1 187,500 lbs. Capacity Air Skate System Air Float - AF KIT Air Bearing Skids These air bearing skids let you move loads from 2,400 to 52,500 lbs per skid easily and safely. Look over the specifications and packages and please contact LGH with any questions. Load Module System Steel Air Skate Specifications Model Number Capacity Per Skate Set (lbs) Dimension Per Skate (A x B x H) Mounting Holes Inlet Size NPT Minimum Lift at Maximum Capacity Flow CFM; M 3 /Min Minimum Load Area* Weight Per Set (lbs) AF KIT 187, ¾ x 37 ½ x 4 ½ - 13 on 3 ½ Ctr. 2-prong Chicago Fitting 1/ ; x 8 1,410 Steel Air Skid Packages Each load skid system includes four or six steel single bearing air skids plus an appropriate CP control package console including on/off valve, pressure regulator, flow control valves. Includes hose with quick disconnect for each skid. Does not include main supply hose. LGH provides a six-port manifold, model # CNT and 32 foot hoses. *
2 Flooring Recommendations The floor condition is an essential and integral part of any successful air film transport system. New installation or existing floor repair methods for air bearing use are generally different from those found in a typical plant or warehouse. Airfloat LLC designs, manufactures, and tests our air bearings to the floor requirements listed below. Compliance to these floor requirements will ensure that your air bearing system operates at its optimum performance levels for which it was designed. Flatness Floor flatness refers to the length and amplitude of waviness, humps, bulges, ridges, gullies, troughs or depressions. Floor undulations considered here must be non-abrupt with well rounded edges. Abrupt floor irregularities must be repaired or avoided. Ways to navigate cracks, expansion joints, holes, seams, etc. are discussed further below in this document. Airfloat air bearing equipment is engineered to operate on floors that meet the following flatness specification: Chart #1 (above) lists allowable depression deviations under various lengths of straight edges laid anywhere on the floor surface where the air bearing transportation system is intended to operate. Diagram #1 (below) illustrates the relative floor flatness of any given location in the air bearing equipment operating area.
3 Levelness The levelness of a floor does not affect the air film produced by an air bearing and therefore does not degrade its performance. Floor levelness is only considered within the context the overall control and maneuverability of the air bearing transport system. For manually operated equipment, it is recommended that the floor not exceed a slope of 1% in any 10 foot run (a total of 1/8 inch rise in any 10 feet). For power driven or assisted equipment, it is required that the floor not exceed a slope of 2% in any 10 foot run (a total of ¼ inch r ise in any 10 feet). See Diagram #2 in which A = rise and B = run. Please note that unleveled floors will allow an air bearing transport system to drift along the floor grade if a guide wheel or power drive is not provided. Surface Texture Air bearings operate with a paper thin film of air between the air bearing diaphragm and the floor. The degree of floor surface smoothness is of paramount importance. Airfloat air bearings are designed to operate on smooth, machine-troweled concrete floors, or other floor types with better or like finishes. Porosity Our equipment is designed for efficient operation on non-porous floors. Air bearings make a floating pressure seal with the floor. A porous floor wastes air through the pores of the floor surface which degrade the pressure seal. Cracks & Expansion Joints Hairline cracks are generally acceptable for air bearing use. As cracks widen, they must be filled and sealed to avoid air loss. If at all possible, expansion joints should be avoided in the path of air bearing movement. If unavoidable, the joint should be filled with a backer rod, finished with a flexible epoxy and sanded flush to blend with the rest of the floor. Projections Any floor projections such as anchor bolts, or cover plates should be finished flush with the floor surface. Blind holes with a diameter less than ¾ will work acceptably with air bearing systems, but should be filled if not used.
