1 Technical Note FlexSteel Pipe Transport, Installation, and Handling Tech Note No. : TN_FlexSteel_113, Rev 0 Date : 20 February 2006 Prepared By : David Lenzer Approved By : Michael Case This technical note presents an overview of the typical packaging, handling, and installation scenarios for Wellstream s FlexSteel spoolable pipeline. 1. Introduction FlexSteel spoolable pipe (FlexSteel) is a durable and cost effective alternative to steel pipelines and other spoolable products. FlexSteel is designed to be installed on the surface, buried below grade, or submerged in compatible fluids to depths within the constraints defined on each pipe datasheet. FlexSteel is spooled onto transportation reels at the factory and typically shipped to the project site on a double drop flatbed trailer. The FlexSteel can be deployed between its connection points using a variety of methods. The most common installation methodologies are discussed herein. Once the pipe is installed, it should be pressure tested to verify it has not been damaged during installation. 2. Packaging FlexSteel pipe is packaged on 12 foot diameter steel reels as shown in Figure 2-1. These reels are approximately 8 wide and weigh up to 9.5 tons fully loaded. The empty reels weigh less than 2 tons. The pipe is spooled on the steel reels with two end fitting connectors already installed on the pipe. The pipe is pressure tested at the factory to verify the integrity of both the pipe and fittings prior to shipment. The spooling of the pipe results in one inboard (wrap closest to drum of reel) and one outboard end fitting that are tied off to the spokes of the reel. The reel and pipe are to be lifted using a spreader beam onto or off of the selected method of transportation (See Figure 2-2). The reel can also be lifted by a fork truck fitted with extended forks or a carpet rod (through center of hub) of sufficient structural integrity (See Figure 2-3 and Figure 2-4). Other means of moving the reels should be reviewed with Wellstream engineering prior to attempting to minimize the potential for damage to the reel, the flexible pipe, other equipment, or personnel. Report No.: TN_FlexSteel_113, Rev 0 Page 1 of 19
2 Figure Diameter Steel Reel Figure 2-2 Lifting with Spreader Beam Report No.: TN_FlexSteel_113, Rev 0 Page 2 of 19
3 Figure 2-3 Lifting with Fork Truck with Carpet Rod Figure 2-4 Lifting with Fork Truck with Extended Forks Report No.: TN_FlexSteel_113, Rev 0 Page 3 of 19
4 3. Transportation For most applications, the FlexSteel pipe will be transported over land by truck or trailer. Wellstream ships FlexSteel by truck to most locations throughout the US and Canada. Typical transportation equipment is shown in Figure 3-1 and Figure 3-2. Figure 3-1 Truck Transport Figure 3-2 Installation Trailer Transport Report No.: TN_FlexSteel_113, Rev 0 Page 4 of 19
5 4. Installation Methods FlexSteel may be installed as part of new construction or for rehabilitation of existing pipelines. It is anticipated that most applications for FlexSteel will include burial of the pipe some distance below grade; however, laying the pipe exposed on the surface is also acceptable as the product is designed for direct sunlight/uv exposure. The duration of this exposure is dependent on the UV stabilization package incorporated in the outer shield so please consult Wellstream for acceptable duration for your specific application. The keys to a successful installation are good communication and careful planning before arrival of the pipe/equipment/personnel. The ability to stage the pipe for proper deployment in the field is essential and is the main goal of the site evaluation that should be performed prior to the initiation of the installation campaign. Upon arrival of FlexSteel to the construction site, there will need to be a crane or specially fitted forklift that can support the 9.5 ton reels on location to unload and position them. As long as the planning is done up front to determine the location and orientation of the reels when offloaded, a crane is typically not necessary on-site during the installation. FlexSteel can be deployed using a number of different methodologies. The most common are from an installation trailer, A-frame structure, or Jack Stands. The reel may be either static as in a pull-in operation or may be driven along the route as the pipe is laid from an installation trailer or Flatbed/A-frame configuration. Some of the least invasive methods of installation include rehabilitation pull-throughs, directional drilling, and plough-in. The equipment and personnel necessary to support the installation is dependent on the specific project. In a typical pull-in scenario with the Wellstream technician and equipment on-site, the only need is for a piece of equipment (with operator) such as a front-end loader, backhoe, or dozer (side boom preferred) to pull the pipe, cradle it into position, and help maneuver installation aids (A-frames, jack stands, swaging machine, etc.). General laborers are beneficial as well (typically one required) to help with the manipulation of the installation aids and monitoring of the pipe route to minimize the potential for installation related damage. Examples of various installation methods are shown in Figure 4-1 through Figure 4-8. Report No.: TN_FlexSteel_113, Rev 0 Page 5 of 19
6 Figure 4-1 Lay Direct from Installation Trailer Figure 4-2 Deploy from Stationary Jack Stands Report No.: TN_FlexSteel_113, Rev 0 Page 6 of 19
7 Figure 4-3 Drag Into Position Figure 4-4 Pipe Layover into Ditch Report No.: TN_FlexSteel_113, Rev 0 Page 7 of 19
8 Figure 4-5 Rehabilitation Pull-Through (3 FlexSteel into 4 Steel) Figure 4-6 Rehabilitation Pull-Through (4 FlexSteel into 6 Steel) Report No.: TN_FlexSteel_113, Rev 0 Page 8 of 19
9 Figure 4-7 Plough-In Figure 4-8 Directional Drilling Report No.: TN_FlexSteel_113, Rev 0 Page 9 of 19
