CHARLES COUNTY GOVERNMENT RFP NO COMMUNITY DEVELOPMENT SOFTWARE SYSTEM

Size: px
Start display at page:

Download "CHARLES COUNTY GOVERNMENT RFP NO COMMUNITY DEVELOPMENT SOFTWARE SYSTEM"

Transcription

1 TO: All Offerors CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: September 25, 2014 RFP NO COMMUNITY DEVELOPMENT SOFTWARE SYSTEM ADDENDUM NUMBER THREE Please be advised of the following modification(s) & information related to Request for Proposals to These modifications, comments, and attachments are hereby made a part of the solicitation documents to the same extent as if bound therein. The due dates for proposals remain the same as published in Addendum Number Two. I. Changes, Additions, Modifications, and Attachments to the RFP A. Addition 1. Appendix 5 PGM Reports/Queries II. Written Questions Received Question 1 Question: Please provide the total # of users that will be utilizing the new system. Response: Previously answered in Addendum #1, Question 1; however, the new anticipated number of users is one hundred-ten (110) users. Question 2 Question: Of the total # of users, how many users will operate primarily in a field environment (i.e. inspectors, code enforcement officers, etc.)? Response: Previously answered in Addendum #1, Question 1. Ten (10) users in the field. Question 3 Question: Please provide details with regard to all required integrations. For each, please list the following: a. Target System Name b. Target System Development & Database Platform c. Business Case (i.e. what is the goal of the integration) d. Whether or not an API is provided e. Frequency of data exchange (i.e. real time or batch) Response: From RFP Part I, Section 3.7 Integration Approach: 1

2 a. Target System Name: New World Systems (NWS) b. Target System Development & Database Platform: IBM iseries VR7 DB2 System Modules: General Ledger, Revenue Accounting, and GeoProperty c. Business Case: General Ledger Validate G/L account numbers and types Revenue Acct. Ideally, at end of the day new system would create the necessary NWS Revenue Accounting files of permit monies collected which would be used for NWS report generation and updating GeoProperty Our GeoProperty module contains all valid Charles County property numbers; the MD State Department of Assessments and Taxation supplies these property number to us. We have to ensure that property numbers in the new system are valid property numbers. d. API: None exist. e. Frequency of Data Exchange: G/L & GeoProperty Ideally real time Revenue Acct. Nightly batch update Please note that Part I, Section 3.7 Integration Approach requests that the offeror present the recommended approach for integrating the proposed solution with our current New World System modules. Question 4 Question: Please provide details with regard to all required data conversions from legacy systems. For each please list the following: a. Source System Name b. Source System Development & Database Platform c. Types of records to be converted (i.e. Permits, Plans, Inspections, Projects, Violations, Invoices, Fees, etc.) d. Does the conversion include digital documents? Are these associated to the record types above with unique ID? Are they stored in the database or on a separate file server? Response: a. Source System Name: New World Systems b. Source System Development & Database Platform: IBM iseries VR7 DB2 c. Types of records to be converted: See RFP, Part III, Section 4.0 Data Migration d. Digital Documents: Our digital documents reside in Laserfiche on a separate server. Currently our system provides a link from the permit/project record which opens up associated documents stored in Laserfiche. We would like to preserve that functionality. Therefore, the Laserfiche index must be converted. Question 5 Question: Please provide a list of the types of permits currently issued by the County (i.e. Electrical, Mechanical, Plumbing, etc.). Response: Previously answered in Addendum #1, Question 3. 2

3 Question 6 Question: Please provide a list of the types of planning and zoning applications currently processed by the County (i.e. Rezoning, Conditional Use, Special Use, Annexations, etc.). Response: Previously answered in Addendum #1, Question #3. Question 7 Question: Please provide a list of the reports currently generated by staff out of the current land management system(s). Response: See Appendix 5 of this Addendum titled PGM Reports/Queries. Question 8 Question: Please provide a list of the reports that the vendor will be expected to develop (if different from the list provided in the previous question). Response: We want to see the proposed solution s standard best practice, industry reports. See RFP Appendix I, Section 3.0 General Reporting Capabilities. See Appendix 5 of this Addendum titled PGM Reports/Queries. Question 9 Question: Please confirm that the County is only interest in an on-premise deployment (i.e. not vendor hosted). Response: Previously answered in Addendum #1, Question 2. Question 10 Question: Approximately how many permits does the County issue per year? Response: Approximately 8,000. Question 11 Question: Approximately how many inspections does the County conduct per year? Response: Approximately 29,000. Question 12 Question: How many users does the County anticipate will require access to the system at any one time? Response: Anticipate 50 users. Question 13 Question: How many total users will need training? Response: All users, 110. Question 14 Question: What is the County s existing GIS environment? Does the County have ArcGIS Server? If so, please provide the version number. Response: Charles County GIS environment consists of products from Environmental Systems Research Institute (ESRI). We are currently running products that work with the 10.0 platform in a desktop, web-based and mobile environment. We have an ArcGIS Server with a MS SQL database 3

4 that meets the minimum of 10.0 SP3 compatibility. See RFP, Appendix I, Requirements Matrix, Section 15.0 GIS. Question 15 Question: Regarding mobile computing, what is the device of choice? Does the County want the ability to work in both an online and offline mode? Response: We are not currently set on a specific device. The County wants the ability to work in both an online and offline mode. Question 16 Question: How many plan reviewers will utilize the electronic plan review module (with the ability to red-line, comment, overlay & company, etc.?) Response: 30. Question 17 Question: Is the County interested in scheduling inspections and obtaining inspection information via touch tone phone with IVR? Response: No. Question 18 Question: Will you please clarify what social media interfaces the County is interested in and details on the interfaces desired? Response: As detailed in the RFP, Appendix I, Requirements Matrix, Section 1.0 General Requirements, Item 1.14, the County is interested in learning about all social media outlets that the proposed solution has to offer and how they are integrated. Question 19 Question: Regarding the Laserfiche integration, is the County interested in a real time push interface to allow all documents in the vendor s solution to push to Laserfiche and make them available County-wide? Response: The County is interested in learning exactly how the proposed solution will interface with Laserfiche. As Laserfiche is the County s standard RDBMS, and is used heavily by Planning & Growth Management, the more integration available, the better. Question 20 Question: Does the County utilize central cashiering? Response: Yes. Question 21 Question: Does the County have a budget for purposes of this RFP? If so, will you please provide? Response: The County does have a budget; however, the County declines to release it. Question 22 Question: To provide an accurate price estimate, please identify the number of distinct name back office users the County requires for the new system (please identify number of names users by business function). [Back office users are staff members who will have partial or complete access to the 4

5 system. They may comprise one or more departments. Their total number may affect how the system is licensed and is needed to determine the number of users that will need to be training on using the system]: a. Land Management/Permitting b. GIS Response: 110. Question 23 Question: How many field/mobile users does the County expect to use the new system? Of the number of mobile uses, how many are included with the number of back office users requested in the previous question? Response: 10. Question 24 Question: Please list the average number of record types created each year for each of the following in the County s current system: a. Compositions b. Cases c. Permits d. Applications e. Work Orders f. Services Requests g. Licenses h. Others? Response: a. Compositions n/a b. Cases Zoning Code Enforcement 5,000 c. Permits 8,000 d. Applications 16,000 e. Work Orders n/a f. Services Requests n/a g. Licenses 3,600 h. Others? Board of Appeals 25/year; Public Information Act Requests 200/year; Request for Assistance 3,000/year Question 25 Question: What standard reporting tools will be used in the new system (i.e. Crystal Reports, Oracle Reports, MS SQL Server Reporting)? Response: As detailed in the RFP Appendix I, Requirements Matrix, Section 3.0 General Reporting Capabilities, the County is interested in learning about the standard report generator and associated tools that are included with the proposed solution. Question 26 Question: Does the County have any specific reports (defined format) that must exist at the time of go-live? If so, how many reports does the County desire? (The definition of a report is any document emitted by the system including letters, citations, permits, statistical reports, etc.). Response: Previously answered in this Addendum, Question 7. 5

