1 1 of 5 SUBJECT: FIXED SAFETY LADDER - PITS I. PURPOSE To establish a standard safety device to supplement presently installed pit ladders for entering or leaving a pit and to provide a standard for future construction of fixed pit ladders. REFERENCE Plant Engineering & Environmental Planning Office Procedure No Federal and State Occupational Safety & Health Acts M.T.I. SMI-110, "Safety & Health Requirements for Work in Confined Spaces" M.T.I. SMI-107, "Procedure for Neutralizing and Locking Out Sources for Machinery, Equipment and Facilities Services" II. FUNCTIONS AFFECTED Manufacturing Engineering Facilities Engineering Employee Safety Industrial Hygiene Security and Fire Prevention Services III. OPERATIONS AFFECTED Chrysler Corporation IV. INFORMATION Common practice has been to bed steel ladder rounds in the pit as the pit walls are being poured. Ladders of this construction generally have their top rung somewhere below floor level, which results in a difficult and unsafe maneuver required by personnel due to the lack of sufficient devices from which hand and arm support may be obtained. Exhibit "A" (attached) indicates a method which will provide arm support to personnel entering pits. In certain plants and locations, the practice has been to embed straight ladder rounds diagonally across a corner of the pit, imbedding one end of the rod in each of two(2) intersecting walls. Installations of this type are still capable of using the device illustrated in Exhibit "A" although a modification will have to be made to suit actual field conditions.

2 2 of 5 V. INSTRUCTION A. Procedure The following procedure should be used when entering pits: B. Use C. Safety 1. Notify area supervisor. 2. Shut off machine if present. 3. Lock out all power sources as outlined in M.T.I. SMI Install barricade or sawhorses around area to be opened up. 5. Remove cover, cover plates or planking over pit. 6. Reach down, grasp chain, and raise pipe in vertical direction. 7. Insert chain pipes into stationary pipe holders. 8. Enter pit following procedure as outlined in M.T.I. 9. Upon leaving, remove pipes from holders and drop down into pit, then replace pit cover. The device, as illustrated in Exhibit "A", or as modified to meet actual field conditions, should be installed in all pits requiring ladders. Installation may be performed by maintenance personnel. The device shall be made an integral part of all new pit installations. Two(2) additional changes should be made to pit ladders to increase safety and minimize the danger of failing. 1. Weld a piece of safety grating three inches (3") wide by the approximate width of the ladder rung to the top of each rung (See Exhibit A). This provides a non-skid surface and a better support for the foot.

3 3 of 5 2. Weld a pipe or rod in the corner of the radii of the ladder rungs (See Exhibit A). This provides a stop for a mans foot and prevents a foot from slipping off the side of the rung. VI. New Construction or Modification of Pit Ladders New construction or modification of pit ladders shall conform to current Federal and State standards governing the installation of pit ladders. A. The weight of the ladder and attached appurtenances together with the live load shall be considered in the design of rails and fastenings. B. The rungs of an individual-rung ladder shall be so designed that the foot cannot slide off the end (See Exhibit B). C. Ladders formed by individual metal rungs imbedded in concrete which serve as access to pits shall have a minimum diameter of one inch (1"). See Exhibit B. D. Where pit atmospheres may cause corrosion or rusting, ladder rungs or metal ladders shall be painted or treated to prevent deterioration. E. The distance between rungs, cleats, and steps shall not exceed twelve inches (12") and shall be uniform throughout the length of the ladder. See Exhibits "A" and "B". F. The distance from center line of rungs, cleats, or steps to the nearest permanent object in back of the ladder shall not be less than seven inches (7"). G. All ladders shall be maintained in a safe condition. All ladders shall be -inspected regularly, with the intervals determined by use and exposure.

4 4 of 5

5 5 of 5

6 6 of 5

7 7 of 5

Effective Date: 14-March Table of Contents

Effective Date: 14-March Table of Contents Version: 2 Page: 1 of 10 Table of Contents 1.0 Introduction... 2 1.1 Purpose... 2 1.2 Scope... 2 1.3 Definitions... 2 2.0 Guarding of Floor Openings, Wall Openings and Holes... 3 2.1 Stairway Floor Openings...

More information

Product Guide Specification

Product Guide Specification ALGRIP Manufactured by April 2017 104 North Maple Avenue P.O. Box 646 Leola, Pennsylvania 17540 Toll Free 800-345-8170 Fax 717-656-2041 Website www.algrip.com / www.rosstechnology.com E-mail sales@rosstechnology.com

More information

Reliant Holdings Ltd Safety Management System

Reliant Holdings Ltd Safety Management System Preparation: Safety Mgr Authority: President Issuing Dept: Safety Page: Page 1 of 7 Purpose The purpose of this program is to prevent injuries due to falls from elevated work areas and ensure employees

More information

Universal Panels & Accessories

Universal Panels & Accessories Universal Panels & Accessories Erection Procedures INTRODUCTION Use common sense when working with Scaffold Your Safety is our #1 Concern Universal Scaffolds are designed with your safety in mind every

More information

Scaffolding. Safety Guide. STOP! Before you climb

Scaffolding. Safety Guide. STOP! Before you climb Scaffolding Safety Guide Printed FEB 2015 rebr. AUG 2016 Contents Safety Guide Disclaimer... 1 Safety Guide Objectives... 2 Roles & Responsibilities of Workplace Parties Employers, Supervisors, Workers...