4 Bridge and Ramp Transitions A bridge or ramp can be used to transition from one surface to another or navigate over obstacles. Typically only light gauge sheet metal is needed to bridge seams, cover floor grating, or ramp to differing floor materials. Please note that bridge and/or ramps must be longer than the diameter of their bearing so that the bearing only transitions over one edge at a time. Its is recommended that a very slight break be placed two inches behind the leading and trailing edges of the sheet metal so to help keep the edges in uniform contact with the floor. Sheet Material Overlays Overlays are typically used in temporary rigging moves as they are the most cost effective way to achieve floor compliance over rough or porous floor surfaces. The most common materials used for overlays are sheet steel, plastic, hard tempered Masonite, and non-textured linoleum. The overlay material thickness should not exceed 1/32 to easy transition on to the overlay. When thicker overlay materials are required, they may necessitate the use of a ramp, which can be created by breaking the edge of the overlay material or by taping the leading edge with a thinner material. Overlay selection needs to consider subsurface conditions. Please consult with factory. Temporary Floor Repairs for Air Bearing Floors Temporary floor repairs are intended to be an inexpensive upgrading of a poor floor surface, to quickly render a floor suitable for air bearing traffic. Normally the following methods are intended to work well for one time or infrequent moves. The repairs will quickly deteriorate with repeated air bearing or wheeled traffic use. A. Sheet Material Overlayment Use of an overlayment material is probably the fastest way to get air film equipment over rough or porous floor surfaces. Just about any smooth sheet material will work well as an overlayment. Some materials which have been used successfully for air bearing pathway surfaces are sheet steel, plastic, hard tempered Masonite and untextured linoleum. Thinner materials less than.030 are easier for air bearings to get up on. Thicker materials may require a ramp up, which can be made by breaking the edge of the material or by making a ramp with tape or another thinner material. Thinner compliant materials such as.005 to.010 polyethylene film are not effective air bearing pathways. The air pressure causes the material to conform too well to the floor and the imperfections show through. Also the material tends to wrinkle and overlap upon itself when traversed. Compliant materials such as.015: to.030 vinyl or linoleum work well in most instances, however, they will not bridge large floor gaps. Semi-rigid materials such as sheet steel (24-18 gauge), stiffer plastics such as.040 to.060 polyethylene or polypropylene or 1/8 or thicker tempered Masonite are flexible enough to conform to rolling concrete floors and work well when bridging gaps or ramping up or down to different slab levels. Sheet metal is the most durable; however, it will normally take on a permanent set when crossed.
5 Certain plastics such as polyethylene or polypropylene will normally spring back and will only deform if the load rest bars exert high point loading when the air bearings are turned off. Masonite may break or fray if bent too sharply. If long runways require that multi-sheets be used, thicker materials should be butted together with joints taped. Thin sheets may be overlapped so that the air film equipment steps down in the direction of movement. This only helps avoid movement of the next consecutive sheet. The extra drag forces encountered in stepping up or down on a sheet are about the same. Taping of the joints help to reduce drag by providing a ramp. Any floor condition which presents a ridge causes problems for air bearings. Ridges may occur at expansion joints, floor cracks, sheet overlayments, and many other situations. When an air bearing traverses a ridge, the ridge blocks the air film lubrication to the leading or trailing edge of the air bearing causing increased drag. Therefore, if an overlayment must be used to bridge a floor joint, best operation will occur if the overlayment is at least as long as the air bearing. Then each air bearing will only have to contend with one ridge at a time. B. Tape Tape may be used to bridge floor cracks and small expansion joints and also form ramps. Thinner tapes such as 3 wide cellophane package sealing tape or a wide vinyl tape work well. Duct tape is less desirable because it tends to roll up when crossed by air bearings. After a few crossings, the tape will get pressed down into the joint. Its effectiveness lessens and it must be stripped and reapplied. C. Fillers Plastic auto body filler can be used as a good, quick, temporary floor repair material. Common sense should be used to achieve good adhesion. Body filler should be pressed into the floor depressions with a wide blade putty knife or plastic spreader and the excess scraped away. Floor pits as well as rough areas can be repaired by the same method. Once the filler has hardened, a flexible disc sander held flat to the floor will quickly smooth the surface without digging in.
Air Skates Airfloat 25,000 Lbs. to 315,000 Lbs., AF Model
Airfloat 25,000 Lbs. to 315,000 Lbs., AF Model Air Bearing Skids These air bearing skids let you move loads from 6,250 to 52,500 lbs per skid easily and safely. Look over the specifications and packages
More informationCONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS SCOPE...3 TS DEFINITIONS...3
CITY OF TORONTO TS 3.70 TRANSPORTATION SERVICES STANDARD CONSTRUCTION SPECIFICATIONS June 2001 CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS 3.70.01 SCOPE...3 TS
More informationPAVEMENT MARKINGS. Presented by: Tom Clayton Director of Training and Member Services CAPA/RMAEC
PAVEMENT MARKINGS Presented by: Tom Clayton Director of Training and Member Services CAPA/RMAEC ASPHALT SURFACES There are different types and textures of asphalt surfaces in which markings are applied.
More informationTECHNICAL SPECIFICATIONS
TECHNICAL SPECIFICATIONS ITEM 00663 TRAFFIC BUTTONS & PAVEMENT MARKERS 663.1 Description. This item shall consist of furnishing and installing traffic buttons and reflectorized pavement markers and jiggle
More informationUniversity Apartments on Brooklyn PROJECT MANUAL
Section 122100 Horizontal Louver Blinds University Apartments on Brooklyn PART 1 - GENERAL 1.1 SECTION INCLUDES A. Horizontal slat louver blinds. B. Operating hardware. 1.2 RELATED SECTIONS A. Section
More information1.2 Reference Standard: NOFMA - National Oak Flooring Manufacturers Association Grading Standards.
