# 8 ) UN MME DISPENSARY AT 2113 N. LV BLVD SPECIAL USE PERMIT EXTENSION OF TIME PUBLIC HEARING
|
|
- Isabel Lester
- 5 years ago
- Views:
Transcription
1 # 8 ) UN MME DISPENSARY AT 2113 N. LV BLVD SPECIAL USE PERMIT EXTENSION OF TIME PUBLIC HEARING STAFF REPORT To: Planning Commission Meeting date: December 9, 2015 Item: UN Prepared by: Marc Jordan GENERAL INFORMATION: Applicant: Owner: Requested action: Purpose: Location: Clark NMSD, LLC dba NuVeda 2113 Investors LLC Approval of an extension of time for an existing special use permit To allow a Medical Marijuana Dispensary 2113 N. Las Vegas Boulevard Parcel Number(s): Lot area: Comprehensive Plan:.6 ± acres Downtown Business District Existing land use and zoning: Office Building; R-A/DC, Redevelopment Area / Downtown Core Subdistrict Surrounding land use and zoning: North: Rosemont Leasing Office and Club House; R-A/DC, Redevelopment Area / Downtown Core Subdistrict East: Silver Nugget Casino; R-A/DC, Redevelopment Area / Downtown Core Subdistrict South: Strip 91 Motel; R-A/DC, Redevelopment Area / Downtown Core Subdistrict West: Mobile Home Park; R-A/DC, Redevelopment Area / Downtown Core Subdistrict
2 BACKGROUND INFORMATION: The applicant is requesting Planning Commission consideration for an extension of time for a previously approved special use permit to allow a medical marijuana dispensary. The special use permit was originally approved by the City Council on October 14, The applicant has not indicated that any changes are proposed to the original submittal. The applicant has received a provisional license from the State for the proposed use. According to the site plan and floor plan, the applicant is proposing to occupy a portion of a building that is approximately 6,523 square feet in size. The floor plan shows the portion of the building proposed for a dispensary to be approximately 3,809 square feet in size. The floor plan does not indicate the type of use proposed for the area not occupied by the proposed dispensary. The floor plan shows a single entrance at the front of the building that provides access to the lobby. The floor plan also shows areas for patient education, consultation rooms, offices, inventory room, vault and other rooms associated with the proposed dispensary The site plan indicates that 38 parking spaces are being provided, where 27 are required for the proposed use and the future tenant of the space not occupied by the dispensary. The building was constructed in approximately According to the site plan, additional landscaped improvements are proposed within the parking lot and adjacent to the west side of the building. In addition, it also appears that additional landscaped materials are also proposed within the landscaped planter area next to Las Vegas Boulevard. The existing building is currently constructed of block and brick, and contains a flat roof. Facade improvements are proposed for the front of the building facing Las Vegas Boulevard. In addition, the applicant is proposing to install a standing seam roof, and paint the remaining exterior elevations. The applicant has indicated in their original letter of intent the desire to provide an interior and exterior that is modern, professional, orderly, dignified and consistent with the traditional style of pharmacies and medical offices. The building elevations indicate that new fiber cement panels and windows would be provided to the front of the building. The letter of intent does not indicate the hours of operation. DEPARTMENT COMMENTS: Public Works Department: Fire Department: Building Division: Police Department: Please see the attached memorandum. Please see the attached memorandum. Please see the attached memorandum. Please see the attached memorandum. ANALYSIS:
3 A medical marijuana dispensary is permitted within the R-A/DC, Redevelopment Area / Downtown Core Subdistrict with the approval of a special use permit. According to Title 17, the following requirements must be demonstrated. Distance Separation Requirements: The applicant must submit a survey from a Nevada licensed surveyor that demonstrates the proposed establishment meets the separation requirements of 1,000 from a school, 300 feet from a community facility, and 1,000 feet from another dispensary. The submitted survey indicates that these requirements have been met. Separate, Stand Alone Building or Facility: According to the site plan, the applicant is proposing to locate the proposed establishment in a portion of a stand alone building. Appropriately Zoned: The subject site has the appropriate zoning of R-A/DC, Redevelopment Area / Downtown Core Subdistrict. Specific Use of the Facility: The applicant is proposing a medical marijuana dispensary. The letter of intent or site plan do not indicate other activities, other than a dispensary. A Single Entrance: According to the floor plan, it appears that one entrance is proposed. The only other entrances appears to be additional ingress/egress doors for life safety. No Outside Storage: The site plan does not indicate that outside storage