More information

STANDARD PRACTICE INSTRUCTION

STANDARD PRACTICE INSTRUCTION STANDARD PRACTICE INSTRUCTION DATE: March 1, 2001 SUBJECT: Scaffolding Safety Program. REGULATORY STANDARDS: 29 CFR 1910.28 Safety Requirements For Scaffolding. 29 CFR 1910.29 Manually Propelled Mobile

More information

SPECIFICATION SECTION 05515: LADDERS O Keeffe s Aluminum Ladders

SPECIFICATION SECTION 05515: LADDERS O Keeffe s Aluminum Ladders Welcome to the O Keeffe s Guide Specification System prepared as an aid to specify in preparing written construction documents. For specification assistance with specific product applications, please contact

More information

DEPAUL UNIVERSITY. Scaffolding Program. Environmental Health & Safety. April 2017

DEPAUL UNIVERSITY. Scaffolding Program. Environmental Health & Safety. April 2017 DEPAUL UNIVERSITY Scaffolding Program Environmental Health & Safety April 2017 1 TABLE OF CONTENTS SECTION PAGE NO. 1.0 PURPOSE 2 2.0 SCOPE 2 3.0 SCAFFOLDING ERECTOR 2 4.0 GENERAL 2 5.0 WOOD SCAFFOLDING

More information

SECTION VIBRATION ISOLATION

SECTION VIBRATION ISOLATION SECTION 15240 VIBRATION ISOLATION PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 15450 - Plumbing Equipment. 2. 15510 - Piping (HVAC). 3. 15515 Valves, Hangers, and Specialties. 4. 15540 - Pumping

More information

SECTION REINFORCING STEEL

SECTION REINFORCING STEEL SECTION REINFORCING STEEL 1. DESCRIPTION This specification shall govern the furnishing and placing of reinforcing steel, deformed and smooth, of the size and quantity designated on the plans and in accordance

More information

Corporate Safety Procedure Grid Mesh, Handrail and Flooring Removal. Table of Contents

Corporate Safety Procedure Grid Mesh, Handrail and Flooring Removal. Table of Contents Table of Contents 1. Purpose... 2 2. Scope... 2 3. Roles and Responsibilities... 2 3.1 Manager/Supervisor... 2 3.2 Workers... 2 3.3 Technical Specialist/Engineer... 2 4. Definitions... 2 5. Procedure...

More information

Scaffolding and Raised Platforms

Scaffolding and Raised Platforms Standard Operating Procedures Scaffolding and Raised Platforms Last Modified: JAN 2013 1 of 7 Scaffolding and Raised Platforms I Purpose To provide a guideline for personnel who work around or on stationary

More information

Flotation Docking Systems, Inc.

Flotation Docking Systems, Inc. GENERAL SPECIFICATIONS The following data outlines the design calculations and specifications around which Flotation Docking Systems, Inc. products are constructed. The use of such information for contract

More information

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS SECTION 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and

More information

DUQUESNE UNIVERSITY SAFETY PROGRAM FOR WORKING AT ELEVATED HEIGHTS

DUQUESNE UNIVERSITY SAFETY PROGRAM FOR WORKING AT ELEVATED HEIGHTS DUQUESNE UNIVERSITY SAFETY PROGRAM FOR WORKING AT ELEVATED HEIGHTS Prepared by: Environmental Health and Safety Department TABLE OF CONTENTS Page Purpose 1 Scope 1 Responsibilities 1 Scaffolding 2 Ladders

More information

OCCUPATIONAL HEALTH AND SAFETY ACT SCAFFOLDING REGULATIONS

OCCUPATIONAL HEALTH AND SAFETY ACT SCAFFOLDING REGULATIONS c t OCCUPATIONAL HEALTH AND SAFETY ACT SCAFFOLDING REGULATIONS PLEASE NOTE This document, prepared by the Legislative Counsel Office, is an office consolidation of this regulation, current to October 28,

More information

PIP STF05520 Details for Pipe Railing for Walking and Working Surfaces

PIP STF05520 Details for Pipe Railing for Walking and Working Surfaces TECHNICAL CORRECTION January 2017 Structural PIP STF05520 Details for Pipe Railing for Walking and Working Surfaces PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process

More information

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY PART 1 - GENERAL 1.1 DESCRIPTION SECTION 28 05 26 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY SPEC WRITER NOTE: Delete // // if not applicable to project. Also delete any other item or paragraph

More information

(6) Crawl boards and ladders used for roof work shall be securely fastened over the ridge of the roof or be otherwise effectively anchored.