10 5. Installation Considerations and Aids FlexSteel can be installed using methods similar to any rigid or spoolable pipeline product. There are a wide range of installation aids that have been developed by Wellstream, clients, contractors, etc. to help facilitate various types of FlexSteel installations. This section provides a good cross-section of the types of equipment and what they are used for. With each installation scenario, selecting the proper aids is an important part of the planning process. Reel Staging and Positioning When installing from a static location it is important to keep two considerations in mind: Pay-off from the bottom of the reel. Pull at a slight angle away from the inboard end fitting. These are diagramed in Figure 5-1. Paying off from the bottom of the reel helps to reduce the tipping loads on the jack stands or A-frames. This also makes it easier to control the direction of the pipe as it is being deployed. By pulling at a slight angle away from the inboard end fitting, the pipe will naturally pull away from this fitting preventing it from becoming snagged during the deployment process. It is difficult to stop the deployment fast enough to prevent damage to the pipe if it gets caught under this fitting. Careful monitoring and taking precautions to push the pipe away from this region during unspooling will prevent any problems of this type. Understanding this will help decide where to place the reels when they are taken off the truck and what orientation they should be in to facilitate the installation. Figure 5-1 FlexSteel Preferred Reel Positioning and Pay-off Report No.: TN_FlexSteel_113, Rev 0 Page 10 of 19
11 Reel Support Structures Reel support structures must be stable for deployment and strong enough to support the 9.5 ton weight of a fully loaded reel. These structures may or may not include mechanisms for lifting the reels, braking during deployment to prevent free-spooling, and/or re-spooling. The most common types of reel support structures include: Installation Trailers A-Frames/Sleds Jack Stands Installation trailers are the preferred method in that they minimize set up time and provide the safest means of handling the reels and deploying the product. The trailer can be easily relocated to various sites and allows for easy repositioning of the reel. They also allow the option of laying the pipe directly or pulling off from a stationary point. A wide variety of trailers have been developed by both Wellstream and the installation contractors. Some of the trailers are simply A-frames on wheels that can carry and deploy pipe but require a crane to load/unload. Others incorporate a means of lifting the reels into place. The most advanced trailers incorporate a means of lifting the reels and an active braking/re-spooling mechanism. Some of the various FlexSteel installation trailers are shown in Figure 5-2. Figure 5-2 Installation Trailers A-Frames are another very stable means of installing the FlexSteel products. These tend to be continuous frames that the reels are set on. They can be mounted on a truck with Report No.: TN_FlexSteel_113, Rev 0 Page 11 of 19
12 the reels and taken to site allowing the pipe to be deployed directly from the A-frame on the back of the flatbed. Alternatively they can be lifted with the reel and placed in the proper configuration for a later pull-in. The A-Frames can be moved around to the reel locations and loaded on site for installation. Like trailers, some A-frames incorporate lifting and active braking/re-spooling mechanisms. Figure 5-3 shows some of the various A- Frame structures used for deploying FlexSteel on location. Figure 5-3 A-Frames Jack Stands are the most portable of the reel support structures. Relative to trailers and A-Frames, they can be moved easily to new locations. Jack stands require a stable footing and must be used with care as they can tip if overloaded or placed on uneven ground. Jack Stands are shown in Figure 5-4. Regardless of the type of system used, it is important that precautions be taken to assure the support structure remains stable. It is also necessary to assure some means of braking is available to avoid free-spooling of the reel which can lead to excess slack in the pipe and possible cross-over looping that can result in damage when pulled. Braking mechanisms can be built into support structure or as a separate device. As a last resort, two people can maintain tension on the pipe by holding back the reel at the spokes or using a 2x4 as a lever under the rim of the reel. These latter methods do not provide the uniformity of a true braking system and can be hazardous if care is not taken due to the momentum of the reel when turning. Report No.: TN_FlexSteel_113, Rev 0 Page 12 of 19
13 Figure 5-4 Jack Stands Report No.: TN_FlexSteel_113, Rev 0 Page 13 of 19
14 Pull Heads Various pull heads can be used to help pull the pipe into position. The pipe is delivered with shipping heads that have an eye bolt installed providing a limited amount of capacity for maneuvering the pipe into position. In many cases this is all that is necessary. However, in situations where the tension load on the pipe will be significant (more than about 2 tons), or where the load line is not directly in line with the pipe, an installation pull head should be used. These can be as simple as a padeye welded to a blind flange, or can be a full cover designed to protect the flange and end fitting from scrapes and impacts during installation. There are also specialized pull heads designed for pull-through operations where the standard ANSI flange is too large. Examples of some of the pullhead arrangements are shown in Figure 5-5. Figure 5-5 Pull Heads Report No.: TN_FlexSteel_113, Rev 0 Page 14 of 19
15 Choke Straps FlexSteel pipe can also be maneuvered using choke straps. While the loading here cannot be as high as using a pull head as it can damage the pipe if overloaded, it is a useful means of grabbing the pipe to pull into position. These straps can either be applied directly to the pipe or immediately behind the end fitting. When applied behind the end fitting, it is important to make sure that the loading does not result in bending where the pipe and end fitting meet to avoid forming a kink in the pipe that would need to be cut out. For straps directly on the pipe itself, since the polyethylene shield has a low friction coefficient, it is sometimes necessary to use duct tape or equivalent to get the strap to grab. Wellstream recommends a minimum of a 3 wide strap and 3 or more wraps to help distribute the load. Careful monitoring to assure the pipe is not necking down in the area of the strap will help assure no damage to the structure. Various strap configurations are shown in Figure 5-6. Figure 5-6 Choke Straps Report No.: TN_FlexSteel_113, Rev 0 Page 15 of 19
