BUILDING MATERIALS EVALUATION COMMISSION (BMEC) HPB (High Performance Bedding)

Size: px
Start display at page:

Download "BUILDING MATERIALS EVALUATION COMMISSION (BMEC) HPB (High Performance Bedding)"

Transcription

1 BUILDING MATERIALS EVALUATION COMMISSION (BMEC) DATE OF AUTHORIZATION DECEMBER 5, 2002 BMEC AUTHORIZATION BMEC # BMEC APPLICATION #A HPB (High Performance Bedding) 1. Applicant 2. Manufacturing Facilities Dufferin Aggregates. Milton Quarry 3300 Hwy #7, Suite Dublin Line, PO Box 68 Concord, Ontario Milton, Ontario L4K 4M3 L9T 2Y3 Tel: (905) Aberfoyle Quarry Pit Fax: (905) RR #3 Country Road #46 Guelph, Ontario N1H 6H9 3. Description The Dufferin Aggregates HPB : High Performance Bedding (HPB ) is a limestone aggregate and gravel offering a 9.5 mm top size. The HPB is a crushed, washed, and graded aggregate; and is manufactured at the Milton Quarry and the Aberfoyle Quarry Pit. 4. Authorization requested The applicant sought Authorization for the use of the HPB as an acceptable alternative that satisfies the granular material requirements for applications beneath floors, and on the top and sides of drain pipes and tile as it is required by the provisions of the 1997 Ontario Building Code as amended. The applicant requested an equivalent to the requirement of the Sentences (2), (4) and (1) of the 1997 Ontario Building Code as amended. Issued December 5, 2002 Page 1 of 5

2 5. Assessment Reports and assessments provided by the applicant demonstrate that if the HPB is manufactured, stored, installed, maintained and monitored in accordance with the limitations of the manufacturer's specifications and the conditions stated in this Authorization, a level of performance equivalent to that required by the Sentences (2), (4) and (1) of the 1997 Ontario Building Code as amended will be provided. Reports submitted and reviewed: 1. Manufacturer s literature You ve got the look. 2. Manufacturer s literature Our Environment is Counting On You x 7 colour photo of HPB with mechanical systems. 3. Ontario Association of Certified Engineering Technicians and Technologist Outstanding Technical Achievement Certificate, dated May 8, Letter of recommendation, Unilock, dated May 16, Letter of recommendation, Mid-North Excavating, dated June 11, Letter of recommendation, Maxwell Excavating Limited, dated July 23, Letter of recommendation, Marshall, Macklin, Manahan, Consulting Engineers, Surveyors, Planners, dated November 29, Letter of Approval, City of Mississauga, Department of Transportation and Works, dated August 17, Letter of Approval, Regional Municipality of Peel, Public Works, dated August 24, Letter of recommendation, Bert Contracting, dated October 18, Technical Background Information Memo (TBI) relating to H.P.B. (High Performance Bedding), dated March 26, Peto MacCallum Ltd.: Consulting Engineers, Comparative Evaluation of Pipe Bedding Stones for Acceptance by the City of Mississauga, dated April 1998, Ref # per copy 8TE Manufacturer Literature: HPB : High Performance Bedding. 14. User Guide for Dufferin Aggregates: Quaility System Manual, ISO 9002:94, Guide 25, dated February 28, Issued December 5, 2002 Page 2 of 5

3 6. Authorization The Dufferin Aggregates HPB : High Performance Bedding (HPB ) is authorized for use as a granular material as referenced in Sentences (2) (4) and (1) of the 1997 Ontario Building Code as amended, when the HPB is manufactured, stored, installed, maintained and monitored in accordance with the limitations of the manufacturer's specifications and recommendations; and the following terms and conditions: A. Specific Terms and Conditions 1. This authorization is valid only for Dufferin Aggregates HPB : High Performance Bedding (HPB ) manufactured at the facilities referenced in Part 2. of this Authorization. 2. The HPB shall be manufactured and stored as per Dufferin Aggregates Quality Control Manuals, dated February 28, When the HPB is used on the top and sides of drain tile or pipes, a geo-textile material shall be installed as per Sentence (3) of the 1997 Ontario Building Code as amended. 4. A signed copy of the quarry ticket, for each shipment received shall be kept with the on-site construction documents, and upon request produced to the Authority Having Jurisdiction; and the Dufferin Aggregates quarry ticket should indicate the following minimum information: (c) (d) (e) Name of the Quarry, Date, Ticket number, Gross and net amount of the HPB product, and Name of the product. 5. The HPB is not authorized for applications pertaining to Part 8 Sewage Systems of the 1997 Ontario Building Code as amended. 6. The HPB is not authorized for use when designed, or installed in combination with other aggregates. B. General Conditions 1. The use of the Dufferin Aggregates HPB (High Performance Bedding) as described in 6. A. Specific Terms and Conditions No. 1. must comply with the Building Code Act, 1992 as amended or re-enacted from time to time and except as specifically authorized herein, with the Ontario Building Code as amended or remade from time to time. Issued December 5, 2002 Page 3 of 5

