State of the Art TBM Full Face Driving

Size: px
Start display at page:

Download "State of the Art TBM Full Face Driving"

Transcription

1 Equipments: TBMs State of the Art TBM Full Face Driving Sonjoy Deb, B.Tech, Civil Associate Editor T unnel construction by means of Tunnel Boring Machine (TBM) has become a preferred method of construction nowadays. In addtion, this is well accepted by the environmentalist and the green groups. This state-of-art technology limits all works underground in building the tunnel to keep the distrubance to land, wildlife and mankind activities at ground level to a minimum throughout the period of construction. Tunnel construction by TBM is quite different from the traditional Drill and Blast Method. The tunnel is excavated by means of a machine instead of blasting with explosive. The tunnel lining is put in place at the back of the machine immediately following a ring length of TBM advancement. A well thought engineering survey scheme is devised to integrate with the operating system and working sequence of the TBM. Refer Figure 1 for a TBM. Full face TBMs have greatly advanced in technical capability 208 The Masterbuilder - May and size during recent years. They are being applied, increasingly, in difficult ground conditions such as poor quality of soil or rock, under high water pressure and with minimal cover. Depending on its properties, the ground exposed during the excavation process will require no support, if the cohesion is sufficient for a stable surface, or require immediate mechanical support from compressed air or with a pressurized liquid, if the face is not stable by itself. Of concern is the reliable stability of the face in complex ground conditions during the process of excavation and during interventions for maintenance, repair and tool replacement, when it is necessary for technicians to access the face. The importance of ground support by means of a liquid has increased significantly: The means and methods are constantly being developed and recent innovations are discussed in this paper.

2 tunnel boring has not been the method of choice in many parts of the world. For example, in India, reasons that have prevented the implementation of tunnel boring, until recently, are: - The existence of hard granitic and volcanic rock in some parts of the country - Plentiful and low cost labour - Short lead times available for beginning conventional (drill and blast) tunneling. Major Component of TBM: Refer Figure 2 and 3 below. Tunnel Boring Machine History of TBM s Tunnel boring was originally attempted over 150 years ago, simultaneously yet independently in England, Europe and North America. The original attempts are generally considered failures, except for the 1.5km Shakespeare tunnel in Dover, a part of the original Channel tunnel, bored over 100 years ago. The imagination of scientists and engineers were far ahead of the technology necessary to turn their concepts into practical reality. Another major attempt to establish tunnel boring was made in the United States during the early 1950s and continuing into the 1960s with some success in very soft rocks. With advances in technology and a desire to excavate harder and harder rock, success was not always realized. Nevertheless, the use of Tunnel TBMs increased into the 1960s and 1970s with technological advances that allowed successful tunnel boring in harder as well as less competent rock. With each advance in technology and success in the field, unsuccessful projects were not uncommon. Component 1 Cutter Disc 2 Shield Skin 3 Pushing Jack 4 Main Drive 5 Screw Conveyor 6 Erector 7 Back Up Facilities Figure 2: Major Components of a TBM Function To excavate rock or soft ground by the rotation of an assembly of teeth or cutting wheels under pressure against rock face. To keep the soil from getting into the machine and to provide a safe space for the workers To be in full contact with the erected segment and extend by hydraulic as the cutter disc turns and thrusts forward. To provide a force in rotating the cutter disc and is powered by electricity. To move the spoil at the cutter disc and feed onto a conveyor system. To erect the segments to form a complete ring after shoving at the tail of the TBM. To travel with the TBM and to service the operation of annular grouting, welding, extension of ventilation, power and track etc. Recent developments of TBM s Tunnelling and especially tunnel boring has had a particular fascination for engineers and contractors alike. The use of tunnel boring has increased through the last two decades to the extent that more than 20 tunnel projects are begun each year by new and used TBMs worldwide. Although tunnel boring accounts for 80 to 90% of all civil tunnel excavation in North America and an ever increasing portion of tunnels worldwide, Figure 1: A Tunnel Boring Machine Figure 3: Different Parts of TBM including Cutting Head Zoomed Operating Sequence of TBM s The TBM moved forward as it excavated the tunnel by extending the pushing jacks at the back. When the advancement of the machine reached distance of the length of a ring, the excavation stopped and the pushing jacks were retrieved, a concert circular ring in form of a numbers of segments were then put together at the tail of the shield. The pushing arms were once again extended in full contact with the concert ring just erected and excavation resumed. The cycle of excavation and ring erection repeated as the TBM advanced to form the lining of the tunnel. Refer Figure 4below. The Masterbuilder - May

3 approximately 14 m for the EPB type. Delivery is in course for two Herrenknecht Slurry-TBMs, with a diameter of m, to Shanghai, China. Refer Figure 5 for size of TBMs Operation Procedures Besides the improvements of the mechanical aspects of Full Face Tunnel Boring Machines, the systematization of the operation procedures, based on physical and chemical knowledge, have developed significantly. This has led to the result that, nowadays, a controlled tunnel drive can be accomplished even in very unfavourable ground conditions. Face Support Figure 4: Tunnel formation through ring erection by TBM Size of TBMS As early as 1984, a TBM with an outstanding diameter of m started its drive on the Gubrist tunnel, in Switzerland. This marked the beginning of an impetuous development of TBMs regarding their size. The request to construct a 2-lane motorway required an excavation diameter of more than 12 m. The favourable ground conditions hard marl on the alignment and cooperation between machine manufacturers Herrenknecht and Robbins facilitated this start. Following that success, the size of TBMs grew steadily also for application in more or less cohesive soils. Part of the Grauholz tunnel in Switzerland had to be driven through glacial deposits with an m Slurry-TBM, which had been converted into an open face TBM for the stretch through stable marls. To underpass the river Elbe, in Hamburg, for a motorway through glacial deposits, a Slurry-TBM with a diameter of m was brought into action. The machine was manufactured by Herrenknecht, and afterwards it was used in Moscow. Only few years later, the manufacturer NFM / Wirth built a Slurry- TBM of m in diameter to underpass the Greune Hart, a country site in the Netherlands. Presently, State of the Art TBMs have diameters larger than 15 m for the slurry type, and Figure 5: Large diameter TBMs A reliable and controlled tunnel drive with a TBM requires immediate and permanent support of the ground surface exposed by the excavation process. The support can be provided either by a mechanical support, a support by compressed air, or by a liquid such as a slurry, or by the conditioned excavated material. An effective and reliable mechanical support presupposes a certain degree of cohesion of the ground and the absence of ground water. Otherwise, deformation of the exposed surfaces is unavoidable. The devices for support are mechanical construction elements. An effective support by compressed air requires specific ground properties. Due to the variability of the ground, this is not always achievable. The low viscosity of air, which is 50 to 70 times lower than water, allows for an easy flow through the pores in the ground and adds to the sensitivity of a permanent compressed air support. The development of TBM systems with a liquid support has resulted in TBM types with higher performance than of those which rely on compressed air or mechanical support. Support Medium Slurry In Slurry TBMs the support medium is a pressurized frictionless suspension. It consists of water and bentonite, a processed clay, which can filter out and settle on the surface of the exposed ground face to form a membrane, a more or less impervious layer, the so called filter cake. Via this membrane, the support forces generated from the pressurized slurry are transferred onto the unstable face. The properties and the quality of this membrane influence the pore water pressure in the ground behind the face, affecting, consequently, the pressure gradient between the support pressure and the pressure in the ground (induced by earth pressure and ground water loads). Additives, special polymers, can be added to the slurry, if the ground at the face is so pervious that the slurry penetrates into it without generating a membrane at the surface. With the application of specially designed mixtures, tunnels have been driven recently through grounds displaying extreme permeability. Figure below shows the application of 210 The Masterbuilder - May

