1 Concrete Pavement Estimating 101 and Economy of Scale March 10, 2017 CPAM Concrete Paving Workshop Mankato MN Presenters: Stefan Gantert, PE ---Bob McPartlin, PE

2 Common Questions: What is the price of Concrete this year? Will there be a Cement shortage? How is the schedule for the Paving Contractors? Will the Chicago Cubs repeat a World Series win?

3 Answers to Common Questions - Depends Never Always can use more work - - later, will answer - -

4 Focus on Depends Where e is your project? Rock & Sand availability; Access for material delivery Size of the project and particulars When will you let it? When is it to be essentially complete? How much contractor risk is there? Traffic Control Coordination with others Other

5 Get a Handle on Project Costs - mz New Way to look at old problem If we cannot learn from History, we will die by History Same old process done the same way will get the same result! Idea Generator: Concrete Ideas Abstract Ideas

6 Abstract Public document Wealth of Information xx items Project info (length, location, etc.) Low bidder and other bidder pricing info Sometimes Low Bidder is NOT the low PCC price!

7 Underlying Premise Time is Money Contractors want to make money Agencies want excellent value for the project An excellent project was designed No money is made when the paver stops (Costs continue?) Mother Nature always wins

8 Least Common Denominator 6 th -grade math Basic Units Easy Computations $$ per S.Y.-inch

9 Dollars per Square Yard - Inch From the Abstract: Concrete Placement - - $ / SY Thickness from plan sheet, item description, phone call Reduce to $ / SY inch Concrete Produced - - $ / CY Divide by $ / SY inch Add the two together No Dowel Bar prices, base prep Includes incidental tie bars, sawing, sealing, texturing May include other costs

10 Comparison to HMA 110 # / $50 / Ton = $2.75 / SY-inch Arithmetic relationship $25 / Ton = $1.38 $75 / Ton = $4.11 Not included: Gravel base Reclaiming costs Milling

11 Display the Information Doctorial Thesis Big words Many multi-syllable words Master sdegreenomograph s Pivot points Logarithmic Scales Bachelor s Essay Voodoo content Leave more questions than it answered Cliff s Notes Excel data points & Graph (Best-Fit): K-words and M-ideas

12 Basic shape of a Common Graph

13 Teenager s Age Parent Disposa able Income

14 P a r e n t I Q Teenager s Age

15 Vehicle Annual $ Miles Driven

16 Time Compr ressivee Strength of Concrete

17 $ per $/ SY in Size of Project S.Y.

18 $10.00 $9.00 Concrete Pavement Prices -- per Square Yard-Inch $8.00 $7.00 $6.00 $5.00 $4.00 $3.00 $2.00 nch $ per SY i R² = R² = R² = R² = $1.00 $0.00 Square Yards of Main Pavement 0 30,000 60,000 90,000120,000150,000180,000210,000240,000270,000300,000330,000360,000390,000420,000450,000480,000510,000540,000

19 Good in Theory Put into Action Steele County two projects Lyon County combo of projects --- new & O.L. Swift, Fillmore Cos. combination to add length Massage project data for better estimates t Common Sense approach Review like projects together Adjust project parameters for cost effectiveness

20 The Steele County Experience Stefan

21 Steele County Existing Conditions CSAH 45 Old Trunk Highway Various layers of aggregate base and bituminous pavement over old 18 wide concrete Existing surface consisted of 8-9 bituminous pavement in good condition based on cores Existing shoulders wide One of highest traffic volume roadways in Steele County often used as I-35 detour route Good candidate for unbonded concrete overlay

22 Steele County Existing Conditions CSAH 7 Existing surface consisted of 7-9 bituminous pavement over minimal aggregate base Bottom layers of existing bituminous in poor condition based on cores Existing shoulders 8-10 wide Primary access to many gravel pits in Steele County significant road deterioration over the last 5 years from construction activity Good candidate for new concrete pavement

23 Steele County - Proposed CSAH 45 unbonded concrete overlay 7.5 mile project wide concrete 6.0 miles of 6 concrete 1.5 miles of 6.5 concrete CSAH 7 concrete pavement Split into two projects Both projects - 28 wide concrete & 6.5 concrete North (N) miles --- dowels in outside wheel path South (S) 2.9 miles --- undoweled

24 Steele County - Photos

25 Steele County Bidding Structure Concern with funding of all 3 projects Engineer s Estimate - $8.6 million Project Priority CSAH 45 > CSAH 7 (N) > CSAH 7 (S) Bidding Options Option A = CSAH 45 + CSAH 7 (N) Option B = CSAH 45 + CSAH 7 (N) + CSAH 7 (S)

26 Steele County Bid Summary 4 bidders (3 of 4 used same concrete pricing) Engineer Estimate $4.05/SY/in. Option A Total area = 178,710 SY Range $3.32/SY/in. to $3.71/SY/in. Option B Total area = 227,206 SY Range - $3.23/SY/in. / to $3.76/SY/in. /

27 Putting Theory into Action Bob to continue

28 How project parameters influence the Graph Thickness --- 4, 5 to 6 vs. 6 7 vs. 8 9 Width vs. 14 Full-width vs One-lane paving Letting date / Completion date Weather, Seasonal changes Incentives --- w/c, /, smoothness, rock, time

29 How project parameters influence the Complexity Graph Turn lanes; lane drop; add lane Openings for intersection, driveway Multi-phase: Utility, spot grading, other Urban vs. Rural design --- C&G; median Batch plant vs. Ready-Mix External traffic congestion Internal traffic --- access; number of residents, etc Timing --- County Fair; Harvest; Milk route; etc

30 Graph as a TOOL To Help, Guide Variables --- controllable and uncontrollable Engineering i thinking required! Not for County Administrators!