is proposed as part of this use. Minimum Square Footage: The proposed dispensary will be approximately 3,809 square feet in size. Therefore, the minimum size criteria of 1,500 square feet for a dispensary has been met. Appearance: The facility must have an appearance, both as to the interior and exterior that is professional, orderly, dignified and consistent with pharmacies or medical offices. The proposed exterior improvements of the building appear to be consistent with that of a medical office. In addition to the above requirements, there are several other requirements the applicant would need to comply with that cannot be determined with the submittal of a land use request. Those requirements include, but are not limited to maintaining discreet and professional signage, not obstructing windows, complying with life safety requirements, and ensuring there is no emission of dust, fumes, vapors, or odors. Requirements for Approval of a Special Use Permit In accordance with the Zoning Ordinance, the Planning Commission may, by motion, grant a special use permit if the Planning Commission finds, from the evidence presented, that all of the following facts exist: 1. The proposed use is consistent with the Comprehensive Master Plan and all applicable provisions of this Code and applicable State and Federal regulations;
4 2. The proposed use is consistent with the purpose and intent of the zoning district in which it is located and any applicable use-specific standards and criteria in Chapter of this Code; 3. The proposed use is compatible with adjacent uses in terms of scale, site design, and operating characteristics (such as, but not limited to, hours of operation, traffic generation, lighting, noise, odor, dust, and other external impacts); 4. Any significant adverse impacts anticipated to result from the use will be mitigated or offset to the maximum extent practicable; and 5. Facilities and services (including sewage and waste disposal, water, gas, electricity, police and fire protection, and roads and transportation, as applicable) will be available to serve the subject property while maintaining adequate levels of service for existing development. The proposed site and building improvements would aid in the redevelopment of the subject site located within the Downtown Redevelopment Area. Prior to issuance of a business license for the proposed use, all site and building improvements should be completed. The Public Works Department in their original consideration have included conditions of approval regarding driveway improvements. Staff has no objections to the proposed use. The proposed use is consistent with the zoning designation, and also appears to be consistent with the criteria set for a medical marijuana establishment. In regards to compatibility with the surrounding properties, the applicant will need to ensure on an on-going basis that noise, odor, dust, or other external impacts do not negatively impact the surrounding properties. Furthermore, prior to issuance of any tenant improvements or the issuance of a business license, the applicant will need to ensure that appropriate facilities and services are in place. RECOMMENDATION: The Community Development and Compliance Department recommends that UN be approved subject to the following conditions: (Note: This item is required to be forwarded to the Redevelopment Agency for final consideration.) Planning and Zoning: 1. That, unless expressly authorized through a variance, waiver or another approved method, this development shall comply with all applicable codes and ordinances. 2. The applicant shall complete all site and building improvements prior to the issuance of a business license. Public Works Department:
5 3. Due to the proximity of the neighboring driveway, the southerly driveway shall be removed and replaced with curb, gutter and sidewalk per the applicable standard drawings. 4. It is recommended that the centrally located driveway also be removed and replaced with curb, gutter and sidewalk, if the existing shared driveway at the northerly property line is expanded. a. In this case, the shared driveway shall be removed and replaced with an ADA compliant commercial driveway per Clark County Area Uniform Standard Drawings number 226.S1 or as otherwise approved by the City Traffic Engineer. 5. Existing non-compliant driveways shall be removed and replaced with ADA compliant driveways. a. Should the existing shared driveway at the northerly property line not be expanded as recommended in the above condition, the centrally located driveway shall be removed and replaced with an ADA compliant commercial driveway per Clark County Area Uniform Standard Drawings number 226.S1 or as otherwise approved by the City Traffic Engineer. 6. Due to the Las Vegas Blvd Complete Streets project, the timing and construction of the required subject improvements, and permit issuance, shall be coordinated with the City Traffic Engineer. Police Department: 7. All applications must follow State of Nevada requirements for facility security. 8. Police Department approval is contingent upon submittal of a security plan to the Police Department, which will be verified with a site visit.