4 Slurry and EPB-drives through various ground conditions, specified by its grain size distribution. Refer Figure 6 and 7. or Polymer slurry have the same suspension content as for Slurry-TBMs. Foam however is an economic agent often used for conditioning excavated ground in EPB-TBMs. It consists generally of 91% air, 8,8 % water and 0,2 % foaming agent. The type and volume of the foaming agent have to be designed. They are variable, resulting in different properties. This has also a decisive influence on the time span until the foamsoil mixture in the working chamber of the TBM becomes unstable. Then, the air bubbles diffuse and accumulate in the top area of the working chamber. This effect starts after 10 to 50 minutes. This concentration of air in the crown area reduces the support pressure in that sensible area and consequently causes over-excavation. The air diffusion, on the other hand, stiffens the muck and facilitates its transportation and deposition. Refer Figure 8 below for the effects of conditioning agent on filtration. Transfer of Support Pressure to the Face Figure 6: Slurry Support Medium for TBM Figure 8: Effect of Conditioning Agent on Filtration Figure 7: EPB drives through various ground conditions Conditioned Excavated Earth Material Because the support medium on EPB-TBMs is the excavated material itself, it does not lend itself to a precise definition due to the variety of ground properties. Even when ground water is present, the properties of the support medium are, at best, those of a non-frictionless, high viscosity fluid. If the soil does not contain enough fine particles and the water inflow from the ground water is insufficient, additives have to be added to achieve fluid properties suitable for pressure transfer to the unstable face. Mechanical elements such as mixing bars, mounted on the revolving wheel and at the stationary pressure bulkhead, mix the excavated material with the added suspension and additives to a homogeneous mass, the earth paste. Different agents are added for conditioning, Bentonite slurry, Polymer slurry or Foam. Bentonite slurry Transfer in Slurry-TBMs In Slurry-TBMs, the support forces are produced by pressurizing the supplied slurry with regulated air compressors. This pressurized fluid will be pumped into the working chamber, (a closed room). Because of the friction-less pressurized liquid, the support forces are transferred directly onto the unstable face, via the out-filtered membrane at the face, the filter cake. To maintain the predetermined pressure in the closed room, and also to compensate for volume differences of the pressurized slurry between inflow and outflow, an adjusted gas reservoir is integrated in the working chamber. This system, a Slurry- TBM with the integrated gas-reservoir, has proved reliable in many projects. Tolerances of less than 0.1 bars for the support pressure are real. Actual developments of the slurry design have therefore widened the successful application in very pervious ground, such as the Portland CSO project, in the USA. Refer Figure 9 and 10 below for transfer of support pressure and support function in inhomogeneous ground. 212 The Masterbuilder - May

5 Transfer In EPB-TBMs In EPB-TBMs, the support forces are produced by the advance Figure 9: Transfer of support pressure cannot be detected, and consequently not compensated by the TBM operator. Aggravating this is the fact that, currently, all known means and methods to assess the exact volume of the excavated ground are not reliable, and therefore not suitable for the adjustment of the operation process by the TBM operator. On the EPB-TBM operated in Porto, Portugal, in extremely hetero-geneous ground, a special device was installed: the Additional Face Support System, compensates automatically for a support pressure drop in the crown area of the working chamber, by injec-tion of a predetermined pressurized bentonite slurry from a tank positioned on the back-up train. The tank is connected via pipes with the crown area of the working chamber. This system operates automatically in the same way as a Slurry-TBM with the integrated gas-reservoir and is, consequently, as re-liable. It has proven successful, and is installed also on the EPB-TBM in construction for an extension of the Metro lines, in Athens, Greece. Refer Figure 11 below. Figure 11: Transfer In EPB-TBMs Figure 10: Support Function in Inhomogeneous Ground forces, which press the conditioned earth paste via the bulk head against the unstable face. The compressible, high viscosity material in the working chamber, make it difficult to determine the support pressure applied at the face. The imposed pressure is measured at the bulkhead by pressure cells. The distance between bulkhead and face is 1 to 2 m. The compressible earth paste transfers only a reduced support force to the face. A pressure reduction of approximately 1 bar is a reality. Together with the influence of the accumulated diffused air from the conditioning agent foam, the support pressure becomes uncertain, even unpredictable, and cannot be derived from the values of the pressure cells at the bulkhead. Reduced and uncertain support pressure in the crown area is the result of these affects. This causes over-excavation, which Maintenance And Repair Lack of maintenance, in particular of excavation tools, often causes problems on TBM drives with liquid face support. During interventions, access into the working chamber for inspection or repair must be provided under compressed air. This action requires special knowledge and experience with compressed air techniques, which is not available everywhere. Therefore, some TBM management teams often shy away from systematic inspection and maintenance of excavation tools. The consequences are fatal if the ground is abrasive. On several TBMs, the tools were completely worn down to the structure of the cutter head. Long lasting repair works were necessary to continue the drive. On the Metro project in Porto, the consumption of the excavation tools of the 9 m diameter TBM summed up to one disc per running meter of The Masterbuilder - May

