1 Minimizing Storm Damage To Operating Houses on Movable Bridges Brett M. Brabham, P.E. Louisiana Department of Transportation and Development Bridge Design Section
2 Introduction 150 Movable Bridges (Excluding Railroad) Vast majority have Operating Houses New Operating Houses cost between $400k to $500k Not included in this estimate is $120k of electrical equipment
3 Codes and Regulations AASHTO has minimal information concerning the construction of Operating Houses Louisiana has adopted National and State codes for the construction of buildings
4 Code Requirements for Buildings in Louisiana International Building Code National Fire Protection Association (NFPA) Code Louisiana Plumbing Code The American Society of Heating, Refrigerating and Air- Conditioning Engineers (ASHRAE)
5 International Building Code Load Requirements 1. Snow Loads
6 Snow Load Map
7 International Building Code Load Requirements 1. Snow Loads 2. Flood Loads
8 Flood Loads Flood Elevations are determined by the Federal Emergency Management Agency (FEMA) Local Jurisdiction
9 International Building Code Design Flood Conditions All new construction of buildings, structures, and portions of buildings including substantial improvement and restoration of substantial damage to buildings and structures, shall be designed and constructed to resist the effects of flood hazards and flood loads.
10 International Building Code Design Flood Conditions Substantial Damage damage of any origin sustained by a structure to its before-damaged condition would equal or exceed 50% of the market value of the structure before the damage occurred.
11 What is the criteria for Determining Flood Zones? Area with a flood plain subject to a 1% or greater chance of flooding in any year; or Area designated as a flood hazard area on a community s flood hazard map, or otherwise legally designated.
12 Bayou Liberty Bridge Former Operating House House Design Elevation is 5. The 100 year Flood Elevation is 7.12.
13 Bayou Liberty Bridge New Operating House New Operating House Elev
14 Existing Structures Below the 100 Year Flood Plain without Substantial Damage? Flood Resistant Materials
15 Flood Resistant Materials Use items which water will have little or no effect.
16 Existing Structures in Flood Zones without Substantial Damage? Flood Resistant Materials Raise items off the floor
17 Existing Structures in Flood Zones without Substantial Damage? Flood Resistant Materials Raise items off the floor Protective walls
18 Protective Walls Keep visibility in mind. Provide a bilge Pumping System.
19 International Building Code Load Requirements 1. Snow Loads 2. Flood Loads 3. Wind Loads
20 Wind Load Map
21 Wind Load Building Connections
22 Roofing Systems Built-up Roofing Systems Metal Roofing Systems
23 Roofing Systems The most important component in regards to wind-related storm damage. Ensure the wall/ceiling to roof connections can withstand the wind loads.
24 Roofing Systems
25 Roofing Systems The most important Component in regards to Wind Related Storm Damage. Ensure the wall/ceiling to roof connections can withstand the wind loads. Ensure that the roof panels/ shingles are installed as per the manf. Recommendations.
26 Roofing Systems
27 Roofing Systems Cont. Written Manufacturer s Warranties Corrosion resistant materials including fasteners.
28 Roofing Systems Consider your environment High Humidity Salt Spray
29 Roofing Systems Cont. Written Manufacturer s Warranties Corrosion resistant materials including fasteners. Make sure the roof drains properly.
30 Roofing Systems
31 Roofing Systems Cont. Written Manufacturer s Warranties Corrosion resistant materials including fasteners. Make sure the roof drains properly. Make sure all items attached to the roof are properly installed such as fans, rooftop units, etc.
32 Roofing Systems
33 Window Systems Storefront Systems Individual Windows
34 Window Systems Must meet IBC wind loads in the building location. Corrosion resistant materials including fasteners. In areas with a wind load of 120 mph or greater, the windows must be large missile impact rated.
35 Window Systems Cont. Must be installed as per the manufacturer s recommendations.
36 Window Systems
37 Window Systems Cont. Must be installed as per the manufacturer s recommendations. Glass must be shatterproof as per AASHTO requirements.
38 Miscellaneous Components Window Units External Ductwork External Piping
39 Window Units Make sure the air conditioning unit is secured to the building.
40 External Ductwork Make sure the ductwork is secured to handle the wind loads in the area.
41 External Ductwork Although the ductwork was securely mounted to the roof, damage occurred due to the ductwork itself failing.