4 2. A copy of this Authorization shall accompany each application for a building permit and shall be maintained on the site of the construction with the building permit. 3. The Applicant named in Part 1 hereof shall promptly notify the BMEC of: the failure of the Applicant, or of the material, system or building design that is the subject matter of this Authorization, to comply with any of the terms and conditions set out in 6. A. above; or the occurrence of any of the events described in Conditions 6. B. 4. and (ii) below. 4. The BMEC may amend or revoke this Authorization where it determines that: any change has been made to: i. the material, system or building design that is the subject matter of this Authorization; ii. iii. the address of the applicant specified in Part 1 of this Authorization; or, the ownership of the applicant specified in Part 1 of this Authorization. the use of the material, system or building design authorized herein; i. does not comply with the Building Code Act, 1992 or any relevant legislation as they may be amended or re-enacted from time to time; or ii. provides an unsatisfactory level of performance, in situ. (c) (d) the Applicant, or the material, system or building design that is the subject matter of this Authorization, has failed to comply with any of the terms and conditions set out in this Authorization; or any Ontario Building Code provision relevant to this Authorization has been amended or remade. Issued December 5, 2002 Page 4 of 5

5 5. Where the Commission receives additional information concerning the material, system or building design authorized herein, the Commission may review this Authorization and the Commission may after the review amend or revoke this Authorization as in the opinion of the Commission may be necessary. th at Toronto this 5 day of December BUILDING MATERIALS EVALUATION COMMISSION Rashmi Nathwani, Chair Issued December 5, 2002 Page 5 of 5

BMEC Authorization Number Date of Issuance September 25, 2008 BMEC Application A Date of Expiration September 25, 2013

BMEC Authorization Number Date of Issuance September 25, 2008 BMEC Application A Date of Expiration September 25, 2013 nd 777 Bay Street, 2 Floor 777, rue Bay, 2 e etage Toronto, Ontario, M5G 2E5 Toronto, Ontario, M5G 2E5 T: 416 585 4234 T: 416 585 4234 F: 416 585 7531 TC: 416 585 7531 W: www.ontario.ca/buildingcode/ W:

More information

BMEC Authorization Number Date of Issuance September 26, 2013 BMEC Application A Date of Expiration September 26, 2018

BMEC Authorization Number Date of Issuance September 26, 2013 BMEC Application A Date of Expiration September 26, 2018 777 Bay Street, 2 nd Floor Toronto, Ontario, M5G 2E5 T: 416 585 4234 F: 416 585 7531 W: www.ontario.ca/buildingcode/ 777, rue Bay, 2 e etage Toronto, Ontario, M5G 2E5 T: 416 585 4234 TC: 416 585 7531 W:

More information

Content Copy Of Original

Content Copy Of Original Content Copy Of Original Ministry of the Environment and Climate Change Ministère de l Environnement et de l Action en matière de changement climatique Maple Lake Park Limited 16 Levy Crt Woodbridge, Ontario

More information

Content Copy Of Original

Content Copy Of Original Content Copy Of Original Ministry of the Environment Ministère de l Environnement ENVIRONMENTAL COMPLIANCE APPROVAL NUMBER 4495-9FUQDY Issue Date: February 5, 2014 Holcim (Canada) Inc. 2300 Steeles Ave

More information

CITY OF TORONTO. BY-LAW No

CITY OF TORONTO. BY-LAW No Authority: Planning and Growth Committee Item 15.6, adopted as amended, by City of Toronto Council on May 26 and 27, 2008 Enacted by Council: May 27, 2008 CITY OF TORONTO BY-LAW No. 514-2008 To amend City

More information

TEXTILE EXCHANGE. Policy and Template for issuing Transaction Certificates (TCs) Objective. Original Document. Multiple Shipments on a TC

TEXTILE EXCHANGE. Policy and Template for issuing Transaction Certificates (TCs) Objective. Original Document. Multiple Shipments on a TC Policy and Template for issuing Transaction Certificates (TCs) Objective This policy provides for mandatory instructions and notes to be followed by approved Certification Bodies (CBs) to issue TCs in

More information

CITY OF FARGO SPECIFICATIONS AGGREGATE BASES

CITY OF FARGO SPECIFICATIONS AGGREGATE BASES AGGREGATE BASES PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, accessories, and equipment necessary

More information

THE CORPORATION OF THE TOWNSHIPSHIP OF ADELAIDE METCALFE

THE CORPORATION OF THE TOWNSHIPSHIP OF ADELAIDE METCALFE THE CORPORATION OF THE TOWNSHIPSHIP OF ADELAIDE METCALFE BY-LAW #69-2011 Being a by-law respecting Construction, Demolition and Change of Use Permits and Inspections for the Township of Adelaide Metcalfe

More information

SUPPLIER QUALITY REQUIREMENTS

SUPPLIER QUALITY REQUIREMENTS SUPPLIER QUALITY REQUIREMENTS TABLE OF CONTENTS 1) PURPOSE PG 2 2) KINNEAR PURCHASE ORDER PG 2 3) USE AND COMMUNICATION PG 2 4) SUPPLIER APPROVAL PG 2 5) GENERAL REQUIREMENTS PG 3 SQD Rev 2 2014-08-13

More information

SEWAGE PERMIT APPLICATION

SEWAGE PERMIT APPLICATION SEWAGE PERMIT APPLICATION PERMIT NUMBER: RECEIPT NUMBER: AMOUNT PAID: DATE: SECTION 1: OWNER - APPLICANT INFORMATION Registered Owner - Last Name First Name Corporation or partnership Mailing Address Email

More information

700 CMR: MASSACHUSETTS DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 700 CMR 14.00: PREQUALIFICATION OF CONTRACTORS FOR HORIZONTAL CONSTRUCTION

700 CMR: MASSACHUSETTS DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 700 CMR 14.00: PREQUALIFICATION OF CONTRACTORS FOR HORIZONTAL CONSTRUCTION 700 CMR 14.00: PREQUALIFICATION OF CONTRACTORS FOR HORIZONTAL CONSTRUCTION Section 14.01: Definitions 14.02: Application for Prequalification of Contractors 14.03: Aggregate Bonding Capacity and Single