6 tunnel, because of the high abrasiveness of the granite. Daily routine interventions managed the problem for an unimpeded tunnel drive. At another project, the tunnel drive was stopped because of loss of excavation tools, as a result of ignored maintenance. With the disabled TBM, the ground was loosened and significant over-excavation was discovered. Long lasting underground repair work under compressed air conditions had to be envisaged. However, in that disturbed ground compressed air intervention failed because of air loss through the loosened ground. The problem was solved by pumping pressurized artificial soil into the working chamber which penetrated, under pressure, into the disturbed ground. After 2 days of setting, the ground around the TBM was ready for repair works. Manual excavation of the artificial soil from the working chamber prepared the area for repair works. Special care has to be taken regarding the membrane at the face. Out filtered bentonite can provide a suitable filter cake only for a short time. It has to be replaced by shotcrete or quick-cement if long lasting compressed air support is necessary. The face has to be sealed as dense as possible to prevent penetration of air into the ground, which deteriorates the stability of the face. On some occasions large lumps of ground slid off the face after weeks of compressed air support, endangering the life of the workers in the working chamber. Refer Figure 12 below for repair methodology. - The maintenance - The installation of lining and bedding in the ground must be elaborated for the total length of the drive. TBM Drive Under High Ground Water Heads The impetuous developments of Tunnel Boring Machines have extended the span of successful application to projects under high ground water heads. It is not only the high burden of the water head on the TBM construction which has to be sustained, but more so the difficulties to dominate safe techniques to enter in a working chamber for maintenance and repair work, under high pressure, balancing the high ground water head. TBMs have been used, in general, for tunnel drives with ground water heads up to 4 bars, which allow workers to enter into the empty working chamber under compressed air. For special projects, such as the Elbe crossing and the Wesertunnel, in Germany, exceptions to these limits were granted to 4.2 and 4.3 bars, respectively, with imposed conditions. Interventions under such water head could be performed while the workers breathed compressed air. Working time in the chamber was restricted to 80 minutes. Decompression required 2 hours, with additional oxygen supply. For higher water heads, on other tunnel projects, the technique to work in a pressurized atmosphere received and adapted elements of diving routines. Actual tunnel projects have required or will require support pressure exceeding the tolerable regular compressed air limits. For instance, in St. Petersburg with 5.5 bars, or in the Westerschelde tunnel, in the Netherlands, with 6.4 bars, and more recently in Shanghai, with 6.5 bars. Several projects in the USA with 7 bars as in the Bright Water project, in the Seattle area, or 10 bars in the Arrowhead tunnels in California, are in the design phase and challenging the tunnel boring technique. All these projects apply elements and equipment with ocean diving technology. For short term interventions, and for inspection purposes, the working chamber is under ordinary compressed air pressure up to 8 bars, while the workers wear a special helmet through which a gas mixture consisting helium, oxygen and nitrogen is provided. For longer interventions, and higher water heads, the application of saturation diving technique is an essential requirement, as used in the Westerschelde project. Refer Figure 13 below. Figure 12: Repair Methodology Strict Management Program For Operation Procedures The above mentioned examples demonstrate the essential requirements for a strict management program of operation procedures for any individual tunnel project. It has to be based on the specific ground conditions and the proposed TBM technique. All relevant data for: - The operation of the TBM - The face stability during drive and down time Figure 13: Working inside TBM under extreme pressure 214 The Masterbuilder - May

7 Equipments: TBMs Construction Stage 1 Prior to the initial drive of TBM, secondary control station was established at the TBM Launching Shaft at surface by transferring co-ordinates from the primary control stations. Refer Figure 14. Figure 16: Zigzag traversing inside the tunnel Figure 14: Transfer of control station at surface 4 Traversed the temporary control stations at the erected rings above the TBM back up gantry to reach the Laser Station located about 30m behind the TBM. Refer Figure Transferred the secondary control station from surface at the TBM Launching Shaft to the tunnel control station at underground level (Refer Figure 15). Figure 17: Transfer of control station at the TBM back up gantry Figure 15: Transfer of control station from surface to underground 3 Moved up the tunnel control station by Double Zigzag Traverse (3.5) behind the TBM as the machine travelled ahead, and transferred a temporary station to the shoulder position of the erected ring at the back-up gantry of the TBM. Refer Figure The Laser Station carried the coordinates from the control station shot the prism target affixed to the bulkhead of TBM to determine the absolute spatial coordinates (x,y,z) of the TBM at that point. The tunnel guidance system and the dual axial inclinometers simultaneousely measured the amount of rotation along the three perpendicular axis of the TBM to determine the orientation of the heading of the machine. Advantages of TBM Operational Advantage There are a number of inherent advantages to tunnel boring which are difficult to quantify yet have a considerable impact on the outcome of excavation rates and costs. These are difficult to value in a tender. These advantages cannot fully be appreciated except from firsthand tunnel boring excavation experience. Some of these are: The Masterbuilder - May Structural stability and safety at the face and work area Continuous (non-cyclic) operation Consistent, less skilled and easily trained operations (labour is assigned to limited tasks that are repetitive,

8 Equipments: TBMs - become routine, and may even produce competition among the labourers) Safer and more pleasant working environment than in D&B Performance advantages TBM performance advantages can be directly related to quantitative benefits and differences which easily translate into costs and are amenable to direct comparisons. Quantitative performance and cost comparisons can be made for: - excavation rates - overbreak labour - equipment elimination of temporary structures - support - supplies Conclusions The steady development of the mechanical aspects of TBM technique has achieved full face boring machines with diameters of more than 15 m. Also, the intensive and detailed preoccupation with the operation procedure resulted in significant progress, expanding the feasibility of full face tunnel drive to extreme unfavourable ground conditions, as well as with very high ground water heads. The operation of modern TBMs requires more and more a high standard of theoretical knowledge in the field of soil mechanics, applied physics and chemistry. For some fields, such as intervention under high water head, a specialist must be employed. For the benefit of an optimal and safe use of the actual available TBM technology a strict management program of operation procedures will be a future essential task, which includes certainly substantial training programs for the management and the working force. Reference minar%20tunnel%20boring%20machines.pdf h t t p : / / w w w. t h e r o b b i n s c o m p a n y. c o m / w p - c o n t e n t / uploads/2010/08/robbins-tbm-brochure.pdf h30larsbabendererde.pdf 218 The Masterbuilder - May

Experts in tunneling with Tunnel Boring Machines

Experts in tunneling with Tunnel Boring Machines www.eurohinca.com www.terratest.es Experts in tunneling with Tunnel Boring Machines info@eurohinca.com EUROHINCA Europea de Hincas Teledirigidas, S.A., EUROHINCA, was incorporated in 1996 for the execution

More information

TBM Selection and Specification

TBM Selection and Specification By Bradford F. Townsend and Paul E. Jenkins Date: 13 June 2009 TBM Selection - Challenges to be met TBM Technology Auxiliary Measures and Backup New Developments Summary of Selection Process Procurements

More information

From Colonia Jardín to Cuatro Vientos

From Colonia Jardín to Cuatro Vientos 60 METROSUR Line 10, Section 1A Contractor: From Colonia Jardín to Cuatro Vientos The extension of Line 10 is underway, with two sections currently being built. The first, which is discussed here, was

More information

Pipe Jacking. Japan Sewage Works Association

Pipe Jacking. Japan Sewage Works Association Pipe Jacking Japan Sewage Works Association June, 2013 1 Pipe Jacking Yosuke Matsumiya y.matsumiya@ngsk.or.jp Japan Sewage Works Association Suisui Bldg. 2-10-12 Uchikanda, Chiyodaku Tokyo 101-0047 Japan,

More information

Long-Term Relations Between Joint Venture Partners A Supplier s Perspective.

Long-Term Relations Between Joint Venture Partners A Supplier s Perspective. Long-Term Relations Between Joint Venture Partners A Supplier s Perspective. Dipl.-Ing. (FH) Gebhard Lehmann, Vice Chairman of the Board of Management, Herrenknecht AG Rotterdam, 2015-10-09 Herrenknecht

More information

TBM rescue projects using shafts and ground freezing

TBM rescue projects using shafts and ground freezing TBM rescue projects using shafts and ground freezing Dipl.-Ing. Michael Löffler, Dipl.-Ing. Helmut Haß (CDM Consult GmbH, Germany) Dipl.-Ing. Thomas Ahlbrecht (Deilmann-Haniel Shaft Sinking GmbH, Germany)

More information

Pipe Jacking/Microtunnelling. Dr. Mark Knight. Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo.