16 Installation Guides During the installation it is beneficial to have guides in place to help with the deployment of the pipe. These are used for making corners, routing around obstacles, etc. In general, the higher the tension load, the more guides are needed. FlexSteel is rated with a minimum bend radius (stated on data sheet and stamped on the pipe) which should not be violated for any reason as it may result in damage to the pipe. Ideally, a guide which meets or exceeds the minimum bend radius is used to assure this is not violated. However, this is usually not practical in the field. In the field, trees, dirt/gravel, vehicles, straps, and snatch blocks are more readily available and can be utilized for this purpose. Examples of various means of guiding the FlexSteel product around corners and obstacles are shown in Figure 5-7. Figure 5-7 FlexSteel installation guides Report No.: TN_FlexSteel_113, Rev 0 Page 16 of 19
17 Rehabilitation FlexSteel is an ideal candidate for pipe rehabilitation due to the ability to provide a quick, full structural repair (See Figure 4-5 and Figure 4-6). The 3 product will fit in a standard 4 steel line and the 4 can be installed in a 6 steel pipe. FlexSteel may also be installed in place of deteriorated pipes of the same or similar size using pipe bursting or pipe splitting techniques. Single pulls of up to 2km, including several sweeps, have been successfully completed. The primary limitation is the length of wire line that can be pushed through the pipeline to pull the FlexSteel into place. Longer pipelines can be installed in several segments with conveniently located bell holes at intervals within the capacity of the wire line equipment. 6. End Terminations FlexSteel pipe is typically shipped with ANSI 600 end fittings attached to each end. The pipe is fully hydro tested in the factory (1.3 x maximum operating pressure) to assure structural integrity. The end fittings are constructed of a grade of 316 stainless steel rated for extreme cold service. The flange is carbon steel and due to the lap flange arrangement is easily rotated to align the bolt holes at a given connection. A 316 stainless steel spiral wound gasket is recommended to assure no leakage problems. The end flange can be cut off to provide a low profile welded connection if desired. Typical end fitting connections are shown in Figure 6-1. Figure 6-1 FlexSteel end fitting configurations The end fittings are attached to the pipe using a double swage process. This process first expands the inside of the fitting (stem) to minimize any internal diametric deviations at the Report No.: TN_FlexSteel_113, Rev 0 Page 17 of 19
18 fitting. The external sleeve (ferrule) is then swaged down to develop the clamping force and fluid seal that ensures performance over the life of the pipeline (See Figure 6-2). End fittings can be installed on location using Wellstream s field swaging unit as shown in Figure 6-3. It is easiest to perform this installation with the swaging machine suspended from straps as this allows the machine to be tilted slightly and maneuvered easily making alignment with the pipe much easier. Swaging Process Interior Swage with Dolly Exterior Swage with Die Figure 6-2 End Fitting Swaging Process Figure 6-3 End Termination with Field Swaging Machine Report No.: TN_FlexSteel_113, Rev 0 Page 18 of 19
19 7. Gas Venting Permeated gasses are a consideration for all polymer piping systems carrying hydrocarbons. The rate of permeation is very small so typically this is not a problem. With single layered poly pipelines these permeated gasses dissipate directly into the atmosphere or ground surrounding the pipe. FlexSteel is a multi-layered product with an annular region between the inner and outer polymer sheaths where the steel reinforcement is. The construction is such that it allows the operator to control where these permeated gasses are transferred to. It is important that a path be provided to avoid pressurization of the wall of the pipe which can cause ballooning of the external sheath or collapse of the internal liner if the line is depressurized rapidly. Wellstream uses a proven technology of venting this internal layer through the end fittings. Jumper hoses at each end fitting connection allow this vent to be conveniently located at any point along the length of the line (Reference Figure 6-1). The gasses can either be re-injected into the gas stream, passed through to the low pressure side of a separator, flared, bottled, or even vented off in a safe manner. Wellstream can provide low pressure vent valves that will allow the gas to vent at a safe pressure directly from the end fitting. 8. Conclusion Wellstream s FlexSteel flexible steel pipe is a cost effective alternative to steel and other spoolable pipelines. It is suitable for a wide range of applications including gas and oil gathering, injection and flowlines, effluent disposal, etc. Installation may be accomplished by any of the methods normally used for installing other pipe products. Simple installation aids make the deployment process easy using readily available equipment. The product is durable, easy to handle, can be installed quickly, and will provide many years of maintenance free service eliminating the need for chemical treatments and cathodic protection systems. The product is suitable for above grade, underwater, and buried applications. All of these features help support why our customers consider FlexSteel the ultimate pipeline solution. Report No.: TN_FlexSteel_113, Rev 0 Page 19 of 19
H. Underground Transmission System Design
H. Underground Transmission System Design In addition to analyzing potential routes, the Company considered several different design technologies for the proposed underground transmission supply lines,
More information4. Beam-mounted pull-out units
Beam-mounted pull-out units Beam-mounted (BM) units are mounted on the cross-beams between the pallet racking uprights. The lower frame of the pull-out unit is bolted to the beams and the upper frame slides
More informationThermoflex Tubing! Reinforced Thermoplastic Gathering, Disposal and Injection Lines! Overview and Case Studies!!! December 17, 2009!
Thermoflex Tubing! Reinforced Thermoplastic Gathering, Disposal and Injection Lines! Overview and Case Studies!!! December 17, 2009!! Why Use Thermoflex Tubing! Corrosion Resistance/ Hydrocarbon Resistance!