More information

SECTION TRENCHING & BACKFILLING

SECTION TRENCHING & BACKFILLING SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications

More information

SECTION A GENERAL SPECIFICATIONS (GS)

SECTION A GENERAL SPECIFICATIONS (GS) SECTION A GENERAL SPECIFICATIONS (GS) STANDARD CONTRACT DOCUMENTS FOR MUNICIPAL CONSTRUCTION PROJECTS 2018 EDITION 1. GENERAL The General Specifications pertain to items which are not generally specified

More information

Construction and Demolition Material Recycling Program

Construction and Demolition Material Recycling Program Construction and Demolition Material Recycling Program WMAC Meeting June 26, 2012 Purpose As part of the Waste Management Advisory Committee s (WMAC) defined role and associated task/project document:

More information

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL Revision: 6 Date 05/18/09 EPICOR, INCORPORATED 1414 E. Linden Avenue P.O. Box 1608 Linden, NJ. 07036-0006 Tel. 1-908-925-0800 Fax 1-908-925-7795 Table of Contents:

More information

2012 VIRGINIA INDUSTRIALIZED BUILDING SAFETY REGULATIONS

2012 VIRGINIA INDUSTRIALIZED BUILDING SAFETY REGULATIONS 13VAC5-91-10. Definitions. The following words and terms when used in this chapter shall have the following meanings unless the context clearly indicates otherwise. Administrator means the Director of

More information

AGGREGATE QUALITY MONITORING PROGRAM

AGGREGATE QUALITY MONITORING PROGRAM Test Procedure for AGGREGATE QUALITY MONITORING PROGRAM TxDOT Designation: Tex-499-A Effective Date: December 007 1. SCOPE 1.1 The Aggregate Quality Monitoring Program (AQMP) provides the requirements

More information

AVAILABLE 5730 SECOND LINE TOWN OF NEW TECUMSETH GROW YOUR BUSINESS HERE IT S MUCH MORE THAN AN ADDRESS OF CONVENIENCE.

AVAILABLE 5730 SECOND LINE TOWN OF NEW TECUMSETH GROW YOUR BUSINESS HERE IT S MUCH MORE THAN AN ADDRESS OF CONVENIENCE. AVAILABLE 5730 SECOND LINE TOWN OF NEW TECUMSETH GROW YOUR BUSINESS HERE IT S MUCH MORE THAN AN ADDRESS OF CONVENIENCE. ADJALA TECUMSETH TOWNLINE SIDE ROAD 10 TOTTENHAM RD. WESTON RD. KEELE ST. LOCATION

More information

INSPECTION SYSTEM REQUIREMENTS

INSPECTION SYSTEM REQUIREMENTS MILITARY SPECIFICATIONS MIL-I-45208A INSPECTION SYSTEM REQUIREMENTS This specification has been approved by the Department of Defense and is mandatory for use by all Agencies. 1. SCOPE 1.1 Scope. This

More information

World Class Industries

World Class Industries World Class Industries Supplier Quality Manual September 28, 2017 1 TABLE OF CONTENTS 1 Vision 2 Purpose 3 Scope 4 General Quality Requirements 4.1 ISIR 4.2 Material Certification 4.3 Warrant 5 Control

More information

Asbestos Consulting Radon Measurements Lead Assessments Indoor Air Quality Testing Mold Investigations. Project Number: Page 1 of 22

Asbestos Consulting Radon Measurements Lead Assessments Indoor Air Quality Testing Mold Investigations. Project Number: Page 1 of 22 Page 1 of 22 Asbestos Survey Project Summary Pursuant to your request; Environmental, Inc., has performed an Asbestos Building Survey on 8/13/2014 and limited to the above referenced location. The Interior/Exterior/Roof

More information

REQUEST FOR TENDER - SERVICES RFT HOUSE DEMOLITION 7958 BEAVERDAMS RD., NIAGARA FALLS, ON.

REQUEST FOR TENDER - SERVICES RFT HOUSE DEMOLITION 7958 BEAVERDAMS RD., NIAGARA FALLS, ON. REQUEST FOR TENDER - SERVICES 1. PURPOSE AND SCOPE This specification is intended to govern the supply of all labour, materials and equipment for the dismantling, demolition of a single dwelling on the

More information

H 5426 S T A T E O F R H O D E I S L A N D

H 5426 S T A T E O F R H O D E I S L A N D LC00 01 -- H S T A T E O F R H O D E I S L A N D IN GENERAL ASSEMBLY JANUARY SESSION, A.D. 01 A N A C T RELATING TO BUSINESSES AND PROFESSIONS - RHODE ISLAND WELL DRILLING CONTRACTORS LICENSING LAW Introduced

More information

Aggregate Industry Discussion Paper

Aggregate Industry Discussion Paper : The Aggregate Industry Discussion Paper April 30, 2015 Overview Recommendations 1. The public and provincial interest in close to market aggregate supply can only be achieved if Provincial Plans contain

More information

ONTARIO BUILDING CODE STANDARD PRACTICE

ONTARIO BUILDING CODE STANDARD PRACTICE ONTARIO BUILDING CODE STANDARD PRACTICE Dormant & Incomplete Building Permit Files Building Services Division 32 Mill Street Thornbury, ON N0H 2P0 Tel.:(519) 599-3131, ext. 239 Toll Free; 1-888-258-6867