Pipe Jacking/Microtunnelling. Dr. Mark Knight. Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo. Pipe Jacking/Microtunnelling Dr. Mark Knight Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo 1 New Installations New Installations Non-Steering Methods Steering Methods

More information

4th International Engineering and Construction Conference - July 28, 2006

4th International Engineering and Construction Conference - July 28, 2006 4th International Engineering and Construction Conference - July 28, 2006 BOX-JACKING - A USEFUL CONSTRUCTION TOOL By Anthony Lynn, Berkeley Engineering Company, Inc. Box jacking is jacking a large precast

More information

King County Uses Trenchless Methods to Construct a Large Siphon Under Seattle s Ship Canal

King County Uses Trenchless Methods to Construct a Large Siphon Under Seattle s Ship Canal North American Society for Trenchless Technology (NASTT) NASTT s 2013 No-Dig Show Sacramento, California March 3-7, 2013 TA-T1-03 King County Uses Trenchless Methods to Construct a Large Siphon Under Seattle

More information

EOSC 547: Tunnelling & Underground Design

EOSC 547: Tunnelling & Underground Design EOSC 547: Tunnelling & Underground Design Topic 4: Tunnelling Methods Soft Ground TBMs 1 of 41 Tunnelling Grad Class (2017) Dr. Erik Eberhardt Excavation Methods Selection of a tunnelling system (i.e.

More information

Construction Technology B (CON4313)

Construction Technology B (CON4313) Topic 5 Tunnelling 1. Introduction Tunnels can be defined as underground passages constructed for the purpose of transportation connection between two points. 2. Type of Tunnels There are many types of

More information

Case study The construction of the West Rail Tsing Kwai Tunnel from Mei Foo to Tsuen Wan

Case study The construction of the West Rail Tsing Kwai Tunnel from Mei Foo to Tsuen Wan Case study The construction of the West Rail Tsing Kwai Tunnel from Mei Foo to Tsuen Wan West Rail Tsing Kwai Tunnel Location of major Tunnel Portal West Rail Tsing Kwai Tunnel Construction Features -

More information

Hardrock Tunnel Boring Machines

Hardrock Tunnel Boring Machines Bernhard Maidl, Leonhard Schmid, Willy Ritz, Martin Herrenknecht Hardrock Tunnel Boring Machines In co-operation with Gerhard Wehrmeyer and Marcus Derbort -=rnst & Sohn '-A Wiley Company Contents 1 Historical

More information

Tel: Neil: Tony: Website:

Tel: Neil: Tony: Website: Australian Tunnelling Services are a consortium that has been formed to offer specialist underground services to both clients and contractors in the Civil Engineering, Mining & Building Industries. The

More information

Grouting Bilfinger Spezialtiefbau GmbH

Grouting Bilfinger Spezialtiefbau GmbH Grouting Bilfinger Spezialtiefbau GmbH Goldsteinstrasse 114 D-60528 Frankfurt Phone: +49 69 6688-345 Fax: +49 69 6688-277 Email: info.spezialtiefbau@bilfinger.com www.foundation-engineering.bilfinger.com

More information

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2 INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS 410. 1 SCOPE... 2 410. 2 DEFINITIONS 2.1 Tunneling and Jacking... 2 2.2 Tunneling... 2 2.3 Jacking... 2 410. 3 MATERIALS 3.1 General...

More information

Principles for Tunnel Design. 20th to 21st April 2017 Kuala Lumpur

Principles for Tunnel Design. 20th to 21st April 2017 Kuala Lumpur 20th to 21st April 2017 Kuala Lumpur Mechanized Tunneling (TBM and Support Systems) Thorsten Tatzki Herrenknecht Asia Headquarters Pte. Ltd. Introduction: General Overview Shield Machines and Tunnel Boring

More information

TUNNEL CONSTRUCTION GUIDELINES 05 - GUIDANCE NOTE ON PRE-EXCAVATION GROUTING FOR

TUNNEL CONSTRUCTION GUIDELINES 05 - GUIDANCE NOTE ON PRE-EXCAVATION GROUTING FOR TUNNEL CONSTRUCTION GUIDELINES 05 - GUIDANCE NOTE ON PRE-EXCAVATION GROUTING FOR UNDERGROUND CONSTRUCTION IN HARD ROCK PRINCIPLES & DESIGN ELEMENTS INTRODUCTION In underground hard rock construction, ground

More information

Tunnels. Introduction in Shield tunnelling Pipe jacking & tunnelling Slurry & hydroshield Slurry versus EPB Principles of support pressure

Tunnels. Introduction in Shield tunnelling Pipe jacking & tunnelling Slurry & hydroshield Slurry versus EPB Principles of support pressure Tunnels content of the lecture 1st Hour Tunnels Immersed tunnels Comparison Bored Tunnels (short) Land tunnels 2nd Hour Introduction in Shield tunnelling Pipe jacking & tunnelling Slurry & hydroshield

More information

Tunnel. Immersed Tunnels

Tunnel. Immersed Tunnels Tunnel Tunnels are underground spaces, usually, in a tubular shape with substantial lengths. They can either be man-made or natural and can be used as passageways, storages, carriageways and utility ducts.

More information

1 Introduction. Figure 1-1 Japanese scheme for the exploitation of underground space in an inner-city area [155]

1 Introduction. Figure 1-1 Japanese scheme for the exploitation of underground space in an inner-city area [155] 1 Introduction The mined construction of underground infrastructure has made steady progress over recent years. It is now possible to construct underground works with very little impairment of buildings

More information

Study of the Permeability of Foam Conditioned Soils with Laboratory Tests

Study of the Permeability of Foam Conditioned Soils with Laboratory Tests American Journal of Environmental Sciences 6 (4): 365-370, 2010 ISSN 1553-345X 2010 Science Publications Study of the Permeability of Foam Conditioned Soils with Laboratory Tests Luca Borio and Daniele

More information

LARGE DIAMETER PIPE ROOF BOX EXCAVATION FOR PASSENGER LINKWAY TUNNEL

LARGE DIAMETER PIPE ROOF BOX EXCAVATION FOR PASSENGER LINKWAY TUNNEL Submission for Hulme Prize 2017 LARGE DIAMETER PIPE ROOF BOX EXCAVATION FOR PASSENGER LINKWAY TUNNEL F. Saffiyah BADURDEEN 1, G. T. SENTHILNATH 2, 1 Ed. Zublin AG Singapore 2 Geoconsult Asia Singapore

More information

Design Data 4M. Jacking Concrete Pipe

Design Data 4M. Jacking Concrete Pipe Design Data 4M Jacking Concrete Pipe FOREWORD Jacking or tunneling concrete pipe is an increasingly important construction method for installing concrete pipelines without interrupting commerce, or disturbing

More information

4D grouting pressure model of a bored tunnel in 3D Tunnel

4D grouting pressure model of a bored tunnel in 3D Tunnel 4D grouting pressure model of a bored tunnel in 3D Tunnel F.J.M. Hoefsloot & A. Verweij, Fugro Ingenieursbureau B.V., The Netherlands INTRODUCTION For some ten years TBM-techniques have been used to construct

More information

1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe.

1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe. MTS Jack and Bore Design Criteria Note: For the purposes of this Design Criteria and subsequent Construction Notes, the term Jack and Bore is used generically to refer to a number of trenchless construction

More information

Pipejacking Tunnel Boring Machines TBMs. Michael Frenke, LOVAT Inc.

