SLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with Aqu
|
|
- Willa Webster
- 6 years ago
- Views:
Transcription
1 INSTALLATION INSTRUCTIONS Note: The following installation instructions are based off of ASTM E 1643 (Standard Practice for Installation of Water Vapor Retarders Used in Contact with Earth or Granular Fill Under Concrete Slabs). 1. Install over compacted base material. s are designed to withstand rugged construction environments; therefore it is not necessary to have a perfectly smooth subsurface. 2. Unroll with the longest dimension parallel with the direction of the concrete pour. The Vapor Barrier should completely cover the entire pour area. 3. Extend over footings and seal to foundation wall, grade beam, or slab at an elevation consistent with the top of the slab or terminate at impediments such as water stops or dowels. (Refer to slab on grade detail). 4. All joints and seams should be overlapped a minimum 6 inches and sealed with 4 inch White Polyethylene Vapor Tape and/or 2 inch Double Bond Tape. (Note: The area of adhesion should be free from dust, dirt and moisture to allow for maximum adhesion of the tape). 5. All penetrations such as utilities and columns should be sealed using, VaporPatch and/or VaporCheck Mastic. Doing so creates a monolithic membrane between the surface of the slab and moisture sources below the slab. (Refer to Boot and Patch Details). 6. If becomes damaged during or after installation, repairs must be made. Methods of repair include: A. Create patch using roll of VaporPatch. Peel off release backing and adhere over damaged area (Refer to Boot and Patch Details). B. Cut a piece of large enough to extend 6 inches beyond damaged area on all sides. Secure patch with either 4 inch White Polyethylene Vapor Tape and/or 2 inch Double Bond Tape. (Note: The area of adhesion should be free from dust, dirt and moisture to allow for maximum adhesion of the tape). 7. A secondary protective layer, such as fine washed gravel or sand is not necessary. If used, do so in accordance with American Concrete Institute s ACI 302 guidelines.
2 SLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with AquaCheck DB (Drainage Board) Granular Fill Wrapped in Geotextile Filter Fabric Per ASTM E 1643, Lap Over Footing and Seal to Foundation Wall *Non-swelling Waterstop Concrete Slab Drain Pipe Graded Compactable Fill Undisturbed or Compacted Soil Undisturbed or Compacted Soil Concrete Footing *Semi-Rigid Preformed Waterstop - OR - *Expanding Type (Clay) or Non-swelling Adhesive-Type Preformed, Moldable Waterstop (with min. 3 horizontal cover to wall surface) *This Detail Shows Multiple Waterstop Options. Check with A/E Specifications for Requirement and/or Placement.
3 PIPE PENETRATION USING VIPER VAPORPATCH Figure: 1 Figure: 2 Cut X Completely Through Patch Top Side of Patch Plumbing Pipe Figure: 3 Figure: 4 Bottom Side of Patch Top Side of Patch Adhesive Release Paper Adhesive Area of Patch That Adheres to Pipe Figure: 5 Figure: 6 Slide Patch Over Pipe Penetration and Adhere to Pipe and Pipe Penetration Pipe Penetration Seal Openings Around Pipe with White Poly Tape or VaporCheck Mastic VaporPatch Pipe Boot Instructions (Using VaporPatch): 1. Cut boot from 11.5 x 50 roll. Each roll contains approximately 50 pipe boots. Note that every 12 there is a pipe grid template. 2. Cut an X through the VaporPatch using the pipe grid template. Note: The grid ranges from 1 inch to 8 inches in diameter. 3. Slide patch over pipe penetration. 4. Peel off the adhesive release paper and firmly apply to the pipe penetration and. 5. Seal off any exposed area with White Polyethylene Tape or VaporCheck Mastic.
4 PIPE PENETRATIONS Option 1: Pipe penetration below is sealed using VaporPatch. Cut square patch approximately 12 x 12 from roll. Cut X in square patch using pipe diameter template. Slide VaporPatch over pipe, peel off release liner and adhere to both Vapor Barrier and pipe. Seal any remaining openings with 4 white poly seam tape or VaporCheck Mastic. VaporPatch VaporPatch Opening Around Pipe 4 White Poly Seam Tape OR Option 2: Pipe penetration below is sealed using a piece of and 4 white poly seam tape. Cut X in remnant, slide over pipe and seal to both and pipe with 4 white poly seam tape. Vapor Barrier Remnant Opening Around Pipe 4 White Poly Seam Tape OR Option 3: Pipe penetration below is sealed using VaporCheck Mastic. For multiple pipe penetrations cut X s in remnant, slide over pipes and seal with 4 White Poly Seam Tape. All remaining openings around pipes are sealed using VaporCheck Mastic. Opening Around Pipe Opening Around Pipe(s) Sealed with VaporCheck Mastic Vapor Barrier Remnant Note: VaporCheck Mastic is available in 5-gallon pails and 28oz caulking tubes. 4 White Poly Seam Tape VaporCheck Mastic
5 CONCRETE SLAB CONSTRUCTION JOINT STEP ONE: Concrete slab Form stake Form Concrete slab Form stake Form Extend 12 past form Compacted subgrade OR Compacted subgrade STEP TWO: Concrete slab White poly seam tape Overlap a minimum 6 Compacted subgrade Note: Stake punctures from form work should be properly taped / patched.
