Obstacles against Value Management Practice in Building Projects of Dar es Salaam Tanzania

Size: px
Start display at page:

Download "Obstacles against Value Management Practice in Building Projects of Dar es Salaam Tanzania"

Transcription

1 International Journal of Construction Engineering and Management 2017, 6(1): DOI: /j.ijcem Obstacles against Value Management Practice in Building Projects of Dar es Salaam Tanzania Valentine G. M. Luvara 1,*, Benson Mwemezi 2 1 Department of Building Economics, Ardhi University, Dar es Salaam, Tanzania 2 Department of Civil Engineering, Ardhi University, Dar es Salaam, Tanzania Abstract This study investigated the obstacles that face Value Management (VM) practice in building projects of Tanzania. The research was confined in Dar es Salaam region and the key respondents being clients, consultants (architects, engineers, quantity surveyors) and contractors who had enough experience in the management of building projects. A quantitative questionnaire survey was used to extract responses from respondents who practice professionally as part of the construction industry. Descriptive statistical tools were used to analyse collected data. Findings revealed that the most critical obstacle is lack of understanding of VM in the construction industry which was rated the first followed by wrong choice of procurement route and lack of trained value managers in the construction industry at second and third. Recommendations include among others that efforts should be made to create awareness of VM in the industry and reinforcing conditions of contracts by introducing value clauses that would support value management. Keywords Value Management, Value in Building, Building Projects, Tanzania 1. Introduction The Tanzanian construction industry continues to be one of the key sectors in the economy. In 2010 the construction sector grew at a rate of 10.2%, compared with 7.5% in 2009 and contributed 8.0% to the national GDP, compared with 7.9% in The industry also employed 9% of the workforce in Tanzania [24, 25]. The cconstruction industry contributed 13.6% to Tanzania s GDP during 2015, reaching almost USD6b. In 2010 the sector accounted for only 7.8% of the country s GDP or USD1.6 billion. The growth rate of the Tanzanian construction sector was 4.3% in Q1 2016, compared to 23.2% in the first quarter of 2015 [23]. According to the Tanzania National Bureau of Statistics (NBS), the slowing of the growth rate was due to reduced investments in construction activities. However, for the fiscal year the government of Tanzania has budgeted Tanzanian Shillings (TZS) 5.47 trillion equivalent to 25.4% of the total budget, excluding public debt service, for infrastructure projects [23]. Tanzania construction sectors have been a vital for human settlements and direct employment in construction sites. The industry provides a large magnitude of other jobs, such as in the production of building materials, equipment and post-construction maintenance [25]. The construction industry in Tanzania is * Corresponding author: luvara001@yahoo.com (Valentine G. M. Luvara) Published online at Copyright 2017 Scientific & Academic Publishing. All Rights Reserved divided into three service groups; the first group comprises professional service (consultants) such as architectural, quantity surveying, civil engineering, electrical and other specialist services [25]. The second group comprises the support services which include regulations and advisory institutions that monitor professional constructions to ensure that they run systematically as per their objectives. The third group comprises the construction services which include all kinds of contractors [25]. The concept of Value Management (VM) has existed for more than half a century. Its application in the construction industry is credited with some success notably in public contracts in the United States. [3]. VM is a function-oriented technique that has proven to be an effective management tool for achieving improved design, construction, and cost effectiveness in various construction and transportation project elements. It is anticipated that the successful implementation of a VM program will result in additional benefits beyond design and cost savings; for example, constant updating of standards and policies, accelerated incorporation of new materials and construction techniques; employee enthusiasm from participation in decisions; increased skills obtained from team participation. In advanced countries, VM, or more accurately, the value methodology, has been used to improve construction and transportation projects for more than 30 years. Traditionally, VM has been used by transportation agencies and municipal organizations to reduce or avoid excess capital construction expenditures. However, VM can play a broader role to support effective decision making to construction projects,

2 14 Valentine G. M. Luvara et al.: Obstacles against Value Management Practice in Building Projects of Dar es Salaam Tanzania increase project performance and quality, balance project objectives, and manage community expectations [22]. For over three decades VM has had a notable history as an effective savings tool for the governments. Current studies like [32] indicate that there is an inclination in the use of VM in the construction industry in order to support project decision making. Countless projects have used VM to reduce cost and improve both products and process. Contractors have also used VM to increase their profit and to ensure continuing improvement to their products. Most authorities concede that VM is an excellent tool but its use has waned in recent years due to a perceived lack of support by various entities and government agencies. Providing this seed money would encourage various sectors and agencies to establish VM, promote wider acceptance and provide criteria for a sound project. In today s environment, VM practice has a vital role as one of the proven tools for reducing cost and improving product and process performance. Several studies have been done on VM. One of the studies looked on VM as used in the United States of America's construction industry by investigating current theory and procedure. It evaluated VM projects and calculates the savings achieved by them. It goes on to analyse the nature of those savings. It looks at four Value Engineering (VE) workshops and makes an appraisal of the technique [19]. Also [20] did a study on constructability in relation to Total Quality Management and Value Engineering. They as well established a framework to measure costs and benefits related to constructability. Previous studies relating to VM have focused on optimization of value engineering that is to change the concept that VE is a function by one party (designer, contractor, or user), to treating VE as structural component of the delivery process which forces all parties to voluntarily integrate the VM process without monetary incentives in the design-bid-build or design-build processes [5]. Also in an attempt to find the linkage between VM theory and practice in UK construction industry, [6] investigated the attitudes and experiences of VM facilitators within major UK cost consultants. In their study they found that Formal VM rarely extends beyond tender stage. Also workshops remain the common format, but these are often compressed into a half-day due to commercial pressures. They also found that VM techniques are adapted to suit the needs of the project, team and client rather than being rigidly applied according to the theoretical approaches outlined in the literature. Other studies like [26-30] have integrated VM and sustainability issues while [31] assessed earned VM practice in the construction industry. In a developing country like Tanzania where existing buildings and infrastructure are restored and reinstated and even replaced by new construction, the consideration of VM on construction projects seems vital. However, despite the fact that VM seems to be a necessary tool for cost saving and managing value in building, still there are obstacles in practicing VM and as a result most of construction output in Tanzania fail to provide effective adherence in all necessary variables required by clients and users. Thus strengthening formal methods of managing value such as VM would bring further developments aimed at improving value. In this regard therefore, this research is aimed at investigating the obstacles against VM practice in building projects of Tanzania. 2. Efforts to Improve Value in Tanzania Building Projects In building development clients may fall in three categories: those who have clear intention of their building requirements but are not aware of the cost implication, those who have a maximum amount of money to spend on project but do not know exactly what amount is required to spend and those who know their building requirements and ha a fixed sum of money to spend on a project [2]. According to author s experience in most building projects in Tanzania construction industry, all these kinds of clients are available and thus cost planning is performed using two options depending on the nature of clients. The first option is costing a design which involves development of the cost of a given design. The architect design and costing is done to get the estimate of total cost. The figure obtained forms the budget for the project. The second option is design to a cost where an architect and cost planner combine their skills to produce a design that accommodate cost limitations as well as functional and aesthetics requirements. Cost planning process in Tanzania normally involves the following stages: Preliminary estimating Preparation of cost plan: requirements are preliminary sketch drawings, indication of materials to be used, contractual information and comparable cost analysis from previous project Cost checking when there is cost limit Tender reconciliation and Post-contract cost control According to a contention by [21] techniques mostly used for cost planning in Tanzania building projects are performance measurements for assessing project progress and magnitude of any variations that occurs, cost change control system and project performance review. From the discussion above the three techniques of cost planning are very essential in project performance but still these are only useful for cost control of building projects and not value for money tools. Performance measurement is essential because it gives indication on how the project progress and variations that occur would affect the cost plan of which does not guarantee value for money. Cost change control system is for ensuring the project costs are within budget. [21] Pointed that cost change control system is a tool that can be used to control project cost and ensure projects come in-on budget. This shows that these techniques are for providing effectiveness and efficiency in cost of projects other than value of building projects because they only base on single value parameter that is a cost cog. Therefore these

