1 SUMP SYSTEM HI 595 CF & D utilize a Sump System to send captured liquids back to the process system. There is a Sump Tank and a Hanging Sump Pile on D, and a Sump tank on CF. The Sump Tank (ABH-3000) on D collects liquids from the Top deck drains and the Hanging Sump Pile Pump, (PBH-3000). The water collected goes out an overboard water leg. The oil skimmed off of the water is pumped to the Performax Skimmer Tanks (NBM-2200/2300) via the Sump Tank Pump (PBH-4000). The Hanging Sump Pile on D collects liquids from the Bottom deck drains. Total fluid from the Hanging Sump Pile is pumped to the Sump Tank, (ABH-3000) via the Hanging Sump Pile Pump, (PBH-3000) The Sump Tank (ABH-4510) on CF collects liquids from the deck drains and skids. The water collected goes out an overboard water leg. The oil skimmed off of the water is pumped to one of the Oil Treaters (NBK-1400/1500) via the Sump Pumps (PBH-4560/4570). Rev: 3 Date: 9/19/16 Page 1 of 5 HI 595 CF & D
2 A. PRE-STARTUP & START-UP PROCEDURES D Platform: 1. Sump Tank, ABH-3000 & Sump Tank Pump, PBH Hanging Sump Pile, ABH-2000 & Hanging Sump Pile Pump, PBH CF Platform: 3. CF Sump Tank, ABH-4510 & Sump Pumps, PBH-4560/4570 NOTICE: Refer to Preliminary Considerations in SECTION 3, PART A before beginning any start-up procedures. Rev: 3 Date: 9/19/16 Page 2 of 5 HI 595 CF & D
3 4. Verify the following for each Sump Pump: a. Sump Tank, ABH-3000 (D-Platform) Verify suction is open from the Sump Tank to Sump Pump Verify discharge is open to the Skimmer Tanks b. Hanging Sump Pile, ABH-2000 (D-Platform) Verify suction is open from the Hanging Sump Pile to Hanging Sump Pile Pump Verify discharge is open to the Sump Tank, ABH-3000 c. Sump Tank, ABH-4510 (CF-Platform) Verify suction is open from the Sump Tank to Sump Pump Verify discharge is open to the Treaters 5. Continue facility Start-up Procedures REFER TO: Section 3 Part B (step 5) 6. D Sump Tank, ABH-3000 & Sump Tank Pump, PBH-4000 b. Reset the Caisson Pump on the Operator and place Pump in Auto 7. D Hanging Sump Pile, ABH-2000 & Hanging Sump Pile Pump, PBH-3000 b. Reset the Hanging Sump Pile Pump on the Operator and place Pump in Auto Rev: 3 Date: 9/19/16 Page 3 of 5 HI 595 CF & D
4 8. CF Sump Tank, ABH-4510 & Sump Pumps, PBH-4560/4570 b. Reset the Sump Pump on the Operator choose desired pump and press Start Pump 9. Immediately begin using Normal Operating Procedures to continue monitoring system REFER TO: SECTION 5, PART S Rev: 3 Date: 9/19/16 Page 4 of 5 HI 595 CF & D
5 B. SHUT-DOWN PROCEDURES NOTICE: Refer to Preliminary Considerations in SECTION 4, PART A before beginning any shut-down procedures. 1. In order to shut-down the Sump System or any parts of the system, a facility process shut-in is required REFER TO: SECTION 4 (Facility Shutdown Procedure) 2. If necessary, individual system pumps can be shut-down for immediate maintenance/repair NOTICE: Shut-down of a system pump will cause a level to accumulate in the corresponding Tank/Caisson oil bucket. The vessel/caisson must be monitored at all times and the pump must be returned to service before a high level or additional shut-downs will be required. a. Manually activate the pump run signal at the vessel to pump down the level in the oil bucket before shut-down of the pump b. Initiate shutdown of pump supply power at the PLC (elect or air) c. Close manual block valves to isolate the pump suction, discharge and fuel gas supply (as applicable) d. Use appropriate collection to bleed down and drain the pumps before beginning work e. Continuously monitor the process system and the level within the vessel so that further shut-down action can be taken as needed NOTICE: If shut-down was performed as preparation for maintenance work, or if the cause of the shutdown requires corrective action/repair, continue with Lock Out/Tag Out (LO/TO) Procedures REFER TO: Fieldwood Safe Work Practices for LO/TO (Section D Chapter 5) (can be found on the Fieldwood SEMS Portal) Rev: 3 Date: 9/19/16 Page 5 of 5 HI 595 CF & D
