COPPER-THERM Specification Guide

Size: px
Start display at page:

Download "COPPER-THERM Specification Guide"

Transcription

1 STANAR SPECIFICATION Pre-insulaed Copper Piping Sysems suiable for Heaing Waer, omesic Ho Waer, Chilled Waer, Condensae Reurn, Process Fluids, and Cryogenic services. Par 1 General 1.1 Pre-insulaed Piping - Furnish a complee sysem of facory pre-insulaed copper piping for he specified service. All pre-insulaed pipe, fiings, insulaing maerials, and echnical suppor shall be provided by he Pre-insulaed Piping Sysem manufacurer. 1.2 The sysem shall be manufacured by Thermacor Process Inc. of For Worh, Texas. Par 2 Producs 2.1 Carrier pipe shall be Type K Copper ube, conforming o ASTM B-88. (A he Engineer s opion, Type or Type M is accepable.) Cleaned and Capped Type K, and ACR Type copper ube may be used for cryogenic and refrigeraion applicaions. All copper piping shall have ends cu square for socke brazing. Sraigh secions of facory insulaed pipe shall be 20-foo in lengh and shall have of exposed pipe a each end for field join fabricaion. Field joining of piping shall uilize approved mehods of brazing wih alloys meling a or above 1100 F; in-lead solder is no accepable. 2.2 Insulaion shall be polyurehane foam eiher spray applied or injeced wih one sho ino he annular space beween carrier pipe and jacke. Insulaion shall be rigid, 90% minimum closed cell polyurehane wih a minimum 2.0 lbs per cubic foo densiy, compressive srengh of F, and coefficien of hermal conduciviy (K-Facor) of no higher han 75 F per ASTM C-518. Maximum operaing emperaure shall no exceed 250 F. Insulaion hickness shall be specified by calling ou appropriae carrier pipe and jacke size combinaions as lised on drawing or Jackeing maerial shall be eiher exruded whie polyvinyl chloride, consising of clean, virgin NSF approved Class B PVC compound, conforming o ASTM -1784, Type 1, Grade 1 or high densiy polyehylene (HPE). PVC jacke shall have a wall hickness in mils equal o en imes he nominal jacke diameer and shall no be less han 60 mils. HPE shall have a minimum wall hickness of 100 mils for jacke sizes less han or equal o 1, 125 mils for jacke sizes larger han 1 o 2, and 150 mils for jacke sizes larger han 2. No FRP, HUP, or ape jacke allowed. 2.4 Sraigh run joins are insulaed using urehane foam o he hickness specified, jackeed wih eiher an HPE or PVC sleeve and sealed wih pressure sensiive, polyehylene backed, rubberized biumen adhesive ape, 30 mils hick, or a hea shrink sleeve. Above ground insallaions shall use whie, pressure sensiive PVC ape. 2.5 Fiings are Thermacor SC (sandard componens) facory pre-fabricaed and pre-insulaed wih urehane o he hickness specified, jackeed wih a molded fiing cover or a PVC fiing cover wrapped wih polyehylene backed, pressure sensiive rubberized biumen adhesive ape, 30 mils hick. Carrier pipe fiings shall be brazed wih alloys meling a or above 1100 F; in-lead solder is no accepable. Fiings include expansion loops, elbows, ees, reducers, and anchors. (A he Engineer s opion, sysem may be pre-engineered.) 2.6 Expansion/conracion compensaion will be accomplished uilizing facory pre-fabricaed and pre-insulaed expansion elbows, Z-bends, expansion loops, and anchors specifically designed for he inended applicaion. Exernal expansion compensaion uilizing flexible expansion pads minimum one inch hick exending on eiher side, boh inside and ouside he radius of he fiings, is used wih all fiings having expansion in excess of 1/. (Coninued)

2 STANAR SPECIFICATION Par 3 Execuion 3.1 Pre-fabricaed sysems shall be provided as SC (sandard componens) fiings and facory insulaed sraigh pipe secions for field engineering per he conrac drawings. (A he Engineer s opion, sysem may be pre-engineered wih spool piece numbers marked for insallaion per manufacurer s drawings.) 3.2 Underground sysems shall be buried in a rench of no less han wo fee deeper han he op of he pipe and no less han eigheen inches wider han he combined O.. of all piping sysems. A minimum hickness of 24 inches of compaced backfill over he op of he pipe will mee H-20 highway loading. 3.3 Trench boom shall have a minimum of of sand or specified backfill maerial, as approved by he engineer, as a cushion for he piping. All field cuing of he pipe shall be performed in accordance wih he manufacurer s insallaion insrucions. 3.4 A hydrosaic pressure es of he carrier pipe shall be performed per he engineer s specificaion wih a facory recommendaion of one and one-half imes he normal sysem operaing pressure for no less han wo hours. Care shall be aken o insure all rapped air is removed from he sysem prior o he es. Appropriae safey precauions shall be aken o guard agains possible injury o personnel in he even of a failure. 3.5 Field service, if required by projec specificaions, will be provided by a cerified manufacurer s represenaive or company field service echnician. The echnician will be available a he job o check unloading, soring, and handling of pipe, join insallaion, pressure esing, and backfilling echniques. This service will be added ino he cos as par of he projec echnical services required by he pre-insulaed pipe manufacurer.

3 POYURETHANE FOAM IN PVC JACKET Carrier Pipe: - Type K,, or M Hard Copper (ASTM B-88) d > - 9 Cu Back d < - Cu Back Jackeing Maerial: Polyvinyl Chloride (PVC) Insulaion: Polyurehane Foam d Pipe 1/ 3/ 1-1/ 1-1/ 2-1/ Jacke Sandard engh Insulaion Thickness Exernal iameer * Oher sizes are available

4 POYURETHANE FOAM IN HPE JACKET Carrier Pipe: - Type K,, or M Hard Copper (ASTM B-88) d > - 9 Cu Back d < - Cu Back Jackeing Maerial: High ensiy Polyehylene (HPE) Insulaion: Polyurehane Foam d Pipe Jacke Sandard engh Insulaion Thickness Exernal iameer 1/ / / 1-1/ 2-1/ * Oher pipe and jacke combinaions are available. ** Insulaion hickness is calculaed using minimum wall hickness. Acual wall hickness may be greaer han saed, hereby minimally decreasing acual foam hickness.