Pipejacking Tunnel Boring Machines TBMs. Michael Frenke, LOVAT Inc. Pipejacking Tunnel Boring Machines TBMs Michael Frenke, LOVAT Inc. Pipejacking Tunnel Boring Machines (TBMs( TBMs) Introduction Pipejacking Sequence TBM Design Features Types of Jacking Pipe Pipejacking

More information

Mechanised Shield Tunnelling

Mechanised Shield Tunnelling 2nd Edition Mechanised Shield Tunnelling Bernhard Maidl Martin Herrenknecht Ulrich Maidl Gerhard Wehrmeyer Table of Contents The authors Foreword to the 2nd Edition............................................

More information

Prof. Eng. Daniele PEILA

Prof. Eng. Daniele PEILA Course in Tunnelling and Tunnel Boring Machine Kurs w zakresie drążenia tuneli oraz maszyny drążącej TUNNEL FACE STABILITY WITH MECHANIZED TUNNELING GENERAL CONCEPTS Prof. Eng. Daniele PEILA 0 When tunneling

More information

An introduction to. pipe jacking

An introduction to. pipe jacking An introduction to pipe jacking The pipe jacking technique The major applications for pipe jacking and microtunneling include new sewerage and drainage construction, sewer replacement and lining, gas and

More information

Stabilization of Running Granular Soils in TBM Alignment with Sodium Silicate Grout

Stabilization of Running Granular Soils in TBM Alignment with Sodium Silicate Grout Stabilization of Running Granular Soils in TBM Alignment with Sodium Silicate Grout Brendan P. Harkins 1, E.I.T.; Dominic M. Parmantier 2, M. ASCE, P.E. 1 Project Engineer, Condon-Johnson & Associates,

More information

Design Data 4. Jacking Concrete Pipe

Design Data 4. Jacking Concrete Pipe Design Data 4 Jacking Concrete Pipe FOREWORD Jacking or tunneling concrete pipe is an increasingly important construction method for installing concrete pipelines without interrupting commerce, or disturbing

More information

4D grouting pressure model PLAXIS

4D grouting pressure model PLAXIS 4D grouting pressure model PLAXIS F.J.M. Hoefsloot & A. Verweij Fugro Ingenieursbureau B.V., Leidschendam, The Netherlands ABSTRACT: Bored tunnels are about to be constructed in the urban areas of Amsterdam

More information

Behavior of Surrounding Soil during Construction and Its Countermeasures Using Pipe Jacking Method in Deep Strata

Behavior of Surrounding Soil during Construction and Its Countermeasures Using Pipe Jacking Method in Deep Strata Open Journal of Geology, 2013, 3, 44-48 http://dx.doi.org/10.4236/ojg.2013.32007 Published Online April 2013 (http://www.scirp.org/journal/ojg) Behavior of Surrounding Soil during Construction and Its

More information

REPAIR OF DISPLACED SHIELD TUNNEL OF THE TAIPEI RAPID

REPAIR OF DISPLACED SHIELD TUNNEL OF THE TAIPEI RAPID REPAIR OF DISPLACED SHIELD TUNNEL OF THE TAIPEI RAPID TRANSIT SYSTEM Chi-Te Chang, Ming-Jung Wang, Chien-Tzen Chang, and Chieh-Wen Sun Central District Office, Department of Rapid Transit System, Taipei

More information

Qatar Rail Doha Metro

Qatar Rail Doha Metro Qatar Rail Doha Metro Dr. Ing. Markus Demmler Stakeholders 11 6 JVs with international companies Project Management Consultants About Qatar Rail Following its establishment in 2011, Qatar Rail is leading

More information

Wastewater Capital Projects Management Standard Construction Specification

Wastewater Capital Projects Management Standard Construction Specification CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 7.2 MICRO TUNNELING 7.2.1 General Where indicated on the Drawings, or where field

More information

Tunnelling under the Fraser River at 6 bar Design and Construction of the Port Mann Main Water Supply Tunnel

Tunnelling under the Fraser River at 6 bar Design and Construction of the Port Mann Main Water Supply Tunnel Tunnelling under the Fraser River at 6 bar Design and Construction of the Port Mann Main Water Supply Tunnel Stephanie Fekete McMillen Jacobs Associates Steve Skelhorn McNally Construction Inc. Tim Langmaid

More information

SPECIFICATION : BORING AND JACKING

SPECIFICATION : BORING AND JACKING SPECIFICATION 330524: BORING AND JACKING PART 1.0 GENERAL 1.1 DESCRIPTION 1.1.1 The work of this specification includes all labor, machinery, construction equipment and appliances required to perform in

More information

Diaphragm wall Construction

Diaphragm wall Construction Diaphragm wall Construction Diaphragm wall is a continuous wall constructed in ground in to facilitate certain construction activities, such as: a) As a retaining wall b) As a cut-off provision to support

More information

SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006

SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006 Michigan Department Of Transportation 3703C (11/06) 1 Materials 1.1 Pipe SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006 Page 1 of 5 The type of pipe used for the pipe jacking method shall be capable

More information

Shield TBM risk model based on Bayesian networks applicable in design stage

Shield TBM risk model based on Bayesian networks applicable in design stage Shield TBM risk model based on Bayesian networks applicable in design stage *Heeyoung Chung 1), In-Mo Lee 2) and Jeongjun Park 3) 1), 2) School of Civil, Environmental and Architectural Engineering, Korea

More information

Groundwater management during the construction of underground hydrocarbon storage in rock caverns

Groundwater management during the construction of underground hydrocarbon storage in rock caverns Groundwater management during the construction of underground hydrocarbon storage in rock caverns Amantini Eric, Cabon François, Moretto Anne. Géostock. 7 rue E. et A. Peugeot. 92563 Rueil-Malmaison. France.

More information

Performance review of a pipe jacking project in Hong Kong

Performance review of a pipe jacking project in Hong Kong Geotechnical Aspects of Underground Construction in Soft Ground Ng, Huang & Liu (eds) 2009 Taylor & Francis Group, London, ISBN 978-0-415-48475-6 Performance review of a pipe jacking project in Hong Kong

More information

Pipe Jacking. Progress is built on ideas.