6 TILT-UP WALL WITH POUR STRIP Bent dowel Waterstop Place pour-back strip after wall panels are erected and braced Dowel Slab-on-grade Finish grade Sand/cement grout with embedded leveling shims as required Graded compactable fill *Overlap and tape Undisturbed or compacted soil Coarse backfill (Other reinforcement may be required, not shown for clarity) * Placement: Extend the initial placement of at least 6 to 12 into the pour back strip area. The pour back strip is usually a 3 to 5 wide strip around the perimeter. Prior to filling the pour back strip, install, overlap and tape to existing piece.
7 STEEL COLUMN ON SHALLOW FOOTING Perforated peel off tab creates cavity for sealant Infill concrete slab Existing concrete slab Insul-Joint (Expansion Joint) Adhesive type waterstop Insul-Joint (Expansion Joint) Fill with concrete after floor is placed and column has full dead load Steel column Insul-Joint (Expansion Joint) Perforated peel off tab creates cavity for sealant Existing concrete slab Nonshrink grout Compacted or undisturbed subgrade soil Compacted or undisturbed subgrade soil Footing or drilled pier
8 POST TENSIONED SLAB ON GRADE 1. END SECTION Grout Tendon anchor Post-tensioning tendon Waterproofing Membrane Finish grade 3% - 5% Slope min. 10 feet Seal exterior waterproofing to at termination Undisturbed soil Compacted fill Grade beam trenched and formed 2. INTERIOR SECTION Tendon supports Slab post-tensioning Tendons Compacted fill Undisturbed soil Draped tendon Trenched grade beam
9 CONCRETE COLUMN ON DEEP FOOTING Perforated peel off tab creates cavity for sealant Insul-Joint (Expansion Joint) Infill concrete slab Insul-Joint (Expansion Joint) Non-swelling waterstop Concrete slab Concrete column (Reinforcement not shown) Insul-Joint (Expansion Joint with perforated peel off tab creates cavity for sealant) Non-swelling waterstop Concrete slab Fill with concrete after floor is placed and column has full dead load 1. Extend into blockout area. 2. Lay a piece of into blockout area, overlap and seal. Steel dowels Compacted or undisturbed subgrade soil
10 RESIDENTIAL CRAWL SPACE Foundation Wall Termination: 1. Apply Double Bond Tape along foundation wall at area of termination. Termination Bar Caulk / Sealant Double Bond Tape Foundation Wall Termination 2. Adhere to Double Bond Tape. 3. Apply termination bar over and Double Bond Tape using mechanical fasteners. Double Bond Tape will self-seal around fasteners. 4. Apply silicone caulk / sealant along top edge of termination. Double Bond Tape (between layers) White Poly Tape Min. 6 Overlap Pier Wrap Template 12" Min. (Width) 1½ Times Perimeter of Pier (Length) VIPER VAPOR BARRIER (Pier Wrap) ½1 Pier Wrap Instructions: 1. Unroll and cut, in length, 1½ times the perimeter of the crawl-space pier. 2. Use scissors or sharp utility knife and cut flaps ½ the width of (see above detail). 3. Adhere Pier Wrap ( ) to pier using Double Bond Tape, approved spray adhesive and/or 4 white polyethylene seam tape 4. Overlap and seal to Pier Wrap using Double Bond Tape and 4 White Polyethylene seam tape. Pier Wrap Detail 1 Pier Wrap White Poly Tape Pier Wrap Detail 2 White Poly Seam Tape Double Bond Tape Pier Wrap White Poly Tape Double Bond Tape (as Pier Wrap) Seal to Foundation Seal to Foundation: 1. Install down the foundation wall, over footing and extend onto sub-grade at least 6 inches. 2. Install over crawl space floor and up to foundation wall. All overlaps should be a minimum 6 inches and sealed using White Poly Seam Tape and/or Double Bond Tape. (Note: To prevent tenting along the foundation wall, addition fastening may be required at the floor and wall intersection.)
11 BELOW GRADE EXTERIOR WATERPROOFING TERMINATION Waterproof Sealant / Mastic Metal / Plastic Termination Bar Concrete Screw / Anchor VaporTape (White Polyethylene Tape) Below Grade Foundation Wall (As a protection course) Waterproofing Membrane
Vapor Retarders ,
Stego Wrap 20-Mil Vapor Barrier Stego Wrap 20-Mil Vapor Barrier USES: Stego Wrap 20-Mil Vapor Barrier is used as a below-slab vapor barrier, and as a protection course for below grade waterproofing applications.
