Forensic Schedule Analysis and Discretionary Logic

Size: px
Start display at page:

Download "Forensic Schedule Analysis and Discretionary Logic"

Transcription

1 TECHNICAL ARTICLE Forensic Schedule Analysis and Discretionary Logic John C. Livengood Esq., CCP CFCC PSP FAACE Abstract: Forensic Schedule Analysis (FSA) and real time schedule reviews do not handle CPM schedules with significant amounts of discretionary logic very well. In the last decade, major theoretical and practical advancements have been made of which FSA methodology is most appropriate to evaluate schedule delay, largely through the introduction of AACE International s Recommended Practice 29R-03, Forensic Schedule Analysis. Nevertheless, discretionary logic, the type of logic that is not dictated by either the contract or the construction necessity of the project, continues to cause difficulty in creating fair and accurate analyses of schedules during the course of the project. Further, these analytical problems persist in the methodologies associated with post-construction FSA. This article considers several applications and refinements of existing forensic delay methodologies, particularly As-Planned vs. As-Built, which can assist in identifying the as-built critical path and delay responsibility in projects with significant amounts of discretionary logic. T he underlying premise of all Forensics Schedule Analysis (FSA) methodologies is the comparison between what was planned and what actually happened, and from that analysis an explanation of the causation for the difference. As a result of the delay and causation analysis, damages can be calculated. This underlying concept works well in most situations because most construction projects have relatively limited sequences or methods that could be used in construction. For example, in a typical building, the excavation must precede the foundation, and the erection of the steel frame must precede the installation of exterior cladding. In such projects, the required sequence of material installation is driven by the project itself and the laws of physics. However, CPM practitioners recognize that the different groups of logic relationships: contractual, mandatory, and discretionary logic, interact with the forensic analysis methods in different ways. One of these logic groups (discretionary) creates special analytical issues within the context of forensic schedule analysis. Four Major FSA Methodology Families AACE identifies nine methodologies [1] though arguments have been made for more types [2], as well as fewer [3]. This article refers to four major types of forensic schedule delay methodologies. All known schedule delay methodologies fit into these broad groupings. Because every project is different and each have different, even if just slightly different, analysis needs and underlying facts, it could be argued that every forensic schedule analysis performed is a different methodology. Since each separate analysis can, at the most granular level of detail, be distinguished from any other methodology, many analysts have insisted that their particular methodology used is different or distinguishable from other methodologies. Often, these schedule analysts assert their methodology is the best or most accurate method available [16]. Despite these nuances, there are many common characteristics that assist in identifying the four core methodological families [4]. Within each of the four major methodology groups, there are several if not dozens of variations that can be performed that might be considered separate methodologies, but in fact, have much in common. In the sections below, these major families of methodologies will be discussed and the various sub-methodologies will be identified and discussed only as relevant. As-Planned vs. As-Built [1] This methodology compares an initial planned schedule with the COST ENGINEERING MARCH/APRIL

2 as-built schedule or as-built data. This methodology can be performed in great detail or at a very summary level. It also can be performed with relatively little construction phase data. If adequate data is available, it can be a very effective and accurate portrayal of delay events on a project. It is often the fall-back methodology used by schedule analysts when other methodologies are inappropriate, or as a quality check to make more understandable one of the more complicated forensic schedule methodologies. It requires no active computer calculation and relies on the schedule s original logic. However, if based on CPM schedules, the logic of the baseline and the accuracy of the as-built must be verified. The As-Planned vs. As-Built (APAB) is the oldest of the schedule delay methodologies, predating CPM by decades [5]. It compares the original schedule with the actual completed performance and measures delays to activities between the two. This is one of the more easily understood methodologies and one of the more common. It is suitable for projects that lack detailed schedule data and it can be performed at a detailed or summary level. The methodology can be broken into time slices, but such a division may not improve its accuracy. In its most elaborate and detailed application, it can evaluate delays on a daily basis using contemporaneous records and assist in allocating responsibility for each day of delay. Its most significant drawback is that it generally does not allow for the analyst to take into account what the parties were considering during the course of the project, and thereby includes no consideration of the contemporaneous understanding of delay [6]. The As-Planned vs. As-Built methodology remains quite common despite the existence of other methodologies that are less dependent on expert interpretation. This is because the method is easily understandable and can be performed with relatively little data. Its accuracy improves as more information on actual events is included. It also remains common because it can be performed even when some of the underlying data, particularly accurate schedule updates, is unavailable. Contemporaneous Period Analysis [1] This methodology relies on schedules prepared during the course of the project. It is often known as windows analysis. The Contemporary Period Analysis (CPA) method generally identifies delays within specific time periods or windows of time [7]. This comparison is accomplished by comparing the schedule at the start of a time period with its status at the end of the time period. The methodology uses the project schedule updates to quantify the loss or gain of time along a logic path that was or became critical, and identifies the activities responsible for the critical delay or gain. This method relies on the forward-looking calculations made at the time the updates were prepared. Further, it does not involve the insertion or deletion of delays, but instead analyses the behavior of the network from update to update and measures schedule variances based on schedule logic, prepared contemporaneously with the project execution. This is in opposition to the schedule developed at the project outset, as with the As-Planned vs. As- Built methodology or reconstructed after-the-fact logic as used in Time Impact Analysis (TIA) and Collapsed As-Built (CAB) methodologies. As with the As- Planned vs. As-Built, the accuracy of the original baseline is essential. By comparing the status of the project at the beginning of the time period with the project status at the end of the time period, a period-by-period calculation of delays and impacts can be generated. Since the method uses schedules developed during the project, it is often perceived as being the best representation of how the project constructors understood the scope and timing of the work and how they planned to perform future work. Analysis using this method is often assisted by the native format schedules, but the method itself does not require changes to the schedule or other network manipulation. This methodology is generally considered one of the most reliable since the analysis is performed on CPM schedules that were developed, used, and modified during the life of the project. At the same time, if the schedule updates were not maintained on a regular basis and are inaccurate or non-existent, they cannot form a basis for a forensic schedule analysis. The accuracy of these schedule updates is often the first question the analyst must determine when deciding if this FSA methodology is the correct one for the assignment. The second, and often equally important, decision for the analyst is to determine the time-periods for use in the analysis. By combining time windows, the analyst reduces the amount of work and potentially the cost of the analysis, but at the price of less detail. Further, combining time periods can create concurrency or hide important events, including delays and subsequent accelerations. Nevertheless, this methodology, regardless of the 32 COST ENGINEERING MARCH/APRIL 2016

3 name used, is one of the most accurate of all the forensic delay methodologies available. Time Impact Analysis [1] Time Impact Analyses (TIA) are important and an incredibly useful tool for schedule analysis. Contractors would be hardpressed to identify and quantify potential schedule impacts without the prospective TIA methodology, the methodology for which the TIA was originally developed [8]. Similarly, the Retrospective TIA is widely used and is recognized by courts and commentators because of its rigorous methodology and its close relationship to the chronological sequence of events on the project [9]. Further, it has also been said that a forensic TIA is better able to identify the quantum of an alleged acceleration claim by comparing the actual performance with what would have happened without the acceleration. The accuracy of the original baseline, as well as the contemporaneous updates is essential. Like the Contemporary Period Analysis, this methodology cannot be adequately performed if the underlying data is defective. This methodology requires active use of CPM software. Schedules developed during the course of the project are modified through the addition of new or expanded activities as part of the analysis to reflect delays and impacts, and the resulting changes in the schedule are observed. A TIA methodology compares two CPM schedules with similar data: one reflecting the schedule at the start of an analysis period (such as the beginning of a month or immediately prior to an impact), and the other with an identical CPM schedule, EXCEPT for the inclusion of one or more fragnets, which reflect an actual or anticipated event not previously included in the CPM schedule. The fragnets, developed by the expert to reflect changed events on the project, add or subtract the events through inclusion (or deletion) of activities, revision of logic, and changes in activity. The comparison of the predicted completion dates of these two schedules (before and after the fragnet insertion) determines the quantum of delay reflected by the fragnet. However, Retrospective TIAs have the following problems and should therefore be carefully considered and reviewed: (1) TIAs may appear to be scientific and computer driven; however, they are subject to the similar vagaries of expert opinion as any other methodology; (2) TIAs seemingly scientific method may obscure the analyst s manipulation of the critical path through the development and use of a fragnet or fragnets; (3) TIAs require a detailed and fully functional baseline schedule and set of updates to work properly, which is a requirement that is often impossible; (4) Modifications to the baseline schedule and updates that are needed to permit TIA analysis can be so significant as to make the underlying schedules irrelevant to the plans of the contractor; and (5) The critical path generated is always a projection and may not accurately reflect the actual events on the project [10]. Since this methodology projects future events, some of perceived inaccuracy can simply reflect that the future events and impacts have not yet been realized. Collapsed As-Built [1] The Collapsed As-Built (CAB) methodology is one of the conceptually easiest to understand and hardest to implement in a reasonable and functional manner. Further, the CAB can isolate and segregate owner and/or contractor-caused delays if there is sufficient detail in the as-built schedule. The concept of deleting delay activities to show the impact is easy to understand and present, but difficult to support factually in a legal setting [17]. Because of its reliance on an accurate detailed as-built, it is closely tied to the history of actual events on the project. Finally, it is the only methodology that can be implemented without any baseline schedule or contemporaneous schedule updates. The CAB, also known as the butfor analysis, takes the project as it was actually built and subtracts impacts to show what would have happened if those impacts had not occurred. The collapsed asbuilt methodology has three basic steps. First, the expert takes the as-built schedule of a completed project and identifies the likely logical relationships between the activities and events, based on either the CPM schedules developed for the project or based on the expert s experience and knowledge. Second, the expert removes those delay or impact activities from the CPM schedule. Third, the expert recalculates the CPM schedule, to show what would have happened, but-for the delay/impact events. This methodology is sometimes criticized because the analyst creates the schedule logic as part the analysis. While such creation might be based on contemporaneous CPM schedules, the methodology is often used when no CPM schedules existed during the course of the project. Therefore, a CPM schedule is created based on the actual events, and at best, the expert s knowledge or at worst, guesswork. COST ENGINEERING MARCH/APRIL