3 International Journal of Construction Engineering and Management 2017, 6(1): techniques do not suffice to provide value for money in building projects. In view of the risks associated with project failures it was recognized that project promoters and financiers require an independent review on the performance of their projects. This would be possible through the use of project audit which is one among VM approaches. The National Construction Council of Tanzania (NCC) established the project audit service in Tanzania to fulfil such needs in Project audit should be applied at any of the stages in a project's life cycle, that is: pre-project, in-project, and post project. Pre-project audits demonstrate the viability of the project or on how best to implement the project. In-project audits review an ongoing project at design, tender, and construction stages; diagnose its problems and recommend means to improve project performance particularly for projects that are overrunning time and cost targets and in situations where there are doubts on the quality of work. Occasionally post-projects audits are required to investigate lack of proper performance of completed projects or to help clients record good practice for future projects [18]. In Tanzania experience shows that, technical audits especially on public projects are conducted on projects which have run into trouble. These types of auditing normally end up into a fault finding exercise and thus denying the client many of the other benefits of technical audit. It is therefore very important right at the beginning of an audit to set clear objectives with the participation of the clients [12]. According to [17] the government and some public institutions require two types of independent audits. One involves the examination of value for money and efficiency of multi-project design and management organizations. The other covers those individual projects which have got trouble for reasons which typically involve lack of funding and passive management. There are a number of construction project audits in both building and civil works that have been carried out by NCC, these audit assignments are associated with construction failure, cost overrun, time overrun, suspicion on poor quality, suspicion on malpractices in procurement and mitigation of construction risks. From the nature of audit carried out by NCC it can be deduced that most of these audit assignments have based on evaluation of project performance in terms of cost, quality, delivery and progress. Since project evaluation is a post-ante analysis of project after it has been undertaken then such audit would give the client just an indication or a good understanding of project performance. These audits will reveal the incompetence or competence of project participants other than providing value for money to clients. Value for money would have been achieved if an ex-ante analysis of a designed scheme is performed at every stage of construction project. Thus it is of the author s opinion that technical audit carried out in Tanzania construction projects does not provide value for money in terms of economic parameter, efficiency and effectiveness. Unless the project audits are undertaken at every stage of construction with regard to all value parameters VM will not be achieved. 3. Obstacles against VM Practice The management and enhancement of value doesn't imply that there may be intentional "gold plating," conscious neglect of responsibility, or unjustifiable error or oversight by the design team. VM simply recognizes that social, psychological, and economic conditions exist that may inhibit good value. The following are some of the more common obstacles against VM practice in building projects as stipulated in different literature: 3.1. Wrong Choice of Procurement Route The wrong choice of procurement is a threat to value effectiveness. The majority of construction projects in Tanzania have been carried out using traditional methods with only a relatively small number of projects being implemented by other procurement systems [14]. Strict distinctions between design and construction phases in traditional contracting methods have caused confrontational attitudes between design and construction teams, which are in fact major obstacle to apply VM successfully [9] Lack of Awareness about VM by Construction Industry Practitioners There is slight understanding of VM in the industry stakeholders such as clients and some consultants and contractors. So far in Tanzania construction industry very few people have put a hand to do research on VM [11]. In Tanzania there are no construction institutions that offer courses in VM except for Ardhi University and only in the School of Construction Economics and Management [11] Failure to Admit Ignorance of Certain Specialized Aspects of Project Development Most construction industry designers in Tanzania especially architects become conceited and uncooperative when they are advised to make design changes which would bring optimum design [4]. Mostly designers would think of one parameter i.e. architectural beauty and engineering aspects but take no attention in reduction of unnecessary cost. The principal aim of VM is to reduce unnecessary cost with maintaining or increasing the function of the structure Lack of Good Communication among Project Stakeholders As contended by [11] construction projects involve many people with different professionals as well as functions. These may be the client, consultants (architect, Quantity Surveyor, engineer, project manager and construction manager), and contractors [11]. Others are subcontractors, material suppliers, bankers, insurance companies and other public agencies. Interactions of a team during design stage

4 16 Valentine G. M. Luvara et al.: Obstacles against Value Management Practice in Building Projects of Dar es Salaam Tanzania means exchange of information from one part or design profession to the other, this leads to involved decisions and may result into making better decisions on the designs [11]. During construction stage there has to be a flow of information either from the employer through his consultants or within consultants and contractors [11]. Lack of good communication among project participants has been a barrier to VM. In early works i.e. pre-construction activities there is both an explicit and implicit charge that poor communication has been a core problem for many years [7]. Communication within the construction team as seen to suffer because insufficient information was available, information was incomplete, rushed and not available in time therefore this would result to poor value of the project output. In construction the information is usually prepared by individuals from diverse backgrounds, such as Architects, Quantity Surveyor, Engineers, Subcontractors and Specialist Suppliers, often using different terms and methods of graphical representation. Failure of information, poor quality of information or inappropriate communication modes between different participants in construction projects has been an obstacle to value effectiveness and the cause of poor quality of final product. If there is no good communication among project participants then VM is blocked to be effective Other Obstacles Other obstacles as portrayed by [11] and [3] are poor human relation, rigid application of standards and traditions without consideration of changing function, technology and value, lack of contractual provision to support VM, lack of trained value managers in construction industry and conflicts of interest among project participants. 4. Methodology 4.1. Population and Sampling Design The objective of this research was to identify obstacles against VM practice in building projects and analyse their relative importance index. The population of the study comprised of clients, Consultants (Architectural firms, Engineering firms and Quantity surveying firms) and building contractors class one (I) to class three (III) registered by Contractors Registration Board (CRB). The sample size was 231 firms comprising of 30 clients, 150 consultants and 51 building contractors. In Tanzania contractors are categorized into seven classes. Criterion set to obtain the sample from building contractors was: building contractors to be class one, two and three because in Tanzania these are grouped as large contractors who have much experience and resources in managing projects. Stratified systematic sampling was used to select 51 intended building contractors out of the population strata of 144 building contractors in which 85 formed class I stratum, 23 class II stratum and 36 class III stratum. The sample size of each stratum was kept proportional to the size of the population strata and multiplied by the intended sample size [10]. After stratification, systematic sampling was used to select every i th item from the list of each stratum. For the case of consultants stratified sampling was not used because their population did not constitute a homogeneous group instead systematic probability sampling was used to draw companies from the lists of consultants. Purposive sampling was used to select clients on the basis that the small mass that was so select from the huge one will be typical or representative of the whole [10] Questionnaire Design This study investigated the obstacles against VM practice in building projects of Tanzania. The investigation considered the building clients, consultants and building contractors (Architects, Quantity Surveyors and Engineers). Obstacles were gathered based on literature review. Face-to-face discussions were carried out held with two building clients from public and private sector, three consultants from architectural, quantity surveying and engineering firms respectively, and three building contractors representing class one to three. These representatives did not participate in the questionnaire later. Rather, they offered their opinions and thereby helped to improve the questionnaire as portrayed in similar way by [1]. Methodology Purpose Outcomes Literature Review Face to face Discussion Pilot Study Questionnaire Survey Identify Obstacles from Literature Review Obtain opinions from respondent Pilot the questionnaire to ensure suitability Compare the most important Obstacles Initial version of questionnaire Improved version of questionnaire Finalized Questionnaire Most important Obstacles Figure 1. Summary of Methods and Outcomes. Adapted from [1]

5 International Journal of Construction Engineering and Management 2017, 6(1): Through a quantitative approach, data used were acquired with a questionnaire survey. The questionnaire was compiled based on the refined list of VM obstacles after a pilot study as depicted in the appendix. The pilot was conducted to improve the quality of the questionnaire and enhance reliability of the questions. Closed-ended questions were used as they are very convenient for collecting factual data and are simpler to analyze because the range of potential answers is limited [8, 1]. The respondents were asked to provide their views on the relative importance of the obstacles against VM using a 5-point Likert scale [8]. In a Likert scale, the respondent is asked to respond to each of the statements in terms of several degrees, usually five degrees [10]. The ratings used were: Not important = 1; Fairly important = 2; Important = 3; Very important = 4; and Extremely important = 5. This type of scale has been found to be acceptable in other construction economics and management research. For example, [16] used a similar approach to study joint venture formation between construction organizations in Tanzania. Figure 1 shows a flow chart of the methods and outcomes as used in this study Data Collection In general the data collection process through this method had been quite good. Multiple sources of evidence were used to collect data. Literature was reviewed to identify what has been written on VM practice in building projects as well as its obstacles. Questionnaires survey was used to collect primary data from clients, consultants and building contractors. Closed-end questions were mainly used for this research after considering the results of the pilot study. The respondents were requested to rank 9 obstacles with regard to their importance in VM practice in building projects. A total of 30 questionnaires were distributed to clients, 150 questionnaires to consultants and 51 questionnaires to building contractors. The target respondents were technical directors of firms for consultants and building contractors and Heads of construction units for clients. In all, 231 questionnaires were distributed and 191 were returned. Of these, 22 responses came from clients, 130 from consultants and 39 from building contractors. A summary of the response rates is provided in Table 1. Respondent Clients Consultants Building contractors Table 1. Response Rate of the Questionnaire Questionnaire sent Questionnaire received Success of responses (%) Total All respondents had experience of more than 10 years in the construction industry which indicate that most of respondents are familiar with management of building projects Results and Discussion 5.1. Data Analysis The researcher prepared and made use of a data analysis sheet to collate data extracted from the interview protocol. The VM obstacles were thereafter rated using the Relative Importance Index (RII) method of descriptive analysis as shown below. RII = 5M 5 + 4M 4 + 3M 3 + 2M 2 + 1M 1 N X (M5 + M4 + M3 + M2 + M1) where M5, M4, M3, M2 and M1 are frequencies of the rating responses given to each obstacle variable; 5,4,3,2 and 1 are the weight given to each factor by respondents and N is the highest weight. Relative Importance Indices (RIIs) comparison tables was used to rank the results by taking into account the mean scores and the RII as indicated in Table 2: Table 2. Relative Importance Indices (RIIs) comparison table Mean score (M) RII Rankings 4.0 M RII High 3.0 M< RII<0.80 Medium 1.0 M< M<0.60 Low 5.2. Agreement Analysis The Spearman s rank correlation coefficient (ρ) was used to show the degree of correlation or agreement between the rankings of any two parties. The Spearman s rank correlation is a non-parametric test for measuring relationship between paired observations of two variables when data are in a ranked form [10]. Non-parametric tests are also referred to as distribution-free tests. The main objective of using this coefficient was to determine the extent to which the two sets of ranking are similar or dissimilar [10]. The correlation coefficient varies between +1 and 1, where +1 implies a perfect positive relationship (agreement), while 1 results from a perfect negative relationship (disagreement) [15]. It might be said then that sample estimates of correlation close to unity in magnitude imply good correlation, while values near zero indicate little or no correlation [15]. The Spearman s rank correlation coefficient (ρ) was calculated as follows: 6Σd 2 ρρ = 1 n(n 2 1) Where d is the difference between the ranks given by any two respondents for an individual obstacle and n is the number of obstacles which in this case is 9 obstacles. Spearman's rank correlation coefficients between the ranks of obstacles associated with clients and consultants, clients and contractors and consultants and contractors were 0.91, 0.86 and 0.95 respectively. The rankings by the different categories are substantial positively correlated. The strong correlation implies that all the parts had similar emphasis on the different obstacles that they consider important for VM practice.