42 External Piping Avoid using PVC piping exposed above ground. Piping should be rigidly supported to the bridge with marine grade fasteners.
43 Summary Know your location within the state prior to designing the building. Know the building elevation for both Flood and Wind Load Design. Use materials based on your environment. Make sure all building connections and components meet wind load requirements. Secure all external items to resist the wind/flood loads in the location of the Operating House.
44 Questions?
Insurance Property Risk Engineering GAPS. WaterWorks
Insurance Property Risk Engineering GAPS WaterWorks 1 Introduction 2 How to Mitigate Water Damage 3 How to Prevent Water Ingress Damage 5 Loss Prevention Measures for Fire Sprinklers 6 Notes Introduction
More informationInsurance Property Risk Engineering GAPS. WaterWorks
Insurance Property Risk Engineering GAPS WaterWorks 1 Introduction 2 How to Mitigate Water Damage 3 How to Prevent Water Ingress Damage 5 Loss Prevention Measures for Fire Sprinklers 6 Notes Introduction
More informationICC/NSSA STANDARD FOR THE DESIGN AND CONSTRUCTION OF STORM SHELTERS ICC
Standards Action - May 2, 2014 - Page 43 of 50 Pages International Code Council ICC/NSSA STANDARD FOR THE DESIGN AND CONSTRUCTION OF STORM SHELTERS ICC 500-2013 edition Public Comment Draft #3 The ICC
More informationCONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist
CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist This checklist is a convenient reference to the 2012 Michigan Building Code. The checklist
More informationSection X - Miscellaneous
Section X - Miscellaneous A. Introduction This section provides design criteria, specific requests/recommendations and preferences related to specifying and constructing systems and materials used in HRSD
More informationSection 32 - Miscellaneous
Section 32 - Miscellaneous A. Introduction This section provides design criteria, specific requests/recommendations and preferences related to specifying and constructing systems and materials used in
More informationWIND, WATER & SALT BEST PRACTICES AND CODE REQUIREMENTS FOR DESIGN IN A TROPICAL ENVIRONMENT
Presents WIND, WATER & SALT BEST PRACTICES AND CODE REQUIREMENTS FOR DESIGN IN A TROPICAL ENVIRONMENT Mike Bishop, PE, LEED AP DESCRIPTION Designing HVAC systems for educational facilities in Florida goes
More informationFull-Scope Commissioning for High-Quality Buildings
Full-Scope Commissioning for High-Quality Buildings Pieter L. van der Mersch, PE, QCxP University of Colorado Boulder 21 st National Conference on Building Commissioning AIA Quality Assurance The Building
More information2004 MASTER FORMAT SECTION Façade Panels
2004 MASTER FORMAT SECTION 07 44 00 Façade Panels Hunter Douglas Façades Aluminum Façade Systems PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General
More informationKEEPING UP WITH I-CODES
KEEPING UP WITH I-CODES 54 www.professionalroofing.net MARCH 2015 Changes to the 2015 I-codes affect roof system designs by Mark S. Graham Model codes, such as those developed by the International Code
More informationField Planning and Data Collection Practices for Conducting Detailed Natural Hazard Vulnerability Assessments of Campus Structures
University of New Orleans ScholarWorks@UNO DRU Workshop 2013 Presentations Disaster Resistant University Workshop: Linking Mitigation and Resilience Conferences and Workshops 3-1-2013 Field Planning and
More informationMEP Seismic & Wind Provisions of ASCE Prepared for the 2017 Rochester Engineering Symposium Richard Sherren, P.E.