More information

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions. SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution

More information

Building Permit Requirements Custom Built Homes

Building Permit Requirements Custom Built Homes Building Permit Requirements Custom Built Homes Pre-application Approvals Checklist Before finalizing the design ensure that the house you wish to build either meets the requirements of or is not affected

More information

You have applied in accordance with Section 9 of the Environmental Protection Act for approval of:

You have applied in accordance with Section 9 of the Environmental Protection Act for approval of: Ministry of the Environment Ministère de l Environnement CERTIFICATE OF APPROVAL AIR NUMBER 7970-7QNRDJ Issue Date: April 2, 2009 William Day Construction Limited 2500 Elm Street, P.O. Box 700 Copper Cliff,

More information

CORRESPONDENTS' GUIDELINES No 3

CORRESPONDENTS' GUIDELINES No 3 CORRESPONDENTS' GUIDELINES No 3 Subject: Certificate for subsequent non-interim recovery or disposal according to Article 15(e) of Regulation (EC) No 1013/2006 on shipments of waste 1. These correspondents'

More information

The Environmental Management and Protection (Saskatchewan Environmental Code Adoption) Regulations

The Environmental Management and Protection (Saskatchewan Environmental Code Adoption) Regulations ENVIRONMENTAL MANAGEMENT 1 ENVIRONMENTAL CODE ADOPTION) E-10.22 REG 2 The Environmental Management and Protection (Saskatchewan Environmental Code Adoption) Regulations being Chapter E-10.22 Reg 2 (effective

More information

SAI Global Full Service Team

SAI Global Full Service Team General information regarding elements of the certification process is described below. A degree of flexibility and options in the certification process are available so please feel free to contact us

More information

Definitions contained in the above mentioned document and industry regulations are applicable herein.

Definitions contained in the above mentioned document and industry regulations are applicable herein. Quality Specification TEC-1021 21May12 Rev E Global Quality Management System Supplement for Various International Nuclear Quality Assurance Criteria, Regulations, and Requirements 1. SCOPE 1.1. Content

More information

Proposed Action on Regulations

Proposed Action on Regulations MARYLAND REGISTER Proposed Action on Regulations Transmittal Sheet PROPOSED OR REPROPOSED Actions on Regulations Date Filed with AELR Committee TO BE COMPLETED BY DSD Date Filed with Division of State

More information

SACHSE EROSION CONTROL GUIDELINES

SACHSE EROSION CONTROL GUIDELINES SACHSE EROSION CONTROL GUIDELINES Section I. Definitions The following words, terms, and phrases, when used in this guideline, shall have the meanings ascribed to them in this Section, except where the

More information

Application for a Sewage System Permit

Application for a Sewage System Permit Application for a Sewage System Permit Sewage System Inspectors can only provide comments based on completed applications and plans. Once a completed application has been received and reviewed, an inspector

More information

CON 509: APPLICATION FOR A RESOURCE CONSENT UNDER THE RESOURCE MANAGEMENT ACT 1991

CON 509: APPLICATION FOR A RESOURCE CONSENT UNDER THE RESOURCE MANAGEMENT ACT 1991 APPLICATION TO USE LAND FOR FARMING ACTIVITY PAGE 1 OF 15 August 2016 CON 509: APPLICATION FOR A RESOURCE CONSENT UNDER THE RESOURCE MANAGEMENT ACT 1991 TO USE LAND FOR A FARMING ACTIVITY WITHIN THE SELWYN

More information

TS4 GUIDELINES, CERTIFICATION SCHEME, AND SPECIFICATION

TS4 GUIDELINES, CERTIFICATION SCHEME, AND SPECIFICATION TS4 GUIDELINES, CERTIFICATION SCHEME, AND SPECIFICATION FOR THE CONSTRUCTION OF TRAFFIC SIGNS February 2012 CONTENTS GUIDELINES 1 G1 General 1 G2 Traffic Signs Manual and Road Traffic Regulation 1 G3 Contracts

More information

IBCI BUILDING CONTROL CONFERENCE 2017 QUALITY CONTROL IN AGGREGATES/CONCRETE/CEMENT

IBCI BUILDING CONTROL CONFERENCE 2017 QUALITY CONTROL IN AGGREGATES/CONCRETE/CEMENT IBCI BUILDING CONTROL CONFERENCE 2017 QUALITY CONTROL IN AGGREGATES/CONCRETE/CEMENT Kevin Maguire Quinn Building Products Hoda Beltagui Quinn Building Products DEFINITION & TYPES Construction aggregate,

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT CEMENT CERTIFICATION. April 18, 2008

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT CEMENT CERTIFICATION. April 18, 2008 1028.01 Scope 1028.02 Procedure SUPPLEMENT 1028 - CEMENT CERTIFICATION April 18, 2008 1028.01 Scope. This supplement outlines the certification of cement. Cement certification is the approval by the Department

More information

West Virginia Department of Health & Human Resources Department of Health

West Virginia Department of Health & Human Resources Department of Health SS-182A Rev 6/07 West Virginia Department of Health & Human Resources Department of Health Application for a Permit to Install or Modify an Onsite Sewage Disposal System Property Owner Phone (H) (W) Address

More information

Redi Rock Specification and Installation Manual

Redi Rock Specification and Installation Manual Redi Rock Specification and Installation Manual 1.0 General Scope This Specification covers the Design, Materials and Installation of Redi Rock modular block Retaining and Freestanding Wall systems as