4 Three Logic Groups CPM schedules typically have three basic types of logic that the schedule creator can use in sequencing activities as the CPM is developed. They are: Contractual Logic This logic is derived from the contract itself and is usually identified by the owner. It may mandate one section of the building being completed first or some other milestone being accomplished prior to other work being undertaken. For example, a school project may mandate that the classrooms be opened by the start of school in September, but allow the gymnasium facilities to lag until the start of winter. Such logic relationships are necessitated by the operational needs of the owner. This is sometimes considered a type of mandatory or hard logic. AACE defines this type of logic as: Clearly understood work scope allows one to define work activities and logic with precision. The opposite of soft logic [11]. But, this definition fails to distinguish between logic that is required by the laws of man (contract) or the laws of physics. So, an alternate definition of this type of logic is: Logic required by the contract and/or scope of work that mandates certain of the owner s sequence and timing requirements. This logic may be related to the physics of the construction. For example, a date is specified for when the steel must be topped out on a high rise, but may be more associated with some external objective, such as wanting to be the first building on the block over ten stories. Mandatory Logic (also known as Hard Logic ) This logic relationship is common on projects. This is the logic that requires the excavation to precede the footings, followed by the foundation, followed by the structure, and so on. While it is occasionally possible to cheat the requirements of physics (construction the building from the top down), most construction schedules are developed around the contractual and mandatory logic requirements. AACE offers the following definition for this type of relationship: [A] dependency inherent in the nature of the work being done, such as a physical limitation. Used in hard logic [11]. AACE also offers definitions of Irrefutable Logic: Network logic that is rational and compelling and cannot be disputed on the basis of reason, [6] that capture most of the meaning of this logic relationship. So, a more comprehensive definition of this type of logic is: Logic required by the physical necessity of the materials and design. This definition separates the contractual mandates discussed previously and makes the logic connection driven solely by the constraints of the construction [18]. Discretionary Logic (also known as Preferential or Soft Logic) This logic is the primary focus of this article. It is the logic that is developed when, for the particular job in question, there is no contractual or physical necessity to perform the work in a certain order. At the same time, discretionary logic recognizes that there are often valid reasons for performing the work in a certain order. For example, if the contractor is erecting the partitions and sheetrock on the fifth floor of a building under construction, there is probably no contractual or mandatory logic for erecting it from south to north rather than north to south. But there may be good reasons to perform the work in a particular way. For example, if the material lift is on the north side of the building, then a contractor s decision to build the partitions and sheetrock from the south (so he doesn t have to carry the materials past already constructed partitions) makes logical sense. Yet, he could perform the work starting at the material lift and working away from it. The disadvantage is probably a minor loss of productivity since the workers have to exercise special care moving the materials past already erected work. AACE has several definitions of this type of logic. Desirable logic: Network logic that is desirable for the contractor (but not necessarily for the client), based on some preference or advantage. Desirable logic may impose unnecessary conditions that preclude an optimum solution [11]. This is pretty close to the type of logic at issue here, but is reversed. Usually the preference will be to gain some advantage, even if there is another way to perform the work. AACE also proposes for a discretionary logic connection two variations: Dependency defined by preference, rather than necessity. These are typically employed in preferential or soft logic [11]. Preferential Logic: contractor's approach to sequencing work over and above those sequences indicated in or required by contract documents. Examples include equipment restraints, crew movements, form reuse, special logic (lead/lag) restraints, etc., factored into the progress schedule instead of disclosing the associated float times [11]. These three groupings of logic appear in virtually all schedules, but usually have little impact on forensic delay analysis, because most out-ofsequence work does not impact the critical path because of the impact of float. Recall that forensic analysis looks at, late dates, while real projects try to work off of early dates. Nevertheless, each of the delay methodologies is impacted by the degree of discretionary logic. Out-of-Sequence Work Out-of-sequence work can occur regardless of the logic group involved with the activity. For example, the contractor may install the footings and foundations and then come back and 34 COST ENGINEERING MARCH/APRIL 2016

5 excavate for utility access afterwards, despite the mandatory logic of installing the underground utilities prior to the foundation or footings. Also, the contract may require that the permanent power be installed prior to the emergency generator installation, but the contractor may decide that because of delays to the permanent power caused by the utility, it is essential to have the generators operational much earlier, so as to support the construction. Such out-ofsequence work does occur, but frequently has little impact on the critical path because of either float issues, or the de minimis nature of the out-of-sequence events. The most common type of out-of-sequence work occurs in the following three situations. First, the CPM schedule depicts a mandatory logic relationship, typically a finish-to-start, but the schedule s CPM logic does not fully reflect the true nature of the sequence of work. This usually occurs when the successor activity subject to a mandatory logic connection starts before the predecessor finishes. This is quite common. For example, the CPM calls for completion of partition erection and gypsum board finishing prior to the start of painting. This is logical because you cannot paint until the gypsum board is sanded smooth. Yet, painting often starts prior to gypsum board completion because the painting can occur in an area of work that is complete, even if there are incomplete areas of the gypsum board finishing elsewhere. This is a typical characteristic reflecting a scheduler s short-cut in the logic sequence. However, correcting such short-cuts may make a CPM schedule substantially larger and more cumbersome, hence less likely to be of use in managing the project. Further, construction professionals all understand this type CPM logic shorthand. Forensically, this type of occurrence is seldom of any importance. Such early starts are recognized forensically as a potential shift in the critical path. Regardless of the methodology used, these types of out-of-sequence events typically have no effect on the accuracy of the forensic analysis. The second type of out-ofsequence works occurs when early delays make a work-around of an otherwise mandatory logic tie essential. The earlier example of the out-of-sequence installation of temporary power prior to the availability of permanent power is also an example of a typical construction situation. In this case, delays caused by the utility in providing permanent power make a potential delay to commissioning and testing likely. The contractor s decision to install emergency generators early not only allows the commissioning and testing to proceed (at least for some limited extent), but can also assist in timelier project completion. Forensically, this type of out-of sequence work is important as there likely will be delays to commissioning and testing completion regardless of the out-ofsequence work because final testing contractually needs permanent power. All forensic methodologies are well equipped to recognize and account for such out-of sequence installation. The third and most complicated type of out-of-sequence work is where items that were largely repetitive and have no need for immediate construction successors, are installed in a sequence other than as planned. While this can occur on many types of projects, the most common occurrence is linear projects, such as roads or pipelines. For example, suppose the contractor is building a bridge that has bents, each of which includes multiple piles and pile caps. The project cannot be completed until all the bents are complete and the successor precast beams and concrete deck between the bents is installed. But the order the bents are completed in is irrelevant. There are no mandatory logic restraints as between the bents, but within the bents the sequence must be: piles, pile caps, precast beams, and precast decking. Deck finishing can only be performed after all the bents are completed. Forensically, out-of sequence installation of the bents can create significant analytical problems for some forensic delay methodologies. It is this third out-of-sequence scenario that will be discussed going forward in this article to demonstrate how each of the four major methodologies copes with this discretionary logic. Role of Contemporaneous Updates Since out-of-sequence work is a common occurrence in projects, best practices associated with active project scheduling has recommendations about how it should be considered. Two approaches predominate [12]. The preferred approach is that as out-of sequence work occurs on a project, the next month s update should reflect new logic dictated by this difference from the planned. Generally, this approach works well for adjusting out-of-sequence work and is associated with minor issues of starting the successor early. Primavera P6 calculation setting retained logic is the usual setting for this situation. This policy is more problematic in the cases where there is significant discretionary logic and the actual sequence is substantially different than that planned. Such out-ofsequence work could result in monthto-month schedules not just evolving, but becoming a continual rebaselining that involves significant remodeling of the schedule s logic. The alternate position, which is less widely advocated, holds that the original baseline schedule should not be continually adjusted and that the Primavera P6 setting of progress override should only be used in situations of out-of-sequence work. Again, this position will have relatively little impact on most forensic analysis when out-of-sequence work is associated with minor issues of starting the successor early. This policy creates calculation irregularities when there is wholesale disregard for the planned logic [19]. COST ENGINEERING MARCH/APRIL