More informationColphene BSW Training and Application Guide. Colphene BSW Waterproofing Membrane. 1. Prepare substrate
Colphene BSW Training and Application Guide Colphene BSW Waterproofing Membrane. 1. Prepare substrate Substrate must be structurally sound. Surface must be free of voids, spalled areas, loose aggregate,
More information4 EXTREME FOUNDATION PANELS
4 EXTREME FOUNDATION PANELS For House Crawl Space On Concrete Footings 1. The type of soil is a factor in determining foundation construction details such as footing design, backfill, and drainage provisions.
More informationA. Product Data: Submit manufacturer s product data, with complete general and specific installation instructions, recommendations, and limitations.
SECTION 071700 - BENTONITE WATERPROOFING PART 1 - GENERAL 1.1 WORK SUMMARY A. The work of this section includes, but is not limited to the furnishing and installing the following materials, per project
More informationE. Section Polymer Modified Cement Waterproofing. K. Section Sub drainage: Foundation perimeter drainage.
DELTA -DRAIN Section 07 10 00 Dampproofing and Waterproofing PART 1 GENERAL 1.1 SECTION INCLUDES A. Below grade drainage sheets. B. Plaza deck and planter drainage sheets. 1.2 RELATED SECTIONS A. Section
More information4 EXTREME FOUNDATION PANELS
4 EXTREME FOUNDATION PANELS For Garages On Granular Footings 1. The type of soil is a factor in determining foundation construction details such as footing design, backfill, and drainage provisions. Soils
More informationPLATON FOUNDATION WRAP
DRAINAGE SOLUTIONS SINCE 1908 PLATON FOUNDATION WRAP RUGGED, DIMPLED HIGH-DENSITY POLYETHYLENE (HDPE) MEMBRANE THAT KEEPS FOUNDATIONS DRY ADVANCED TECHNOLOGY EASY INSTALLATION PROVEN PERFORMANCE ARMTEC.COM
More informationStructural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)
Inspection of Fabricators (1704.2) Furnish inspection reports (1704.2.1) - Fabricators that have not been approved Provide a Certificate of Compliance (1704.2.2) - Approved Fabricators Steel Construction
More informationSTEGO WRAP VAPOR BARRIER ASTM E1745 Class A-B-C Compliant
STEGO WRAP ASTM E1745 Class A-B-C Compliant STEGO WRAP is made with our proven trade secret blend of prime virgin resins and additives. Stego Wrap Vapor Barrier is an ASTM E1745 Class A Vapor Barrier (Below
More informationSee the IRC for additional information. See CPD-DS Information Bulletin 100 for Requirements for 1 & 2 Family Dwelling plan submittals.
As a customer service initiative, the Kansas City, Missouri, City Planning and Development Department/Development Services, in cooperation with the Greater Kansas City Home Builders Association, has developed
More informationEncapsulated, Sealed & Closed Crawlspace Installation Manual
YourCrawlSpace, Inc. 1007 Johnni4 Dodds Blvd. Mt. Pleasant, SC 29464 Toll Free: 877-44-CRAWL (27295) Local: (843) 593-1115 Encapsulated, Sealed & Closed Crawlspace Installation Manual Copyright 2017 Your
More informationLIQUID RUBBER INDUSTRIES ENGINEERING SPECIFICATIONS FOR ENGINEERS AND ARCHITECTS. Diagram 1: Standard Membrane Continuation 150 mm Overlap
LIQUID RUBBER INDUSTRIES ENGINEERING SPECIFICATIONS FOR ENGINEERS AND ARCHITECTS Diagram 1: Standard Membrane Continuation 150 mm Overlap Ensure Membrane to Membrane Contact Diagram 2: Membrane Continuation
More informationSTEGO WRAP 15-MIL. 15 mil. A true VAPOR BARRIER ASTM E 1745 Class A-B-C Compliant WRAP STEGO VAPOR BARRIER THE STEGO ADVANTAGES FEATURES & BENEFITS
15-MIL A true VAPOR BARRIER ASTM E 1745 Class A-B-C Compliant 15-MIL VAPOR BARRIER HIGH TEMPERATURE/LOW HUMIDITY = LOW PRESSURE 15 mil represents a recent breakthrough in state-of-the-art plastic extrusion
More informationA Design Review of Waterproofing Codes
A Design Review of Waterproofing Codes Section 1807 of Chapter 18 of the International Building Code addresses waterproofing under the section title of Dampproofing and Waterproofing. The section defines
More informationSpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 )
SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 ) WARNING - When unpacking SpaVault, DO NOT discard styrofoam pieces, these are not packaging materials. Step 1 Excavation Important:
More informationThe better way to build TM. Installation Manual FOUNDATION SIPs & FROST WALLS SIPs
The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs November 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements....................................