Enviro Voraxial Technology
1.0 Introduction Enviro Voraxial Technology 821 NW 57 th Place, Fort Lauderdale, FL 33309 Phone 954.958.9968 Fax: 954.958.8057 sales@evtn.com www.evtn.com Case Study Voraxial 4000 Separator On Offshore
More informationCasing Gas Recovery Unit
Standard Features RotorComp NK60 Twin Screw Compressor 25 HP Hydraulic Or Electric Motor 8 x 48 Inlet Scrubber c/w Double Diaphragm Pump 2-4 x 42 Activated Alumina Regenerative Drying Vessels Oil/Gas Discharge
More informationAircraft Lockout/Tagout (LOTO)
Aircraft Lockout/Tagout Program (LOTO) for All EMPLOYEES Rules codified in 29 CFR 1910.147 and 1910.146. There are many areas on an aircraft that require positive control of Hazardous Energy: E & E Bays,
More informationBP OIL -- TOLEDO REFINERY
BP OIL -- TOLEDO REFINERY Document Type: Procedure Effective Date: December 5, 2012 Owner: Tom Harvey Refinery Wide Demolition, Decommissioning, or Mothballing Process Units and Equipment Auth. By: Neal
More informationMECHANICAL INTEGRITY
MECHANICAL INTEGRITY 1.0 Purpose This element identifies Petsec s Mechanical Integrity (MI) program as required by its Safety and Environmental Management System (SEMS) Program and applies to all Petsec
More informationSystem & Equipment Checkout Procedure Client Name Plant Location
System & Equipment Checkout Procedure Client Name Plant Location Procedure Title: Boiler Feed Water System Prepared By: Applied Performance Strategies 1 of 7 Approved By: Date: 01/11/08 Date: Purpose:
More informationWestinghouse Small Modular Reactor. Passive Safety System Response to Postulated Events
Westinghouse Small Modular Reactor Passive Safety System Response to Postulated Events Matthew C. Smith Dr. Richard F. Wright Westinghouse Electric Company Westinghouse Electric Company 600 Cranberry Woods
More informationField Inspection Manual Part: 2-ASTP Section: 3 - DTWS Page: 1 of 18. Automatic Weighing Devices Issued: Revision Number: Original
Field Inspection Manual Part: 2-ASTP Section: 3 - DTWS Page: 1 of 18 REFERENCE Weights and Mesures Regulations, NAWDS & the National Technical Training Bulk Weigher Training Module. PURPOSE The following
More informationDECLARATION OF INSPECTION
DOI DECLARATION OF INSPECTION CHECKLIST: (EXAMPLE: The Following Document is an example of a Declaration of Inspection. Other forms such as ISGOTT (International Oil Tanker and Terminal Safety Guide)-Type
More informationWB produces >>> FLOATING ROOF DRAIN SYSTEMS 2. ALUMINUM DOME COVERS 3. INTERNAL FLOATING ROOF SYSTEMS 4. EXTERNAL FLOATING ROOF SEAL SYSTEMS
WB produces >>> 1. 3+1 2. ALUMINUM 3. 4. SEAL 5. WB, World Best Products, World Best Service, World Best Technology INDEX >>> 1. WB Patented Twin Access Type FSJ 03 2. Demonstration Works and Pictures
More informationTECHNICAL INFORMATION Bulletin NUMBER Thirty-Four
Peerless Pump Company Indianapolis IN, 46207-7026 TECHNICAL INFORMATION Bulletin NUMBER Thirty-Four Peerless Pump Hydroconstant fluid drive applications in breweries New brewery techniques, based upon
More informationAtlas Copco. ZM Oil-free multistage centrifugal pressure and vacuum blowers
Atlas Copco ZM Oil-free multistage centrifugal pressure and vacuum blowers 100-40,000 cfm / 2-24 psi / 5-3,600 hp 3-1160 m 3 /m / 100-1700 mbar / 4-2600 kw A ZM for every application Atlas Copco s ZM oil-free
More informationDomino. Domino VGS. Vertical Gravity Separator
Vertical Gravity Separator Oil Out Clean Water Outlet Oily Water In Sludge Outlet Introduction Product Overview The is an oil/water separator developed to effectively remove free oil, grease and suspended