Pipe Jacking. Progress is built on ideas. Pipe Jacking Progress is built on ideas. Frankfurt airport, enlargement of hydrant-fuelling system elongation of southeast-sewer, Nuremberg U 55 subway station, Brandenburger Tor, Berlin subway station

More information

Trenchless Pipeline Crossings

Trenchless Pipeline Crossings Trenchless Pipeline Crossings Overview Where we started Horizontal Directional Drilling 1960 s Evolution of the process Where we are today HDD Microtunneling Direct Pipe Crossing Process Where we re going

More information

COMPETITIVENESS OF PIPE-JACKING TUNNEL LININGS

COMPETITIVENESS OF PIPE-JACKING TUNNEL LININGS fib Symposium Keep Concrete Attractive, Budapest 2005 COMPETITIVENESS OF PIPE-JACKING TUNNEL LININGS Kolic D. 1, Hörlein N. 2, Schneider K. 3, Steiner H. 3 NEURON Consult ZT 1, PORR Tunnelbau GmbH 2, ÖBB-Infrastruktur

More information

Ground Freezing for Tunnel, Shafts, and Adits

Ground Freezing for Tunnel, Shafts, and Adits Ground Freezing for Tunnel, Shafts, and Adits Joseph A. Sopko, Adam Curry Moretrench American Corporation Bianca Messina Skanska USA Civil Stephen Njoloma McMillen Jacobs Associates ABSTRACT Construction

More information

Pipetron Tunnel Construction Issues

Pipetron Tunnel Construction Issues Pipetron Tunnel Construction Issues James E. Friant Colorado School of Mines and Excavation Engineering Associates, Inc., 1352 SW 175th St., Seattle, WA 98166 Robert A. Bauer and David L. Gross Illinois

More information

TRANSPORTATION RESEARCH FORUM March A State-of-the-Art of Underground Construction In Urban Areas

TRANSPORTATION RESEARCH FORUM March A State-of-the-Art of Underground Construction In Urban Areas TRANSPORTATION RESEARCH FORUM March 2006 A State-of-the-Art of Underground Construction In Urban Areas Nasri Munfah PE Vice President Tunneling Practice Leader Parsons Brinckerhoff Underground Construction

More information

Soil conditioning for EPB tunnelling in choesionless soil, clay and rock masses and backfilling in shield tunnelling

Soil conditioning for EPB tunnelling in choesionless soil, clay and rock masses and backfilling in shield tunnelling 2do Congreso Latinoamericano de Túneles y Espacios Subterráneos LAT 2015 28 de septiembre de 2015 Soil conditioning for EPB tunnelling in choesionless soil, clay and rock masses and backfilling in shield

More information

D7: TUNNEL CONSTRUCTION AND METHODOLOGY

D7: TUNNEL CONSTRUCTION AND METHODOLOGY HIGH SPEED TWO INFORMATION PAPER D7: TUNNEL CONSTRUCTION AND METHODOLOGY This paper outlines the proposed tunnelling methodology. It will be of particular interest to those potentially affected by the

More information

GEOTECHNICAL BASELINE REPORTS APPLYING THE GUIDELINES TO MICROTUNNELING

GEOTECHNICAL BASELINE REPORTS APPLYING THE GUIDELINES TO MICROTUNNELING The North American Society (NASTT) and the International Society for Trenchless Technology (ISTT) International No-Dig Show 2009 Toronto, Ontario Canada March 29 April 3, 2009 Paper A-2-04 GEOTECHNICAL

More information

Analysis of the EPB-TBM Excavation Parameters Used in a Tunnel Construction in Istanbul

Analysis of the EPB-TBM Excavation Parameters Used in a Tunnel Construction in Istanbul Proceedings of the 2 nd World Congress on Mechanical, Chemical, and Material Engineering (MCM'16) Budapest, Hungary August 22 23, 2016 Paper No. MMME 113 DOI: 10.11159/mmme16.113 Analysis of the EPB-TBM

More information

Geo-treatments in Constructing a Tunnel in Karst Strata: Lessons Learned from the Metro Subway Project in Guangzhou, China

Geo-treatments in Constructing a Tunnel in Karst Strata: Lessons Learned from the Metro Subway Project in Guangzhou, China Geo-treatments in Constructing a Tunnel in Karst Strata: Lessons Learned from the Metro Subway Project in Guangzhou, China Qing-Long Cui, Ph.D. student Co-authors: Ye-Shuang Xu, Shui-Long Shen*, Huai-Na

More information

Secoroc Rock Drilling Tools CASING ADVANCEMENT SYSTEMS

Secoroc Rock Drilling Tools CASING ADVANCEMENT SYSTEMS Secoroc Rock Drilling Tools CASING ADVANCEMENT SYSTEMS PRODUCTIVITY IN A PIPE Creating stability Drilled casings, or casing advancement systems, are today's preferred method for drilling in difficult ground

More information

STANDARD SPECIFICATIONS SECTION JACKED CASING

STANDARD SPECIFICATIONS SECTION JACKED CASING STANDARD SPECIFICATIONS SECTION 02315 JACKED CASING PART 1 - GENERAL A. Description Tunneling method by jacked casing, directional drilling, or a tunnel boring machine, for highway, railroad, creek, and

More information

CROSSRAIL INFORMATION PAPER D8 TUNNEL CONSTRUCTON METHODOLOGY

CROSSRAIL INFORMATION PAPER D8 TUNNEL CONSTRUCTON METHODOLOGY CROSSRAIL INFORMATION PAPER TUNNEL CONSTRUCTON METHODOLOGY This paper sets out the proposed Crossrail tunnel construction strategy and methodology. It will be of particular relevance to those in the vicinity

More information

TRENCHLESS INSTALLATION OF ROAD DRAINAGE & SERVICE DUCTS

TRENCHLESS INSTALLATION OF ROAD DRAINAGE & SERVICE DUCTS L L S! " # #! " # # $ % & ' (! & ) * + ', - )!!!. &! - * + ', - )!!!. &! - * " # # $ % & ' (! & ) " &! % - / 0 1 2 3 4 3 2 5 6 3 7 8 4 7 9 : 7 5 ; < 7 9 = > / 1 9 3 1 >? @ A A B C 9 1 8 2 D E 1 > > F 8

More information

Tunnel Boring Machines

Tunnel Boring Machines Tunnel Boring Machines IMIA WGP 60 Michael Spencer, Zurich London (Chairman) Alessandro Stolfa Generali Heiko Wannick Munich Re Ronan Gallagher Allianz John Forder Willis Beat Guggisberg Allianz Eric Bentz

More information

Compensation grouting for TBM tunnelling beneath shallow-cover

Compensation grouting for TBM tunnelling beneath shallow-cover Compensation grouting for TBM tunnelling beneath shallow-cover E. Chiriotti, N. Avagnina & P. Grasso Geodata S.p.A., Torino, Italy G. Tripoli IGM S.r.l., Basiglio (MI), Italy ABSTRACT: The last section

More information

Australasian Society for Trenchless Technology Standard for Microtunnelling & Pipe Jacking

Australasian Society for Trenchless Technology Standard for Microtunnelling & Pipe Jacking Australasian Society for Trenchless Technology Standard for Microtunnelling & Pipe Jacking - 2 Minor changes JP JP JP JP 1 June 2015 1 General Revisions JC MI NH JP 03 Feb 2010 0 Issued for Use Client

More information

7. Draw an equipment set up for the production of a beam by post tensioning. 10. What are the common concrete structures which are produced by

7. Draw an equipment set up for the production of a beam by post tensioning. 10. What are the common concrete structures which are produced by Construction Technology B (CON4313) Self Assessment Questions: Chapter 1 Prestressed Concrete 1. How does the prestressing of steel tendons in prestressed concrete offer a higher loading capacity than

More information

3 rd Edition of the ITA Tunnelling Awards - the winners 2017!

