001B-01-Group A-P5 T1 March 19,
More informationIDENTIFY STAKEHOLDERS BEST PRACTICES 1. Identify Stakeholders Best Practices. Bill Carswell
IDENTIFY STAKEHOLDERS BEST PRACTICES 1 Identify Stakeholders Best Practices Bill Carswell IDENTIFY STAKEHOLDERS BEST PRACTICES 2 Abstract Identifying stakeholders is an enabling activity, leading to development
More informationProject Management Professional (The Project Professional MBA)
HR CERTIFICATION INSTITUTE ISO 9001:2015 Certified :2010 Certified An Intensive 10 - Day Seminar On Project Management Professional DUBAI 10-21 December 2017 EuroMaTech is proud to be associated with the
More informationEngaging the Business to Ensure Project Success. Cindy Stonesifer, MBA, PMP
Engaging the Business to Ensure Project Success Cindy Stonesifer, MBA, PMP Objectives and Agenda Objectives. At the end of this session you will: Be aware of stakeholder classification models you can use
More informationEffective PMP Exam Coaching. Effective Project Management Consultancy. PMP Exam Study Material
Integration Effective Project Management Consultancy Stakeholders Scope Time Cost PMP Exam Study Material Based on PMBOK Guide Fifth Edition Quality Communication Procurement Effective PMC Private Limited
More informationCPET 545 SOA and Enterprise Applications
SOA Project Planning & Management CPET 545 SOA and Enterprise Applications SOA Project Planning & Management 11-18-2008 SOA Project Phases [1] Requirement engineering Business domain analysis Solution
More informationThe 10-day Project Professional MBA (Project Management Professional)
HR CERTIFICATION INSTITUTE ISO 9001:2015 Certified ISO 29990:2010 Certified ISO 29990 05-FEB-18 The 10-day Project Professional MBA (Project Management Professional) 04-15 Mar 2018, Dubai 27 Aug - 07 Sep
More informationSix Sigma/PM Integration Rules of Engagement
Six Sigma/PM Integration Rules of Engagement Prepared By: Dr. Abhay V. Trivedi, Ph.D., PMP, CSSBB, PMI-RMP trivediabhay@gmail.com Phone: 770-315-0139 Dr. Trivedi and Associates October 20, 2011 Because
More informationChapter One. Why Do Project Managers Need This Book?
Chapter One Why Do Project Managers Need This Book? The main purpose of this book is to create a connection between what is referred to as the body of knowledge of project management, the Project Management
More informationProject Management Manual Prepared by: Project Support Office, Major Projects Department
Project Management Manual Prepared by: Project Support Office, Major Projects Department Version: 2015 Project Support Office Project Management Manual Version: November 2015 This manual is a living document
More informationMeasurement Tailoring Workshops
Measurement Tailoring Workshops Introduction The Director of Information Systems for Command, Control, Communications, and Computers (DISC4) policy memorandum of 19 September 1996, reference (a), eliminated
More informationSET UP TOOL: A PROJECT CHARTER OR CONCEPT PAPER
Definition: SET UP TOOL: A PROJECT CHARTER OR CONCEPT PAPER A charter or concept paper is very much like a contract between senior administrators and the project team. In most organizations, this document
More informationGUIDEBOOK CODE OF CONDUCT MANAGEMENT SYSTEMS
GUIDEBOOK CODE OF CONDUCT MANAGEMENT SYSTEMS 2005 Levi Strauss & Co. Page 1 of 57 Table of content SECTION I: INTRODUCTION... 3 1. Introduction... 3 2. How to use this Guidebook... 3 SECTION II: THE MANAGEMENT
More informationPROJECT MANAGEMENT ESSENTIALS. Project Management Plans
PROJECT MANAGEMENT ESSENTIALS Project Management Plans BS6079, the British Standard for Project Management, offers guidelines on the level and type of information that should be defined in the early stages
More informationHANDOUT 3-1 REQUIREMENTS RECORD PROJECT TITLE: PROJECT MANAGER: REQUIREMENT: ASSUMPTIONS: CONSTRAINTS: REQUIRED RESOURCES:
Handouts HANDOUT 3-1 REQUIREMENTS RECORD PROJECT TITLE: DATE: PROJECT MANAGER: REQUIREMENT: ASSUMPTIONS: CONSTRAINTS: REQUIRED RESOURCES: FUNCTIONAL GROUPS PARTICIPATING: SAMPLE 3-1 REQUIREMENTS RECORD
More informationHow a Traditional Project Manager Transforms to Scrum Jeff Sutherland & Nafis Ahmad
How a Traditional Project Manager Transforms to Scrum Jeff Sutherland & Nafis Ahmad August 9 th, Agile 2011, Salt Lake City Brief Bios Dr. Jeff Sutherland (jeff@scruminc.com) Co-inventor of Scrum Chairman
More informationMBA BADM559 Enterprise IT Governance 12/15/2008. Enterprise Architecture is a holistic view of an enterprise s processes, information and
Enterprise Architecture is a holistic view of an enterprise s processes, information and information technology assets as a vehicle for aligning business and IT in a structured, more efficient and sustainable
More informationCertificate IV in Project Management Student Assessment Guide
Overview The assessment for the Certificate IV in Project Management comprises Assessment Task Description Percentage Individual Assignment Unit Tests Development of a detailed Project Management Plan
More informationPMI Risk Management Professional (PMI RMP ) Exam Preparation Student Courseware Book
PMI Risk Management Professional (PMI RMP ) Exam Preparation Student Courseware Book The PM Instructors EXAM DOMAINS COVERED INCLUDE: Risk Communication Risk Analysis Risk Response Planning Risk Governance