More informationPreliminary Lessons Learned from the Fukushima Daiichi Accident for Advanced Nuclear Power Plant Technology Development
Preliminary Lessons Learned from the Fukushima Daiichi Accident for Advanced Nuclear Power Plant Technology Development A. Introduction The IAEA Report on Reactor and Spent Fuel Safety in the Light of
More informationYOUR SPLASH PAD RESOURCE
1 Index Permits & Inspections Material List Warnings Splash Pad Types Pre-Site Grading Plumbing Schematic Pressure Testing Concrete Preparation and Pour Housing/Nozzle Installation Above Ground Water Feature
More informationSECONDARY CONTAINMENT RAINWATER MANAGEMENT
ENVIRONMENTAL STANDARD OPERATING PROCEDURE 30 SECONDARY CONTAINMENT RAINWATER MANAGEMENT 1. Version, Date. 1, 1 April 2012 2. Purpose. This Environmental Standard Operating Procedure (ESOP) summarizes
More informationSECRETARY OF THE AIR FORCE 17 APRIL 2000 PART ONE - NORMAL PROCEDURES
BY ORDER OF THE AFI 11-2C-130V3 CL-9 SECRETARY OF THE AIR FORCE 17 APRIL 2000 Flying Operations MAFFS OPERATIONS COCKPIT CREW MAFFS CHECKLIST This checklist establishes procedures for the operation of
More informationInstallation & Operating Instructions
200 G R A V I T Y F E D Installation & Operating Instructions Note: Do not attempt to operate this unit before reading the manual thoroughly Manufactured by Evolution Aqua Ltd. Evolution House Kellett
More informationKeys to Excellence in the Practice of Process Engineering. An overview by Scott D. Love, P.E. October 2016
Keys to Excellence in the Practice of Process Engineering An overview by Scott D. Love, P.E. October 2016 Outline What is excellence? How do I learn about my process? Learning examples Summary Questions?
More informationA Multi-Faceted Approach to Odor Control for a 28.5-Mile Long Force Main
A Multi-Faceted Approach to Odor Control for a 28.5-Mile Long Force Main Kristen L. Smeby*, David S. Ehrhardt, Brian F. Duane Hazen and Sawyer, P.C. *Email: ksmeby@hazenandsawyer.com ABSTRACT Upon startup
More informationSeries Sump and Sewage Systems
Series 000 Sump and Sewage Systems file no: 0. date: may 17, 13 supersedes: 0. date: march 29, 13 Series 000 Sump Series 0 & 2 Armstrong offers a complete range of high performance, easily maintained Column
More informationNPP Simulators Workshop for Education - Passive PWR NPP & Simulator Overview
NPP Simulators Workshop for Education - Passive PWR NPP & Simulator Overview Wilson Lam (wilson@cti-simulation.com) CTI Simulation International Corp. www.cti-simulation.com Sponsored by IAEA Modified
More informationSample Written Program. for. Control of Hazardous Energy (Lockout/Tagout) OSHCON
Sample Written Program for Control of Hazardous Energy (Lockout/Tagout) provided as a public service by OSHCON Occupational Safety and Health Consultation Program Publication No. HS02-011B(3-03) Revised
More informationDewatering solutions that work
Dewatering solutions that work COMPLETE RENTALS SERVICES FOR SEWAGE BY-PASS, CONSTRUCTION DEWATERING, FLOOD DRAINAGE, SURFACE IRRIGATION AND MINE DEWATERING Pumps, Mixers, Generators and Accessories Sewage
More informationUNIQUE DESIGN CHALLENGES IN THE AUX SABLE NGL RECOVERY PLANT
UNIQUE DESIGN CHALLENGES IN THE AUX SABLE NGL RECOVERY PLANT Presented at the 81 st Annual Convention of the Gas Processors Association March 11, 2002 Dallas, Texas Joe T. Lynch, P.E. Ortloff Engineers,
More information5.2 MW Solar Mobile Power Unit
5.2 MW Solar Mobile Power Unit Ventilation air intake Ventilation air exhaust Air inlet & silencer Exhaust Silencer Power Control Room & Trailer -13.8 KV switchgear -CO2 fire system -480 VAC MCCC for turbine
More informationTITLE 35 LEGISLATIVE RULES BUREAU OF ENVIRONMENT DIVISION OF ENVIRONMENTAL PROTECTION OFFICE OF OIL AND GAS