More informationInstallation Manual. ArchCast Bridge. 3-Sided Precast Concrete Bridge Structure
ArchCast Bridge 3-Sided Precast Concrete Bridge Structure Installation Manual Salem Location: 749 West Commercial Ave. Salem, IL 62881 (618) 548-1190 countymaterials.com Email: info@countymaterials.com
More informationDiffused Aeration Piping Equipment
1.0 General 1.1. The specifications in this section include all components of the Diffused Aeration System with the exception of the individual diffuser units. Refer to additional specification sections
More informationMulticell. Vikimatic MultiCell Conduit Systems MULTICELL
Multicell Vikimatic MultiCell Conduit Systems These guidelines should help you install MultiCell Conduit in the simplest way possible and should be read in their entirety before attempting to install the
More informationWL Plastics Corp WL111A Handling WL Plastics Reeled Pipe
HANDLING WL PLASTICS REELED PIPE 1. Scope 1.1. This document provides WL Plastics recommendations for customer handling of WL Plastics pipe that is packaged on reels and shipped by commercial carrier.
More informationWellmaster Installation Manual Edition 4
Wellmaster Installation Manual Edition 4 The Flexible Rising Main CONTENTS Please read this manual completely before attempting any installation. it is especially important to check Section 3 which lists
More informationSeptember 25, 2015 Composite Linepipe Technology. CRUG 5 th Annual Conference & Exhibition
September 25, 2015 Composite Linepipe Technology CRUG 5 th Annual Conference & Exhibition 2 Composite Linepipe Agenda Oil and Gas Pipeline Materials Linepipe Types Composite Advantages / Disadvantages
More informationSECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION
SECTION 21 05 00 COMMON WORK RESULTS FOR FIRE SUPPRESSION PART 1 - GENERAL 1.1 SUMMARY A. This section supplements all sections in this division, including pipe, fittings, valves, and connections for sprinkler
More informationfor Phoenix II-1 Human Cremation Retort
Installation Manual for Phoenix II-1 Human Cremation Retort Please Read Carefully Before Installing. Any Questions? Please Call! Failure to install properly may VOID your warranty. NOTICE: Specifications
More informationA. This section is intended to provide design guidelines for Utility Direct Buried Piping and Conduit Systems.
Date Description of Change Pages / Sections Modified ID 6/15/16 Entire document - mgl44 PART 1 - INTRODUCTION 1.1 PURPOSE A. This section is intended to provide design guidelines for Utility Direct Buried
More informationLight Duty Ramps. Loadingdocksupply.com PHONE:
Light Duty Ramps Light Duty Aluminum Dockplates Designed for use by pallet trucks, carts, and foot traffic the A & B model Aluminum Dockplate is lightweight and portable. Accomodates differentials up to
More informationMiller Collective Safety at Height Solutions EPIC ULTRA Barrier System EPIC Post-N-Barrier System EPIC Basic Barrier System
For over 65 years the Miller brand has been synonymous with personal fall protection products and services. As the global leader in safety at height solutions, Honeywell Safety Products introduces a new
More informationfor BLP 200/75 Animal Cremation Retort
Installation Manual for BLP 200/75 Animal Cremation Retort Please Read Carefully Before Installing. Any Questions? Please Call! Failure to install properly may VOID your warranty. NOTICE: Specifications
More informationHg Umbilical Installation Guide
0419-38002 Hg Umbilical Installation Guide GUIDELINES FOR THE INSTALLATION OF DEKORON UNITHERM MERCURY ANALYZER BUNDLES This bulletin provides the Field Engineer and Crafts with tips and techniques to
More informationHydraulic Excavators
Chapter 8 Hydraulic Excavators Hydraulic excavators are designed to excavate below the ground surface on which the machine rests. These machines have good mobility and are excellent for general-purpose
More informationSan Antonio Water System Standard Specifications for Construction ITEM NO. 824 SERVICE SUPPLY LINES (WATER)
San Antonio Water System Standard Specifications for Construction ITEM NO. 824 SERVICE SUPPLY LINES (WATER) 824.1 DESCRIPTION: This item shall consist of water service supply lines adjustment and installation
More informationReal lumber kilns, that just happens to be small. Installation guide for kiln-direct s Small Lumber Kiln (and small side-loaded pallet/firewood kiln)
Real lumber kilns, that just happens to be small. Installation guide for kiln-direct s Small Lumber Kiln (and small side-loaded pallet/firewood kiln) Dear Sir. October 2008 Thank you for choosing our small
More informationSECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE)
SECTION 02623 HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) PART 1 - GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required and install high density
More informationSlings, Rigging and Lifting Equipment
A printed or saved copy is an UNCONTROLLED copy. Check that it is the latest available version before use. Title: Number: SLINGS, RIGGING AND LIFTING EQUIPMENT CSBP-GM-11-038-02 Version Number: 14.0.0
More informationUNIVERSITY OF MISSOURI Hydronic Energy Distribution 2016 Q1
