1 I&I Mitigation: Reconstruction of Sewer Laterals and Sealing the Connections to the Main Rick Gage Vice President, Business Development LMK TECHNOLOGIES 1
2 Discussion Points System Rehabilitation Overview The Evolution of Lateral Linings ASTM F Standard Practice Accessing the Lateral through an Outside Clean Out Materials Sealing the Annular Space between the Main and Host Pipe Inserting, Inflating and Inverting the Liner Curing and Final Inspection 2
3 Failing Mainline Pipes 3
4 Mainline CIPP Only 4
5 Mainline CIPP and End Seals 5
6 Mainline with CIPP 6
7 Discussion Points System Rehabilitation Overview The Evolution of Lateral Linings ASTM F Standard Practice Accessing the Lateral through an Outside Clean Out Materials Sealing the Annular Space between the Main and Host Pipe Inserting, Inflating and Inverting the Liner Curing and Final Inspection 7
8 A Brief History 1 st Generation 2 nd Generation 3 rd Generation 4 th Generation ASTM F th Generation ASTM F
9 1st Generation Just Renew the Lateral No Seal at the Connection 9
10 2nd Generation Systems advanced modifying the lower end of lateral linings to include a hat or brim style junction This design was intended to seal by gluing the brim to the inner side of the main pipe Concerns: Bonding Resistance to Buckling Distance of Lateral Lining Seal is 100% dependent on adhesion 10
11 2 nd Generation Hat or Brim Style Connection 11
12 2 nd Generation Challenge of Adhesion 12
13 2 nd Generation Service Life of Adhesion 13
14 2nd Generation Repair Process 14
15 3rd Generation Cylindrical Main Connection (360º) Structural design per Appendix X1 of ASTM F1216 Resist Buckling 15
16 3 rd Generation with Mainline CIPP 16
17 A Brief History 3 rd Generation Not Complete 1 st Generation 2 nd Generation 3 rd Generation Need for Advancement in Technology Need for Standardization to Ensure Service Life Results 17
18 Design of Test Equipment Minimum Criteria Capable of testing multiple types of CIPP linings Capable of allowing for the nondestructive testing of a sample Capable of non destructive removal of connection sample from testing apparatus Capable of regulating external hydrostatic pressure Real time pressure monitoring Allows for unobstructed installation of all types of known trenchless junction rehab methods CAD rendering of Hydrostatic Test Tank 18
19 19
20 CIPP Connection Silicate Resin and No Gaskets 20
21 Challenge of 2 nd and 3 rd Generations ADHESION 21
22 4 th Generation = ASTM F Added Feature: Swelling Gaskets Two O Rings on both sides of the Connection Made of Hydrophilic Rubber 22
23 ASTM F : A TRUE Trenchless Alternative To Dig And Replace USA Canada Mexico Denmark Germany Sweden Singapore 23
24 4 th Generation with Mainline CIPP Compliant with ASTM F
25 A Brief History 1 st Generation 2 nd Generation 3 rd Generation 4 th Generation ASTM F th Generation ASTM F
26 No Gasket at Lateral Termination 26
27 5th Generation = ASTM F Added Feature: Hydrophilic O Ring at Upper End of Lateral 27
28 5 th Generation Compliant with ASTM F
29 Discussion Points System Rehabilitation Overview The Evolution of Lateral Linings ASTM F Standard Practice Accessing the Lateral through an Outside Clean Out Materials Sealing the Annular Space between the Main and Host Pipe Inserting, Inflating and Inverting the Liner Curing and Final Inspection 29
30 ASTM F Standard Practice for Rehabilitation of a Sewer Service Lateral and its Connection to the Main Using a One Piece Main and Lateral Cured in Place Liner. Incorporates ASTM F1216, D2990, D790 & D5813 ASTM F Standard Practice for Rehabilitation of Existing Pipelines and Conduits by the Inversion and Curing of a Resin Impregnated Tube ASTM D Standard Test Methods for Tensile, Compressive, and Flexural Creep and Creep Rupture of Plastics ASTM D Standard Test Methods for Flexural Properties of Unreinforced and Reinforced Plastics and Electrical Insulating Materials ASTM D (2012) Standard Specification for Cured In Place Thermosetting Resin Sewer Piping Systems 30
31 Discussion Points System Rehabilitation Overview The Evolution of Lateral Linings ASTM F Standard Practice Accessing the Lateral through an Outside Clean Out Materials Sealing the Annular Space between the Main and Host Pipe Inserting, Inflating and Inverting the Liner Curing and Final Inspection 31
32 Why AN Outside Clean-Out? Per ASTM F2561 Lateral line cleaning before lining per NASSCO Guidelines Remove roots/ debris before lining Ensure pipe is able to be lined Verify diameters, lengths and transitions Can protect home from odors by plugging upstream side Reduce risk by preventing homeowner flushing which can cause premature curing Reduce costs Ensure no resin slugs Ensure liner is fully deployed Allows post CCTV inspection 32
33 Install Clean-Out without Digging Technology exists to install a clean out without excavation using VAC A TEE A PVC saddle snapped onto a Lateral pipe through a 16" to 20 diameter hydro or vacuum excavated bore hole No digging No shoring No man entry No damage to adjacent utilities No damage to landscaping Small bore hole versus open trench Minimal disruption and restoration No spoils left in the yard 33
34 Locate Lateral Camera launched from the main to locate where the cleanout will be installed Locating Sonde camera 34
35 Vacuum Excavation in Close Quarters 35
36 Saddle Attached to Riser Pipe Depth measurement taken Riser pipe cut and saddle attached Adhesive applied to saddle 36
37 Saddle is Snapped on to the Pipe Bore hole filled w/sand Riser pipe filled w/water Leak test is performed Crown of pipe is cut Same Day Restoration Sod is replaced 37
38 VAC-A-TEE Accessories Lateral Access Shoe Root and Debris Cutting Equipment Can be inserted either upstream or downstream 38
39 Discussion Points System Rehabilitation Overview The Evolution of Lateral Linings ASTM F Standard Practice Accessing the Lateral through an Outside Clean Out Materials Sealing the Annular Space between the Main and Host Pipe Inserting, Inflating and Inverting the Liner Curing and Final Inspection 39
40 Tube and Sheet 40
41 ainline Connection T OR Y
42 cuum Impregnation r ASTM F1216 Performed On Site by Trained Certified Installers
43 scussion Points System Rehabilitation Overview The Evolution of Lateral Linings ASTM F Standard Practice Accessing the Lateral through an Outside Clean Out Materials Sealing the Annular Space between the Main and Host Pipe Inserting, Inflating and Inverting the Liner Curing and Final Inspection
44 aling the System Wrapping Mainline Sheet with Hydrophilic O rings ASTM F2561 The Design Calculations for the Main & Lateral Tube shall assume no bonding to the host pipe.