6 Choosing the Right Methodology As a general rule, the 11 different items that should be considered in choosing the right delay methodology, as published by AACE, remain in place. These items are described in detail in section five of AACE s RP29R-03, and will in most cases serve the analyst well. They are: 1. Contractual Requirements 2. Purpose of Analysis 3. Source Data Availability and Reliability 4. Size of the Dispute 5. Complexity of the Dispute 6. Budget for Forensic Schedule Analysis 7. Time Allowed for Forensic Schedule Analysis 8. Expertise of the Forensic Schedule Analyst and Resources Available 9. Forum for Resolution and Audience 10. Legal or Procedural Requirements 11. Custom and Usage of Methods on the Project or the Case Nevertheless, as described in the paragraphs below, when significant discretionary logic is involved, there is another overlay of technical capability that needs to be considered [15]. Methodologies and Out-of-Sequence Work The discussion of the four major methodological groups does not follow the typical sequence as presented earlier in this article and in AACE s RP29R-03. In the paragraphs below, the sequence is determined by the least impacted out-of-sequence first and the most impacted last. Collapsed As-Built Out-of-sequence work has no impact on the analysis using this methodology. Because this methodology relies on an after-thefact backward review of the actual project activities and compares that actual sequence to a sequence excluding perceived delays, the change in sequence of activities during the course of the project has no special impact on the results. If out-ofsequence work affects the production rate of the work, then such a change in production would appear as potential delays that could be excluded as part of the analysis. Time Impact Analysis Out-of-sequence work has minimal impact on this methodology since it relies on inserting fragnet changes related to potential delay into the schedule and recalculating. Note that out-of-sequence performance will manifest itself as part of the as-built condition and thus should not impact the delay portion. However, if the claimed delay is the result of out-ofsequence work, then discretionary logic will have a role in the TIA. Generally, the work sequence will in essence self-correct during the course of an analysis. Contemporaneous Period Analysis Out-of-sequence work has only minimal impact on this methodology. CPA relies on comparing the preimpact schedule with the post-impact schedule, so out-of-sequence work will be absorbed into the as-built nature of the second schedule. Again, as with the TIA, if the out-of-sequence work is itself the claimed impact, then it could evidence itself in the analysis. Figure 1 Traditional APAB/DDM 36 COST ENGINEERING MARCH/APRIL 2016

7 It is important to realize that both the TIA and the CPA rely on schedules that are updated. Therefore, it is essential that out-of sequence work, when it occurs, be integrated into revised logic in the next update. As with a TIA, the work sequence will in essence selfcorrect during the course of an analysis. As-Planned As-Built The biggest impact on FSA results, if there is substantial discretionary logic and resultant out-of-sequence work, is associated with the As- Planned vs. As-Built (APAB) methodology. Because the starting point of this methodology is the asplanned schedule, significant logic variations from that plan create correspondingly significant potentialities for delay and errors in forensically calculating its impact. It is, of course, recognized that this is one of the principle reasons that many FSA experts believe that the APAB methodology is a poor choice for delay analysis [5]. It is axiomatic that the larger the project, the more complicated the project, and the longer the project is in production, the less likely the ABAB will result in reasonable or accurate analysis results [1]. Nevertheless, APAB remains one of the most commonly used FSA methods [13]. Further, it can be argued that in cases with massive discretionary logic and associated outof-sequence work, methodologies like TIA and CPA, which relay on accurate contemporaneous updates, are not appropriate to perform delay analysis. Using a Daily Delay Measure to Assist [14] The Daily Delay Measure (DDM) is an enhanced procedure within the APAB methodology identified in RP29R-03 [1]. It compares the planned late start and finish dates progress with the actual start and finish dates on a periodic basis. Generally, this analysis technique uses a mathematical formula to compare the amount of actual time expended against the planned amount of time expended. For example, assume the planned activity was 10 calendar days long and its late planned start date was 01-April, and the actual start date was 01-May. On that date, the activity would show it delayed 30 calendar days. Upon its completion on 20-May, the DDM would show the activity 40 calendar days late. Since the activity lost a half day for every day of progress (10/20), the activity would have been 35 calendar days late on 10- May. By making this calculation for every day for every activity, a detailed picture of the project s delay can be assembled. The analysis can be done at any frequency identified by the analyst: daily, weekly, and monthly are all useful depending on the level of detail required. The DDM calculates the status of individual activities by positive and negative numbers indicating days of delay. By doing this for each activity and comparing them side by side, it provides a detailed look at potential critical path activities, because the analyst can tell at a glance which activities are the most delayed compared to their late dates. This technique automatically accounts for float differences by using the late dates. It does not identify the as-built critical path [14]. While the comparison can be made between the early and actual dates when the late dates are unreliable, it is better to compare late dates with actual dates [20]. Any delay indicated by the comparison using late dates is a true delay rather than consumption of float. As a result of that exercise, any float associated with the duration of a schedule activity is excluded. Activities that have float (and accordingly are not on the asplanned critical path) will generally not appear to have been delayed during the early stages of analysis since they will appear to be ahead of schedule because of their float. As the analysis progresses through a project s performance however, the activities that initially had float, if they were delayed for duration in excess of the value of that float, can become critical, thus overtaking one or more of those activities originally on the project s asplanned critical path. Traditional Daily Delay Measure Traditional APAB/DDM procedures will not provide an accurate evaluation of delays when there is substantialout-of-sequence work. This is evident in that comparing an event that was supposed to be performed first with its actual timing could show great variation from activities that were significantly ahead of schedule to those that were significantly behind schedule. Such an outcome would not provide the analyst with an accurate picture of the overall delay trend of the project. Figure 1 shows this unrealistic result of the Traditional DDM by plotting the cumulative delay in the vertical axis and the date of that delay on the horizontal axis, using the DDM procedure. For comparison, the Adjusted Traditional DDM is shown that simply reflects normalization of the excessive variation. Not surprisingly, this shows that there is wild variation in the cumulative delay as out-of-sequence activities are compared to the original baseline. Even as the overall trend shows more than 100 calendar days of cumulative delay, this graphic representation shows that the work may be ahead of schedule. Production Based Daily Delay Measure There are at least two variations of the APAB/DDM technique that address this problem. Both were first identified and used in an entirely different context when first described in 2003 [14]. The DDM methodology, described in AACE International s RP29R-03, largely conforms to the traditional technique proposed in As such, it is a powerful tool for helping to identify candidates for a project s critical path and when that path may shift from one delayed sequence to another. As used in evaluating out-ofsequence performance, it can be adapted to compare the planned rate of installation of similar elements to the actual rate of those same elements. In the example of the COST ENGINEERING MARCH/APRIL

8 Figure 2 Traditional APAB/Production Based DDM installation of repetitive bridge elements (piles, pile caps, and piers), the method compares the date of the first planned element to the actual date of the first planned element, the second actual unit dates to the second planned dates, and so on. This process is repeated for each type of element. It is important that the units are essentially the same. It works well for comparing pier installation or units of distance on a roadway project. Such a comparison therefore eliminates the penalty for out-of-sequence work because it pretends that the planned sequence was the same as the actual sequence, just delayed because of poor production; or other factors such as late design, weather, or delayed approvals. Figure 2 depicts this Production Based DDM in comparison to the Adjusted Traditional DDM. It shows that the overall delay to the project is the same, but the delay is measured incrementally as it actually occurs. This is important if the causes of the delay are being analyzed. It may be that during the production there was some detail change that impacted production rates. If so, the incremental approach would show when it occurred and the time-related impact. Cost Based Daily Delay Measure A cost based APAB/DDM is a second variation of the procedure that can yield accurate results by identifying the amount of delay incrementally when it actually occurred. This technique requires the schedule to be cost loaded. If not already cost loaded, the analyst could manually cost load the major activities groups and create a reasonable representation of a true cost loaded schedule. Assuming planned schedule is cost loaded, either through original cost loading or an expert approximation, a table can be created that shows the anticipated earnings (not billings, since they will likely reflect withheld retainage). Using that same cost values tied to the actual dates for the appropriate activities, a comparison can be made with the actual earnings. Traditionally, this is shown in an S-curve; however, using the planned and actual dates of the earnings, a schedule delay comparison is possible. This method of course is similar to an earned-value measure. The difference is that it is predicated on time differential from the as-planned to the as-built, so it actually measures delay. It is important to accommodate two potential issues in this cost based DDM analysis. Large equipment purchases or installations can seriously alter the cost model for both the planned and actual dates. In performing this type of analysis, it is recommended that such large material or equipment purchases be eliminated from the calculation. A second adjustment should be made for change orders. The value of the change order needs to be added into the proper place in both the planned schedule and actual schedule. Figure 3 shows this Cost-Based DDM in comparison with Production- Based DDM and the Adjusted Traditional DDM. The similarity of the two cumulative delay curves generated by the alternative DDM techniques can give the analyst confidence that the overall depiction of the delay is accurate. At the same time, the differences warrant a detailed review to ascertain the causes. In Figure 3, the analyst 38 COST ENGINEERING MARCH/APRIL 2016