6 ATTACHMENTS: Public Works Memorandum Fire Department Memorandum Building Division Memorandum Building Division Memorandum dated November 10, 2015 Police Department Memorandum Police Department Memorandum dated November 3, 2015 Site Photo s Letter of Intent for an Extension of Time Original Letter of Intent City Council Notice of Final Action Site Plan Landscaping Plan Floor Plan Building Elevations Survey Clark County Assessor s Map Location and Zoning Map
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
# 17 ) UN DESERT GREEN FARMS SPECIAL USE PERMIT EXTENSION OF TIME PUBLIC HEARING
# 17 ) UN-101-14 DESERT GREEN FARMS SPECIAL USE PERMIT EXTENSION OF TIME PUBLIC HEARING STAFF REPORT To: Planning Commission Meeting date: December 9, 2015 Item: UN-101-14 Prepared by: Robert Eastman GENERAL
More information# 5 ) UN GREENLEAF FARMS HOLDINGS - CULTIVATION SPECIAL USE PERMIT PUBLIC HEARING
# 5 ) UN-20-16 GREENLEAF FARMS HOLDINGS - CULTIVATION SPECIAL USE PERMIT PUBLIC HEARING STAFF REPORT To: Planning Commission Meeting date: March 9, 2016 Item: UN-20-16 Prepared by: Marc Jordan GENERAL
More information# 11 ) UN MEDICAL MARIJUANA - CULTIVATION SPECIAL USE PERMIT PUBLIC HEARING
# 11 ) UN-31-16 MEDICAL MARIJUANA - CULTIVATION SPECIAL USE PERMIT PUBLIC HEARING STAFF REPORT To: Planning Commission Meeting date: June 8, 2016 Item: UN-31-16 Prepared by: Marc Jordan GENERAL INFORMATION:
More information# 5 ) UN THREE CUPS YARD NORTH AMERICA CULTIVATION FACILITY SPECIAL USE PERMIT PUBLIC HEARING
# 5 ) UN-74-16 THREE CUPS YARD NORTH AMERICA CULTIVATION FACILITY SPECIAL USE PERMIT PUBLIC HEARING STAFF REPORT To: Planning Commission Meeting date: November 9, 2016 Item: UN-74-16 Prepared by: Marc
More information#4) UN NUVEDA - CULTIVATION SPECIAL USE PERMIT PUBLIC HEARING
#4) UN-60-16 NUVEDA - CULTIVATION SPECIAL USE PERMIT PUBLIC HEARING STAFF REPORT To: Planning Commission Meeting date: September 14, 2016 Item: UN-60-16 Prepared by: Robert Eastman GENERAL INFORMATION:
More informationSTAFF REPORT. To: Planning Commission Meeting date: April 13, 2016 Item: UN Prepared by: Marc Jordan. Dion Co (Coex Import Export Corp)
# 12 ) UN-25-16 COEX IMPORT EXPORT CORP SPECIAL USE PERMIT INDOOR RECYCLING CENTER PUBLIC HEARING STAFF REPORT To: Planning Commission Meeting date: April 13, 2016 Item: UN-25-16 Prepared by: Marc Jordan
More informationSTAFF REPORT. To: Planning Commission Meeting date: December 14, 2016 Item: UN Prepared by: Robert Eastman. To allow a vehicle impound yard
# 6 ) UN-79-16 ABC TOWING, TITAN TOWING, AND TOW GUY TOWING SPECIAL USE PERMIT PUBLIC HEARING STAFF REPORT To: Planning Commission Meeting date: December 14, 2016 Item: UN-79-16 Prepared by: Robert Eastman
More information# 7 ) UN MY PLACE HOTEL SPECIAL USE PERMIT PUBLIC HEARING
# 7 ) UN-53-16 MY PLACE HOTEL SPECIAL USE PERMIT PUBLIC HEARING STAFF REPORT To: Planning Commission Meeting date: September 14, 2016 Item: UN-53-16 Prepared by: Marc Jordan GENERAL INFORMATION: Applicant:
More informationSTAFF REPORT. To: Planning Commission Meeting date: February 10, 2016 Item: UN Prepared by: Marc Jordan
# 14 ) UN-10-16 QUICK N CLEAN SPECIAL USE PERMIT VEHICLE WASHING ESTABLISHMENT PUBLIC HEARING STAFF REPORT To: Planning Commission Meeting date: February 10, 2016 Item: UN-10-16 Prepared by: Marc Jordan
More informationSTAFF REPORT. To: Planning Commission Meeting date: August 10, 2016 Item: UN Prepared by: Robert Eastman
#3) UN-50-16 GSCP HOLDINGS NEVADA SPECIAL USE PERMIT PUBLIC HEARING STAFF REPORT To: Planning Commission Meeting date: August 10, 2016 Item: UN-50-16 Prepared by: Robert Eastman GENERAL INFORMATION: Applicant:
More information#21 ) FDP Covenant Group FINAL DEVELOPMENT PLAN
STAFF REPORT #21 ) FDP-04-16 Covenant Group FINAL DEVELOPMENT PLAN To: Planning Commission Meeting date: October 12, 2016 Item: FDP-04-16 Prepared by: Robert Eastman GENERAL INFORMATION: Applicant: Owner:
More information# 14 ) ZN AMERICAN DIALYSIS CENTER OF NORTH LAS VEGAS M-2, GENERAL INDUSTRIAL DISTRICT TO M-1, BUSINESS PARK INDUSTRIAL DISTRICT PUBLIC HEARING
# 14 ) ZN-10-16 AMERICAN DIALYSIS CENTER OF NORTH LAS VEGAS M-2, GENERAL INDUSTRIAL DISTRICT TO M-1, BUSINESS PARK INDUSTRIAL DISTRICT PUBLIC HEARING STAFF REPORT To: Planning Commission Meeting date:
More informationCITY OF NORTH LAS VEGAS REGULAR REDEVELOPMENT AGENCY MEETING MINUTES
CITY OF NORTH LAS VEGAS REGULAR REDEVELOPMENT AGENCY MEETING MINUTES February 4, 2009 Website - http://www.cityofnorthlasvegas.com CHAIRMAN ROBERT L. ELIASON VICE CHAIRWOMAN SHARI BUCK CALL TO ORDER 5:32
More informationSTAFF REPORT FOR PLANNING COMMISSION MEETING OF MARCH 28, 2018 FILE NO: SUP AGENDA ITEM: E.2
STAFF REPORT FOR PLANNING COMMISSION MEETING OF MARCH 28, 2018 FILE NO: SUP-18-022 AGENDA ITEM: E.2 STAFF CONTACT: Kathe Green, Assistant Planner AGENDA TITLE: For Possible Action: To consider a request
More informationSec Development Standards in P-N-T Districts.