45 scussion Points System Rehabilitation Overview The Evolution of Lateral Linings ASTM F Standard Practice Accessing the Lateral through an Outside Clean Out Materials Sealing the Annular Space between the Main and Host Pipe Inserting, Inflating and Inverting the Liner Curing and Final Inspection
46 cessing the Lateral Clean-Out
47 sitioning the Liner The main is renewed with an 18 inch long cylinder shaped main liner simultaneous with the lateral lining
48 scussion Points System Rehabilitation Overview The Evolution of Lateral Linings ASTM F Standard Practice Accessing the Lateral through an Outside Clean Out Materials Sealing the Annular Space between the Main and Host Pipe Inserting, Inflating and Inverting the Liner Curing and Final Inspection
49 eam Cure As Quick As 30 Minutes Lower cost Very thorough cure Increased production Minimal homeowner disruption
50 dder Tube Removal & Post Video Lateral Camera from Outside Clean Out
51 teral Indicia 00 Pennsylvania Ave NW talled by Certified Contractor iner by LMK Cx3Bx13Cx5SKxT/PU LMK656 2,.2
52 ng-term Testing of Molded Hydrophilic bber Made of Neoprene esting protocol was developed to gauge the performance of he molded seals in a simulated sewer pipe his led to the initiation of a 10,000 hour test Molded seals are subjected to alternate hydration and dehydration Measured for dimensions as well as weight when dry and wet ycles recorded 2, 7, 30, 90, 180 and 416 days
53 ng-term Testing Results he hydrophilic gaskets maintain their expansion properties when ubjected to alternate hydration and dehydration ble to retain expansion of at least 4% or higher when subjected to ehydration etain moisture even when dehydrated over periods as long as 3 onths isually the seals do not show any degradation or loss of material hen dehydrated aintain flexibility and demonstrate excellent surface properties ithout loss of material even after multiple hydration/ dehydration ycle
54
55 ASE STUDIES
56 Naperville lem: Infiltration & inflow issues caused by extraneous flows from ing sewers/laterals during wet weather events, exacerbated by ulation increase (more homes/more people) tion: Lined more than 65 miles of sanitary sewer mains since 1992, and e than 3,000 sewer service laterals since 2003 utilizing LMK technology lts: lanned multi million dollar wastewater treatment plant expansion was eferred as a result of creating more system capacity by sealing the nitary sewer system (see below) ity is benefitting from greatly reduced maintenance costs, fewer resident omplaints about sewer backups and lower energy costs to run the astewater plant due to renewing and sealing the sewer collection stem
57 w Castle County, DE
58 Collection System After Mainline and Main to Lateral Renewal nt: City of Fort Saskatchewan inline CIPP Installer: IVIS, Inc. #1: 8 X 4 X #2: 8 X 4 X 90
59 mmary VAC A TEE is an accepted solution for creating an outside clean out by many municipalities Cured in Place Liners do not bond, but if they do for how long? To maximize I&I reduction utilize ASTM F2561 For connection sealing, you must start with a structural liner To create a water tight seal with CIPP, you must use a compression gasket
60 uestions? &I Mitigation: econstruction of Sewer Laterals and ealing the Connections to the Main Rick Gage Vice President, Business Development LMK TECHNOLOGIES
I&I Mitigation: Rehabilitation of Sewer Laterals and Sealing the Collection System
I&I Mitigation: Rehabilitation of Sewer Laterals and Sealing the Collection System Rick Gage, Vice President of Sales Mike Czipar, Vice President of Business Development Discussion Points Mainline CIPP
More informationESTABLISHING OBJECTIVE TEST PROTOCOLS FOR THE QUANTIFICATION OF WATER-TIGHTNESS OF A REHABILITATED MAIN/LATERAL SEWER CONNECTION
North American Society for Trenchless Technology (NASTT) No-Dig Show 2011 Washington, D.C. March 27-31, 2011 Paper E-5-03 ESTABLISHING OBJECTIVE TEST PROTOCOLS FOR THE QUANTIFICATION OF WATER-TIGHTNESS
More informationCIPP Lateral Renewal Connection System
Product Submittal Document Information CIPP Lateral Renewal Connection System ManEntry Lapel Liner Updated 6/12/14 Product Submittal Review ITEM 1. Manufacturer Company Name: LMK Technologies, LLC Contact
More informationNorth American Society for Trenchless Technology (NASTT) NASTT s 2016 No-Dig Show. Dallas, Texas March 20-24, 2016 WM-T3-01