More information

CITY OF LETHBRIDGE INFRASTRUCTURE SERVICES DEPT. CONSULTING ENGINEER S LAND DEVELOPMENT FIELD SERVICES GUIDELINES

CITY OF LETHBRIDGE INFRASTRUCTURE SERVICES DEPT. CONSULTING ENGINEER S LAND DEVELOPMENT FIELD SERVICES GUIDELINES CITY OF LETHBRIDGE INFRASTRUCTURE SERVICES DEPT. Approved: April 1999 Amended: January 2003 Amended: April 2009 Amended: January 2011 Amended: March 2013 Amended: May 2014 Amended: 2016 CITY OF LETHBRIDGE

More information

Residential Sewer Backup Prevention Program

Residential Sewer Backup Prevention Program City of Wheaton Residential Sewer Backup Prevention Program Please Note: The City reserves the right to modify the policies, procedures and rules of this program or discontinue the program in its entirety

More information

Evaluation Report. for. Empire West, Inc Graton Road Post Office Box 511 Graton, California 95444

Evaluation Report. for. Empire West, Inc Graton Road Post Office Box 511 Graton, California 95444 for Empire West, Inc. 9270 Graton Road Post Office Box 511 Graton, California 95444 CertMark International Pty Ltd (CMI) has awarded this Certification to the company named above for the Product/system

More information

HOLDING TANK PLANNING & INSTALLATION GUIDELINES

HOLDING TANK PLANNING & INSTALLATION GUIDELINES HOLDING TANK PLANNING & INSTALLATION GUIDELINES Under no circumstances is sewage from a holding tank to be discharged onto the surface of the ground or into groundwater or surface waters. TABLE OF CONTENTS

More information

SECTION AGGREGATES

SECTION AGGREGATES SECTION 32 05 00 AGGREGATES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Aggregate base 2. Engineered fill 3. Backfill 4. Fine filter aggregate (non-frost susceptible fill) 5. Riprap 6. Recreational

More information

Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI PH. (517) FAX (517)

Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI PH. (517) FAX (517) Date Issued Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI 48854 PH. (517) 676-8395 FAX (517) 676-8364 APPLICATION FOR SOIL EROSION AND SEDIMENTATION POLLUTION

More information

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013 WATSON ROAD FACILITY PAGE 1 OF 6 PART 1 GENERAL 1.1 Description The work covered by this Section includes all labour, materials, equipment, and supervision necessary to complete the site services as shown

More information

Building Regulations

Building Regulations Product 1.1 Technobond is a range of polyester fibre insulation used as thermal and acoustic insulating material in ceilings, roofs and walls of buildings. Appraisal No.69 [010] BRANZ Appraisals Technical

More information

TILE TILE

TILE TILE 09300 - TILE 09300-1 PART ONE: GENERAL 1.1 Description TILE 1.1.1 Work of this Section, as shown or specified, shall be provided by the Interior Contractor and shall be in accordance with the requirements

More information

SUPPLIER GUIDELINES MANUAL

SUPPLIER GUIDELINES MANUAL 1.0 INTRODUCTION 1.1 This guidelines manual defines the minimum requirements for Supreme Machined Products Co.; Inc. LTD (to be referenced as Supreme throughout the document) Supplier s and does not supersede

More information

Application for a Sewage System Permit

Application for a Sewage System Permit Application for a Sewage System Permit The following forms must be completed and returned with the appropriate fee. 1. Application for a Permit to Construct or Demolish; 2. Schedule 1: Designer Information;

More information

Minimum Requirements for 1 CARAVAN AND CAMPING PARKS Assessment Form REGISTRATION & CLASSIFICATION

Minimum Requirements for 1 CARAVAN AND CAMPING PARKS Assessment Form REGISTRATION & CLASSIFICATION Minimum Requirements for 1 CARAVAN AND CAMPING PARKS REGISTRATION & CLASSIFICATION 1 PREMISES NAME: ADDRESS OF PREMISES: NUMBER OF PITCHES: CONTACT DETAILS: Name: Tel: Mobile: Fax: Email: Website: 1 Regulation

More information

Altech Machining, Inc. Terms and Conditions

Altech Machining, Inc. Terms and Conditions 11000 Woodside Avenue North Phone: (619) 448-3392 Santee, CA 92071 Fax: (619) 448-6854 info@altechmachining.net Altech Machining, Inc. Terms and Conditions The terms and conditions listed in this document

More information

Power JoIst ADI-40, ADI-60, ADI-80 I-joists

Power JoIst ADI-40, ADI-60, ADI-80 I-joists Evaluation Report CCMC 13053-R MASTERFORMAT DIVISION 06 17 33.01 Issued 2002-03-06 Re-evaluated 2008-09-19 Re-evaluation due 2011-03-06 Power JoIst ADI-40, ADI-60, ADI-80 I-joists 1. Opinion It is the

More information

GUIDELINES FOR SUBMISSION OF AN APPLICATION FOR A SEWAGE SYSTEM PERMIT

GUIDELINES FOR SUBMISSION OF AN APPLICATION FOR A SEWAGE SYSTEM PERMIT GREY BRUCE HEALTH UNIT Owen Sound (Head Office) 920 1st Ave. W. N4K 4K5 (519) 376-9420 (800)-263-3456 Durham P.O. Box 417 N0G 1R0 (519) 369-3318 (800) 394-6643 Southampton P.O. Box 213 N0H 2L0 (519) 797-2010

More information

Strength. Performance. Passion. Paris Pit CAP. March 18, Holcim (Canada) Inc.