(6) Crawl boards and ladders used for roof work shall be securely fastened over the ridge of the roof or be otherwise effectively anchored. Newfoundland & Labrador - Terre-Neuve-et-Labrador Ladder Safety - Sécurité des échelles This material has been extracted from the Acts and Regulations of the Province to help students understand the subject.

More information

MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications

MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications Mar/2008 v1.0 SECTION 02255 HYDRAULICLY DRIVEN STEEL UNDERPINNING PILES PART 1 GENERAL 1.01 SCOPE OF WORK The work shall

More information

SECTION CHAIN LINK FENCES AND GATES

SECTION CHAIN LINK FENCES AND GATES SECTION 32 31 13 CHAIN LINK FENCES AND GATES SPEC WRITER NOTE: 1. Delete text between // // not applicable to project. Edit remaining text to suit project. 2. Use this section in specifying permanent chain

More information

TANK REPAIRS INCLUDING SCRAP DISPOSAL SCAFFOLDING JOBS

TANK REPAIRS INCLUDING SCRAP DISPOSAL SCAFFOLDING JOBS :- 1. Erect Metallic Scaffolding (including supply of all Scaffolding materials like Pipes, Planks, Clamps, Pins, Ladder arrangements), wherever required inside / outside the Tanks etc. as per instructions

More information

Safety on Heights: Our Policy

Safety on Heights: Our Policy 11/17/14 Safety on Heights: Our Policy Only volunteers over the age of 18 are allowed to work on heights of more than six feet off the ground. This includes all work on scaffolds. Only volunteers who are

More information

C. Concrete Inertia Bases: Drawings showing required concrete steel reinforcing, construction details, and dimensions.

C. Concrete Inertia Bases: Drawings showing required concrete steel reinforcing, construction details, and dimensions. 15240 VIBRATION ISOLATION ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 230548 An optional keynote

More information

Walking-Working Surfaces

Walking-Working Surfaces Walking-Working Surfaces Introduction Slips, trips and falls cause: the majority of general industry accidents 15 percent of all accidental deaths more fatalities than all other causes but motor vehicles

More information

SPECIFICATION FOR SPHERICAL VESSELS (PROJECT STANDARDS AND SPECIFICATIONS)

SPECIFICATION FOR SPHERICAL VESSELS (PROJECT STANDARDS AND SPECIFICATIONS) Page : 1 of 1 April 01 #03-1 Block Aronia, TABLE OF CONTENTS 1. GENERAL 1.1 Scope. DESIGN.1 Shell Design. Support Column Design.3 Opening Reinforcement. Nozzles and Manholes.5 Internals and Externals.

More information

Smarter. Safer. Leaner.

Smarter. Safer. Leaner. Smarter. Safer. Leaner. Fast Installation and Removal Decrease Leading Edge Exposure by 87% OSHA Compliant Versatile and Reusable Use Perimeter Protection Posts During Construction: At Building Perimeter

More information

WORKING AT HEIGHT PROCEDURE

WORKING AT HEIGHT PROCEDURE Page 1 of 8 AL-Yamama Engineering Company HSSE Department (s) WORKING AT HEIGHT PROCEDURE Page 1 of 8 Page 2 of 8 Introduction Work at height is any work activity that is performed where the work is to

More information

Management Plan for Walking/Working Surfaces & Fall Protection (29 CFR , 23, 66 App.C; 29 CFR ) ISD #535

Management Plan for Walking/Working Surfaces & Fall Protection (29 CFR , 23, 66 App.C; 29 CFR ) ISD #535 Management Plan for Walking/Working Surfaces & Fall Protection (29 CFR 1910.22, 23, 66 App.C; 29 CFR 1926.502) ISD #535 Health & Safety Office Maintenance Service Building 10 SE 9½ Street Rochester, MN

More information

Workplaces must be kept clean, orderly, and sanitary. Workroom floors must be maintained as clean and dry as possible.

Workplaces must be kept clean, orderly, and sanitary. Workroom floors must be maintained as clean and dry as possible. Section C.19 University of South Carolina Safety Program Guide WALKING AND WORKING SURFACES Introduction Occupational Safety and Health Administration (OSHA) CFR 1910 Subpart D Walking and Working Surfaces

More information

Walking-Working Working Surfaces. OSHA Office of Training and Education 1

Walking-Working Working Surfaces. OSHA Office of Training and Education 1 Walking-Working Working Surfaces OSHA Office of Training and Education 1 Introduction Slips, trips and falls cause: the majority of general industry accidents 15 percent of all accidental deaths more fatalities

More information

Walking-Working Surfaces

Walking-Working Surfaces Walking-Working Surfaces 29 CFR Part 1910 Subpart D Presented by: ETTA, OSH Division 919-807-2875 Objectives 29 CFR 1910, Subpart D In this course, we will discuss the following: Hazards Definitions General

More information

SECTION MASONRY ACCESSORIES

SECTION MASONRY ACCESSORIES PART 1 GENERAL 1.01 SCOPE OF WORK A. Contractor shall furnish all labor, materials, equipment and incidentals required to provide masonry accessories as shown on the Contract Drawings and specified herein.