9 Figure 3 Cost Based/Traditional/Production DDM identified the principle reason for the divergence between the two lines is related to valuation differenced caused by the length (and therefore cost) of some of the deck/precast elements. Conclusion In choosing a forensic delay methodology, the analyst should follow the 11 criteria identified in AACE Recommended Practice 29R-03, Forensic Schedule Analysis [15]. However, when significant discretionary logic in a schedule has resulted in significant out-of-sequence work, there is an additional overlay of method selection to consider. Of the four basic methodology groupings, which AACE has divided into nine distinct forensic schedule analysis methodologies, three of the four can probably be used without modification. However, each of these methodologies has well known shortcomings, whether it is minimal acceptance in courts of law in the U.S. (Collapsed As-Built), or the need for accurate baseline and schedule update information, which is often unavailable (Contemporary Period Analysis and Time Impact Analysis). The fourth major methodology group, the As-Planned to As-Built methodology, if used in conjunction with the enhancement of the DDM technique, can provide accurate incremental delay data where other methodologies may fail. The APAB/DDM methodology, when used with either a production based adjustment or a cost based adjustment, can provide an accurate identification of when and by how much the project was delayed, thus facilitating identification of the causes of that delay and eventual damage calculations based on that data. REFERENCES 1. K. Hoshino, C. Carson, and J. Livengood, AACE International Recommended Practice RP 29R-03, Forensic Schedule Analysis, Section 3, AACE International, Morgantown, WV. 29R-03 (2011). 2. S. Dale and R. D Onofrio. Reconciling Concurrency in Schedule Delay and Construction Acceleration. (2010) 39 Public Cont. L.J B. Bramble and M. Callahan. Construction Delay Claims, (3d ed.), Aspen P. Kelly and W. Franczek. Fall, 2013, Clearing the Smoke: Forensic Schedule Analysis Method Selection for Construction Attorneys. The Construction Lawyer, p S. Dale and R. D Onofrio. Construction Schedule Delays, West Thompson Reuters, 2014, Pages 598 and P. Kelly and J. Livengood. Forensic Schedule Analysis Methods: Reconciliation of Different Results. Transactions 2014, AACE International, Morgantown, WV. 7. L. Schumacher. Quantifying Delays on Construction Projects. Seattle Daily J. of Commerce, Dec. 24, 1991; and L. Schumacher. Apportioning Delay on Construction Projects. Seattle Daily J. of Commerce, Dec , T. Calvey and R. Winter. AACE International Recommended Practice RP 52R-06, Time Impact Analysis As Applied in Construction, 2006, AACE International, Morgantown, WV. 9. J. Wickwire, T. Driscoll, R. Hurlbut, and R. Hillman. Construction Scheduling: Preparation, Liability COST ENGINEERING MARCH/APRIL

10 and Claims, 3rd edition, 2010, 8.13, Aspen Publishers: P. Bruner and J. O Connor. Bruner & O Connor Construction Law, Vol. 2, Section 15: , West Thompson Reuters, New York. (2007). 10. J. Livengood. Retrospective TIA s Time to Lay Them to Rest AACE International Transactions, AACE Definitions, AACE International Recommended Practice No 10S-90, Cost Engineering Terminology, AACE International, Morgantown, WV, GAO Schedule Assessment Guide. (May, 2012) (GAO 12 12OG). 13. N. Braimah. An Investigation into the Use of Construction Delay and Disruption Analysis Methodologies. Doctoral Thesis, University of Wolverhampton, UK, August Page J. Livengood. Daily Delay Measure A New Technique to Precisely Measure Delay. AACE Transactions, See also R. Seals. Continuous Delay Measurement and the Role of Daily Delay Values Fully Explained. AACE Transactions, K. Hoshino, C. Carson, and J. Livengood. 2011, AACE International Recommended Practice RP 29R-03 Forensic Schedule Analysis, Section 5, AACE International, Morgantown, WV. 16. It is instructive that many of the experts who object to The Recommended Practice on Forensic Schedule Analysis (RP29R-03) have their own pet methodologies that were insufficiently distinct from other methodologies to be independently identified they were considered to be a subset of nine that were identified. 17. The difficulty in finding factual support for the collapsed as-built methodology has two root causes. First, the methodology is often used when there is no effective baseline schedule to show how the contractor reasonably planned to perform the work. Second, as discussed in the paper, the expert s development and control of the after-the-fact schedule logic make it subject to criticism of it being only weakly related to the events in the field, and at the extreme, contrived. 18. The issue of logic controlled by resource restraint could be considered as either a mandatory restrain or as a discretionary restraint. Depending on where and when the work is being performed, the lack of equipment and materials may be just as real as gravity in controlling the sequence of construction. For discussion in this paper, it has been considered controlled by discretionary logic. 19. The situation where the contract forbids or sharply curtains logic revisions in updates is not addressed by the discussions in this paper. In such cases, the contractor has a more complicated problem because the owner has drastically reduced the contractor s risk-mitigation options. Since the schedule is developed and maintained by the contractor, provisions that restrict the contractors ability to manage the schedule are ultimately selfdefeating for the owner 20. The reporting of actual finish dates is an issue of significance in forensic schedule analysis. Because activities soften linger for a long time after they are effectively complete, it is important to know if the reporting convention is 100 percent complete or effectively complete, which may be 90 percent or 95 percent. ABOUT THE AUTHOR John C. Livengood Esq., CCP CFCC PSP FAACE, is with Navigant. He can be contacted by sending to: john.livengood@navigant.com FOR OTHER RESOURCES To view additional resources on this subject, go to: Do an advanced search by author name for an abstract listing of all other technical articles this author has published with AACE. Or, search by any total cost management subject area and retrieve a listing of all available AACE articles on your area of interest. AACE also offers pre-recorded webinars, an Online Learning Center and other educational resources. Check out all of the available AACE resources. 40 COST ENGINEERING MARCH/APRIL 2016

Andrew Avalon, P.E., PSP

Andrew Avalon, P.E., PSP Andrew Avalon, P.E., PSP LONG INTERNATIONAL Long International, Inc. 5265 Skytrail Drive Littleton, Colorado 80123-1566 USA Telephone: (303) 972-2443 Fax: (303) 200-7180 www.long-intl.com Andrew Avalon,

More information

LONG INTERNATIONAL. Andrew Avalon, P.E., PSP and Ronald J. Rider, MBA

LONG INTERNATIONAL. Andrew Avalon, P.E., PSP and Ronald J. Rider, MBA Andrew Avalon, P.E., PSP and Ronald J. Rider, MBA LONG INTERNATIONAL Long International, Inc. 5265 Skytrail Drive Littleton, Colorado 80123-1566 USA Telephone: (303) 972-2443 Fax: (303) 200-7180 www.long-intl.com

More information

4-Part Series. Schedule Delay Analysis: Forensic Methods and Practical Applications. Register Today! Owes. Who. What?

4-Part Series. Schedule Delay Analysis: Forensic Methods and Practical Applications. Register Today! Owes. Who. What? Who EARN Owes 10.5 CEU Who CREDITS Schedule Delay Analysis: Forensic Methods and Practical Applications What? Starts Wednesday, September 13, 2017 4-Part Series Who Should Attend? Agenda at a Glance Construction

More information

Assessing Extensions of Time Tony Farrow Trett Consulting March 2006

Assessing Extensions of Time Tony Farrow Trett Consulting March 2006 Assessing Extensions of Time Tony Farrow Trett Consulting March 2006 Contracts require the Works to be completed by a set date, subject to the Contractor s entitlement of extensions of time under the Conditions

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR CRITICAL PATH METHOD SCHEDULE. CFS:BD 1 of 14 APPR:MB:JJG FHWA:APPR:

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR CRITICAL PATH METHOD SCHEDULE. CFS:BD 1 of 14 APPR:MB:JJG FHWA:APPR: MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR CRITICAL PATH METHOD SCHEDULE CFS:BD 1 of 14 APPR:MB:JJG 09-29-18 FHWA:APPR:10-01-18 a. Description. Prepare and submit a critical path method

More information

Project Controls Expo

Project Controls Expo Project Controls Expo 9 Nov 2, London DELAY AND FORENSIC ANALYSIS Robert McKibbin : Director, Navigant Consulting Copyright @ 2. All rights reserved Introduction Delay in Construction Contracts: On-going

More information

The Effects of Comparative 4D Models on Schedule Development and Controls. Abstract

The Effects of Comparative 4D Models on Schedule Development and Controls. Abstract The Effects of Comparative 4D Models on Schedule Development and Controls Kevin Coyne, P.E. Managing Engineer, Exponent, Inc. Abstract In this paper the argument is made that the use of comparative 4D