Strength. Performance. Passion. Paris Pit CAP. March 18, Holcim (Canada) Inc. Strength. Performance. Passion. Paris Pit CAP March 18, 2014 2012 Holcim (Canada) Inc. Agenda Welcome Minutes from Last Meeting Dufferin Paris Pit - General Update Site Timeline Health & Safety - Silica

More information

INTERNATIONAL STANDARD ON AUDITING (IRELAND) 210 AGREEING THE TERMS OF AUDIT ENGAGEMENTS

INTERNATIONAL STANDARD ON AUDITING (IRELAND) 210 AGREEING THE TERMS OF AUDIT ENGAGEMENTS INTERNATIONAL STANDARD ON AUDITING (IRELAND) 210 AGREEING THE TERMS OF AUDIT ENGAGEMENTS MISSION To contribute to Ireland having a strong regulatory environment in which to do business by supervising and

More information

OHIO ENVIRONMENTAL PROTECTION AGENCY L PE RMIT-TO4 N STALL t

OHIO ENVIRONMENTAL PROTECTION AGENCY L PE RMIT-TO4 N STALL t OHIO ENVIRONMENTAL PROTECTION AGENCY L PE RMIT-TO4 N STALL t * - r..- T' c!f L 3 CZ.= > F 3 c- Application Number: PTI # 03-9614 Application Received: March 1, 1996 - -? c I- Permit Fee: $80,000.00 L;

More information

A copy of the new Standard Vendor Agreement is enclosed. This Vendor Agreement is for the time period of January 1, 2018 to December 31, 2018.

A copy of the new Standard Vendor Agreement is enclosed. This Vendor Agreement is for the time period of January 1, 2018 to December 31, 2018. November 2017 Dear Supplier: A copy of the new Standard Vendor Agreement is enclosed. This Vendor Agreement is for the time period of January 1, 2018 to December 31, 2018. The receipt of this vendor agreement

More information

SIKALASTIC-152 EXTERIOR WATERPROOFING MEMBRANE. Product. Scope. Appraisal No. 811 [2013] Appraisal No. 811 (2013) Amended 28 August 2017

SIKALASTIC-152 EXTERIOR WATERPROOFING MEMBRANE. Product. Scope. Appraisal No. 811 [2013] Appraisal No. 811 (2013) Amended 28 August 2017 SIKALASTIC-152 EXTERIOR WATERPROOFING MEMBRANE Amended 28 August 2017 BRANZ Appraisals Technical Assessments of products for building and construction. Sika (NZ) Ltd PO Box 19 192 Avondale Auckland 1746

More information

Mineral-Fibre Thermal Insulation for Buildings

Mineral-Fibre Thermal Insulation for Buildings Preface MASTERFORMAT 07 21 13.19 REVISED DATE 2011-06-22 Mineral-Fibre Thermal Insulation for Buildings Scope These Evaluation Listings apply to mineral-fibre thermal insulation in the form of faced and

More information

PROCEDURE FOR REQUESTING A BUILDING PERMIT

PROCEDURE FOR REQUESTING A BUILDING PERMIT PROCEDURE FOR REQUESTING A BUILDING PERMIT A. CHECKLIST OF REQUIREMENTS FOR BUILDING PERMIT APPLICATION: The following checklist indicates the requirements based on the type of Building Permit being requested.

More information

This ordinance applies to the entire unincorporated areas of Waupaca County.

This ordinance applies to the entire unincorporated areas of Waupaca County. REPEAL AND RECREATE CHAPTER 10, SECTION 10.50 OF THE WAUPACA COUNTY CODE OF ORDINANCES RELATING TO MANURE STORAGE AND LAND SPREADING OF MANURE MANURE MANAGEMENT 10.50 GENERAL PROVISIONS A. Title: This

More information

SHELTON INDUSTRIAL PATTERN INC.

SHELTON INDUSTRIAL PATTERN INC. Defintions: Seller : Supplier of materials, parts and or services that support production Supplies : materials, parts that support production FOD : Foreign Object Debri / Damage 1. Quality Management System

More information

Reliance Aerospace Solutions

Reliance Aerospace Solutions Reliance Aerospace Solutions Quality Manual The information contained in this document is the property of Reliance Aerospace Solutions, a division of Reliance Steel & Aluminum Company This manual is a

More information

Truck Freight Generators and Attractors in the Province of Ontario

Truck Freight Generators and Attractors in the Province of Ontario Truck Freight Generators and Attractors in the Province of Ontario Freight Day February 10, 2015 2 3 139 pages Recent MITL Report Largely empirical study Lots of maps, tables, charts, dashboards Extensive

More information

ISO Environmental Management System Manual

ISO Environmental Management System Manual Corresponding Requirements: ISO Standard / EMS Manual: 4.4.4 City of Gastonia Wastewater Treatment Division ISO 14001 - Environmental Management System Manual Prepared By: Beth Eckert, Industrial Chemist

More information

JAMIESON LABORATORIES LTD. Street Information: 4025 RHODES DR Unit: City/Town: WINDSOR

JAMIESON LABORATORIES LTD. Street Information: 4025 RHODES DR Unit: City/Town: WINDSOR Ministry of the Environment and Climate Change Ministère de l Environnement et de l Action en matière de changement climatique ENVIRONMENTAL COMPLIANCE APPROVAL NUMBER: 0000000442 Version: 1.0 Issue Date:

More information

RUWACON QUALITY MANUAL

RUWACON QUALITY MANUAL RUWACON QUALITY MANUAL Rev Date Preparation Review Approved Description of Revision 1 29 June SHEQ Manager SHEQ Manager Managing 2011 Director Ruwacon (PTY) Ltd P.O. Box 13596 Noordstad 9303 THIS DOCUMENT

More information

BEAU CHÊNE HOMEOWNERS ASSOCIATION, INC. CROSS CONNECTION CONTROL RULE

BEAU CHÊNE HOMEOWNERS ASSOCIATION, INC. CROSS CONNECTION CONTROL RULE BEAU CHÊNE HOMEOWNERS ASSOCIATION, INC. CROSS CONNECTION CONTROL RULE Section 1: Cross-Connection Control Device or Method Required. A. Each existing or new structure is required to implement and maintain

More information

LOT GRADING GUIDELINES

LOT GRADING GUIDELINES LOT GRADING GUIDELINES RESIDENTIAL PROPERTIES The Drainage Bylaw 16200 came into effect on June 1, 2013 replacing previous versions of the Surface Drainage Bylaw 11501. This Bylaw requires that all single

More information

WOOD FLOORING WOOD FLOORING

WOOD FLOORING WOOD FLOORING 09550 - WOOD FLOORING 09550-1 PART ONE: GENERAL 1.1 Description WOOD FLOORING 1.1.1 Work in this Section, as shown or specified, shall be provided by the Interior Contractor and shall be in accordance

More information

Human Resources. Disciplinary procedures Teaching and support staff

Human Resources. Disciplinary procedures Teaching and support staff Human Resources Disciplinary procedures Teaching and support staff Rev: September 2013 Contents Page 1. Introduction 3 2. Key policy principles 3 3. Support available during the disciplinary procedure

More information

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit: TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION 355-7575 Ext. 395 Needed to Obtain Permit: 1. Building Permit Application, and/or residential plumbing permit application, as applicable, to be

More information

Policy Statement. Purpose. Scope. Policy Title: Roadway Directional Signage Policy Number:

Policy Statement. Purpose. Scope. Policy Title: Roadway Directional Signage Policy Number: Policy Title: Roadway Directional Signage Policy Number: 10-04-01 Section: Roads And Traffic Subsection: Traffic Signals Effective Date: June 10, 2015 Last Review Date: June, 2015 Approved by: Council

More information

TITLE: Quality Assurance Sub-Contract Quality Clauses DATE: 12/4/2017 OWNER: Operations Manager

TITLE: Quality Assurance Sub-Contract Quality Clauses DATE: 12/4/2017 OWNER: Operations Manager Scope: This process outlines the Exotic Tool Welding (ETW) quality control terms and conditions levied to suppliers providing product or service for ETW. The QA codes identified on the purchase order correlate

More information

Additional criteria for approval of sanitary landfill facility permit to install applications.

Additional criteria for approval of sanitary landfill facility permit to install applications. 3745-27-07 Additional criteria for approval of sanitary landfill facility permit to install applications. (A) General criteria. The director shall not approve any permit to install application for a sanitary

More information

Chain of Custody Certification at a Glance

Chain of Custody Certification at a Glance Chain of Custody Certification at a Glance So you re interested in Chain of Custody Certification? Congratulations on taking this first step. If you choose to become CoC certified, you will be helping

More information

Quarry, Mobile asphalt plant, Equipment Yard and Storage Garage

Quarry, Mobile asphalt plant, Equipment Yard and Storage Garage Quarry, Mobile asphalt plant, Equipment Yard and Storage Garage Trans Canada Highway, 8.5 KM west of Springdale Jct, NL. Department of Environment and Conservation File Ref No. 200.20.2475 Prepared for.

More information

SECTION QUALITY REQUIREMENTS

SECTION QUALITY REQUIREMENTS SECTION 014000 - PART 1 - GENERAL 1.1 SUMMARY A. Defines SRP requirements for Contractor Quality Control and Owner Quality Assurance. As an Electric and Water Utility, SRP has many critical facilities.

More information

ARTICLE XIII. COMMUNICATION TOWERS

ARTICLE XIII. COMMUNICATION TOWERS ARTICLE XIII. COMMUNICATION TOWERS Section 13.1. Purposes. The general purpose of this Section is to regulate the placement, construction, and modification of communication towers, support structures,

More information

Content Copy Of Original

Content Copy Of Original Content Copy Of Original Ministry of the Environment and Climate Change Ministère de l Environnement et de l Action en matière de changement climatique T.C.M. Investments Limited 77 Ferguson Avenue South

More information

ARTICLE 38: AIR QUALITY ASSESSMENT AND VENTILATION REQUIREMENT FOR URBAN INFILL RESIDENTIAL DEVELOPMENTS

ARTICLE 38: AIR QUALITY ASSESSMENT AND VENTILATION REQUIREMENT FOR URBAN INFILL RESIDENTIAL DEVELOPMENTS San Francisco Health Code ARTICLE 38: AIR QUALITY ASSESSMENT AND VENTILATION REQUIREMENT FOR URBAN INFILL RESIDENTIAL DEVELOPMENTS Sec. 3801. Sec. 3802. Sec. 3803. Sec. 3804. Sec. 3805. Sec. 3806. Sec.

More information

PACIFIC MARINE SERVICES

PACIFIC MARINE SERVICES APPR No : PMS/D.A.RSP/ Date : Pages : One (7) /UAE Data Sheet for Approval of Firms Issued within the scope of the Pacific Marine Services General Conditions - Radio Service Supplier for Inspection Services

More information

CORPORATE QUALITY MANUAL

CORPORATE QUALITY MANUAL Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of the ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance

More information

4 EXTREME FOUNDATION PANELS

4 EXTREME FOUNDATION PANELS 4 EXTREME FOUNDATION PANELS For House Crawl Space On Concrete Footings 1. The type of soil is a factor in determining foundation construction details such as footing design, backfill, and drainage provisions.