MEP Seismic & Wind Provisions of ASCE 7-10 Prepared for the 2017 Rochester Engineering Symposium Richard Sherren, P.E. 1 New York State Model Building Code The state of New York has adopted the 2015 International
More informationProperty Condition Assessment
Property Condition Assessment Pewaukee, WI 53072 Inspection Date: 1/6/15 Prepared For: Report Number: Prepared By: Shamrock Building Inspection Consultants LLC N29 W29951 Shel-Mar Dr. Pewaukee, WI 53072
More informationStorm Damage Repair Requirements
Storm Damage Repair Requirements A Guide to Navigating the Existing Building Code 1st Edition 516.621.2900 info@jsheld.com jsheld.com Overview When performing inspections of buildings or structures after
More informationTEXAS A&M ENGINEERING
TEXAS A&M ENGINEERING 312 Jack K. Williams Administration Building I 3126 TAMU I College Station, Texas 77843-3126 M. Katherine Banks, Ph.D., P.E. Vice Chancellor and Dean of Engineering Director, Texas
More informationCONSTRUCTION MATERIALS
CONSTRUCTION MATERIALS T E C H N O L O G I E S LABORATORY TEST RESULTS Report for: Dymotek Date: September 7, 2010 7 Main St., P.O. Box 440 Revised: December 17, 2010 Ellington, CT 06029 Attention: Tom
More informationDamaged Buildings and Health Facility Evaluations
Damaged Buildings and Health Facility Evaluations Hurricanes and Health Care Conference Harborview Center Clearwater, Florida June 18, 2009 Skip Gregory, NCARB Bureau Chief Office of Plans and Construction
More informationBusiness License Application
Business License Application Corporate / parent company: Corporate address: Corp. Phone #: Fax #: Local Contact name: Phone #: Mobile #: Missouri Tax Number: Federal employee ID #: Certificate of Workman
More informationICC-SRCC LISTING. DIVISION: PLUMBING Section: Residential Solar Domestic Water Heater System
ICC-SRCC LISTING SRCC TM Solar Heating & Cooling Code & Standard Listing Program Listing Number: SRCC-16004 Effective Date: May 27, 2017 This listing is subject to re-examination in one year. www.solar-rating.org
More information9th Edition Residential Volume with MA Amendments - Flood Standards Only DRAFT. 9th Edition Massachusetts Residential Code Requirements in Floodplains
9th Edition Massachusetts Residential Code Requirements in Floodplains This unofficial document was prepared to serve as a guide for using the flood standards in the Massachusetts Building Code 9th Edition
More informationFOR GENERATING SYSTEMS
Understanding IBC Wind Load Requirements FOR GENERATING SYSTEMS AUTHOR PUNEET SOMAN Staff Engineer KOHLER Power Systems INTRODUCTION It is important for standby power system enclosures to withstand loads
More informationWater Management & Damage Prevention: A Guide for Homeowners
Water Management & Damage Prevention: A Guide for Homeowners This article provides homeowners with basic information to make these decisions and take the appropriate actions to keep their homes dry and
More informationSECTION ADDENDUM NUMBER ONE
Softball Field Repairs and Upgrades 03 February 2012 University of South Carolina Upstate State Project Number: H34-I350 DP3 Architects Project Number: 11124 GENERAL INFORMATION SECTION 00 09 10 ADDENDUM
More informationMichael Teller, CBI Consulting Inc. Gymnasium & Auditorium Restoration at South Middle School
A D D E N D U M # 1 DATE: TO: FROM: PROJECT: All Bidders Michael Teller, CBI Consulting Inc. Gymnasium & Auditorium Restoration at South Middle School CBI JOB NO.: 11063 The following items shall modify
More informationADJUSTABLE PIPING SUPPORT PRODUCT BROCHURE
ADJUSTABLE PIPING SUPPORT PRODUCT BROCHURE OVERVIEW REVOLUTIONARY VERSATILE EFFICIENT The Roof Top Blox is a revolutionary roof top support block system that works with height extension rods, securing
More information1 AND 2 FAMILY DWELLING REQUIREMENTS
PLAN REQUIREMENTS: 1 AND 2 FAMILY DWELLING REQUIREMENTS All residential plans including additions and attached garages shall be designed to the current edition of the International Residential Code. Plans
More informationADJUSTABLE PIPING SUPPORT PRODUCT BROCHURE
ADJUSTABLE PIPING SUPPORT PRODUCT BROCHURE OVERVIEW REVOLUTIONARY VERSATILE EFFICIENT The Roof Top Blox is a revolutionary roof top support block system that works with height extension rods, securing
More informationVMA C (Revision 2)
Certification No. VMA-45784-01C (Revision 2) Certification Parameters: Expiration Date: 05/04/2015 The nonstructural products (mechanical and/or electrical components) listed on this certificate are CERTIFIED
More information: Plan Review and Project Services