Sec. 4-9. Development Standards in P-N-T Districts. a. Intent: The purpose of this district is to recognize predominately residential areas which: (1) Front along major or secondary arterial streets, (2)
More informationPLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015
PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015 NAME SUBDIVISION NAME CC Williams Plant Subdivision CC Williams Plant Subdivision LOCATION CITY COUNCIL DISTRICT
More informationRequest Conditional Use Permit (Bulk Storage Yard) Staff Recommendation Approval. Staff Planner Jimmy McNamara
Applicant Jones At 1888, LLC Property Owner City of Virginia Beach Public Hearing April 11, 2018 City Council Election District Beach Agenda Item 7 Request Conditional Use Permit (Bulk Storage Yard) Staff
More informationCommunity Development Department Council Chambers, 7:30 PM, July 20, 2017
STAFF REPORT 2017-26P: Special Use Permit Community Development Department Council Chambers, 7:30 PM, July 20, 2017 To: From: Re: Paul Luke, Chairman, Skokie Plan Commission Steve Marciani, AICP, Planning
More informationCommunity Development Department Council Chambers, 7:30 PM, September 7, 2017
STAFF REPORT 2017-30P: Special Use Permit Community Development Department Council Chambers, 7:30 PM, September 7, 2017 To: From: Re: Paul Luke, Chairman, Skokie Plan Commission Mike Voitik, Planning Technician
More informationSpecial Use Permit Application Martin Street Property
Special Use Permit Application Martin Street Property Submitted to City of Reno February 08, 2016 Prepared for PCD Asset Group 2760 Camino Diablo Walnut Creek, CA 94597 Prepared by Martin Street Property
More informationCITY OF SACRAMENTO COMMUNITY DEVELOPMENT DEPARTMENT ZONING ADMINISTRATOR 300 Richards Blvd, 3rd Floor, Sacramento, CA 95811
CITY OF SACRAMENTO COMMUNITY DEVELOPMENT DEPARTMENT ZONING ADMINISTRATOR 300 Richards Blvd, 3rd Floor, Sacramento, CA 95811 ACTION OF THE ZONING ADMINISTRATOR On Thursday, October 16, 2014, the Zoning
More informationAppearance Review Board Staff Report
Appearance Review Board Staff Report March 15, 2018 Case Number ARB2017-00020 Applicant Agenda Item 1 500 N. Orange Ave. AT&T/WSSA Building Rehabilitation and Renovation Wayne Dunkelberger, Baker Barrios
More informationArchitectural Review Board Report
Architectural Review Board Report To: From: Cc: Subject: Architectural Review Board Architectural Review Board Meeting: July 31, 2017 Agenda Item: 7.8 Russell Bunim, Associate Planner Stephanie Reich,
More informationProject Title: Major Site Review (SR16-06) for Ripon Gardens II Commercial
Planning Commission Staff Report Planning Commission Hearing November 14, 2016 Project Title: Major Site Review (SR16-06) for Ripon Gardens II Commercial Request: A request to develop a 15,996 square foot
More informationRZ-1 LEGEND FUTURE ACCESS TO ALIGN W/ EXISTING HARRIS COVE DRIVE FUTURE ACCESS TO ALIGN WITH PROPOSED ACCESS OPPOSITE COX ROAD
ZONED RU(CD) ZONED RU(CD) LEGEND FUTURE ACCESS TO ALIGN W/ EXISTING HARRIS COVE DRIVE ZONED R-9PUD ZONED R-9PUD ZONED RU(CD) ZONED R-9PUD FUTURE ACCESS TO ALIGN WITH PROPOSED ACCESS OPPOSITE COX ROAD RZ-1
More informationARTICLE 13 SITE PLAN REVIEW
Sections: 13-1 Intent 13-2 Applicability 13-3 Authority 13-4 Filing Fee 13-5 Submission Requirements 13-6 Standard of Review 13-7 Development Standards ARTICLE 13 SITE PLAN REVIEW SECTION 13-1 INTENT 13-101.
More informationTOWN OF BRUNSWICK, MAINE
TOWN OF BRUNSWICK, MAINE INCORPORATED 1739 DEPARTMENT OF PLANNING AND DEVELOPMENT 85 UNION STREET, SUITE 216 BRUNSWICK, ME 04011 ANNA M. BREINICH, FAICP PHONE: 207-725-6660 DIRECTOR OF PLANNING & DEVELOPMENT
More informationHISTORIC LANDMARK COMMISSION STAFF REPORT. Terrace Falls Sun Deck PLNHLC East 3 rd Avenue February 5, 2015
HISTORIC LANDMARK COMMISSION STAFF REPORT Applicant: Fernando Silva Staff: Katia Pace (801) 535-6354 or katia.pace@slcgov.com Tax ID: 09-31-340-039 Current Zone: RMF-35 Moderate Density Multifamily Terrace
More informationArchitectural Review Board Report
Architectural Review Board Report Architectural Review Board Meeting: December 15, 2014 Agenda Item: 7.5 To: From: Subject: Architectural Review Board Steve Traeger, Principal Urban Designer Grace Page,
More informationArchitectural Review Board Report
Architectural Review Board Report To: From: Subject: Architectural Review Board Grace Page, ARB Liaison Architectural Review Board Meeting: June 20, 2016 Agenda Item: 7.4 16ARB-0046 to approve the building
More informationArchitectural Review Board Report
Architectural Review Board Report To: From: Subject: Architectural Review Board Rathar Duong, ARB Liaison Architectural Review Board Meeting: January 23, 2017 Agenda Item: 7.11 16ARB-0605 to approve the
More informationHISTORIC LANDMARK COMMISSION STAFF REPORT. Terrace Falls Sun Deck PLNHLC & PLNHLC East 3 rd Avenue January 15, 2015
HISTORIC LANDMARK COMMISSION STAFF REPORT Terrace Falls Sun Deck PLNHLC2014-00576 & PLNHLC2014-00823 171 East 3 rd Avenue January 15, 2015 Applicant: Fernando Silva Staff: Katia Pace (801) 535-6354 or
More informationRequest Conditional Use Permit (Automobile Repair Garage) Staff Planner Jimmy McNamara
Applicant & Property Owner Public Hearing April 13, 2016 City Council Election District Rose Hall Agenda Item 5 Request Conditional Use Permit (Automobile Repair Garage) Staff Planner Jimmy McNamara Location
More information4 May 14, 2014 Public Hearing
4 May 14, 2014 Public Hearing APPLICANT: MID ATLANTIC COMMERCIAL PROPERTIES PROPERTY OWNER: 336 CEDAR ROAD LLC STAFF PLANNER: Kevin Kemp REQUEST: Conditional Use Permit (Gas Station with Convenience Store)
More informationPERMITTED USES: Within the MX Mixed Use District the following uses are permitted:
6.24 - MX - MIXED USE DISTRICT 6.24.1 INTENT: The purpose of the MX Mixed Use District is to accommodate the development of a wide-range of residential and compatible non-residential uses (including major
More informationFor Duplicate Buildings and Buildings of 60,000 Gross Square Feet or Greater
7.7.1 General Purpose and Intent For Duplicate Buildings and Buildings of 60,000 Gross Square Feet or Greater 7.7.1. General Purpose and Intent a. The purpose of this Section is to supplement development
More informationCOMMUNITY DEVELOPMENT DEPARTMENT
COMMUNITY DEVELOPMENT DEPARTMENT 333 Broadalbin Street SW, P.O. Box 490; Albany, OR 97321 STAFF REPORT Historic Review of New Construction HEARING BODY LANDMARKS ADVISORY COMMISSION HEARING DATE Wednesday,
More information5 February 12, 2014 Public Hearing APPLICANT AND PROPERTY OWNER: ERIK HOMES, L.L.C.