6 Question 27 Question: Please describe County s report writing resources. Response: The County s current Planning & Growth Management Permitting System lives on an IBM i5 in a DB2 database. The County currently utilizes the Query Manager tool that is supplied with the IBM. See RFP Appendix I, Requirements Matrix, 3.0 General Reporting Capabilities. Question 28 Question: As part of the training protocol, does the County want to be trained in report writing and development; and if so, what percentage of reports does the County wish the vendor to write as part of the implementation? (For example, vendor writes 20 reports, the County is trained to write 30 reports). Response: Yes, the County wants to be trained in report writing and development. In response to the percentage of reports that the vendor must develop, this depends on the standard reports that the vendor currently has available. We anticipate that the selected solution will have many of the required reports as part of the standard package. In Appendix I, Requirements Matrix, we have requested a listing of all standard reports included: 3.11, 4.17, 5.34, 6.32, 7.8, 8.12, 9.18, 10.23, 11.21, 16.40, 17.34, 18.12, and Question 29 Question: Please estimate the number of reports and custom documents the County would like developed based on High, Medium, or Low complexity for scoping purposes. Complexity Description Number High Reports that require complex queries, joins, multiple sources, etc. Examples include statistical and analytical reports, schedules, management summaries and agendas. Medium Reports that require some calculations and summaries. Examples include forms and transaction reports (receipts, permits, inspection tickets, journals, logs). Many reports fall under this category. Low Reports that require a simple pull from a limited number of database fields and presentation on a document. Examples include letters and notices. Response: Previously answered in this Addendum, Question 28. Question 30 Question: Please complete the following table with all systems data that must be converted into the new system. System Name Vendor DB Type # of Base Records # of data fields Response: Charles County IT staff will work with the selected vendor to produce appropriate upload files. See RFP Part III, Section 4.0 Data Migration, for record counts for Electrical Licenses and Contractors. System Vendor DB Type # of Base # of data Name Permitting New World Systems (NWS) Records DB2 Permit Master 142,750 (approx.) fields 75 6

7 Permitting NWS DB2 - Permit subsidiary records (inspections, fees & payments, narratives) 1,543,045 (approx.) Varies Question 31 Question: Will the County require a periodic Address, Parcel, and Owner (APO) load into the new, selected system? If yes, please complete the table below. System Name Vendor DB Type # of Parcel Records Response: Previously answered in this Addendum, Question 3. Question 32 Question: Does the County have resources to put the legacy data into a prescribed format, and then participate in the conversion process in the new system? Response: Yes. Question 33 Question: Is there a GIS solution that is expected to integrate with the new solution? If so, what vendor and version does the County currently use? Response: Previously answered in this Addendum, Question 14. Question 34 Question: What imaging and/or document management systems are currently in place? Does this solution support web services integration? Response: Laserfiche, Client/ Server Version Yes. Question 35 Question: What is the budget for this project? Response: Previously answered in this Addendum, Question 21. Question 36 Question: What vendor systems has the County seen or had demonstrated relative to this RFP/RFI? Response: The County has seen general demonstrations over time. No formal RFI was conducted. Question 37 Question: Please list/clarify all interfaces required to or from the new, selected system; please include as much detail as possible. Interface Name One-Way or Two-Way Frequency (Batch, real-time) Description Response: Previously answered in this Addendum, Question 3. Question 38 Question: Will there be a dedicated Project Manager(s), and if so, will the Project Manager(s) be from the County or an outside consultant? To whom will the Project Manager(s) report? How many 7

8 dedicated County staff will be assigned to the duration of this system implementation and in what roles? Response: There will be a dedicated Project Manager from the County. A dedicated team, consisting of County Planning and Growth Management staff and IT staff will be assigned to the project. The County staff assigned to the duration of this system implementation and their roles shall be based upon the accepted proposed solution. Question 39 Question: Please clarify whether the selected vendor will train all of the system users in each area, or if the County desires a Train-the-Trainer approach? Response: The proposed solution shall include a training plan as described in Part I, Section 3.9 Training. Question 40 Question: Please state the County s desired implementation timeframe (project start to go-live). Response: - The proposed solution shall include implementation time frames as described in Part I, Section 3.12 Project Plan. Question 41 Question: Does the County desire electronic document/plan review functionality as part of this project? Response: Yes. Question 42 Question: If yes to Question 41, what business processes or record types will be enabled for electronic plan review? (i.e. Simple Residential Permits, Commercial Permits, etc.) Response: All permits that include either site plans, plats, grading plans, site construction plans or building construction plans will need to be included in the proposed solution. Question 43 Question: If yes to Question 41, does the County plan to roll out electronic document/plan review functionality for all record types at once or phasing in record types over a specified timeframe? Response: The proposed solution shall include roll out or implementation plans as described in Part I, Section 3.12 Project Plan. Question 44 Question: Does the County currently have Adobe Acrobat X license or Adobe Acrobat 9 licenses that can be upgraded to Acrobat X? If so, do all the plan review personnel have licenses allocated to them for Acrobat Pro? If not, does the County have a volume price agreement or government rate agreement for the Adobe suite of products? Response: Some staff members already have Acrobat X and Acrobat XI licenses. If needed, we can purchase additional licenses. 8

9 Question 45 Question: Is it important for the selected solution to be 508c compliant? Response: The selected solution should be ADA compliant, at a minimum meeting priority one checkpoints of the Web Content Accessibility Guidelines. Question 46 Question: How many dedicated full time equivalent (FTE) staff manage and maintain the current system? Response: The equivalent of one (1) FTE IT staff member maintains the entire New World Systems suite of software, as well as the IBM i5. Question 47 Question: What is the County s current disaster recovery strategy? How are systems backed up? Is there a second data center? Response: We backup our entire network on a daily, weekly, and monthly basis. Yes, there is a second data center. Question 48 Question: Does the County run a VM environment, and if so, which product? Response: Yes, Microsoft Hyper V. Question 49 Question: How many applications is the County supporting agency-wide? Response: In the Hundreds. Question 50 Question: Please summarize the County existing security policy for your current system. Response: Physically, the i5 is located behind 3 locked doors with multiple security cameras throughout the area. Operating system access is limited to IBM Security Officer. Two levels of authentication are required to access New World Systems (NWS). Once in NWS, specific screen and function security settings are established for each user ID. Question 51 Question: Page 1-1, Section 1.2 of RFP required Offeror to provide no less than 5 representative project. Are 5 reference projects required from each company in a prime and subcontractor team arrangement, or the team can submit total of 5? Response: It is the County s intent to award to a single firm; therefore, the prime shall submit five (5) representative projects within the past thirty-six (36) months of their own. The County may request from the prime the experience information about the subcontractor at any time. Also see Addendum #1, Question 24. Question 52 Question: Page III-4 Section 3.1 to 3.3, is it County s expectation that costs for developing the 3 customized processes/applications be included in this proposal? Response: Yes. Page I-14 of the RFP states, All costs must be included in the cost proposal. 9

10 Question 53 Question: What are the format (SQL Server, Access, Excel sheet, etc.) of current legacy data that need to be converted to the new system? How many databases need to be converted? Response: Previously answered in this Addendum, Questions 4 & 32. Question 54 Question: To allow an appropriate amount of time between receiving answer to these questions, and the submission deadline we request the County provide a two week extension to the proposal due date. Response: The due date has already been extended. Please see Addendum #-2 for the most current solicitation schedule. Question 55 Question: For requirement 3.10, can the County provide more detail as to the example noted and the ultimate need expressed by this requirement. Is the intent to establish the ability of the system to create reports on the three items noted across all case types? Response: Yes. Reporting would need to be available for all case types. Reports should be available to note cases pending or issued in particular geographic location. Reports should also be available to determine a status on any case type and allow for all internal business functions to be properly reports. Question 56 Question: Addendum #1 states that the successful Offeror shall furnish all requirements due at contract/agreement execution, which may include, but is not limited to performance bonds, and/or payment bonds Will the County consider another form of surety other than a performance bond? Response: There are no bonds required. Question 57 Question: If an Offeror is working with a sub who is an approved MBE in the State of Maryland, do they also need to register with Charles County in order for the bid to receive proper credit for the MBE requirement? Response: Vendors certified as MBE s by the Maryland Department of Transportation are recognized and accepted by Charles County Government. We encourage vendors to register as a MBE with Charles County Government; however, it is not required. There is an aspirational minimum goal of 25% MBE participation for each project. There is no MBE requirement. 10

