1 Crown Surface Land Amendments And Disposition Renewals Presented by: Shelby Biddlecombe, CPSA Devon Energy Auditorium, June 16,
2 Overview Three main types of Crown Applications: Enhanced Approval Process (EAP) 4 yr Short Term Limited Scope of Projects MSL, LOC, PLA, PIL Applies to Conventional development only Major Industrial Applications 25 yr expiry Applies to ALL Oil Sands and In-Situ Projects. Traditional Crown Applications mostly 25 yr expiry Covers all Conventional applications that are outside of scope of EAP. 2
3 Short Term and Long Term Dispositions Two stages to an EAP application: Short Term (Interim) Disposition 4 year Term Allows for a company to construct, drill and complete a site. A Long Term Disposition (Final Disposition) must be applied for within the 4 years. Otherwise, the Short Term Disposition will expire and the land will revert back to the Crown. Notice will be provided to the Company of the impending expiry of the disposition. Long Term (Final) Disposition 25 year Term on MSL s, LOC s, PIL s Indefinite Term on PLA s. Full application required including: Final As built survey plans, or a Statutory Declaration from the Surveyor New LAT report (caution: review to ensure no new conditions are present that would change the project to non-standard) New Supplement forms Copies of the Occupant consents ensure that the disposition numbers are noted on the Occupant consents. 3
4 What you need: In order to apply for an EAP Long Term disposition, you need the following: A Statutory Declaration, or: New First Nations Consultation number, deemed adequate by ACO As- Built Survey plan (encrypted file for submission) New LAT Reports ensure conditions have been met Appropriate Supplemental Forms completed New Consent from any Occupant, including FMA holders or GRL holders 4
5 Landscape Analysis Tool (LAT) Reports As LAT Reports can only be used once, a new LAT is required to support the Long Term Application LAT conditions need to be reviewed and accepted by the Project Team PRIOR to applying for the disposition. ***Ensure that your site DOES meet the conditions in the LAT report*** It is possible that a site that was originally a standard application is now, due to a new condition, considered to be non-standard and should be applied as NS. If all conditions in the LAT can be met by the project, the Long Term application can proceed as Standard. If one or more conditions cannot be met by the project, the application can proceed, but must be submitted as Non-Standard, and a mitigation strategy for the conditions in question must be provided, yes, even after the fact. 5
6 Application Supplements Four Supplement forms: Sites and Installations (for both MSL and PIL s) Access (LOC) Pipelines (PLA) Non-Standard Mitigation Long Term Disposition Applications require NEW Application Supplements. Each EAP application requires an Application Supplement Form to be completed & submitted via EDS upon application. The Supplement forms outline project specifics as to construction, reclamation, and existing stakeholder consultation. The Supplement forms are updated regularly and should be pulled from the AER website to ensure the latest version is being used. Old forms will not be accepted if a newer version has been released. Non-Standard Mitigation forms are required if a project cannot meet all of the conditions in the LAT report. Watch for new requirements on the supplement forms, such as consent from ISP holders etc. 6
7 Consent of Occupants Prior to applying for a Long Term EAP disposition, all Occupants must provide written consent to the project. Occupants include: FMA Holders DTL, CTL Holders GRL Holders Occupant Consents must reference either the LAT report number, or the disposition number, and the Occupants disposition number. If the LAT report number changes, the Occupant consent must be updated, or it will be rejected. Refer to Bulletin for details on Occupant consent requirements. 7
8 Other Stakeholders Review the Crown search for other stakeholders such as: CNT Consultative Notation PNT Protective Notation ISP Industrial Sample Plot Such stakeholders NOW need to provide their CONSENT prior to submitting any application. If a new stakeholder is now present, they too need to provide CONSENT. 8
9 Long Term Dispositions Long Term Disposition will be issued for a 25 year term. Long Term Dispositions will only be issued on sites that have had site entry reported on. In cases where there are Associated Dispositions.they can be dis-associated for the purpose of submitting a Stat Dec and an Asbuilt. to aersurfaceactivityapplication@aer.ca to have two associated dispositions dis-associated. ** Surface Rentals will always be calculated from the original date of the Short Term Disposition, despite the 25 year expiry is from the date of the Long Term Disposition. 9
10 Working in EDS: Stat Dec s 10
11 EDS: EAP Statutory Declarations 11
12 EDS: EAP Statutory Declarations 12
13 EDS: EAP Statutory Declarations 13
14 Working in CS: As-Built Surveys 14
15 EDS: EAP As-Built survey plans 15
16 EDS: EAP As-Built survey plans 16
17 EDS: EAP As-Built survey plans 17
18 EDS: EAP As-Built survey plans 18
19 References 19
20 Acronyms LAT Landscape Analysis Tool FMA Forestry Management Area GRL Grazing Lease CTL Coniferous Timber License DTL Deciduous Timber License FNC First Nations Consultation EDS Electronic Disposition System ETS Electronic Transfer System CNT Consultative Notation PNT Protective Notation ISP Industrial Sample Plot 20
21 Important Links Electronic Transfer System (ETS) fault.aspx Electronic Dispositions System (EDS) Enhanced Approval Process Website EAP Manuals & Guides First Nations Consultation AER Forms 21
22 Questions?? 22
EAP Supplement Instructions
SRD/ Instructions for Completing Supplements under the Enhanced Approvals Process Purpose: These instructions are intended to provide assistance and clarification in the completion of EAP Supplement forms;
More informationPROJECT REPORT INTERIM PROJECT REPORT
PROJECT REPORT 2001-22 INTERIM PROJECT REPORT Integrated Resource Management in Alberta s Boreal Forest: Opportunities and Constraints Norah MacKendrick, Colette Fluet, Debra J. Davidson, Naomi Krogman
More informationForest Tenure. This lesson provides an overview of Alberta's Legislation and Policy that relates to Forest Tenure.