5 HEAT OSS IAGRAM ( - PIPE) HEAT OSS FOR OF POYURETHANE FOAM* Q loss (Bu/f/hr) Burial deph: 3 - Soil conduciviy: 12 (Bu/h.f 2. F/f) - Soil emperaure: 50 F Service Temperaure ( F) HEAT OSS FOR OF POYURETHANE FOAM* Q loss (Bu/f/hr) Burial deph: 3 - Soil conduciviy: 12 (Bu/h.f 2. F/f) - Soil emperaure: 50 F Service Temperaure ( F) * Values are calculaed using 3E Plus in accordance wih ASTM C680 and are subjec o he erms and limiaions saed in he sofware. Acual hea loss may vary.

HT-406 Specification Guide

HT-406 Specification Guide 2.101 Part 1 - General Pre-insulated HDPE-Jacketed Steel Piping Systems suitable for Steam, Condensate Return, and High Temperature Heating Water. 1.1 Pre-insulated Piping - Furnish a complete HDPE jacketed

More information

DUO-THERM 505 Specification Guide

DUO-THERM 505 Specification Guide STANDARD SPECIFICATION 3.101 7.01.08 Part 1 - General Duo - Therm 505 Steel Piping Systems suitable for Steam, High Temperature Hot Water, Gravity and Pumped Condensate. 1.1 Pre-insulated Piping - Furnish

More information

Approval of Welding Consumables for High Strength Quenched and Tempered Steels for Welded Structures

Approval of Welding Consumables for High Strength Quenched and Tempered Steels for Welded Structures .1 (1995) (Rev 1 1997) Approval of Welding Consumables for High Srengh Quenched and Tempered Seels for Welded Srucures 1. General 1.1 Scope 1.1.1 These requiremens supplemens he UR W17 and give he condiions

More information

LOK-21 FEATURES & BENEFITS

LOK-21 FEATURES & BENEFITS LOK-21 FTURS & NFITS INTROUTION GSKT ILLUSTRTION iamond Lok-21 resrained join PV pressure pipe is manufacured in accordance wih WW 900 Polyvinyl hloride (PV) Pressure Pipe and Fabricaed Fiings in sizes

More information

Connections and Tension Member Design

Connections and Tension Member Design Connecions Connecions and Tension Member Design Connecions mus be able o ransfer any axial force, shear, or momen from member o member or from beam o column. Seel consrucion accomplishes his wih bol and

More information

SECTION HVAC PIPING

SECTION HVAC PIPING SECTION 23 21 13 PART 1 - GENERAL 1.1 SUMMARY A. Work Included: 1. Heating Water Piping, Buried 2. Heating Water Piping, Above Ground 3. Chilled Water Piping, Buried 4. Chilled Water Piping, Above Grade

More information

Single Stage Regulator for General Applications

Single Stage Regulator for General Applications Single Sage Regulaor for General Applicaions Series AK igh inle pressure ype: Max. 3 psig (. MPa) Flo capaciy Sandard: o slpm F (opion): o slpm Body maerial: Sainless seel and available aselloy inernals

More information

Subjective Paper-II. 1. b Explain in detail the ultrasonic pulse velocity method of non-destructive testing of concrete.

Subjective Paper-II. 1. b Explain in detail the ultrasonic pulse velocity method of non-destructive testing of concrete. C- Convenional Paper-II IS-0 www.gaeforum.com Subjecive Paper-II. a Wha are he differen ypes of Porland cemen as per Indian code of pracice? iscuss any wo.. b xplain in deail he ulrasonic pulse velociy

More information

SECTION 3 BOILERS AND PRESSURE VESSELS. 1 General. 1.2 Application. 1.1 Principles. 1.3 Definitions. Pt C, Ch 1, Sec 3

SECTION 3 BOILERS AND PRESSURE VESSELS. 1 General. 1.2 Application. 1.1 Principles. 1.3 Definitions. Pt C, Ch 1, Sec 3 P C, Ch 1, Sec 3 SECTION 3 BOILERS AND PRESSURE VESSELS 1 General 1.2 Applicaion 1.1 Principles 1.1.1 Scope of he Rules The boilers and oher pressure vessels, associaed piping sysems and fiings shall be

More information

Contents. Index 4. Quality targets, Technical standards 5. Problems and solutions 6 7. Raw material data: PP-R, metals 8 9

Contents. Index 4. Quality targets, Technical standards 5. Problems and solutions 6 7. Raw material data: PP-R, metals 8 9 The green pipe Conens Please read he informaion conained in his handbook before you use K2 PPR for he firs ime, especially he informaion abou how o make he joins. Index 4 Qualiy arges, Technical sandards

More information

Hydrotite - Hydrophilic Water Swelling Material

Hydrotite - Hydrophilic Water Swelling Material Hydroie - Hydrophilic Waer Swelling Maerial Feaures Hydroie is well known as a superior waer sealan. Unlike convenional waer sealans, Hydroie has a unique double acion sysem. Firs, he rubber elasiciy forms

More information

AHRI Standard 420 (I-P) 2016 Standard for Performance Rating of Forced-circulation Free-delivery Unit Coolers for Refrigeration

AHRI Standard 420 (I-P) 2016 Standard for Performance Rating of Forced-circulation Free-delivery Unit Coolers for Refrigeration AHRI Sandard 40 (I-P) 016 Sandard for Performance Raing of Forced-circulaion Free-delivery Uni Coolers for Refrigeraion IMPORTANT SAFETY DISCLAIMER AHRI does no se safey sandards and does no cerify or

More information

DC Rotary Solenoid 6 G D A

DC Rotary Solenoid 6 G D A DC Roary Solenoid 6 Produc Group G D A Funcion increasing orque characerisic pure roary operaion, angles up o 95 o wih or wihou adjusable spring reurn lef or righ hand operaion Consrucion no axial linear