GENERAL: The scope of this document is to provide instruction for the installation and testing of chilled water piping installed for the University of Missouri. DESIGN GUIDELINES: 1. Materials 1.1. Pipe
More informationCOST AND PERFORMANCE BENEFITS OF DUAL LAMINATE PIPE OVER LINED STEEL
COST AND PERFORMANCE BENEFITS OF DUAL LAMINATE PIPE OVER LINED STEEL Kira Townsend Sales and Business Development Manager RPS Composites Inc. Mobile, AL Prepared for Clearwater 2016 40 th Annual International
More informationSimulsat-5B Installation Planning Guide
Matt Cousins 9Oct13 1 of 8 Simulsat-5B Installation Planning Guide With any major project, planning is paramount to ensure that the project moves forward and all concerned are aware of all aspects that
More information(01) Thermo Bond Buildings Military Service Shelter: DOG KENNEL OPERATING AND SETUP MANUAL MSS-RP-1-20P
Thermo Bond Buildings Military Service Shelter: DOG KENNEL OPERATING AND SETUP MANUAL MSS-RP-1-20P Tool-free assembly Portable Durable Climate-controlled Warnings & Safety Quick overview Assembly Maintenance
More informationITEM NO. 824 SERVICE SUPPLY LINES (WATER)
ITEM NO. 824 SERVICE SUPPLY LINES (WATER) 824.1 DESCRIPTION: This item shall consist of water service supply lines installation and adjustment installed in accordance with these specifications and as directed
More informationBulk Bag Filling. Dust-free filling and weighing of Bulk Bags, Rigid Bins, Drums and IBCs
Bulk Bag Filling Dust-free filling and weighing of Bulk Bags, Rigid Bins, Drums and IBCs Bulk Bag Weigh Fillers DESIGNED FOR VERSATILITY. BUILT FOR ADAPTABILITY. Over 100 million bulk bags are sold each
More informationInstallation Quality Assurance Manual. GSE GundSeal. Geomembrane Supported Geosynthetic Clay Liner Products
GSE GundSeal Geomembrane Supported Geosynthetic Clay Liner Products Table of Contents 1.0 Introduction...1 2.0 Unloading Procedures...1 3.0 Storage...2 4.0 Subgrade Preparation...2 5.0 Deployment for Overlapped
More informationPress Release. Rehabilitation of oil pipelines with flexible high pressure pipes
Press Release July 31, 2013 Rehabilitation of oil pipelines with flexible high pressure pipes Network operators all over the world are confronted with increasingly aging pipeline infrastructure. Since
More informationCITY OF MOUNT DORA LIFT STATION CHAINLINK FENCE AND GATE SPECIFICATIONS
CITY OF MOUNT DORA LIFT STATION CHAINLINK FENCE AND GATE SPECIFICATIONS PART 1 - GENERAL 1.01 SUMMARY A. Section Includes furnishing and installing chain-link fabric fence, gate, and appurtenances. 1.02
More information- 2 - GUIDELINES FOR SAFE UNLOADING OF 20 LINED BOX CONTAINERS CONTENTS
GUIDELINES FOR SAFE UNLOADING OF 20 FOOT LINED ISO BOX CONTAINERS V1 September 2016 - 2 - CONTENTS 1: INEOS O&P CUSTOMER COMMITMENT 3 2: INEOS O&P SAFETY POLICY 4 3:TYPE OF DELIVERY 5 4:RISKS 8 4: UNLOADING
More informationDUCTILE IRON PIPES AND FITTINGS DETAILED PRODUCTS SPECIFICATIONS
DUCTILE IRON PIPES AND FITTINGS DETAILED PRODUCTS SPECIFICATIONS General All Materials shall be EN, ISO or equivalent standard and shall be supplied from approved manufacturers. According to the International
More informationINDUSTRIAL PIPE FITTINGS, LLC
Page 1 of 9 SPIROLITE MUNICIPAL AND INDUSTRIAL ODOR CONTROL PIPING Municipal wastewater treatment plants, industrial processes and composting facilities can be assured of trouble free transport of foul
More informationBore-Gard. Boreable Multi-Gard Assembly Multi-Gard Trenchless Raceway
Bore-Gard Boreable Multi-Gard Assembly............................176 Multi-Gard...177 Trenchless Raceway................................178 179 Bore-Gard Trenchless Raceway Product Overview RUS Accepted
More informationReceiving your order: Ambor Structures Container Unloading Guide
Receiving your order: Ambor Structures Container Unloading Guide Ambor Structures is happy to provide logistical support for your tower orders. Once shipping arrangements have been made, Ambor will be
More informationWATER LINE IN TUNNELS
Section 02517 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Handling, transporting, and installing water line in primary liner tunnels, including invert cleanup and blocking and water line in casings that
More informationGTT Pluto II Subsea Cryogenic Pipeline
GTT Pluto II Subsea Cryogenic Pipeline Approved by As the market is growing continuously, elements of the value chain have to adapt constantly to new needs. Some new import and export terminals have to
More informationFiberspar LinePipe TM The Leader In Spoolable Pipeline Systems. Composite Piping Systems, Development, Application, and Evaluation
Fiberspar LinePipe TM The Leader In Spoolable Pipeline Systems Composite Piping Systems, Development, Application, and Evaluation July 17 th, 2012 History of Fiberspar and Spoolable LinePipe Fiberspar
More informationGreenLock L9 Heavy Duty Retaining Wall Block (RWB) Features and advantages of the L9 retaining wall block
GreenLock L9 Heavy Duty Retaining Wall Block (RWB) Features and advantages of the L9 retaining wall block 1. The L9 RWB has the ideal weight to size ratio and is designed to build strong, heavy duty and
More information7. Allowable Fittings.