Forest Tenure The summaries and their associated interpretations contained in this document are for general information only, not legal advice. To interpret or apply the law, you must consult the legally
More informationForest Management Branch Directive
SUSTAINABLE RESOURCE DEVELOPMENT Forest Management Branch Directive Directive No. 2005-1 Date April 7, 2006 Subject Regeneration Stratum Declarations and Allowable Cut Adjustments Purpose To provide procedures
More informationCERTIFICATION SCHEME FOR TYPE APPROVAL OF PRODUCTS
CERTIFICATION SCHEME FOR TYPE APPROVAL OF PRODUCTS 1. Introduction 1.1 Scheme for type approval of products of Indian Register of Shipping (IRS) is an impartial certification system based on a design review
More informationENERGY AND NATURAL RESOURCES
ENERGY AND NATURAL RESOURCES We work for the best : our clients. New Brunswick Newfoundland & Labrador Nova Scotia Prince Edward Island mcinnescooper.com ENERGY AND NATURAL RESOURCES ELECTRICITY ATLANTIC
More informationOverview of Forest Tenure
These reading materials provide a roadmap outlining the evolution of tenure in Alberta. Learn how the Crown and tenure holders have specific rights and obligations for each type of tenure and how these
More informationCustomer Specific Requirements. For Use with ISO/TS16949 And ISO 9001
Customer Specific Requirements For Use with ISO/TS16949 And ISO 9001 Effective: October 9, 2015 Introduction This document contains BWI companion requirements to the current revision of ISO/TS16949. Each
More informationPolicy for the Association of Organizations with FSC
DRAFT 2-0 Title Document reference code Approval body Contact for comments FSC Board of Directors Director s Office FSC Global Development Charles de Gaulle Strasse 5 53113 Bonn Germany +49 (0)228 367660
More informationInformation on the focal point for the Convention. Information on the point of contact for the Convention
Questionnaire for the REPORT OF MONTENEGRO ON THE IMPLEMENTATION OF THE CONVENTION ON ENVIRONMENTAL IMPACT ASSESSMENT IN A TRANSBOUNDARY CONTEXT in the period 2006 2009 Information on the focal point for
More informationGUIDE. DWWP Amendments Licence Amendments Licence Renewals & New System Applications. Municipal Residential Drinking Water Systems
GUIDE FOR APPLYING FOR DWWP Amendments Licence Amendments Licence Renewals & New System Applications Municipal Residential Drinking Water Systems SAFE DRINKING WATER BRANCH November 2010 PIBS 7014e01 Guide
More informationHinton Wood Products A division of West Fraser Mills Forest Management Agreement FMA O.C. 565/2007
Hinton Wood Products A division of West Fraser Mills Forest Management Agreement FMA 8800025 O.C. 565/2007 Mountain Pine Beetle Forest Management Plan Amendment Technical Report #1 - Landbase Classification
More informationEDS - Land Status Check Manual
EDS - EDS - Revisin Histry Versin Date Authr/Organizatin Descriptin V1.00 2011-06-09 Mnarch Delumen First Draft 2012 Gvernment f Alberta Page 2 f 13 EDS - Disclaimer In this disclaimer prvisin: Crwn means
More informationServices Support Lifecycle Change Notice
Services Support Notice Date: April 10, 2017 Product Name: Avaya Communications Server 1000 (CS 1000) X11 Rls 23-25 Systems Services Support Lifecycle Change Notice Service Support Lifecycle change: The
More informationMadrid System for the International Registration of Marks
Madrid System for the International Registration of Marks Management and Maintenance of International Trademark Registration Prague, April 27, 2015 Normunds LAMSTERS Acting Coordinator, Processing Team
More informationGuidelines for the Closure and Reclamation of Advanced Mineral Exploration and Mine Sites in the Northwest Territories
DRAFT Guidelines for the Closure and Reclamation of Advanced Mineral Exploration and Mine Sites in the Northwest Territories Preface... 5 Introduction... 7 Purpose... 7 Authority... 7 How These Guidelines
More informationMinistry of Licence No Natural Resources
Ministry of Licence No. 542548 Natural Resources SUSTAINABLE FOREST LICENCE Approved by Order in Council O.C. 712/99 dated April 14, 1999 And as amended as set out in Appendix G And as most recently amended
More informationFluid Tailings Management for Oil Sands Mining Projects. 1 Introduction Purpose of This Directive AER Requirements...