31 $10.00 $9.00 Concrete Pavement Prices -- per Square Yard-Inch $8.00 $7.00 $6.00 $5.00 $4.00 $3.00 $2.00 nch $ per SY i R² = R² = R² = R² = $1.00 $0.00 Square Yards of Main Pavement 0 30,000 60,000 90,000120,000150,000180,000210,000240,000270,000300,000330,000360,000390,000420,000450,000480,000510,000540,000

32 Graph as a TOOL To Help, Guide Variables --- controllable and uncontrollable Engineering i thinking required! Not for County Administrators! Yes, the Cubs will win the WS again! Discussion to follow.....

33

34

35 Questions?

Design and Construction of Concrete Overlays. By: James K. Cable, P.E. Cable Concrete Consultation

Design and Construction of Concrete Overlays. By: James K. Cable, P.E. Cable Concrete Consultation Design and Construction of Concrete Overlays By: James K. Cable, P.E. Cable Concrete Consultation PCC OVERLAY AGENDA Current design & construction features What is needed in a PCC overlay set of plans?

More information

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page SECTION 14 RESTORATION OF SURFACES... 14.1 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01

More information

Full Depth Pavement Reclamation

Full Depth Pavement Reclamation Full Depth Pavement Reclamation Delaware County, Ohio Chris Bauserman, PE, PS April 28, 2015 Background Population has increased from 55,000 in 1989 to approximately 200,000 Explosive growth in residential,

More information

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01 Aggregate Base... 14.1 14-3.02 Asphalt

More information

AMERICA RIDES ON US KEYS TO A SUCCESSFUL ALTERNATE BIDDING PROCESS

AMERICA RIDES ON US KEYS TO A SUCCESSFUL ALTERNATE BIDDING PROCESS AMERICA RIDES ON US KEYS TO A SUCCESSFUL ALTERNATE BIDDING PROCESS KEYS TO A SUCCESSFUL ALTERNATE BIDDING PROCESS INTRODUCTION With alternate bidding, road and highway agencies offer the opportunity to

More information

12/11/ th Annual Illinois Bituminous Paving Conference December 11, 2013

12/11/ th Annual Illinois Bituminous Paving Conference December 11, 2013 PCC Pavement Rehabilitation with Hot Mix Asphalt 54th Annual Illinois Bituminous Paving Conference December 11, 2013 Kevin Burke III, P.E. Illinois Asphalt Pavement Association burkeiii.kevin@comcast.net

More information

National Industry Update and Strategic Directions CPAM Annual Workshop March 12, 2015

National Industry Update and Strategic Directions CPAM Annual Workshop March 12, 2015 National Industry Update and Strategic Directions CPAM Annual Workshop March 12, 2015 Gerald F. Voigt, PE President & CEO American Concrete Pavement Association T 2 Thru Our Clearinghouse! Game Changer

More information

2014 APC/ Dist. 9-0 BITUMINOUS PAVING

2014 APC/ Dist. 9-0 BITUMINOUS PAVING 2014 APC/ Dist. 9-0 BITUMINOUS PAVING To Be Covered- BLUE KNOB MC PILOT SPECIAL PROVISIONS TACK COAT LONGITUDINAL JOINT PERCENT WITHING TOLERANCE (PWT) SPEC LOCAL ACCEPTANCE- RETESTS SAFETY EDGE Importance

More information

Annual CSAH Needs Update for 2017

Annual CSAH Needs Update for 2017 Annual CSAH Needs Update for 2017 MnDOT - State Aid for Local Transportation CSAH Needs Unit These instructions provide guidance for updating CSAH Needs segments and project data using the SANeeds system.

More information

CHAPTER 11 PAVEMENT TYPE DETERMINATION

CHAPTER 11 PAVEMENT TYPE DETERMINATION CHAPTER 11 PAVEMENT TYPE DETERMINATION 11.1 PAVEMENT TYPE SELECTION FACTORS A highway system designation shall not determine the choice of pavement type. The following factors should be considered when

More information

Pavement Management Systems

Pavement Management Systems Pavement Management Systems Basics and Benefits David R. Johnson, P.E. Regional Engineer Asphalt Institute Rocky Mountain Region djohnson@asphaltinstitute.org Presentation Outline Definition Requirements

More information

General Information for Joints

General Information for Joints Design Manual Chapter 5 - Roadway Design 5G - PCC Pavement Joints 5G-1 General Information for Joints A. General Information The need for a jointing system in concrete pavements results from the desire

More information

Overview. Preventive Maintenance Concepts. What are thin and ultra thin mixes. Experience in Michigan with ultra thin

Overview. Preventive Maintenance Concepts. What are thin and ultra thin mixes. Experience in Michigan with ultra thin Overview Preventive Maintenance Concepts What are thin and ultra thin mixes Experience in Michigan with ultra thin Case Study- Washington County Thin mix overlays Preventive Maintenance The planned strategy

More information

PAVEMENT CONSTRUCTION QA PROCEDURES RIDEABILITY TESTING CONSTRUCTION PRACTICE

PAVEMENT CONSTRUCTION QA PROCEDURES RIDEABILITY TESTING CONSTRUCTION PRACTICE PAVEMENT CONSTRUCTION QA PROCEDURES RIDEABILITY TESTING CONSTRUCTION PRACTICE Quality Assurance is not Quality Control Quality control is Contractors responsibility during construction. Quality Assurance

More information

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013 SPECIAL PROVISIONS - SP2014 BOOK Page 1 S-1 (2104) REMOVE AND REPLACE BITUMINOUS PAVEMENT (ADA) Always include SP2014-119 (PLANT MIXED ASPHALT PAVEMENT) or SP2014-121 (PLANT MIXED ASPHALT PAVEMENT FOR

More information

Pavement Preservation with Thin Lift Concrete Overlays. Dale Harrington, P.E. Representing the National Concrete Pavement Technology Center