5 February 12, 2014 Public Hearing APPLICANT AND PROPERTY OWNER: ERIK HOMES, L.L.C. STAFF PLANNER: Kristine Gay REQUEST: Special Exception for Alternative Compliance to the Oceanfront Resort District Form-Based
More informationAll of the following must be submitted before the Planning Department can process the application:
CITY OF WEST COVINA PLANNING DEPARTMENT Instructions for Filing for a Variance All of the following must be submitted before the Planning Department can process the application: 1. Application Sheet, with
More informationBeck Street single family home rebuild Conditional Use PLNPCM North Beck Street June 26, 2013
PLANNING COMMISSION STAFF REPORT Administrative Item Beck Street single family home rebuild Conditional Use PLNPCM2013-00222 1653 North Beck Street June 26, 2013 Planning and Zoning Division Department
More informationRequests Conditional Use Permit (Craft Brewery & Open-Air Market) Staff Recommendation Approval. Staff Planner Jimmy McNamara
Applicant Property Owner Wong Foon Yuen & Wong Bik Yok Public Hearing January 11, 2017 City Council Election District Bayside Agenda Item 10 Requests Conditional Use Permit (Craft Brewery & Open-Air Market)
More information# Mercyhealth Hospital Project Review for Planning and Zoning Commission
#2017-38 Mercyhealth Hospital Project Review for Planning and Zoning Commission Meeting Dates: December 6, 2017 and January 3, 2018 Requests: 1. Preliminary Planned Unit Development and 2. Special Use
More informationPublic Hearing January 13, Request Conditional Use Permit (Auto Repair Garage) Staff Planner Carolyn A.K. Smith
Applicant Property Owner Holland Century Associates, LLP Public Hearing January 13, 2016 Request Conditional Use Permit (Auto Repair Garage) Staff Planner Carolyn A.K. Smith Location 3949 Holland Road
More informationCITY OF PLACERVILLE PLANNING COMMISSION STAFF REPORT
CITY OF PLACERVILLE PLANNING COMMISSION STAFF REPORT ITEM: 5.1 APPLICATION NUMBER Site Plan Review 92-05-R PUBLIC HEARING DATE September 5, 2017 BRIEF SUMMARY OF REQUEST APPLICANT/PROPERTY OWNER Applicant:
More informationCOMMUNITY DEVELOPMENT DEPARTMENT 333 Broadalbin Street SW, P.O. Box 490; Albany, OR 97321
COMMUNITY DEVELOPMENT DEPARTMENT 333 Broadalbin Street SW, P.O. Box 490; Albany, OR 97321 STAFF REPORT HEARING BODY LANDMARKS ADVISORY COMMISSION HEARING DATE Wednesday, June 6, 2018 HEARING TIME HEARING
More informationDESIGN REVIEW COMMITTEE AGENDA ITEM
DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: MARCH 15, 2017 TO: THRU: FROM: SUBJECT: Chair Fox and Members of the Design Review Committee Anna Pehoushek, Assistant Community Development Director Monique
More informationSection 7.25 REGULATION OF SOLAR FARMS AND SOLAR PANELS
Section 7.25 REGULATION OF SOLAR FARMS AND SOLAR PANELS This amendment Solar Energy is hereby added to the Montcalm Township Zoning Ordinance to state as follows: A. INTENT AND PURPOSE This section is
More informationPLANNING COMMISSION STAFF REPORT ADMINISTRATIVE ITEM
PLANNING COMMISSION STAFF REPORT ADMINISTRATIVE ITEM RONALD McDonald HOUSE PLNPCM2012-00751 Conditional Use PLNPCM2012-00751 935 East South Temple November 14, 2012 Planning Division Department of Community
More informationSMOKY RIDGE HOMEOWNERS ASSOCIATION ARCHITECTURAL CONTROL COMMITTEE (ACC) GUIDELINES EFFECTIVE DATE: April 22, 2019
SMOKY RIDGE HOMEOWNERS ASSOCIATION ARCHITECTURAL CONTROL COMMITTEE (ACC) EFFECTIVE DATE: April 22, 2019 The Process Defined 1. The completed Architectural Improvement Request Form and all supporting documentation
More information# Teckler Boulevard Self Storage Preliminary PUD Project Review for Planning and Zoning Commission
#2014-13 Teckler Boulevard Self Storage Preliminary PUD Project Review for Planning and Zoning Commission Meeting Date: March 19, 2014 and April 2, 2014 Requests: 1. Special Use Permit to allow a Preliminary
More informationEASTERN SE & 750 CHERRY SE - REQUEST FOR NEW BUILDINGS
Planning Staff Report Meeting Date: November 1, 2017 215-255 EASTERN SE & 750 CHERRY SE - REQUEST FOR NEW BUILDINGS BACKGROUND: The project in question is in regards to two new buildings previously approved
More informationSITE PLAN AND ARCHITECTURAL REVIEW APPLICATION