Directive [XXX] Release date: [Month XX, 20XX] Effective date: [Month XX, 20XX] Fluid Tailings Management for Oil Sands Mining Projects The Alberta Energy Regulator has approved this directive on [Month
More informationManitoba s Submission Guidelines for Peatland Management Plans
Manitoba s Submission Guidelines for Peatland Management Plans Peatland Management Guidebook Forestry and Peatlands Branch Manitoba Sustainable Development First Published: September 2017 Review by: 2022
More informationState Significant Development and State Significant Infrastructure
Planning, Development & Heritage State Significant Development and State Significant Infrastructure Last updated: July 2015 These Fact Sheets are a guide only and are no substitute for legal advice. To
More informationFirst Nations Direct Award Forest Tenure Opportunities Guidelines
First Nations Direct Award Forest Tenure Opportunities Guidelines 1. Table of Contents I. Introduction:... 2 II. Forest Tenures... 2 III. Forest Tenure Opportunity Agreements (FTOA)... 2 IV. FTOA Mandates
More informationImpacts of the New Zealand Emissions Trading Scheme on Crown Forest Licensed Land
Impacts of the New Zealand Emissions Trading Scheme on Crown Forest Licensed Land Prepared by for Second Edition March 2010 FOREWORD Maori have a significant stake in the forestry sector. With the return
More informationMANUAL REVISION TRANSMITTAL
Ministry of Forests and Range FOR FURTHER INFORMATION OR IF YOU HAVE A CHANGE OF ADDRESS, PLEASE CONTACT: John Wai Residue Forester and Log Salvage Policy Forester Revenue Branch Ministry of Forests and
More informationReforestation. After working through this lesson, you should be able to:
Reforestation The summaries and their associated interpretations contained in this document are for general information only, not legal advice. To interpret or apply the law, you must consult the legally
More informationNotice of Availability of the Final Environmental Impact Statement for the Monument
This document is scheduled to be published in the Federal Register on 06/24/2016 and available online at http://federalregister.gov/a/2016-15023, and on FDsys.gov 4310-DQ-P DEPARTMENT OF THE INTERIOR Bureau
More informationGuidance Notes for Police Staff Application for Employment
Guidance Notes for Police Staff Application for Employment Please refer to the following guidance when completing your application form. Thank you for your interest in working with the Scottish Police
More informationEmployer s Guide: Applying for Approval of Excess Weekly Hours of Work and Averaging Hours of Work
Employer s Guide: Applying for Approval of Excess Weekly Hours of Work and Averaging Hours of Work These publications are provided for your information and convenience only. They are not legal documents.
More information2011 SUSTAINABLE FOREST MANAGEMENT STEWARDSHIP REPORT
2011 SUSTAINABLE FOREST MANAGEMENT STEWARDSHIP REPORT February, 2012 Aaron Jones, R.P.F. Stewardship/Public Affairs Coordinator Dan Rollert, R.P.F. Woodlands Manager TABLE OF CONTENTS EXECUTIVE SUMMARY...
More informationRange Management on Alberta s Public Land
Range Management on Alberta s Public Land Association of Alberta Forest Management Professionals Spring 2016 Study Session March 12, 2016 Room NRE 1-001, Natural Resources Engineering Facility, Edmonton
More informationINTERIM CONSULTATION PROCEDURE WITH TREATY 8 FIRST NATIONS September 2011
INTERIM CONSULTATION PROCEDURE WITH TREATY 8 FIRST NATIONS September 2011 Version 1.1 Contents 1 PREFACE...3 BACKGROUND...3 2 INTRODUCTION...4 OVERVIEW...4 3 OVERVIEW OF COMMISSION CONSULTATION...5 PHASE
More informationDeveloper Services. Building over or near a sewer. DEV 005G Guidance notes and procedure. What is a public sewer?