6 Clients Consultants Contractors Wrong choice of procurement route Valentine G. M. Luvara et al.: Obstacles against Value Management Practice in Building Projects of Dar es Salaam Tanzania Table 3. Ranking of Obstacles against VM Practice Obstacles Total weighted score Mean score RII Total weighted score Mean score RII Total weighted score Mean score RII Max=110 Max=5 Max=1 Rank Max=650 Max=5 Max=1 Rank Max=195 Max=5 Max=1 Rank Failure to admit ignorance in certain specialized aspects on project development Lack of awareness of VM by practitioners in the construction industry Lack of contractual provisions to support VM Poor human relation Rigid application of standards and tradition without consideration of changing function, technology and value Lack of good communication among project stakeholders Lack of trained value managers in construction industry Conflicts of interest among project stakeholders

7 International Journal of Construction Engineering and Management 2017, 6(1): Significance Test To determine whether the parties displayed significant agreement in their rankings, the null hypothesis that there is no correlation/agreement in the rankings of clients and consultants, clients and contractors, and consultants and contractors with regard to the relative importance of the obstacles against VM practice was tested using a two-tailed test from the values of Spearman s rank correlation table (for n < 30) at 5% significance level and found the critical values for ρ to be ± representing the upper and lower limits of acceptance regions. And since our calculated ρ for all parts are outside the limits of the acceptance region (see Table 4), the null hypothesis is rejected and accepts the alternative hypothesis that there is correlation/agreement in the ranked data of clients and consultants, clients and contractors, and consultants and contractors with regard to the relative importance of the obstacles against VM practice. Part Table 4. Spearman s Rank Correlation Coefficients Result Client and Consultant Client and Contractor Consultant and Contractor ρ 0.91* 0.86* 0.95* *Correlation is 5% significance level (two-tailed) ρ - Spearman rank correlation coefficient for each part 5.4. Obstacles against VM Practice Respondents were required to respond on the obstacles against VM practice in building projects by ranking them according to their relative importance. The obstacles listed to them are; wrong choice of procurement route, failure to admit ignorance in certain specialized aspects in project development, lack of understanding of VM in the construction industry, lack of contractual provisions to support VM, poor human relation, conflicts of interests and jealous among project stakeholders, rigid application of standards and traditions, lack of good communication among project stakeholders and lack of trained value managers in the construction industry. The top most highly ranked obstacles against VM practice in building projects, as shown in Table 3, were (1) Lack of understanding of VM in the construction industry (mean = 4.591,4.377 and 4.410;RII = 0.918,0.875 and as responded by clients, consultants and contractors respectively),this obstacle has also been found to be critical by some researchers for example in his study Towards Value Management practice in Building Projects of Tanzania [11] found the same results that respondents had little understanding of VM but lack very basic concepts of VM which was indicated by some wrong perceptions they had on VM. (2) Wrong choice of procurement route (mean = 4.227, and 4.410; RII = 0.854, and as responded by clients, consultants and contractors respectively), this is the second most critical obstacle of VM practice and is advocated by the domination of traditional system as contended by [14]. In a research by [3] design and build is the best choice of procurement route to allow VM implementation as it provides more flexibility to VM studies in the sense that designers and contractors effectively belong to the same team under procurement routes. Thus frequent communication and close ties exist between the two parties., (3) Lack of trained value managers in construction industry was found to be the third most critical obstacle to VM practice in building projects (mean = 4.136, and 4.000; RII = 0.827, and 0.80 as responded by clients, consultants and contractors respectively). The medium ranked obstacles were found to be (1) Failure to admit ignorance in certain specialized aspects on project development (mean=3.455, and 3.970; RII=0.691, and as responded by clients, consultants and contractors respectively), (2) Lack of contractual provisions to support VM (mean=3.136, and 3.641; RII=0.627, and as responded by clients, consultants and contractors respectively), (3) Rigid application of standards and tradition without consideration of changing function, technology and value (mean=2.455, and 3.436; RII=0.491, and as responded by clients, consultants and contractors respectively) Conclusions The aim of this study was to investigate the obstacles against VM practice in building projects of Tanzania. The study employed a quantitative survey method of research to extract responses from respondents who practice professionally as part of the construction industry in Dar es Salaam, Tanzania. Descriptive statistical tools were used to analyse collected data. The Spearman's rank correlation coefficient was used to examine the similarity or dissimilarity in the ranking of the VM practice obstacles amongst the respondents, which were categorised into clients, consultants and contractors for the purpose of this study. The following are the three most highly ranked obstacles: (1) Lack of understanding of VM in the construction industry, (2) Wrong choice of procurement route and (3) Lack of trained value managers in the construction industry. Significance test was carried out to determine whether the parties displayed significant agreement in their rankings. This demonstrates the validity and reliability of information and findings from this research. Information collected from this study is expected to be useful both in practice and academics. In practice, the results can assist in the identification of potential areas of weaknesses in practice so that suitable standard remedial measures based on VM attributes can be proactively taken. In academic arena, the research has endowed with some insights on the existing knowledge and theories in the area of construction economics and management, particularly with regards to obstacles against VM practice. This contribution is potential for being used to improve the contents and curriculum of educational programmes for the betterment of project managers and stakeholder management in construction.

8 20 Valentine G. M. Luvara et al.: Obstacles against Value Management Practice in Building Projects of Dar es Salaam Tanzania This research was limited to identifying and analysing obstacles against VM practice in building projects, future studies could be focused on finding out the drivers that would stimulate VM practice in Tanzania construction industry Recommendations The following recommendations are made based upon the findings of the study. In order to build the practice of VM, efforts should be made to create awareness of VM. Providing the workshops and seminars to construction project practitioners for the purpose of creating awareness among stakeholders of the construction industry on the effective use of VM, together with its benefits and shortfalls. In addition it is necessary to introduce VM courses into undergraduate programmes of engineering and construction based universities. That a clause to be introduced in conditions of contracts of construction projects that supports VM practice. In advanced countries introduction of value incentive clauses into conditions of contracts has been practiced for years (Fong and Shen, 2000). This clause when introduced will encourage contractors to bring change proposals. It is important that practitioners should change their behaviour towards project development. Most of designers in Tanzania become very arrogant when advised to make changes in their design that would bring potential cost saving. Professionals should accept that team working is very important and they need to share ideas if the best output is required. They should also know that VM results may also be subject to rejection if not worth. Appendix Main Questionnaire (For Finding Relative Importance Index) Which of the following best describes your organization? [ ] Consultant [ ] Client [ ] Building contractor Regarding experience, how long have you been working in the construction industry? [ ] 1-5 years [ ] 6-10 years [ ] Over 10 years Please indicate by ticking the appropriate column the relative importance of each of the following obstacles to Value Management practice in building projects. Please tick mark according to your point of view only in one column in each row No Obstacles against VM practice Not important Fairly important important Very important Extremely important 1 Wrong choice of procurement route 2 Failure to admit ignorance in certain specialized aspects on project development 3 Lack of awareness of VM by practitioners in the construction industry 4 Lack of contractual provisions to support VM 5 Poor human relation Rigid application of standards and tradition without consideration of changing function, technology and value Lack of good communication among project stakeholders Lack of trained value managers in construction industry Conflicts of interest among project stakeholders