7. Allowable Fittings. a. General Requirements. 1) The fittings listed in this section are generally the allowable fittings for the design of DIP and PVC pipe. For steel pipe and fittings, see Part One,
More informationGuideline No.: G-01(201510) G-01 CRANES. Issued date: October 20,2015. China Classification Society
Guideline No.: G-01(201510) G-01 CRANES Issued date: October 20,2015 China Classification Society Foreword: This Guide is a part of CCS Rules, which contains technical requirements, inspection and testing
More informationAlthon slot channels Althon
Effectively innovative. Althon slot channels - the solid drainage system! Althon slot channels Althon Drainage systems Althon slot channels high resilience high performance! The Althon slot channel is
More informationMODULO GEOBENT Installation Guidelines
MODULO GEOBENT Installation Guidelines SUBGRADE PREPARATION The relative thinness of GCLs requires that more attention be given to subgrade preparation than should be given during the construction of a
More informationBulk Bag Filling. Dust-free filling and weighing of Bulk Bags, Rigid Bins, Drums, and Gaylords
Bulk Bag Filling Dust-free filling and weighing of Bulk Bags, Rigid Bins, Drums, and Gaylords Bulk Bag Weigh Fillers DESIGNED FOR VERSATILITY. BUILT FOR ADAPTABILITY. Over 100 million bulk bags are sold
More informationMAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT EXIT 44 SOUTHBOUND ON RAMP IMPROVEMENTS MILE 44.3
MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT 2018.03 EXIT 44 SOUTHBOUND ON RAMP IMPROVEMENTS MILE 44.3 The following changes are made to the Proposal, Specifications, and Plans. PROPOSAL Proposal Sheets
More informationLoading Arm Installation, Maintenance & Safety Manual
Loading Arm Installation, Maintenance & Safety Manual Version Loading Arm Hot Line: 1-800-547-9393 Dear OPW Customer: Thank you for selecting OPW Engineered Systems, Inc. ("OPW"), and giving us the opportunity
More informationHDPE Conduit Specification 2011
General This specification covers the minimum requirements for HDPE conduit and is based on ASTM F 2160. HDPE Conduit is for use primarily in underground applications as conduit, innerduct, direct buried
More informationUnloading Handling Storage
structurlam.com version 5.0, March 2017 INTRODUCTION What is CrossLam? CrossLam or otherwise known as Cross Laminated Timber (CLT) panels are produced from dried SPF lumber which are stacked together at
More informationLarge cable sizes stronger than pipe/strut
Legrand Seismic Wire Rope/Cable Bracing is the recommended seismic bracing for Legrand wire mesh and ladder tray systems. It is UL Listed, complies with all building codes and standards, and offers significant
More information5.0 NUDURA PRODUCTS ON SITE STORAGE PACKAGING, UNIT ASSEMBLY, USAGE
5.0 NUDURA PRODUCTS ON SITE STORAGE PACKAGING, UNIT ASSEMBLY, USAGE NUDURA Inc. has one of the most complete lineups of products and accessories available today in the construction industry. NUDURA s Integrated
More informationInstruction Manual. Modular Attenuator Assembly
Instruction Manual Modular Attenuator Assembly Version: 02 Date of issue: 28 th October 2015 Contents 1.0 Introduction Page 3 2.0 Safety... Page 4 3.0 Delivery and Receipt of Equipment. Page 5 4.0 Preparing
More informationSection WATER LINE IN TUNNELS
PART 1 GENERAL 1.01 SUMMARY Section 02517 This Section includes handling, transporting, and installing water line in primary liner tunnels, including invert cleanup and blocking and water line in casings
More informationBy Gorbel Inc. The Best in the Business is Better Than Ever!
By Gorbel Inc. The Best in the Business is Better Than Ever! Cleveland Tramrail by Gorbel: A Name Built on Quality Since 1977, Gorbel Inc. has specialized in overhead material handling solutions, providing
More informationSTANDARD SPECIFICATIONS SECTION JACKED CASING
STANDARD SPECIFICATIONS SECTION 02315 JACKED CASING PART 1 - GENERAL A. Description Tunneling method by jacked casing, directional drilling, or a tunnel boring machine, for highway, railroad, creek, and
More informationSPECIAL SPECIFICATION 6623 Multi-Duct Conduit System
2004 Specifications Houston District SPECIAL SPECIFICATION 6623 Multi-Duct Conduit System 1. Description. Furnish and place a Multi-Duct Conduit (MDC) system that is suitable for installation in an outdoor
More informationPlanning, Ordering, and Installing FRP Trail Bridges In the Forest Service, the recreation program has the
In the Forest Service, the recreation program has the responsibility for planning and conducting environmental analyses for trail bridges. The forest engineer is responsible for ensuring that a site survey
More informationNorth End and South End Section Hauled Wastewater Receiving Facilities Page 1 Bid Opportunity No
Hauled Wastewater Receiving Facilities Page 1 Part 1 General 1.1 SECTION INCLUDES.1 Materials and installation for sewage force mains. 1.2 RELATED SECTIONS.1 CW 2110 Watermains and all specifications referenced
More informationUnderground System. Description
Description Insapipe is a factory fabricated and insulated Underground piping system designed for direct burial into an unlined trench. The product is manufactured generally to British Standard 4508 for
More informationMUSC Psychiatric Hospital CRI Air-Cooled Chiller Replacement Project
MUSC Psychiatric Hospital CRI Air-Cooled Chiller Replacement Project H51-9832-FW-A ADDENDUM NO. 01 The following items shall take precedence over the drawings and specifications for the above named project
More informationITEM 555 CHAIN LINK FENCING
ITEM 555 AFTER MARCH 1, 2012 CHAIN LINK FENCING 555.1 Description. This item shall govern for furnishing the quantities of chain link fencing and gates as shown on the plans, including all posts, bracing
More informationCONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 602 MARCH 1993 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER 602.01 SCOPE 602.02 REFERENCES 602.05 MATERIALS TABLE OF CONTENTS
More informationInstallation Instructions
Installation Instructions Flue Gas System Basic Kit GA-K - Chimney Flue Gas System for GB125 Oil Condensing Boiler For trained and certified installers Please read carefully prior to installation. 6 720
More informationSteel Forming System BROCHURE. A durable, all-steel forming system that is ideal for pier caps and self-spanning applications.