SITE PLAN AND ARCHITECTURAL REVIEW APPLICATION CITY OF GENEVA, NEW YORK The purpose of the site plan and architectural review process is to secure compliance with the City s Zoning Ordinance and to promote
More informationArchitectural Review Board Report
Architectural Review Board Report To: From: Subject: Architectural Review Board Rathar Duong, ARB Liaison Architectural Review Board Meeting: October 17, 2016 Agenda Item: 8.5 16ARB-0462 to approve modification
More information19 January 13, 2010 Public Hearing APPLICANT: GARY C. KIMNACH C/O BEACH AUTO
19 January 13, 2010 Public Hearing APPLICANT: GARY C. KIMNACH C/O BEACH AUTO PROPERTY OWNERS: WIILAIM D. FRIERSON, GRACE A. FRIERSON, DONALD S. CLARKE, PRICE M. CLARKE, CITY OF VIRGINIA BEACH STAFF PLANNER:
More informationPART II CODE OF ORDINANCES Chapter 114 ZONING ARTICLE II. DISTRICT REGULATIONS
DIVISION 12. CC-1, COMMERCIAL CORRIDOR DISTRICT Sec. 114-591. Scope. Sec. 114-592. Intent. Sec. 114-593. Permitted principal uses and structures. Sec. 114-594. Prohibited uses. Sec. 114-595. Permitted
More informationDEPARTMENT OF PLANNING JEFFERSON PARISH, LOUISIANA
DEPARTMENT OF PLANNING JEFFERSON PARISH, LOUISIANA DESIGN REVIEW REPORT DOCKET NO: CPZ-38-15 SUMMAR NO.: COUNCIL DISTRICT: : E. Ben Zahn, III COUNCIL AT LARGE: A: Christopher L. Roberts B: Cynthia Lee-Sheng
More informationCharter Township of Garfield Grand Traverse County
Charter Township of Garfield Grand Traverse County 3848 VETERANS DRIVE TRAVERSE CITY, MICHIGAN 49684 PH: (231) 941-1620 FAX: (231) 941-1588 SPECIAL USE PERMIT APPLICATION APPLICANT INFORMATION Name: Address:
More informationBOARD OF ZONING ADJUSTMENT STAFF REPORT Date: October 3, 2016
# 5 ZON2016-01807 BOARD OF ZONING ADJUSTMENT STAFF REPORT Date: October 3, 2016 CASE NUMBER 6058 APPLICANT NAME LOCATION VARIANCE REQUEST ZONING ORDINANCE REQUIREMENT ZONING AREA OF PROPERTY ENGINEERING
More informationApplicable Section(s) of the Land Development Code: Section (f)(4)
City of Naples Application for VARIANCE ZONING Date Received File Number Staff Reviewer Petitioner: SHEA S AT LANSDOWNE STREET LLC Address: C/O PO BOX 366069 BONITA SPRINGS, FL 34136 Telephone #: 239-825-5751Fax
More information181 State Road 415, New Smyrna Beach. Railey Harding & Allen, P.A. Barcelo Developments, Inc. Scott Ashley, AICP, Planning Manager
GROWTH AND RESOURCE MANAGEMENT DEPARTMENT PLANNING AND DEVELOPMENT SERVICES DIVISION CURRENT PLANNING ACTIVITY 123 W. Indiana Avenue, Room 202, DeLand, FL 32720 (386) 943-7059 PUBLIC HEARING: CASE NO:
More informationPhone Fax Phone Fax. Owner/Agent Signature (Agents must provide written proof of authorization) OFFICE USE ONLY
www.appleton.org APPLICATION FOR SPECIAL USE PERMIT FOR TAVERNS AND RESTAURANTS WITH ALCOHOL Community and Economic Development Department 100 N. Appleton St. PH: 920-832-6468 Appleton, WI 54911 FAX: 920-832-5994
More informationDESIGN REVIEW COMMITTEE AGENDA ITEM
DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: APRIL 20, 2016 TO: THRU: FROM: SUBJECT: Chair Fox and Members of the Design Review Committee Leslie Aranda Roseberry, Planning Manager Jennifer Le, Principal
More informationRequests Conditional Use Permit (Craft Winery & Assembly Use) Staff Recommendation Approval. Staff Planner Jimmy McNamara
Applicant Property Owner Wong Foon Yuen & Wong Bik Yok Public Hearing July 12, 2017 City Council Election District Bayside Agenda Item 12 Requests Conditional Use Permit (Craft Winery & Assembly Use) Staff
More informationPLANNING COMMISSION STAFF REPORT. RUSSON BROTHERS CONDITIONAL USE Case #PLNPCM South 200 East May 12, 2010 REQUEST STAFF RECOMMENDATION
PLANNING COMMISSION STAFF REPORT RUSSON BROTHERS CONDITIONAL USE Case #PLNPCM2010-00173 255 South 200 East May 12, 2010 Planning and Zoning Division Department of Community and Economic Development Applicant:
More information524 Arctic Court Property Development Feasibility Study
Attachment D 524 Arctic Court Property Development Feasibility Study Prepared for the Redevelopment Agency of Salt Lake City November 2015 Prepared by VODA Landscape + Planning www.vodaplan.com TABLE OF
More informationJackson County Administration Building Auditorium 67 Athens Street Jefferson, Georgia. June 22, :00 P.M.