More informationInstallation Information 2016
Installation Information 2016 DENDRO-SCOTT Root Barrier... why use anything else? DENDRO-SCOTT Root Barrier, recognised by the Environment Agency, is known for its quality and reliability. It is flexible
More informationFoundation Systems 1, spread foundations. What s the point? What types? The foundation s primary purpose is:
Foundation Systems 1, spread foundations What s the point? The foundation s primary purpose is: Distribute building loads to the soil Prevent frost uplift of the building (act as frost barrier) Some foundation
More information84 Lapping & Jointing 86 Service Pipe Penetrations 87 Sealing to Cavity Wall Constructions 88 Protecting Membranes System Components.
84 Lapping & Jointing 86 Service Pipe Penetrations 87 Sealing to Cavity Wall Constructions 88 Protecting Membranes 90 System Components installation/ SYSTEM COMPONENTS INSTALLATION ADVICE LAPPING and JOINTING
More informationChapter 2: Foundation
Chapter 2: Foundation Crawlspace [V502.1.2] [V502.1.2] [V502.1.3] Vents. Vents in the crawlspace help keep floor insulation and floor framing dry. Crawlspace vents also reduce the potential for radon buildup
More informationITEM 458 WATERPROOFING FOR STRUCTURES
ITEM 458 WATERPROOFING FOR STRUCTURES 458.1. Description. This Item shall govern for the furnishing and placing of waterproofing on concrete and steel bridge decks of railroad structures and on other structures
More informationCRAWL-SPACE CONSTRUCTION
CRAWL-SPACE CONSTRUCTION Many basementless houses are built over a crawl space- that is, the grade-level floor is over an excavation which is deep enough to allow a man to gain access to the underfloor
More informationCrawl Space Moisture Control
Crawl Space Moisture Control Crawl space foundations are found in many homes. Typically, these foundation types are equipped with operable vents designed to provide ventilation for moisture control. Unfortunately,
More informationSHOTCRETE APPLICATION MANUAL
SHOTCRETE APPLICATION MANUAL THIS INSTALLATION MANUAL IS SPECIFICALLY FOR SHOT- CRETE FOUNDATION WALL APPLICATIONS. THE MANUAL IS DIVIDED INTO TWO SECTIONS: HYDROSTATIC AND NON- HYDROSTATIC CONDITIONS.
More informationInspection of New One- and Two- Family Dwellings
Building Safety Division 8500 Santa Fe Drive Overland Park, KS 66212 (913) 895-6225 Fax (913) 895-5016 Email: permitservices@opkansas.org Inspection of New One- and Two- Family Dwellings Planning and Development
More informationNCMA TEK TEK 19-5A FLASHING DETAILS FOR CONCRETE MASONRY WALLS
NCMA TEK National Concrete Masonry Association an information series from the national authority on concrete masonry technology FLASHING DETAILS FOR CONCRETE MASONRY WALLS TEK 19-5A Water Penetration Resistance
More informationPLATON RUGGED, DIMPLED HIGH-DENSITY POLYETHYLENE (HDPE) MEMBRANE THAT KEEPS FOUNDATIONS AND FLOORING DRY ADVANCED TECHNOLOGY EASY INSTALLATION
DRAINAGE SOLUTIONS SINCE 1908 PLATON RUGGED, DIMPLED HIGH-DENSITY POLYETHYLENE (HDPE) MEMBRANE THAT KEEPS FOUNDATIONS AND FLOORING DRY ADVANCED TECHNOLOGY EASY INSTALLATION PROVEN PERFORMANCE ARMTEC.COM
More informationA. Source Limitations: Obtain each type of building insulation through one source.
SECTION 07210 - BUILDING INSULATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationPRODUCT DATA SHEET SikaProof Bentonite
PRODUCT DATA SHEET NATURAL SODIUM BENTONITE BELOW GROUND WATERPROOFING SYSTEM (ONLY TO BE APPLIED BY A SIKA APPROVED CONTRACTOR) PRODUCT DESCRIPTION SikaProof Bentonite is a needle punched thermally locked
More informationTensile ASTM D1970 MD = 939 psi / CD = 1252 psi Self Sealability / water penetration resistance around nails. ASTM D1970 Section 7.
TECHNICAL DATA SHEET Protecto Universal Primer Free Membrane Self-adhered Flashing / Air Barrier / Vapor Retarder Thru-Wall Flashing / Below Grade Waterproofing Membrane with Super Stick technology TECHNICAL
More informationGEOMEMBRANE INSTALLATION GUIDELINES RUFCO 20, 30 & 40 MIL UNREINFORCED DURA SKRIM 30, 36 & 45 MIL REINFORCED
GEOMEMBRANE INSTALLATION GUIDELINES RUFCO 20, 30 & 40 MIL UNREINFORCED DURA SKRIM 30, 36 & 45 MIL REINFORCED Sept 2010 TABLE OF CONTENTS SECTION PAGE 1.0 SUBGRADE PREPARATION 3 2.0 PANEL LAYOUT 4 3.0 IDENTIFICATION
More informationAnchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi
STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel
More informationDIVISION 04 MASONRY CAST STONE. A. Design Considerations. 1. Cast stone shall comply with ASTM C1364, Standard Specification for Cast Stone.