Pavement Preservation with Thin Lift Concrete Overlays. Dale Harrington, P.E. Representing the National Concrete Pavement Technology Center Pavement Preservation with Thin Lift Concrete Overlays Dale Harrington, P.E. Representing the National Concrete Pavement Technology Center Concrete Overlay Guide second edition Contents 1. Overview of

More information

Performance of Thin Bituminous Treatments for Low-Volume Roads. Greg Johnson Minnesota Department of Transportation June 25, 2003

Performance of Thin Bituminous Treatments for Low-Volume Roads. Greg Johnson Minnesota Department of Transportation June 25, 2003 Performance of Thin Bituminous Treatments for Low-Volume Roads Greg Johnson Minnesota Department of Transportation June 25, 2003 Overview Introduction MN Historical Perspective Current Performance Double

More information

MODOT Alternate Pavement Approach. Dave Ahlvers NCAUPG Conference Overland Park, Kansas February 3, 2010

MODOT Alternate Pavement Approach. Dave Ahlvers NCAUPG Conference Overland Park, Kansas February 3, 2010 MODOT Alternate Pavement Approach Dave Ahlvers NCAUPG Conference Overland Park, Kansas February 3, 2010 Cost Control in Missouri implementation - the road to success Past Decade Letting schedules optimized

More information

Life Cycle Cost Analysis July 2011 Materials Division Page 1 TABLE OF CONTENTS V. ASPHALT PAVEMENT CONSTRUCTION/RECONSTRUCTION...

Life Cycle Cost Analysis July 2011 Materials Division Page 1 TABLE OF CONTENTS V. ASPHALT PAVEMENT CONSTRUCTION/RECONSTRUCTION... Materials Division Page 1 TABLE OF CONTENTS EXECUTIVE SUMMARY...2 I. INTRODUCTION...4 II. Purpose...4 What is LCCA?...4 History of LCCA in VDOT...4 ECONOMIC ANALYSIS COMPONENTS...6 Analysis Period...6

More information

What is it? What is Granular Base Stabilization ti (GBS)? Emulsion Full Depth Reclamation Process

What is it? What is Granular Base Stabilization ti (GBS)? Emulsion Full Depth Reclamation Process Emulsion Full Depth Reclamation and Granular Base Stabilization An Engineered Approach 47 th Idaho Asphalt Conference Rocktober 25 th, 2007 Full Depth Reclamation (FDR) What is it? Rehabilitation technique

More information

Whitetopping: The Overlay Choice

Whitetopping: The Overlay Choice Whitetopping: The Overlay Choice The Worldwide Leader in Concrete Paving Technology A GOMACO GHP-2800 is slipforming the new concrete overlay on top of existing asphalt. HW-051210 D13 Whitetopping Project:

More information

Session 11: Concrete Overlays

Session 11: Concrete Overlays Session 11: Concrete Overlays Learning Outcomes Define Concrete Resurfacing Define Bonded & Unbonded Overlays List Benefits of Overlays Describe Evaluation Considerations Describe Primary Design Considerations

More information

o Alternate Pavement Type Bidding projects will be identified in ECMS on the Planned Six-Month Letting Schedule, which will be updated monthly.

o Alternate Pavement Type Bidding projects will be identified in ECMS on the Planned Six-Month Letting Schedule, which will be updated monthly. DATE: June 25, 2014 482-14-21 SUBJECT: Publication 242 Pavement Policy Manual Chapter 11 Pilot Pavement Type Determination TO: District Executives FROM: R. Scott Christie, P.E. /s/ Brian Thompson, P.E.

More information

Cold In-Place Recycling

Cold In-Place Recycling Cold In-Place Recycling Dan Schellhammer, P.E. Midstate Reclamation and Trucking In 1991, Midstate brought the first reclaimer into the state of Minnesota Emphasis on asphalt recycling techniques (milling,

More information

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS 603.1 DESCRIPTION Determine the smoothness of the pavement surface and correct the deficiencies as specified in the Contract Documents. For the purposes of this

More information

Sustainability Strategies for Highway Construction: A Case Study of ADOT s Piestewa SR51 HOV Widening Project

Sustainability Strategies for Highway Construction: A Case Study of ADOT s Piestewa SR51 HOV Widening Project Sustainability Strategies for Highway Construction: A Case Study of ADOT s Piestewa SR51 HOV Widening Project Jacqueline D. Thompson, M.U.E.P. and Howard H. Bashford, Ph.D., P.E. Arizona State University

More information

Pavement Design. TTP Orientation Seminar 2017

Pavement Design. TTP Orientation Seminar 2017 Pavement Design TTP Orientation Seminar 2017 What are Pavements? Engineered structures in contact with the earth's surface built to facilitate movement of people and goods Pedestrians Personal vehicles

More information

The Illinois Tollway s Use of Composite Concrete Pavements with Greener Concrete for Improved Sustainability

The Illinois Tollway s Use of Composite Concrete Pavements with Greener Concrete for Improved Sustainability The Illinois Tollway s Use of Composite Concrete Pavements with Greener Concrete for Improved Sustainability Steve Gillen. Illinois Tollway / Deputy Program Manager of Materials Arizona Pavements / Materials

More information

Nova Scotia 2009 Pavement Preservation. Jim Chisholm Highway Construction Services

Nova Scotia 2009 Pavement Preservation. Jim Chisholm Highway Construction Services Nova Scotia 2009 Pavement Preservation Jim Chisholm Highway Construction Services 2009 Construction Overview Pavement Preservation Hot Mix Asphalt Overlays Cold in Place Recycling Pulverization/Graveling/HMA

More information

Concrete Paving Association of Minnesota CPAM Annual Workshop March 11, Gordy Bruhn- Senior Engineering Specialist