TITLE 35 LEGISLATIVE RULES BUREAU OF ENVIRONMENT DIVISION OF ENVIRONMENTAL PROTECTION OFFICE OF OIL AND GAS SERIES 1 MISCELLANEOUS WATER POLLUTION CONTROL RULES 35-1. General. 1.1. Scope. -- This legislative
More informationBraemar Technical Services
Braemar Technical Services Cargo Handling and Emergency Shutdown Systems in an LNG cargo vessel - What is the Connection? By Ray Martyn 20 th April 2017 Overview Introduction to the Cargo Handling System
More informationTABLE OF CONTENT
Page : 1 of 10 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 2 REFERENCES
More informationUFL Micro Biogas CHPs
UFL Micro Biogas CHPs The UFL Micro Biogas CHPs are based on the highly durable Petter industrial diesel engine. Low cost replacement parts are available worldwide. This range of micro biogas CHPs has
More informationItem Hydrogen Gas Plant
Item 6530. Hydrogen Gas Plant Hydro-Chem Hydrogen Generating Plant 90,000 scfh @ 200 psig. Purity 99.99% Hydrogen generating plant engineered by Hydro-Chem built in 1980. Design capacity is 90,000 scfh
More information3.4 Harvest and Use BMPs
3.4 Harvest and Use BMPs Type of BMP Treatment Mechanisms Minimum Tributary Drainage Area Other Names LID Harvest and Use Volume Reduction This BMP is generally limited by the cistern / detention storage
More informationWATER RECYCLING SOLUTIONS
WATER RECYCLING SOLUTIONS Reverse Osmosis De-Mineralization Softening Sand/ Carbon Filtration Cartridge/ Bag Filtration Zero Liquid Discharge EVIAN ENGINEERING PRIVATE LIMITED A-80, Mohan Garden, Uttam
More informationTHREE MILE ISLAND ACCIDENT
THREE MILE ISLAND ACCIDENT M. Ragheb 12/4/2015 1. INTRODUCTION The Three Mile Island (TMI) Accident at Harrisburg, Pennsylvania in the USA is a severe and expensive incident that has seriously affected,
More informationLockout/Tagout. Company Policy
Company Policy Lockout/Tagout is dedicated to the protection of its employees from occupational injuries and illnesses. is responsible for providing a safe working environment and the employees have and
More informationChemigation. in Georgia
Chemigation in Georgia Table of Contents Chemigation Terminology...3 The Benefits of Chemigation...3 General Principles of Chemigation Safety Considerations...3 Injection Methods...4 Determining Injection
More informationRule 326: Mechanical Integrity Guidance
COGCC OPERATOR GUIDANCE RULE 326: MECHANICAL INTEGRITY GUIDANCE Document Control: Created Date: May 15, 2015 Last Updated Date: May 15, 2015 Last Updated By: Dave Kulmann Review Cycle: Yearly Review Systems
More informationDEACTIVATED NUCLEAR. Brenda Barber, P.E. Hans Honerlah, CHMM Baltimore District, CENAB-ENE. March 2018
1 DEACTIVATED NUCLEAR POWER 237 217 PLANT 200 PROGRAM 80 252 237 217 200 119 174 237 217 200 27.59 255 0 163 131 239 110 112 SM-1, 255 0 FT 163 BELVOIR, 132 65 135 VA 92 255 0 163 122 53 120 56 62 102
More informationOceanGuardTM Ballast Water Management System
OceanGuardTM Ballast Water Management System About OceanGuard Ballast Water Management System In response to an urgent need to resolve one of the greatest threats to the world s oceans, the OceanGuard
More informationHow to Care for Your Septic System
How to Care for Your Septic System Did you know as a homeowner it is your responsibility to maintain your septic system? Did you know maintaining your septic system is protecting your investment? Did you
More informationDewatering solutions that work
Dewatering solutions that work COMPLETE RENTALS SERVICES FOR SEWAGE BY-PASS, CONSTRUCTION DEWATERING, FLOOD DRAINAGE, SURFACE IRRIGATION, AND MINE DEWATERING Pumps, Mixers, Generators, and Accessories
More informationAmmonia Inhalation. To share lessons learned gained from incident investigations through a small group discussion method format.