11 APPENDICES 11

12 APPENDIX 5 PGM REPORTS/QUERIES 1. DAILY REPORTS/QUERIES 1.1 Outstanding Approvals 1.2 Daily Permit Tracking Approvals Health Department 1.3 Outstanding Temporary Use and Occupancy Certificates 1.4 Permits Having Last Agency Sign Off 1.5 SFD Permits Aging Report 1.6 Missing Last Action Dates for Reviewers 1.7 KPI for SFD Permit Reviews 2. FREQUENT OR MONTHLY PERMIT REPORTS 2.1 Change Related Permit Number 2.2 Change Permit Property Numbers 2.3 Change Q Property Numbers 2.4 Statistics Reports 2.5 Estimated Value List 2.6 Display Permit Fee Codes 2.7 Plancheck Invoice 2.8 Utility Stats 2.9 Same Day Permit Count 2.10 Add Fees to Permits 2.11 Chamber Report 2.12 Dates Not Posted 2.13 Search Narratives 2.14 Plumbing without Issue Date 2.15 Electrical with No Issue Date 2.16 Outstanding RFA Print 2.17 Archive Inventory List 2.18 CAL Square Footage 2.19 CAD Square Footage 2.20 NC Square Footage 2.21 SFD Construction Value 2.22 SVD CON1 Construction Value 2.23 Building Permits for Active Permits 2.24 Building Permit Two-Week Reports 2.25 Building Permit Issued Permit Report (Monthly) 2.26 Building Permit Averages Report 2.27 Building Permit Compliance Report 2.28 Zoning Violation Aging Report-Outstanding 30 Day Inspections 12

13 2.29 Zoning Violation Aging Report-Outstanding Re-Inspections 2.30 Zoning Violation Aging Report-Outstanding County Attorney 2.31 Zoning Violation Aging Report-Outstanding Court Date 2.32 Zoning Violation Aging Report-Outstanding Court Ordered Inspections 2.33 Zoning Violation Aging Report-Outstanding Show Cause 3. DEVELOPMENT SERVICES PERMIT QUERIES 3.1 Monthly Permit Application Report 3.2 Monthly Permit Issuance Report 3.3 Active Permits 3.4 Two-Week Reports 3.5 Completed/Issued Permits 3.6 Averages Report 3.7 Compliance Report 3.8 Construction Inspection Report 3.9 Permit Inquiry (Permit Status for Individual Permits) 4. MONTHLY STATISTICS 4.1 Building Permit Applications by Type Per Month Two (2) Years 4.2 Building Permits Approved by Type Per Month Two (2) Years 4.3 Use & Occupancy Certificates Issued Per Month by Permit Type Two (2) Years 4.4 Building Estimates & Revenue, Yearly & Fiscal Year 4.5 Utility Permit Report Summary 4.6 Building Permits Voided 4.7 Zoning Statistics, Incoming & Outgoing 4.8 Building Permits Issued by Fiscal Year 4.9 Building Permit Applications Rolling Average 4.10 Code Enforcement Statistics 4.11 Development Services Permits by Month for Applications & Issuance 5. ANNUAL REPORT DATA COLLECTION 5.1 PRIMARILY PLAN APPROVALS Total Number of Preliminary Plans Approved Total Number of Lots and/or Units Approved Inside & Outside the Priority Funding Are (PFA) & Development District (DD) Total Approved Subdivision Area (Gross Acres) Lot Area (Net Acres) Subdivisions & Lots Approved Inside the Planned Unit Development (PUD) Plan Type: Residential, Commercial, etc. 13

14 5.2 FINAL PLATS (RESIDENTIAL & COMMERCIAL) Total Number of Plats Approved Total Number of Lots and/or Units Approved Both Inside & Outside the PFA & DD Total Approved Subdivision Area (Gross Acres) Lot Area (Net Acres) Subdivisions & Lots Approved Inside the PUD Type of Plats that Record Lots: Residential, Commercial, Industrial, etc. 5.3 SITE DEVELOPMENT PLANS Total Number of Site Plans Approved Type of Use (Commercial, Public Use, Cell Towers, Residential Apt., etc.) Total Building Square Feet Approved (Gross) Total Square Feet Constructed (Gross) Total Lot Size (Net Acres) Site Plans & Square Feet Approved Inside the PUD Total Number of Redevelopment Projects 5.4 BUIDLING PERMITS (RESIDENTIAL & COMMERCIAL) Total Number of Permits Issued Permit Type (NC, SF, APT, TH, etc.) Total Number of Units Approved Inside & Outside the PFA & DD Total Number of Units Approved Inside the PUD Total Number of Apartments Approved for Senior Housing Total Number of Condos vs. Apartments 5.5 USE & OCCUPANCY PERMITS Total Number of Permits Issued Permit Types (NC, SF, APT, TH, etc.) Total Number of Units Approved Inside & Outside the PFA & DD Total Number of Units Approved Inside the PUD Total Number of Apartments Approved for Senior Housing Total Number of Condos vs. Apartments 14

15 6. FREQUENT OR MONTHLY PERMIT REPORTS List of reports currently generated out of existing, excel and custom School Allocation program and requests for **new system: A. Water and Sewer Allocation - Excel Tracking Chart Existing Medium Complexity 1. A manually produced excel chart that presently serves as our primary historical and active tracking chart for the approval process for water and sewer allocation. 2. This individual, stand-alone application process should be interlinked with the overall Permits system by a common identifier such as a parent parcel, subdivision name, etc. This would allow for more efficient determination of status for W&S allocations and should provide active status to multiple users for permits, plats, and Development Services Permit applications. B. Development Rights & Responsibility Agreements (DRRA) Existing Low Complexity 1. Tracked and managed on two (2) separate excel spreadsheets that are used to: a. Track and manage the status of active applications: This is a basic data entry excel sheet that is used to add new applications and track progress through several internal review processes, leading to consideration, approval and recordation of the document. **Other Divisions and Departments should be able to query the status. b. Track the payments or other milestones required by each approved application/agreement. (Medium Complexity): This manually produced excel spread sheet comprises all historically approved DRRA agreements and provides a yearly phasing schedule, presently out to year This spread sheet contains basic formulas to provide totals of receipts per project, total receipts per year as well as future yearly expected totals based upon approved yearly payment phasing schedules, unique to each DRRA. c. **This current application would benefit from an inter-linked status specifically with the record plat process. (Parent parcel or subdivision name) This should also have a notes area or narrative section. C. School Allocation System Existing Medium Complexity 1. A current system, custom prepared system used to enter, track and administer the school allocation process, performed as a sub-set of the Plat review process. This is a bi-yearly process of allocating available school seats to eligible projects. This process includes the automatic preparation (mail merge) of offer and acceptance letters, tracking expiration dates as well as tracking and the preparation of refund letters for deposits paid. **The new system can replicate the existing elements of the current system, however may not be necessary to provide automatic letter preparation. The new system should provide the envisioned inter-link with other applications, especially with regard to the Final Plat process. Will need refund tracking and ability to query data to make refund determinations and provide back-up receipt data. 15

Answers To Vendor Questions Related to the Permit & Project Tracking RFP City of San Mateo 11/9/2012

Answers To Vendor Questions Related to the Permit & Project Tracking RFP City of San Mateo 11/9/2012 Answers To Vendor Questions Related to the Permit & Project Tracking RFP City of San Mateo 11/9/2012 Question Answer Notes 1. What data would the City like converted?(i.e. permits, inspections, code cases,

More information

City of Placentia Request for Proposal Permit Tracking System

City of Placentia Request for Proposal Permit Tracking System City of Placentia Request for Proposal Permit Tracking System Question and Answer Sheet #1 The following were questions posed by interested parties and submitted to the City. The answers below are made

More information

RFP for Land Management, Permitting and Business License System. Vendor Questions

RFP for Land Management, Permitting and Business License System. Vendor Questions Vendor Questions 1. What is the approved or anticipated budget for this project? This RFP is a preliminary step in the City s process to determine the feasibility and desirability of staying on its legacy

More information

Request for Proposal: Community Planning & Development System City of University Place, Washington