Concrete Paving Association of Minnesota CPAM Annual Workshop March 11, Gordy Bruhn- Senior Engineering Specialist Concrete Paving Association of Minnesota CPAM Annual Workshop March 11, 2016 Gordy Bruhn- Senior Engineering Specialist FDR Removals I-94 Monticello, MN FDR Removals TH 2 Erskine, MN Revised Reinforcing

More information

Warm Mix Asphalt (WMA) Guide Specification for Highway Construction

Warm Mix Asphalt (WMA) Guide Specification for Highway Construction Warm Mix Asphalt (WMA) Guide Specification for Highway Construction Division 400 - Asphalt Pavements and Surface Treatments SECTION 4XX - WARM MIX ASPHALT (WMA) PAVEMENT Warm mix asphalt (WMA) is the generic

More information

550 Surface Treatments

550 Surface Treatments Table of Contents 550 Surface Treatments... 550-1 550.1 Introduction... 550-1 551 Crack Sealing... 550-1 551.1 Project Selection... 550-1 551.2 Design Considerations... 550-1 552 Chip Sealing... 550-2

More information

Puerto Rico. Pavement Preservation Conference and Technology Implementation. US. Department of Transportation Federal Highway Administration

Puerto Rico. Pavement Preservation Conference and Technology Implementation. US. Department of Transportation Federal Highway Administration Puerto Rico Pavement Preservation Conference and Technology Implementation US. Department of Transportation Federal Highway Administration Cold In-Place Asphalt Recycling Overview Michael L. Polak E.J.

More information

MIDLAND COUNTY ROAD COMMISSION

MIDLAND COUNTY ROAD COMMISSION MIDLAND COUNTY ROAD COMMISSION BID FORM Sealed Proposals will be received at the office of the Board of Road Commissioners, County of Midland, at 2334 N. Meridian Road, Sanford, Michigan, 48657, until:

More information

How to Select the Appropriate Pavement Rehabilitation Option. David Rettner, PE American Engineering Testing, Inc.

How to Select the Appropriate Pavement Rehabilitation Option. David Rettner, PE American Engineering Testing, Inc. 1 How to Select the Appropriate Pavement Rehabilitation Option David Rettner, PE American Engineering Testing, Inc. 2 Pavement Rehabilitation Selection Understanding the Problem 3 Pavement Assessment Pavement

More information

Asphalt Rubber Surface Treatment & SAMIs in Pavement Preservation

Asphalt Rubber Surface Treatment & SAMIs in Pavement Preservation Asphalt Rubber Surface Treatment & SAMIs in Pavement Preservation 62 nd School for Highway Superintendents Cornell Local Roads Program June 5, 2007 By Rod Birdsall, P.E. www.fp2.org Resources www.pavementpreservation.org

More information

STANDARD SPECIFICATIONS SECTION PAVEMENT REQUIREMENTS

STANDARD SPECIFICATIONS SECTION PAVEMENT REQUIREMENTS STANDARD SPECIFICATIONS SECTION 02950 PAVEMENT REQUIREMENTS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for removing, replacing and providing new paving for roads, driveways, parking

More information

CHAPTER 10: PAVING. Refer to page 548 of the 2016 Spec book or page 573 of the 2018 Spec book for material specifications under G.

CHAPTER 10: PAVING. Refer to page 548 of the 2016 Spec book or page 573 of the 2018 Spec book for material specifications under G. CHAPTER 10: PAVING AGGREGATE Aggregate has become more specific on how it is paid for. Therefore, make sure the plan specifies they type of aggregate to use. Spec 2118 Aggregate Surfacing - Aggregate placed

More information

INVITATION TO BID ON TOWN PAVING PROJECTS

INVITATION TO BID ON TOWN PAVING PROJECTS INVITATION TO BID ON TOWN PAVING PROJECTS Offers shall be clearly labeled Paving Bid and submitted to: Town of Madison Paving Bid Attn: Tim Curtis, Town Manager 26 Weston Ave Madison, ME 04950 Bid opening:

More information

Reclamation Guidelines

Reclamation Guidelines Reclamation Guidelines MAAPT 63 rd Asphalt Conference December 7, 2016 Terry Beaudry MnDOT Grading Base, Recycling, and Aggregate Engineer Outline 2 Design and Preliminary Work Construction Production

More information

Pavement Maintenance Best Practices. Thomas J. Wood

Pavement Maintenance Best Practices. Thomas J. Wood Pavement Maintenance Best Practices Thomas J. Wood Agenda Why pavement maintenance / preservation is important Dealing with cracks When to apply a surface treatment Fog Sealing Micro Milling UTBWC Thin

More information

SECTION PAVEMENT STRUCTURE ANALYSIS

SECTION PAVEMENT STRUCTURE ANALYSIS MATERIALS PAVEMENT DESIGN 540.02.01 540.01 General SECTION 540.00 PAVEMENT STRUCTURE ANALYSIS 540.01.01 An engineering report covering life cycle cost analysis of the pavement structure shall be made for

More information

Design of Illinois Tollway Composite Pavements

Design of Illinois Tollway Composite Pavements Design of Illinois Tollway Composite Pavements William R. Vavrik, Ph.D., P.E. FHWA Tollway National Open House, August 20, 2013 1 Presentation Overview Starting in Composite Pavements Move to 2-Lift Concrete

More information

Opportunities with Concrete Pavements

Opportunities with Concrete Pavements Opportunities with Concrete Pavements Stewardship, Cost Effectiveness and Innovation North Carolina Concrete Pavement Conference Durham, North Carolina November 17 th, 2016 Leif G. Wathne, P.E. American

More information

Washington State Department of Transportation Case Study. Guidelines for the Preservation of High-Traffic-Volume Roadways (R26)