DIVISION 04 MASONRY 04720 CAST STONE A. Design Considerations 1. Cast stone shall comply with ASTM C1364, Standard Specification for Cast Stone. 2. Care must be taken in the design of individual units
More informationDesign & Construction Standards, Revised January
PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
More informationHILLSBOROUGH TOWNSHIP CODE ENFORCEMENT
HILLSBOROUGH TOWNSHIP CODE ENFORCEMENT SAMPLE GUIDE FOR RESIDENTIAL DECKS revised 7 16 Call before you dig! 1 800 272 1000 New Jersey One Call. Utility Mark Out. THIS GENERIC GUIDE IS NOT ALL INCLUSIVE
More informationSECTION COLD APPLIED RUBBER MODIFIED ASPHALT WATERPROOFING
P.O. Box 599 - Mars, PA 16046 800-321-3337 SECTION 07555 COLD APPLIED RUBBER MODIFIED ASPHALT WATERPROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including
More informationGOWANDA, NEW YORK SEPTEMBER 18, 2008 ARCH PROJECT NO
SECTION 07210 BUILDING INSULATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationRedi Rock Specification and Installation Manual
Redi Rock Specification and Installation Manual 1.0 General Scope This Specification covers the Design, Materials and Installation of Redi Rock modular block Retaining and Freestanding Wall systems as
More informationINSPECTION GUIDELINES: JOIST AND UNDERFLOOR COMBO
Joist and Underfloor Combo Page 1 of 7 Revision Date: 10/02/2017 DEVELOPMENT SERVICES BUILDING INSPECTION INSPECTION GUIDELINES: JOIST AND UNDERFLOOR COMBO INSPECTION CODE: 212, 213 SCOPE: RESIDENTIAL
More informationEXCEL Medical Waste - Equipment Installation Section SECTION GYPSUM BOARD
SECTION 09 29 00 GYPSUM BOARD PART 1 - GENERAL 1.1 DESCRIPTION This section specifies installation and finishing of gypsum board. 1.2 RELATED WORK A. Installation of steel framing members for walls, partitions,
More informationSECTION THERMOPLASTIC POLYOLEFIN (TPO) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 075423 - THERMOPLASTIC POLYOLEFIN (TPO) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including Division 00 Bidding Requirements and other Division
More informationRIW SHEETSEAL GR BENEFITS APPLICATIONS APPLIED TO
CI/SfB TN6 LI4143 August 2017 RIW SHEETSEAL GR is a cold applied, high density polyethylene film bonded to aluminium foil and coated with a bitumen/rubber self adhesive layer with a removable reinforced
More informationTUFF-TAC TM BRIDGE MEMBRANE INSTALLATION GUIDE
5 pages TUFF-TAC TM BRIDGE MEMBRANE INSTALLATION GUIDE The following will describe the proper procedure to use when installing Tuff-Tac TM bridge deck membrane. The guide will cover recommended tools to
More informationBENTOMAT CL GEOSYNTHETIC CLAY LINER SPECIFICATION GUIDELINES
BENTOMAT CL GEOSYNTHETIC CLAY LINER SPECIFICATION GUIDELINES This specification is intended for use as a GENERAL GUIDELINE for developing a specification for a specific project. It is NOT intended as a
More informationVOLTEX DS SHOTCRETE FOR FOUNDATION SHORING WALLS
PRODUCT MANUAL SHOTCRETE FOR FOUNDATION SHORING WALLS THIS INSTALLATION MANUAL IS SPECIFICALLY FOR SHOTCRETE FOUNDATION WALL CONSTRUCTION THE MANUAL IS DIVIDED INTO TWO SECTIONS: HYDROSTATIC AND NON-HYDROSTATIC
More informationSTEGO WRAP VAPOUR BARRIER ASTM E1745 Class A-B-C Compliant
STEGO WRAP VAPOUR BARRIER ASTM E1745 Class A-B-C Compliant STEGO WRAP VAPOUR BARRIER is made with our proven trade secret blend of prime virgin resins and additives. Stego Wrap Vapour Barrier is an ASTM
More informationConcrete Slab-on-Ground
Concrete Slab-on-Ground This training package provides information on concrete slab-on-ground construction, including reinforcement, formwork, mix, placement and curing, for village infrastructure and
More informationReflective Insulation Specification & Application Guide for Post Frame and Metal Building Construction
Reflective Insulation Specification & Application Guide for Post Frame and Metal Building Construction WHAT IS PLY-FOIL? Ply-Foil is a multilayer, reflective insulation which comes in rolls consisting
More informationSECTION FOUNDATION DRAINAGE
SECTION 33 41 13 SPEC WRITER NOTES: Use this section only for NCA projects. Delete text between // // not applicable to project. Edit remaining text to suit project. PART 1 - GENERAL 1.1 SUMMARY A. Section
More informationElevated Slab Sequence
Elevated Slab Sequence The following group of photos shows the sequence for installa4on of a one- way elevated slab. (Slab & Beam with Reinforcing & Post- Tensioning) Columns Placed & Form Support (Scaffolding)
More informationSPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)
Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular
More informationSYNTHETIC GRASS INDOOR SURFACE SPECIFICATIONS: K9GRASS LITE
SYNTHETIC GRASS INDOOR SURFACE SPECIFICATIONS: K9GRASS LITE 1.01! DESCRIPTION OF WORK: The contractor shall provide all labor, materials, equipment and tools necessary for the complete installation of
More information1. Decks, balconies, and sun porches 2. Walkways, ramps, and stairways 3. Patios and courtyards
SECTION 07185 TRAFFIC MEMBRANE PART 1 GENERAL 1.1 SECTION INCLUDES A. Traffic membrane, consisting of welded seam PVC waterproofing, over f following surfaces: 1. Decks, balconies, and sun porches 2. Walkways,
More informationSECTION UTILITY MANHOLES AND STRUCTURES
SECTION 33 05 14 UTILITY MANHOLES AND STRUCTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Precast reinforced concrete manholes and structures with tongue-and-groove joints with masonry transition
More informationThe Original. The Innovator.