More information

The Survey Says! Source: The Project Manager, Pinnell-Bush, Inc. Owner s say 31% of contractors do not submit monthly updates. 41% don t submit recove

The Survey Says! Source: The Project Manager, Pinnell-Bush, Inc. Owner s say 31% of contractors do not submit monthly updates. 41% don t submit recove Improved Project Control Through Scheduling January 24, 2014 The Survey Says! Source: The Project Manager, Pinnell-Bush, Inc. Owner s say 31% of contractors do not submit monthly updates. 41% don t submit

More information

SAMPLE. SCHEDULE LOGS TCM Framework: 10.1 Project Performance Assessment. AACE International Recommended Practice No. 93R-17

SAMPLE. SCHEDULE LOGS TCM Framework: 10.1 Project Performance Assessment. AACE International Recommended Practice No. 93R-17 E 93R17 SA M PL SCHEDULELOGS AACE International Recommended Practice No. 93R-17 SCHEDULE LOGS TCM Framework: 10.1 Project Performance Assessment Rev. Note: As AACE International Recommended Practices evolve

More information

Timely Time Extensions: The Owner s Duty

Timely Time Extensions: The Owner s Duty Timely Time Extensions: The Owner s Duty John Orr, PSP URS Corporation Construction CPM Conference New Orleans, LA January 27 th to 30 th, 2013 Author Biography: John P. Orr, PSP Degrees / Certifications:

More information

LONG INTERNATIONAL. Andrew Avalon, P.E., PSP and Curtis W. Foster

LONG INTERNATIONAL. Andrew Avalon, P.E., PSP and Curtis W. Foster Andrew Avalon, P.E., PSP and Curtis W. Foster LONG INTERNATIONAL Long International, Inc. 5265 Skytrail Drive Littleton, Colorado 80123-1566 USA Telephone: (303) 972-2443 Fax: (303) 200-7180 www.long-intl.com

More information

FORENSIC SCHEDULE ANALYSIS CHAPTER 2: DELAY ANALYSIS ON NON-CPM SCHEDULED PROJECTS 1

FORENSIC SCHEDULE ANALYSIS CHAPTER 2: DELAY ANALYSIS ON NON-CPM SCHEDULED PROJECTS 1 GLOBAL CONSTRUCTION FORENSIC SCHEDULE ANALYSIS CHAPTER 2: DELAY ANALYSIS ON NON-CPM SCHEDULED PROJECTS 1 By Steven A. Collins 2 and James G. Zack, Jr., CCM, CFCC, FAACE, FRICS, PMP 3 Association for the

More information

EXHIBIT 2-2-C SCHEDULES

EXHIBIT 2-2-C SCHEDULES EXHIBIT 2-2-C SCHEDULES PART 1 GENERAL 1.01 SUMMARY A. The Work specified in this section consists of furnishing transportation, labor, materials, equipment, and incidentals necessary for preparation,

More information

Project Planning & CPM Scheduling using MS Project. APWA NorCal 2018 Annual Conference

Project Planning & CPM Scheduling using MS Project. APWA NorCal 2018 Annual Conference Project Planning & CPM Scheduling using MS Project APWA NorCal 2018 Annual Conference What is Planning? Planning: A determination of the what, how, where and by whom ; the tasks that need to be completed

More information

2017 Construction CPM Conference Ron Winter, PSP, FAACE Schedule Analyzer Software CPM ACTIVITY STATUS

2017 Construction CPM Conference Ron Winter, PSP, FAACE Schedule Analyzer Software CPM ACTIVITY STATUS 2017 Ron Winter, PSP, FAACE Schedule Analyzer Software CPM ACTIVITY STATUS Ron Winter, PSP, FAACE Bachelor of Science in Engineering Construction Scheduler US Air Force Navigator Construction Scheduler

More information

Project Time Management

Project Time Management Project Time Management Project Time Management Project Time Management includes the processes required to manage timely completion of the project. Plan schedule management The process of establishing

More information

BASELINE SCHEDULING BASICS Part 2: May 3, 2007

BASELINE SCHEDULING BASICS Part 2: May 3, 2007 BASELINE SCHEDULING BASICS Part 2: May 3, 2007 Mark Boe, P.E., PSP Vice President Capital Project Management, Inc. mboe@cpmiteam.com Chris Carson, PSP Project Controls Manager Alpha Corporation chris.carson@alphacorporation.com

More information

CONSTRUCTION PROGRESS DOCUMENTATION (SCHEDULING)

CONSTRUCTION PROGRESS DOCUMENTATION (SCHEDULING) 01 32 00 CONSTRUCTION PROGRESS DOCUMENTATION (SCHEDULING) PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

LONG INTERNATIONAL. Robin K. Long, PMP

LONG INTERNATIONAL. Robin K. Long, PMP Robin K. Long, PMP LONG INTERNATIONAL Long International, Inc. 5265 Skytrail Drive Littleton, Colorado 80123-1566 USA Telephone: (303) 972-2443 Fax: (303) 200-7180 www.long-intl.com Robin K. Long, PMP

More information

International Association of Certified Practicing Engineers

International Association of Certified Practicing Engineers www.iacpe.com Knowledge, Certification, Networking Page: 1 71 IACPE No 19, Jalan Bilal Mahmood 80100 Johor Bahru Malaysia The International is providing the introduction to the Training Module for your

More information

DIVISION 1 GENERAL REQUIREMENTS SECTION PROJECT SCHEDULE

DIVISION 1 GENERAL REQUIREMENTS SECTION PROJECT SCHEDULE DIVISION 1 GENERAL REQUIREMENTS SECTION 01 32 16 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. All drawings and technical specifications, Notice to Bidders, Instructions and Information to Bidders, Bid Proposal

More information

THE CONTRACTS GROUP LTD. THE SOCIETY OF CONSTRUCTION LAW DELAY & DISRUPTION PROTOCOL 2 nd Edition

THE CONTRACTS GROUP LTD. THE SOCIETY OF CONSTRUCTION LAW DELAY & DISRUPTION PROTOCOL 2 nd Edition THE CONTRACTS GROUP LTD. THE SOCIETY OF CONSTRUCTION LAW DELAY & DISRUPTION PROTOCOL 2 nd Edition 18 January 2017 SCL Delay & Disruption Protocol 2 nd Edition INTRODUCTION TIME - Methods of Delay Analysis

More information

SECTION CONSTRUCTION SCHEDULES (COMPUTERIZED CPM FORMAT) [LUMP SUM CONTRACTS]

SECTION CONSTRUCTION SCHEDULES (COMPUTERIZED CPM FORMAT) [LUMP SUM CONTRACTS] SECTION 01 32 00.1 CONSTRUCTION SCHEDULES (COMPUTERIZED CPM FORMAT) [LUMP SUM CONTRACTS] Note: This section is intended to include general procedural requirements for the preparation, submittal and updating

More information

SECTION CONSTRUCTION SCHEDULES (COMPUTERIZED CPM FORMAT) UNIT PRICE CONTRACTS

SECTION CONSTRUCTION SCHEDULES (COMPUTERIZED CPM FORMAT) UNIT PRICE CONTRACTS SECTION 01 32 00.3 CONSTRUCTION SCHEDULES (COMPUTERIZED CPM FORMAT) UNIT PRICE CONTRACTS Note: This section is intended to include general procedural requirements for the preparation, submittal and updating

More information

FORENSIC PLANNING DELAY ANALYSIS, EXPERT WITNESS, CLAIMS AND CONTRACT ADMINISTRATION SERVICES

FORENSIC PLANNING DELAY ANALYSIS, EXPERT WITNESS, CLAIMS AND CONTRACT ADMINISTRATION SERVICES FEARNSIDES AND ASSOCIATES FORENSIC PLANNING DELAY ANALYSIS, EXPERT WITNESS, CLAIMS AND CONTRACT ADMINISTRATION SERVICES File Note- 001-Delay Methodology-18-July-16 Subject: Delay Analysis Methodology 1.