Purpose To share lessons learned gained from incident investigations through a small group discussion method format. To understand lessons learned through a Systems of Safety viewpoint. This material was
More informationAmec Foster Wheeler Power and process division
Power and process division Scaling for Commercialization Six Things to Do Well July 24, 2017 World Bio Conference Montreal, Canada Presenter: Cecil Massie Six Things to do Well Scaling novel technologies
More informationCHEMICAL FREE PHOSPHOROUS ELIMINSTION P-UPTAKE PROCESS
CHEMICAL FREE PHOSPHOROUS ELIMINSTION P-UPTAKE PROCESS 2013 Florida Water Resources Conference Albert Bock Panama City, Florida, 32404 (407) 913 1495, info@aquaconeer.com 1 Introduction: Today Bay County
More informationMontreal Protocol. Process Agents Task Force. Case Study #10. Use of CFC 11 in manufacturing a fine synthetic fiber sheet structure
Montreal Protocol Process Agents Task Force Case Study #10 Use of CFC 11 in manufacturing a fine synthetic fiber sheet structure May 2001 Notice The United Nations Environment Program (UNEP), the UNEP
More informationENVOY STATION FUEL SELF AUDIT CHECKLIST
A. GENERAL AND INSTRUCTIONS 1. Self-audits of jet fuel storage facilities, mobile refueling units and into-plane fueling operations are to be performed at all Company stations as described in this section.
More informationMEMORANDUM. The general findings of the assessment are as follows:
November 28, 2006 MEMORANDUM Project No.: 030009-002-01 To: From: Re: WRIA 31 Planning Unit Steve Germiat, LHG, CGWP, and Timothy J. Flynn, LHG, CWGP Evaluation of Winterizing Existing River Pump/Conveyance
More informationRead Only Copy Not For Distribution. Chapter 17. Private Potable Water Supply Systems 17.1 GENERAL REGULATIONS 17.2 QUANTITY OF WATER REQUIRED
Chapter 17 Private Potable Water Supply Systems 17.1 GENERAL REGULATIONS 17.1.1 Applicability The regulations in this chapter apply to any private potable water supply system where plumbing fixtures are
More informationOil Drilling and Production Overview
Oil Drilling and Production Overview Los Cerritos Wetlands Oil Consolidation and Restoration Project Introduction Over the course of millions of years, decaying organic matter becomes trapped in many layers
More informationREVERSE OSMOSIS DESALINATOR MODEL PW3000 PW18000
TECHNICAL MANUAL FOR REVERSE OSMOSIS DESALINATOR MODEL PW3000 PW18000 DESCRIPTION, INSTALLATION, OPERATION AND MAINTENANCE Village Marine Tec. Reverse Osmosis Purification Systems World Headquarters/Manufacturing
More informationLock Out Tag Out (LOTO) Safety Procedure
Pars Oil & Gas Company Lock Out Tag Out (LOTO) Safety Procedure HEALTH, SAFETY AND ENVIRONMENT PROCEDURE Lock Out Tag Out (LOTO) Safety Procedure DOCUMENT ID - PR-82-POGC-002 REVISION 0.0 Pars Oil & Gas
More informationLARGE STORAGE TANK PROJECT
INTRODUCTION The Fairbanks Large Storage Tank is part of the Interior Energy Project (IEP) designed to expand natural gas distribution in Fairbanks and Interior Alaska. A tank with a capacity of 0.44 Bcf
More informationINDUSTRIAL FILTRATION EQUIPMENT LWS Filter Series
INDUSTRIAL FILTRATION EQUIPMENT LWS Filter Series (Single, Twin, Triple or Quadruple Demand Systems) 1 P age filtration equipment can be engineered to solve complex commercial and industrial water treatment
More informationPK-110. User Manual. American Weigh Scales. PK-110 (0-44lb x 0.05lb / lb x 0.1lb)
American Weigh Scales PK-110 User Manual PK-110 (0-44lb x 0.05lb / 44-110lb x 0.1lb) Copyright 2012 American Weigh Scales, Inc. All rights reserved. Rev. 1.1 PK-110 Manual Thank you for purchasing the
More informationUsing S88 Batch Techniques to Manage and Control Continuous Processes
Presented at the World Batch orum North American Conference Woodcliff Lake, NJ April 13-16, 2003 107 S. Southgate Drive Chandler, Arizona 85226-3222 480-893-8803 ax 480-893-7775 E-mail: info@wbf.org www.wbf.org
More informationContinuous Surfactant Injection to Remediate Liquid Loading at Satellite Installations in the SNS
Continuous Surfactant Injection to Remediate Liquid Loading at Satellite Installations in the SNS Alistair Agnew, Kirsten Agnew, Iain Brown, Brian Marr, Tom Moore, Mark Oatey Agenda Field Background Well
More informationThe following definitions apply with regard to requirements specified in this document:
MARKING REQUIREMENTS AND GUIDELINES FOR HAZARDOUS MATERIALS AND HAZARDOUS WASTES For Use by Unidocs Member Agencies or where approved by your Local Jurisdiction Authority Cited: California Fire Code; California
More informationC. ASSE 1013 Performance Requirements for Reduced Pressure Principle Backflow Preventers.
PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
More informationCommonwealth of Dominica. Office of the Maritime Administrator
Marine Safety Circular CD-MSC 08-03 Rev01 Commonwealth of Dominica Office of the Maritime Administrator TO: SUBJECT: PURPOSE: ALL SHIPOWNERS, OPERATORS, MASTERS AND OFFICERS OF MERCHANT SHIPS, AND RECOGNIZED
More informationFlow Monitoring of Blueprint Columbus Sump Pump Pilot Program
Flow Monitoring of Blueprint Columbus Sump Pump Pilot Program Fang Cheng, PhD, PE, Dave Bukovac City of Columbus Department of Public Utilities Division of Sewerage and Drainage 8/17/2017 Flow Monitoring
More informationSECTION 4 MANAGEMENT OF CHANGE OCS Production Operations
Safety & Environmental Management Version 2.3 SECTION 4 MANAGEMENT OF CHANGE Reviewed By Director of Production and Operations Steve Bodden Stone Energy Corporation Reviewed By Director of Deepwater Drilling
More informationRemote Monitoring of Equipment in Small Modular Reactors
A publication of CHEMICAL ENGINEERING TRANSACTIONS VOL. 33, 2013 Guest Editors: Enrico Zio, Piero Baraldi Copyright 2013, AIDIC Servizi S.r.l., ISBN 978-88-95608-24-2; ISSN 1974-9791 The Italian Association
More information'90 DEGREE' STYLE 'IN-LINE' STYLE
BOC WATER HYDRAULICS DECOKING VALVES DV SERIES '90 DEGREE' STYLE 'IN-LINE' STYLE 12024 SALEM WARREN ROAD PO BOX 1028 SALEM, OHIO 44460 WWW.BOCWATERHYDRAULICS.COM WORD FROM THE PRESIDENT TODD OLSON, PRESIDENT
More informationtechnical bulletin Subcooler Control
Overview technical bulletin The E2 now has support for controlling a Subcooler. Incorporating Subcooler control in the E2 eliminates the need for standalone Subcoolers that do not have network communication
More informationMODELS PH PH PH
WWW.BURCAM.COM 2190 Boul. Dagenais West TEL: 514.337.4415 LAVAL (QUEBEC) FAX: 514.337.4029 CANADA H7L 5X9 info@burcam.com Your pump has been carefully packaged at the factory to prevent damage during shipping.
More informationVariety, economy and efficiency
Variety, economy and efficiency A complete range of filters for domestic swimming-pools suitable for all demands and applications. Bobbin wound polyester sand filters Industrial quality and performance
More informationGuidelines for the Exchange of Oil Samples/Results between countries, and on Oil Spill Identification
Guidelines for the Exchange of Oil Samples/Results between countries, and on Oil Spill Identification Preliminary remark Oil spill identification is conducted by experienced and specialised laboratories
More informationOxiPRO Q2.0 Microbial Control Technology
OxiPRO Q2.0 Microbial Control Technology Specification SPEC-613 OxiPRO Q2.0 Microbial Control Technology improves paper machine efficiency by proactively monitoring and controlling microbial-based deposits.