WOOD FLOORING GENERAL INFORMATION 1.1 This section applies to factory finished wood strip flooring. 1.2 Reference Standard: NOFMA - National Oak Flooring Manufacturers Association Grading Standards. 1.3
More informationMASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 03 - CONCRETE
SECTION 035300 - CONCRETE TOPPING PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Emery-aggregate concrete floor topping. 2. Iron-aggregate concrete floor topping. 1.2 SUBMITTALS
More informationPCC Pavement Rideability
Supplemental Technical Specification for PCC Pavement Rideability SCDOT Designation: SC-M-502 (04/16) 1. SCOPE 1.1. The Resident Construction Engineer (RCE) will evaluate Portland cement concrete (PCC)
More informationSemstone Construction Details
Semstone Construction Details SP01-94 Treatment for Expansion Joints, Control Joints, and Structural Cracks, Vertical and Horizontal, for Non-Vehicular Traffic 1. Maintain joint/crack through coating.
More information1. Decks, balconies, and sun porches 2. Walkways, ramps, and stairways 3. Patios and courtyards
SECTION 07185 TRAFFIC MEMBRANE PART 1 GENERAL 1.1 SECTION INCLUDES A. Traffic membrane, consisting of welded seam PVC waterproofing, over f following surfaces: 1. Decks, balconies, and sun porches 2. Walkways,
More informationFlexLok Adhesive Tabs for Carpet Tile
FlexLok Adhesive Tabs for Carpet Tile INSTALLATION EcoFlex ICT EcoFlex NXT 160 South Industrial Blvd. Calhoun, GA. 30701 MohawkGroup.com Technical Services Department 508 East Morris St. Dalton, GA 30721
More informationSECTION ALUMINUM HANDRAIL SYSTEMS
SECTION 05520 ALUMINUM HANDRAIL SYSTEMS PART 1 - GENERAL 1.01 SUMMARY A. Section includes aluminum handrails and railings. B. Related Work: 1. Section 03300 - Cast-in-Place Concrete C. References: 1. American
More informationSECTION MECHANICALLY STABILIZED EARTH 1.01 SUMMARY
SECTION 028300 PART 1 GENERAL 1.01 SUMMARY A. Section includes Basis of Design Mechanically Stabilized Earth System: SierraScape Mechanically Stabilized Earth (MSE) retaining wall system having high density
More informationChapter 5: Designs for Recreational Uses 5-1 Asphalt Pavements for Non-Vehicular Use 5-1 Table 5-1: Thickness Design Chart: Bikeways, Paths, Trails
5-1 Asphalt Pavements for Non-Vehicular Use 5-1 Table 5-1: Thickness Design Chart: Bikeways, Paths, Trails and Walkways 5-3 Table 5-2: Thickness Design Chart: Playgrounds 5-4 Tennis Courts 5-5 Table 5-3:
More informationCity of Regina Standard Construction Specification SECTION 2350 PLACEMENT OF ASPHALTIC CONCRETE SURFACE 1.0 GENERAL. 1.1 Scope
1.0 GENERAL 1.1 Scope 2.0 PRODUCTS 1.1.1 The work shall consist of placing asphaltic concrete to a compacted thickness conforming to the lines, grades, and cross-sections as shown on the plan or as designated
More informationPLYWOOD FLOATING FLOOR
PLYWOOD FLOATING FLOOR Read First These suggestions represent generally accepted procedures for successful installation of Enka Building Products. These instructions may be followed, modified, or rejected
More informationSECTION CURB RAMPS AND OTHER MINOR CONCRETE FACILITIES. Part 1 - General Work Included Related Requirements...
SECTION 02530 CURB RAMPS AND OTHER MINOR CONCRETE FACILITIES CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Inspection And Tests... 1 1.04 Quality Assurance...