More information

PIP STF05521 Details for Angle Railings for Walking and Working Surfaces

PIP STF05521 Details for Angle Railings for Walking and Working Surfaces TECHNICAL CORRECTION January 2017 Structural PIP STF05521 Details for Angle Railings for Walking and Working Surfaces PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of

More information

AMERICAN NATIONAL STANDARD ANSI/NAAMM STANDARD. Maximum Bearing Bar Depth / 2 (63.5 mm)

AMERICAN NATIONAL STANDARD ANSI/NAAMM STANDARD. Maximum Bearing Bar Depth / 2 (63.5 mm) METAL BAR GRATING AMERICAN NATIONAL STANDARD ANSI/NAAMM STANDARD MBG 531-17 GRATINGS 5 ANSI/NAAMM MBG 531-17 SEPTEMBER 7, 2017 METAL BAR GRATING MANUAL EIGHTH EDITION Maximum Bearing Bar Depth... 2 1 /

More information

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. Kaf-Tech Product Specification This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. SECTION 260519 METAL CLAD CABLE - MC-PLUS Neutral

More information

SECTION ENTRANCE FLOOR GRILLES STAINLESS STEEL GRATING

SECTION ENTRANCE FLOOR GRILLES STAINLESS STEEL GRATING 7160 Krick Rd., Walton Hills, OH 44146 800-321-3827 - Tel 440-439-8650 - Fax 440-439-6889 SECTION 12 48 16 ENTRANCE FLOOR GRILLES STAINLESS STEEL GRATING PART 1. GENERAL 1.01 SUMMARY: This section includes

More information

RailRider Pro. September Education and Training Center RailRider Date 9/15/2015. Page 1

RailRider Pro. September Education and Training Center RailRider Date 9/15/2015. Page 1 Pro September 2015 Page 1 Table of Contents Equipment Introduction to the Equipment Restricted Zone Safety Operating the Equipment Operation Setting Up Pneumatic System Shut-Off Valve Control Valves Quiz

More information

Stainless Steel Aeration Equipment Specification

Stainless Steel Aeration Equipment Specification Section 15 Stainless Steel Aeration Equipment Specification Part 1 - General 1.01 Description A. Scope of Work 1. Furnish, install and test aeration system including air mains, drop pipes, valves, expansion

More information

Diffused Aeration Piping Equipment

Diffused Aeration Piping Equipment 1.0 General 1.1. The specifications in this section include all components of the Diffused Aeration System with the exception of the individual diffuser units. Refer to additional specification sections

More information

COMPLETE REVISION November Process Industry Practices Structural. PIP STF05530 Grating Fabrication Details

COMPLETE REVISION November Process Industry Practices Structural. PIP STF05530 Grating Fabrication Details COMPLETE REVISION November 2006 Process Industry Practices Structural PIP STF05530 Grating Fabrication Details PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process

More information

EVALUATION REPORT. PFC-5551 Reissued April 1, Filing Category: DESIGN Steel (038)

EVALUATION REPORT. PFC-5551 Reissued April 1, Filing Category: DESIGN Steel (038) ICBO Evaluation Service, Inc. 5360 WORKMAN MILL ROAD WHITTIER, CALIFORNIA 90601-2299 A subsidiary corporation of the International Conference of Building Officials EVALUATION REPORT Copyright 2001 ICBO

More information

of GENERAL. A. Description

of GENERAL. A. Description 02920-1 of 11 SECTION 02920: EARTH TUNNELING 02920.01 GENERAL A. Description Earth tunneling shall include, but not necessarily be limited to, constructing earth tunnels and furnishing and installing tunnel

More information

Introduction. Disclaimer. Table of contents

Introduction. Disclaimer. Table of contents Updated July 18, 2012 Introduction The Cambridge Elevating Limited-Use / Limited-Application Elevator is designed to service schools, libraries, low rise, low occupancy commercial buildings, churches and

More information

Treads, Tread Repair Covers and Nosings

Treads, Tread Repair Covers and Nosings ALGRIP Slip-Resistant Metal Stair Treads, Tread Repair Covers and Nosings Remarkably versatile, slip-resistant tread solutions for new and existing stairways ALGRIP Slip-Resistant Metal Stair Treads, Tread

More information

Table of Contents. List of Drawings

Table of Contents. List of Drawings SCOPE OF WORK Hastings Stadium Exhibition Park, 81 London Road, Guelph, Ontario Structural and Maintenance Remedial Work Prepared For City of Guelph City Hall, 1 Carden Street, Guelph, ON N1H 3A1 Prepared