Washington State Department of Transportation Case Study. Guidelines for the Preservation of High-Traffic-Volume Roadways (R26) Washington State Department of Transportation Case Study Guidelines for the Preservation of High-Traffic-Volume Roadways (R26) Background Stretching the time between major rehabilitation projects can save

More information

Maintenance & Rehabilitation. Treatments. Crack Sealing. Sealant Types. Asphalt Pavement Preservation: Identification of Alternative Treatments

Maintenance & Rehabilitation. Treatments. Crack Sealing. Sealant Types. Asphalt Pavement Preservation: Identification of Alternative Treatments Asphalt Pavement Preservation: Evaluation, Maintenance & Rehabilitation Maintenance & Rehabilitation Treatments Identification of Alternative Treatments Before selecting a treatment for a pavement, we

More information

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS Section Page 26-1 GENERAL... 26.1 26-2 PAVEMENT KEYCUTTING... 26.1 26-3 PAVEMENT PLANING... 26.2 26-4 PLANED PAVEMENT CONFORMS... 26.3

More information

Pavement Design. TTP Orientation Seminar 2013

Pavement Design. TTP Orientation Seminar 2013 Pavement Design TTP Orientation Seminar 2013 What are Pavements? Engineered structures in contact with the earth's surface built to facilitate movement of people and goods Pedestrians Personal vehicles

More information

NCAT PAVEMENT TEST TRACK

NCAT PAVEMENT TEST TRACK NCAT PAVEMENT TEST TRACK 1 REPLACEMENT SECTIONS Red Mill and Inlay New Mix Performance Sections (11) Blue Excavate and Install New Structural Sections (5) 2 RESEARCH SPONSORS (+ FHWA) 3 CHAIN OF COMMAND

More information

PORTLAND CEMENT CONCRETE OVERLAYS. C. Unbonded Concrete Overlays Over Concrete (with separation layer)

PORTLAND CEMENT CONCRETE OVERLAYS. C. Unbonded Concrete Overlays Over Concrete (with separation layer) PORTLAND CEMENT CONCRETE OVERLAYS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Bonded Concrete Overlays Over Concrete B. Bonded Concrete Overlays Over Asphalt C. Unbonded Concrete Overlays Over Concrete (with

More information

BITUMINOUS MIXTURE # 13A BID SHEET

BITUMINOUS MIXTURE # 13A BID SHEET BITUMINOUS MIXTURE # 13A BID SHEET Sealed bids will be received at the office of the Clinton County Road Commission at 3536 S. US Highway 27, St. Johns, Michigan, until 1:00 P.M. Tuesday, January 31 st,

More information

Probabilistic Life Cycle Cost Analysis FHWA Demonstration Project DP 115

Probabilistic Life Cycle Cost Analysis FHWA Demonstration Project DP 115 Transportation Kentucky Transportation Center Research Report University of Kentucky Year 1998 Probabilistic Life Cycle Cost Analysis FHWA Demonstration Project DP 115 R. Clark Graves David L. Allen University

More information

THINLAY ASPHALT FOR PAVEMENT PRESERVATION

THINLAY ASPHALT FOR PAVEMENT PRESERVATION THINLAY ASPHALT FOR PAVEMENT PRESERVATION WAPA & WSDOT 2015 JOINT TRAINING LINDSI HAMMOND, P.E. Overview The Need for Pavement Preservation Purpose & Benefits of Pavement Preservation Thinlay Asphalt Treatments

More information

April 1, CITY OF PORTSMOUTH Public Works Department. Bid # Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS

April 1, CITY OF PORTSMOUTH Public Works Department. Bid # Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS April 1, 2009 CITY OF PORTSMOUTH Public Works Department Bid #54-09 2009 Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS This Addendum forms part of the original document marked Bid #54-09 2009

More information

2016 County Engineer s Workshop

2016 County Engineer s Workshop 2016 County Engineer s Workshop Manistee, Michigan Presented By: Tim Moomaw, WSDOT Construction Trainer February 2, 2016 Presentation Overview This presentation will review the past, present and future

More information

ADDENDUM NO. 1. FY 2012 Full Depth Reclamation Project CITY OF GAINESVILLE, GEORGIA

ADDENDUM NO. 1. FY 2012 Full Depth Reclamation Project CITY OF GAINESVILLE, GEORGIA ADDENDUM NO. 1 FY 2012 Full Depth Reclamation Project CITY OF GAINESVILLE, GEORGIA Bids to be received until 2:00 p.m., local time, July 9, 2012 SPECIFICATIONS Delete Section 00 41 53 Bid Unit Price in

More information

Section 508. CHIP SEALS Description. Prepare the surface and apply the specified single chip seal, double chip seal or shoulder chip seal.

Section 508. CHIP SEALS Description. Prepare the surface and apply the specified single chip seal, double chip seal or shoulder chip seal. 508.01 Section 508. CHIP SEALS 508.01 Description. Prepare the surface and apply the specified single chip seal, double chip seal or shoulder chip seal. 508.02 Materials. Use materials meeting the following.

More information

Mix Design & Construction -1-

Mix Design & Construction -1- Mix Design & Construction -1- AGENDA RCC Mix Design RCC Mix Production RCC Construction Process -2- THE FINAL SURFACE TYPE WILL DICTATE THE NECESSARY TECHNIQUES & EQUIPMENT NEEDED TO BE SUCCESSFUL Natural

More information

SHRP2 R21 Composite Pavement Systems Project Overview

SHRP2 R21 Composite Pavement Systems Project Overview SHRP2 R21 Composite Pavement Systems Project Overview Michael I. Darter & Shreenath Rao Applied Research Associates, Inc. 2100 Louisiana Transportation Conference Baton Rouge, LA 10 January 2011 SHRP2

More information

INDOT Thin Concrete Overlay Initiatives. Tommy E. Nantung INDOT Division of Research and Development