More informationPROJECT TIME MANAGEMENT
PROJECT TIME MANAGEMENT ESTIMATE ACTIVITY DURATION PLANNING MONITORING & CONTROLLING 6.1 Plan Schedule Mgt 6.7 Control Schedule 6.2 Define Activities 6.3 Sequence Activities 6.4 Estimate Activity Resources
More informationEnterprise Architecture: an ideal discipline for use in Supply Chain Management
Enterprise Architecture: an ideal discipline for use in Supply Chain Management Richard Freggi Senior Supply Chain Architect (TOGAF 9.1 certified level 2) HP Inc. Content Understanding Supply Chain Management
More informationChapter 11 Project Implementation, Closure, and Evaluation
Chapter 11 Project Implementation, Closure, and Evaluation Introduction, project implementation, Administrative closure, project evaluation, project audit Project Implementation Focuses on installing or
More informationContents An Introductory Overview of ITIL Service Lifecycle: concept and overview...3 I. Service strategy...6 The 4 P's of ITIL Service
ITIL 2011 Notes Contents An Introductory Overview of ITIL 2011...3 Service Lifecycle: concept and overview...3 I. Service strategy...6 II. The 4 P's of ITIL Service Strategy...6 Key processes and activities...7
More informationTHE POWER OF ENTERPRISE- FILE: PROJECT MANAGEMENT
Concentrated Knowledge for the Busy Executive www.summary.com December 2007 Order # 29D-PMI Published By FILE: PROJECT MANAGEMENT THE POWER OF ENTERPRISE- WIDE PROJECT MANAGEMENT by Dennis L. Bolles and
More informationTOOL 8.1. HR Transformation Milestones Checklist. The RBL Group 3521 N. University Ave, Ste. 100 Provo, UT
HR TOOL 8.1 HR Transformation Milestones Checklist The RBL Group 3521 N. University Ave, Ste. 100 Provo, UT 84604 801.373.4238 www.hrtransformation.com TOOL 8.1 HR Transformation Milestones Checklist In
More informationScope Definition and Management DJT
Scope Definition and Management DJT01 0407 Copyright ESI International April 2007 All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any
More informationInformation Technology. Project Management, Sixth Edition
Solutions to Accompany Information Technology Project Management, Sixth Edition ISBN-10: 0324786921 ISBN-13: 9780324786927 Course Technology MIS Series Companion Web Site: www.cengage.com/mis/schwalbe
More informationSystem Requirements Definition and System Selection
BerryDunn s Presentation to Texas Association of Governmental Information Technology Managers for System Requirements Definition and System Selection Presented in Partnership with the City of College Station
More informationManaging Projects (Course Code: 5927A) Course length: 3 days
Managing Projects (Course Code: 5927A) Course length: 3 days Course Summary: This three-day instructor-led course provides students with the knowledge and skills to build, maintain, and control well-formed
More informationRequirements for Estimation Purposes
Requirements for Estimation Purposes William Roetzheim william@level4ventures.com (619) 917-4917 www.level4ventures.com 1 Instructor Introduction Mr. William H. Roetzheim Lead Scientist, Founder & CEO,
More informationProject Management. Kristian Sandahl
Project Management Kristian Sandahl 2 Maintenance Requirements Validate Requirements, Verify Specification Acceptance Test (Release testing) System Design (Architecture, High-level Design) Verify System
More informationDeveloping a Business Case
Developing a Business Case Figures don t lie but liars figure. Attributed to Mark Twain and others The business case document is a formal, written argument intended to convince a decision maker to approve
More informationCHAPTER 2: IMPLEMENTATION PHASES AND OFFERINGS
CHAPTER 2: IMPLEMENTATION PHASES AND OFFERINGS Objectives Introduction The objectives are: Describe the purpose of the phase planning activity, preconditions, and deliverables in the implementation methodology.
More informationHerzlich Willkommen zum. Vortrag. PMBOK Guide 6 th Edition (2017) Änderungen zur 5. Edition (2013) Michael Forstenhäusler PS Consulting International
Chapter 2 Herzlich Willkommen zum Vortrag PMBOK Guide 6 th Edition (2017) Änderungen zur 5. Edition (2013) PS PS Consulting International Horber Horber Straße Straße 142 142 D-72221 D-72221 Haiterbach
More informationPortfolio, Programme and Project Offices (P3O ) Online Repository. AXELOS.com PUBLIC
Portfolio, Programme and Online Repository AXELOS.com 2009 are registered trade marks of AXELOS Limited. The Swirl Logo is a registered trade mark of AXELOS Limited. Reproduction of this 2 Portfolio, Programme
More informationInformation Technology. Project Management, Seventh Edition
Solutions to Accompany Information Technology Project Management, Seventh Edition ISBN-10: 1133526853 ISBN-13: 978-1133526858 Course Technology MIS Series Kathy Schwalbe, Ph.D., PMP Created November 27,
More informationThis resource is associated with the following paper: Assessing the maturity of software testing services using CMMI-SVC: an industrial case study
RESOURCE: MATURITY LEVELS OF THE CUSTOMIZED CMMI-SVC FOR TESTING SERVICES AND THEIR PROCESS AREAS This resource is associated with the following paper: Assessing the maturity of software testing services