More information

MODERNFOLD GWS 100SR-G MOVEABLE GLASS WALLS

MODERNFOLD GWS 100SR-G MOVEABLE GLASS WALLS MODERNFOLD GWS 100SR-G MOVEABLE GLASS WALLS Ideal for applications requiring space division, visibility and security Used in bank lobbies, offices, conference areas, interior storefronts and arena skyboxes

More information

CONSULTANT PROCEDURES & DESIGN GUIDELINES Electrical Manholes and Handholes UNIVERSITY OF MISSOURI

CONSULTANT PROCEDURES & DESIGN GUIDELINES Electrical Manholes and Handholes UNIVERSITY OF MISSOURI GENERAL: The scope of this document is to provide instruction for the installation of concrete electric manholes. DESIGN GUIDELINES: 1. Materials for Manhole 1.1. Cast-in-Place or Pre-Cast concrete may

More information

RESIDENTIAL FENCE STANDARDS

RESIDENTIAL FENCE STANDARDS RESIDENTIAL FENCE STANDARDS 3.5200 PURPOSE The standards set forth in this Section are established to encourage the suitable use of land while advancing the following goals of the City: to preserve privacy,

More information

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS 6.1 DESCRIPTION This work shall consist of constructing curbs, gutters, sidewalks, ramps, local depressions and driveways of the form and dimensions shown

More information

Scaffolding Safety. Scaffolding

Scaffolding Safety. Scaffolding Scaffolding Safety Scaffolding 1926.450 - Scope, Application Covers all scaffolds used in workplaces Does not apply to crane or derrick suspended personnel platforms, which are covered by 1926.550(g) Aerial

More information

SECTION 1043 FENCE MATERIAL

SECTION 1043 FENCE MATERIAL SECTION 1043 FENCE MATERIAL 1043.1 Scope. This specification covers the material required in the construction of chainlink fence and woven wire fence. 1043.2 Basis of Acceptance. The basis of acceptance

More information

CONSULTING OFFICE OF MORRIS S. FARKAS PROFESSIONAL SAFETY ENGINEER

CONSULTING OFFICE OF MORRIS S. FARKAS PROFESSIONAL SAFETY ENGINEER CONSULTING OFFICE OF MORRIS S. FARKAS PROFESSIONAL SAFETY ENGINEER EDUCATION 3835 East Thousand Oaks Boulevard, #365 Westlake Village, California 91362 Telephone: (805) 494-0444 Facsimile: (805) 494-0441

More information

SCAFFOLDS Revision No: 3

SCAFFOLDS Revision No: 3 PAGE 1 OF 6 1.0 PURPOSE/ SCOPE To communicate the safety requirements for the erection, inspection and safe use of scaffolds. Compliance with these requirements will assure employee safety while working

More information

PIP STE05501 Fixed Ladders and Cages Design Guide

PIP STE05501 Fixed Ladders and Cages Design Guide TECHNICAL CORRECTION January 2017 Structural PIP STE05501 Fixed Ladders and Cages Design Guide PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities,

More information

Job-made ladders for construction

Job-made ladders for construction Data Sheet 1-568 Rev. April 2016 Job-made ladders for construction This data sheet covers the fabrication and installation of ladders usually made on the job and installed in a semipermanent location as

More information

Access Ladders And Disappearing Stairways: Code Compliant Solutions

Access Ladders And Disappearing Stairways: Code Compliant Solutions Ron Blank & Associates, Inc. 2009 Please note: you will need to complete the conclusion quiz online at ronblank.com to receive credit Access Ladders And Disappearing Stairways: Code Compliant Solutions

More information

SUGGESTED SPECIFICATIONS Pump Frames through 64132

SUGGESTED SPECIFICATIONS Pump Frames through 64132 TYPE HBB - HORIZONTAL SOLIDS-HANDLING WASTEWATER PUMPS Pump Frames 44081 through 64132 GENERAL Furnish and install Horizontal Flexible Coupled Dry Pit Pumping Units complete with all accessories and appurtenances

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS PART 1 GENERAL 1.01 SUMMARY Section 15140 PIPE HANGERS, This Section includes the furnishing and subsequent installation of: A. Pipe and equipment hangers, supports, and associated anchors B. Equipment

More information

4188 East Andrew Johnson Highway Morristown, TN

4188 East Andrew Johnson Highway Morristown, TN 4188 East Andrew Johnson Highway Morristown, TN 37814 800-225-7814 education@precisionladders.com Super Simplex Disappearing Stairway Automatic Electric Disappearing Stairway Automatic Super Simplex FL

More information

MADISON WATER UTILITY MADISON, WISCONSIN UNIT WELL 26 GENERATOR ADDITION AND MCC UPGRADES

MADISON WATER UTILITY MADISON, WISCONSIN UNIT WELL 26 GENERATOR ADDITION AND MCC UPGRADES AND MCC UPGRADES VICINITY MAP CALL DIGGERS HOTLINE 1-800-242-8511 TOLL FREE LEGEND, ABBREVIATIONS, INDEX GENERAL NOTES AND BENCHMARKS G-1 HIGH POINT ROAD SITE PLAN C-1 PROPOSED SITE PLAN C-2 4" DIA. SCH

More information

PS 3000 Installation Manual Step-By-Step Procedures C.9. DOOR AND WINDOW OPENINGS C.9.1 PREPARE IN ADVANCE. C.9.2 VBUCK CONSTRUCTION.