3 rd Edition of the ITA Tunnelling Awards - the winners 2017! Geneva, 17 th November, 2017 PRESS RELEASE 3 rd Edition of the ITA Tunnelling Awards - the winners 2017! Anyone who owns a car or has taken the metro has already experienced underground space. If tunnels

More information

Trenchless Technology

Trenchless Technology TRENCHLESS TECHNOLOGY Gene Woodbridge Earth Boring Co. Limited www.earthboring.ca Earth Boring Co. Limited 1576 Ifield Road Mississauga, ON L5H 3W1 (905) 277-9632 fax (905) 274-9040 Trenchless Technology

More information

PAUL ZICK, PE NORTH SHORE CONSTRUCTORS JV

PAUL ZICK, PE NORTH SHORE CONSTRUCTORS JV NORTH SHORE CONNECTOR TUNNELS AND STATION SHELL LIGHT RAIL PROJECT PAUL ZICK, PE NORTH SHORE CONSTRUCTORS JV North Shore Connector Alignment 7300 lf Extension to existing 25 mile system 18 Contracts $435

More information

introduction Introduction to Bridge and Tunnel Engineering Characteristics of ideal bridge Ideal location Factors affecting bridge type Classification

introduction Introduction to Bridge and Tunnel Engineering Characteristics of ideal bridge Ideal location Factors affecting bridge type Classification 1 introduction Introduction to Bridge and Tunnel Engineering A structure constructed over an obstacle to provide the passage Road bridge movement of traffic See NRS 2045 Cross drainage structure span greater

More information

Instrumentation and Data Management for the Zurich Zimmerberg Railway Tunnel Construction Daniel Naterop Solexperts Ltd.

Instrumentation and Data Management for the Zurich Zimmerberg Railway Tunnel Construction Daniel Naterop Solexperts Ltd. Instrumentation and Data Management for the Zurich Zimmerberg Railway Tunnel Construction Daniel Naterop Solexperts Ltd., Switzerland 1. Introduction The 9.4 km Zimmerberg base tunnel is an important part

More information

ROTARY DRILLING TECHNIQUES LARGE DIAMETER

ROTARY DRILLING TECHNIQUES LARGE DIAMETER INTRODUCTION This paper presents details about large diameter rotary drilling techniques typically employed in the civil engineering industry. These techniques have also been applied to the resources /

More information

TBM experiences from the Koralm railway tunnel (Austria) and re-use of TBM muck. Gerhard HARER

TBM experiences from the Koralm railway tunnel (Austria) and re-use of TBM muck. Gerhard HARER TBM experiences from the Koralm railway tunnel (Austria) and re-use of TBM muck Gerhard HARER 2 Project overview Koralm railway Part of the Baltic-Adriatic Core Network Corridor, which is one of the most

More information

Large Diameter Highway Tunnels

Large Diameter Highway Tunnels Large Diameter Highway Tunnels Richard Prust Towards a solution Need Feasibility Whole-life cost Corridors for through trips SR-99 carries a significant proportion of total through trips SR-99 corridor

More information

6 Preliminary Assessment of Construction Method and Constructability Issues

6 Preliminary Assessment of Construction Method and Constructability Issues 6 Preliminary Assessment of Construction Method and Constructability Issues 6.1 Construction Approach Appendix C includes conceptual designs of the alternatives discussed below. Generally, the conceptual

More information

New Developments in Automated Tunnel Surveying Systems

New Developments in Automated Tunnel Surveying Systems New Developments in Automated Tunnel Surveying Systems N.J. Chittenden, H.P. Müller Amberg Measuring Technique Ltd, Regensdorf-Watt, Switzerland ABSTRACT The surveying requirements during tunnel construction

More information

Introduction to Tunnel Construction

Introduction to Tunnel Construction Introduction to Tunnel Construction David Chapman, Nicole Metje and Alfred Stark *< \ Spon Press an imprint of Taylor & Francis LONDON AND NEWYORK * V TECHNISCHE INFORMATION S8IBLIOTHEK UNIVERSITATSBIBUOTHEK

More information

Concrete Pipe Jacking

Concrete Pipe Jacking Concrete Pipe Jacking Concrete Pipe Association of Australasia ACN 007 067 656 TECHNICAL BULLETIN CONTENTS ABSTRACT 1 INTRODUCTION 2 METHOD OF INSTALLATION 3 CONCRETE PIPE DESIGN 4 CONCRETE PIPE JOINT

More information

Expert in Tunneling Systems & Trenchless Technology (HDD, Microtunneling, Pipe Jacking, Thrustboring, Sheet Piling)

Expert in Tunneling Systems & Trenchless Technology (HDD, Microtunneling, Pipe Jacking, Thrustboring, Sheet Piling) INDEX 2 Company Profile 4 Technical Description 13 Organization Chart 6 Quality & HSE 19 Services Offered 8 Certification 22 COMPANY PROFILE Company Profile 4 Thrustboring Technology Contracting Company

More information

Influence of steering actions by the machine operator on the interpretation of TBM performance data

Influence of steering actions by the machine operator on the interpretation of TBM performance data RESEARCH REPORT Influence of steering actions by the machine operator on the interpretation of TBM performance data Funded by the Austrian Marshall Plan Foundation Supervisors: Prof. Walter Purrer Universität

More information

Design and Construction Issues of the Soft-Eye Headwall for Brisbane AirportlinkM7 s 12.48m Diameter Tunnel Boring Machines

Design and Construction Issues of the Soft-Eye Headwall for Brisbane AirportlinkM7 s 12.48m Diameter Tunnel Boring Machines Design and Construction Issues of the Soft-Eye Headwall for Brisbane AirportlinkM7 s 12.48m Diameter Tunnel Boring Machines Joseph Donohue 1, R. Greg Eberhardt 2 and Ildiko Juhasz 3 1 Associate, Arup 2

More information

HCC completes up-line tunnel for DMRC CC30

HCC completes up-line tunnel for DMRC CC30 HCC completes up-line tunnel for DMRC CC30 The 2.2 km twin-tunnel of DMRC s CC30 package, part of the 59km long Majlis Park to Shiv Vihar Metro Corridor of Phase III. Background Delhi Metro, the second

More information

Venice Pumping Plant Dual Force Main Project Draft EIR

Venice Pumping Plant Dual Force Main Project Draft EIR City of Los Angeles Venice Pumping Plant Dual Force Main Project Draft EIR 4.0 ALTERATIVES UDER COSIDERATIO Alternatives under consideration for this Project are defined by the alignment and construction

More information

Risk Management based Ground deformation monitoring during Queens Bored Tunnels project

Risk Management based Ground deformation monitoring during Queens Bored Tunnels project Risk Management based Ground deformation monitoring during Queens Bored Tunnels project Michael MOONEY a, Jacob GRASMICK a, Eric PRANTIL b, Andrew THOMPSON b a Civil and Environmental Engineering, Colorado

More information

Combined Pile Foundation System for a Residential Complex

Combined Pile Foundation System for a Residential Complex Combined Pile Foundation System for a Residential Complex Alvin K.M. Lam, Geotechnical Engineer, Ove Arup & Partners Hong Kong Limited, Hong Kong, China; email: alvin.lam@arup.com Daman D.M. Lee, Civil

More information

Modelling of ground deformation control induced by slurry shield tunnelling

Modelling of ground deformation control induced by slurry shield tunnelling Modelling of ground deformation control induced by slurry shield tunnelling Zili Li 1, Jacob Grasmick 1, Mike Mooney 1 1 Center for Underground Construction & Tunnelling, Colorado School of Mines, mooney@mines.edu

More information

Heavy-Duty Rolling and Plain Bearings. for Mining, Processing, On- and Offshore Technology

Heavy-Duty Rolling and Plain Bearings. for Mining, Processing, On- and Offshore Technology Heavy-Duty Rolling and Plain Bearings for Mining, Processing, On- and Offshore Technology E x p e r t i s e For Advanced Bearings in the Mining and Processing Sector... Technical progress in the fields

More information

STANDARD SPECIFICATIONS SECTION BORING AND JACKING. A. Section includes requirements for boring and jacking casing pipe.