More information

Document No: SB002-P3 Revision No: Last Updated: April

Document No: SB002-P3 Revision No: Last Updated: April BRIEF People often are confused with the term - Out-of-Sequence, and use them in inappropriate ways. While we talk about Out-of-Sequence, we also need to discuss the difference between Retained Logic and

More information

How to Develop, Manage and Communicate Effective Schedules Using Primavera P6 Professional

How to Develop, Manage and Communicate Effective Schedules Using Primavera P6 Professional How to Develop, Manage and Communicate Effective Schedules Using Primavera P6 Professional Session ID: 10686 Prepared by: Raquel Shohet, PSP Vice President Hill International, Inc. How to Develop, Manage

More information

PROJECT PLANNING AND SCHEDULING

PROJECT PLANNING AND SCHEDULING PROJECT PLANNING AND SCHEDULING AFTAB HAMEED MEMON Office: E6-003A, Makmal Kej. Bangunan Jab. Kej. Bangunan & Peminaan, FKAAS Contact No. 014-2527620 E-mail: ah78memon@hotmail.com Introduction to Project

More information

LONG INTERNATIONAL. Richard J. Long, P.E., Andrew Avalon, P.E., PSP and Ronald J. Rider, MBA

LONG INTERNATIONAL. Richard J. Long, P.E., Andrew Avalon, P.E., PSP and Ronald J. Rider, MBA Richard J. Long, P.E., Andrew Avalon, P.E., PSP and Ronald J. Rider, MBA LONG INTERNATIONAL Long International, Inc. 5265 Skytrail Drive Littleton, Colorado 80123-1566 USA Telephone: (303) 972-2443 Fax:

More information

SECTION NETWORK ANALYSIS SCHEDULES (NAS) FOR DESIGN-BUILD 8/10

SECTION NETWORK ANALYSIS SCHEDULES (NAS) FOR DESIGN-BUILD 8/10 SECTION 01 32 17.05 20 NETWORK ANALYSIS SCHEDULES (NAS) FOR DESIGN-BUILD 8/10 PART 1 GENERAL 1.1 DESCRIPTION The Contractor is responsible for scheduling all design, procurement and construction. A single

More information

SAN FRANCISCO PUBLIC UTILITIES COMMISSION WATER SYSTEM IMPROVEMENT PROGRAM CONSTRUCTION MANAGEMENT PROCEDURES

SAN FRANCISCO PUBLIC UTILITIES COMMISSION WATER SYSTEM IMPROVEMENT PROGRAM CONSTRUCTION MANAGEMENT PROCEDURES SAN FRANCISCO PUBLIC UTILITIES COMMISSION WATER SYSTEM IMPROVEMENT PROGRAM CONSTRUCTION MANAGEMENT PROCEDURES SECTION: WSIP CONSTRUCTION MANAGEMENT APPROVED: PROCEDURE NO.: 015 DATE: 08I'4I09 TITLE: CONSTRUCTION

More information

PMP Exam Preparation Course Project Time Management

PMP Exam Preparation Course Project Time Management Project Time Management 1 Project Time Management Processes Define Activities Sequence Activities Estimate Activity Resources Estimate Activity duration Develop Schedule Control Schedule In some projects,

More information

1.1.3 In order to achieve effective time management there must be:

1.1.3 In order to achieve effective time management there must be: 1.1 Core p rinciples 1.1.1 The Guide is a practical treatise on the processes to be followed and standards to be achieved in the effective management of time. It is not based upon any contractual regime,

More information

MnDOT Project Management Office Presents: Impact Schedules. Presenter: Jonathan McNatty Senior Schedule Consultant DRMcNatty & Associates, Inc.

MnDOT Project Management Office Presents: Impact Schedules. Presenter: Jonathan McNatty Senior Schedule Consultant DRMcNatty & Associates, Inc. MnDOT Project Management Office Presents: Impact Schedules Presenter: Jonathan McNatty Senior Schedule Consultant DRMcNatty & Associates, Inc. Housekeeping Items Lines will be muted during the webinar

More information

Consulting Newsletter

Consulting Newsletter Spring 2014 Newsletter In this, our 2014 Spring newsletter, are 2 articles. The first article is Programme Review and Acceptance. Our second article is titled, Acceleration Roger Gibson June 2014 PROGRAMME

More information

FORENSIC SCHEDULE ANALYSIS TCM Framework: 6.4 Forensic Performance Assessment

FORENSIC SCHEDULE ANALYSIS TCM Framework: 6.4 Forensic Performance Assessment E 29R03 SA M PL FORENSI CSCHEDULEANAL YSI S AACE International Recommended Practice No. 29R-03 E FORENSIC SCHEDULE ANALYSIS TCM Framework: 6.4 Forensic Performance Assessment PL Rev. Note: As AACE International

More information

Estimating and Scheduling

Estimating and Scheduling Estimating and Scheduling Practical Tips and Techniques for Construction Scott Feeney, CPE, LEED AP Q1stCM Ram Ramdass, PMP, PSP Turner Construction April 2018 Today s Discussion: Scheduling techniques

More information

PS.08. Let s Scrap the Precedence Diagramming Method

PS.08. Let s Scrap the Precedence Diagramming Method 2004 AACE International Transactions PS.08 Let s Scrap the Precedence Diagramming Method Earl T. Glenwright Jr. THE STATE OF CONSTRUCTION SCHEDULING PRACTICES AND SCHEDULES WHY PRECEDENCE DIAGRAMMING WAS

More information

CDR.493. Forensic Schedule Analysis: Example Implementation, Part 2

CDR.493. Forensic Schedule Analysis: Example Implementation, Part 2 CDR.493 Forensic Schedule Analysis: Example Implementation, Part 2 Mark C. Sanders, PE CCE PSP ABSTRACT Recommended Practice 29R-03 Forensic Schedule Analysis, has aroused significant debate in the forensic

More information

Principles of Schedule Contingency Management

Principles of Schedule Contingency Management Principles of Schedule Contingency Management Ted Douglas, CCC, PSP ACTPMA, LLC Consulting 2014 Construction CPM Conference Orlando, Florida Schedule Contingency Management Background Outline of Presentation

More information

Schedule Design Planning for Schedule Development

Schedule Design Planning for Schedule Development Schedule Design Planning for Schedule Development Chris Carson, PSP Corporate Director of Project Controls Alpha Corporation Chris.carson@alphacorporation.com 757-342-5524 Schedule Design Why design a

More information

Week 5 Project Work Plan

Week 5 Project Work Plan Week 5 Project Work Plan 457.657 Civil and Environmental Project Management Department of Civil and Environmental Engineering Seoul National University Prof. Seokho Chi shchi@snu.ac.kr 건설환경공학부 35 동 304

More information

THE IMPORTANCE OF PLANNING DURING PROJECT EXECUTION

THE IMPORTANCE OF PLANNING DURING PROJECT EXECUTION THE IMPORTANCE OF PLANNING DURING PROJECT EXECUTION Dr. Dan Patterson, PMP Chief Design Officer, PLANNING & SCHEDULING Introduction Twenty-five years ago, I was taught that project management was built

More information

A Framework for Schedule Design Planning for Schedule Development

A Framework for Schedule Design Planning for Schedule Development A Framework for Schedule Design Planning for Schedule Development Chris Carson, PSP Corporate Director of Project Controls Patrick Kelly, PSP Project Controls Manager Chris.Carson@alphacorporation.com

More information

A Structured Approach to Minimum Cost Recovery Scheduling

A Structured Approach to Minimum Cost Recovery Scheduling A Structured Approach to Minimum Cost Recovery Scheduling Chris Carson, PSP Project Controls Manager Alpha Corporation Norfolk, Virginia Email: chris.carson@alphacorporation.com Background Project management

More information

// Improving Project Plans using a Schedule Maturity Framework

// Improving Project Plans using a Schedule Maturity Framework // Improving Project Plans using a Schedule Maturity Framework An Introduction to the S1 > S5 Schedule Maturity Framework Dr. Dan Patterson, PMP CEO & President, Acumen August 2010 www.projectacumen.com

More information

Managing Schedule Change

Managing Schedule Change Managing Schedule Change Ted Douglas, CCP, PSP, FAACE CPM Construction Conference Orlando, Florida January 11, 2017 Managing Schedule Change Outline Change Drivers Contract Changes Clause Schedule Change

More information

East Central College

East Central College SECTION 013200 - CONSTRUCTION PROGRESS DOCUMENTATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

Module #4 Time Impact Analysis

Module #4 Time Impact Analysis Reviewing & Analyzing CPM Construction Schedules Module #4 Forward looking schedule analysis technique that adds a modeled delay to an accepted contract schedule to determine the possible impact of that

More information

For the PMP Exam using PMBOK Guide 5 th Edition. PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc.

For the PMP Exam using PMBOK Guide 5 th Edition. PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc. For the PMP Exam using PMBOK Guide 5 th Edition PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc. 1 Contacts Name: Khaled El-Nakib, MSc, PMP, PMI-RMP URL: http://www.khaledelnakib.com

More information

EVALUATION COPY. Unauthorized Reproduction or Distribution Prohibited THE OCCASIONAL PROJECT MANAGER

EVALUATION COPY. Unauthorized Reproduction or Distribution Prohibited THE OCCASIONAL PROJECT MANAGER THE OCCASIONAL PROJECT MANAGER 2016 by Systemation. ALL RIGHTS RESERVED. No part of this book may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying

More information

COST LOADED CONSTRUCTION SCHEDULES PART 1 - GENERAL

COST LOADED CONSTRUCTION SCHEDULES PART 1 - GENERAL SECTION 01310 COST LOADED CONSTRUCTION SCHEDULES PART 1 - GENERAL 1.01 SCOPE: A. COST LOADED CONSTRUCTION SCHEDULE (Construction Schedule): The WORK under this Contract shall be planned, scheduled, executed,

More information

SPECIFICATIONS - DETAILED PROVISIONS Section Project Control Schedule C O N T E N T S

SPECIFICATIONS - DETAILED PROVISIONS Section Project Control Schedule C O N T E N T S SPECIFICATIONS - DETAILED PROVISIONS Section 01310 - Project Control Schedule C O N T E N T S PART 1 - SCHEDULE REQUIREMENTS PROGRESS SCHEDULE... 1 PART 2 - SUBMITTAL PROCEDURES... 2 PART 3 - DEFINITIONS...