North American Society for Trenchless Technology (NASTT) NASTT s 2016 No-Dig Show Dallas, Texas March 20-24, 2016 WM-T3-01 A Comprehensive Understanding of ASTM F3097-15 Standard Practice for Installation
More informationInstallation Practice InnerSeal
Installation Practice InnerSeal Rehabilitation of a Full-Length Sewer Service Lateral using One-Piece Main and Lateral Cured-In-Place Liner Assembly Installed By Means Of Air Inversion 1. Intent This instruction
More informationDISPUTING THE MYTH OF INFLOW AND INFILTRATION REMOVAL EFFICIENCY
North American Society for Trenchless Technology (NASTT) NO-DIG 2005 Orlando, Florida April 24-27, 2005 DISPUTING THE MYTH OF INFLOW AND INFILTRATION REMOVAL EFFICIENCY Keith Cheek, Manager of Water Distribution
More informationService Lateral Rehabilitation Using Cured-In-Place-Pipe (CIPP)
THE TOTAL SOURCE Service Lateral Rehabilitation Using Cured-In-Place-Pipe (CIPP) Brendan Doyle BLD Services, LLC Introduction Intent, to provide information on: Lateral preparation Lateral CCTV Inspection
More informationA COMPREHENSIVE UNDERSTANDING
A COMPREHENSIVE UNDERSTANDING of ASTM F2561-11 The Standard Practice for Rehabilitation of a Sewer Service Lateral and its Connection to the Main Using a One-Piece Main and Lateral Cured-in- Place Liner.
More informationNorth American Society for Trenchless Technology (NASTT) No-Dig Show Nashville, TN March 11-15, Paper B-3-02
North American Society for Trenchless Technology (NASTT) No-Dig Show 2012 Nashville, TN March 11-15, 2012 Paper B-3-02 Kristina Kiest 1, and John Vose 2 Gasket Sealing Technology: A Solution to Sealing
More informationSPECIFICATIONS FOR PREMIER-PIPE USA CURED-IN-PLACE TECH LINER
SPECIFICATIONS FOR PREMIER-PIPE USA CURED-IN-PLACE TECH LINER 1. General Statement: This specification is for the Cured in Place Pipe process (CIPP) of pipe rehabilitation using a glass fiber reinforced
More informationRehabilitation of the Coral Gables Wastewater Collection System
North American Society for Trenchless Technology (NASTT) NASTT s 2014 No-Dig Show Orlando, Florida April 13-17, 2014 MA-T3-02 Rehabilitation of the Coral Gables Wastewater Collection System Sahar Hasan,
More informationService Lateral Rehabilitation
THE TOTAL SOURCE Service Lateral Rehabilitation Jacob Trapani BLD Services, LLC Introduction Intent, to provide information on: Lateral rehabilitation Sealing options Studies have shown that 40% to 70%
More informationCured-in-Place Pipe (CIPP) for Pressure Pipe. Presented by: Mike Moore
Cured-in-Place Pipe (CIPP) for Pressure Pipe Presented by: Mike Moore CIPP Proven Technology Introduced over 45 years ago Most used trenchless technology for the rehabilitation of gravity flow pipeline
More informationSpecial Specification SS1- INTERNAL CIPP POINT REPAIR OF PIPELINES. A. General. 1. Scope
Special Specification SS1- INTERNAL CIPP POINT REPAIR OF PIPELINES A. General 1. Scope The work covered in this item includes the labor, equipment, materials for performing all work necessary to rehabilitate
More informationSECTION 809 CURED-IN-PLACE PIPE (CIPP) LATERALS
SECTION 809 CURED-IN-PLACE PIPE (CIPP) LATERALS 809-1 DESCRIPTION: This Work consists of installing a cured-in-place pipe (CIPP) liner to stabilize structural defects and construction inadequacies in sanitary
More informationSPECIAL SPECIFICATION 4631 Cured-In-Place Pipe (CIPP)
2004 Specifications CSJ 0912-34-171 SPECIAL SPECIFICATION 4631 Cured-In-Place Pipe (CIPP) 1. Description. Reconstruct existing drainage structures by forming a new pipe within an existing deteriorated
More informationSPECIAL SPECIFICATION 4411 Cured-In-Place Pipe (CIPP) (Drainage Structures)
2004 Specifications CSJ 6165-86-001 SPECIAL SPECIFICATION 4411 Cured-In-Place Pipe (CIPP) (Drainage Structures) 1. Description. Reconstruct existing cross drainage structures by forming a new pipe within
More informationTECHNICAL SPECIFICATIONS FIBERGLASS/ULTRAVIOLET LIGHT CURED-IN-PLACE PIPE (CIPP) FOR MAINLINE RENEWAL
TECHNICAL SPECIFICATIONS FIBERGLASS/ULTRAVIOLET LIGHT CURED-IN-PLACE PIPE (CIPP) FOR MAINLINE RENEWAL PART 1 - PRODUCTS 1.1 GENERAL It is the intent of this specification to provide for the reconstruction
More informationMichelle D. Beason, PE National Plant Services, Inc.
8th Biennial HWEA Collection System Conference Michelle D. Beason, PE National Plant Services, Inc. Honolulu, HI December 4, 2015 CLEANING INSPECTION REPAIR LARGE AND SMALL DIAMETER PIPE CLEANING ROOT
More informationSpecifying Trenchless Sewer Rehabilitation Projects. Presented by: Todd Stelmacher Visu-Sewer, Inc.