STANDARD SPECIFICATIONS SECTION BORING AND JACKING. A. Section includes requirements for boring and jacking casing pipe. STANDARD SPECIFICATIONS SECTION 02445 BORING AND JACKING PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for boring and jacking casing pipe. 1.2 DEFINITIONS A. Carrier Pipe: Sewer or water

More information

Energy & Data Transmission Systems for Underground Applications

Energy & Data Transmission Systems for Underground Applications Energy & Data Transmission Systems for Underground Applications Systems for Underground Applications Conductix-Wampfler energy & data transmission systems keep tunnels moving forward. Whether it s for

More information

PIPE JACKING. An introduction to pipe jacking prepared by the Pipe Jacking Association

PIPE JACKING. An introduction to pipe jacking prepared by the Pipe Jacking Association PIPE JACKING An introduction to pipe jacking prepared by the Pipe Jacking Association Pipe Jacking Pipe Jacking Microtunnelling Pipe Jacking - General Arrangement Pipe Jacking is an integrated system linking:

More information

USE OF MICROTUNNELING TO INSTALL PIPES IN AN ENVIRONMENTALLY SENSISTIVE AREA. Miranda Roman D. *, LaFaso Edward

USE OF MICROTUNNELING TO INSTALL PIPES IN AN ENVIRONMENTALLY SENSISTIVE AREA. Miranda Roman D. *, LaFaso Edward USE OF MICROTUNNELING TO INSTALL PIPES IN AN ENVIRONMENTALLY SENSISTIVE AREA Miranda Roman D. *, LaFaso Edward Iseki, Inc. 7518 Carroll Road, San Diego, Calif. 92121-2402 USA This paper will discuss the

More information

Full-Ring Experimental Study of the Lining Structure of Shanghai Changjiang Tunnel

Full-Ring Experimental Study of the Lining Structure of Shanghai Changjiang Tunnel Aug. 2011, Volume 5, No. 8 (Serial No. 45), pp. 732-739 Journal of Civil Engineering and Architecture, ISSN 1934-7359, USA D DAVID PUBLISHING Full-Ring Experimental Study of the Lining Structure of Shanghai

More information

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DRILLED SHAFTS

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DRILLED SHAFTS SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DRILLED SHAFTS 1.0 DESCRIPTION This work shall consist of furnishing all materials and labor necessary for conducting an Osterberg Cell (O-cell)

More information

METHOD STATEMENT for INSTALLATION OF MICROPILE

METHOD STATEMENT for INSTALLATION OF MICROPILE METHOD STATEMENT for INSTALLATION OF MICROPILE A. MATERIAL TO BE USED 1. Grout Grout shall be mixed from Ordinary Portland Cement and clean water free from harmful substances. Usage of other cement which

More information

City of San Mateo WWTP Filter Cake System

City of San Mateo WWTP Filter Cake System FLO-LINE TECHNOLOGY (WWW.FLOLINEPUMPS.COM) 11822 Kemper Rd., Auburn CA 95603 Ph 800-255-2933 Fax 530-887-2243 CITY OF SAN MATEO WWTP - FILTER CAKE PUMP SYSTEM City of San Mateo WWTP Filter Cake System

More information

Pipe Jacking Association An introduction to pipe jacking and microtunnelling

Pipe Jacking Association An introduction to pipe jacking and microtunnelling Pipe Jacking Association An introduction to pipe jacking and microtunnelling Copyright Pipe Jacking Association ISBN 978-1-5272-0341-9 All rights reserved. No part of this publication may be reproduced,

More information

SEATTLE S BRIGHTWATER UNDERGROUND CONVEYANCE SYSTEM TUNNELING & UNDERGROUND CONSTRUCTION

SEATTLE S BRIGHTWATER UNDERGROUND CONVEYANCE SYSTEM TUNNELING & UNDERGROUND CONSTRUCTION TUNNELING & UNDERGROUND CONSTRUCTION THE OFFICIAL PUBLICATION OF UCA OF SME WWW.TUCMAGAZINE.COM VOLUME 1 NO 2 JUNE 2007 SEATTLE S BRIGHTWATER UNDERGROUND CONVEYANCE SYSTEM Tunnel Demand Forecast Ground

More information

Influence of slurry TBM parameters on ground deformation

Influence of slurry TBM parameters on ground deformation Influence of slurry TBM parameters on ground deformation Zili LI, Colorado School of Mines, USA, zilili@mines.edu Jacob GRASMICK, Colorado School of Mines, USA, jgrasmic@mymail.mines.edu Michael MOONEY,

More information

SPECIAL SPECIFICATION 1169 Tunnel Excavation and Primary Liner For Water Mains

SPECIAL SPECIFICATION 1169 Tunnel Excavation and Primary Liner For Water Mains 1993 Specifications CSJ 0271-07-249, etc. SPECIAL SPECIFICATION 1169 Tunnel Excavation and Primary Liner For Water Mains 1. Description. This Item consists of tunnel construction and installation of primary

More information

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) PART 1 - GENERAL TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) 1.01 SECTION INCLUDES A. Trenchless Installation of Carrier Pipe with Casing Pipe B. Trenchless Installation of Carrier Pipe without

More information

Monitoring Earth Pressure Balance Tunnels in Los Angeles

Monitoring Earth Pressure Balance Tunnels in Los Angeles Monitoring Earth Pressure Balance Tunnels in Los Angeles Thomas M. Saczynski 1, M ASCE P.E., Michael Pearce 2, M ASCE, P.E., G.E., and Amanda Elioff 3, M ASCE, P.E. 1 Sr. Manager, KBR,790 Colorado Blvd

More information

Magnetically Coupled Submerged Cryogenic Pumps and Expanders for Ammonia Applications

Magnetically Coupled Submerged Cryogenic Pumps and Expanders for Ammonia Applications Paper 4d Magnetically Coupled Submerged Cryogenic Pumps and Expanders for Ammonia Applications Liquefied Ammonia, or Liquid NH3, is (like LNG or liquefied natural gas) a cryogenic fluid and production

More information

Walls generally range from 600 to 1500 mm thickness, in wide between 2000 and 3500 mm and can be excavated to depths of 60m or more.

Walls generally range from 600 to 1500 mm thickness, in wide between 2000 and 3500 mm and can be excavated to depths of 60m or more. TECHNOLOGY Diaphragm walls Diaphragm walls are one of the most important technologies of special foundation engineering. A diaphragm wall is constructed using a trench excavated in ground and supported

More information