Request for Proposal: Community Planning & Development System City of University Place, Washington Request for Proposal: Community Planning & Development System City of University Place, Washington CONTENTS 1. Invitation and Introduction 2. System Expectations and Scope 3. System Demonstration and Product

More information

CEDAR RIVER WATER & SEWER DISTRICT

CEDAR RIVER WATER & SEWER DISTRICT CEDAR RIVER WATER & SEWER DISTRICT 18421 SE Petrovitsky Road P.O. Box 1040 Renton, Washington 98058-0552 Maple Valley, WA 98038-1040 (425) 255-6370 FAX: (425) 228-4880 Cedar River Water & Sewer District

More information

Questions and Answers No. 5 Request for Proposal MDM Systems Operations Support RFP January 29, 2016

Questions and Answers No. 5 Request for Proposal MDM Systems Operations Support RFP January 29, 2016 Questions and Answers No. 5 Request for Proposal MDM0031023850 Systems Operations Support RFP January 29, 2016 Ladies/Gentlemen: This list of questions and responses is being issued to clarify certain

More information

Invitation to Negotiate (ITN) Statewide Travel Management System ITN No D. Questions and Answers ITN Amendments

Invitation to Negotiate (ITN) Statewide Travel Management System ITN No D. Questions and Answers ITN Amendments Invitation to Negotiate (ITN) ADDENDUM NO. 1 Questions and Answers ITN Amendments September 2016 Contained herein are the responses to the questions submitted to the Department of Management Services (Department).

More information

Albany Unified School District Contractor Prequalification

Albany Unified School District Contractor Prequalification Albany Unified School District Contractor Prequalification The Albany Unified School District ( District ) has determined that contractors providing construction services ( Contractor(s) or Firm(s) ) must

More information

City of Hyattsville RFP Amendment #1

City of Hyattsville RFP Amendment #1 July 12, 2016 RFP#CED06092016 City of Hyattsville RFP Amendment #1 Request for Proposal Enterprise Resource Planning (ERP) Solution Questions and Answers City of Hyattsville 4310 Gallatin Street Hyattsville,

More information

MARYLAND STATE TREASURER S OFFICE Louis L. Goldstein Treasury Building 80 Calvert Street, Room 109 Annapolis, Maryland 21401

MARYLAND STATE TREASURER S OFFICE Louis L. Goldstein Treasury Building 80 Calvert Street, Room 109 Annapolis, Maryland 21401 MARYLAND STATE TREASURER S OFFICE Louis L. Goldstein Treasury Building 80 Calvert Street, Room 109 Annapolis, Maryland 21401 QUESTIONS AND ANSWERS FOR RFP FOR MICROSOFT DYNAMICS ENTERPRISE 365 IMPLEMENTATION

More information

Request for Proposals (RFP) Information Technology Independent Verification and Validation RFP No IVV-B ADDENDUM NO.

Request for Proposals (RFP) Information Technology Independent Verification and Validation RFP No IVV-B ADDENDUM NO. Request for Proposals (RFP) Information Technology Independent Verification and Validation ADDENDUM NO. 2 Questions and Answers RFP Amendments September 2015 Contained herein are the responses to the questions

More information

Attachment 11 Notarized Signature Page Attachment 12 Exceptions and Alternates (1) Signed Master Copy of Proposal (technical and price,

Attachment 11 Notarized Signature Page Attachment 12 Exceptions and Alternates (1) Signed Master Copy of Proposal (technical and price, City of Hastings, NE Request for Proposals ATTACHMENT 1: RFP SUBMITTAL CHECKLIST RFP Submittal Checklist Task Reference Page # Submitted Introductory Material 2.3.1 Executive Summary 2.3.2 Proposed Application

More information

Queen Anne s County. ADDENDUM NO. 1 July 31, 2015

Queen Anne s County. ADDENDUM NO. 1 July 31, 2015 Queen Anne s County County Commissioners: James J. Moran, At Large Jack N. Wilson, Jr., District 1 Stephen Wilson, District 2 Robert Charles Buckey, District 3 Mark A. Anderson, District 4 OFFICE OF BUDGET,

More information

Addendum #4: RFP #15P-013 Software and Implementation Services: Billing, Collection and Customer Service System November 24, :00 am

Addendum #4: RFP #15P-013 Software and Implementation Services: Billing, Collection and Customer Service System November 24, :00 am VILLAGE CENTER COMMUNITY DEVELOPMENT DISTRICT 1071 CANAL STREET THE VILLAGES, FLORIDA 32162 PHONE: (352) 751-6700 * FAX: (352) 751-6715 E-mail: marilyn.douglas@districtgov.org Addendum #4: RFP #15P-013

More information

Morgan Hill Unified SCHOOL DISTRICT SEMI-ANNUAL PREQUALIFICATION QUESTIONNAIRE FOR PROSPECTIVE BIDDERS

Morgan Hill Unified SCHOOL DISTRICT SEMI-ANNUAL PREQUALIFICATION QUESTIONNAIRE FOR PROSPECTIVE BIDDERS Morgan Hill Unified SCHOOL DISTRICT SEMI-ANNUAL PREQUALIFICATION QUESTIONNAIRE FOR PROSPECTIVE BIDDERS The Morgan Hill Unified School District ( District ) has determined that contractors on future projects

More information

September 2, 2016 ADDENDUM No. 5 SFMTA

September 2, 2016 ADDENDUM No. 5 SFMTA September 2, 2016 ADDENDUM No. 5 SFMTA 2016-83 Request for Proposals Citation Processing, Permit Processing and Support Services To all prospective bidders: The following modifications are made to the

More information

(CSC) RFP SOLICITATION NO. EXCHANGE (MDM )

(CSC) RFP SOLICITATION NO. EXCHANGE (MDM ) 167 Sec. 2.6 Based on the below excerpt from the RFP document (page 34), please clarify if MHBE or the Offeror will provide key technologies for this opportunity (which include ACD, IVR, CRM, digital recording,

More information

South Bend Public Transportation Corporation RFP No Addendum #1

South Bend Public Transportation Corporation RFP No Addendum #1 South Bend Public Transportation Corporation RFP No. 2 2018 Addendum #1 2018 Access software RFP questions 1. How many end users require concurrent access to the software? (i.e schedulers, dispatchers,

More information

City of Cheyenne, Wyoming Board of Public Utilities (BOPU) Request for Proposal AD for an ERP System and Implementation Services ADDENDUM #1

City of Cheyenne, Wyoming Board of Public Utilities (BOPU) Request for Proposal AD for an ERP System and Implementation Services ADDENDUM #1 City of Cheyenne, Wyoming Board of Public Utilities (BOPU) Request for Proposal AD-17-01 for an ERP System and Implementation Services ADDENDUM #1 May 25, 2017 The following changes/clarifications have

More information

OAKLAND UNIFIED SCHOOL DISTRICT FOR NON-LOCAL PRIME CONTRACTORS PREQUALIFICATION QUESTIONNAIRE FOR CURRENTLY QUALIFIED FIRMS RENEWAL

OAKLAND UNIFIED SCHOOL DISTRICT FOR NON-LOCAL PRIME CONTRACTORS PREQUALIFICATION QUESTIONNAIRE FOR CURRENTLY QUALIFIED FIRMS RENEWAL OAKLAND UNIFIED SCHOOL DISTRICT FOR N-LOCAL PRIME CONTRACTORS PREQUALIFICATION QUESTIONNAIRE FOR CURRENTLY QUALIFIED FIRMS RENEWAL OAKLAND UNIFIED SCHOOL DISTRICT PREQUALIFICATION QUESTIONNAIRE FOR CURRENTLY

More information

SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT

SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT Issued By: Clifford Gorman Date Issued: October 5, 2015 BID NO.: 15-15083 FORMAL INVITATION FOR BEST VALUE BID (BVB) FOR THE PURCHASE OF SERVICE DESK SOFTWARE

More information

RFP # Enterprise Resource Planning (ERP) System and Implementation Services. Addendum #2

RFP # Enterprise Resource Planning (ERP) System and Implementation Services. Addendum #2 Page 3 of 6 RFP # 011-17 Enterprise Resource Planning (ERP) System and Implementation Services QUESTIONS AND ANSWERS Addendum #2 Question #1: Question #2: I was reviewing the attendance sheet and noticed