More information

OPTIMIZATION OF THE PLASTIC INJECTION PROCESS THROUGH THE MODIFICATION OF THE PROCESS FUNCTIONAL PARAMETERS

OPTIMIZATION OF THE PLASTIC INJECTION PROCESS THROUGH THE MODIFICATION OF THE PROCESS FUNCTIONAL PARAMETERS OPTIMIZATION OF THE PLASTIC INJECTION PROCESS THROUGH THE MODIFICATION OF THE PROCESS FUNCTIONAL PARAMETERS Teodor - Daniel Mîndru, Ciprian Dumiru Ciofu &, Dumiru Nedelcu Gheorghe Asachi Technical Universiy

More information

TRICON DOUBLE-CON PLUS

TRICON DOUBLE-CON PLUS TRICON DOUBLE-CON PLUS System Specifications Iron Pipe Size Steel Conduit O.D. Steel Conduit Wall Outer Insulation (IN)* Alum./Stainless/Galv. Jacket O.D. (IN) Metal Jacket Wall Thickness 1 4.50.120 1.75

More information

DUO-THERM 505 HIGH DENSITY POLYETHYLENE JACKETED CLASS A STEEL CONDUIT SYSTEM

DUO-THERM 505 HIGH DENSITY POLYETHYLENE JACKETED CLASS A STEEL CONDUIT SYSTEM HIGH DENSITY POLYETHYLENE JACKETED CLASS A STEEL CONDUIT SYSTEM THERMACOR S is a factory-fabricated, pre-insulated piping system that incorporates polyurethane foam and a rugged, noncorrosive, High Density

More information

Electronic Flow Meter FC03 (compressed air/gases)

Electronic Flow Meter FC03 (compressed air/gases) Elecronic Flow Meer FC0 (compressed air/gases) Descripion The miniaure Flow Meer FC0 is designed o operae wih air, compressed air, oxygen, nirogen and biogas. Wih one analogue oupu, one frequency oupu

More information

BioStim. BioStim Controller & Computer Interface SUPERTECH. User's Manual

BioStim. BioStim Controller & Computer Interface SUPERTECH. User's Manual BioSim BioSim Conroller & Compuer Inerface User's Manual SUPERTEC The pars of he BioSim universal biological simulaor sysem The BioSim sysem is divided ino wo funcional pars. The ime parameers are generaed

More information

Q.1 Explain conduction of heat. Describe its three applications.

Q.1 Explain conduction of heat. Describe its three applications. CHP # 9 RANSFER OF HEA. Explain conducion of hea. Describe is hree applicaions. (Ans) Conducion of hea he process in which hea energy is ransferred from paricle o paricle by collision is called conducion

More information

PVC. System Specifications TABLE 1 TABLE 2

PVC. System Specifications TABLE 1 TABLE 2 TRICON PVC TABLE 1 Pipe Size Minimum Insulation Thickness PVC Jacket O.D. PVC Jacket Wall 2 1.81 6.14.070 3 1.25 6.14.070 4 1.75 8.16.080 6 1.69 10.20.100 8 1.69 12.24.120 10 1.65 14.32.140 12 1.47 16.00.160

More information

FLEXURAL BEHAVIOUR OF LIGHT GAUGE COLD FORMED STEEL MEMBERS : COMPARISON OF IS CODE AND EURO CODE

FLEXURAL BEHAVIOUR OF LIGHT GAUGE COLD FORMED STEEL MEMBERS : COMPARISON OF IS CODE AND EURO CODE IJRET: Inernaional Journal of Research in Engineering and Technology eissn: 319-1163 pissn: 31-738 FLEXURAL BEHAVIOUR OF LIGHT GAUGE COLD FORMED STEEL MEMBERS : COMPARISON OF IS CODE AND EURO CODE A Jayaraman

More information

Demand Planning: Forecasting and Demand Management

Demand Planning: Forecasting and Demand Management CHAPTER TWELVE Demand Planning: orecasing and Demand Managemen McGraw-Hill/Irwin Copyrigh 2011 by he McGraw-Hill Companies, Inc. All righs reserved. Where We Are Now Relaionships Susainabiliy Globalizaion

More information

2.Sphere shape. 3.Irregular shape

2.Sphere shape. 3.Irregular shape Polycrysalline Compac (PDC) of supreme company is sinered wih diamond and WC under ulrahigh pressure and emperaure. I inegraes he advanages of diamond and WC, wih boh exremely high wear resisance and excellen

More information

STEEL FOR FOUNDATIONS STEEL SHEET PILES TUBES AND PIPES MICRO PILING ANCHORING SYSTEMS

STEEL FOR FOUNDATIONS STEEL SHEET PILES TUBES AND PIPES MICRO PILING ANCHORING SYSTEMS STEEL FOR FOUNDATIONS STEEL SHEET PILES TUES AND PIPES MICRO PILING ANCHORING SYSTEMS English March 2017 AOUT PALPILE PalPile is a family owned rading company, locaed in he Neherlands. We specialize in

More information

CON II CONTAINMENT PIPING SYSTEM

CON II CONTAINMENT PIPING SYSTEM CONTAINMENT PIPING SYSTEM THERMACOR S Hazardous Fluids Containment System is a pre-engineered, factory-fabricated, containment piping system for above or below ground transportation of hazardous fluids.

More information

REPORT as a partial requirement for the course on ENGINEERING EXPERIMENTATION

REPORT as a partial requirement for the course on ENGINEERING EXPERIMENTATION REORT as a parial requiremen for he course on ENGINEERING EXERIMENTATION DETERMINATION OF RESSURE WITHIN A THIN WALLED CYLINDER USING AN EXTERNALLY ALIED STRAIN GAGE Submied by: Signed Name(s) Suden_A

More information

A. This section is intended to provide design guidelines for Utility Direct Buried Piping and Conduit Systems.

A. This section is intended to provide design guidelines for Utility Direct Buried Piping and Conduit Systems. Date Description of Change Pages / Sections Modified ID 6/15/16 Entire document - mgl44 PART 1 - INTRODUCTION 1.1 PURPOSE A. This section is intended to provide design guidelines for Utility Direct Buried