More information

Construction Planning and Scheduling

Construction Planning and Scheduling Instructor s Manual to accompany Construction Planning and Scheduling Fourth Edition Jimmie W. Hinze Updated by Paresh Shettigar Upper Saddle River, New Jersey Columbus, Ohio Copyright 2012, 2008, 2004,

More information

Rod C. Carter, CCP, PSP

Rod C. Carter, CCP, PSP Rod C. Carter, CCP, PSP LONG INTERNATIONAL Long International, Inc. 5265 Skytrail Drive Littleton, Colorado 80123-1566 USA Telephone: (303) 972-2443 Fax: (303) 200-7180 www.long-intl.com Rod C. Carter,

More information

Chapter 24. Software Project Scheduling

Chapter 24. Software Project Scheduling Chapter 24 Software Project Scheduling - Introduction - Project scheduling - Task network - Timeline chart - Earned value analysis (Source: Pressman, R. Software Engineering: A Practitioner s Approach.

More information

Exposition Metro Line Construction Authority CRITICAL PATH METHOD SCHEDULE AND COST/SCHEDULE INTEGRATION SYSTEM

Exposition Metro Line Construction Authority CRITICAL PATH METHOD SCHEDULE AND COST/SCHEDULE INTEGRATION SYSTEM SECTION 01310 CRITICAL PATH METHOD SCHEDULE AND COST/SCHEDULE INTEGRATION SYSTEM 1.0 General 1.1 Description The Work specified in this Section consists of developing and maintaining a Critical Path Method

More information

PMP EXAMINATION PREP CHAPTER 6 SCHEDULE MANAGEMENT. PMP Exam Prep

PMP EXAMINATION PREP CHAPTER 6 SCHEDULE MANAGEMENT. PMP Exam Prep PMP EXAMINATION PREP CHAPTER 6 SCHEDULE MANAGEMENT PMP Exam Prep PROJECT SCHEDULE MANAGEMENT Page 223 Schedule Management Process : Contains 6 of the 49 total processes Plan Schedule Management Define

More information

THE IMPORTANCE OF PLANNING DURING PROJECT EXECUTION

THE IMPORTANCE OF PLANNING DURING PROJECT EXECUTION THE IMPORTANCE OF PLANNING DURING PROJECT EXECUTION A BASIS White Paper by Dr. Dan Patterson, PMP Introduction Twenty-five years ago, I was taught that project management was built upon the premise of

More information

Time Management PLANNING

Time Management PLANNING Time Management 6.1 Plan Schedule Management: The process of establishing policies, procedures and documentation for planning, developing, managing, executing and controlling the project schedule # Schedule

More information

PMBOK Guide Fifth Edition Pre Release Version October 10, 2012

PMBOK Guide Fifth Edition Pre Release Version October 10, 2012 5.3.1 Define Scope: Inputs PMBOK Guide Fifth Edition 5.3.1.1 Scope Management Plan Described in Section 5.1.3.1.The scope management plan is a component of the project management plan that establishes

More information

Hydra White Paper. Scheduling technologies: Resource centric versus Task centric

Hydra White Paper. Scheduling technologies: Resource centric versus Task centric Hydra White Paper Scheduling technologies: Resource centric versus Task centric Introduction Historically all project management products have revolved around a common set of techniques to determine the

More information

James M. Bolin and Andrew Avalon, P.E., PSP

James M. Bolin and Andrew Avalon, P.E., PSP James M. Bolin and Andrew Avalon, P.E., PSP LONG INTERNATIONAL Long International, Inc. 5265 Skytrail Drive Littleton, Colorado 80123-1566 USA Telephone: (303) 972-2443 Fax: (303) 200-7180 www.long-intl.com

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS *************************************************************************** SECTION

UNIFIED FACILITIES GUIDE SPECIFICATIONS *************************************************************************** SECTION USACE / NAVFAC / AFCEC / NASA UFGS-01 32 17.05 20 (March 2015) Change 1-09/15 ----------------------------------- Preparing Activity: NAVFAC Superseding UFGS-01 32 17.05 20 (February 2013) UNIFIED FACILITIES

More information

Lessons Learned Schedule Updating and Maintenance using Primavera P6 Hannah Schumacher, PSP, PMI-SP, LEED AP Hill International

Lessons Learned Schedule Updating and Maintenance using Primavera P6 Hannah Schumacher, PSP, PMI-SP, LEED AP Hill International Schedule Updating and Maintenance using Primavera P6 Hannah Schumacher, PSP, PMI-SP, LEED AP Hill International Charlie Jackson, PSP, Primavera Certified Trainer Hill International Construction CPM Conference

More information

SA 265 COMMUNICATING DEFICIENCIES IN INTERNAL CONTROL

SA 265 COMMUNICATING DEFICIENCIES IN INTERNAL CONTROL Part I : Engagement and Quality Control Standards I.169 SA 265 COMMUNICATING DEFICIENCIES IN INTERNAL CONTROL TO THOSE CHARGED WITH GOVERNANCE AND MANAGEMENT (EFFECTIVE FOR ALL AUDITS RELATING TO ACCOUNTING

More information

Audit Evidence. SSA 500, Audit Evidence superseded the SSA of the same title in September 2009.

Audit Evidence. SSA 500, Audit Evidence superseded the SSA of the same title in September 2009. SINGAPORE STANDARD SSA 500 ON AUDITING Audit Evidence SSA 500, Audit Evidence superseded the SSA of the same title in September 2009. SSA 610 (Revised 2013), Using the Work of Internal Auditors gave rise

More information

INTERNATIONAL STANDARD ON AUDITING 500 AUDIT EVIDENCE CONTENTS

INTERNATIONAL STANDARD ON AUDITING 500 AUDIT EVIDENCE CONTENTS INTERNATIONAL STANDARD ON 500 AUDIT EVIDENCE (Effective for audits of financial statements for periods beginning on or after December 15, 2004) CONTENTS Paragraph Introduction... 1-2 Concept of Audit Evidence...

More information

SECTION CONSTRUCTION PROGRESS DOCUMENTATION

SECTION CONSTRUCTION PROGRESS DOCUMENTATION SECTION 01 32 00 CONSTRUCTION PROGRESS DOCUMENTATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

Auditing Standards and Practices Council

Auditing Standards and Practices Council Auditing Standards and Practices Council PHILIPPINE STANDARD ON AUDITING 315 UNDERSTANDING THE ENTITY AND ITS ENVIRONMENT AND ASSESSING THE RISKS OF MATERIAL MISSTATEMENT PHILIPPINE STANDARD ON AUDITING

More information

Lessons Learned Schedule Updating and Maintenance using Primavera P6

Lessons Learned Schedule Updating and Maintenance using Primavera P6 Schedule Updating and Maintenance using Primavera P6 Hannah Schumacher, PSP, PMI SP, LEED AP Hill International Charlie Jackson, PSP Project Life Span Construction CPM Conference - 2017 Author Biography

More information

Scheduling. Adapted from John Musser

Scheduling. Adapted from John Musser Scheduling Adapted from John Musser Today Network Fundamentals Gantt Charts PERT/CPM Techniques WBS Review Types: Process, product, hybrid Formats: Outline or graphical organization chart High-level WBS

More information

INTERNATIONAL STANDARD ON AUDITING 315 UNDERSTANDING THE ENTITY AND ITS ENVIRONMENT AND ASSESSING THE RISKS OF MATERIAL MISSTATEMENT CONTENTS

INTERNATIONAL STANDARD ON AUDITING 315 UNDERSTANDING THE ENTITY AND ITS ENVIRONMENT AND ASSESSING THE RISKS OF MATERIAL MISSTATEMENT CONTENTS INTERNATIONAL STANDARD ON AUDITING 315 UNDERSTANDING THE ENTITY AND ITS ENVIRONMENT AND ASSESSING THE RISKS OF MATERIAL MISSTATEMENT (Effective for audits of financial statements for periods beginning

More information

International Auditing and Assurance Standards Board ISA 500. April International Standard on Auditing. Audit Evidence

International Auditing and Assurance Standards Board ISA 500. April International Standard on Auditing. Audit Evidence International Auditing and Assurance Standards Board ISA 500 April 2009 International Standard on Auditing Audit Evidence International Auditing and Assurance Standards Board International Federation of

More information

COMM 391. Learning Objective 1. Learning Objectives. Introduction to Management Information Systems

COMM 391. Learning Objective 1. Learning Objectives. Introduction to Management Information Systems COMM 391 Introduction to Management Information Systems INFORMATION SYSTEMS SOURCING AND PROJECT MANAGEMENT Winter 2014 Term 1 Learning Objectives 1. Explain the basic concepts of IS projects. 2. Describe