Developer Services DEV 005G Guidance notes and procedure Building over or near a sewer If you are thinking of building a structure (for example, a new building, extension, conservatory, garage etc.) you
More informationService Suppliers Engaged in Condition Monitoring of Machinery Onboard Ships and Mobile Offshore Units
pproval of rvc upplrsno. 2.9 STANDARD FOR CERTIFICATION Approval Programmes Approval of Service Suppliers No. 416 Service Suppliers Engaged in Condition Monitoring of Machinery Onboard Ships and Mobile
More informationTHE LEGISLATIVE FRAMEWORK FOR MUNICIPAL PLANNING, SUBDIVISION, AND DEVELOPMENT CONTROL
THE LEGISLATIVE FRAMEWORK FOR MUNICIPAL PLANNING, SUBDIVISION, AND DEVELOPMENT CONTROL Alberta Municipal Affairs February 1997 Updated March 2002 1.0 INTRODUCTION The authority for municipal planning,
More informationEnvironment. Main points Introduction Audit conclusions and findings Better human resource plan... 81
Environment Main points... 77 Introduction... 79 Audit conclusions and findings... 80 Better human resource plan... 81 Supervision of staff needed... 82 Controlling bank accounts... 82 Following revenue
More informationRISK COMMITTEE BYLAW OF THE SUPERVISORY BOARD OF ING BANK ŚLĄSKI S.A.
RISK COMMITTEE BYLAW OF THE SUPERVISORY BOARD OF ING BANK ŚLĄSKI S.A. 1 The Risk Committee of the Supervisory Board of ING Bank Śląski S.A., hereinafter referred to as the Committee, shall perform consultation
More informationProduction Part Approval Process (PPAP)
Document ID: QN-M04 Page 1 of 13 Aerojet Rocketdyne Quality Note M04 Date: 03/16/2016 Table of Contents 1. PURPOSE... 2 2. APPLICATION... 2 2.1. Resubmissions... 2 2.2. Applicable Documents... 3 3. CONVENTIONS...
More informationProtocol Agreement. Ministry of Sustainable Resource Management and the Oil and Gas Commission
Protocol Agreement March 5, 2004 Ministry of Sustainable Resource Management and the Oil and Gas Commission 1.0 PURPOSE 1.1 This agreement defines the roles and responsibilities of the Archaeology and
More informationPLAN SUBMISSION, BUFFERING AND SETBACK FROM TRANSMISSION PIPELINES
PLAN SUBMISSION, BUFFERING AND SETBACK FROM TRANSMISSION PIPELINES Note: The sections of this ordinance are intended to be enacted as part of a Township s Subdivision and Land Development Ordinance. AN
More informationPMA Quality Assurance Manual Rev. 2 Date 12 Feb 2016
PMA Quality Assurance Manual Date Aviation Technical Services, Inc. 3121 109 th Street SW Everett, WA 98204 425-423-3371 2600 West Casino Road Everett, WA 98204 10315 Airport Road Everett, WA 98204 www.atsmro.com
More informationVILLAGE OF KRONENWETTER FIRE DEPARTMENT
VILLAGE OF KRONENWETTER FIRE DEPARTMENT 1582 Kronenwetter Drive Kronenwetter, WI 54455 www.kronenwetter.org Dear Fire Department Applicant: On behalf of the Vil1age of Kronenwetter Fire Department, I would
More informationNexen Inc. and CNOOC Canada Inc.