PS 3000 Installation Manual Step-By-Step Procedures C.9. DOOR AND WINDOW OPENINGS C.9.1 PREPARE IN ADVANCE. C.9.2 VBUCK CONSTRUCTION. C.9. DOOR AND WINDOW OPENINGS Openings for doors and windows are formed with bucks, or frames, which are constructed to the rough opening dimensions required for the doors and windows to be installed.

More information

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards Date Description of Change Pages / Sections Modified ID 6/15/16 Updated format, division title, and removed references to other sections. - mgl44 A. Summary This section contains design criteria for the

More information

Aluminum Component Pipe Railings

Aluminum Component Pipe Railings 1 SECTION 05 7360 ALUMINUM COMPONENT PIPE RAILINGS PART 1 GENERAL 1.01 SECTION INCLUDES A. Aluminum component pipe handrails and railings. 1.02 RELATED REQUIREMENTS A. Section 02 9000: Landscaping: Installation

More information

Conergy SolarFamulus II

Conergy SolarFamulus II Conergy SolarFamulus II Installation manual www.conergy.com Table of Contents Table of Contents SolarFamulus II for universal use on flat roofs 1 Introduction 1 1.1 Short description 1 1.2 Intended use

More information

STATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014

STATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014 STATE STRUCTION FUND DIRECTIVE 5-1 Issue date: October 2014 STRUCTURAL STEEL 1. General: It is the Fund's policy that the design of the structural steel is the prime responsibility of the project's Structural

More information

Port of Lake Charles RE: 3501 Bayou D Inde Road 200,000 Gallon EWT

Port of Lake Charles RE: 3501 Bayou D Inde Road 200,000 Gallon EWT P.O. Box 3753 Lake Charles, LA 70602 July 21, 2016 Mr. Nick Pestello Assistant Director of Engineering (337) 794-3687 Job No. 316288 If you would like to speak with Patrick Heltsley concerning this report,

More information

Materials Carbon Steel and Malleable Iron are used in the manufacture of concrete inserts. Stainless Steel and other materials are available.

Materials Carbon Steel and Malleable Iron are used in the manufacture of concrete inserts. Stainless Steel and other materials are available. Concrete inserts offered in this section are designed to provide a pre-set support point in concrete ceilings, walls, and floors. A range of inserts with varying design loads are available. Materials Carbon

More information

B. Polyethylene samples shall be submitted for Owner approval of color and quality.

B. Polyethylene samples shall be submitted for Owner approval of color and quality. Glass Rail ENGINEERED DASHERBOARD SPECIFICATIONS PART 1 - GENERAL 1.01 PROJECT SCOPE A. Contractor shall furnish and install one complete set of steel framed dasherboards as indicated on the drawings and

More information

RISK BULLETIN. Walking & Work Surfaces: Floors, Stairs and Elevated Workstations Checklist DATE / / NAME SIGNATURE WALKWAYS YES NO ACTION ASSIGNED

RISK BULLETIN. Walking & Work Surfaces: Floors, Stairs and Elevated Workstations Checklist DATE / / NAME SIGNATURE WALKWAYS YES NO ACTION ASSIGNED RISK BULLETIN Walking & Work Surfaces: Floors, Stairs and Elevated Workstations Checklist DATE / / NAME SIGNATURE WALKWAYS Are aisles and passageways kept clear? Are aisles and walkways marked to separate

More information

STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL

STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL 1. SCOPE 2. DESIGN 3. MATERIALS 4. CONSTRUCTION 5. METHOD OF MEASUREMENT AND PAYMENT SCOPE This Specification sets out requirements for the design,

More information

Perimeter Relief and Control Joints in Fire-Rated Gypsum Board

Perimeter Relief and Control Joints in Fire-Rated Gypsum Board Perimeter Relief and Control Joints in Fire-Rated Gypsum Board In multi-family residential construction, involving fire-rated assemblies stress relief in the firerated assemblies is important, but often

More information

HANDSET WALL FORM. Handset Wall Form. Quick Assembly - can be built using only a hammer. Reduced weight increases productivity

HANDSET WALL FORM. Handset Wall Form. Quick Assembly - can be built using only a hammer. Reduced weight increases productivity HANDSET WALL FORM Quick Assembly - can be built using only a hammer Reduced weight increases productivity Unsurpassed flexibility in design and availability of panels for a wide variety of applications

More information

MERCHANTS METALS. A. ASTM F552 Standard Terminology Relating to Chain Link Fencing