50368 York MoistureControl Rev5:50368 YorkMoistureControl 9/11/08 2:33 PM Page 1 The Original. The Innovator. 50368 York MoistureControl Rev5:50368 YorkMoistureControl 9/11/08 2:33 PM Page 2 Through-Wall
More informationWhen I started tiling, we didn t do our own shower pans that BATHS
BATHS Preventing Leaks in Tiled Showers Detail the pan properly before any tile is installed BY TOM MEEHAN Photos by Roe Osborn When I started tiling, we didn t do our own shower pans that job fell to
More informationCATCH BASIN ST-1 ENGINEERING DEPARTMENT PLATE NUMBER 3.33' 3.0' 2.0' 4.33' 3.0' 4.0' 1.00' TO BACK OF CURB LINE
3.33' 3.0' 2.0' 4.33' 4.0' 3.0' 1.00' TO BACK OF CURB LINE TOP OF GRATE ELEV. - SEE PLAN NEENAH CASTING R-3067-V OR AS NOTED ON PLANS. "INFA-SHIELD" SEAL OR EQUAL. RINGS (2 MIN., 1' MAX. OF RINGS AND MORTAR).
More informationELEVATION FOR DETAIL REFERENCE ONLY
6 7 8 10 OUTSIDE CORNER 19 20 4 5 11 21 22 15 16 13 12 OPENING 14 SOFFIT 18 END WALL 17 INSIDE CORNER 9 6 7 8 ELEVATION FOR DETAIL REFERENCE ONLY CCV-01 CCV-02 CCV-03 CCV-04 CCV-05 CCV-06 CCV-07 CCV-08
More informationAnchorplex retaining wall construction guide. Building. Anchorplex. Retaining Wall Systems
Anchorplex retaining wall construction guide Building Anchorplex Retaining Wall Systems Table of Contents and ow to Use This Guide table of contents ow to Use This Guide. 2 About the Anchorplex System.
More information1. Cast-in-place concrete is specified in Section
SECTION 03 38 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for furnishing and installing post-tensioned slabs, jacks, jacking and anchors at Parking Structure, and record
More informationB-500 / B-600 SERIES
B-500 / B-600 SERIES VAPOR VENT TRANSITION INSTALLATION GUIDE SINGLE WALL VENT TRANSITION SUMPS B-500 VENT TRANSITION SINGLEWALL SERIES SHOWN WITH WATERSPLASH LID, AND SUPPORT FOR 5 VENT LINES. B-500 SINGLEWALL
More informationProject Address: Name of Person Completing Form:
Statement of Inspections This form is provided as a way to list aspects of the project that require special inspection and testing in accordance with IBC Sections 107.1, 1704, and 1705 and define duties
More informationMinimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08
Minimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08 Table of Contents 1. Title 2. Designation 3. List of Figures 4. Scope 5. Referenced
More informationThe Inspection Process. Waxhaw N.C.