More information

STEEL-THERM D.I. COUPLED STEEL PIPING SYSTEM

STEEL-THERM D.I. COUPLED STEEL PIPING SYSTEM D.I. COUPLED STEEL PIPING SYSTEM THERMACOR S is a factory-fabricated, pre-insulated piping system for chilled water, heating water, or domestic hot water. The system is designed with a steel carrier pipe

More information

TEMPORARY BRIDGES. Acrow 700XS

TEMPORARY BRIDGES. Acrow 700XS TEMPORARY BRIDGES Acrow 700XS E N G I N E E R I N G I D E A S - W O R L D C L A S S S O L U T I O N S - Acrow 700XS emporary bridges The Acrow 700XS russ bridge sysem is based on he Bailey bridge sysem,

More information

2. Vertical resistance

2. Vertical resistance How o design masonry srucures using Eurocode 6 2. Verical resisance Revision 2 Eur Ing, Prof. J J Robers BSc(Eng), PhD, CEng, FISrucE, FICE, FIMS, FCMI, MICT O Brooker BEng, CEng, MICE, MISrucE Inroducion

More information

PBA series Piezo switches

PBA series Piezo switches P series Piezo swiches Specificaions UG4 ushing diameer 6 mm, 9 mm or 22 mm Sealed o IP68 and IP69K (swiches mouned on panel) Easy o clean meal surface Very long life expecancy Ring or do illuminaion 2

More information

Plant Design & Economics

Plant Design & Economics Posal Correspondence GATE & Public Secors Plan Design & Economics To Buy Posal Correspondence Package call a 0-9990657855 GATE 2015 Cu-off Marks BRANCH GENERAL SC/ST/PD OBC(Non-Creamy) Toal Appeared Chemical

More information

Semblex Doro-PT '!II DU RO-PT. Design guide fasteners for thermoset plastics SCREWS FOR PLASTICS

Semblex Doro-PT '!II DU RO-PT. Design guide fasteners for thermoset plastics SCREWS FOR PLASTICS Semblex Doro-PT '! SCREWS FOR PLASTCS DU RO-PT Design guide faseners for hermose plasics Semblex Buro-PT screws are designed for use in hermose and hermohardening plasics. The DU RO-PT fasener can be insalled

More information

Longitudinal strength standard

Longitudinal strength standard (1989) (Rev. 1 199) Longiudinal srengh sandard.1 Applicaion This requiremen applies only o seel ships of lengh 90 m and greaer in unresriced service. For ships having one or more of he folloing characerisics,

More information

MECHANICAL ENGINEERING

MECHANICAL ENGINEERING Serial : 1. JP_ME_Casing & Welding_30518 CLASS TEST Delhi Noida Bhopal Hyderabad Jaipur Lucknow Indore Pune Bhubaneswar Kolkaa Pana Web: E-mail: info@madeeasy.in Ph: 011-451461 MECHANICAL ENGINEERING Casing

More information

Strategic Information Systems Planning

Strategic Information Systems Planning Course Overview CISB444 Sraegic Informaion Sysems Planning Sraegic Planning for Informaion Sysems explores he impac ha informaion sysems (IS) and informaion echnology (IT) have on business performance

More information

HYGROTHERMAL AGING OF POLYIMIDE MATRIX COMPOSITE LAMINATES

HYGROTHERMAL AGING OF POLYIMIDE MATRIX COMPOSITE LAMINATES HYGROTHERMAL AGING OF POLYIMIDE MATRIX COMPOSITE LAMINATES John A. Nairn and Man-Hee Han Maerials Science and Engineering, Universiy of Uah 122 S Cenral Campus Dr Rm 34, Sal Lake Ciy, UT, 84121-56, USA

More information

FIBER-THERM FRP PIPING SYSTEM

FIBER-THERM FRP PIPING SYSTEM FRP PIPING SYSTEM THERMACOR S is a factory-fabricated, preinsulated piping system for below ground distribution of chilled water, heating water, domestic hot water, process fluids, and condensate return.

More information

Conceptual Questions. Fig Fig.1.27 EXERCISES

Conceptual Questions. Fig Fig.1.27 EXERCISES XRISS oncepual Quesions. The number of decimal places in a measuremen along wih he uni is an indicaor of he precision of an insrumen. escribe wha kind of insrumens can be used o produce measuremens of

More information

Specification Tutorial

Specification Tutorial Laser Safey Glasses (Page of ) Indelibly prined on he laser safey glasses are wo ses of numbers: Opical Densiy () and L-Raing, which are boh used o indicae he level of proecion provided for specific wavelengh

More information

Understanding Life Systems

Understanding Life Systems Table of Conens Secion 1 Undersanding Life Sysems Sudens will learn abou biodiversiy and invesigae he impacs of environmenal condiions and human aciviies on biodiversiy. They will be inroduced o he five

More information

D-10 OUTLINE SPECIFICATION FOR PRE FAB Undergrd Piping System

D-10 OUTLINE SPECIFICATION FOR PRE FAB Undergrd Piping System D-10 OUTLINE SPECIFICATION FOR PRE FAB Undergrd Piping System PREFABRICATED CONDUIT PIPING SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General

More information

Underground System. Description

Underground System. Description Description Insapipe is a factory fabricated and insulated Underground piping system designed for direct burial into an unlined trench. The product is manufactured generally to British Standard 4508 for

More information

Effect of Climate Conditions and Some Operating Parameters on Water Evaporation of Cooling Tower in Refrigeration and Air Conditioning Systems

Effect of Climate Conditions and Some Operating Parameters on Water Evaporation of Cooling Tower in Refrigeration and Air Conditioning Systems Inernaional Journal of Research Sudies in Science, Engineering and Technology Volume 3, Issue 1, January 2016, PP 22-28 ISSN 2349-4751 (Prin) & ISSN 2349-476X (Online) Effec of Climae Condiions and Some

More information

Weldability. TALAT Lecture pages, 14 figures. Basic Level. prepared by Ulrich Krüger, Schweißtechnische Lehr- und Versuchsanstalt Berlin