JACKSON COUNTY PLANNING COMMISSION Minutes Jackson County Administration Building Auditorium 67 Athens Street Jefferson, Georgia June 22, 2017 6:00 P.M. Members Present Marty Clark Vice-Chairman Steve
More informationSUGGESTED GUIDELINES Design Review Board
SUGGESTED GUIDELINES Design Review Board The Suggested Design Guidelines for Downtown Holland have been created to provide direction to those seeking approval for a private improvement project falling
More informationSUGGESTED GUIDELINES Design Review Board
SUGGESTED GUIDELINES Design Review Board The Suggested Design Guidelines for Downtown Holland have been created to provide direction to those seeking approval for a private improvement project falling
More informationM E M O R A N D U M. Meeting Date: April 5, Item No. H-2. Mark Hafner, City Manager. To: David Hawkins, Planning Manager.
M E M O R A N D U M Meeting Date: April 5, 2016 Item No. H-2 To: From: Subject: Mark Hafner, City Manager David Hawkins, Planning Manager Consider a resolution approving variances to the City of Keller
More informationCHAPTER MANUFACTURED HOME PARKS
CITY OF MOSES LAKE MUNICIPAL CODE CHAPTER 18.65 MANUFACTURED HOME PARKS Sections: 18.65.010 Intent 18.65.020 Binding Site Plan 18.65.030 Permitted Uses and General Requirements 18.65.040 Manufactured Home
More informationSingle Family District
Alley Single Family District R1 4.01 Intent: The R1 Single Family District is established to protect, promote and maintain the development of single family dwellings, as well as provide for limited public
More informationTOWN CENTER BUILDING A.1 JSP 17-24
TOWN CENTER BUILDING A.1 JSP 17-24 Town Center Building A.1 JSP 17-24 Approval at the request of Novi Town Center Investor, LLC for Preliminary Site Plan and Section 9 Façade Waiver. The subject property
More informationStaff Report. Conditional Use
Staff Report PLANNING DIVISION DEPARTMENT OF COMMUNITY AND NEIGHBORHOODS To: From: Salt Lake City Administrative Hearing Officer Kelsey Lindquist kelsey.lindquist@slcgov.com (801) 535-7930 Date: August
More informationRequest Conditional Use Permit (Automobile Repair Garage) Staff Planner Jimmy McNamara
Applicant Property Owner Sarrow One, LLC Public Hearing December 14, 2016 City Council Election District Princess Anne Agenda Item 13 Request Conditional Use Permit (Automobile Repair Garage) Staff Planner
More informationDESIGN REVIEW COMMITTEE AGENDA ITEM
DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: JANUARY 18, 2012 TO: THRU: FROM: SUBJECT: Chair Cathcart and Members of the Design Review Committee Leslie Aranda Roseberry, Planning Manager Daniel Ryan,
More informationCITY OF SACRAMENTO COMMUNITY DEVELOPMENT DEPARTMENT ZONING ADMINISTRATOR 300 Richards Boulevard, 3 rd Floor, Sacramento, CA 95811
CITY OF SACRAMENTO COMMUNITY DEVELOPMENT DEPARTMENT ZONING ADMINISTRATOR 300 Richards Boulevard, 3 rd Floor, Sacramento, CA 95811 ACTION OF THE ZONING ADMINISTRATOR & Acting Design Director On March 1,
More informationUrban Planning and Land Use
Urban Planning and Land Use 701 North 7 th Street, Room 423 Phone: (913) 573-5750 Kansas City, Kansas 66101 Fax: (913) 573-5796 Email: planninginfo@wycokck.org www.wycokck.org/planning To: From: City Planning
More informationTOWN OF WINTER PARK PLANNING COMMISSION Tuesday, September 25, :00 AM. Minutes
I. The meeting was called to order at 8:00am TOWN OF WINTER PARK PLANNING COMMISSION Tuesday, September 25, 2018 8:00 AM Minutes II. III. Roll Call indicated present: Brad Holzwarth, Mike Davlin, George
More informationCity of Lafayette Staff Report Design Review Commission
City of Lafayette Staff Report Design Review Commission Meeting Date: October 24, 2016 Staff: Subject: Chris Juram, Planning Technician S09-16 Michael Radcliffe (Owner), C-1 Zoning: Request for a Master
More informationPlanning Commission Agenda Item
Planning Commission Agenda Item TO: THRU: FROM: Chair Gladson and Members of the Planning Commission Anna Pehoushek Assistant Community Development Director Monique Schwartz Assistant Planner SUBJECT PUBLIC
More informationCITY OF GRAND JUNCTION, COLORADO
CITY OF GRAND JUNCTION, COLORADO ORDINANCE NO. 4812 AN ORDINANCE AMENDING PARTS OF THE DOWNTOWN OVERLAY (TITLE 24 OF THE GRAND JUNCTION MUNICIPAL CODE) REGARDING POLICIES, STANDARDS AND GUIDELINES OF THE
More informationCorridor Commercial Traditional District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations
16.20.080 - Corridor Commercial Traditional District ( CCT ) CCT-1 Figure REFERENCE Typical Buildings in the CCT District CCT-2 Sections: 16.20.080.1 Composition of Corridor Commercial Traditional 16.20.080.2
More informationLOT GRADING. LOT GRADING REQUIREMENTS The following lot grading requirements came into effect on May 1, 2007:
LOT GRADING DEFINITION Lot grading is the reshaping or sloping of the land in such a way that surface drainage from rain runoff is directed away from the buildings and is controlled in a manner that eliminates
More informationA PPEARANCE REVIEW BOARD
ARB Staff Report A PPEARANCE REVIEW BOARD July 21, 2016 Case Number AGENDA ITEM 4 619, 621, 623 E. PINE ST. THE OLIVE TOWNHOMES ARB2016-00037 Applicant Michael Wenrich Michael Wenrich Architects Owner
More informationGUSTAVO J. CARBONELL, P.A.