More information

Amendment One to the Decision Support System Request for Information RFI Questions and Answers and Response Date Change

Amendment One to the Decision Support System Request for Information RFI Questions and Answers and Response Date Change Amendment One to the Decision Support System Request for Information RFI Questions and Answers and Response Date Change The receipt deadline for responses has been extended to Wednesday, October 8, 2014

More information

Maintenance and Operations 1302 Service Road Tustin, California (714) CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20

Maintenance and Operations 1302 Service Road Tustin, California (714) CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20 Maintenance and Operations 1302 Service Road Tustin, California 92780 (714) 730-7515 CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20 The Tustin Unified School District ( District ) has determined that

More information

A TECHNICAL SPECIFICATIONS LOCK BOX PAYMENTS

A TECHNICAL SPECIFICATIONS LOCK BOX PAYMENTS JEA Solicitation #146-18 Customer Payment Processing Services - Bank to Bank Payments and Lockbox Payments APPENDIX A TECHNICAL SPECIFICATIONS LOCK BOX PAYMENTS The scope of Work is for lockbox payment

More information

City of Independence - U.B.E.R. Project Cost Analysis

City of Independence - U.B.E.R. Project Cost Analysis City of Independence - U.B.E.R. Project Analysis Total Summary Category Normalization Core Components Application Software $414,500 $455,000 None $350,000 $406,500 Other Software No bid & included $140,800

More information

VILLAGE OF MALONE REQUEST FOR PROPOSALS SUBMISSION DEADLINE: 3:00 PM Friday, January 5, 2018

VILLAGE OF MALONE REQUEST FOR PROPOSALS SUBMISSION DEADLINE: 3:00 PM Friday, January 5, 2018 VILLAGE OF MALONE REQUEST FOR PROPOSALS GEOGRAPHIC INFORMATION SERVICES (GIS) IN SUPPORT OF NEW YORK STATE ARCHIVES LOCAL GOVERNMENT RECORDS MANAGEMENT IMPROVEMENT FUND (LGRMIF) GRANT SUBMISSION DEADLINE:

More information

State of Florida Department of Financial Services. Invitation to Negotiate DFS RM ITN 13/14-07 For Insurance Management System

State of Florida Department of Financial Services. Invitation to Negotiate DFS RM ITN 13/14-07 For Insurance Management System State of Florida Department of Financial Services Invitation to Negotiate DFS RM ITN 13/14-07 For Insurance Management System Addendum #2 Modifications to the ITN documentation ITN, Section 2.2, Schedule

More information

... Operations Services Department. Request for Proposal. Utility Billing Software

... Operations Services Department. Request for Proposal. Utility Billing Software City of Pleasanton Information Technology Division 123 Main St. Pleasanton, CA 94566 Operations Services Department Utility Billing Software.... Request for Proposal Utility Billing Software Request for

More information

City of Portsmouth Portsmouth, New Hampshire Parking Division

City of Portsmouth Portsmouth, New Hampshire Parking Division City of Portsmouth Portsmouth, New Hampshire Parking Division 12.11.2017 REQUEST FOR PROPOSALS Parking Citation Management System The City of Portsmouth, NH is seeking proposals to provide a Parking Citation

More information

3.0 INTRODUCTION - PERFORMANCE SPECIFICATIONS Purpose of Procurement

3.0 INTRODUCTION - PERFORMANCE SPECIFICATIONS Purpose of Procurement 3.0 INTRODUCTION - PERFORMANCE SPECIFICATIONS 3.1. Purpose of Procurement The overall objective of this Request for Quote is to obtain the services of a qualified Information Technology consulting firm

More information

Connecticut Lottery Corporation

Connecticut Lottery Corporation Connecticut Lottery Corporation Request for Proposals, #CLC201502 Addendum 1: Additional Information and Answers to Questions April 1, 2015 Microsoft Dynamics GP 2015 Software Purchase, Implementation

More information

Notice is hereby given of the following changes to the above-referenced SOLICITAITON:

Notice is hereby given of the following changes to the above-referenced SOLICITAITON: FLORIDA DEPARTMENT OF TRANSPORTATION Procurement Office 605 Suwannee Street, MS 20 Tallahassee, Florida 32399-0450 Phone: (850) 414-4381 Fax: (850) 414-4951 ADDENDUM NO. 2 DATE: May 10, 2016 RE: BID #:

More information

IT HELP DESK RFQ SUPPLIER QUESTIONS AND COMMONWEALTH ANSWERS. Questions Submitted prior to the 4/4/12 Preproposal Conference

IT HELP DESK RFQ SUPPLIER QUESTIONS AND COMMONWEALTH ANSWERS. Questions Submitted prior to the 4/4/12 Preproposal Conference Questions Submitted prior to the 4/4/12 Preproposal Conference 1. Based on your Service Level of a 10 minute or less average talk time, is there any additional process time required after the call is terminated?

More information

ADDENDUM 2 TO REQUEST FOR PROPOSAL NO. 663-BC WORKDAY HUMAN CAPITAL MANAGEMENT AND WORKDAY FINANCIAL CAPITAL MANAGEMENT IMPLEMENTATION CONSULTANTS

ADDENDUM 2 TO REQUEST FOR PROPOSAL NO. 663-BC WORKDAY HUMAN CAPITAL MANAGEMENT AND WORKDAY FINANCIAL CAPITAL MANAGEMENT IMPLEMENTATION CONSULTANTS ADDENDUM 2 TO REQUEST FOR PROPOSAL NO. 663-BC WORKDAY HUMAN CAPITAL MANAGEMENT AND WORKDAY FINANCIAL CAPITAL MANAGEMENT IMPLEMENTATION CONSULTANTS University of Nevada, Las Vegas Purchasing Department

More information

REQUEST FOR PROPOSALS FOR PROFESSIONAL ENGINEERING SERVICES FOR CITY OF NANTICOKE

REQUEST FOR PROPOSALS FOR PROFESSIONAL ENGINEERING SERVICES FOR CITY OF NANTICOKE REQUEST FOR PROPOSALS FOR PROFESSIONAL ENGINEERING SERVICES FOR CITY OF NANTICOKE Proposals Solicited by: City of Nanticoke 15 East Ridge Street Nanticoke, PA 18634 C:\Users\jim\Desktop\Nanticoke City\07222013professionalengservices\Engineer

More information

Wood/Wirt County 911

Wood/Wirt County 911 Wood/Wirt County 911 Request for Bid Public Safety Software System Wood County, WV Bids must be received by Dec 1th, 2017 RFB Checklist Have you signed the transmittal letter? Have you signed the required

More information

DATE: May 9, 2018 Submission of second round questions to Cathy Colbert,

DATE: May 9, 2018 Submission of second round questions to Cathy Colbert, Please note, a second round of Q&A has been added to the RFP process and the final submission date for proposals has been updated. Changes to original RFP noted in red below: DATE: May 9, 2018 Submission

More information

IBM Commerce Insights

IBM Commerce Insights IBM Terms of Use SaaS Specific Offering Terms IBM Commerce Insights The Terms of Use ( ToU ) is composed of this IBM Terms of Use - SaaS Specific Offering Terms ( SaaS Specific Offering Terms ) and a document

More information

Introduction. An Enhanced Version of IBM i DMAS From I/O International, Inc. Version: Prepared by

Introduction. An Enhanced Version of IBM i DMAS From I/O International, Inc. Version: Prepared by Introduction An Enhanced Version of IBM i DMAS From I/O International, Inc. Version: 1.35 Prepared by Suite 2002 Pinewood Business Center Somers, New York 10589 The term IBM i refers to the IBM operating

More information

General Accounting Applications. Licensing Applications. Additional Applications (As featured in this pdf document)

General Accounting Applications. Licensing Applications. Additional Applications (As featured in this pdf document) SOFTWARE PRODUCTS LIST General Accounting Applications MSI-Accounts Payable MSI-General Ledger MSI-Payroll MSI-Budget Planning MSI-Cash Register: Offering an Optional Credit Card Processing Module MSI-Purchase

More information

OPERATING POLICY MANUAL

OPERATING POLICY MANUAL Page 1 of 7 Section 1. PURPOSE This policy is to explain the review process that the Bedford Regional Water Authority ( Authority ) utilizes for water and sewer developer projects planned within the service