Weldability. TALAT Lecture pages, 14 figures. Basic Level. prepared by Ulrich Krüger, Schweißtechnische Lehr- und Versuchsanstalt Berlin TALAT Lecure 4202 Weldailiy 13 pages, 14 figures Basic Level prepared y Ulrich Krüger, Schweißechnische Lehr- und Versuchsansal Berlin Ojecives: descriing he imporan facors governing weldailiy of minium,

More information

PLASTIC HELICAL COIL HEAT EXCHANGER AS AN ALTERNATIVE FOR A DOMESTIC WATER STORAGE TANK

PLASTIC HELICAL COIL HEAT EXCHANGER AS AN ALTERNATIVE FOR A DOMESTIC WATER STORAGE TANK PLASTIC HELICAL COIL HEAT EXCHANGER AS AN ALTERNATIVE FOR A DOMESTIC WATER STORAGE TANK Bokisova L.*, Bağcı Ö., Sharif A., Beyne W., Daenens D. and De Paepe M. *Auhor for correspondence Deparmen of Flow,

More information

SECTION POLYVINYL CHLORIDE (PVC) WATERLINE

SECTION POLYVINYL CHLORIDE (PVC) WATERLINE SECTION 02632 POLYVINYL CHLORIDE (PVC) WATERLINE PART 1 - GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment, and incidentals required, and install polyvinyl chloride (PVC) waterline,

More information

2.500 Desalination and Water Purification

2.500 Desalination and Water Purification MIT OpenCourseWare hp://ocw.mi.edu 2.500 Desalinaion and Waer Purificaion Spring 2009 For informaion abou ciing hese maerials or our Terms of Use, visi: hp://ocw.mi.edu/erms. Inroducion To Physical Oceanography

More information

In chinese (if applicable): 2. Select the BEST answer to each question. Record your answers in the multiple-choice questions answer sheet provided.

In chinese (if applicable): 2. Select the BEST answer to each question. Record your answers in the multiple-choice questions answer sheet provided. Specimen Paper Page 1 of 11 SINGAPORE POLYTECHNIC SCIENCE ENTRANCE TEST Name : In chinese (if applicable): Passpor / ID No: Sea No: Tes Venue: Dae: Time Allowed: 1 1 / 2 hours Insrucions o candidaes: 1.

More information

Piezo switches Ø 30 mm

Piezo switches Ø 30 mm New! P series Piezo swiches Ø 3 mm Disincive feaures and specificaions ushing diameer 3 mm (.8) SW-P3-76 Sealed o IP68 and IP69K (swiches mouned on panel) Easy o clean meal surface Very long life expecancy

More information

Machine Parts. Welded Joints Introduction

Machine Parts. Welded Joints Introduction Machine Pars Welded Joins Łukasz Jedliński, Ph.D., Eng. Inroducion Welding is a echnique for permanenly joining meal componens by using a molen maerial ha can be eiher a layer of he componens (base maerial)

More information

ARTICLE 26 UTILITY LINE INSTALLATION REQUIREMENTS

ARTICLE 26 UTILITY LINE INSTALLATION REQUIREMENTS UTILITY LINE INSTALLATION REQUIREMENTS Index 26.01 JACK AND BORE OPERATIONS 26.02 PRESSURE PIPE RESTRAINT 26.03 PRESSURE CONNECTION BACK TO TABLE OF CONTENTS Section 26.01 JACK AND BORE OPERATIONS 26.01.01

More information

GrowSpan Series 2000 Steel End Frame Kits

GrowSpan Series 2000 Steel End Frame Kits GrowSpan Series 2000 Steel End Frame Kits 20' Wide 2017 Farmek All Rights Reserved. Reproduction is prohibited without permission. SK# GK2EW22120B GK2EW22120G 20' Wide (Base Plates) 20' Wide (No Base Plates)

More information

Development of Non-Destructive Coke Thickness Measurement Technology for Fired Heater Tubes Using Infrared Thermography

Development of Non-Destructive Coke Thickness Measurement Technology for Fired Heater Tubes Using Infrared Thermography 13h Inernaional Symposium on Nondesrucive Characerizaion of Maerials (NDCM-XIII), -24 May 13, Le Mans, France www.nd.ne/?id=123 More Info a Open Access Daabase www.nd.ne/?id=123 Developmen of Non-Desrucive

More information

THE WAY IS OUR GOAL Innovative conveying systems

THE WAY IS OUR GOAL Innovative conveying systems THE WAY IS OUR GOAL Innovaive sysems echnology www.zeppelin.com ENGINEERING YOUR SUCCESS Every Zeppelin plan is developed according o he cliens specific requiremens and realized hanks o our cusomized innovaive

More information

HYDRONIC PIPING

HYDRONIC PIPING Uponor, Inc. 5925 148th Street West Apple Valley, MN 55124 Toll Free: (800) 321-4739 Phone: (952) 891-2000 Fax: (952) 891-1409 www.uponor-usa.com This specification is a manufacturer-specific proprietary

More information

HYDRONIC PIPING CHAPTER 12

HYDRONIC PIPING CHAPTER 12 CHAPTER 12 HYDRONIC PIPING SECTION 1201 GENERAL 1201.1 Scope. The provisions of this chapter shall govern the construction, installation, alteration and repair of hydronic piping systems. This chapter

More information

EVALUATION OF THERMAL DIFFUSIVITY OF SOIL NEAR THE SURFACE: METHODS AND RESULTS

EVALUATION OF THERMAL DIFFUSIVITY OF SOIL NEAR THE SURFACE: METHODS AND RESULTS 7 Bulgarian Journal of Agriculural Science, (No ), 7-7 Agriculural Academy EVALUATION OF THERMAL DIFFUSIVITY OF SOIL NEAR THE SURFACE: METHODS AND RESULTS B. Evsaiev Universiy of Ruse, BG 77 Ruse, Bulgaria

More information

SPECIAL SPECIFICATION 6623 Multi-Duct Conduit System

SPECIAL SPECIFICATION 6623 Multi-Duct Conduit System 2004 Specifications Houston District SPECIAL SPECIFICATION 6623 Multi-Duct Conduit System 1. Description. Furnish and place a Multi-Duct Conduit (MDC) system that is suitable for installation in an outdoor