Decision 2012-330 Long Lake Project December 6, 2012 The Alberta Utilities Commission Decision 2012-330: Long Lake Project Application No. 1608729 Proceeding ID No. 2074 December 6, 2012 Published by The
More informationMCDR INSPECTION REPORT
1 MCDR INSPECTION REPORT General SN Particulars Details Date of Inspection 18.10.2016 1 Name of the Mine Dhobitola Titaniferous Iron Ore Mine 2 Total Lease Area (Ha) 2.61 Ha (Entire Forest Land) with breakup
More informationMINISTER OF TRADE REPUBLIC OF INDONESIA REGULATION OF THE MINISTER OF TRADE OF THE REPUBLIC OF INDONESIA NUMBER: 97/M-DAG/12/2014 CONCERNING
MINISTER OF TRADE REPUBLIC OF INDONESIA REGULATION OF THE MINISTER OF TRADE OF THE REPUBLIC OF INDONESIA NUMBER: 97/M-DAG/12/2014 CONCERNING EXPORT PROVISION OF FORESTRY INDUSTRY PRODUCT WITH THE BLESSING
More informationIAEA SAFETY STANDARDS for protecting people and the environment. Predisposal Management of Radioactive Waste from Nuclear Fuel Cycle Facilities
DS447 Date: 20 February 2015 IAEA SAFETY STANDARDS for protecting people and the environment STATUS: SPESS STEP 12 For submission to CSS Predisposal Management of Radioactive Waste from Nuclear Fuel Cycle
More informationMinistry of Natural Resources Licence No
Ministry of Natural Resources Licence No. 551832 SUSTAINABLE FOREST LICENCE Approved by Order in Council O.C. 1160/2010 dated August 10, 2010 And as amended as set out in Appendix G And as most recently
More informationCondominium Project Profile and General Review Form
Condominium Project Profile and General Review Form This form must be completed, signed and returned to Tarion by a vendor/builder proposing to sell and/or build a condominium project. All references to
More informationCustomer Specific Requirements. For Use with ISO/TS16949 And ISO 9001
Customer Specific Requirements For Use with ISO/TS16949 And ISO 9001 Rev. 13 - Effective Date: Oct. 27, 2017 Introduction This document contains BWI companion requirements to the current revision of ISO/TS16949.
More informationJob Application Form
Name: Position Applied For: SIA License No: Personal Email Information Application Forms should be completed in BLOCK CAPITALS and in BLACK ink. Please check that all the sections have been completed.
More informationTechnical Manual Waste Management
Waste Management ndcp2005 tm 06 waste_051201.doc Production: Newcastle Waste Management was prepared by the Development and Environment Division of Newcastle City Council. Enquiries: For information about
More informationFORESTRY AND LAND MANAGEMENT (SCOTLAND) BILL
FORESTRY AND LAND MANAGEMENT (SCOTLAND) BILL EXPLANATORY NOTES INTRODUCTION 1. As required under Rule 9.3.2A of the Parliament s Standing Orders, these Explanatory Notes are published to accompany the
More informationMinistry of Northern Development, Licence No Mines and Forestry
Ministry of Northern Development, Licence No. 550398 Mines and Forestry SUSTAINABLE FOREST LICENCE Approved by Order in Council O.C. 1102/2003 Dated May 14, 2003 as amended as set out in Appendix G And
More informationMillar Western Forest Products Ltd.
Millar Western Forest Products Ltd. A RESOURCEFUL COMPANY Application for a Commercial Timber Permit to Harvest in WO1 in 2017-18 MILLAR WESTERN FOREST PRODUCTS LTD. 1 Company Overview Privately held business
More informationTaxability of Software
Taxability of Software TB-51(R) Issued July 5, 2011 Tax: Sales and Use Tax PREWRITTEN COMPUTER SOFTWARE IS TANGIBLE PERSONAL PROPERTY Computer software means a set of coded instruction designed to cause
More informationOntario Energy Board
Ontario Energy Board Standard Supply Service Code for Electricity Distributors Revised (Replacing version issued on October 8, 2015) Table of Contents 1. GENERAL AND ADMINISTRATIVE PROVISIONS 1.1 PURPOSE
More informationGuidelines for the Closure and Reclamation of Advanced Mineral Exploration and Mine Sites in the Northwest Territories.
MVLWB/AANDC Guidelines for the Closure and Reclamation of Advanced Mineral Exploration and Mine Sites in the Northwest Territories November 2013 Cover photo: Image on left shows Colomac Mine site circa
More informationRING FENCING GUIDELINE
RING FENCING GUIDELINE PLAN AER Submission - July 2017 Purpose of this document > This document outlines Essential Energy s strategy to achieve compliance with the AER s Ring Fencing Guideline > This strategic
More informationApplication for GS1 Malaysia Berhad Membership & LICENSE
Mar 2017 Pg 1 Application for GS1 Malaysia Berhad Membership & LICENSE GS1 Standards and Keys in Malaysia are managed by Wisma FMM, No. 3 Persiaran Dagang, Bandar Sri Damansara, 52200 Kuala Lumpur Tel:
More informationHuman Samples in Research
Human Samples in Research Import and Export of Human Tissue Document Identifier HTA-06-SOP-Import and Export AUTHOR APPROVER EFFECTIVE DATE: Name and role Signature and date Name and role Signature and
More informationDetermining Whether a Proposal is Subject to the National Environmental Policy Act (NEPA) Section 102 Updated March
Determining Whether a Proposal is Subject to the National Environmental Policy Act (NEPA) Section 102 Updated March 2005 1 This paper presents some key thresholds to consider when determining whether a
More informationIncident Reporting Requirements
Incident Reporting Requirements Directive PNG014 December 2016 Version 2.0 Governing Legislation: Acts: The Oil and Gas Conservation Act The Pipelines Act, 1998 Regulations: The Oil and Gas Conservation
More informationFluid Tailings Management for Oil Sands Mining Projects. 1 Introduction AER Requirements What s New in This Edition...