More information

IBM Commerce Insights

IBM Commerce Insights IBM Terms of Use SaaS Specific Offering Terms IBM Commerce Insights The Terms of Use ( ToU ) is composed of this IBM Terms of Use - SaaS Specific Offering Terms ( SaaS Specific Offering Terms ) and a document

More information

ADDENDUM NO. 1 November 16, Bid# CL16-GN-0030, Tririga Work Order Implementation Services Project for the University of Massachusetts Lowell

ADDENDUM NO. 1 November 16, Bid# CL16-GN-0030, Tririga Work Order Implementation Services Project for the University of Massachusetts Lowell ADDENDUM NO. 1 November 16, 2015 To all Bidders on the Project Titled: Bid# CL16-GN-0030, Tririga Work Order Implementation Services Project for the University of Massachusetts Lowell UNIVERSITY OF MASSACHUSETTS

More information

REPUBLIC OF KENYA COUNTY GOVERNMENT OF MACHAKOS P.O. BOX MACHAKOS COUNTY TREASURY TENDER NO. GMC/EOI/77/ EXPRESSION OF INTEREST

REPUBLIC OF KENYA COUNTY GOVERNMENT OF MACHAKOS P.O. BOX MACHAKOS COUNTY TREASURY TENDER NO. GMC/EOI/77/ EXPRESSION OF INTEREST REPUBLIC OF KENYA COUNTY GOVERNMENT OF MACHAKOS P.O. BOX 1996-90100 MACHAKOS COUNTY TREASURY TENDER NO. GMC/EOI/77/2015-2016 EXPRESSION OF INTEREST FOR INTERGRATED COUNTY REVENUE COLLECTION AND MANAGEMENT

More information

Business Requirements Definitions

Business Requirements Definitions Business Requirements s Department of Financial Services Date: 01/19/2017 Revision: Version 2.0 Table of Contents Overview... 3 Priority Field Values s... 4 Functional Requirements Categories... 5 Accounts

More information

October 25, 2018 RFP # REQUEST FOR PROPOSAL

October 25, 2018 RFP # REQUEST FOR PROPOSAL JEFFERSON COUNTY DEPARTMENT OF HEALTH 401 14 th Street South, Birmingham, AL 35233 (205) 930-1961/Fax (205) 930-1060 Hazel Collins Purchasing Agent October 25, 2018 RFP #19-10-03 REQUEST FOR PROPOSAL Sealed

More information

Appendix A Scope of Services

Appendix A Scope of Services Scope of Services 1. Project Title: Municipal Public Administration Software 2. Scope of Services Contact Questions about the technical nature of the Scope of Services and the responses may be submitted

More information

REPUBLIC OF KENYA THE NATIONAL TREASURY

REPUBLIC OF KENYA THE NATIONAL TREASURY REPUBLIC OF KENYA THE NATIONAL TREASURY Telegraphic Address: 22921 THE NATIONAL TREASURY Finance - Nairobi P O BOX 30007 00100 FAX NO. 310833 NAIROBI Telephone: +254 2252299 Website: www.treasury.go.ke

More information

Cybex Systems Release 8.2

Cybex Systems Release 8.2 Release 8.2 POS, Head Office, Advanced Series www.cybexsystems.com Ongoing investment in technology Crystal Reports, Microsoft SQL Server 2005.Net Framework Visual studio 2008 Advanced Series, Visual Studio

More information

IRVINE UNIFIED SCHOOL DISTRICT CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20

IRVINE UNIFIED SCHOOL DISTRICT CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20 CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20 The Irvine Unified School District ( District ) has determined that bidders on an annual basis must be prequalified prior to submitting a bid on a project

More information

Administrative Services About Administrative Services

Administrative Services About Administrative Services About The Department oversees and directs the operations of Finance, Human Resources, Sales Tax, Purchasing, Information Technology, Risk Management, Budget, the Public Information Office, Front Desk Reception,

More information

Expression of Interest. Financial accounting system: Supply, design, implementation & training

Expression of Interest. Financial accounting system: Supply, design, implementation & training Expression of Interest Financial accounting system: Supply, design, implementation & training July 2017 CONTENTS BACKGROUND... 2 SCOPE OF THE PROPOSAL... 2 CRITERIA FOR SELECTION... 4 FUNCTIONAL REQUIREMENTS...

More information

SANTA PAULA UNIFIED SCHOOL DISTRICT 201 S. Steckel Drive Santa Paula, California (805)

SANTA PAULA UNIFIED SCHOOL DISTRICT 201 S. Steckel Drive Santa Paula, California (805) SANTA PAULA UNIFIED SCHOOL DISTRICT 201 S. Steckel Drive Santa Paula, California 93060 (805) 933-3908 Annual Pre-Qualification for MEP Contractors per Public Contract Code 20111.6 License Classifications:

More information

Construction & Engineering Global Business Unit Service Descriptions and Metrics February 12, 2018

Construction & Engineering Global Business Unit Service Descriptions and Metrics February 12, 2018 Construction & Engineering Global Business Unit Service Descriptions and Metrics February 12, 2018 Construction Engineering Service Descriptions 1 Table of Contents METRIC DEFINITIONS... 4 GLOSSARY...

More information

Development of. Management Information System (MIS) of Sardar Bahadur Khan (SBK) Women University, Quetta. Submission Deadline: 25 th October, 2008

Development of. Management Information System (MIS) of Sardar Bahadur Khan (SBK) Women University, Quetta. Submission Deadline: 25 th October, 2008 REQUEST FOR PROPOSAL Development of Management Information System (MIS) of Sardar Bahadur Khan (SBK) Women University, Quetta Submission Deadline: 25 th October, 2008 SARDAR BAHADUR KHAN (SBK) WOMEN S

More information

CHARLES COUNTY GOVERNMENT ITB NO MATTAWOMAN WATER RECLAMATION FACILITY (MWRF) PRIMARY CLARIFIER NO. 1 IMPROVEMENTS

CHARLES COUNTY GOVERNMENT ITB NO MATTAWOMAN WATER RECLAMATION FACILITY (MWRF) PRIMARY CLARIFIER NO. 1 IMPROVEMENTS CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 February 07, 2017 ITB NO. 17-17 MATTAWOMAN WATER RECLAMATION FACILITY (MWRF) PRIMARY

More information

INTERNAL CONTROLS REVIEW PROGRESS REPORT Yellow highlighted items have been completed/validated since last report in August 2016

INTERNAL CONTROLS REVIEW PROGRESS REPORT Yellow highlighted items have been completed/validated since last report in August 2016 INTERNAL S REVIEW PROGRESS REPORT Yellow highlighted items have been completed/validated since last report in August 2016 RECOMMENDATIONS ADDRESSED THROUGH INTERNAL AUDIT WORK PLANS Monthly Reconciliation

More information

TAX INCREMENT FINANCING (TIF) ASSISTANCE. Application Packet

TAX INCREMENT FINANCING (TIF) ASSISTANCE. Application Packet TAX INCREMENT FINANCING (TIF) ASSISTANCE Application Packet 1 General Application Information The Tax Increment Financing program is designed to serve the diverse needs of the business community and to

More information

APPENDIX 2 COMMUNITY DEVELOPMENT COMMISSION FINANCIAL CHECKLIST REQUIRED FOR ALL APPLICANTS (A SITE VISIT MAY BE CONDUCTED LATER)

APPENDIX 2 COMMUNITY DEVELOPMENT COMMISSION FINANCIAL CHECKLIST REQUIRED FOR ALL APPLICANTS (A SITE VISIT MAY BE CONDUCTED LATER) REQUIRED FOR ALL APPLICANTS (A SITE VISIT MAY BE CONDUCTED LATER) AGENCY NAME: AGENCY ADDRESS AGENCY PHONE: DATE PREPARED: PREPARED BY: TITLE: EMAIL: AGENCY GENERAL INFORMATION EXECUTIVE DIRECTOR /CITY

More information

INTERNAL CONTROLS REVIEW PROGRESS REPORT Highlighted items have been completed since last report in January 2016

INTERNAL CONTROLS REVIEW PROGRESS REPORT Highlighted items have been completed since last report in January 2016 INTERNAL S REVIEW PROGRESS REPORT Highlighted items have been completed since last report in January 2016 RECOMMENDATIONS ADDRESSED THROUGH INTERNAL AUDIT WORK PLANS Internal Audit: prepare documentation

More information

CITY OF CLEVELAND DEPARTMENT OF PUBLIC UTILITIES REQUEST FOR PROPOSAL

CITY OF CLEVELAND DEPARTMENT OF PUBLIC UTILITIES REQUEST FOR PROPOSAL Proposals are due on September 15, 2017 by 12:00 p.m. The last day for questions is Wednesday September 6, 2017 by 12:00 p.m. An additional addendum will be released shortly thereafter with the answers.