Max-A-Form Steel Forming System BROCHURE A durable, all-steel forming system that is ideal for pier caps and self-spanning applications. Max-A-Form System Design The Max-A-Form Forming System combines
More informationPort Machinery Container cranes:
Port Machinery Container cranes: Container cranes are used to lift containers on and off ships by using a long horizontal arm called a boom that is part of the crane which can reach over the container
More informationSECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING
SECTION 23 05 16 EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING PART 1 - GENERAL 1.1 SUMMARY A. Section includes flexible pipe connectors, expansion joints and compensators, pipe loops, offsets, and swing
More informationBorehole Pumps Best Practises
Borehole Pumps Best Practises When it has been identified that water should be abstracted for any reasons a Scope of Work should be developed. 1. Essential Steps when determining Scope. - Determine the
More informationV-Squared Post System Temporary Site Security System Frequently Asked Questions (FAQs)
V-Squared Post System Temporary Site Security System Frequently Asked Questions (FAQs) OVERVIEW Depending on the market there seem to be three different approaches to the rental fence business. First,
More informationThis section includes materials and installation of ductile-iron pipe and fittings for potable and recycled water systems.
NORTH MARIN WATER DISTRICT STANDARD SPECIFICATIONS SECTION 15056 DUCTILE-IRON PIPE AND FITTINGS PART 1 GENERAL 1.01 DESCRIPTION This section includes materials and installation of ductile-iron pipe and
More informationSite Preparation... 2
TRUFIREWALLS INSTALLATION MANUAL This Installation Manual is intended to assist in the preparation and installation of TruFireWalls products manufactured by Oldcastle Enclosure Solutions. The TruFireWalls
More informationPIPE BURSTING SUCCESS
GRUNDOCRACK PNEUMATIC PIPE BURSTING SYSTEM PIPE BURSTING SUCCESS STARTS HERE TT Technologies is the world leader in pipe bursting equipment and experience. For over 20 years contractors have relied upon
More informationBulk Bag Unloader Installation, Operation and Maintenance Manual
Web-Tech Australia Pty Ltd Bulk Bag Unloader Installation, Operation and Maintenance Manual Web-Tech Australia Pty Ltd Manufacturers & Suppliers of Weighing, Level & Batching Equipment 11 Electronics Street
More informationRIGGING INFORMATION & INSTRUCTIONS SEASONS-4 RES PRODUCTS
RIGGING INFORMATION & INSTRUCTIONS SEASONS-4 RES PRODUCTS NOTE: PLEASE REVIEW THE FOLLOWING INSTRUCTIONS CAREFULLY BEFORE RIGGING OF ANY UNIT. Seasons-4 manufactures RES Series roof mounted HVAC units
More informationKelley HULK Dock Lifts and Ergonomic Lift Tables
Kelley HULK Dock Lifts and Ergonomic Lift Tables Kelley HULK Lift Products help increase productivity and employee safety with innovative, cost effective solutions to the unique challenges associated with
More informationSan Antonio Water System Standard Specifications for Construction ITEM NO. 813 WATER SERVICE FOR FIRELINES
ITEM NO. 813 WATER SERVICE FOR FIRELINES 813.1 DESCRIPTION: This item shall consist of water service for fire line installations in accordance with these specifications and as directed by the Engineer.
More informationSOUNDGUARD INSTALLATION MANUAL
SOUNDGUARD INSTALLATION MANUAL WWW.ROOFSCREEN.COM 831 421 9230 Introduction... 2 This manual... 2 Application... 2 System Overview... 2 Components... 2 Face Panels... 3 Insulation... 3 Perforated Liner
More informationLifting Gear Hire Corporation
187,500 lbs. Capacity Air Skate System Air Float - AF01036-6KIT Air Bearing Skids These air bearing skids let you move loads from 2,400 to 52,500 lbs per skid easily and safely. Look over the specifications
More information210 Series UL Listed Modular Vault Panel Installation Procedures January 15, 2009
210 Series UL Listed Modular Vault Panel Installation Procedures January 15, 2009 Model 210, UL Class M Model 211, UL Class 1 Model 212, UL Class 2 Model 213, UL Class 3 CAUTION EXTREMELY HEAVY THIS PRODUCT
More informationSECTION HANGERS AND SUPPORTS FOR PLUMBING
SECTION 22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationSMACNA-01Accepted Industry Practice for Industrial Duct Construction. A. Duct work sizes on drawings state inside clear dimensions.