More information

The Project Planning Process Group

The Project Planning Process Group 3 The Project Planning Process Group............................................... Terms you ll need to understand: Activity Activity attributes Activity list Activity on arrow diagram (AOA) Activity

More information

CHAPTER 7 STRUCTURAL SYSTEMS

CHAPTER 7 STRUCTURAL SYSTEMS BTB.Senior.Ch07 11/25/03 8:42 AM Page 163 CHAPTER 7 STRUCTURAL SYSTEMS Senior housing and care facilities have used virtually every structural system normally employed in relatively simple structures:

More information

Application & Management of CPM Schedules

Application & Management of CPM Schedules Application & Management of CPM Schedules Matthew Milliet James Construction Group, LLC 2009 Louisiana Transportation Conference Session 60 Project Scheduling DISCLAIMER The following is intended to outline

More information

Welcome to the Eastwood Harris Pty Ltd Primavera P6 Versions 8.2 EPPM Web Tool 2 day training course Enterprise Portfolio Project Management

Welcome to the Eastwood Harris Pty Ltd Primavera P6 Versions 8.2 EPPM Web Tool 2 day training course Enterprise Portfolio Project Management Welcome to the Eastwood Harris Pty Ltd Primavera P6 Versions 8.2 EPPM Web Tool 2 day training course Enterprise Portfolio Project Management Page 2 Copyright Eastwood Harris Pty Ltd IMPORTANT POINTS FOR

More information

(Really) Understanding Microsoft Project

(Really) Understanding Microsoft Project 2019 (Really) Understanding Microsoft Project Ron Winter, PSP, FAACE Schedule Analyzer Software 1 Ron Winter, PSP, FAACE Bachelor of Science in Engineering Construction Scheduler US Air Force Navigator

More information

USE DECISION TREES TO MAKE IMPORTANT PROJECT DECISIONS BY CPM OUT-OF-SEQUENCE METHODOLOGY REWORK ON CONSTRUCTION AND SOME PRACTICAL RESULTS

USE DECISION TREES TO MAKE IMPORTANT PROJECT DECISIONS BY CPM OUT-OF-SEQUENCE METHODOLOGY REWORK ON CONSTRUCTION AND SOME PRACTICAL RESULTS COST THE JOURNAL OF AACE INTERNATIONAL - THE AUTHORITY FOR TOTAL COST MANAGEMENT July/August 2014 ENGINEERING www.aacei.org USE DECISION TREES TO MAKE IMPORTANT PROJECT DECISIONS DISRUPTION ANALYSIS BY

More information

Public Performance Reporting

Public Performance Reporting Public Performance ing Guide to Preparing Public Performance s May 2007 1 This Guide is intended to stimulate thought and provide a framework for preparing a public sector entity s public performance report.

More information

International Standard on Auditing (UK and Ireland) 500

International Standard on Auditing (UK and Ireland) 500 Standard Audit and Assurance Financial Reporting Council October 2009 International Standard on Auditing (UK and Ireland) 500 Audit evidence The FRC is responsible for promoting high quality corporate

More information

Information Technology Project Management, Seventh Edition

Information Technology Project Management, Seventh Edition Information Technology Project Management, Note: See the text itself for full citations. Understand the importance of project schedules and good project time management Discuss the process of planning

More information

Project Forecast Survey Results Good Scheduling Practices June 2016

Project Forecast Survey Results Good Scheduling Practices June 2016 Good Scheduling Practices 5 June 6 Good Scheduling Practices 5 June 6 Executive Summary There is a saying failing to plan is planning to fail, but what if the plan itself is a failure? The scheduling of

More information

Audit Evidence. HKSA 500 Issued July 2009; revised July 2010, May 2013, February 2015, August 2015, June 2017

Audit Evidence. HKSA 500 Issued July 2009; revised July 2010, May 2013, February 2015, August 2015, June 2017 HKSA 500 Issued July 2009; revised July 2010, May 2013, February 2015, August 2015, June 2017 Effective for audits of financial statements for periods beginning on or after 15 December 2009 Hong Kong Standard

More information

4D Model Analysis. Introduction

4D Model Analysis. Introduction 4D Model Analysis Introduction 4D models can be useful either as alternatives to CPM networks and bar charts, or as supplements to these schedules. People can more easily understand the project schedule

More information

Project Time Management

Project Time Management Project Time Management Prof. Dr. Daning Hu Department of Informatics University of Zurich Adapted from Managing Information Technology Projects, Schwalbe Learning Objectives Define activities as the basis

More information

Procurement Department Bid Office Customer Center 1 st Floor, Room W. Church Street Jacksonville, Florida 32202

Procurement Department Bid Office Customer Center 1 st Floor, Room W. Church Street Jacksonville, Florida 32202 Procurement Department Bid Office Customer Center 1 st Floor, Room 002 21 W. Church Street Jacksonville, Florida 32202 June 28, 2017 ADDENDUM NUMBER: TWO (2) TITLE: Riverview Water Main Extension Phase

More information

User Guidance Manual. Last updated in December 2011 for use with ADePT Design Manager version Adept Management Ltd. All rights reserved

User Guidance Manual. Last updated in December 2011 for use with ADePT Design Manager version Adept Management Ltd. All rights reserved User Guidance Manual Last updated in December 2011 for use with ADePT Design Manager version 1.3 2011 Adept Management Ltd. All rights reserved CHAPTER 1: INTRODUCTION... 1 1.1 Welcome to ADePT... 1 1.2

More information

International Standard on Auditing (Ireland) 500 Audit Evidence

International Standard on Auditing (Ireland) 500 Audit Evidence International Standard on Auditing (Ireland) 500 Audit Evidence MISSION To contribute to Ireland having a strong regulatory environment in which to do business by supervising and promoting high quality

More information

Scope of this SA Effective Date Objective Definitions Sufficient Appropriate Audit Evidence... 6

Scope of this SA Effective Date Objective Definitions Sufficient Appropriate Audit Evidence... 6 SA 500* AUDIT EVIDENCE (Effective for audits of financial statements for periods beginning on or after April 1, 2009) Contents Introduction Paragraph(s) Scope of this SA...1-2 Effective Date... 3 Objective...

More information

Estimating Project Schedule-Time and Cost

Estimating Project Schedule-Time and Cost Estimating Project Schedule-Time and Cost Chapter 5 5 1 Where We Are Now 5 2 1 Overview Seminar Agenda What is involved in schedule and cost management? In-depth Determining the sequence of activities

More information

Design & Development of a Schedule Management Plan. Session #PRJ10

Design & Development of a Schedule Management Plan. Session #PRJ10 Design & Development of a Schedule Management Plan Session #PRJ10 Chris Carson, PMP, PSP, CCM Alpha Corporation 2010 Permission is granted to PMI for PMI Marketplace use only Chris Carson, PSP, CCM, PMP

More information

SECTION CONSTRUCTION PROGRESS DOCUMENTATION SECTION CONSTRUCTION PROGRESS DOCUMENTATION

SECTION CONSTRUCTION PROGRESS DOCUMENTATION SECTION CONSTRUCTION PROGRESS DOCUMENTATION PART 1 GENERAL 1.01 SECTION INCLUDES A. Preliminary schedule. SECTION 01 32 00 SECTION 01 32 00 B. Construction progress schedule, with network analysis diagrams and reports. C. Daily construction reports.

More information

LOSS OF CONTROL FROM PROJECT CONTROLS

LOSS OF CONTROL FROM PROJECT CONTROLS GLOBAL CONSTRUCTION LOSS OF CONTROL FROM PROJECT CONTROLS John Hanlon, Director OVERVIEW Companies often invest in major capital construction and engineering projects to create long-term value for the

More information

INTERNATIONAL STANDARD ON AUDITING (NEW ZEALAND) 500

INTERNATIONAL STANDARD ON AUDITING (NEW ZEALAND) 500 Issued 07/11 Compiled 10/15 INTERNATIONAL STANDARD ON AUDITING (NEW ZEALAND) 500 Audit Evidence (ISA (NZ) 500) This compilation was prepared in October 2015 and incorporates amendments up to and including

More information

Week 5 Project Work Plan

Week 5 Project Work Plan Week 5 Project Work Plan 457.657 Civil and Environmental Project Management Department of Civil and Environmental Engineering Seoul National University Prof. Seokho Chi shchi@snu.ac.kr 건설환경공학부 35 동 304

More information

Week 5 Project Work Plan

Week 5 Project Work Plan Week 5 Project Work Plan 457.307 Construction Planning and Management Department of Civil and Environmental Engineering Seoul National University Prof. Seokho Chi shchi@snu.ac.kr 건설환경공학부 35 동 304 호 Project

More information

// Does Better Scheduling Drive Execution Success?

// Does Better Scheduling Drive Execution Success? // Does Better Scheduling Drive Execution Success? Dr. Dan Patterson, PMP CEO & President, Acumen Jin Ouk Choi Research Intern, Acumen September 2011 www.projectacumen.com Table of Contents Introduction...

More information