9 International Journal of Construction Engineering and Management 2017, 6(1): REFERENCES [1] Alinaitwe, H. and Ayesiga, R. 2013, Success Factors for the Implementation of Public Private Partnerships in the Construction Industry in Uganda, Journal of Construction in Developing Countries, 18(2), [2] Ashworth, A. 1999, Cost Studies of Buildings, 3rd Ed., Longman, UK. [3] Cheah, C. Y. J. & Ting, S. K. 2005, Appraisal of value engineering in construction in Southeast Asia, International Journal of Project Management, 23(2), [4] Craig, S. 1996, Optimization of Designs in Construction, Brick Wells & Specers, Honsh. [5] Dean, T. & Bharti, K. 2002, The optimization of value engineering as a structural component of the construction procurement process, Arizona State University. USA. [6] Ellis, R.C.T., Gerard D. Wood, G.D., & Keel, D.A. 2005, Value Management Practices of Leading UK Cost Consultants, Construction Management and Economics, 23:5, , DOI: / [7] Ermason, D. K. 1962, Communication modes of the design team, Englewood Cliffs, NJ: Prentice Hall. [8] Fellows, R. & Liu, A. 2003, Research Methods for Construction, 2nd Ed., Blackwell Science, Oxford. [9] Fong, P.S & Shen, Q. 2000, Is the Hong Kong Construction Industry Ready for Value Management? International Journal of Project Management, 18(5), [10] Kothari. C.R. 2004, Research Methodology, 2nd Edition, Jaipur, India. [11] Luvara, V.G.M. 2010, Towards Value Management Practice in Building Projects of Tanzania, Master s thesis, Ardhi University, Dar es Salaam. [12] Mamiro, J.G. 2009, Course on Principles and Practice of Technical Audit: Procedures in Auditing Construction Projects, National Construction Council, Tanzania. [13] Maro, G. 2008, Assessment on Application of Project Management System in Tanzania Construction Industry, Master s Thesis, Ardhi University, Dar es Salaam. [14] Maro, G. & Kikwasi, G.J. 2009, Appropriate Skills for Project Management System and Its Adoption in Tanzania Construction Sector, in ASOCSA Proceedings, 4 th Built Environment Conference, ASOCSA, May, Livingstone-Zambia. [15] Megha, D. & Rajiv, B. 2013, A Methodology for Ranking of Causes of Delay for Residential Construction Projects in Indian Context, International Journal of Emerging Technology and Advanced Engineering, 3(3), 66.pdf retrieved on 11th January, [16] Minja, S.J., Kikwasi, G.J., & Thwala, W.D. 2012, A study of joint venture formation bet weenco nst ruction organization in Tanzania, Australasian Journal of Construction Economics and Building, Conference Series, 1(2), [17] Msita, K.M. 2009, Course on Principles and Practice of Technical Audit: An Introduction to Technical Audit, National Construction Council, Tanzania. [18] NCC, 2014, retrieved on 14th January, [19] Palmera, A., Kelly, J. & Male, S. 1996, Holistic Appraisal of Value Engineering in Construction in United States, Journal of Construction Engineering and Management, 122(4), [20] Russel, J., Swiggum, K., Shapiro, J. & Alaydrus, A. 1994, Constructability Related to Total Quality Management, Value Engineering and Cost/Benefits, Journal of Performance of Constructed Facilities, 8(1), [21] Samizi, M. 2008, Towards Improvement of Cost Management Practice in Construction Projects, Master s thesis, University of Dar es Salaam, Dar es Salaam. [22] Wilson, D. 2005, Value Engineering in Transportation, NCHRP Synthesis 352. [23] uction-sector-report, retrieved on 26 th January [24] The United Republic of Tanzania; National Budget 2011/2012, Ministry of finance. Govenment printer, Dar es Salaam. [25] Phoya, S. 2012, Health and Safety Risk Management On Building Construction Sites In Tanzania: The Practice of Risk Assessment, Communication and Control, Licentiate, Chalmers University of Technology. [26] Abidin, N.Z., Said., I Involvement of sustainability issues in value management: requisite factors. Paper presented at the International Conference on Construction Industry 2006: Toward Innovative Approach in Construction and Property Development, Padang, Indonesia S1PP17.pdf. [27] Al-Yousefi, A.S The synergy between value engineering and sustainable construction. Paper presented at the CTBUH 8th World Congress, Dubai. rg/publications/technicalpapers/tabid/71/default.aspx. [28] Alexandre, J., Maia, A., Camocho, D., F., R., J., H., Catarino, J How to measure the value from a sustainable point of view. Value World, 30. [29] Saleh, Y.M.A., Taleb, H.M The integration of sustainability within value management practices: a study of experienced value managers in the Gcc countries. Project Management Journal., 4(12): doi: /pmj [30] Oke, A.E, Aghimien, D.O & Olatungi, S.O (2015), Implementtion of VM as an Economic Sustainability Tool for Building Construction in Nigeria, International Journal of Managing Value and Supply Chain,6(4), [31] Kang, B.G., Lv, J. & Zang, C (2015), An Investigation into Practice of Earned Value Management for the Construction Industry in Jiangsu Province China, Preceedings of Intarnational Conference on Civil and Architectural Engineering, ISBN [32] Noor, N.F., Kamruzzaman, S.N. & Ghaffar, N.A. 2015, Sustainability concern in value management: A study on Government s building project, International Journal of Current Research and Academic Review, Special Issue (2),

SUSTAINABILITY CONCERN IN VALUE MANAGEMENT: A STUDY ON GOVERNMENT S BUILDING PROJECT

SUSTAINABILITY CONCERN IN VALUE MANAGEMENT: A STUDY ON GOVERNMENT S BUILDING PROJECT SUSTAINABILITY CONCERN IN VALUE MANAGEMENT: A STUDY ON GOVERNMENT S BUILDING PROJECT *Nuur Fadzilah Md. Noor 1, Kamruzzaman, S.N. 2, and Norafida Ab. Ghaffar 2 1 Faculty of Built Environment, Universiti

More information

The Changing Face of Quantity Surveying Practices in Construction Industry

The Changing Face of Quantity Surveying Practices in Construction Industry The Changing Face of Quantity Surveying Practices in Construction Industry YESHWANTH BABU REDDY School of Architecture and Building Deakin University Table of Contents: 1.1 Background... 2 1.2 Introduction...

More information

FACTORS AFFECTING PROCUREMENT PERFORMANCE OF PUBLIC UNIVERSITIES IN NAIROBI COUNTY

FACTORS AFFECTING PROCUREMENT PERFORMANCE OF PUBLIC UNIVERSITIES IN NAIROBI COUNTY FACTORS AFFECTING PROCUREMENT PERFORMANCE OF PUBLIC UNIVERSITIES IN NAIROBI COUNTY Anthony Nzau Masters Student, Jomo Kenyatta University of Agriculture and Technology, Kenya Dr. Agnes Njeru Lecturer,

More information

ASIAN JOURNAL OF MANAGEMENT RESEARCH Online Open Access publishing platform for Management Research

ASIAN JOURNAL OF MANAGEMENT RESEARCH Online Open Access publishing platform for Management Research Online Open Access publishing platform for Management Research Copyright by the authors - Licensee IPA- Under Creative Commons license 3.0 Research Article ISSN 2229 3795 Stakeholders perspective on cost

More information

Evaluation on the Application of Quality Management System in Tanzania Building Construction Projects

Evaluation on the Application of Quality Management System in Tanzania Building Construction Projects American Journal of Management Science and Engineering 2017; 2(6): 170-175 http://www.sciencepublishinggroup.com/j/ajmse doi: 10.11648/j.ajmse.20170206.12 ISSN: 2575-193X (Print); ISSN: 2575-1379 (Online)

More information

EVALUATION OF CONSTRUCTION COST AND TIME ATTRIBUTES

EVALUATION OF CONSTRUCTION COST AND TIME ATTRIBUTES EVALUATION OF CONSTRUCTION COST AND TIME ATTRIBUTES T.M.S. Elhag and A.H. Boussabaine School of Architecture and Building Engineering, The University of Liverpool, Liverpool L69 3BX, UK Understanding the

More information

Value Management of Construction Projects

Value Management of Construction Projects Value Management of Construction Projects Value Management of Construction Projects John Kelly Steven Male Drummond Graham # 2004 by Blackwell Science Ltd, a Blackwell Publishing Company Editorial Offices:

More information

Mitigations on Joint Venture Risks in Real Estate Projects

Mitigations on Joint Venture Risks in Real Estate Projects Mitigations on Joint Venture Risks in Real Estate Projects Laxmikant Bajarang Zirape 1, Prof. Abhijit A. Warudkar 2 1M.E (Construction & Management) Student, Civil Dept. ICOER, Wagholi, Pune, India 2Professor,

More information

Administration of Agreement Practice in the Informal Construction Sector: A Case of Goba and Madale Dar es Salaam

Administration of Agreement Practice in the Informal Construction Sector: A Case of Goba and Madale Dar es Salaam International Journal of Construction Engineering and Management 2018, 7(1): 22-28 DOI: 10.5923/j.ijcem.20180701.02 Administration of Agreement Practice in the Informal Construction Sector: A Case of Goba

More information

Appraising the State of Procurement Methods on Educational Building Projects in Abuja, Nigeria