15XXX - 1 Section 15XXX : CORROSIVE EXHAUST DUCT WORK PART 1GENERAL 1.1 REFERENCES SMACNA-01Accepted Industry Practice for Industrial Duct Construction SMACNA-06HVAC Duct Construction Standards SMACNARound
More informationPENTALIFT ELEVATING DOCKS
PRODUCT INFORMATION PENTALIFT ELEVATING DOCKS 2946 Larimer St. Denver, CO 80205 303-295-1100 / 800-373-7693 FAX 303-295-2464 Email info@snyderequipment.com www.snyderequipment.com Could This Happen At
More information7 2 i n. x 9 i n. Tr i - Fo l d R a m p s OWNER S MANUAL
7 2 i n. x 9 i n. Tr i - Fo l d R a m p s OWNER S MANUAL WARNING: Read carefully and understand all ASSEMBLY AND OPERATION INSTRUCTIONS before operating. Failure to follow the safety rules and other basic
More informationBulletin No. 621L, Page 2 Installation Considerations SOCKETFAST resin has not been tested with stainless steel wire rope. Give particular attention t
Installation Guidelines Technical Bulletin # 621L Product Description SOCKETFAST is a safe, convenient, pourable resin socketing system for all types of wire rope including galvanized wire rope. Socketfast
More informationInterior Hangers. Application
Application Interior bridge deck hangers are typically fabricated using two heavy duty sheet metal end clips that have been electrically resistance welded to an appropriate sized wire or formed metal connecting
More informationHT-406 Specification Guide
2.101 Part 1 - General Pre-insulated HDPE-Jacketed Steel Piping Systems suitable for Steam, Condensate Return, and High Temperature Heating Water. 1.1 Pre-insulated Piping - Furnish a complete HDPE jacketed
More informationINVITATION TO BID B I D F O R M. Please submit bid on or before 1:15 pm 101 North Halagueno Street May 30, 2014, at the office of the
BID NO.: 2014-37 INVITATION TO BID B I D F O R M Refuse Containers, Roll-Out Refuse Containers, Lids, Lid Assemblies, Front & Rear Replacement Lids, Piano and Loop Hinges City of Carlsbad Please submit
More informationWithout Compromise. CRP Spikies Earth Continuity Rings To Suit ASME Class 150 Piping Systems
Providing Complete Fluid Handling Solutions Without Compromise CRP Spikies Earth Continuity Rings To Suit ASME Class 150 Piping Systems Preventing Static Electricity build up in PTFE Lined Piping Systems
More informationCAMON C500 STUMP GRINDER IMPORTANT PLEASE READ CAREFULLY
CAMON C500 STUMP GRINDER IMPORTANT PLEASE READ CAREFULLY OPERATOR MANUAL Teknol House, Victoria Road, Burgess Hill RH15 9LH T: 01444 247689 F: 01444 871612 I: www.tracmaster.co.uk OPERATION Operation Before
More information310 Sterling Industrial Road Brunswick GA USA Fax
310 Sterling Industrial Road Brunswick GA 31525 USA 912-264 264-1804 912-264 264-1844 Fax www.grabber.com GT3800 Truck System TABLE OF CONTENTS Specifications and Dimensions...3 Component Inventory and
More informationHALSEY TAYLOR OWNERS MANUAL Classic TM Series Barrier-Free Water Coolers Refrigerated Fountains with Back Panel
HALSEY TAYLOR OWNERS MANUAL Classic TM Series BarrierFree Water Coolers Refrigerated Fountains with Back Panel Figure HTERQ Figure HTSRQ Figure 3 HTSERQ Figure HTESRQ Figure 3 Model HTERQ HTSRQ HTSERQ
More informationCOLLECTIVE POSITION ON SAFE REMOVAL OF TEMPORARY BRACES
COLLECTIVE POSITION ON SAFE REMOVAL OF TEMPORARY BRACES Published by the Tilt-Up Concrete Association Tilt-Up Concrete Association PO Box 204 Mount Vernon, Iowa 52314 (319) 895-6911 www.tilt-up.org COLLECTIVE
More information72IN. X 9IN. STEEL TRI-FOLD RAMPS (PAIR)
72IN. X 9IN. STEEL TRI-FOLD RAMPS (PAIR) OWNER S MANUAL WARNING: Read carefully and understand all ASSEMBLY AND OPERATION INSTRUCTIONS before operating. Failure to follow the safety rules and other basic
More informationBULK BAG FILLING SYSTEMS
QUICKPAK SERIES 330E BULK BAGGING SYSTEM Unique Pin & Ladder frame adjusts quickly and safely without tools or outside lift device. Pneumatic carriage design can be easily programmed to lift, stretch and
More informationMade in U.S.A. Moai Bike Rack Submittal Sheet. Materials: Finishes: Mount Options: Capacity: Setbacks: 2 Bikes
Submittal Sheet Materials: 1. 5 Schedule 40 Steel Pipe (1.90 OD) Finishes: Galvanized An after fabrication hot dipped galvanized finish is available. Powder Coat Our powder coat finish assures a high level
More informationh Installation Manual
h Installation Manual 1 General Information The installation of HOBAS GRP Pipes is subject to applicable standards and guidelines such as EN 1610 and ISO/ TS 10465-1. Correct installation always requires
More informationCONSTRUCTION SPECIFICATION FOR GROUNDING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 609 NOVEMBER 2001 CONSTRUCTION SPECIFICATION FOR GROUNDING TABLE OF CONTENTS 609.01 SCOPE 609.02 REFERENCES 609.03 DEFINITIONS - Not Used 609.04 DESIGN
More informationSECTION HORIZONTAL DIRECTIONAL DRILLING
SECTION 330532- HORIZONTAL DIRECTIONAL DRILLING PART 1 - GENERAL 1.1 DESCRIPTION A. Furnish all labor, materials, tools, and equipment required to install pipes below the outer perimeter prison fence using
More informationFork Mounted Spreader Bars
Fork Mounted Spreader Bars Model - MASPRX-1320 Installation and Safety Manual www.haugenattachments.com Adjustable Spreader Bars -Engineering Haugen Spreader Bar model MASPRX 1320 is designed for use on
More informationSECTION DUCTILE IRON FITTINGS. A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller.
PART 1 - GENERAL 1.1 DESCRIPTION A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller. 1.2 RELATED WORK SPECIFIED ELSEWHERE A. Section 01300 Record
More informationStormPod Arch Installation Guide
StormPod Arch Installation Guide xx Foundation Bed Preparation Use standard construction procedures for the construction of the bed for StormPod Modular Arch Systems. As with any construction project,
More informationVALLECITOS WATER DISTRICT SECTION POLYVINYL CHLORIDE (PVC) PRESSURE PIPE
PART 1 - GENERAL 1.1 DESCRIPTION A. This section designates the requirements for the manufacture and installation of polyvinyl chloride, abbreviated PVC, pressure pipe. 1.2 RELATED WORK SPECIFIED ELSEWHERE
More information