01 34 10: Plan Review and Project Services November 7th, 2014 Contact Information Tony Schifiliti, Consultant Engineer Office: 781-440-8630 Cell: 617-771-2350 Anthony.Schifiliti@fmglobal.com George Schork,
More informationChapter UNIFORM CODES FOR CONSTRUCTION BUILDING CODE
Chapter 23.12 UNIFORM CODES FOR CONSTRUCTION BUILDING CODE 23.12.010 Adoption of the 2010 California Building Code. Part 2. Title 24 of the California Code of Regulations. There is adopted and incorporated
More informationAPPLICATION AND CERTIFICATE FOR PAYMENT
AND CERTIFICATE FOR PAYMENT TO OWNER: MASTER TEMPLATE - SAVE PROJECT FILE 1 DATE: 10/5/2012 PERIOD TO: ARCHITECT: PROJECT NO: CONTRACTOR'S FOR PAYMENT Application is made for payment, as shown below, in
More informationReclaimed Water Treatment, Distribution, Pumping and Storage Engineering Report Form
Oklahoma Department of Environmental Quality Water Quality Division Phone: 405-702-8100 Construction Permitting Section 707 N. Robinson, OKC, OK 73102-6010 P.O. Box 1677, OKC, OK 73101-1677 Reclaimed Water
More information6 Holub Middle School Overall Site Plan Gymnasium Floor Plan Exterior Perspective Before Exterior Perspective - After
Contents 1 Program Outline Gymnasium Restrooms Storage rooms IDF 2 Finish Outline Walls Flooring Ceiling Roof 3 MEP Outline Plumbing Mechanical Electrical 4 Communication and Security Guideline Communication
More informationSECTION ROOF MOUNTED ATTIC EXHAUST VENT
SECTION 07 72 00 ROOF MOUNTED ATTIC EXHAUST VENT **This is a CSI Three-Part Specification using CSI MasterFormat 2004-2010 Section Numbers and Titles. This specification must be edited to suit your particular
More information2015 Virginia Building Code Changes As Related to Flood Items. September 27, 2018 Southwest Virginia VFMA Workshop
2015 Virginia Building Code Changes As Related to Flood Items September 27, 2018 Southwest Virginia VFMA Workshop Ken Somerset, CBO, CZA, CFM City of Poquoson Kenneth Somerset Building Official Floodplain
More informationRoof System. and Considerations. Environment friendly e-library
Sustainable Roof System Design Drivers and Considerations Environment friendly e-library Sustainable Roof System Design Drivers Sustainable Roof System Design Drivers Buildings use about 50% of all energy
More informationIBHS Shutter Selection Guide
IBHS Shutter Selection Guide Guide to Shutter Installation Visit DisasterSafety.org for more information on protecting your home. 1 Guide to Shutter Installation Keeping wind and water out is critical
More informationSECTION ELECTRICAL POWER ATTIC EXHAUST VENTILATOR
SECTION 07 72 00 ELECTRICAL POWER ATTIC EXHAUST VENTILATOR **This is a CSI Three-Part Specification using CSI MasterFormat 2004-2010 Section Numbers and Titles. This specification must be edited to delete
More informationSILVER LINE BUILDING PRODUCTS. Series 1700 Heavy Commercial Aluminum Double Hung. HC65 48 x84 / HC50 60 x96 Replacement Window
DIVISION 08 / SECTION 08505 METAL WINDOWS SILVER LINE BUILDING PRODUCTS SPECIFICATIONS: GENERAL Series 1700 Heavy Commercial Aluminum Double Hung 1. SECTION INCLUDES 2. RELATED SECTIONS 3. QUALITY ASSURANCE
More information3 Season Porch Windows
3 Season Porch Windows Technical Information Quad pulley balance system for smooth and reliable operation Stainless steel aircraft cable supports the counterbalanced sashes for easy ventilation Dual sashes
More informationMaintaining Building Envelope Integrity. Is Your Leak REALLY a Roof Leak?
Maintaining Building Envelope Integrity Is Your Leak REALLY a Roof Leak? Learning Objectives: At the end of the program, participants will be able to: Recognize what is, and what is not, a roof leak. Identify
More informationCLEAR CREEK COUNTY BUILDING DEPARTMENT PERMIT PROCEDURES AND REQUIREMENTS FOR COMMERCIAL AND MULTI-FAMILY DEVELOPMENTS
CLEAR CREEK COUNTY BUILDING DEPARTMENT PERMIT PROCEDURES AND REQUIREMENTS FOR COMMERCIAL AND MULTI-FAMILY DEVELOPMENTS After all of your other permits have been issued and your construction plans and site
More informationFEMA P-1019 Emergency Power Systems for Critical Facilities. ASFPM May 4, 2017 David K Low, PE DK Low & Associates
FEMA P-1019 Emergency Power Systems for Critical Facilities ASFPM May 4, 2017 David K Low, PE DK Low & Associates FEMA P-1019 FEMA P-1019 A critical facility that is fully compliant with the minimum building
More informationPERMIT APPLICATION REQUIREMENTS NEW RESIDENTIAL (SFD) POOL
PERMIT APPLICATION REQUIREMENTS MANDATORY DOCUMENTS: NEW RESIDENTIAL (SFD) POOL CODES USED: CURRENT ADOPTED FLORIDA BUILDING CODE AND NEC 1. COMPLETED RESIDENTIAL (SFD) POOL PERMIT APPLICATION PACKET.