Appraising the State of Procurement Methods on Educational Building Projects in Abuja, Nigeria Appraising the State of Procurement Methods on Educational Building Projects in Abuja, Nigeria Aje, Isaac O., Adedokun, Olufisayo A., & Igbalaye, Wasiu, O. Department of Quantity Surveying School of Environmental

More information

International Journal of Engineering Research and General Science Volume 4, Issue 4, July-August, 2016 ISSN

International Journal of Engineering Research and General Science Volume 4, Issue 4, July-August, 2016 ISSN Causes of Variation Orders on Public Building Projects in Addis Ababa Andualem Endris Yadeta 1 1 School of Civil and Environmental Engineering, Addis Ababa Institute of Technology, Addis Ababa University,

More information

Capacity of Local Construction Professionals in Undertaking Natural Gas Downstream Activities in Tanzania

Capacity of Local Construction Professionals in Undertaking Natural Gas Downstream Activities in Tanzania International Journal of Construction Engineering and Management 2018, 7(2): 73-80 DOI: 10.5923/j.ijcem.20180702.03 Capacity of Local Construction Professionals in Undertaking Natural Gas Downstream Activities

More information

Critical Factors Influencing Construction Productivity in Thailand

Critical Factors Influencing Construction Productivity in Thailand Critical Factors Influencing Construction Productivity in Thailand Arun Makulsawatudom,* Margaret Emsley* and Kuldej Sinthawanarong** Abstract Factors affecting construction in Thailand were disclosed

More information

Performance evaluation of major risk factors affecting construction projects

Performance evaluation of major risk factors affecting construction projects Performance evaluation of major risk factors affecting construction projects Kumar PS* ThirumurugaPoiyamozhi MVV** *Department of Civil Engineering, University College of Engineering, Ariyalur, Tamilnadu,

More information

The National Standard of Competency for Architects (2015 edition)

The National Standard of Competency for Architects (2015 edition) The (2015 edition) The Architects Accreditation Council of Australia has maintained Standards for the purpose of assessment processes for registration as an architect in Australia since 1990 in collaboration

More information

THE SELECTION OF SUBCONTRACTORS: IS PRICE THE MAJOR FACTOR?

THE SELECTION OF SUBCONTRACTORS: IS PRICE THE MAJOR FACTOR? THE SELECTION OF SUBCONTRACTORS: IS PRICE THE MAJOR FACTOR? Derek Lavelle 1, Jason Hendry and Glenn Steel School of the Built Environment, Northumbria University, Ellison Building, Ellison Place, Newcastle

More information

APPRAISAL OF VALUE ENGINEERING IN DESIGN IN PORTUGAL

APPRAISAL OF VALUE ENGINEERING IN DESIGN IN PORTUGAL APPRAISAL OF VALUE ENGINEERING IN DESIGN IN PORTUGAL Francisco Loforte Ribeiro Instituto Superior Técnico, Departamento de Engenharia Civil, Secção de Estruturas e Construção, Av. Rovisco Pais 1, 1096

More information

Growth Trend of Local Building Contractors for the Period of in Dar Es Salaam, Tanzania.

Growth Trend of Local Building Contractors for the Period of in Dar Es Salaam, Tanzania. Growth Trend of Local Building Contractors for the Period of 2005-2015 in Dar Es Salaam, Tanzania. Dennis N.G.A.K. Tesha 1, Valentine G.M. Luvara 2, Mwavita Samizi 3, Deogratius Lukansola 4. 1,2,4 Dept

More information

Appendix A: Outline of Construction Management Functions /Roles for each phase of the project (source: Construction Management Association of America)

Appendix A: Outline of Construction Management Functions /Roles for each phase of the project (source: Construction Management Association of America) Appendix A: Outline of Construction Management Functions /Roles for each phase of the project (source: Construction Management Association of America) 108 Appendix B: Questionnaire 109 CONSTRUCTION MANAGEMENT

More information

Factors Affecting Construction Cost in the Pakistani Construction Industry

Factors Affecting Construction Cost in the Pakistani Construction Industry Third International Conference on Construction in Developing Countries (ICCIDC III) Advancing Civil, Architectural and Construction Engineering & Management July 4-6, 2012, Bangkok, Thailand Factors Affecting

More information

Sustainability concern in value management: A study on Government s building project

Sustainability concern in value management: A study on Government s building project ISSN: 2347-3215 Special Issue-2 (January-2015) pp. 72-83 www.ijcrar.com Sustainability concern in value management: A study on Government s building project Nuur Fadzilah Md. Noor 1*, S.N.Kamruzzaman 2

More information

Pario Sample 360 Report

Pario Sample 360 Report Pario Sample 360 Report Pario 360 Feedback Personal Development Feedback Report Chris Case-Study Report Compiled 16th May 2011 Note: This report does not include the table that compares mean ratings of

More information

MATCHING A PROCUREMENT SYSTEM TO CLIENT AND PROJECT NEEDS: A PROCUREMENT SYSTEM EVALUATOR

MATCHING A PROCUREMENT SYSTEM TO CLIENT AND PROJECT NEEDS: A PROCUREMENT SYSTEM EVALUATOR MATCHING A PROCUREMENT SYSTEM TO CLIENT AND PROJECT NEEDS: A PROCUREMENT SYSTEM EVALUATOR M.D. AMBROSE and S.N. TUCKER CSIRO Building, Construction and Engineering, Melbourne, Australia Abstract The selection

More information

Analysis and Identification of Critical Factors of Delay in Construction Projects

Analysis and Identification of Critical Factors of Delay in Construction Projects Analysis and Identification of Critical Factors of Delay in Construction Projects 83 Analysis and Identification of Critical Factors of Delay in Construction Projects M.P.Venkatesh*, C.Umarani**, S. M.

More information

TABLE OF CONTENTS WATER SERVICES ASSOCIATION OF AUSTRALIA PROCESS BENCHMARKING AUDIT PROTOCOLS COPYRIGHT:... 3

TABLE OF CONTENTS WATER SERVICES ASSOCIATION OF AUSTRALIA PROCESS BENCHMARKING AUDIT PROTOCOLS COPYRIGHT:... 3 WATER SERVICES ASSOCIATION OF AUSTRALIA AUDIT PROTOCOL FOR THE AQUAMARK ASSET MANAGEMENT PROCESS BENCHMARKING PROJECT DECEMBER 2007 TABLE OF CONTENTS COPYRIGHT:... 3 1.0 INTRODUCTION:... 4 1.1 OVERVIEW...

More information

BSC (HONS) QUANTITY SURVEYING (PART-TIME, TOP- UP) E 413

BSC (HONS) QUANTITY SURVEYING (PART-TIME, TOP- UP) E 413 BSC (HONS) QUANTITY SURVEYING (PART-TIME, TOP- UP) E 413 1. PROGRAMME DESCRIPTION Quantity Surveyors are construction and cost managers for building and civil engineering projects. They are involved from

More information

Selection of environment friendly materials through value management: An integrated process model

Selection of environment friendly materials through value management: An integrated process model Selection of environment friendly materials through value management: An integrated process model Manewa, A, Rameezdeen, R and Amaratunga, RDG Title Authors Type URL Published Date 2005 Selection of environment

More information

ABERDEEN CITY COUNCIL

ABERDEEN CITY COUNCIL ABERDEEN CITY COUNCIL 1 Job Details Job Title: Chief Officer - Capital Job Profile No: Function: Resources Grade: CO SCP 34 Version Date: November 2017 Salary 81,504 2 Job Purpose This role is responsible

More information

Aon Infrastructure Solutions

Aon Infrastructure Solutions Aon Risk Solutions Aon Infrastructure Solutions Aon Infrastructure Solutions Alternative Project Delivery Risk Advisors Aon plc is the leading global provider of risk management services, insurance and

More information

The Application of Value Engineering to Highway Projects and Programs

The Application of Value Engineering to Highway Projects and Programs The Application of Value Engineering to Highway Projects and Programs Bruce A. Lind Assistant Division Administrator, Federal Highway Administration Oklahoma City, Oklahoma A challenge universally faced

More information

Infrastructure Transparency Initiative

Infrastructure Transparency Initiative Infrastructure Transparency Initiative ASSURANCE OF NATINAL SOCIAL SECURITY FUND DUNGU SATELLITE VILLAGE PROJECT FINAL REPORT SEPTEMBER 2017 1 Table of Contents Page List of Abbreviations / Acronyms 3

More information

CONSTRUCTION PROFESSIONALS PERCEPTION ON THE CAUSES AND EFFECTS OF PROJECT DELAY IN LUSAKA, ZAMBIA

CONSTRUCTION PROFESSIONALS PERCEPTION ON THE CAUSES AND EFFECTS OF PROJECT DELAY IN LUSAKA, ZAMBIA CONSTRUCTION PROFESSIONALS PERCEPTION ON THE CAUSES AND EFFECTS OF PROJECT DELAY IN LUSAKA, ZAMBIA MJ Mukuka 1, CO Aigbavboa 2, and WD Thwala 3 Department of Construction Management & Quantity Surveying,