Specifying Trenchless Sewer Rehabilitation Projects Presented by: Todd Stelmacher Visu-Sewer, Inc. Todd Stelmacher Bio Visu-Sewer Sales Engineer MN, ND, SD, WI 30+ years public utilities experience Municipal
More informationProject Specifications
Project Specifications 2016 Work Description - Root remove, clean via hydro-jetting, perform pre-televising and install Cured In Place Pipe liner (CIPP) utilizing either an inverted or pulled in place
More informationSECTION IRRIGATION PIPELINE LINING (CURED-IN-PLACE PIPE)
SECTION 02518 IRRIGATION PIPELINE LINING (CURED-IN-PLACE PIPE) PART 1 GENERAL 1.01 SECTION INCLUDES A. Irrigation pipeline lining, as herein specified, consists of installing pipe liner by trenchless methods
More informationINTERFIT LATERAL SEALING SYSTEM INSTALLATION GUIDELINE SPECIFICATION
INTERFIT LATERAL SEALING SYSTEM INSTALLATION GUIDELINE SPECIFICATION INTERFIT LATERAL SEALING SYSTEM SECTION 1: GENERAL 1.1 INTENT 1.2 SCOPE 1.3 REFERENCE DOCUMENTS AND STANDARDS 1.4 SUBMITTALS SECTION
More informationMokapu CIPP Case Study & Innovations in Trenchless Technologies for Wastewater System Rehabilitation
Mokapu CIPP Case Study & Innovations in Trenchless Technologies for Wastewater System Rehabilitation Presented by Mike York, Insituform Technologies, Inc. Trenchless v. Dig and Replace What is CIPP? Developed
More informationMethod One: Liner/Bladder Assembly-Inversion Method.
CIPP Sectional/Point Repairs Critical Factors Finally Explained By: Shaun M. Flanery Abstract A 1999 report from the American Society of Civil Engineers indicated at that time that the nation s 500,000
More informationCIPMH (Cured-in-Place Manhole) Lining System
Product Submittal Document Information CIPMH (Cured-in-Place Manhole) Lining System CIPMH FULL DEPTH-PA For Structural Rehabilitation Updated 9/25/14 Product Submittal Review ITEM 1. Manufacturer Company
More informationSPECIFICATIONS. Cured-in-Place Pipe Liner (CIPP Liner). Shall comply with Subsection
PIPELINE SYSTEM REHABILITATION SPECIFICATIONS The intent of the work under this section involves the trenchless rehabilitation of existing sewer pipelines. This lining shall rebuild strength and substantially
More informationOverview of Lateral and Main/Lateral Connection Lining and Sealing Technologies
Overview of Lateral and Main/Lateral Connection Lining and Sealing Technologies Prepared by the NASSCO Lateral Committee 11/14/12 0 P a g e TABLE OF CONTENTS 1.0 INTRODUCTION PAGE 3 2.0 REHABILITATION
More informationOverview of Lateral and Main/Lateral Connection Lining and Sealing Technologies
Overview of Lateral and Main/Lateral Connection Lining and Sealing Technologies Prepared by the NASSCO Lateral Committee 08/12/14 0 P a g e TABLE OF CONTENTS 1.0 INTRODUCTION PAGE 3 2.0 REHABILITATION
More informationSECTION XXXXX CHEMICAL GROUTING
SECTION XXXXX CHEMICAL GROUTING PART 1 -- GENERAL 1.01 SCOPE OF WORK A. Provide all labor, materials, accessories, equipment, and tools required for the rehabilitation, infiltration reduction, and root
More informationSECTION 808 CURED-IN-PLACE-PIPE (CIPP)
SECTION 808 CURED-IN-PLACE-PIPE (CIPP) 808-1 DESCRIPTION: This Work consists of providing labor, materials, equipment, and supervision necessary to accomplish the CIPP lining of all sewer mains designated
More informationSTANDARD SPECIFICATIONS FOR CONSTRUCTING SANITARY SEWER FACILITIES DIVISION III - CONSTRUCTION SPECIFICATIONS
STANDARD SPECIFICATIONS FOR CONSTRUCTING SANITARY SEWER FACILITIES DIVISION III - CONSTRUCTION SPECIFICATIONS SECTION 5 REHABILITATION OF SANITARY SEWER MAINS BY THE CURED-IN-PLACE PIPE (CIPP) METHOD 5.01
More informationGENERAL SPECIFICATION FOR THE REHABILITATION OF SEWERS USING THE THERMOFORM (PVC) PIPE LINING SYSTEM
1. GENERAL 1.01 DESCRIPTION GENERAL SPECIFICATION FOR THE REHABILITATION OF SEWERS USING THE THERMOFORM (PVC) PIPE LINING SYSTEM A. The Contractor shall furnish all labor, equipment and materials necessary
More informationPIPE REHABILITATION. Comply with Division 1 - General Provisions and Covenants, as well as the following:
PIPE REHABILITATION PART 1 - GENERAL 1.01 SECTION INCLUDES A. Sliplining Pipe B. Cured-in-place Pipe Lining C. Deformed/Reformed Pipe Lining D. Folded/Formed Pipe Lining E. Spot Repairs by Pipe Replacement
More informationChemical Grouting to Maintain and Sustain Municipal Sewers By: Marc A Anctil Logiball Inc.