More informationCity of South Pasadena COMMUNITY IMPROVEMENT
City of South Pasadena COMMUNITY IMPROVEMENT Office Address: Mailing Address: 6940 Hibiscus Ave S 7047 Sunset Dr S South Pasadena, FL 33707 South Pasadena, FL 33707 *PHONE: (727) 343-4192 * FAX: (727)
More informationSECTION TURBINE VENTILATORS
SECTION 07 72 00 TURBINE VENTILATORS **This is a CSI Three-Part Specification using CSI MasterFormat 2004-2010 Section Numbers and Titles. This specification must be edited to suit your particular project.
More informationCOMPLETE REVISION October Process Industry Practices Civil. PIP CVC01017 Plant Site Data Sheet
COMPLETE REVISION October 2011 Process Industry Practices Civil PIP Plant Site Data Sheet PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities,
More informationBuilding Inspection Report
Building Inspection Report Sample Commercial Inspection Report Inspection Date: Prepared For: Prepared By: Professional Property Inspection Consultants 4857 Winterset Drive Columbus, OH 43220 (614) 459-5941
More informationCity of Grosse Pointe Park Sanitary Sewer System Inflow and Infiltration Investigation Smoke Testing
City of Grosse Pointe Park Sanitary Sewer System Inflow and Infiltration Investigation Smoke Testing August 2017 Definitions Sanitary Sewer System Sanitary sewer pipes and pump stations that collect wastewater
More informationRetail Effects of ANSI/ASHRAE/IES Standard
Retail Effects of ANSI/ASHRAE/IES Standard 90.1-2016 Prepared by Dialectic Inc. INTRODUCTION Background ANSI/ASHRAE/IES 90.1-2016 Energy Standard for Buildings Except Low-Rise Residential Buildings replaces
More informationINSPECTION REQUIREMENTS Page 1 of 5. JOB SITE ADDRESS posted during entire construction process.
INSPECTION REQUIREMENTS Page 1 of 5 JOB SITE ADDRESS posted during entire construction process. JOB PLACARD POSTED IN PLAIN SIGHT: GREEN Placard - Building, ORANGE Placard Electrical, BLUE Placard - HVAC,
More informationTohono O odham Nation. Adoption of Building Codes
Tohono O odham Nation Adoption of Building Codes History; International Building Code (IBC) In 1915, the Building Officials and Code Administration (BOCA) was established. This organization developed what
More informationDepartment of Public Safety and Corrections Uniform Construction Code Council. Uniform Construction Code (LAC 55:VI.301)
Department of Public Safety and Corrections Uniform Construction Code Council Uniform Construction Code (LAC 55:VI.301) In accordance with the provisions of R.S. 40:1730.26 and R.S. 40:1730.28, relative
More informationBridge Maintenance Painting Projects Design and Management Considerations
Bridge Maintenance Painting Projects Design and Management Considerations A Presentation to the 2018 Louisiana Transportation Conference Baton Rouge, Louisiana Are we still making progress? Things are
More informationPERMIT APPLICATION REQUIREMENTS
PERMIT APPLICATION REQUIREMENTS MANDATORY DOCUMENTS: ACCESSORY STRUCTURE (Shed, storage building, pergola, gazebo, arbor, etc.) CODES USED: CURRENT ADOPTED FLORIDA BUILDING CODE & NEC 1. COMPLETED BUILDING/CONSTRUCTION
More informationICC-SRCC LISTING. DIVISION: PLUMBING Section: Residential Solar Domestic Water Heater System
ICC-SRCC LISTING ICC-SRCC Solar Thermal Listing Program Listing Number: SRCC-16004 Effective Date: May 31, 2018 This listing is subject to re-examination in one year. www.solar-rating.org (888) 422-7233
More informationDISASTER PREPAREDNESS CHECKLIST
Are you prepared for severe weather? Natural disasters are on the rise, putting your property at-risk. Homeowners should take the necessary precautions to minimize property damage before disaster strikes.