More information

Critical Factors Affecting the Implementation of Total Quality Management in the Construction Industry in U.A.E

Critical Factors Affecting the Implementation of Total Quality Management in the Construction Industry in U.A.E Critical Factors Affecting the Implementation of Total Quality Management in the Construction Industry in U.A.E Firas Mohamad Al-Sabek Abstract The purpose of the paper is to examine the most critical

More information

Commercial Management in the Construction Industry

Commercial Management in the Construction Industry Unit 11: Commercial Management in the Construction Industry Unit code: A/504/4355 QCF level: 6 Credit value: 15 Aim This unit gives learners an understanding of the factors which determine the cost of

More information

Evaluation Framework: Research Programmes and Schemes

Evaluation Framework: Research Programmes and Schemes Evaluation Framework: Research Programmes and Schemes November 2015 BBSRC Polaris House North Star Avenue Swindon SN2 1UH www.bbsrc.ac.uk Why BBSRC Evaluates the Research and Training it Supports EVALUATION

More information

EMPLOYMENT OPPORTUNITIES

EMPLOYMENT OPPORTUNITIES EMPLOYMENT OPPORTUNITIES The Bank of Tanzania, an equal opportunity employer and Tanzania s central bank, is looking for suitably qualified young Tanzanian citizens of high personal integrity to fill the

More information

A New Approach to International Construction Price Comparison

A New Approach to International Construction Price Comparison International Comparison Program [01.01] A New Approach to International Construction Price Comparison Jim Meikle 5 th Technical Advisory Group Meeting April 18-19, 2011 Washington DC Table of Contents

More information

Benefits and Level of Using Retention Bond for Construction Projects in Nigeria

Benefits and Level of Using Retention Bond for Construction Projects in Nigeria International Journal of Architecture, Engineering and Construction Vol 2, No 2, June 2013, 98-105 Benefits and Level of Using Retention Bond for Construction Projects in Nigeria Ayodeji E. Oke Department

More information

Causes of Delay in Public Building Construction Projects: A Case of Addis Abeba Administration, Ethiopia

Causes of Delay in Public Building Construction Projects: A Case of Addis Abeba Administration, Ethiopia Asian Journal of Managerial Science ISSN: 2249-6300 Vol.8 No.2, 2019, pp. 4-9 The Research Publication, www.trp.org.in Causes of Delay in Public Building Construction Projects: A Case of Addis Abeba Administration,

More information

The potential of knowledge management processes for facilitating PFI projects

The potential of knowledge management processes for facilitating PFI projects Loughborough University Institutional Repository The potential of knowledge management processes for facilitating PFI projects This item was submitted to Loughborough University's Institutional Repository

More information

Job Description Director of Capital

Job Description Director of Capital Salary: 90,000-120,000 Responsible to: Chief Executive Officer About the Role REAch2 Academy Trust is seeking an exceptional Director of Capital to join the Trust to lead on the strategy and management

More information

Trade-Related Assistance: What Do Recent Evaluations Tell Us?

Trade-Related Assistance: What Do Recent Evaluations Tell Us? 3-4 NOVEMBER 2008 CONFERENCE CENTRE, PARIS Background Document for Session III Trade-Related Assistance: What Do Recent Evaluations Tell Us? MAIN FINDINGS AND KEY RECOMMENDATIONS 1 Identify the most adequate

More information

International Seminar on Strengthening Public Investment and Managing Fiscal Risks from Public-Private Partnerships

International Seminar on Strengthening Public Investment and Managing Fiscal Risks from Public-Private Partnerships International Seminar on Strengthening Public Investment and Managing Fiscal Risks from Public-Private Partnerships Budapest, Hungary March 7 8, 2007 The views expressed in this paper are those of the

More information

COMPLEXITY OF STATUTORY REQUIREMENTS: CASE STUDY OF REFURBISHMENT PROJECTS IN MALAYSIA. * Azlan Shah Ali & 2 Rohayati Zakaria

COMPLEXITY OF STATUTORY REQUIREMENTS: CASE STUDY OF REFURBISHMENT PROJECTS IN MALAYSIA. * Azlan Shah Ali & 2 Rohayati Zakaria COMPLEXITY OF STATUTORY REQUIREMENTS: CASE STUDY OF REFURBISHMENT PROJECTS IN MALAYSIA * Azlan Shah Ali & 2 Rohayati Zakaria * Centre for Construction, Building and Urban Studies, Faculty of Built Environment,

More information

Prequalification Questionnaire. for. Property Related Professional Services. PROC/2013/80/CT/Professional Services EU RESTRICTED PROCEDURE

Prequalification Questionnaire. for. Property Related Professional Services. PROC/2013/80/CT/Professional Services EU RESTRICTED PROCEDURE Section A Prequalification Questionnaire for Property Related Professional Services PROC/2013/80/CT/Professional Services EU RESTRICTED PROCEDURE CONTENTS Section A Section B Section C Appendix 1 Appendix

More information

Introduction to Business Research 3

Introduction to Business Research 3 Synopsis Introduction to Business Research 3 1. Orientation By the time the candidate has completed this module, he or she should understand: what has to be submitted for the viva voce examination; what

More information

INTERNAL AUDIT OF PROCUREMENT AND CONTRACTING

INTERNAL AUDIT OF PROCUREMENT AND CONTRACTING OFFICE OF THE COMMISSIONNER OF LOBBYING OF CANADA INTERNAL AUDIT OF PROCUREMENT AND CONTRACTING AUDIT REPORT Presented by: Samson & Associates February 20, 2015 TABLE OF CONTENT EXECUTIVE SUMMARY... I

More information

Which Archaeologist? The Procurement of Archaeological Services

Which Archaeologist? The Procurement of Archaeological Services Which Archaeologist? The Procurement of Archaeological Services 2014 Guidance and best practice for managing risk in selecting an archaeological supplier Purpose The aim of this document is to foster an

More information

1 Management Responsibility 1 Management Responsibility 1.1 General 1.1 General

1 Management Responsibility 1 Management Responsibility 1.1 General 1.1 General 1 Management Responsibility 1 Management Responsibility 1.1 General 1.1 General The organization s management with executive The commitment and involvement of the responsibility shall define, document

More information

Workshop II Project Management

Workshop II Project Management Workshop II Project Management UNITAR-HIROSHIMA FELLOWSHIP FOR AFGHANISTAN 2007 Introduction to Project Management 15 17 August 2007, Dehradun, India Presented by: Jobaid Kabir, Ph.D. Fellowship Program

More information

Chapter3. Methodology of Study. Conceptual Framework. The conceptual framework for my research is based on the extensive interviews done.

Chapter3. Methodology of Study. Conceptual Framework. The conceptual framework for my research is based on the extensive interviews done. Chapter3 Methodology of Study Conceptual Framework The conceptual framework for my research is based on the extensive interviews done. Influencing variables: Information Security Experience Knowledge on

More information

The Impact of Variation Orders on Public Building Projects

The Impact of Variation Orders on Public Building Projects International Journal of Construction Engineering and Management 016, 5(3): 86-91 DOI: 10.593/j.ijcem.0160503.03 The Impact of Variation Orders on Public Building Projects Andualem Endris Yadeta School

More information

JOB DESCRIPTION. Line Management responsibility for the Programmes Senior Programme Officers and Programme Officers

JOB DESCRIPTION. Line Management responsibility for the Programmes Senior Programme Officers and Programme Officers JOB DESCRIPTION DIRECTORATE: SECTION: JOB TITLE: Business & Skills Programme and Fund Services Assistant Programmes Manager RESPONSIBLE TO: Programmes Manager SUPERVISORY RESPONSIBILITY: KEY RELATIONSHIPS:

More information

Construction Experts Perception on the Causes and Effects of Cost Overruns in Johannesburg, Gauteng Province, South Africa

Construction Experts Perception on the Causes and Effects of Cost Overruns in Johannesburg, Gauteng Province, South Africa Construction Experts Perception on the Causes and Effects of Cost Overruns in Johannesburg, Gauteng Province, South Africa Abstract Mukuka MJ 1, Clinton Aigbavboa 2, and Wellington Thwala 3 The construction

More information

From Uncertainty to Certainty; How Clients can Improve their Experience of the Construction Process

From Uncertainty to Certainty; How Clients can Improve their Experience of the Construction Process From Uncertainty to Certainty; How Clients can Improve their Experience of the Construction Process www.provelio.com Summary This paper is an independent project manager s critique of two projects. One

More information

HSE Integrated Risk Management Policy. Part 1. Managing Risk in Everyday Practice Guidance for Managers

HSE Integrated Risk Management Policy. Part 1. Managing Risk in Everyday Practice Guidance for Managers HSE Integrated Risk Management Policy Part 1 Managing Risk in Everyday Practice Guidance for Managers HSE Integrated Risk Management Policy Part 1 Managing Risk in Everyday Practice Guidance for Managers

More information

A study on HR Planning at Karvy Stock Broking Company Limited

A study on HR Planning at Karvy Stock Broking Company Limited A study on HR Planning at Karvy Stock Broking Company Limited P. Ramesh Associate Professor, Department of Engineering & Management Studies, Marri Laxman Reddy Institute of Technology & management - JNTUH,

More information

CHAPTER 1 INTRODUCTION

CHAPTER 1 INTRODUCTION CHAPTER 1 INTRODUCTION Cost is a major factor in most decisions regarding construction, and cost estimates are prepared throughout the planning, design, and construction phases of a construction project,

More information

Conception Design Construction Operation.