Chemical Grouting to Maintain and Sustain Municipal Sewers By: Marc A Anctil Logiball Inc. TRENCHLESS TECHNOLOGY ROADSHOW May 28-29, 2014 Scotiabank Convention Centre, Niagara Falls, ON There could
More informationSEWER TELEVISING & REPAIRS. Adam Tierney Business Development Manager Northern Pipe, Inc.
SEWER TELEVISING & REPAIRS Adam Tierney Business Development Manager Northern Pipe, Inc. AGENDA Purpose of CCTV Inspections Equipment NASSCO (National Association of Sewer Service Companies) Inspection
More informationSample Bid Specification Revision 2 PVC Expanded-in-Place Pipeline Reconstruction
Sample Bid Specification Revision 2 PVC Expanded-in-Place Pipeline Reconstruction 1.00 DESCRIPTION 1.01 WORK INCLUDED: This work shall include the furnishing of all labor, equipment and materials necessary
More informationLateral Thinking The Key To Meeting Sewer Infiltration Reduction Targets & Lowering Operating Costs
Lateral Thinking The Key To Meeting Sewer Infiltration Reduction Targets & Lowering Operating Costs John Monro Interflow Pty Limited Keywords: house service line, lateral, infiltration reduction, rehabilitation,
More informationEVALUATION SUBJECT: HAMMERHEAD CURED-IN- PLACE PIPE (CIPP) LINING SYSTEM DIVISION: PLUMBING SECTION: SANITARY WASTE AND VENT PIPING
ICC-ES Report PMG-1273 Reissued 01/2018 This report is subject to renewal 01/2019 EVALUATION SUBJECT: HAMMERHEAD CURED-IN- PLACE PIPE (CIPP) LINING SYSTEM DIVISION: 22 00 00 PLUMBING SECTION: 22 13 16
More informationThe Rehabilitation of Existing Building Drains and Building Sewers by the
Inversion or Pulled-in-Place Method and Curing of Resin-impregnated Tube Page 1 of 7 www.icc-es.org/pmg (800) 423-6587 (562) 699-0543 A Subsidiary of the International Code Council PROPOSED PMG LISTING
More informationTECHNICAL SPECIFICATION FOR CURED-IN-PLACE MANHOLE REHABILITATION LINER SYSTEM
TECHNICAL SPECIFICATION FOR CURED-IN-PLACE SYSTEM PART 1 GENERAL 1.01 SCOPE OF WORK Furnish all materials, labor, equipment, tools and required incidentals for providing and installing a resin impregnated
More informationCITY OF ODESSA SPECIAL SPECIFICATIONS ITEM 1000 GLASS-FIBER REINFORCED POLYESTER (FRP) REHAB/REPLACEMENT MANHOLE
CITY OF ODESSA SPECIAL SPECIFICATIONS ITEM 1000 GLASS-FIBER REINFORCED POLYESTER (FRP) REHAB/REPLACEMENT MANHOLE 1000.1 DESCRIPTION These specifications shall govern the furnishing of glass-fiber reinforced
More informationITEM NO SLIPLINING SANITARY SEWERS
ITEM NO. 1100 SLIPLINING SANITARY SEWERS 1100.1 DESCRIPTION: Sliplining is accomplished by pulling or pushing liner pipe into existing sewers by use of mechanical or hydraulic equipment. Once in place,
More informationInland Pipe Rehabilitation. August 17 OAWWA Canton, OH
Inland Pipe Rehabilitation August 17 OAWWA Canton, OH Presentation Agenda Introduction to IPR IPR Products & Services RS Technik by HammerHead Advanced CIPP Process Spartanburg, SC project review IPR Overview
More informationCIPP Cured-in-Place Pipeline CIPP. cured-in-place pipe. trenchless pipe rehabilitation
CIPP Cured-in-Place Pipeline CIPP cured-in-place pipe trenchless pipe rehabilitation MPC ToughTube cured-in-place pipe lives up to its name. The lining process is accomplished by either inverting or pulling
More informationLS 2760 CURED-IN-PLACE SEWER LINING
LS 2760 CURED-IN-PLACE SEWER LINING A. Related Documents B. Summary C. Submittals D. Quality Assurance E. Project Conditions F. Sequencing and Scheduling G. Quantities H. Liner and Resins I. Initial Sewer
More informationSPECIAL SPECIFICATION 5256 Cured-In-Place Pipe (Sanitary Sewer)
2004 Specifications CSJ 0912-71-657 SPECIAL SPECIFICATION 5256 Cured-In-Place Pipe (Sanitary Sewer) 1. Description. Furnish and install cured-in-place pipe. A. Resin-impregnated flexible tubes inserted
More informationTable 1 Description of Work Pipe Size (mm) 1 Sunshine Way A/C No. A/C Yes
March 2, 2018 To: Cured-In-Place Pipe (CIPP) Relining Contractors RE: CITY OF GRAND FORKS REQUEST FOR QUOTE FOR CIPP RELINING CONTRACTORS 1.0 INTRODUCTION The City of Grand Forks is requesting quotes to
More informationCEDAR RAPIDS METROPOLITAN AREA STANDARD SPECIFICATIONS FOR PUBLIC IMPROVEMENTS May 2014 SECTION SEWER LINERS
SECTION 02310 SEWER LINERS PART 1 GENERAL 1.01 - References A. American Society for Testing and Materials (ASTM): 1. ASTM D638 Test method for tensile properties of plastics. 2. ASTM D790 Test method for
More informationProcess Specification. Structural Rehabilitation & Corrosion Protection for Circular Structures in Wastewater Collection and Potable Water Systems
Process Specification Structural Rehabilitation & Corrosion Protection for Circular Structures in Wastewater Collection and Potable Water Systems SECTION 1: GENERAL 1.01 DESCRIPTION This specification
More informationSS 207 Junction Sealing for Circular Non Man Entry Sewer Pipe
Standard Specification SS 207 Junction Sealing for Circular Non Man Entry Sewer Pipe Version 1 1 General 1.1 Intent The intent of this specification is to define the requirements for rehabilitating and