More informationElastomeric Protected Membrane Roofing Fluid-Applied Protected Membrane Roofing. Restoration Coating System (RCS) over Cap Sheet
07 55 53 Elastomeric Protected Membrane Roofing 07 55 56 Fluid-Applied Protected Membrane Roofing Restoration Coating System (RCS) over Cap Sheet PART 1 - GENERAL 1.1 SUMMARY A. This specification covers
More informationAurora Genmounts Install LT Installation Manual
Aurora Genmounts Install LT Installation Manual TABLE OF CONTENTS 1.0 INTRODUCTION 2.0 PRODUCT OVERVIEW 3.0 TECHNICAL SPECS 4.0 INSTALLER RESPONSIBILITY 5.0 SITE SELECTION 6.0 TOOLS REQUIRED 7.0 COMPONENT
More informationICC/NSSA STANDARD FOR THE DESIGN AND CONSTRUCTION OF STORM SHELTERS
ICC/NSSA STANDARD FOR THE DESIGN AND CONSTRUCTION OF STORM SHELTERS ICC 500-2013 edition Public Comment Draft #2 The ICC Consensus Committee on Storm Shelters has held 1 public meetings to develop the
More informationKOCHVILLE TOWNSHIP REQUIRED INFORMATION FOR CONSTRUCTION PLAN REVIEW COMMERCIAL AND MULTI-FAMILY
KOCHVILLE TOWNSHIP REQUIRED INFORMATION FOR CONSTRUCTION PLAN REVIEW COMMERCIAL AND MULTI-FAMILY Please note that this is not an all-inclusive list. The type and complexity of your project may require
More informationNassau County Building Department
July 6, 2018 Nassau County Building Department Inspection Types ALL INSPECTION REQUESTS ARE REQUIRED TO BE INITIATED BY THE PERMIT HOLDER, ALL INSPECTION REQUESTS SHALL SUPPLY THE PERMIT NUMBER FOR EACH
More informationExhibit A Library Shell Construction
Exhibit A Library Shell Construction Library Component Building Requirements Approximately 15,000-17,000 square feet plus 900 square feet for mechanical room and additional space on roof for installation
More informationCommittee Input No NFPA [ New Section after ]
of 2 http://submittals.nfpa.org/terraviewweb/formlaunch?id=/terraview/c... 10/26/2015 1:41 PM Committee Input No. 1006-NFPA 5000-2015 [ New Section after 37.1.4.2 ] Add new Sections as follows. 37.1.5
More informationDESIGNING SAFE ROOMS AND SAFE HOMES WITH LOGIX.
. Actual ICF-Built Home That Survived Katrina Table of Contents Section Page Overview Logix Wind Resistance Advantages...3 Logix Wall Engineering To 300 MPH Wind Rating...6 Fema-Compliant Design Specifications
More information2014 Advanced FBC Fifth Edition Chapter 15 Florida Specific Review
2014 Advanced FBC Fifth Edition Chapter 15 Florida Specific Review Mark Zehnal, CPRC Florida Roofing & Sheet Metal Contractors Association FRSA Director of Technical Services 2012 International Building
More informationMASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 08 - OPENINGS. A. This Section includes fixed and operable aluminum-framed windows.
SECTION 085113 - ALUMINUM WINDOWS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes fixed and operable aluminum-framed windows. 1.2 PERFORMANCE REQUIREMENTS A. General: Provide aluminum windows capable
More informationEncapsulated, Sealed & Closed Crawlspace Installation Manual
YourCrawlSpace, Inc. 1007 Johnni4 Dodds Blvd. Mt. Pleasant, SC 29464 Toll Free: 877-44-CRAWL (27295) Local: (843) 593-1115 Encapsulated, Sealed & Closed Crawlspace Installation Manual Copyright 2017 Your
More informationD. Provide UL-approved assemblies for pipes and ducts passing through fire-rated floors, walls, or partitions as required.
PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
More informationG R E E N H O U S E D E S I G N M A N U F A C T U R I N G FEATURED GREENHOUSE PACKAGES
S t u ppy, Inc. G R E E N H O U S E D E S I G N M A N U F A C T U R I N G FEATURED GREENHOUSE PACKAGES STUPPY, INC. BRINGING STRUCTURE TO A NATURAL WORLD S t u p p y, I n c. G r e e n h o u s e d e s i
More informationWeatherSmart Air Barrier Installation Guide
WeatherSmart Air Barrier Installation Guide 1 The intent of this document is to provide a guide for the installation of WeatherSmart as both a Weather Resistive Barrier (W.R.B.) and an Air Barrier Material
More informationINSTALLING WATER-RESISTIVE BARRIERS & FLASHING
INSTALLING WATER-RESISTIVE BARRIERS & FLASHING IN A TWO-LAYER STUCCO APPLICATION Fortifiber Building Systems Group provides this guide to assist installers by demonstrating a two-layer installation of
More informationCEILING MOUNTED ARTICULATING JIB CRANE
SECTION 14657 CEILING MOUNTED ARTICULATING JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station
More informationUnderstanding IBC Wind Load Requirements for Generating Systems
Understanding IBC Wind Load Requirements for Generating Systems By: Allan Bliemeister Senior Staff Engineer Kohler Power Systems It is important for standby power system enclosures to withstand loads produced
More informationShowing Only Sections Changed 6 th Edition FBC (2017) from 5 th Edition FBC (2015) [changes shown with underline and strike-through]
Showing Only Sections Changed 6 th Edition FBC (2017) from 5 th Edition FBC (2015) [changes shown with underline and strike-through] This publication reproduces excerpts from the Florida Building Code,
More informationBorough of Doylestown Building and Zoning Department
Borough of Doylestown Building and Zoning Department 57 West Court Street, Doylestown, PA 18901 215.345.4140 RESIDENTIAL BUILDING AND ZONING PERMIT APPLICATION PACKAGE BACKGROUND A building permit is required
More informationCWRP WEEKLY CONSTRUCTION PROGRESS REPORT Week ending April 20, 2013
CWRP WEEKLY CONSTRUCTION PROGRESS REPORT Week ending April 20, 2013 RIVER DIVERSION SEGMENT This week on the River Diversion, Ducworks completed the steel pipe installation below the waterline elevation.
More informationDesign & Construction Standards, Revised January
PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
More informationPRE-FABRICATED HOUSING
Building Department 200 W. Oak Street 3 rd Floor Fort Collins, CO 80521 970-498-7700 www.larimer.org/building PRE-FABRICATED HOUSING PRE-FABRICATED HOUSING When you are buying a pre-fabricated home, you
More informationAdministration Building Needs Assessment
Town Hall Meeting with the Habersham County Board of Commissioners Administration Building Needs Assessment JUNE 13, 2016 Detailed Evaluation Performed in 2015 Engineering Evaluation Site/Civil Architectural
More informationCentral Station Air Handler Specification
Central Station Air Handler Specification PART 1: GENERAL 1.01 WORK INCLUDED (Model CS 3 ) Mechanical Specification A. Provide complete air handling unit(s) suitable for indoor installation. Contractor
More informationACP Greater Tampa Bay Mitigation as a Precursor to Recovery
. ACP Greater Tampa Bay Mitigation as a Precursor to Recovery Wednesday, September 25, 2013 Chuck Miccolis Commercial Lines Engineer URL to Previous Slide s Video http://vimeo.com/60451146 How does IBHS
More informationROOF OWNER'S OPERATION AND MAINTENANCE MANUAL
ROOF OWNER'S OPERATION AND MAINTENANCE MANUAL Table of Contents Section Title Page Section 1.0 General Maintenance Statement 2 Section 2.0 Safety 2 Section 3.0 Inspections 2-4 Section 4.0 Repairs 4 Section
More informationRead Only Copy Not For Distribution. Chapter 17. Private Potable Water Supply Systems 17.1 GENERAL REGULATIONS 17.2 QUANTITY OF WATER REQUIRED
Chapter 17 Private Potable Water Supply Systems 17.1 GENERAL REGULATIONS 17.1.1 Applicability The regulations in this chapter apply to any private potable water supply system where plumbing fixtures are