Conception Design Construction Operation. 4 Development Process and Procurement 4.1 The development process by which the project moves from the earliest ideas to the final completion of the facilities and their use can be considered as having

More information

ASSESSMENT OF PROCUREMENT METHODS USED FOR EXECUTING MAINTENANCE WORKS IN LAGOS STATE. ADENUGA, O.A. 1 and DOSUMU, O.S. 2

ASSESSMENT OF PROCUREMENT METHODS USED FOR EXECUTING MAINTENANCE WORKS IN LAGOS STATE. ADENUGA, O.A. 1 and DOSUMU, O.S. 2 ASSESSMENT OF PROCUREMENT METHODS USED FOR EXECUTING MAINTENANCE WORKS IN LAGOS STATE ADENUGA, O.A. 1 and DOSUMU, O.S. 2 http://dx.doi.org/10.4314/ejesm.v5i4.s6 Received 16th August 2012; accepted 8th

More information

Factors affecting organizational commitment of employee s of Lao development bank

Factors affecting organizational commitment of employee s of Lao development bank Open Access Journal of Business Economics Research Article Open Access Factors affecting organizational of employee s of Lao development bank Abstract This study was conducted in Vientiane Capital, Lao

More information

AUSTRALIAN ENGINEERING COMPETENCY STANDARDS STAGE 2 - EXPERIENCED PROFESSIONAL ENGINEER IN LEADERSHIP AND MANAGEMENT

AUSTRALIAN ENGINEERING COMPETENCY STANDARDS STAGE 2 - EXPERIENCED PROFESSIONAL ENGINEER IN LEADERSHIP AND MANAGEMENT AUSTRALIAN ENGINEERING COMPETENCY STANDARDS STAGE 2 - EXPERIENCED IN LEADERSHIP AND MANAGEMENT The Stage 2 Competency Standards are the profession's expression of the knowledge and skill base, engineering

More information

Introduction to FIDIC Conditions of contract OUTLINE. What is FIDIC? Dr. Mirosław J. Skibniewski, A.J. Clark Chair Professor

Introduction to FIDIC Conditions of contract OUTLINE. What is FIDIC? Dr. Mirosław J. Skibniewski, A.J. Clark Chair Professor New tendency in contracts worldwide Introduction to FIDIC Conditions of contract Dr. Mirosław J. Skibniewski, A.J. Clark Chair Professor 1 2 OUTLINE 1. What is FIDIC? 2. Characteristics of FIDIC Conditions

More information

AN ANALYSIS OF BUILDING PROCUREMENT FACTORS AFFECTING COORDINATION OF BUILDING SERVICES

AN ANALYSIS OF BUILDING PROCUREMENT FACTORS AFFECTING COORDINATION OF BUILDING SERVICES AN ANALYSIS OF BUILDING PROCUREMENT FACTORS AFFECTING COORDINATION OF BUILDING SERVICES K.C. Lam, A.G.F. Gibb and W.D. Sher Department of Civil & Building Engineering Loughborough University. UK The procurement

More information

A FRAMEWORK FOR AUDIT QUALITY. KEY ELEMENTS THAT CREATE AN ENVIRONMENT FOR AUDIT QUALITY February 2014

A FRAMEWORK FOR AUDIT QUALITY. KEY ELEMENTS THAT CREATE AN ENVIRONMENT FOR AUDIT QUALITY February 2014 A FRAMEWORK FOR AUDIT QUALITY KEY ELEMENTS THAT CREATE AN ENVIRONMENT FOR AUDIT QUALITY February 2014 This document was developed and approved by the International Auditing and Assurance Standards Board

More information

2.1 Overview by industry type Overview by managerial level Overview by international comparisons Overview by index comparisons 4

2.1 Overview by industry type Overview by managerial level Overview by international comparisons Overview by index comparisons 4 Macau Management Capability Index (MMCI) 2017 Contents 1 Executive Summary 2 2 Key findings 3 2.1 Overview by industry type 3 2.2 Overview by managerial level 3 2.3 Overview by international comparisons

More information

VACANCIES NSSF KWANZA. Jiunge Nasi. Boresha Maisha Yako

VACANCIES NSSF KWANZA. Jiunge Nasi. Boresha Maisha Yako We Build Your Future VACANCIES The National Social Security Fund (NSSF) which is the leading provider of Social Security in Tanzania is hereby inviting applications from suitable, qualified, experienced,

More information

A Public Interest Framework for the Accountancy Profession

A Public Interest Framework for the Accountancy Profession International Federation of Accountants Exposure Draft November 2010 Comments requested by March 25, 2011 IFAC Policy Position Paper #4 A Public Interest Framework for the Accountancy Profession REQUEST

More information

Competence Criteria for Fellow (FCIBSE)

Competence Criteria for Fellow (FCIBSE) Competence Criteria for Fellow (FCIBSE) FACTSHEET F21 The competence criteria for the Fellow grade of CIBSE (FCIBSE) are directly aligned to the Competence Statements issued by the Engineering Council,

More information

BIS Research & Evaluation Framework. Guide for Buyers

BIS Research & Evaluation Framework. Guide for Buyers BIS Research & Evaluation Framework Guide for Buyers Framework reference: CR150025BIS BIS Research & Evaluation Framework: Guide for Buyers Update 22 June 2016 1 P age Research & Evaluation Framework Contract

More information

Kong, China however, there has been some successful results from the informal process (see the Hong Kong, China local study) Consideration of wo

Kong, China however, there has been some successful results from the informal process (see the Hong Kong, China local study) Consideration of wo INFORMAL WORKOUTS IN THE RETA ECONOMIES 10.1 Introduction As mentioned earlier in this report, the commercial culture of many of the RETA economies appears to be more conditioned toward non-confrontational

More information

Applying Evaluate Marketing Processes Corporation Marketing Capability Maturity Model Evidence from Bursa Malaysia Market

Applying Evaluate Marketing Processes Corporation Marketing Capability Maturity Model Evidence from Bursa Malaysia Market Applying Evaluate Marketing Processes Corporation Marketing Capability Maturity Model Evidence from Bursa Malaysia Market Suseela Devi Chandran Phd Candidate, Institute of Malaysia & International Studies,

More information

Audit of the Initiation Phase of the New Bridge for the St. Lawrence Corridor (NBSLC) Project

Audit of the Initiation Phase of the New Bridge for the St. Lawrence Corridor (NBSLC) Project 2014-709 Audit of the Initiation Phase of the New Bridge for the St. Lawrence Corridor (NBSLC) Project May 14, 2015 Office of Audit and Evaluation TABLE OF CONTENTS MAIN POINTS... i INTRODUCTION... 1

More information

CAPITAL PROJECTS: PROCUREMENT & TENDERING STRATEGIES

CAPITAL PROJECTS: PROCUREMENT & TENDERING STRATEGIES Client Guide CAPITAL PROJECTS: PROCUREMENT & TENDERING STRATEGIES ABOUT THIS GUIDE: This quick reference guide is intended as an outline of the key procurement and strategies to be considered when undertaking

More information

Financial Provision for Construction Health and Safety (H&S)

Financial Provision for Construction Health and Safety (H&S) 1881 Financial Provision for Construction Health and Safety (H&S) John SMALLWOOD 1 and Fidelis EMUZE 2 1 Department of Construction Management, Nelson Mandela Metropolitan University, P.O. Box 77000, Port

More information

Value-based Design Decision on Building System Selection

Value-based Design Decision on Building System Selection Value-based Design Decision on Building System Selection F Murti, C Utomo. Department of Architecture, Surabaya, Indonesia. University of Agustus (UNTAG), Surabaya, Indonesia. faridamurti@gmail.com. Institut

More information

Construction Industry Development Comparison & Acceleration CIDCA * - Introduction -

Construction Industry Development Comparison & Acceleration CIDCA * - Introduction - Construction Industry Development Comparison & Acceleration CIDCA * - Introduction - Mohan Kumaraswamy The University of Hong Kong HKU Research Project funded by Research Grants Council, Hong Kong, entitled:

More information

Florida Cleanroom Systems

Florida Cleanroom Systems Florida Cleanroom Systems Design Build Projects / Project Quality Control Plan (PQCP) Quality Control / Quality Assurance Manual May 2010 1 TABLE OF CONTENTS Section 1: Introduction 3 1.1 Defining Plan