More informationPSTC Tape Methods Criteria TENSILE ADHESION THICKNESS ELONGATION TAPE NO. DESCRIPTION PRINCIPAL USE (lbs/in) (oz/in) (mils) (%)
Page 63 7400 West Industrial Drive Forest Park, IL 60130 (708) 488-1025 (888) 500-5805 www.duracoinc.com Twin Stick Closed cell white polyolefin foam, Permanent bonding and general mounting of 128 2 double
More informationStudent Services & Classroom Addition
SECTION 093000 - TILING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationSECTION POLYPROPYLENE FABRIC WALL COVERING
PART 1 - GENERAL 1.1 DESCRIPTION: SECTION 09 72 31 POLYPROPYLENE FABRIC WALL COVERING SPEC WRITER NOTES: 1. Delete between // // if not applicable to project. Also delete any other item or paragraph not
More informationSECTION RESILIENT SHEET FLOORING
SECTION 09665 RESILIENT SHEET FLOORING PART 1 - GENERAL 1.1 DESCRIPTION A. This Section specifies the installation of sheet flooring with backing and integral cove base. 1.2 RELATED WORK A. Color and pattern:
More informationINSTALLATION INSTRUCTIONS
CLICK BAMBOO FLOORING INSTALLATION INSTRUCTIONS General The locking system is a revolutionary system for installing bamboo floors without using glue. The panels can be clicked together simply. Position
More informationINSTALLATION INFORMATION
INSTALLATION INFORMATION INTRODUCTION We have prepared the following recommendations and instructions that apply to most applications. Only factory-approved adhesives are to be used for the warranty to
More informationARTIK ART & ARCHITECTURE STAGE FLOORING ASSEMBLY SECTION STAGE FLOORING ASSEMBLY
SECTION 09 65 40 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to
More informationCounty of Sacramento Standard Construction Specifications January 1, 2008 TECHNICAL PROVISIONS
County of Sacramento Standard Construction Specifications January 1, 2008 TECHNICAL PROVISIONS SECTION 27 CURBS, GUTTERS, SIDEWALKS, AND DRAINAGE STRUCTURES 27-1 GENERAL Concrete curbs, gutters, sidewalks,
More informationASE SYSTEMS. EPOXY RESIN FLOOR Prep / REPAIR SYSTEM For Air Caster Load Moving Equipment
ASE SYSTEMS The Ergonomics & Productivity Specialists! 5611 Guhn Road Ste: A1 * Houston Texas 77040 *al@asesystems.com 713-462-3072 * fax: 713-462-3540 * www.asesystems.com The following Epoxy Resins &
More informationSection SECTION RESINOUS FLOORING PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 096723 - RESINOUS FLOORING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationKANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION OF 1990
KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION OF 1990 90P-270 Sheet 1 of 5 SECTION PAVEMENT PATCHING Page 591, Section. Delete the Section and replace with
More information***************************************************************************************************************
09330 QUARRY TILE *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 09 30 16 ***************************************************************************************************************
More informationSYNTHETIC GRASS INDOOR SURFACE SPECIFICATIONS: K9GRASS LITE
SYNTHETIC GRASS INDOOR SURFACE SPECIFICATIONS: K9GRASS LITE 1.01! DESCRIPTION OF WORK: The contractor shall provide all labor, materials, equipment and tools necessary for the complete installation of
More informationB. Polyethylene samples shall be submitted for Owner approval of color and quality.
Glass Rail ENGINEERED DASHERBOARD SPECIFICATIONS PART 1 - GENERAL 1.01 PROJECT SCOPE A. Contractor shall furnish and install one complete set of steel framed dasherboards as indicated on the drawings and
More informationASPHALT MIX DESIGNER
ASPHALT MIX DESIGNER EFFECT OF MIX DESIGN ON PERFORMANCE AND CONSTRUCTION OF HMA Module 8 Module 8 1, July 2005 8-1 QUALITY Meets or Exceeds the Expectations or Needs of the Customer Module 8 2, July 2005
More information3 in 1 Accoustical Underlay
3 in 1 Accoustical Underlay Our revolutionary SoundChoice laminate floor underlayment smoothes out little sub floor imperfections while quieting impact sound and floor to ceiling noise. Not only does it
More informationITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS
ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS 6.1 DESCRIPTION This work shall consist of constructing curbs, gutters, sidewalks, ramps, local depressions and driveways of the form and dimensions shown
More informationSECTION METAL ATHLETIC LOCKERS
SECTION 10 51 13 - METAL ATHLETIC LOCKERS PART 1 GENERAL 1.1 SECTION INCLUDES A. DESCRIPTION: Furnish and install factory-assembled Heavy-Duty MIG-Welded Metal Lockers, complete, as shown and specified
More informationInstallation Instructions
Installation Instructions I. GENERAL INFORMATION KEY CHIP-100 FLOORING is a decorative resin flooring system consisting of clear, 100% solids epoxy resin and colored vinyl chips. KEY CHIP-100 FLOORING
More informationPerry Fiberglass Products, Inc. LEADERS IN FIBERGLASS REINFORCED PLASTIC DUCT PRODUCTS
5415 VILLAGE DRIVE ROCKLEDGE, FL 32955 JOINING PROCEDURES FOR WET LAY-UP PAGE 1 JOINING PROCEDURES FOR FIBERGLASS REINFORCED PLASTIC (FRP) RESIN FABRICATORS WET LAY-UP BONDING INSTRUCTIONS Job Preparation:
More informationBelow-grade pours (such as foundations) can be done out of the chute of the concrete truck or conveyer, however using a pump is best.
Concrete Placement Below-grade pours (such as foundations) can be done out of the chute of the concrete truck or conveyer, however using a pump is best. Above-grade pours require lifting equipment. Most
More informationB. Store products in dry spaces protected from the weather, with ambient temperatures maintained between 50 and 90 deg F (10 and 32 deg C).