INDOT Thin Concrete Overlay Initiatives. Tommy E. Nantung INDOT Division of Research and Development INDOT Thin Concrete Overlay Initiatives Tommy E. Nantung INDOT Division of Research and Development System of Concrete Overlays Thinner Concrete Overlays Thicker Bonded Overlay System Unbonded Overlay

More information

MNDOT PAVEMENT DESIGN MANUAL

MNDOT PAVEMENT DESIGN MANUAL MNDOT PAVEMENT DESIGN MANUAL Chapter 9 truction and Rehabilitation Alternates MnDOT Pavement Engineer Date Contents Introduction... 1 900 Existing Pavement-Types... 2 910 Rehabilitation with HMA Overlay

More information

NYSDOT TRANSPORTATION MAINTENANCE DIVISION PAVING PROJECT QUALITY ASSURANCE ASSESSMENT Rating Guidelines (Revision #1)

NYSDOT TRANSPORTATION MAINTENANCE DIVISION PAVING PROJECT QUALITY ASSURANCE ASSESSMENT Rating Guidelines (Revision #1) NYSDOT TRANSPORTATION MAINTENANCE DIVISION PAVING PROJECT QUALITY ASSURANCE ASSESSMENT Rating Guidelines (Revision #1) INTRODUCTION The condition assessment is intended to be performed from a customer

More information

Flexible Pavement of Ohio

Flexible Pavement of Ohio Flexible Pavement of Ohio 49 th Annual Meeting & Equipment Exposition Wednesday, March 9, 2011 Doug Davis, P.E., P.S. Muskingum County Engineer Zanesville, Ohio Roads are living and breathing organisms.

More information

Curtis Bouteillier, Proform Management Inc. Wayne Gustafson, The City of Red Deer

Curtis Bouteillier, Proform Management Inc. Wayne Gustafson, The City of Red Deer Life Cycle Cost Analysis Considerations in Pavement Type Selection in Red Deer and Construction Challenges Bozena Czarnecki, Ph.D., P.Eng., Principal Specialist, Engineering Practice, Tetra Tech Canada

More information

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT). SECTION 32 01 16 ASPHALT OVERLAY PART 1 - GENERAL 1.1 SCOPE OF WORK A. This Section specifies the requirements for scarifying, grinding, sweeping and repair of existing asphalt concrete pavement to establish

More information

Cold Foam In-Place Recycling (CIR)

Cold Foam In-Place Recycling (CIR) Cold Foam In-Place Recycling (CIR) FONSECA/McELROY GRINDING CO., INC. Cold Foam CIR CIR Method/Foamed Asphalt Cold In-Place Recycling Foamed Asphalt Hot Bitumen Water Air Foamed Asphalt The larger surface

More information

Agency Process for Alternate Design and Alternate Bid of Pavements

Agency Process for Alternate Design and Alternate Bid of Pavements Agency Process for Alternate Design and Alternate Bid of Pavements William H. Temple, P.E. Chief Engineer Louisiana Department of Transportation and Development Baton Rouge, LA 70804 Phone: (225) 379-1234

More information

SPECIFICATIONS FOR FULL DEPTH RECLAMATION WITH CALCIUM CHLORIDE

SPECIFICATIONS FOR FULL DEPTH RECLAMATION WITH CALCIUM CHLORIDE SPECIFICATIONS FOR FULL DEPTH RECLAMATION WITH CALCIUM CHLORIDE 1.0 DEFINITIONS The term Director [Superintendent, etc.] shall mean the Director of Public Works of the awarding authority. The term Designee

More information

Specifications for Asphaltic Paving of Clark Road in Salem Township and Ludlow Road in Union Township both in Champaign County, Ohio.

Specifications for Asphaltic Paving of Clark Road in Salem Township and Ludlow Road in Union Township both in Champaign County, Ohio. Specifications for Asphaltic Paving of Clark Road in Salem Township and Ludlow Road in Union Township both in Champaign County, Ohio. General Conditions Scope: It is the intent of these specifications

More information

GUIDELINES FOR ASSESSING PAVEMENT PRESERVATION TREATMENTS AND STRATEGIES

GUIDELINES FOR ASSESSING PAVEMENT PRESERVATION TREATMENTS AND STRATEGIES GUIDELINES FOR ASSESSING PAVEMENT PRESERVATION TREATMENTS AND STRATEGIES EDITION 2 JULY, 2006 Page left blank intentionally EDITION 2 JULY, 2006 FOREWORD Alberta Infrastructure & Transportation's Pavement

More information

SUPERPAVE FACT SHEET

SUPERPAVE FACT SHEET WASHINGTON STATE DEPARTMENT OF TRANSPORTATION December 2003 SUPERPAVE FACT SHEET stands for SUperior PERforming asphalt PAVEment and is the result of a Strategic Highway Research Program (SHRP) initiative

More information

Thin Asphalt Overlays for Pavement Preservation

Thin Asphalt Overlays for Pavement Preservation Thin Asphalt Overlays for Pavement Preservation Mid-Year Asphalt Pavement Technical Seminar Sponsored by Flexible Pavements of Ohio Defining a Thin Asphalt Overlay? Thin overlays are typically 1 ½ inch

More information

Full Depth Reclamation

Full Depth Reclamation Full Depth Reclamation FDR Has Been Around A While 2 3 What is Full Depth Reclamation (FDR)? Full Depth Reclamation is a pavement rehabilitation technique in which the full flexible pavement section and

More information

500 Rigid Pavement. 502 Portland Cement Concrete Pavement (Non-QC/QA) Concrete Pavement (**)(**)(**) 501-1

500 Rigid Pavement. 502 Portland Cement Concrete Pavement (Non-QC/QA) Concrete Pavement (**)(**)(**) 501-1 500 Rigid Pavement Plate 501 Portland Cement Concrete Pavement (QC/QA) Concrete Pavement (**)(**)(**) 501-1 Quality Control Testing Concrete Pavement (**)(**)(**) 501-2 Record of Tested Material Received