Directive 085 Release date: October 12, 2017 Effective date: October 12, 2017 Replaces previous edition issued July 14, 2016 Fluid Tailings Management for Oil Sands Mining Projects The Alberta Energy Regulator
More informationForest Stewardship Council FSC STANDARD. Requirements for sourcing Controlled Wood FSC-STD V 3-0 EN. Controlled Wood
Forest Stewardship Council FSC STANDARD Requirements for sourcing Controlled Wood Controlled Wood Title: Document reference code: Approval date and body: Requirements for sourcing Controlled Wood DRAFT
More informationDRAFT RECLAMATION MANUAL RELEASE Comments on this draft release must be submitted to Michael Pulskamp at by 5 PM on June 4, 2012.
Background and Purpose of the Following Temporary Release (TRMR) Directive and Standard (D&S) The goal of preparing this TRMR D&S document, and providing stakeholders with the opportunity to comment on
More informationMEDICAL INNOVATION HOLDINGS, INC.
MEDICAL INNOVATION HOLDINGS, INC. FORM 10QSB/A (Amended Quarterly Report of Financial Condition) Filed 02/16/01 for the Period Ending 07/31/00 Address 5805 STATE BRIDGE ROAD SUITE G 328 DULUTH, GA, 30097
More information9001:2015. Quality Manual 9001:2015. Engineering Value through Quality and Innovation.
Quality Manual 9001:2015 9001:2015 Suburban Manufacturing, Inc. encourages comments from customers, suppliers, employees and friends in order to improve our business and its performance. Information contained
More informationWeyerhaeuser Pembina Timber Harvest Planning and Operating Ground Rules
Weyerhaeuser Pembina Timber Harvest Planning and Operating Ground Rules 2017 Weyerhaeuser Pembina OPERATING GROUND RULES Weyerhaeuser Pembina FMA ALBERTA AGRICULTURE and FORESTRY ENDORSEMENTS The Weyerhaeuser
More informationAppendix 1: Forest Carbon Emission Offset Project Development Guidance
The Ministry of Forests, Lands and Natural Resource Operations (FLNRO) supports the use of forest carbon management options that satisfy the diverse values that British Columbians seek from their forests.
More informationREGULATION FOR PRODUCTION CONTROL OF PERSONAL
Page 1 of 6 INDEX 1 PURPOSE AND PREMISE... 2 2 ENTRUSTMENT OF ASSIGNMENT... 2 3 INSPECTION OPERATIONAL ACTIVITY... 2 3.1 Methodology... 2 3.1.1 Sampling... 2 3.1.2 Verifica della omogeneità della produzione...
More informationSubscription and maintenance external FAQ
Subscription and maintenance external FAQ 1. What is Foundry announcing? Foundry is pleased to announce two new ways to stay up-to-date with Modo: annual subscription and a maintenance option for perpetual
More informationPolicy and Genetic Resource Management Directions or Who moved my seed?