SECTION 09651 - RESILIENT TILE FLOORING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationpro-level Data sheet Recommended use: Materials Substrates Features
Data sheet Transition profile between floor coverings at different levels. It covers the non-glazed edge of the tile and protects it from shocks. Technical profiles for small height differences between
More informationInstallation and Maintenance Instructions VINYL FLOORING (Premium Resilient Tile (PRT) / Commercial Resilient Tile (CRT)
Installation and Maintenance Instructions VINYL FLOORING (Premium Resilient Tile (PRT) / Commercial Resilient Tile (CRT) NOTICE TO INSTALLER THIS BROCHURE CONTAINS IMPORTANT INSTALLATION, MAINTENANCE AND
More informationCONCRETE TILE PAVERS
Section 32 14 13 CONCRETE TILE PAVERS (1995 MasterFormat Section 02780) Note: This guide specification for the U.S. is for the installation of concrete tile paving units whose thickness are less than the
More informationSIDEWALK REPAIR GUIDE
SIDEWALK REPAIR GUIDE Below are examples of sidewalk deficiencies as defined by Chapter 136 of the Altoona Code of Ordinances. Included with each example is a repair suggestion. Some examples may have
More informationLow Maintenance Slabs Supports Are Needed for Long-Term Performance of Welded Wire Reinforcement In Slabs-On-Grade
TF 702-R-08 Low Maintenance Slabs Supports Are Needed for Long-Term Performance of Welded Wire Reinforcement In Slabs-On-Grade INTRODUCTION With its cost-efficiency and superior performance attributes,
More information507 SLURRY SEAL AND MICRO-SURFACING 1 of 8 CATEGORY 500 PAVING SECTION 507 SLURRY SEAL SECTION 507 SLURRY SEAL AND MICRO-SURFACING
507 SLURRY SEAL AND MICRO-SURFACING 1 of 8 CATEGORY 500 PAVING SECTION 507 SLURRY SEAL 489 DELETE: SECTION 507 SLURRY SEAL in its entirety. INSERT: The following. SECTION 507 SLURRY SEAL AND MICRO-SURFACING
More informationAPPENDIX J PROFICIENCY CHECKLISTS
APPENDIX J PROFICIENCY CHECKLISTS SPEEDY MOISTURE TEST Equipment Needed: Complete speedy kit, No. 4 sieve, speedy chart, and sample of soil. Make sure moisture tester is clean and in good working order.
More informationITEM 431 PNEUMATICALLY PLACED CONCRETE. All material shall conform to the pertinent requirements of the following items:
ITEM 431 PNEUMATICALLY PLACED CONCRETE 431.1. Description. This Item shall govern for furnishing and placing of "Pneumatically Placed Concrete" for encasement of designated structural steel members, the
More informationDO-IT-YOURSELF SELF ADHESIVE PLANK INSTALLATION
Woodland Creek Series Self-Adhesive Residential Vinyl Plank Pattern Numbers: Sku 725-6664 PLK1102 Sable Sku 725-6666 PLK1106 Gray Wolf DO-IT-YOURSELF SELF ADHESIVE PLANK INSTALLATION MATERIALS YOU MAY
More informationA-9,250 Parking Structure Resurfacing Cement Look
A-9,250 Page 1 A-9,250 Parking Structure Resurfacing Cement Look Description This specification includes the repair and resurfacing methods used when applying Americrete products over cracked, spalled,
More informationSECTION METAL ATHLETIC LOCKERS
SECTION 10 51 13 - METAL ATHLETIC LOCKERS PART 1 GENERAL 1.1 SECTION INCLUDES A. DESCRIPTION: Furnish and install factory-assembled Heavy-Duty MIG-Welded Metal Lockers, complete, as shown and specified
More informationStages and Risers. National Public SEATING Corp. Shown NPS Seated Risers
Stages and Risers Shown NPS Seated Risers SPECIFICATIONS STAGES AND RISERS Platform Constructed with a ¾" thick solid plywood core, the riser shall be surfaced with one of the following: Option 1: Carpet
More informationCONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS SCOPE...3
CITY OF TORONTO TS 3.65 TRANSPORTATION SERVICES STANDARD CONSTRUCTION SPECIFICATIONS June 2001 CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS 3.65.01 SCOPE...3 TS 3.65.02 TS 3.65.03 REFERENCES...3
More information2. Subfloor Preparation - Removal of Existing Floor Coverings
Generic Scope of Works - Forbo Sure Step and Safe Step Sheet Vinyls 1) Subfloor Preparation - New Concrete Floors 2) Subfloor Preparation Preparing Existing Concrete / Removal of Existing Floorcoverings
More informationInstallation Manual. ArchCast Bridge. 3-Sided Precast Concrete Bridge Structure
ArchCast Bridge 3-Sided Precast Concrete Bridge Structure Installation Manual Salem Location: 749 West Commercial Ave. Salem, IL 62881 (618) 548-1190 countymaterials.com Email: info@countymaterials.com
More informationSECTION PIPE AND TUBE RAILINGS
SECTION 055213- PIPE AND TUBE RAILINGS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationBush Elem. Addition & Alterations QUARRY TILE SECTION QUARRY TILE PART 1 - GENERAL