More information

Underground Steam Condensate Distribution Piping

Underground Steam Condensate Distribution Piping University of New Hampshire University of New Hampshire Scholars' Repository Division 33 Utilities Chapter 5 Technical Construction and Renovation Standards Spring 4-16-2018 336313 Underground Steam Condensate

More information

Viscometer System ViscoTester 550

Viscometer System ViscoTester 550 Viscomeer Sysem ViscoTeser 550 Concep Applicaion Measuring Principle Sensors Sofware The ViscoTeser 550 is specially designed for Qualiy Conrol applicaions I is a roaional viscomeer ha measures precisely,

More information

SSG University BRM Training

SSG University BRM Training SSG Universiy BRM Training Your company has made huge invesmens in Oracle BRM isn i ime for everyone o know wha i is and how i works? See how we rain people in he ways of Oracle BRM a SSG Universiy. This

More information

การประช มว ชาการว ศวกรรมเคม และเคม ประย กต แห งประเทศไทย คร งท 17 ประจ าป

การประช มว ชาการว ศวกรรมเคม และเคม ประย กต แห งประเทศไทย คร งท 17 ประจ าป KCF18_1 Kineics Rae of Polypropylene Caalyic Cracking Paarawan Klomkom, Chainurak Pum-in, Sunan Limrakul, and Terdhai Vaanaham* Deparmen of Chemical Engineering, Faculy of Engineering, Kasesar Universiy,

More information

* National Institute of Occupational Safety and Health, USA. ** American Conference of Governmental Industrial Hygienists

* National Institute of Occupational Safety and Health, USA. ** American Conference of Governmental Industrial Hygienists Supercriical Fluid Desorpion Sudies for Recovery of - Caprolacam from Granular Acivaed Carbon afer Wasewaer Treamen: Modelling of Diffusive Behaviour B. Al-Duri * and C.S. Kalpage Dep of Chemical Engineering,

More information

Analysis on Crack Fatigue Growth Calculation for Nuclear Power Plant Inservice

Analysis on Crack Fatigue Growth Calculation for Nuclear Power Plant Inservice MTEC Web of Conferences 95, 15006 (017) DOI: 10.1051/ maecconf/0179515006 ICMME 016 nalysis on Crack Faigue Growh Calculaion for Nuclear Power Plan Inservice Inspecion Cheng Yang, Xueliang Zhang and Peng

More information

Diamond/CNT Film Interface for Heat Dissipation in Electronic Devices

Diamond/CNT Film Interface for Heat Dissipation in Electronic Devices Diamond/CNT Film Inerface for Hea Dissipaion in Elecronic Devices Gran No. AOARD-8-456 PI.: Prof. Dr. Phan Ngoc Minh, Insiue of Maerials Science, Vienam Academy of Science and Technology 18- HoangQuocVie

More information

DYNAMIC BEHAVIOUR OF TITANIUM ALLOY Ti-6Al-4V AT INCERASED TEMPERATURE. Milan Forejt Miroslav Šlais

DYNAMIC BEHAVIOUR OF TITANIUM ALLOY Ti-6Al-4V AT INCERASED TEMPERATURE. Milan Forejt Miroslav Šlais DYNAMIC BEHAVIOUR OF TITANIUM ALLOY Ti-6Al-4V AT INCERASED TEMPERATURE Milan Forej Miroslav Šlais Brno Universiy of Technology, FME, Insiue of Manufacuring Technology, Technická 2, 616 69 Brno, Czech Republic,

More information

SPECIFICATIONS - DETAILED PROVISIONS Section Plastic (PVC) Pressure Water Pipe & Fittings C O N T E N T S

SPECIFICATIONS - DETAILED PROVISIONS Section Plastic (PVC) Pressure Water Pipe & Fittings C O N T E N T S SPECIFICATIONS - DETAILED PROVISIONS Section 15064 - Plastic (PVC) Pressure Water Pipe & Fittings C O N T E N T S PART 1 - GENERAL... 1 1.01 REQUIREMENT... 1 1.02 DELIVERY... 1 1.03 QUALITY ASSURANCE...

More information

STATIC ENERGY ABSORPTION CAPACITY OF GRAPHITE-EPOXY TUBES

STATIC ENERGY ABSORPTION CAPACITY OF GRAPHITE-EPOXY TUBES STATIC ENERGY ABSORPTION CAPACITY OF GRAPHITE-EPOXY TUBES Michael W. Hyer and Marc R. Schulz Deparmen of Engineering Science and Mechanics Virginia Polyechnic Insiue and Sae Universiy, Blacksburg, VA 2461,

More information

UNIVERSITY OF MISSOURI Hydronic Energy Distribution 2016 Q1

UNIVERSITY OF MISSOURI Hydronic Energy Distribution 2016 Q1 GENERAL: The scope of this document is to provide instruction for the installation and testing of chilled water piping installed for the University of Missouri. DESIGN GUIDELINES: 1. Materials 1.1. Pipe

More information

A Study of Thermal Comfort Control Using Least Enthalpy Estimator on HVAC system

A Study of Thermal Comfort Control Using Least Enthalpy Estimator on HVAC system 5 American Conrol Conference June 8-1, 5. Porland, O, USA FrA8.5 A Sudy of Thermal Comfor Conrol Using Leas Enhalpy Esimaor on HVAC sysem Chi-Min Chu, Tai-Lang Jong, and Yue-ei Huang Absrac Thermal comfor

More information

Ice Rink Renovation & New Clubhouse

Ice Rink Renovation & New Clubhouse SECTION 331213 - WATER SERVICE CONNECTIONS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe and fittings for domestic water service connections to buildings. 2. Corporation stop assembly. 3. Curb

More information

CITY OF ODESSA SPECIAL SPECIFICATIONS ITEM 1000 GLASS-FIBER REINFORCED POLYESTER (FRP) REHAB/REPLACEMENT MANHOLE

CITY OF ODESSA SPECIAL SPECIFICATIONS ITEM 1000 GLASS-FIBER REINFORCED POLYESTER (FRP) REHAB/REPLACEMENT MANHOLE CITY OF ODESSA SPECIAL SPECIFICATIONS ITEM 1000 GLASS-FIBER REINFORCED POLYESTER (FRP) REHAB/REPLACEMENT MANHOLE 1000.1 DESCRIPTION These specifications shall govern the furnishing of glass-fiber reinforced