The Inspection Process In Waxhaw N.C. This information is provided by the Waxhaw Enforcement Division to assist you in the progression of your project. Nothing in this document should be considered "Code"
More informationROOFING CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION
ROOFING CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION Revised September 14 The General Trade Knowledge portion of the examination is administered daily in Computer Based Testing (CBT)
More informationgeotechnical and construction materials consultants
geotechnical and construction materials consultants City of Dallas Public Works and Transportation Department 320 E. Jefferson Blvd, Room 307 Dallas, Texas 75203 ATTN: Mr. Vincent Lewis, P.E. Email: Vincent.lewis@dallascityhall.com
More informationTERM Foundation Barrier
TERM Foundation Barrier EPA Establishment No. 89537-TX-1 Product Data Sheet Special Data Sheet-ICF Foundations International Code Council Report ESR-3632 Termite Barrier System Polyguard Detail Sealant
More informationOne and Two Family Additions
One and Two Family Additions An addition to a house, duplex, garage, or an accessory structure requires a building permit prior to performing any construction. Building Department & Permit Office Mon-Fri
More informationSITE WORK II: Footings, Cisterns
SITE WORK II: Footings, Cisterns RUBBLE FOOTINGS FOR EARTHBAG BUILDINGS Materials: Rubble, stone, gravel Tranchée/ Trench: The bottom of the trench must be level and at least 20 cm (8 ) deep on the downhill
More informationTech Solutions WEATHERMATE Straight Flashing. Commercial Installation Guide
Tech Solutions 536.0 WEATHERMATE Straight Flashing Commercial Installation Guide Table of Contents Product Overview.................................................................................3 Benefits
More informationITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS
ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS 701-1 DESCRIPTION 701-1.1 This item shall consist of the construction of pipe culverts, and storm drains, removal of existing storm pipes, connections to existing
More informationSECTION STAY-IN-PLACE INSULATED CONCRETE FORMING SYSTEM
ARCHITECTURAL SPECIFICATIONS MANUFACTURER: InterBlock LLC PO Box 1123, Sheboygan, WI 53082 Phone Number 920-207-7234 SECTION 03100 STAY-IN-PLACE INSULATED CONCRETE FORMING SYSTEM PART 1 GENERAL 1.01 Summary
More informationStructural Inspection
General: Background: An inspection and structural analysis have been performed for the purpose of evaluating the buildings structural systems and components. A full set of structural drawings was utilized
More informationSECTION SHEET MEMBRANE WATERPROOFING AND CRACK ISOLATION
SECTION 093000 - SHEET MEMBRANE WATERPROOFING AND CRACK ISOLATION PART 1 - GENERAL This specification includes the sheet membrane used as waterproofing, vapor retarder, and crack isolation in conjunction
More informationSECTION CAST-IN-PLACE CONCRETE
SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 SUMMARY A. Furnish equipment, materials, and labor required for the supply, casting, finishing, curing, and testing of cast-in-place concrete, as
More information1 Exam Prep Placing Reinforcing Bars Tabs and Highlights
1 Exam Prep Placing Reinforcing Bars Tabs and s These 1 Exam Prep Tabs are based on the CRSI Placing Reinforcing Bars Recommended Practices, 9 th Edition. Each 1 Exam Prep tabs sheet has five rows of tabs.
More informationSECTION SELF-ADHERING SHEET WATERPROOFING
SECTION 07 13 26 SELF-ADHERING SHEET WATERPROOFING This guide specification has been prepared by Polyguard Products Inc., in printed and electronic media, as an aid to specifiers in preparing written construction
More informationRoof Replacement. Notes: T-1 (Title Sheet) Roof Key Plan Russell House Student Union 1400 Greene Street Columbia, South Carolina 29208
Notes: Drawing Index T-1 Title R-1 Roof Plan - Existing Conditions R-2 Roof Plan - New D-1 Roof Details D-2 Roof Details D-3 Roof Details M-1 Mechanical - Roof Plan M-2 Mechanical - Details Roof Key Plan
More informationPreventing Water Leakage through Construction Joints using SYNKOFLEX Preformed Compressible Waterstop
Preventing Water Leakage through Construction Joints using SYNKOFLEX Preformed Compressible Waterstop Introduction A typical problem in most Water Retaining Structures is the leakage of water through Construction
More informationSECTION DECORATIVE STAINLESS STEEL DRAINS AND GRATES
PART 1 - GENERAL 1.1 SUMMARY: SECTION 05 70 00 MODERN DESIGN LINEAR DRAINS DECORATIVE STAINLESS STEEL DRAINS AND GRATES EDITING NOTE: DELETE SYSTEMS AND MATERIALS THAT ARE NOT REQUIRED FOR THE PROJECT.
More informationZurn Z886. 6" Perma-Trench. Installation Instructions
Zurn Z886 6" Perma-Trench Installation Instructions Z886 Accessories 6" [152mm] Wide Trench Drain System Below are the components of the Z886 trench drain typical to an installation. Check your order to
More informationSTRATEGIES FOR TERMITE RESISTANCE TEK 3-9A
NCMA TEK National Concrete Masonry Association an information series from the national authority on concrete masonry technology STRATEGIES FOR TERMITE RESISTANCE TEK 3-9A Construction (2000) Keywords:
More informationSPECIFICATION FOR REINFORCED SOIL WALL
SPECIFICATION FOR REINFORCED SOIL WALL 1.0 EXTENT OF WORK The work shall consist of Reinforced Soil walls built in accordance with this specification and in conformity with the lines, levels and details
More informationSECTION METAL BUILDING SYSTEMS
SECTION 13 3419 PART 1 GENERAL 1.01 SECTION INCLUDES A. Manufacturer-engineered, shop-fabricated structural steel building frame. B. Insulated Metal wall and roof panels including gutters and downspouts.