More informationStorm Drone 6 GPS DEVO 7 Setup for NAZA-M Lite
DEVO 7 Setup for NAZA-M Lite Step 1 - Set Fixed ID on the transmitter! Skip this part if you have a brand new Storm Drone 6 GPS, we have already done before we ship. 1. 2. 3. 4. 5. 6. 7. 8. 9. Turn on
More informationHYGIENIC DESIGN ASPECTS OF PASTEURIZER TO PREVENT CROSS CONTAMINATION OF PASTEURIZED MILK
Review paper UDC 637.133.3 HYGIENIC DESIGN ASPECTS OF PASTEURIZER TO PREVENT CROSS CONTAMINATION OF PASTEURIZED MILK Prabhakar Kanade 1, Asaithambi Subramani 1* 1 Mother Dairy Fruit & Vegetable Private
More informationHydraulics Laboratory Experiment Report
Hydraulics Laboratory Experiment Report Name: Ahmed Essam Mansour Section: Title: "1", Monday 2-5 pm Centrifugal Pumps Date: 27 November, 2006 Objectives: To study the performance of a centrifugal pumps
More informationSTERIS Continuous Effluent Decontamination (CED) System
LABORATORY RESEARCH STERIS Continuous Effluent Decontamination (CED) System The Safety and Efficacy of Continuous Effluent Decontamination A Breakthrough in Decontamination Technology Continuous Effluent
More informationEBARA INTERNATIONAL CORPORATION Cryodynamics Division CRYODYNAMICS SUBMERGED CRYOGENIC PUMPS & EXPANDERS
EBARA INTERNATIONAL CORPORATION Cryodynamics Division CRYODYNAMICS SUBMERGED CRYOGENIC PUMPS & EXPANDERS WHO WE ARE EBARA INTERNATIONAL CORPORATION, CRYODYNAMICS DIVISION (EIC CRYO) For over forty years,
More informationECRC~SIMEC Canada's Marine Oil Spill Preparedness Regime
ECRC~SIMEC Canada's Marine Oil Spill Preparedness Regime Paul Pouliotte CFO Introduction In 1993 amendments were made to the Canada Shipping Act (CSA) to strengthen Canada s marine oil spill response capability.
More informationAD26 Systems for Iron, Manganese, Sulfide and Arsenic Removal
AD26 Systems for Iron, Manganese, Sulfide and Arsenic Removal Technical Bulletin 2004-02 rev0707 Q: What is the AdEdge AD26 System? A: The AD26 system is a pre-engineered, packaged treatment system specifically
More informationTest Quality Assurance Plan Standard Quality Assurance Project Plan Shipboard Testing
Shipboard Testing Golden Bear Facility Vallejo, California 5 November 2012 Shipboard Testing Golden Bear Facility Vallejo, California 5 November 2012 BY: Nicholas Welschmeyer, PhD Lead Investigator Golden
More informationRisks Associated with Shutdown in PWRs
International Conference Nuclear Option in Countries with Small and Mi Opatija, Croatia, 1996 Risks Associated with Shutdown in PWRs Igor Grlicarev Slovenian Nuclear Safety Administration Vojkova 59, 1113
More informationFlorida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Division of Waste Management - Storage Tank Facility Registration Form Registration
More informationSECTION COOLING TOWER
PART 1 GENERAL 1.1 SECTION INCLUDES A. Mechanical induced draft Cooling Tower B. Controls C. Ladder and handrails 1.2 REFERENCES SECTION 23 65 00 COOLING TOWER A. ANSI/AFBMA 9 - Load Rating and Fatigue
More informationLNG PUMPS FOR FLOATING STORAGE AND REGAS UNIT
4661 Eaker Street North Las Vegas, Nevada, 89081 USA Tel: +1 702 643 4900 Fax: +1 702 643 0391 nci.marketing@nikkisocryo.com http://www.nikkisocryo.com 1 Introduction. Lower capital costs, shorter on-stream
More informationReclaimed Water Treatment, Distribution, Pumping and Storage Engineering Report Form
Oklahoma Department of Environmental Quality Water Quality Division Phone: 405-702-8100 Construction Permitting Section 707 N. Robinson, OKC, OK 73102-6010 P.O. Box 1677, OKC, OK 73101-1677 Reclaimed Water
More information300828TWP INSTALLATION INSTRUCTIONS MODEL SUBMERSIBLE SUMP PUMP
www.burcam.com 2190 Dagenais Blvd. West TEL : 514.337.4415 LAVAL (QUEBEC) FAX : 514.337.4029 CANADA H7L 5X9 info@burcam.com Your pump has been carefully packaged at the factory to prevent damage during
More informationFAYOUM CITY SEWAGE TREATMENT PLANT, DEVELOPMENT STAGES, CASE STUDY
FAYOUM CITY SEWAGE TREATMENT PLANT, DEVELOPMENT STAGES, CASE STUDY Ahmed El-Zayat, Environmental Engineering Group, Egypt Emaill: ahmed_el_zayat@yahoo.com Introduction This case study focuses on three
More informationHEAVY OIL PRODUCTION ENHANCEMENT UNCONVENTIONAL HEAVY OIL PRODUCTION OPTIMIZATION