More information

RFP for Furnishing: ( ) ELECTRONIC GOVERNMENT BUSINESS PORTAL AND PAYMENT SYSTEM

RFP for Furnishing: ( ) ELECTRONIC GOVERNMENT BUSINESS PORTAL AND PAYMENT SYSTEM ALL FIRMS ON BID LIST REF: City of Tampa REQUEST FOR PROPOSAL, dated MAY 18, 2000 RFP for Furnishing: (61070600) ELECTRONIC GOVERNMENT BUSINESS PORTAL AND PAYMENT SYSTEM To Be Opened: JULY 6, 2000 @ 2:30

More information

As indicated above, the Department s responses are not final, official or binding.

As indicated above, the Department s responses are not final, official or binding. Please note that the Department s responses are not final, official or binding. Violation of section 287.057(23) of the Florida Statutes, by a respondent to a solicitation, or persons acting on their behalf,

More information

CSDC Systems. amanda editions. Permitting, Compliance & Licensing. csdcsystems.com

CSDC Systems. amanda editions. Permitting, Compliance & Licensing. csdcsystems.com CSDC Systems amanda editions Permitting, Compliance & Licensing csdcsystems.com amanda editions platform for smarter government CSDC Inc. has more than 25 years of expertise helping governments modernize,

More information

REQUEST FOR QUALIFICATIONS

REQUEST FOR QUALIFICATIONS Delivery Method: Prequalification for Design-Bid-Build Contracts Issue Date: November 17, 2017 Project Name: SWaM 18-20 Pre-qualified Contractors Term Project Code: SWaM-18-20 Commodity/Service: Construction

More information

CSDC Systems. amanda editions. Permitting, Compliance & Licensing. csdcsystems.com

CSDC Systems. amanda editions. Permitting, Compliance & Licensing. csdcsystems.com CSDC Systems amanda editions Permitting, Compliance & Licensing csdcsystems.com amanda editions platform for smarter government CSDC Inc. has more than 25 years of expertise helping governments modernize,

More information

RFP Restructuring Advisory Committee: Water and Sewer Question and Answer. Question Cut-Off 2/13/17

RFP Restructuring Advisory Committee: Water and Sewer Question and Answer. Question Cut-Off 2/13/17 RFP 2017-0007 Restructuring Advisory Committee: Water and Sewer Question and Answer Question Cut-Off 2/13/17 1. What is the estimated value of the sewer system? Determining an appropriate valuation of

More information

Burleigh County Detention Center Request for Proposal. Solicitation for Jail Management System

Burleigh County Detention Center Request for Proposal. Solicitation for Jail Management System Burleigh County Detention Center Request for Proposal Solicitation for Jail Management System Deputy Tom Schroeder-Automation & Technology 5/22/2012 REQUEST FOR PROPOSAL BURLEIGH COUNTY DETENTION CENTER

More information

RFP SOURCING SERVICES AND TEMPORARY STAFFING AGENCIES. 1. Is this a new solicitation? If not, please share the name of incumbent vendors.

RFP SOURCING SERVICES AND TEMPORARY STAFFING AGENCIES. 1. Is this a new solicitation? If not, please share the name of incumbent vendors. RFP 19-006 SOURCING SERVICES AND TEMPORARY STAFFING AGENCIES Questions/Answers in BOLD Addendum #1 Date 1/30/2019 1. Is this a new solicitation? If not, please share the name of incumbent vendors. This

More information

LOS ANGELES COUNTY SHERIFF S DEPARTMENT REQUEST FOR INFORMATION RFI NUMBER 491-SH PERSONNEL TRACKING MANAGEMENT SYSTEM

LOS ANGELES COUNTY SHERIFF S DEPARTMENT REQUEST FOR INFORMATION RFI NUMBER 491-SH PERSONNEL TRACKING MANAGEMENT SYSTEM LOS ANGELES COUNTY SHERIFF S DEPARTMENT REQUEST FOR INFORMATION RFI NUMBER 491-SH PERSONNEL TRACKING MANAGEMENT SYSTEM (PTMS) Table of Contents 1.0 INTRODUCTION... 3 2.0 SYSTEM OVERVIEW AND REQUIREMENTS...

More information

Date: July 11, Telephone: (816) Fax: (816)

Date: July 11, Telephone: (816) Fax: (816) REQUEST FOR INFORMATION (RFI) #18-7001-34A TRANSIT PASS ORDER FULFILLMENT SERVICES Date: July 11, 2018 Contact: Tamika McDonald Senior Buyer Telephone: (816) 346-0283 Fax: (816) 346-0336 Email: tmcdonald@kcata.org

More information

This addendum is to provide all potential bidders with answers to questions received in reference to Request for Information RFI/FFS-14/15-68.

This addendum is to provide all potential bidders with answers to questions received in reference to Request for Information RFI/FFS-14/15-68. ADDENDUM 1 TO: FROM: RE: Vendors Vianka Colin, Purchasing Director REQUEST FOR INFORMATION RFI/FFS-14/15-68 This addendum is to provide all potential bidders with answers to questions received in reference

More information

REQUEST FOR INFORMATION FOR FINANCIAL SYSTEM 19-RFI-FS

REQUEST FOR INFORMATION FOR FINANCIAL SYSTEM 19-RFI-FS REQUEST FOR INFORMATION FOR FINANCIAL SYSTEM 19-RFI-FS March 5, 2019 HEALTH CARE DISTRICT OF PALM BEACH COUNTY 1515 N. FLAGLER DRIVE, SUITE 101 WEST PALM BEACH, FL 33401 PART 1 GENERAL INFORMATION 1-1

More information

REQUEST FOR INFORMATION FOR FINANCIAL SYSTEM 19-RFI-FS

REQUEST FOR INFORMATION FOR FINANCIAL SYSTEM 19-RFI-FS REQUEST FOR INFORMATION FOR FINANCIAL SYSTEM 19-RFI-FS March 5, 2019 HEALTH CARE DISTRICT OF PALM BEACH COUNTY 1515 N. FLAGLER DRIVE, SUITE 101 WEST PALM BEACH, FL 33401 PART 1 GENERAL INFORMATION 1-1

More information

Request for Information 18-RFP-004-LAJ WOTC Application Management System. Questions and Answers

Request for Information 18-RFP-004-LAJ WOTC Application Management System. Questions and Answers Request for Information 18-RFP-004-LAJ WOTC Application Management System Questions and Answers The Department s responses to timely submitted questions are provided below: Question Number 1. All 2. All

More information

CITY OF FARMINGTON 800 Municipal Drive Farmington, NM (505) Fax (505)

CITY OF FARMINGTON 800 Municipal Drive Farmington, NM (505) Fax (505) REQUEST FOR PROPOSALS FOR Mobile Mapping Software, RFP #18-125718 IMMEDIATE ATTENTION ADDENDUM ONE March 23, 2018 CITY OF FARMINGTON 800 Municipal Drive Farmington, NM 87401-2663 (505) 599-1373 Fax (505)

More information

RFP NO A CONTRACT FOR THE PROCUREMENT AND INSTALLATION OF AN ENTERPRISE RESOURCE PLANNING SYSTEM PART V. EVALUATION CRITERIA AND PROCESS

RFP NO A CONTRACT FOR THE PROCUREMENT AND INSTALLATION OF AN ENTERPRISE RESOURCE PLANNING SYSTEM PART V. EVALUATION CRITERIA AND PROCESS 1.0 OVERALL PROPOSER EVALUATION CRITERIA 1.1 OVERALL PROPOSER EVALUATION AND CRITERIA The evaluation committee will select a best solution based on a weighted scoring system. The following table presents