MERCHANTS METALS. A. ASTM F552 Standard Terminology Relating to Chain Link Fencing MERCHANTS METALS SECTION 32 31 13 COLORBOND CHAIN LINK FENCE AND GATES 2014 PART 1 GENERAL 1.1 RELATED DOCUMENTS A. DIVISION 01 - GENERAL REQUIREMENTS: Drawings, quality, product and performance requirements,

More information

CARROLL COUNTY BUREAU OF PERMITS AND INSPECTIONS RESIDENTIAL CODE COMPLIANCE GUIDELINES FOR DECKS

CARROLL COUNTY BUREAU OF PERMITS AND INSPECTIONS RESIDENTIAL CODE COMPLIANCE GUIDELINES FOR DECKS CARROLL COUNTY BUREAU OF PERMITS AND INSPECTIONS RESIDENTIAL CODE COMPLIANCE GUIDELINES FOR DECKS Code Reference: Chapter 97, Code of Public Local Laws and Ordinances of Carroll County and The International

More information

WATER STORAGE TANKS: INSPECTION METHODS

WATER STORAGE TANKS: INSPECTION METHODS WATER STORAGE TANKS: INSPECTION METHODS Service Trucks Would could go wrong? H2 Gas build-up Tank Failure: 300,000 gal Auburn, MA Sidewall failure due to corrosion Water Tank Styles & Design Issues: Leg

More information

Special Provision No. 540S01 March OPSS 540, Construction Specification for Highway Fence, is deleted and replaced with the following:

Special Provision No. 540S01 March OPSS 540, Construction Specification for Highway Fence, is deleted and replaced with the following: HIGHWAY FENCE - Item No. BRACE PANELS - Item No. GATES - Item No. Special Provision No. 540S01 March 2006 AMENDMENT TO OPSS 540, MAY 1988 OPSS 540, Construction Specification for Highway Fence, is deleted

More information

Agenda. Safety Decking Basics Decking Issues Felt Kick Out Flashing Fascia

Agenda. Safety Decking Basics Decking Issues Felt Kick Out Flashing Fascia Decking & Fascia Agenda Safety Decking Basics Decking Issues Felt Kick Out Flashing Fascia 2 Chapter 7 Tools & Materials Tools for Decking Hammer Measuring Tape Chalk Line Speed Square Utility Knife Circular

More information

SECTION CERAMIC TILING

SECTION CERAMIC TILING SECTION 09 3013 CERAMIC TILING PART 1 - GENERAL 1.1 SUMMARY A. Includes But Not Limited To: 1. Furnish and install ceramic tile and tile setting materials and accessories as described in Contract Documents.

More information

SECTION STRUCTURAL RETROFIT ROOF SUB-FRAMING SYSTEM

SECTION STRUCTURAL RETROFIT ROOF SUB-FRAMING SYSTEM SECTION 13 34 21 - STRUCTURAL RETROFIT ROOF SUB-FRAMING SYSTEM PART 1 - GENERAL 1.1 DESCRIPTION A. The structural retrofit roof sub-framing system will provide support for a new metal roofing system constructed

More information

Tate Access Floors, Inc. All Steel 1000 Access Floor Panel 600 mm Bolted Stringer Understructure System

Tate Access Floors, Inc. All Steel 1000 Access Floor Panel 600 mm Bolted Stringer Understructure System Tate Access Floors, Inc. All Steel 1000 Access Floor Panel 600 mm Bolted Stringer Understructure System SECTION 10270 PART 1 - GENERAL 1.1 Section Includes A. Work of this section includes, but is not

More information

MODULAR ACCESS SYSTEMS PRODUCT OVERVIEW

MODULAR ACCESS SYSTEMS PRODUCT OVERVIEW MODULAR ACCESS SYSTEMS PRODUCT OVERVIEW WE CARE FIXFAST Providing maximum safety with minimum fuss to workers at height. Our extensive range of safe access products and fall protection systems are designed

More information

SECTION CHAIN LINK FENCES AND GATES

SECTION CHAIN LINK FENCES AND GATES SECTION 32 31 13 SPEC WRITER NOTES: Use this section only for NCA projects. Delete text between // // not applicable to project. Edit remaining text to suit project. PART 1 - GENERAL 1.1 SUMMARY A. Section

More information

CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE Residential Accessory Structures

CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE Residential Accessory Structures CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE - 268-5161 Residential Accessory Structures This information has been compiled for the benefit of any person

More information

DIVISION 3: SEWER. Improvement Design Standards City of Dundee Oregon. Division 3 : Sewer Page 1

DIVISION 3: SEWER. Improvement Design Standards City of Dundee Oregon. Division 3 : Sewer Page 1 DIVISION 3: SEWER 3.1 DESIGN CRITERIA A. APPLICABILITY 1. These Design Standards shall govern all construction and upgrading of public sanitary sewer facilities in the City of Dundee and applicable work

More information

SECTION ROLLER GATES

SECTION ROLLER GATES GENERAL SUMMARY A. The Contractor shall provide all labor, materials, equipment, and incidentals required to furnish and install roller gates, complete and operational with all necessary accessories as