Policy and Genetic Resource Management Directions or Who moved my seed? Brian Barber, RPF A/Director Tree Improvement Branch July 29, 2008 Overview Setting the context Major Forestry Issues MPB State of
More informationOvertime Averaging Rules. Maximum Duration of Arrangeme nt
Overtime Averaging Rules Jurisd. Federal Alberta BC Manitoba New Brunswick NL va Scotia Method of Authorization Posting of Schedule IV notice ; government not required ; Averaging Period Duration of Arrangeme
More informationMINISTRY OF ENVIRONMENT AND FORESTRY DIRECTORATE GENERAL OF SUSTAINABILE PRODUCTION FOREST MANAGEMENT
MINISTRY OF ENVIRONMENT AND FORESTRY DIRECTORATE GENERAL OF SUSTAINABILE PRODUCTION FOREST MANAGEMENT REGULATION OF DIRECTOR GENERAL OF SUSTAINABILE PRODUCTION FOREST MANAGEMENT NO:P.7/PHPL-SET/2015 CONCERNING
More informationFinTech Regulatory Laboratory Guidance. Consultation Paper No 3 of 2016 Annex B
FinTech Regulatory Laboratory Guidance Consultation Paper No 3 of 2016 TABLE OF CONTENTS 1. INTRODUCTION... 3 2. OBJECTIVES OF THE REGLAB FRAMEWORK... 3 3. THE REGLAB S INTENDED PARTICIPANTS... 4 4. FEATURES
More informationAdult Autism Waiver Supports Coordination Training
Adult Autism Waiver Supports Coordination Training Bureau of Autism Services August 2016 BAS Mission 2 BAS Values 3 What are the goals of AAW? Increase person s ability to care for themselves Decrease
More informationProfessional Employment Application
3800 Charco Road Phone: 361.354.2224 Beeville, TX 78102 Fax: 361.358.3982 Email: humanresources@coastalbend.edu Professional Employment Application Position Applying For: I am interested in working at:
More informationCAIRNGORMS NATIONAL PARK AUTHORITY
CAIRNGORMS NATIONAL PARK AUTHORITY Title: Prepared by: REPORT ON CALLED-IN PLANNING APPLICATION ANDREW TAIT, PLANNING OFFICER (DEVELOPMENT MANAGEMENT) DEVELOPMENT PROPOSED: REFERENCE: APPLICANT: VARIATION
More informationUK Civil Aviation Authority
UK Civil Aviation Authority Member of the Joint Aviation Authorities SRG FORM 2101 - UK GYROPLANE PILOT LICENCE APPLICATION Please complete the form in BLOCK CAPITALS using black or dark blue ink after
More informationPresentation to NAS Workshop Oct 2016 M. Garamszeghy, NWMO, Canada
Presentation to NAS Workshop 24-25 Oct 2016 M. Garamszeghy, NWMO, Canada The opinions given in this presentation represent my own views and observations from more than 35 years of experience in the field
More informationPublic Private Partnerships (P3) The Latest Trends
Public Private Partnerships (P3) The Latest Trends Wisconsin Counties Association January 23, 2017 Andrew T. Phillips Steven L. Nelson Milwaukee Madison Fox Valley - Green Bay Waukesha County www.vonbriesen.com
More informationEWA ENVIRONMENTAL AFFAIRS
326 National Environmental Management Act (107/1998): Amendments to the Environmental Impact Assessment Regulations, 2014 40772 STAATSKOERANT, 7 APRIL 2017 No. 40772 211 DEPARTMENT OF ENVIRONMENTAL AFFAIRS
More informationIssuance of Policy Statement, Methods of Approval of Retrofit Shoulder Harness. SUMMARY: This document announces an FAA general statement of policy
DEPARTMENT OF TRANSPORTATION Federal Aviation Administration [Policy Statement Number ACE-00-23.561-01] Issuance of Policy Statement, Methods of Approval of Retrofit Shoulder Harness Installations in Small
More informationChapter 3 TIMBER SUPPLY ANALYSIS
Introductions Chapter 3 TIMBER SUPPLY ANALYSIS 3.1 Introduction The ANC mill facility requires about 265,000 Bone Dry Tonnes (approximately 690,000 m 3 ) of virgin coniferous wood fibre and 17,000 tonnes
More informationCOMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /
EN EN EN COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, C Draft COMMISSION REGULATION (EU) No / of [ ] amending Commission Regulation (EC) No 1702/2003 laying down implementing rules for the airworthiness
More informationPressure Control Supplier Quality Requirements Coating & Plating Services SQ-03 Rev: 1.1
Approved By: Jerry Longmire Vice President - Quality Jim Harris Quality Leader - NAM Document Revision Chart The following chart lists the revisions made to this document tracked by version. Use this to
More informationPROVINCE OF BRITISH COLUMBIA MINISTRY OF NATURAL GAS DEVELOPMENT
PROVINCE OF BRITISH COLUMBIA MINISTRY OF NATURAL GAS DEVELOPMENT PUBLIC NOTICE OF COMPETITION FOR THE RIGHT TO EXPLORE AND DEVELOP CROWN PETROLEUM AND NATURAL GAS RESOURCES May 18, 2016 Pursuant to Section
More informationForeword 3. Terminology 5
CONTENTS Foreword 3 Terminology 5 Section 1 Introduction 7 What Legislation Applies 7 The Division Of Responsibility 8 Building Regulations Compliance In General 9 Risk Assessment and The Workplace Fire
More informationto The Uganda Gazette No. 25, Volume CX, dated 5th May, 2017 Printed by UPPC, Entebbe, by Order of the Government No. 22.