More information

HYDRONIC PIPING

HYDRONIC PIPING Uponor, Inc. 5925 148th Street West Apple Valley, MN 55124 Toll Free: (800) 321-4739 Phone: (952) 891-2000 Fax: (952) 891-1409 www.uponor-usa.com This specification is a manufacturer-specific proprietary

More information

BI-METAL BLADES PRODUCTION APPLICATIONS M42 BI-METAL

BI-METAL BLADES PRODUCTION APPLICATIONS M42 BI-METAL BI-METAL BLADES PRODUCTION APPLICATIONS M42 BI-METAL 1 CARBIDE TIP BLADES SPECIALTY APPLICATIONS Applicaions Alloy seels Sainless seels Typical users include: Seel service ceners Forging operaions General

More information

n 1 = W 11 W 1a = n 2 2W 11 = W 1a = n b

n 1 = W 11 W 1a = n 2 2W 11 = W 1a = n b Deerminaion of he Er 3+ o Ho 3+ Energy Transfer Coefficien in (Er, Ho):YAG Russell M Kurz Physical Opics Corporaion, Elecro-Opics and Holography Division 0600 Gramercy Pl Bldg 100 Torrance, CA 90501 The

More information

Grain storage Temporary storage of grain, bas ic des ign principles

Grain storage Temporary storage of grain, bas ic des ign principles Queensland he Smar Sae DPI&F noe Grain sorage Temporary sorage of grain, bas ic des ign principles Auhors: Troy Jensen, and Ken Bullen, DPI&F, Plan Science, Toowoomba, and Alan Andrews, Cusomvac Ausralia

More information

BUILDING ENERGY ANALYSIS AND SIMULATION OF CHANGSHA AREA. Junwen Hu, Changzhi Yang, Jinghua Yu

BUILDING ENERGY ANALYSIS AND SIMULATION OF CHANGSHA AREA. Junwen Hu, Changzhi Yang, Jinghua Yu Proceedings: Building Simulaion 27 BUILDING ENERGY ANALYSIS AND SIMULATION OF CHANGSHA AREA Junwen Hu, Changzhi Yang, Jinghua Yu College of Civil Engineering, Hunan Universiy, Changsha 4182, China Email:

More information

Laydown Grooving For Shallow Grooves METRIC

Laydown Grooving For Shallow Grooves METRIC aydown Grooving For Shallow Grooves METIC 2011-2012 aydown Grooving Ordering Code Sysem Inser 5 1 2 I 3 4 1.1 5-6 D472 7-6 1.3 8 VKP 9 1- Inser Size 5.0 - IC5.0 2 - IC1/4 3 - IC 4 - IC1/2 5 - IC5/8 I C

More information

Ecology 141. PP Pipe & Fittings. Pipe & Fittings. Flange. EF Socket. Welding Rod. Prefab Joint IAM LOCK. Technical Document P.142 P.153 P.154 P.

Ecology 141. PP Pipe & Fittings. Pipe & Fittings. Flange. EF Socket. Welding Rod. Prefab Joint IAM LOCK. Technical Document P.142 P.153 P.154 P. PP Pipe & Fiings Pipe & Fiings Flange EF Socke Welding Rod Prefab Join IAM OCK Technical Documen P.142 P.153 P.154 P.155 P.155 P.157 P.158 Ecology 141 PP Pipe & Fiings IST Type Field Maerial Sandard/Wall

More information

MODULE 3 LECTURE NOTES 6 RESERVOIR OPERATION AND RESERVOIR SIZING USING LP

MODULE 3 LECTURE NOTES 6 RESERVOIR OPERATION AND RESERVOIR SIZING USING LP Waer Resources Sysems Planning and Managemen: Linear Programming and Applicaions: Reservoir Operaion and Reservoir Sizing using LP 1 MODULE 3 LECTURE NOTES 6 RESERVOIR OPERATION AND RESERVOIR SIZING USING

More information

DETC A SYSTEMATIC METHODOLOGY FOR ACCURATE DESIGN-STAGE ESTIMATION OF ENERGY CONSUMPTION FOR INJECTION MOLDED PARTS

DETC A SYSTEMATIC METHODOLOGY FOR ACCURATE DESIGN-STAGE ESTIMATION OF ENERGY CONSUMPTION FOR INJECTION MOLDED PARTS Proceedings of he ASME 2010 Inernaional Design Engineering echnical Conferences & Compuers and Informaion in Engineering Conference IDEC/CIE 2010 Augus 15-18, 2010, Monreal, Quebec, Canada DEC2010-28889

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA The following standard specification is intended to be edited according to the specifics of the project. Brackets [ ] and areas shaded in gray [e.g. format] indicate requirements that are optional depending

More information

LionRock Corporate Nigeria Limited 3Tech Corporate Limited

LionRock Corporate Nigeria Limited 3Tech Corporate Limited LionRock Corporae Nigeria Limied 9B, Kafaya Abdulrazak sree, Lekki Phase 1, Lagos, Nigeria. Tel:081 8942 0743 / 080 9908 9084 / 080 6688 5978 www.lionrocknigeria.com Email: nigeria@lionrockpower.com 3Tech

More information

REDD Methodological Module. Estimation of carbon stocks in the soil organic carbon pool CP-S

REDD Methodological Module. Estimation of carbon stocks in the soil organic carbon pool CP-S CP-S - 1 REDD Mehodological Module Esimaion of carbon socks in he soil organic carbon pool CP-S Version 1.0 - June 2010 I. SCOPE, APPLICABILITY AND PARAMETERS Scope This module allows for esimaion of carbon

More information

Available online at ScienceDirect. Procedia Engineering 146 (2016 ) 89 99

Available online at   ScienceDirect. Procedia Engineering 146 (2016 ) 89 99 Available online a www.sciencedirec.com ScienceDirec Procedia Engineering 146 (2016 ) 89 99 8h Inernaional Cold Climae HVAC 2015 Conference, CCHVAC 2015 Thermal performance of new hybrid solar energy-phase

More information

SPECIFICATION for ISCO HDPE DUAL CONTAINMENT PIPE

SPECIFICATION for ISCO HDPE DUAL CONTAINMENT PIPE SPECIFICATION for ISCO HDPE DUAL CONTAINMENT PIPE SECTION 15000 MECHANICAL 1. GENERAL 1.1 This specification shall govern the materials and installation of polyethylene dual contained system of pipe, structures

More information

GRADE. FREE ENDS OF WALL PROVIDE 2 VERTICAL BARS TO MATCH VERTICAL PROVIDE U-BARS TO MATCH SIZE AND SPACING OF HORIZONTAL REINFORCING. HOLES.