73651.01 QUARRY TILE 093016-1 1.1 RELATED DOCUMENTS: SECTION 093016 - QUARRY TILE PART 1 - GENERAL A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division
More informationSECTION ASPHALT CONCRETE PAVEMENT REPAIR
SECTION 02743 ASPHALT CONCRETE PAVEMENT REPAIR PART 1 GENERAL 1.01 SUMMARY A. Furnish labor, equipment, and material required for cutting, removing, protecting, replacing or stabilizing existing roadways,
More informationSECTION STORM DRAINAGE
SECTION 02720 STORM DRAINAGE PART 1 - GENERAL 1.01 WORK INCLUDED A. Trenching and other excavation. B. Ground water control. C. Pipe bedding. D. Installation of storm drains and appurtenances. E. Installation
More informationThe use of wood putty, wood filler and wood stain for enhancement of the flooring should be accepted as normal.
3/4 SOLID HARDWOOD STRIP AND PLANK FLOORING INSTALLATION INSTRUCTIONS FOR MECHANICALLY FASTENED, STAPLE, NAIL OR CLEAT APPLICATIONS I. GENERAL INFORMATION Owner/Installer Responsibility: Beautiful hardwood
More informationSystem Overview. Calcium Sulphate Interlock System
System Overview Calcium Sulphate Interlock System Calcium Sulphate Interlock System The SNA Series CS-IL is an access floor system that has been designed for applications where stone or tile finishes are
More informationTILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following:
PART 1 GENERAL 1.01 SUMMARY SECTION 03460 TILT-UP PRECAST CONCRETE SANDWICH PANELS A. Work includes, but is not limited to, the following: 1. Architectural precast concrete sandwich wall panels. 2. Integral
More informationSECTION POLYETHYLENE TAPE WRAPPING FOR PIPE
PART 1 -- GENERAL 1.1 THE SUMMARY SECTION 09 96 12 - A. The CONTRACTOR shall provide a prefabricated, cold-applied, multilayer polyethylene tape coating system on pipe, complete and in place, in accordance
More informationAsphalt Pavement Forensics: Understanding the Problem to Better Determine the Solution
Asphalt Pavement Forensics: Understanding the Problem to Better Determine the Solution 63 rd Annual Asphalt Paving Conference FireKeepers Casino Hotel Battle Creek, Michigan March 6-7, 2019 1 Copyright
More informationSteel Forming System BROCHURE. A durable, all-steel forming system that is ideal for pier caps and self-spanning applications.
Max-A-Form Steel Forming System BROCHURE A durable, all-steel forming system that is ideal for pier caps and self-spanning applications. Max-A-Form System Design The Max-A-Form Forming System combines
More informationRESINOUS FLOORING
PART 1 - GENERAL 1.1 RELATED DOCUMENTS Bid #2017-17 A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this
More informationKU Design Guidelines APPENDIX II PERMEABLE BITUMINOUS PAVEMENT
PERMEABLE BITUMINOUS PAVEMENT PART 1: GENERAL 1.01. RELATED DOCUMENTS: A. Drawings and general provisions of Contract, including Special Requirements General Conditions and Division 1 Specifications Sections,
More informationFloor Preparation Recommendations. Best Practices to Prepare Concrete for Polishing
Floor Preparation Recommendations Best Practices to Prepare Concrete for Polishing Polishing Basics FACT #1 Poorly finished concrete WILL result in a substandard polishing process. Finished concrete is
More informationTECHNICAL BULLETIN. Recommended Levels of Finish for Paper-Faced Gypsum Board
TECHNICAL BULLETIN Recommended Levels of Finish for Paper-Faced Gypsum Board The intent of this document is to provide clarification and assist architects, designers, specifiers, and interior contractors
More informationComforTech Cushioned Rubber Sheet Flooring
ComforTech Cushioned Rubber Sheet Flooring Installation Instructions Introduction Johnsonite ComforTech Rubber flooring features an exclusive construction that enhances thermal insulation, sound absorption,
More informationHTG Concrete Seal. Technical Specifications. Safety. HMIS (Concentrate/RTU) Availability. Directions
HTG Concrete Seal HTG(gray) Concrete Seal is a 2-part, high-solid epoxy resin formulation for extreme durability that dries gray. Use HTG to transform bare concrete or previously coated concrete floors
More informationInstallation Instructions
Please read all instructions before installing products. STORAGE: BioPrism wall cladding must be stored flat and fully supported with no sagging or bowing. The pallets that BioPrism wall cladding are shipped
More informationChapter 6 Designs for Recreational Uses
Designs for Recreational Use 6-1 Chapter 6 Designs for Recreational Uses ASPHALT PAVEMENTS FOR NON- VEHICULAR USE In addition to highways, streets, and parking lots that carry autos and trucks, many other