June 10, 2014 Mr. Jaye Epstein Director Planning and Development Services 2600 Hollywood Blvd, Room 315 Hollywood, Florida 33022-9045 RE: Hollywood 3100, LLC 1915 Harrison St. Hollywood, FL 33020 RE: Case
More informationPLANNED UNIT DEVELOPMENT STAFF REPORT Date: September 7, 2017
PLANNED UNIT DEVELOPMENT STAFF REPORT Date: September 7, 2017 DEVELOPMENT NAME LOCATION Custom Boat Storage 3975 Demetropolis Road (East side of Demetropolis Road, 0.2± miles South of Halls Mill Road.)
More informationA. The temporary use of one on-premise portable sign provided that the portable sign Page 1 of 8 07/26/2016 ORD.821
SECTION 17.0800 SIGNS 17.0801 PURPOSE AND INTENT The intent of this Ordinance is to promote the public health, safety, and welfare by creating a framework for a comprehensive and balanced system of signs,
More informationCity of Sebastopol Planning Department
City Council Mayor Patrick Slayter Vice Mayor Neysa Hilton Michael Carnacchi Sarah Glade Gurney Una Glass City of Sebastopol Planning Department Planning Director Kenyon Webster Assistant Planner Dana
More informationArchitectural Review Board Report
Architectural Review Board Report To: From: Subject: Architectural Review Board Steve Traeger, Principal Urban Designer Grace Page, ARB Liaison Architectural Review Board Meeting: April 6, 2015 Agenda
More informationCHAPTER 15 - "M2" HEAVY INDUSTRIAL DISTRICT
CHAPTER 15 - "M2" HEAVY INDUSTRIAL DISTRICT Sec. 15-1. Regulations: The regulations set forth in this chapter or set forth elsewhere in this zoning ordinance when referred to in this chapter are the regulations
More informationCorridor Commercial Suburban District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations
16.20.090 - Corridor Commercial Suburban District ( CCS ) CCS-1 CCS-2 Figure REFERENCE Typical Buildings in the CCS District INSERT DRAWING: SITE PLAN OF A TYPICAL SUBURBAN COMMERCIAL CORRIDOR DEVELOPMENT
More informationAGENDA PLANNING COMMISSION MEETING Thursday, May 5, 2016 City Council Chambers 220 E Morris Avenue, 2 nd Floor Planning Commission Work Meeting at 6:30 p.m. 1. Discussion of Agenda Items Regular Planning
More informationMEMORANDUM. HEARING DATE: July 10, 2018 CASE NUMBER: PC Bridge Road Suite 230 Madison, WI University Ave Madison, WI 53726
MEMORANDUM TO: FROM: PREPARED BY: Plan Commission Technical Review Committee Sarah Sauer Planner DATE DISTRIBUTED: July 2, 2018 HEARING DATE: July 10, 2018 CASE NUMBER: PC18-2600 SUBJECT: SKYLINE CAPITAL,
More information(d) Metal buildings used for industrial uses are not exempt from additional landscape standards as required in Section (e).
5.22. Non-Residential and Multifamily Design Standards. 5.22-1 Applicability of Non-Residential Design Standards. All non-residential and multifamily buildings, with the exception of those described in
More informationPermitted Uses. Permitted uses in the "LI" District include: Offices (except contractors offices), office-showrooms, and office-warehouses
SECTION 14. "LI" LIMITED INDUSTRIAL DISTRICT Subsection 1. Purpose. The purpose of the Limited Industrial District is to establish and preserve areas for industrial and related uses of such a nature that
More informationADMINISTRATIVE HEARING STAFF REPORT
ADMINISTRATIVE HEARING STAFF REPORT Salt Lake City Water Treatment Facility 1365 West 2300 North CONDITIONAL USE Case #PLNPCM2013-00762 December 12, 2013 Planning and Zoning Division Department of Community
More informationEl Dorado Avenue
A t t a c h m e n t 1 F i n d i n g s a n d C o n d i t i o n s 1995-1999 El Dorado Avenue Use Permit #08-10000055 JULY 10, 2008 CEQA FINDINGS 1. The project is categorically exempt from the provisions
More informationEXHIBIT A STATEMENT OF JUSTIFICATION FOR REQUESTED ACTION
EXHIBIT A STATEMENT OF JUSTIFICATION FOR REQUESTED ACTION EXHIBIT A STATEMENT OF JUSTIFICATION FOR REQUESTED ACTION PROPOSED ANNECY GROUP, LLC DEVELOPMENT FOR ENWORK 1089 LINCOLN LAKE, VERGENNES TOWNSHIP,
More informationPLAN CHECK GUIDELINES MULTI-FAMILY/COMMERCIAL
o PUBLIC WORKS DEPARTMENT PLAN CHECK GUIDELINES MULTI-FAMILY/COMMERCIAL CIVIL ENGINEERING AND ARCHITECTURE 1. Offsite Improvements - Civil Engineering drawings may be required to show the following: Replacement
More informationREPORT TO PLANNING AND DESIGN COMMISSION City of Sacramento
REPORT TO PLANNING AND DESIGN COMMISSION City of Sacramento 915 I Street, Sacramento, 95814-2671 www.cityofsacramnto.org 9 PUBLIC HEARING November 17, 2016 To: Members of the Planning and Design Commission
More information