More informationCLEAR CREEK COUNTY BUILDING DEPARTMENT REQUIREMENTS FOR A SINGLE FAMILY RESIDENCE
CLEAR CREEK COUNTY BUILDING DEPARTMENT REQUIREMENTS FOR A SINGLE FAMILY RESIDENCE After all of your other permits have been issued and your construction plans and site plan have been approved by the other
More informationNATIONWIDE SAN ANTONIO SALES & SERVICE CENTER
SECTION 21 05 31 SEISMIC CONTROLS AND WIND RESTRAINTS PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Not Applicable 1.02 SUMMARY A. This section includes the design, application and installation of seismic and
More informationREHABILITATION STANDARDS CHECKLIST
Project Name Date Built Date Last Rehabilitated (If applicable) EXTERIORS REHABILITATION STANDARDS CHECKLIST ROOF Age (Yrs) Poor Fair Good Excellent Roof /Pitch/Flat # of Layers Substrate Material Insulation
More informationCommercial Remodel Permit
Commercial Remodel Permit Zoning requirements Staff recommends always verifying the zoning requirements for your project before deciding to build. Warrensburg has eleven separate zoning districts, each
More informationA. ASTM E 84 - Standard Test Method for Surface Burning Characteristics of Building Materials
PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
More informationMills Elementary School Site Summary
1 Mills Elementary School Site Summary Address 6201 Davis Lane Austin, TX 78749 Number of Permanent Campus Facilities 1 Original Year of Construction 1998 Total Campus Building Area (combined) 81,368 SF
More informationSECTION ORNAMENTAL ALUMINUM RAILINGS PART 1 - GENERAL 1.01 SUMMARY
3-PART SPEC ORNAMENTAL ALUMINUM RAILINGS PART 1 - GENERAL 1.01 SUMMARY SECTION 05720 A. Section Includes: a. Solutions aluminum extruded shape top rail, square or round balustrade & rectangular bottom
More informationDuPont Tyvek Wall Underlay Install Guide
DuPont Tyvek Wall Underlay Install Guide (For Residential & Light Commercial Buildings) Acceptable Solution to NZBC E2/AS1 New Zealand As at 1/4/15 Version 2 Subject to change without notice DuPont Tyvek
More informationCOVER SHEET ELEVATION SHEET SECTION DETAILS (MECHANICALLY ASSEMBLY) SECTION DETAILS (WELDED ASSEMBLY)
COVER SHEET ELEVATION SHEET SECTION DETAILS (MECHANICALLY ASSEMBLY) SECTION DETAILS (MECHANICALLY ASSEMBLY) SECTION DETAILS (WELDED ASSEMBLY) SECTION DETAILS (WELDED ASSEMBLY) SECTION DETAILS (DOOR ASSEMBLY)
More informationAPPENDIX 6 (not yet reviewed by UCCS) STRUCTURAL ANALYSIS/VIBRATION CRITERIA
APPENDIX 6 (not yet reviewed by UCCS) STRUCTURAL ANALYSIS/VIBRATION CRITERIA GENERAL The purpose of this standard is to identify structural submittal requirements, as well as identify vibration design
More informationSECTION LATCHWAYS CONSTANT FORCE POSTS
PART 1 GENERAL 1.1 SYSTEM DESCRIPTION SECTION 112429 LATCHWAYS CONSTANT FORCE POSTS A. Type of system required: Constant Force Posts (CFP(s)) Use with Latchways Lifeline or single point anchors B. System
More information2. DEFINITIONS. American Association of State Highway and Transportation Officials.
2. DEFINITIONS 2.010 Definitions [See Amendment 2] In addition to words and terms that may be defined elsewhere in this manual, the following words and terms shall have the meanings defined below: AASHTO:
More information2018 Manufactured Homes and Factory Built Housing
2018 Manufactured Homes and Factory Built Housing Routt County Regional Building Department (RCRBD) is a Participating Jurisdiction in the Mobile Home Inspection Program (MHIP) approved by the Colorado
More informationTABLE OF CONTENTS. (Δ = Rev 06/08)
TABLE OF CONTENTS (Δ = Rev 06/08) INTRODUCTION REQUEST FOR REVISION FORMS TAB A TABLE OF CONTENTS TAB B PROCEDURES B-9 Record Drawings B-10 Variance Procedure B-11 Surface Water Procedures (New Section)
More information2015 I-Code Highlights
2015 I-Code Highlights International Building Code Fire service access elevators in high rises are required to be able to accommodate a 24 x84 stretcher (size unspecified in the 2012 code). (Section 403.6.1;
More information