More informationSECTION REINFORCING STEEL
SECTION REINFORCING STEEL 1. DESCRIPTION This specification shall govern the furnishing and placing of reinforcing steel, deformed and smooth, of the size and quantity designated on the plans and in accordance
More informationSOUND REDUCER INSTALLATION MANUAL. Manufactured in the U.S.A. by: Ecore. Revised 08/28/2017 Supersedes all previous versions Check website for updates
SOUND REDUCER MANUAL Manufactured in the U.S.A. by: Ecore Revised 08/28/2017 Supersedes all previous versions Check website for updates 800-536-9007 www.centaurfloors.com 1 TABLE OF CONTENTS GENERAL INFORMATION
More informationINSTALLATION PROCEDURES FOR RUBBER FLOORING
! INSTALLATION PROCEDURES FOR RUBBER FLOORING Installation of rubber flooring will only mirror the characteristics of the existing substrate. Proper subfloor preparation is paramount to a successful installation.
More informationSECTION 8130 XR-3-PW FABRIC BAFFLE WALL SPECIFICATION
SECTION 8130 XR-3-PW FABRIC BAFFLE WALL SPECIFICATION PART 1 GENERAL 1.01 WORK INCLUDED 1.01.1 This specification covers the design, fabrication, and erection of tension-fabric baffle systems composed
More informationPOLYGUARD RD-6 A FAIL SAFE PIPELINE COATING SYSTEM FOR REHABILITATION OR GIRTH WELDS ON CATHODICALLY PROTECTED PIPELINES
POLYGUARD RD-6 A FAIL SAFE PIPELINE COATING SYSTEM FOR REHABILITATION OR GIRTH WELDS ON CATHODICALLY PROTECTED PIPELINES A large percent of corrosion failures on cathodically protected structures are associated
More informationSLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with Aqu
INSTALLATION INSTRUCTIONS Note: The following installation instructions are based off of ASTM E 1643 (Standard Practice for Installation of Water Vapor Retarders Used in Contact with Earth or Granular
More information550 Surface Treatments
Table of Contents 550 Surface Treatments... 550-1 550.1 Introduction... 550-1 551 Crack Sealing... 550-1 551.1 Project Selection... 550-1 551.2 Design Considerations... 550-1 552 Chip Sealing... 550-2
More informationArmor Plate Pipe Wrap
Armor Plate Pipe Wrap Training and Certification Course Course Elements Section 1 - Pipeline Repair Systems Section 2 - Pipeline Coating Systems Section 3 - Surface Preparation Section 4 - Required Number
More informationDRIVABLE GRASS GUIDELINE FOR DRIVABLE TURF INSTALLATION
DRIVABLE GRASS GUIDELINE FOR DRIVABLE TURF INSTALLATION Please read through this instruction completely before beginning your installation. Be sure the proper equipment, and safety precautions are in place.
More informationInstallation Instructions Vinyl Glue Down Flooring - Pro
Installation Instructions Vinyl Glue Down Flooring - Pro 1 of 5 Installation Instructions for GoHaus Vinyl Glue Down Flooring - Pro PLEASE READ BEFORE INSTALLATION Congratulations on your purchase of GoHaus
More informationAlligator Cracking. Light. Medium. High
Alligator Cracking Description: A series of interconnecting cracks caused by fatigue failure on the asphalt concrete surface under repeated traffic loading. Causes: Loads in excess of the current pavement
More informationSECTION Summit Phenolic Lockers (Solid Phenolic Lockers)
SECTION 10 51 00 Summit Phenolic Lockers (Solid Phenolic Lockers) Part 1-General 1.01 Summary A. Section includes: solid phenolic lockers solid phenolic benches 1.02 Submittals A. Submittals: Comply with
More informationSection Performance Floor Asemblies (Also Dance Floor Assemblies)
Sample Specifications for kiwifloor Studio System Section 09646 Performance Floor Asemblies (Also Dance Floor Assemblies) PART 1 GENERAL 1.1 GENERAL A. Work of this Section, as shown or specified, shall
More informationSECTION TILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following:
PART 1 GENERAL 1.01 SUMMARY SECTION 03460 TILT-UP PRECAST CONCRETE SANDWICH PANELS A. Work includes, but is not limited to, the following: 1. Architectural precast concrete sandwich wall panels. 2. Integral
More informationTECHNICAL BULLETIN TB015
TECHNICAL BULLETIN TB015 TB015.012 ARDEX Australia 2003-2017 APPLICATIONS FOR ARDEX K15M, K12N, ARDITEX NA & FEATHER FINISH OVER INTERNAL DRY TIMBER SURFACES & UNDERLAY SHEETS Date, Tuesday, 24 October
More informationADA-COMPLIANT SAFETY DEVICES PRODUCT GUIDE. SafetyRail TM Barricade SafetyWall TM Barricade BoardWalk Temporary RAMP
ADA-COMPLIANT SAFETY DEVICES PRODUCT GUIDE SafetyRail TM Barricade SafetyWall TM Barricade BoardWalk Temporary RAMP SafetyWall TM ADA-COMPLIANT PEDESTRIAN BARRICADE Ideal for creating accessible work zones.
More informationSPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013
SPECIAL PROVISIONS - SP2014 BOOK Page 1 S-1 (2104) REMOVE AND REPLACE BITUMINOUS PAVEMENT (ADA) Always include SP2014-119 (PLANT MIXED ASPHALT PAVEMENT) or SP2014-121 (PLANT MIXED ASPHALT PAVEMENT FOR
More informationSPECIAL SPECIFICATION 2042 Decorative Colored Pattern Concrete Paving
2004 Specifications CSJ 0196-02-120 SPECIAL SPECIFICATION 2042 Decorative Colored Pattern Concrete Paving 1. Description. This Item shall govern for the furnishing and placing of colored concrete wave
More informationSPECIFICATIONS: Architectural Aluminum Railings
PART ONE: GENERAL 1.1 SUMMARY SPECIFICATIONS: Architectural Aluminum Railings A. Work in this section includes custom and standard Interior and Exterior aluminum railings and guardrails. 1.2 PERFORMANCE
More informationCompliance. Safety. Durability.
Compliance. Safety. Durability. Products that install faster and last longer. MEA-Approved Photoluminescent Exit Path Markings for NYC Local Law 26 Compliance Code compliant products: engineered The BradyGlo
More informationWater Control Structures Selected Design Guidelines Alberta Environment Page 24-1
Alberta Environment Page 24-1 24.0 CONSTRUCTION CONSIDERATIONS 24.1 Care of Water Typically, the design, construction, maintenance and removal of temporary measures for the care of water during construction
More informationADA-COMPLIANT SAFETY DEVICES PRODUCT GUIDE. SafetyRail TM Barricade SafetyWall TM Barricade BoardWalk Temporary RAMP
ADA-COMPLIANT SAFETY DEVICES PRODUCT GUIDE SafetyRail TM Barricade SafetyWall TM Barricade BoardWalk Temporary RAMP SafetyWall TM ADA-COMPLIANT PEDESTRIAN BARRICADE Ideal for creating accessible work zones.
More information1. PREPARATION 2. INSTALLATION 3. FINISHING 4. MAINTENANCE
In the following text vinyl floor(s) refers to floors from the Quick-Step Livyn Ambient Glue+ and Balance Glue+ collections. The branded accessories refer to the specific Quick-Step vinyl accessories.
More informationTexline Ideal loose lay
Installation Guide Texline Ideal loose lay When installed correctly Gerflor Texline s patented construction makes it an ideal loose lay solution since it does not expand or contract with changing weather.
More informationConcrete Cloth. Geosynthetic Cementitious Composite Mat (GCCM) INSTALLATION GUIDE
Concrete Cloth Geosynthetic Cementitious Composite Mat (GCCM) INSTALLATION GUIDE Overview This document provides guidance for the installation of Milliken s Concrete Cloth material under field conditions.
More informationMega Clic Laminate Floor Installation Instructions
Mega Clic Laminate Floor Installation Instructions GENERAL Mega Clic is a revolutionary system for installing laminate floors without using glue. The planks can be clicked together simply, thanks to the
More informationSECTION CURB, COMBINATION CURB AND GUTTER, AND MONOLITHIC MEDIAN. 1. Bituminous concrete pavement; Section
02670-1 of 6 SECTION 02670 CURB, COMBINATION CURB AND GUTTER, AND 02670.01 GENERAL A. Description This work shall include, but not necessarily be limited to, the construction of concrete curb, concrete
More informationNRDCA GUIDELINE FOR APPLICATION of CEMENTITIOUS WOOD FIBER ROOF DECK SYSTEMS
NRDCA 600 - GUIDELINE FOR APPLICATION of CEMENTITIOUS WOOD FIBER ROOF DECK SYSTEMS The National Roof Deck Contractors Association (NRDCA) has prepared this document to provide, customers and installers,