GRADE. FREE ENDS OF WALL PROVIDE 2 VERTICAL BARS TO MATCH VERTICAL PROVIDE U-BARS TO MATCH SIZE AND SPACING OF HORIZONTAL REINFORCING. HOLES. EMEN NGS 8" #4 @ 2" oc. x HORIZONAL OF CONCREE WALLS WALL REINFORCEMEN " ANSION JOIN #4 HORIZONAL 4" CONCREE WIRE FARIC FREE ENDS OF WALL PROVIDE 2 DEAILS CONCREE FOUNDAION VERICAL ARS O MACH VERICAL CONCREE

More information

:;J TH ANNUAL U.S. HYDROGEN MEETING

:;J TH ANNUAL U.S. HYDROGEN MEETING The Naional Hydrogen Associaion's :; TH ANNUAL U.S. HYDROGEN MEETING 11 PROCEEDINGS I1 TO SUSTAINABLE ENERGY MARCH 2.3-2.5, 1994 MEETING SPONSORS Eecric Power Research Insiue Federal Transi Adminisraion

More information

Lecture 8 Flotation 1. CHAPTER 10 - Flotation Machines. Contents: Residence time. Mixing. Unit cells. Flotation banks. Columns. New types of cells.

Lecture 8 Flotation 1. CHAPTER 10 - Flotation Machines. Contents: Residence time. Mixing. Unit cells. Flotation banks. Columns. New types of cells. Lecure 8 Floaion 1 CHAPTER 10 - Floaion Machines Conens: Residence ime. Mixing. Uni cells. Floaion banks. Columns. New ypes of cells. Inroducion Floaion is a rae process. We can invesigae floaion raes

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 848 SANITARY SEWERS

San Antonio Water System Standard Specifications for Construction ITEM NO. 848 SANITARY SEWERS ITEM NO. 848 SANITARY SEWERS 848.1 DESCRIPTION: This item shall govern the furnishing, installation and jointing of sanitary sewer pipe of the size and type specified by the project's plans and specifications.

More information

RESEARCH ON FAILURE CRITERION FOR COMPOSITE MATERIALS IN OPTIMIZATION

RESEARCH ON FAILURE CRITERION FOR COMPOSITE MATERIALS IN OPTIMIZATION TH INTERNATIONAL CONGRESS OF THE AERONAUTICAL SCIENCES RESEARCH ON FAILURE CRITERION FOR COMPOSITE MATERIALS IN OPTIMIZATION PhD. Cheng Wenyuan *, Prof. Cui Degang ** BEIHANG Universiy,*Aviaion Indusry

More information

New Conduit Specification

New Conduit Specification New Conduit Specification Combines Portions of Sections 715, 783 & 992 into New Section 630. Coordinated Effort Between Traffic Operations, ITS, Lighting, Construction, and Industry New Conduit Specification

More information

SECTION POLYVINYL CHLORIDE (PVC) PRESSURE PIPE

SECTION POLYVINYL CHLORIDE (PVC) PRESSURE PIPE SECTION 02622 POLYVINYL CHLORIDE (PVC) PRESSURE PIPE PART 1 - GENERAL 1.1 SCOPE A. The work covered by this section includes furnishing all labor, equipment, and materials required to install and test

More information

Calculation of the CO 2 Emission Reduction Costs in Markal Model

Calculation of the CO 2 Emission Reduction Costs in Markal Model Proceedings of he 6 h Inernaional Conference on Nuclear Opion in Counries wih Small and Medium Elecriciy Grids Dubrovnik, Croaia, 21-25 May 2006 Paper Code. No. S3-38 Calculaion of he CO 2 Emission Reducion

More information

PROTECTION AGAINST EXCESS VOLTAGE FOR OUTDOOR LED LIGHTING EQUIPMENTS

PROTECTION AGAINST EXCESS VOLTAGE FOR OUTDOOR LED LIGHTING EQUIPMENTS PROTECTION AGAINST EXCESS OLTAGE FOR OUTDOOR LED LIGHTING EQUIPMENTS The use of ligh-emiing diodes (LEDs) and elecronics in lighing equipmens has highlighed he problem of excessive volage caused by direc

More information

SECTION UNDERGROUND ELECTRICAL CONSTRUCTION

SECTION UNDERGROUND ELECTRICAL CONSTRUCTION PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 05 41 UNDERGROUND ELECTRICAL CONSTRUCTION A. This section specifies the furnishing, installation, and connection of precast manholes and pullboxes with ducts

More information

*************************************************************************************************************

************************************************************************************************************* 15510 PIPING (HVAC) ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 23 21 13 *************************************************************************************************************

More information

SECTION TAPPING SLEEVES AND VALVES

SECTION TAPPING SLEEVES AND VALVES SECTION 33 12 16.17 TAPPING SLEEVES AND VALVES PART 1: GENERAL 1.01 SCOPE Furnish, install and test all tapping sleeves, tapping valves, and tapping saddles as shown on the Drawings. 1.02 RELATED WORK

More information

Proceedings: Building Simulation 2007

Proceedings: Building Simulation 2007 FLUCTUATION OF INDOOR TEMPERATURE CAUSED BY INSUFFICIENT COOLING SUPPLY: COMPUTER SIMULATION AND EXPERIMENTAL STUDY Lei Yang 1,2, Jinghua Wei, and Gao Wu 1 1 Deparmen of Energy & Environmen, Zhongyuan

More information