More information

Multi-Year Accessibility Plan

Multi-Year Accessibility Plan Multi-Year Accessibility Plan Compliance note: This multi-year plan are prepared in compliance with Ontario Regulation 191/11 under the Accessibility for Ontarians with Disabilities Act, 2005 ( AODA ),

More information

TORONTO MUNICIPAL CODE CHAPTER 813, TREES. Chapter 813 TREES. ARTICLE I Inspection; Removal of Infested Trees

TORONTO MUNICIPAL CODE CHAPTER 813, TREES. Chapter 813 TREES. ARTICLE I Inspection; Removal of Infested Trees Chapter 813 TREES ARTICLE I Inspection; Removal of Infested Trees 813-1. Inspection for presence of Asian Long-Horned Beetles and other pests; removal of infested trees. 813-2. Right to enter private property.

More information

INTERNATIONAL STANDARD ON AUDITING 260 COMMUNICATION WITH THOSE CHARGED WITH GOVERNANCE CONTENTS

INTERNATIONAL STANDARD ON AUDITING 260 COMMUNICATION WITH THOSE CHARGED WITH GOVERNANCE CONTENTS Introduction INTERNATIONAL STANDARD ON AUDITING 260 COMMUNICATION WITH THOSE CHARGED WITH GOVERNANCE (Effective for audits of financial statements for periods beginning on or after December 15, 2009) +

More information

ADOPTION OF CHAPTER 120 (TREE CONSERVATION ORDINANCE) OF THE 1976 CODE OF THE COUNTY OF FAIRFAX, VIRGINIA

ADOPTION OF CHAPTER 120 (TREE CONSERVATION ORDINANCE) OF THE 1976 CODE OF THE COUNTY OF FAIRFAX, VIRGINIA ADOPTION OF CHAPTER 120 (TREE CONSERVATION ORDINANCE) 36-07-120 (Also see Heritage, Specimen, Memorial and Street Trees Ordinances 37-07-N adopted simultaneously on October 15, 2007) OF THE 1976 CODE OF

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 01-22-815 Application # 2001-14 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24 (1) of the Building Code Act, 1992. AND IN THE MATTER OF Articles 3.3.1.8. and 3.4.3.6. of Regulation

More information

Errata Sheet. LEED for Schools Reference Guide First Edition for the document titled:

Errata Sheet. LEED for Schools Reference Guide First Edition for the document titled: Errata Sheet for the document titled: LEED for Schools Reference Guide First Edition 2007 Notes: Updates to this document are posted on the LEED for Schools Rating System page and the Reference Guide electronic

More information

SepticDesign.ca Gunnell Engineering Ltd.

SepticDesign.ca Gunnell Engineering Ltd. SepticDesign.ca Gunnell Engineering Ltd. Presentation Summary Best Practices Code Context Prior to Attending the Site When on Site Site Assessment Assessing Existing Sewage Systems The Septic Test Pit

More information

548 September 26, 2011

548 September 26, 2011 548 September 26, 2011 WHEREAS, it is the finding of the City Council that the decision to perform the work described in the September 26, 2011 memo was in the best interest of the citizens of the City

More information

Airport Zoning Regulation to Protect Hospital Helicopter Flight Paths- Final Report. Planning and Growth Management Committee

Airport Zoning Regulation to Protect Hospital Helicopter Flight Paths- Final Report. Planning and Growth Management Committee Revised PG24.3 STAFF REPORT ACTION REQUIRED Airport Zoning Regulation to Protect Hospital Helicopter Flight Paths- Final Report Date: October 18, 2017 To: From: Planning and Growth Management Committee

More information

FINAL DOCUMENT. International Medical Device Regulators Forum. Medical Device Regulatory Audit Reports

FINAL DOCUMENT. International Medical Device Regulators Forum. Medical Device Regulatory Audit Reports FINAL DOCUMENT International Medical Device Regulators Forum Title: Authoring Group: Medical Device Regulatory Audit Reports IMDRF MDSAP Working Group Date: 2 October 2015 Toshiyoshi Tominaga, IMDRF Chair

More information

Terrazzo & Terrazzo Concrete

Terrazzo & Terrazzo Concrete Terrazzo & Terrazzo Concrete Product and Technical Information for Terrazzo Cementious Tile Range. Terrazzo Concrete Wall or Floor Application These tiles are formed by a mixture of mineral powders, cement,

More information

AGS 10. Joint Audits AUDIT GUIDANCE STATEMENT

AGS 10. Joint Audits AUDIT GUIDANCE STATEMENT AUDIT GUIDANCE STATEMENT AGS 10 Joint Audits This Audit Guidance Statement was approved by the Council of the Institute of Singapore Chartered Accountants (formerly known as Institute of Certified Public

More information

DRAFT TECHNICAL SPECIFICATIONS FOR

DRAFT TECHNICAL SPECIFICATIONS FOR DRAFT TECHNICAL SPECIFICATIONS FOR DETROIT RIVER AOC STONY ISLAND HABITAT RESTORATION PROJECT THE DETROIT RIVER, WAYNE COUNTY, MICHIGAN FOR INFORMATION JANUARY, 2016 Prepared for: FRIENDS OF THE DETROIT

More information