More information

REQUEST FOR EXPRESSION OF INTEREST (EOI)

REQUEST FOR EXPRESSION OF INTEREST (EOI) United Nations Nations Unies Procurement Division New York REQUEST FOR EXPRESSION OF INTEREST (EOI) Title of the EOI: EOI for United Nations Enterprise Resource Planning (ERP) System Support Services Date

More information

REQUEST FOR PROPOSAL # Temporary Staffing Services for Union County

REQUEST FOR PROPOSAL # Temporary Staffing Services for Union County REQUEST FOR PROPOSAL # 2016-047 Temporary Staffing Services for Union County ADDENDUM No. 1 ISSUE DATE: May 5, 2017 ****************************************************************************************************

More information

Information Services and Technology FY Performance Plan

Information Services and Technology FY Performance Plan I. MISSION STATEMENT The Information Systems and Technology Department assists county departments in achieving their stated business goals by effectively deploying information management services and providing

More information

Prequalification Statement 11.16

Prequalification Statement 11.16 COMPANY INFORMATION Prequalification Statement 11.16 It is recommended that you have the Adobe Acrobat Reader version 8 or newer installed on your computer to complete this Fillable Adobe PDF form. Adobe

More information

North Carolina Department of Agriculture and Consumer Services Purchasing

North Carolina Department of Agriculture and Consumer Services Purchasing North Carolina Department of Agriculture and Consumer Services Purchasing IMPORTANT ADDENDUM June 4, 2018 FAILURE TO RETURN THIS BID ADDENDUM IN ACCORDANCE WITH INSTRUCTIONS SHALL SUBJECT YOUR BID TO REJECTION.

More information

Corporate. Report COUNCIL DATE: April 29, 2002 NO: R082 REGULAR. TO: Mayor & Council DATE: April 18, 2002

Corporate. Report COUNCIL DATE: April 29, 2002 NO: R082 REGULAR. TO: Mayor & Council DATE: April 18, 2002 Corporate NO: R082 Report COUNCIL DATE: April 29, 2002 REGULAR TO: Mayor & Council DATE: April 18, 2002 FROM: General Manager, Finance, Technology & HR and General Manager, Engineering FILE: 1220-20 SUBJECT:

More information

October 5, 2017 TO ALL PROSPECTIVE OFFERORS: Subject: RFP 17-PR-DET-48 Addendum No. 4 For: TIC Document Management Proposal Due Date: October 27, 2017

October 5, 2017 TO ALL PROSPECTIVE OFFERORS: Subject: RFP 17-PR-DET-48 Addendum No. 4 For: TIC Document Management Proposal Due Date: October 27, 2017 October 5, 2017 TO ALL PROSPECTIVE OFFERORS: Subject: RFP 17-PR-DET-48 Addendum No. 4 For: TIC Management Proposal Due Date: October 27, 2017 The subject RFP 17-PR-DET-48 for Technical Information Center

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS CONSTRUCTION MANAGEMENT SERVICES OCTOBER 09, 2014 EAST BAY REGIONAL PARK DISTRICT Atlas Road Extension Improvements POINT PINOLE REGIONAL SHORELINE PROPOSALS DUE: 2:00PM, NOVEMBER

More information

REQUEST FOR QUALIFICATIONS

REQUEST FOR QUALIFICATIONS Issue Date: August 11, 2013 Title: Issuing Agency & Address Location of Work: RFQ#: SWaM-2013-15 Pre-Qualified Contractors Term Small, Women, and Minority Owned (SWaM) Contractors for Renovation, Replacement

More information

ADDENDUM No. 1. FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION Procurement Section 3800 Commonwealth Boulevard, MS#93 Tallahassee, Florida

ADDENDUM No. 1. FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION Procurement Section 3800 Commonwealth Boulevard, MS#93 Tallahassee, Florida ADDENDUM No. 1 FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION Procurement Section 3800 Commonwealth Boulevard, MS#93 Tallahassee, Florida 32399-3000 December 22, 2015 Addendum To: DEP Solicitation No.

More information

FINANCE DEPARTMENT DIRECTOR

FINANCE DEPARTMENT DIRECTOR FINANCE DEPARTMENT DIRECTOR Controller Financial Operations Analyst Deputy Treasurer Utility Accounts Procurement & Risk Services Accounting & Reporting Customer Service Purchasing Accounts Payable Collections

More information

Request for Proposal RFP Washington State Good To Go! Back Office System. Vendor Solution Demonstration Guidelines

Request for Proposal RFP Washington State Good To Go! Back Office System. Vendor Solution Demonstration Guidelines Request for Proposal RFP-2016-1201 Washington State Good To Go! Back Office System Issued December 21, 2016 Executive Summary: This document, prepared by the Washington State Department of Transportation

More information

SELECTION CRITERIA AND PROCESS

SELECTION CRITERIA AND PROCESS Page 12 of 49 / ATTACHEMENT 1 - ADDENDUM 3: replace pages 12-16 with the following: Super User Training Admin Training Representatives from the IT, Legal, Finance, Neighborhood Services, and Police Departments

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS Announcement REQUEST FOR PROPOSALS ESRI GIS Implementation Services The Madison Metropolitan Sewerage District (MMSD or district ) seeks proposals from qualified vendors to implement Esri s geographic

More information

REQUEST FOR PROPOSALS. Enterprise Resource Planning (ERP) Software and Implementation Services. Questions & Answers 22 November 2017

REQUEST FOR PROPOSALS. Enterprise Resource Planning (ERP) Software and Implementation Services. Questions & Answers 22 November 2017 REQUEST FOR PROPOSALS Enterprise Resource Planning (ERP) Software and Implementation Services Questions & Answers 22 November 2017 Web Site: https://www.ccgov.net/civicalerts.aspx?aid=608 RFP: https://www.ccgov.net/documentcenter/view/11853

More information

REQUEST FOR INFORMATION (RFI)

REQUEST FOR INFORMATION (RFI) REQUEST FOR INFORMATION (RFI) MARYLAND DEPARTMENT OF TRANSPORTATION MOTOR VEHICLE ADMINISTRATION DIGITAL IMAGING AND WORKFLOW SYSTEM SOLICITATION INFORMATION NUMBER: V-HQ-15025-IT ISSUE DATE: September

More information

ACTION Agenda Item I ANNUAL AUDIT REPORT December 6, 2002

ACTION Agenda Item I ANNUAL AUDIT REPORT December 6, 2002 ACTION Agenda Item I-2 2001-02 ANNUAL AUDIT REPORT December 6, 2002 Recommendation That the KCTCS Board of Regents receive the financial audit results for the 2001-02 fiscal year. Rationale The resolution

More information

Request for Proposals

Request for Proposals Request for Proposals CityLink CSR Application Software PROPOSALS WILL BE RECEIVED UNTIL 12:00 Noon, Friday, November 3, 2017 in Purchasing Department, City Hall Building 101 North Main Street, Suite 324

More information

APPENDIX D CONSTRUCTION PHASE CRITERIA

APPENDIX D CONSTRUCTION PHASE CRITERIA A. GENERAL REQUIREMENTS CONSTRUCTION PHASE CRITERIA For the Construction Phase of the Project, the Architect/Engineer (A/E) is responsible for providing project administration for the Owner in accordance

More information

Construction & Engineering Global Business Unit Service Descriptions and Metrics*

Construction & Engineering Global Business Unit Service Descriptions and Metrics* Construction & Engineering Global Business Unit Service Descriptions and Metrics* December 13, 2018 The Service Descriptions for Textura Payment Management and Early Payment Cloud Services can be found

More information

WRITTEN ANSWERS TO QUESTIONS RECEIVED

WRITTEN ANSWERS TO QUESTIONS RECEIVED WRITTEN ANSWERS TO QUESTIONS RECEIVED All written questions are reproduced in the same format as submitted by the Respondent. IT denotes technical question and response DP denotes purchasing or admin question

More information

Request for Proposals Baltimore Accountable Health Communities - Technical Infrastructure

Request for Proposals Baltimore Accountable Health Communities - Technical Infrastructure Request for Proposals Baltimore Accountable Health Communities - Technical Infrastructure 1 1. BACKGROUND / PURPOSE Addressing health-related social needs is essential to driving population health and

More information