More information

FULL DEPTH RECLAMATION FOR CITIES AND COUNTIES. OTEC - October 27, 2015

FULL DEPTH RECLAMATION FOR CITIES AND COUNTIES. OTEC - October 27, 2015 FULL DEPTH RECLAMATION FOR CITIES AND COUNTIES OTEC - October 27, 2015 OVERVIEW Time + Traffic + Environment = Deterioration Temporary repairs include overlays or mill and fills to extend service life

More information

Maryland Transportation Authority (MDTA)

Maryland Transportation Authority (MDTA) Maryland Transportation Authority (MDTA) I-95 Major Deck and Superstructure Rehabilitation South of the Fort McHenry Tunnel Northeast Bridge Preservation Partnership Conference September 20, 2016 David

More information

Integrated Tools for Pavement Design and Management

Integrated Tools for Pavement Design and Management Integrated Tools for Pavement Design and Management W. James Wilde, Principal Investigator Center for Transportation Research and Implementation Minnesota State University, Mankato February 2014 Research

More information

SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS

SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS The City of Blue Springs hereby adopts Section 2200 of the Kansas City Metropolitan Chapter of APWA Construction and Material

More information

Life Cycle Cost Analysis of Full Depth Reclamation versus Traditional Maintenance and Rehabilitation Strategies

Life Cycle Cost Analysis of Full Depth Reclamation versus Traditional Maintenance and Rehabilitation Strategies Life Cycle Cost Analysis of Full Depth Reclamation versus Traditional Maintenance and Rehabilitation Strategies Andrew Braham University of Arkansas Rocky Mountain Asphalt Conference Denver, CO February

More information

Double covered. ODOT tests enhanced chip seal on S.R. 20. chip seal constructed on an. existing flushed roadway has the

Double covered. ODOT tests enhanced chip seal on S.R. 20. chip seal constructed on an. existing flushed roadway has the PAVEMENT MAINTENANCE By Mark Russell, P.E., Kevin Littleton, P.E., and Jeff Uhlmeyer, P.E. Contributing Authors Double covered ODOT tests enhanced chip seal on S.R. 20 A chip seal constructed on an existing

More information

NCC Accelerated Construction. Dan DeGraaf, P.E. Michigan Concrete Association April 26, 2011

NCC Accelerated Construction. Dan DeGraaf, P.E. Michigan Concrete Association April 26, 2011 NCC Accelerated Construction Dan DeGraaf, P.E. Michigan Concrete Association April 26, 2011 language to use Maslansky Luntz & Partners AASHTO Much of the standstill you experience sitting in traffic could

More information

610 - DOUBLE ASPHALT SURFACE TREATMENT SECTION 610 DOUBLE ASPHALT SURFACE TREATMENT

610 - DOUBLE ASPHALT SURFACE TREATMENT SECTION 610 DOUBLE ASPHALT SURFACE TREATMENT SECTION 610 DOUBLE ASPHALT SURFACE TREATMENT 610.1 DESCRIPTION Construct a wearing surface composed of an asphalt prime coat followed by the applications of 2 asphalt seal coats and cover material as specified

More information

Rapid Repair Materials and Construction Rapid Bridge Repair Workshop Holiday Inn Tanglewood-Roanoke, Virginia May 21 and 22, 2009

Rapid Repair Materials and Construction Rapid Bridge Repair Workshop Holiday Inn Tanglewood-Roanoke, Virginia May 21 and 22, 2009 Rapid Repair Materials and Construction Rapid Bridge Repair Workshop Holiday Inn Tanglewood-Roanoke, Virginia May 21 and 22, 2009 Michael Sprinkel, P.E. Associate Director Virginia Transportation Research

More information

TRANSVERSE CRACKING PROGRESSION IN ASPHALT SHOULDERS ADJACENT TO CONCRETE PAVEMENTS

TRANSVERSE CRACKING PROGRESSION IN ASPHALT SHOULDERS ADJACENT TO CONCRETE PAVEMENTS TRANSVERSE CRACKING PROGRESSION IN ASPHALT SHOULDERS ADJACENT TO CONCRETE PAVEMENTS Sam Owusu-Ababio and Robert Schmitt University of Wisconsin-Platteville, U.S.A. Abstract The shoulder forms an integral

More information

SECTION 20 INDEX PAVING FABRIC 1. SCOPE OF WORK MATERIAL REQUIREMENTS CONSTRUCTION AND INSTALLATION REQUIREMENTS...

SECTION 20 INDEX PAVING FABRIC 1. SCOPE OF WORK MATERIAL REQUIREMENTS CONSTRUCTION AND INSTALLATION REQUIREMENTS... SECTION 20 INDEX PAVING FABRIC 1. SCOPE OF WORK... 20-2 2. MATERIAL REQUIREMENTS... 20-2 3. CONSTRUCTION AND INSTALLATION REQUIREMENTS... 20-2 4. METHOD OF MEASUREMENT... 20-5 20-1 SECTION 20 PAVING FABRIC

More information

Cost Estimating Guideline February, 2017

Cost Estimating Guideline February, 2017 Cost Estimating Guideline February, 2017 Procedures are subject to change without notice. Check the Capital Project Delivery website to ensure this is the current version. Table of Contents Section 1 -

More information

September 2012 Volume 1 No. 2

September 2012 Volume 1 No. 2 v o i ce North Dakota 200 Overlay Project Excels NORTH DAKOTA READY MIX & CONCRETE PRODUCTS ASSOCIATION PO Box 1076 Bismarck, ND 58502 September 2012 Volume 1 No. 2 David C. Sethre Marketing Director PO

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 806 ASPHALT CONCRETE WITH JOINT DENSITY FOR MULTI-LANE HIGHWAYS.