More information

BENEFITS OF MOBILE TELEPHONES FOR CONSTRUCTION CONTRACTORS IN THE UNITED KINGDOM

BENEFITS OF MOBILE TELEPHONES FOR CONSTRUCTION CONTRACTORS IN THE UNITED KINGDOM BENEFITS OF MOBILE TELEPHONES FOR CONSTRUCTION CONTRACTORS IN THE UNITED KINGDOM Apollo Tutesigensi 1 and Kevin Parcell Department of Civil Engineering, University of Portsmouth, Portsmouth, PO1 3AH, UK

More information

AUSTRALIAN ENGINEERING COMPETENCY STANDARDS STAGE 2 - EXPERIENCED PROFESSIONAL ENGINEER

AUSTRALIAN ENGINEERING COMPETENCY STANDARDS STAGE 2 - EXPERIENCED PROFESSIONAL ENGINEER AUSTRALIAN ENGINEERING COMPETENCY STANDARDS STAGE 2 - EXPERIENCED The Stage 2 Competency Standards are the profession's expression of the knowledge and skill base, engineering application abilities, and

More information

Abstract. Keywords: Contracting Quantity Surveyor, Flow Activities, Lean Concepts, Sri Lankan construction industry. 1. Background

Abstract. Keywords: Contracting Quantity Surveyor, Flow Activities, Lean Concepts, Sri Lankan construction industry. 1. Background Acceptability of Lean Concepts to Functions of Quantity Surveyor in Sri Lanka Nissanka N.A.L.N., Department of Building Economics, University of Moratuwa (email: nimmiabc@yahoo.com ) Sepani Senarathne.,

More information

PMP MOCK EXAMS BASED ON PMBOK 5TH EDITION

PMP MOCK EXAMS BASED ON PMBOK 5TH EDITION PMP MOCK EXAMS http://www.tutorialspoint.com/pmp-exams/pmp_mock_exams_set4.htm Copyright tutorialspoint.com BASED ON PMBOK 5TH EDITION Here are 200 objective type sample questions and their answers are

More information

EQUITY INVESTORS EXPECTATION AND EXPERIENCE A GAP ANALYSIS

EQUITY INVESTORS EXPECTATION AND EXPERIENCE A GAP ANALYSIS 46 ABSTRACT EQUITY INVESTORS EXPECTATION AND EXPERIENCE A GAP ANALYSIS TARAK PAUL*; EKTA GARODIA** *Assistant Professor, Royal School of Business, Betkuchi, Guwahati. **Research Scholar, Royal School of

More information

BETTER BUSINESS CASE - EFFICIENT DECISION MAKING Chris Purchas, Tonkin + Taylor Limited

BETTER BUSINESS CASE - EFFICIENT DECISION MAKING Chris Purchas, Tonkin + Taylor Limited BETTER BUSINESS CASE - EFFICIENT DECISION MAKING Chris Purchas, Tonkin + Taylor Limited Introduction If you are involved in any type of public infrastructure development in New Zealand you have probably

More information

Ministry of Finance of the Republic of Lithuania in cooperation with. Public Policy and Management Institute (PPMI) and

Ministry of Finance of the Republic of Lithuania in cooperation with. Public Policy and Management Institute (PPMI) and Financed by the European Social Fund under project EU Structural Funds Evaluation Capacity Building in Lithuania 3 implemented within the framework of Technical Assistance Operational Programme. Prepared

More information

COMMISSION OF THE EUROPEAN COMMUNITIES REPORT FROM THE COMMISSION TO THE COUNCIL AND THE EUROPEAN PARLIAMENT

COMMISSION OF THE EUROPEAN COMMUNITIES REPORT FROM THE COMMISSION TO THE COUNCIL AND THE EUROPEAN PARLIAMENT COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 9.11.2004 COM(2004) 745 final REPORT FROM THE COMMISSION TO THE COUNCIL AND THE EUROPEAN PARLIAMENT ON INCENTIVES FOR EMAS REGISTERED ORGANISATIONS {SEC(2004)1375}

More information

Assessment of Extension of Time Claims in Hydropower Projects of Pakistan

Assessment of Extension of Time Claims in Hydropower Projects of Pakistan International Journal of Engineering and Advanced Technology (IJEAT) Assessment of Extension of Time Claims in Hydropower Projects of Pakistan Hashim Hanif, Yasar Saleem, Zuhaib Aslam Shahid, Abdullah

More information

Corporate Governance Policy

Corporate Governance Policy BACKGROUND Scope (Vic) Ltd. ( Scope ) was established in 1948 as The Spastic Children s Society of Victoria by a group of parents of children with cerebral palsy. It became The Spastic Society of Victoria

More information

IRM s Professional Standards in Risk Management PART 1 Consultation: Functional Standards

IRM s Professional Standards in Risk Management PART 1 Consultation: Functional Standards IRM s Professional Standards in Risk PART 1 Consultation: Functional Standards Setting standards Building capability Championing learning and development Raising the risk profession s profile Supporting

More information

Associate Professors Department of Management Studies Rajalakshmi Engineering college Chennai Corresponding Author:1Dr.J.Krithika

Associate Professors Department of Management Studies Rajalakshmi Engineering college Chennai Corresponding Author:1Dr.J.Krithika IOSR Journal of Business and Management (IOSR-JBM) e-issn: 2278-487X, p-issn: 2319-7668. Volume 19, Issue 12. Ver. II (December. 2017), PP 51-56 www.iosrjournals.org A Study on Entrepreneurial Career Intention

More information

National Commissioning Board. Leading Integrated and Collaborative Commissioning A Practice Guide

National Commissioning Board. Leading Integrated and Collaborative Commissioning A Practice Guide National Commissioning Board Leading Integrated and Collaborative Commissioning A Practice Guide March 2017 Introduction The short practical guide is intended to stimulate commissioners and other senior

More information

Educators Performance Management in Secondary Schools in Mauritius

Educators Performance Management in Secondary Schools in Mauritius Educators Performance Management in Secondary Schools in Mauritius Bhaugeerutty Vinod Sharma PhD Student, Open University of Mauritius Mauritius Email: vsharma471@yahoo.co.uk Received: November 10, 2016

More information

BUSINESS ECONOMICS. 16: Project Appraisal and Impact Analysis PAPER NO. 16 : PROJECT APPRAISAL AND IMPACT ANALYSIS MODULE NO. 6 : FEASIBILITY STUDY

BUSINESS ECONOMICS. 16: Project Appraisal and Impact Analysis PAPER NO. 16 : PROJECT APPRAISAL AND IMPACT ANALYSIS MODULE NO. 6 : FEASIBILITY STUDY Subject Paper No and Title Module No and Title Module Tag 16: Project Appraisal and Impact Analysis 6: Feasibility Study BSE_P16_M6 TABLE OF CONTENTS 1. Learning Outcomes 2. Introduction 3. Feasibility

More information

Achieve. Performance objectives

Achieve. Performance objectives Achieve Performance objectives Performance objectives are benchmarks of effective performance that describe the types of work activities students and affiliates will be involved in as trainee accountants.

More information

FINANCIAL MANAGEMENT ASSESSMENT

FINANCIAL MANAGEMENT ASSESSMENT Second Green Power Development Project (RRP BHU 44444) A. Summary Assessment FINANCIAL MANAGEMENT ASSESSMENT 1. The Druk Green Power Corporation (DGPC) is the executing agency. The Tangsibji Hydro Energy

More information

Simulating The Impact Of The Material Flow In The Jordanian Construction Supply Chain And Its Impact On Project Performance

Simulating The Impact Of The Material Flow In The Jordanian Construction Supply Chain And Its Impact On Project Performance Simulating The Impact Of The Material Flow In The Jordanian Construction Supply Chain And Its Impact On Project Performance Dr. Ghaith Al-Werikat Abstract: With the new developments and challenges within

More information

Building Policies for a Better World. ESCO models for the retrofit of existing buildings in China. GBPN November 2013

Building Policies for a Better World. ESCO models for the retrofit of existing buildings in China. GBPN November 2013 ESCO models for the retrofit of existing buildings in China GBPN November 2013 1. Project background The global building sector accounts for approximately 30% of total energy consumption and related CO

More information

Towards the Integration of Risk and Value Management

Towards the Integration of Risk and Value Management Towards the Integration of Risk and Value Management Ranesh, A. Zillante, G., and Chileshe, N. (University of South Australia, Australia) Abstract Governments are increasingly faced with the challenge

More information

Performance Appraisal amongst Contractors in Construction Project in Malaysia Siti Hafiza Mat Yahya 1, a and Syuhaida Ismail 2,b

Performance Appraisal amongst Contractors in Construction Project in Malaysia Siti Hafiza Mat Yahya 1, a and Syuhaida Ismail 2,b Performance Appraisal amongst Contractors in Construction Project in Malaysia Siti Hafiza Mat Yahya 1, a and Syuhaida Ismail 2,b 1 UTM Razak School of Engineering and Advanced Technology, UTM Kuala Lumpur,

More information

Sustainable Architecture

Sustainable Architecture WELCOME "Creating sustainable architecture requires a detailed exploration of living within these complex times. My goal is to contribute responsible and enthusiastic examples of 21st century architecture.

More information