More informationSan Antonio Water System Standard Specifications for Construction ITEM NO SANITARY SEWER LATERAL STUB OUTS OR RECONNECTIONS
1109.1 DESCRIPTION: ITEM NO. 1109 SANITARY SEWER LATERAL STUB OUTS OR RECONNECTIONS 1. Installation of sanitary sewer lateral stub outs in sanitary sewer mains serving areas where service did not previously
More informationFiber Reinforced Cured-in-Place Rehabilitation Under an Interstate
Fiber Reinforced Cured-in-Place Rehabilitation Under an Interstate UCT Conference - February 2017 Presented By Chantal Evans Representing Owner Jonathan Stathis/Cedar City Owner and owner issues Cedar
More informationEVALUATION SUBJECT: PERMA-LATERAL PULLED- IN-PLACE CURED-IN-PLACE PIPE LINING SYSTEM
ICC-ES Report PMG-1074 Reissued 11/2017 This report is subject to renewal 11/2018 EVALUATION SUBJECT: PERMA-LATERAL PULLED- IN-PLACE CURED-IN-PLACE PIPE LINING SYSTEM DIVISION: 22 00 00 PLUMBING SECTION:
More informationThe Weak Links in the Wastewater Collection System: Manholes and Access Devices. Antonio V Almeida, PE CMOM 2014 Austin Texas August 19, 2014
The Weak Links in the Wastewater Collection System: Manholes and Access Devices Antonio V Almeida, PE CMOM 2014 Austin Texas August 19, 2014 Agenda Manhole Design The Manhole Paradigm past, present & future
More informationInfrastructure Point Repair System Technical Specifications
4301 A 34 t h Street North St. Petersburg, FL 33714 PH: 877-327-4216 Fax: 727-327- 4118 Web: www.irsi.net Infrastructure Point Repair System 1. Scope: This specification defines the approved methodology
More informationSan Antonio Water System Standard Specifications for Construction
Item No. 905.1 Rehabilitation of Sanitary Sewer By Cured-In-Place Pipe (UV Light Cured) 905.1 DESCRIPTION: This specification includes requirements to rehabilitate existing sanitary sewers by the Ultraviolet
More informationADDENDUM No. 2. City of Joliet, 2017 Spring Creek Interceptor Sewer Lining at CN Railyard
ADDENDUM No. 2 October 19, 2017 TO: PROJECT: All Potential Bidders, 2017 Spring Creek Interceptor Sewer Lining at CN Railyard BID OPENING: Tuesday, October 24, 2017 at 11:00 A.M. The following is a list
More informationSTANDARD SPECIFICATIONS SECTION SEWER MAINS AND LATERAL REHABILITATION BY LINING
STANDARD SPECIFICATIONS SECTION 02955 SEWER MAINS AND LATERAL REHABILITATION BY LINING PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for reconstruction of sewer mains and laterals by
More informationMWRD Infiltration and Inflow Control Program Compliance Update. Committee of the Whole Meeting April 3, 2018
MWRD Infiltration and Inflow Control Program Compliance Update Committee of the Whole Meeting April 3, 2018 Presentation Outline Background on MWRD s Watershed Management Ordinance Wastewater, Infiltration
More informationOTEC 2017 Spray Applied Pipe Liner Supplemental Specifications 833 Calculations for the Resin Based Liner Presented by Peter Blais, PE
Innovative Solutions through Engineered Products OTEC 2017 Spray Applied Pipe Liner Supplemental Specifications 833 Calculations for the Resin Based Liner Presented by Peter Blais, PE HydraTech Engineered
More informationCITY OF TAMPA ADDENDUM NO. 1. DATE: September 15, Contract 11-C-00001; Wastewater Sewer Rehabilitation by Cured-in-Place Pipe (C.I.P.P.
CITY OF TAMPA Pam Iorio, Mayor CONTRACT ADMINISTRATION DEPARTMENT David L. Vaughn, AIA, Director ADDENDUM NO. 1 DATE: September 15, 2010 Contract 11-C-00001; Wastewater Sewer Rehabilitation by Cured-in-Place
More informationPipe User Group. Tuesday March 14, Walnut Creek, CA. Matt Wassam
Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500 Agenda AWWA M-28 liner definitions brief overview What information is required to bid a project? Technology Overview Transmission
More informationFOX METRO WATER RECLAMATION DISTRICT MANHOLE / SEWER PIPE MATERIALS AND INSTALLATION SPECIFICATIONS MATERIALS 1. PIPE & FITTINGS
FOX METRO WATER RECLAMATION DISTRICT MANHOLE / SEWER PIPE MATERIALS AND INSTALLATION SPECIFICATIONS MATERIALS 1. PIPE & FITTINGS Rev: 3/26/18 Pipe and fittings used in sanitary sewer construction shall
More informationKey I/I Reduction Plan Components
MARCH 24, 2015 Brad D. Werner, P.E. Key I/I Reduction Plan Components Understanding of the Collection System Developing solid Ordinances and Policies Long-Range Plan Development Capital Project Implementation
More informationGAS UTILITY TECHNOLOGY UPDATE
GAS UTILITY TECHNOLOGY UPDATE NORTHEAST GAS ASSOCIATION 2013 FALL CONFERENCE ULC ROBOTICS www.ulcrobotics.com Who is ULC? We work with energy and utility companies to face infrastructure, technical and
More information4.1 Sewer System Mapping
A preventive and proactive Operations and Maintenance (O&M) Program is the basis of a well-run sewer collection system. It describes what work is done on a regular basis to the collection system mains,
More informationB. Fiberglass for construction in back lot easements placed on cast-in-place base.