HEAVY OIL PRODUCTION ENHANCEMENT UNCONVENTIONAL HEAVY OIL PRODUCTION OPTIMIZATION MAXIMIZE PRODUCTION FROM RESERVOIR TO REFINERY UNLOCK POTENTIAL. OPTIMIZE HEAVY OIL PRODUCTION. Reduce costs through application
More informationFundamentals of Distillation Column Control
Fundamentals of Distillation Column Control by Terry Tolliver Standards Certification Education & Training Publishing Conferences & Exhibits ISA Automation Week 2011 PRESENTER Terry Tolliver Terry is a
More informationGrease Interceptors. Design & Operation. Material & Characteristics
Grease Interceptors Dormont offers a full line of grease interceptors for installation on cooking/prep sinks, pot, pan & scullery sinks and dishwasher applications. Dormont offers a variety of interceptor
More informationDraft 2015 Edition. Comments must be submitted on the attached Public Review Comment Form
Comments must be submitted on the attached Public Review Comment Form Draft 2015 Edition Deleted items are designated by strikethrough. Additions are designated by double underline. The National Board
More informationTYPES OF SEWAGE PUMPS. Solids Handling Pumps: Grinder Pumps: Effluent Pumps:
Effluent Pumps: Effluent pumps are the pumps most often used in small on-site systems. They are designed to pump effluent, the effluent flowing out of a septic tank. This effluent is relatively clear liquid
More informationInduced Gas Flotation (IGF) within an API Skim Tank A Case Study of Design Approach and Results
TECHNICAL PAPER Induced Gas Flotation (IGF) within an API Skim Tank A Case Study of Design Approach and Results Reprint of paper presented at the 16th Annual Produced Water Society Seminar - League City,
More informationFlorida Clean Vessel Act Program
Office of Sustainable Initiatives Florida Clean Vessel Act Program Brenda Leonard Program Administrator National Working Waterfronts and Waterways Symposium Tampa, Florida November 19, 2015 Clean Vessel
More informationAppendix 4. Standard format for the Procedures and Arrangements Manual. Annex II
Appendix 4 : Regulations for the Control of Pollution by NLS Standard format for the Procedures and Arrangements Manual Note 1: The format consists of a standardized introduction and index of the leading
More informationEPR: Steam Generator Tube Rupture analysis in Finland and in France
EPR: Steam Generator Tube Rupture analysis in Finland and in France S. ISRAEL Institut de Radioprotection et de Sureté Nucléaire BP 17 92262 Fontenay-aux-Roses Cedex, France Abstract: Different requirements
More informationMARINE PIPING SYSTEMS
MARINE PIPING SYSTEMS Glassfiber Reinforced Epoxy GREEN THREAD 75 / 50 Marine Piping Systems GREEN THREAD 75 and 50 Fiber Glass Systems products meet the challenges of Marine applications by offering resistance
More information2% & (+ 2% PSI.
Warning: If your vehicle has an engine that has spark plugs, be sure they are resistor type spark plugs or you may damage the memory chip of this unit. If the scale unit fails when the engine is running,
More informationB. System Design and Performance Requirements
15625 Water Chillers This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or in notes
More informationTRISIM Plus. Comprehensive Control System Emulation for Triconex
Comprehensive Control System Emulation for Triconex TRISIM Plus is a Virtual Simulation of Triconex Trident and Tricon controllers and TRI-GP combined with the base modeling capability from DYNSIM. This
More informationPump selection: a real example
28 Feature WORLD PUMPS March 2010 Centrifugal pumps Pump selection: a real example Choosing the most appropriate and cost-effective centrifugal pump for a given duty requires strict adherence to a thorough
More informationFAIRBANKS NIJHUIS SUBMERSIBLE SOLIDS HANDLING PUMPS.
FAIRBANKS NIJHUIS SUBMERSIBLE SOLIDS HANDLING PUMPS www.fairbanksnijhuis.com FAIRBANKS NIJHUIS Introduction Fairbanks Nijhuis manufactures a complete line of submersible pumps for municipal and industrial
More informationLiquid Stream Fundamentals: Grit Removal
FACT SHEET Liquid Stream Fundamentals: Grit Removal Grit removal is an essential component of the wastewater treatment process. Not only does the removal of grit help protect downstream equipment from
More information