More informationSECTION EXPANSION CONTROL
SECTION 07 95 00 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply
More informationFlexLok Adhesive Tabs for Carpet Tile
FlexLok Adhesive Tabs for Carpet Tile INSTALLATION EcoFlex ICT EcoFlex NXT 160 South Industrial Blvd. Calhoun, GA. 30701 MohawkGroup.com Technical Services Department 508 East Morris St. Dalton, GA 30721
More informationWATERPROOFING TAMKOWATERPROOFING.COM
WATERPROOFING TAMKOWATERPROOFING.COM DIVISION 7 Powerful Water Control Using the same SBS-modified technology we pioneered in the 1970s, TAMKO continues to raise the standard in waterproofing to help you
More informationFLUID APPLIED WATERPROOFING
SECTION 07120 FLUID APPLIED WATERPROOFING PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 03300 - Cast-In-Place Concrete. 2. 09200 - Metal Studs, Metal Lath, Suspension Ceilings, Plaster, and Stucco.
More informationMaster Specification SECTION 02621
Master Specification 02621-1 PART 1 - GENERAL 1.01 SUMMARY SECTION 02621 FOUNDATION DRAINAGE SYSTEMS Date: 07/01/99 A. Section includes: Subdrainage system material at vertical ** waterproofed walls **
More informationINSULATED CONCRETE MASONRY UNITS Section 04220
INSULATED CONCRETE MASONRY UNITS Section 04220 PART 1 GENERAL 1.01 Summary A. Section Includes 1. Insulated masonry wall units (CMU's) 2. Decorative insulated masonry wall units 1.02 SUBMITTALS A. Samples:
More informationPella 250 Series. Wood Frame Construction with Vinyl Siding... V250-ID-888 Wood Frame Construction with Brick Veneer...
SECTION DIRECTORY General Information Introduction... V250-ID-886 Installation Accessories and Applications... V250-ID-886 Typical Sealant Placement Details... V250-ID-887 Fin Installation Details Wood
More informationNorthpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017
SECTION 055213 - PIPE AND TUBE RAILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationELEVATION FOR DETAIL REFERENCE ONLY
6 7 8 10 26 19 20 14 15 22 SOFFIT OUTSIDE CORNER INSIDE CORNER 23 25 24 25 5 27 28 29 16 11 OPENING 17 18 END WALL 21 12 13 9 6 7 8 ELEVATION FOR DETAIL REFERENCE ONLY CSH-01 CSH-02 CSH-03 CSH-04 CSH-05
More informationHabitat For Humanity: How to Build a House by Larry Haun
This is an excerpt from the book Habitat For Humanity: How to Build a House by Larry Haun Copyright 2002 by The Taunton Press www.taunton.com CHAPTER3 FIRM, FLAT, LEVEL, AND SQUARE: Foundations and Floors
More informationUNDERSLAB OPTION
www.systemplaton.com WATER WALL MOISTURE AIR GAP Introduction Platon is a uniquely dimpled, 24-mil high density polyethylene membrane, performance proven since 1991 to solve basement leakage problems.
More informationConstruction. Method Statement SikaProof A GREENSTREAK 02/09/2012 1/20
02/09/2012 Method Statement SikaProof A Corporate Office Sika Greenstreak Tel.: (636) 225-9400 Email: info@greenstreak.com 3400 Tree Court Industrial Blvd. (800) 325-9504 St. Louis, MO 63122 Fax: (636)
More informationCHAPTER VI. -- FOUNDATION REPAIR & DAMP PROOFING TABLE OF CONTENTS
CHAPTER VI. -- FOUNDATION REPAIR & DAMP PROOFING TABLE OF CONTENTS 30.50 (1.) Application for Building Permit 30.50 (2.) Best Management Standards for Foundation Repair 30.50 (3.) Definitions 30.50 (4.)
More informationELEVATION FOR DETAIL REFERENCE ONLY
4 5 6 8 18 13 10 15 SOFFIT OUTSIDE CORNER INSIDE CORNER 16 17 3 19 20 11 9 OPENING 12 END WALL 14 7 4 5 6 ELEVATION FOR DETAIL REFERENCE ONLY EH-01 INDEX EH-02 STANDARD PANEL OFFERING EH-03 SIDE LAP DETAILS
More informationSECTION GYPSUM BOARD ASSEMBLIES
SECTION 09 21 16 GYPSUM BOARD ASSEMBLIES PART 1 GENERAL 1.1 SECTION INCLUDES A. Metal stud wall and ceiling framing, 20 gauge. B. Metal channel suspended ceiling framing. C. Gypsum board. D. Gypsum sheathing.
More informationTable of Contents. List of Drawings
SCOPE OF WORK Hastings Stadium Exhibition Park, 81 London Road, Guelph, Ontario Structural and Maintenance Remedial Work Prepared For City of Guelph City Hall, 1 Carden Street, Guelph, ON N1H 3A1 Prepared
More information