Section 02083 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Fiberglass manholes for unpaved areas placed on top of a precast base to form a manhole. B. Fiberglass for construction in back lot easements
More informationGENERAL SPECIFICATION FOR THE REHABILITATION OF SEWERS
AM-LINER II PATENTED GENERAL SPECIFICATION FOR THE REHABILITATION OF SEWERS USING THE AM-LINER II PATENTED (PVC)PIPELINING SYSTEM TRENCHLESS TECHNOLOGY August 16, 2005 1 AMERICAN PIPE & PLASTICS, INC.
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-22 05 83.63 (November 2016) -------------------------------- Preparing Activity: NASA UFGS-22 05 83.63 (November 2013) UNIFIED FACILITIES GUIDE SPECIFICATIONS References
More informationWASTEWATER REVIEW CHECKLIST. Project Number: Reviewed By: Telephone:
The City of East Point DEPARTMENT OF WATER AND SEWER 1526 East Forrest Ave. Suite 400 East Point, Georgia 30344 FAX (404) 270-7215 www.eastpointcity.org WASTEWATER REVIEW CHECKLIST Project Name: Tax ID
More informationStructural Lining of Water Mains. City of St. John s, Water and Wastewater Division
Structural Lining of Water Mains Overview Applications Pre-lining process Installation (Aqua-Pipe Product) Post-lining process Challenges Applications Alternative to water main reconstruction. Limited
More informationINFLOW & INFILTRATION CORRECTION VIA LATERAL LINE DITCH LEAK REPAIRS
1 of 5 8/1/2013 2:10 PM INFLOW & INFILTRATION CORRECTION VIA LATERAL LINE DITCH LEAK REPAIRS Project Location and Description Glen Mayberry, Project Manager Roy F. Weston, Houston, TX The project is in
More informationCured-In-Place-Pipe (CIPP) LATERAL SEALS
Cured-In-Place-Pipe (CIPP) LATERAL SEALS PERFORMANCE SPECIFICATION GUIDELINE October, 2016 Thanks to the following participants for the development of this document: Brendan Doyle BLD Services LLC (Chair)
More informationSpecification Guidelines for Testing and Sealing Lateral Connections and Lateral Service Lines in Sanitary Sewer Systems
Specification The information contained in the document is property of Avanti International. Avanti offers the following verbiage as a technical reference to assist in the creation of specifications for
More informationInternational Aramoon Corp. Pipe Inspection and Rehabilitation By: Faiz Al-Elweet. SAWEA Al-Khobar KSA February 24, 2010
International Aramoon Corp. 1 Pipe Inspection and Rehabilitation By: Faiz Al-Elweet SAWEA Al-Khobar KSA February 24, 2010 International Aramoon Corp. 2 Nobody would like to wait until the problem appears
More informationBMEC AUTHORIZATION:
777 Bay Street, 2 nd Floor Toronto, Ontario, M5G 2E5 777, rue Bay, 2 e etage Toronto, Ontario, M5G 2E5 T: F: W: 416 585 4234 416 585 7531 www.ontario.ca/buildingcode/ T: TC: W: 416 585 4234 416 585 7531
More informationCITY OF TAMPA ADDENDUM NO. 3. DATE: February 15, 2017
CITY OF TAMPA Bob Buckhorn, Mayor CONTRACT ADMINISTRATION DEPARTMENT Michael W. Chucran, Director ADDENDUM NO. 3 DATE: February 15, 2017 Contract 16-C-00027; Ragan Park Restroom Improvements - Rebid Bidders
More informationRowlett Cottonwood Transfer Sewer: 60" RCP Sanitary Sewer Rehabilitation Project. TACWA Meeting
Rowlett Cottonwood Transfer Sewer: 60" RCP Sanitary Sewer Rehabilitation Project TACWA Meeting September 25, 2009 North Texas Municipal Water District Project Background 1. Rowlett-Cottonwood Transfer
More informationBuilding the City of West Palm Beach s Stormwater Infrastructure Rehab Program June 15, 2018
Building the City of West Palm Beach s Stormwater Infrastructure Rehab Program June 15, 2018 2018 HDR, Inc., all rights reserved. Data Evaluation and Literature Review Presentation Outline Condition Assessment
More informationHIGH CHEMICAL RESISTANCE LINER (EPOXY RESIN FORMAPOX 301)
HIGH CHEMICAL RESISTANCE LINER (EPOXY RESIN FORMAPOX 301) LINING SPECIFICATIONS FOR UNDERGROUND PROCESS PIPING WITH NO-DIG TECHNOLOGIES FORMADRAIN Inc. 09032015 U.S.A. 2915 Ogletown Road - #132 Newark,
More informationSKSC Civils (pty) LTD. Brilliance Technology Quality - Innovation
SKSC Civils (pty) LTD Brilliance Technology Quality - Innovation About us SKSC Civils was inspired by numerous individuals in South Africa, ranging from the civil to the construction industry, to truly
More informationClean Water 2020 Program
Clean Water 2020 Program INFRASTRUCTURE REHABILITATION PROGRAM (IR Program) November 2016 Updated March 2017 Table of Contents Infrastructure Rehabilitation Program 2016 List of Tables... 2 List of Figures...