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 806 ASPHALT CONCRETE WITH JOINT DENSITY FOR MULTI-LANE HIGHWAYS. STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 806 ASPHALT CONCRETE WITH JOINT DENSITY FOR MULTI-LANE HIGHWAYS March 2, 2015 806.01 Description 806.02 JMF Field Adjustments 806.03

More information

1301 SCOPE. This section covers asphaltic concrete (AC) pavement for roadways and parking areas.

1301 SCOPE. This section covers asphaltic concrete (AC) pavement for roadways and parking areas. SECTION 1300 - ASPHALTIC CONCRETE PAVEMENT 1301 SCOPE. This section covers asphaltic concrete (AC) pavement for roadways and parking areas. 1302 GENERAL. Pavement shall be constructed to the lines, grades,

More information

WSDOT Pavement Preservation Performance

WSDOT Pavement Preservation Performance WSDOT Pavement Preservation Performance Jianhua Li, PhD PE 2014 NWPMA Conference 1 FHWA Pavement Preservation Definition Pavement Preservation is a program employing a network level, long-term strategy

More information

Airport Pavement Rehabilitation 2015 Minnesota Airports Conference

Airport Pavement Rehabilitation 2015 Minnesota Airports Conference Airport Pavement Rehabilitation 2015 Minnesota Airports Conference St. Cloud, Minnesota April 16, 2015 David L. Rettner, P. E. American Engineering Testing, Inc. Pavement Life Cycle Routine Maintenance

More information

Special Provision for Hot-Mix Asphalt Prime Coat

Special Provision for Hot-Mix Asphalt Prime Coat All Regional Engineers Omer M. Osman, P.E. Special Provision for Hot-Mix Asphalt Prime Coat July 25, 2014 This special provision was developed by the Bureau of Materials and Physical Research to improve

More information

IGGA Guide Specification: Conventional Diamond Grinding for Pavement Preservation Introduction

IGGA Guide Specification: Conventional Diamond Grinding for Pavement Preservation Introduction IGGA Guide Specification: Conventional Diamond Grinding for Pavement Preservation Introduction This standard developed, by the International Grooving and Grinding Association (IGGA), specifies the procedures

More information

Concrete Overlays. ACPA Pennsylvania Chapter. ACPA Pennsylvania Chapter. Versatile & Sustainable Solutions. Reasons to Consider a Concrete Overlay

Concrete Overlays. ACPA Pennsylvania Chapter. ACPA Pennsylvania Chapter. Versatile & Sustainable Solutions. Reasons to Consider a Concrete Overlay Overlays February 22, 2012 ACPA Pennsylvania Chapter Overlays John M. Becker, P.E. ACPA Penn Chapter February 22, 2012 One of 25 state paving associations affiliated with ACPA National Comprised of approximately

More information

Georgia DOT Micro-milling and Thin Overlay

Georgia DOT Micro-milling and Thin Overlay Georgia DOT Micro-milling and Thin Overlay Presented by Yichang (James) Tsai, Ph.D., P.E., Professor Georgia Institute of Technology Erany Robinson-Perry, P.E., Assistant State Maintenance Engineer Georgia

More information

OGFC Meets CRM : Where the Rubber meets the Rubber

OGFC Meets CRM : Where the Rubber meets the Rubber OGFC Meets CRM : Where the Rubber meets the Rubber GEORGE B. WAY, P.E. Pavement Section Engineer Arizona Department of Transportation Materials Group March 25, 1998 The Asphalt Conference Atlanta, Georgia

More information

TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM

TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM VIRGINIA DEPARTMENT OF TRANSPORTATION TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Americans with Disabilities Act Requirements of Maintenance and Operational

More information

MnROAD Safer, Smarter, Sustainable Pavements Through Innovative Research

MnROAD Safer, Smarter, Sustainable Pavements Through Innovative Research MnROAD Safer, Smarter, Sustainable Pavements Through Innovative Research A state of the art cold weather pavement and transportation testing facility located in central Minnesota January 2011 Serving the

More information

SELECTIVE FLEXIBLE PAVEMENT REHABILITATION BASED ON FORENSIC INVESTIGATION AND DEFLECTION ANALYSIS: SEVENTEEN YEARS CASE STUDY IN VIRGINIA

SELECTIVE FLEXIBLE PAVEMENT REHABILITATION BASED ON FORENSIC INVESTIGATION AND DEFLECTION ANALYSIS: SEVENTEEN YEARS CASE STUDY IN VIRGINIA 0 0 0 0 SELECTIVE FLEXIBLE PAVEMENT REHABILITATION BASED ON FORENSIC INVESTIGATION AND DEFLECTION ANALYSIS: SEVENTEEN YEARS CASE STUDY IN VIRGINIA Mohamed Elfino, Ph.D., P.E. * Assistant State Materials

More information

LTRC 211 LATEX MODIFIED ASPHALT AND EXPERIMENTAL JOINT TREATMENTS ON ASPHALTIC CONCRETE OVERLAYS EXPERIMENTAL PROJECT NO. 3 ASPHALT ADDITIVES

LTRC 211 LATEX MODIFIED ASPHALT AND EXPERIMENTAL JOINT TREATMENTS ON ASPHALTIC CONCRETE OVERLAYS EXPERIMENTAL PROJECT NO. 3 ASPHALT ADDITIVES LTRC 211 LATEX MODIFIED ASPHALT AND EXPERIMENTAL JOINT TREATMENTS ON ASPHALTIC CONCRETE OVERLAYS EXPERIMENTAL PROJECT NO. 3 ASPHALT ADDITIVES By STEVEN L. CUMBAA, P.E. SPECIAL STUDIES RESEARCH ADMINISTRATOR

More information