More information

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) PART 1 - GENERAL TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) 1.01 SECTION INCLUDES A. Trenchless Installation of Carrier Pipe with Casing Pipe B. Trenchless Installation of Carrier Pipe without

More information

TECHNICAL SPECIFICATIONS

TECHNICAL SPECIFICATIONS TECHNICAL SPECIFICATIONS ITEM 00663 TRAFFIC BUTTONS & PAVEMENT MARKERS 663.1 Description. This item shall consist of furnishing and installing traffic buttons and reflectorized pavement markers and jiggle

More information

3.0 DESIGN CRITERIA FOR SANITARY SEWER FACILITIES

3.0 DESIGN CRITERIA FOR SANITARY SEWER FACILITIES 3.0 DESIGN CRITERIA FOR SANITARY SEWER FACILITIES All sanitary sewers shall be designed in accordance with these Design Standards, LBWD Rules and Regulations, and to accepted engineering principles. In

More information

By Jerry Turrentine, NRCS Biologist USDA Natural Resources Conservation Service

By Jerry Turrentine, NRCS Biologist USDA Natural Resources Conservation Service Appendix O By Jerry Turrentine, NRCS Biologist USDA Natural Resources Conservation Service 100 WILDLIFE WATERING FACILITIES DESIGNS AND DRAWINGS Designs for wildlife watering facilities can be simple or

More information

SECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck)

SECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck) SECTION 13125 ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck) PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

Sales Hire Erections

Sales Hire Erections LTD www.scafhire.ie Sales Hire Erections Scaffolding Specialists Company History Since its modest inception in 1980 Scafhire Ltd has progressed to a position of very high prominecnce and respectability

More information

DIVISION 05 METALS Commissioning of Metals STRUCTURAL METAL FRAMING Structural Steel Framing

DIVISION 05 METALS Commissioning of Metals STRUCTURAL METAL FRAMING Structural Steel Framing DIVISION 05 METALS 05 00 00 METALS 05 01 00 Maintenance of Metals 05 01 10 Maintenance of Structural Metal Framing 05 10 20 Maintenance of Metal Joists 05 10 30 Maintenance of Metal Decking 05 10 40 Maintenance

More information

Daytona Beach Pier Building Renovation Jun 2010

Daytona Beach Pier Building Renovation Jun 2010 SECTION 15150 - SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

RB WEIR GATES MODEL GENERAL DESCRIPTION DESIGN CONSTRUCTION

RB WEIR GATES MODEL GENERAL DESCRIPTION DESIGN CONSTRUCTION GENERAL DESCRIPTION The Orbinox model RB Weir Gate is designed for downward opening applications where a more accurate flow control is required. The water flows over the top of the slide permitting a constant

More information

DIVISION 33 - UTILITIES SECTION UTILITY PIPE BORING AND JACKING DIVISION 33 UTILITIES SECTION UTILITY PIPE BORING AND JACKING

DIVISION 33 - UTILITIES SECTION UTILITY PIPE BORING AND JACKING DIVISION 33 UTILITIES SECTION UTILITY PIPE BORING AND JACKING DIVISION 33 UTILITIES PART 1 GENERAL 1.01 SCOPE A. This work shall consist of the underground construction of a pipeline across the state right-ofway, or other facility as indicated on the plans and as

More information

Underground Piping for Private Hydrants & Sprinkler Supply Line

Underground Piping for Private Hydrants & Sprinkler Supply Line City of Brea Brea Fire Department Fire Prevention 1 Civic Center Circle Phone: (714) 990-7655 Underground Piping for Private Hydrants & Sprinkler Supply Line PURPOSE The provision of adequate water supplies

More information

DESIGN CRITERIA. Allowable Stress Design (ASD) AISC-1999.

DESIGN CRITERIA. Allowable Stress Design (ASD) AISC-1999. DESIGN CRITERIA 1. INTRODUCTION This appendix summarizes the codes, standards, criteria, and practices that are generally used in the design and construction structural engineering system for the Sarker

More information

CITY OF RICHMOND PINE CAMP COMMUNITY CENTER ROOF REPLACEMENT PROJECT RCS PROJECT NO

CITY OF RICHMOND PINE CAMP COMMUNITY CENTER ROOF REPLACEMENT PROJECT RCS PROJECT NO SECTION 07220 - ROOF INSULATION PART 1 - GENERAL 1.01 DESCRIPTION A. Work included: The Roofing Contractor will provide all polyisocyanurate insulation and high density wood fiber roof insulation (tapered

More information

Section Subparts T. Cleveland State University Work Zone Safety and Efficiency Transportation Center. Demolition

Section Subparts T. Cleveland State University Work Zone Safety and Efficiency Transportation Center. Demolition Demolition 1926.252(a) Whenever materials are dropped more than 20 feet to any point lying outside the exterior walls of the building, an enclosed chute of wood, or equivalent material, shall be used.

More information