More informationNorth Pecos Water & Sanitation District Request for Proposal CURED-IN-PLACE-PIPE PROJECT 2015 SANITARY SEWER REHABILITATION
North Pecos Water & Sanitation District Request for Proposal CURED-IN-PLACE-PIPE PROJECT 2015 SANITARY SEWER REHABILITATION TABLE OF CONTENTS Request for Sealed Proposal Page 4 Proposal Guidelines and
More informationSECTION 813 SEWER FLOW CONTROL
SECTION 813 SEWER FLOW CONTROL 813-1 DESCRIPTION: Sewer flow control is a set of methods to adjust the flow in the sewer system to allow for inspection, maintenance, repair or replacement. This is accomplished
More informationCIPP REFERENCE SPECIFICATION
CIPP REFERENCE SPECIFICATION This CIPP Reference Specification serves as only a guideline and is not intended to encompass the requirements of every municipality or industrial application. However, the
More informationSECTION 802 GRAVITY SEWER PIPE
SECTION 802 GRAVITY SEWER PIPE 802-1 DESCRIPTION: This Work shall consist of furnishing all labor, materials, equipment, and incidentals required to remove and dispose of existing gravity sewer pipe if
More informationSWIMMING IN SUCCESS, NOT I/I WHAT MADE IT WORK CLEVELAND, TENNESSEE S SCOPE 10 PROGRAM
SWIMMING IN SUCCESS, NOT I/I WHAT MADE IT WORK CLEVELAND, TENNESSEE S SCOPE 10 PROGRAM Travis E. Wilson, PE 1, Greg Clark, PE 2 twilson@smeinc.com 1 S&ME, Inc., Murfreesboro, Tennessee 2 Cleveland Utilities,
More informationTHE COMPLETE NO-DIG PIPELINE REHABILITATION SOLUTION
TM THE COMPLETE NO-DIG PIPELINE REHABILITATION SOLUTION CLEAN ENGINEERING. Premier Pipe U.S.A. Premier Pipe is a people-driven company that prides itself on old school standards. With extensive training
More informationSECTION SANITARY UTILITY SEWERAGE PIPING
SECTION 33 31 00 SANITARY UTILITY SEWERAGE PIPING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Sanitary sewer pipe and fittings. 2. Underground pipe markers. 3. Connection to existing manholes. 4.
More informationSPECIAL SPECIFICATIONS UV CURED IN-PLACE SPIRAL WOUND FIBERGLASSS PIPE LINING
5101.1 Description This item shall govern approved methods and materials for the rehabilitation of deteriorated gravity sewer and storm water pipes by an Ultra-Violet Light Cured-In-Place Pipe (CIPP) lining
More informationInfrastructure Solutions Pressure Pipe Overview
Infrastructure Solutions 2017 Pressure Pipe Overview Pipe problems Costly repairs & lost revenue Water quality Water main breaks Water loss Leaking pipes Flow capacity Aging pipelines 2 Infrastructure
More informationSTANDARD SPECIFICATION FOR OIL GRIT SEPARATOR (OGS) STORMWATER QUALITY TREAMENT DEVICE
STANDARD SPECIFICATION FOR OIL GRIT SEPARATOR (OGS) STORMWATER QUALITY TREAMENT DEVICE PART 1 GENERAL 1.1 WORK INCLUDED This section specifies requirements for constructing underground stormwater treatment
More informationCHAPTER 18: SANITARY SEWER SYSTEMS Introduction and Goals Administration Standards Standard Attachments 18.
18.00 Introduction and Goals 18.01 Administration 18.02 Standards 18.03 Standard Attachments 18.1 18.00 INTRODUCTION AND GOALS The purpose of this chapter is to provide guidance and outline specific standards
More informationTHE COSTS FOR ACCESSING THE SEWER SHALL BE INCLUDED IN THE VARIOUS UNIT PRICES BID. THE UNIT COSTS SHALL INCLUDE ANY AND ALL ACCESS TO THE SEWER.
Contract Drawings For FY18 Gravity Sewer and Manhole Rehabilitation TRAVELERS REST TAYLORS Frazier Project No. WCRSA-035 Greenville, South Carolina March 2018 GREENVILLE FIVE FORKS GANTT BASIN 650 SIMPSONVILLE
More informationSTIFPIPE : INTRODUCING A NEW HONEYCOMB-FRP PIPE
STIFPIPE : INTRODUCING A NEW HONEYCOMB-FRP PIPE Mo Ehsani, PhD, PE, SE, F.ASCE President, PipeMedic, LLC and Professor Emeritus of Civil Engineering, University of Arizona, 2055 E. 17 th St.,Tucson, AZ
More informationSECTION FACILITY SANITARY SEWERS
SECTION 22 13 13 FACILITY SANITARY SEWERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationPIPE BURSTING GRAVITY SEWER MAINS WITH HDPE PIPE
PIPE BURSTING GRAVITY SEWER MAINS WITH HDPE PIPE SUGGESTED STANDARD SPECIFICATION January, 2012 Prepared by International Pipe Bursting Association Thanks to the following participants for the development
More informationInfiltration and Inflow. Michael Sassaman Phone
Infiltration and Inflow Michael Sassaman msassaman@entecheng.com Phone 610-373-3345 Inflow and Infiltration PA DEP Learning Objectives Do you have Excessive I/I? Sources of Inflow and Infiltration I/I
More information