STATUTORY INSTRUMENTS SUPPLEMENT No. 13 5th May, 2017 STATUTORY INSTRUMENTS SUPPLEMENT to The Uganda Gazette No. 25, Volume CX, dated 5th May, 2017 Printed by UPPC, Entebbe, by Order of the Government.
More informationOverview of Environmental Impact Assessment (EIA) Procedure SEA and Sustainable Development Goals in Myanmar
Overview of Environmental Impact Assessment (EIA) Procedure SEA and Sustainable Development Goals in Myanmar Sein Aung Min Assistant Director, ECD 6 th October 2016 Constitution(2008) Government s Policy
More informationSupply Base Report: Shaw Resources Eastern Embers
Supply Base Report: Shaw Resources Eastern Embers www.sustainablebiomasspartnership.org Completed in accordance with the Supply Base Report Template Version 1.2 For further information on the SBP Framework
More informationFIXED TERM CONTRACTS WORKSHOP PRESENTED BY ADVOCATE PUSHPA NAIDU
FIXED TERM CONTRACTS WORKSHOP PRESENTED BY ADVOCATE PUSHPA NAIDU EMPLOYEES ON FIXED TERM CONTRACTS THE AMENDMENT INCREASES THE PROTECTION FOR EMPLOYEES ON FIXED TERM CONTRACTS. WHAT IS A FIXED TERM CONTRACT?
More informationThe North-Atlantic Free Trade Agreement and the Trans-Pacific Partnership: Side-by-Side Comparison. NAFTA Chapter 10: Government Procurement
The North-Atlantic Free Trade Agreement and the Trans-Pacific Partnership: Side-by-Side Comparison NAFTA Chapter 10: Government Procurement Chapter Ten: Government Procurement Chapter Fifteen: Government
More informationMaster Development Plans (MDPs) / Geographic Area Plans (GAPS)
Master Development Plans (MDPs) / Geographic Area Plans (GAPS) COMPREHENSIVE PLANNING TOOLS FOR OIL AND GAS PROJECTS BUREAU OF LAND MANAGEMENT COLORADO RIVER VALLEY FIELD OFFICE (CRVFO) SILT, COLORADO
More informationEuropean Treaty Series - No. 121 CONVENTION FOR THE PROTECTION OF THE ARCHITECTURAL HERITAGE OF EUROPE
European Treaty Series - No. 121 CONVENTION FOR THE PROTECTION OF THE ARCHITECTURAL HERITAGE OF EUROPE Granada, 3.X.1985 2 ETS 121 Protection of the architectural heritage, 3.X.1985 The member States of
More informationCode of Practice. for Inspecting and Certifying Buildings and Works. Building Control Regulations 1997 to 2015
for Inspecting and Certifying Buildings and Works Building Control Regulations 1997 to 2015 September, 2016 Table of Contents 1. Introduction 1 1.1 Status and Purpose of Code 1 1.2 Overview of Code 1
More information4.05. Groundwater Program. Chapter 4 Section. Background. Follow-up to VFM Section 3.05, 2004 Annual Report. Ministry of the Environment
Chapter 4 Section 4.05 Ministry of the Environment Groundwater Program Follow-up to VFM Section 3.05, 2004 Annual Report Chapter 4 Follow-up Section 4.05 Background Groundwater is defined as water located
More informationBASIC INFORMATION QUESTIONNAIRE
Application No. Central Environmental Authority BASIC INFORMATION QUESTIONNAIRE Essential information to determine the environmental approval requirement of projects (Note Use separate sheets as and when
More informationRelative as Direct Support Employee (RDSE)
Relative as Direct Support Employee (RDSE) Network Management AGENDA The Policy NC Innovations Waiver Amendment Specific to RDSE New Employees Existing Employees Services Responsibilities Application:
More informationAPPRENTICESHIP PROGRAM REGULATION
Province of Alberta APPRENTICESHIP AND INDUSTRY TRAINING ACT APPRENTICESHIP PROGRAM REGULATION Alberta Regulation 258/2000 With amendments up to and including Alberta Regulation 46/2009 Office Consolidation
More informationLAND AND WATER BRITISH COLUMBIA INC. A Corporation of the Government of British Columbia
LAND AND WATER BRITISH COLUMBIA INC. A Corporation of the Government of British Columbia Service Plan Fiscal 2003/2004-2005/2006 National Library of Canada Cataloguing in Publication Data Land and Water
More informationSt Kilda Fuel Tank Replacement - Version 1-5 th October 2015
St Kilda Fuel Tank Replacement - Version 1-5 th October 2015 Detail in support of Schedule Monument Consent - Historic Scotland Introduction Prepared : B A Urquhart 5 th October 2015 Boiler and diesel
More information