Ground Disturbance or Surface Penetration

Size: px
Start display at page:

Download "Ground Disturbance or Surface Penetration"

Transcription

1 PURPOSE To define the minimum requirements for managing the health and safety risks associated with ground disturbance or surface penetration activities. Where: Ground disturbance involves digging, excavation, drilling and the driving of spikes, poles, piles and pipes, resulting in penetration of the ground by 300mm or greater. And: Surface Penetration includes any drilling, cutting into or through any wall or building surface behind which any service, ducting, pipework or other supply may reside. 1 SCOPE This procedure applies to all Ground Disturbance or Surface Penetration work at the University of Canberra. This procedure shall be read in conjunction with the Permit to Work System Guideline POL-1000 and other relevant Permit to Work Procedures. 2 PROCEDURE 2.1 Risk Assessment, FRM-1031 Ground Disturbance/ Surface Penetration Permit and FRM-1001 Job Safety Analysis A risk assessment shall be conducted on all proposed work that involves ground disturbance of a depth of 300mm or more or any surface penetration. This shall be achieved by completion of FRM-1001 Job Safety Analysis, FRM-1031 Ground Disturbance /Surface Penetration Permit and additionally may include a Safe Work Method Statement (SWMS) This Risk assessment shall include checking of all relevant University plans/ maps; and performance of an on-site services location check FRM-1031 Ground Disturbance/ Surface Penetration Permit shall be authorised in conjunction with FRM-1001 Job Safety Analysis before any ground disturbance/ surface penetration activity may commence Each person performing the role of Ground Disturbance/ Surface Penetration Permit to Work Authoriser shall be appointed in writing by the Estate and Facilities Manager using FRM-1003 Authority to Issue Permit to Work. This authorisation shall PRO-1030 V1.0 Ground Disturbance or Surface Penetration.doc Page 1 of 20

2 be recorded in a department register and communicated throughout the department FRM-1030 Ground Disturbance/ Surface Penetration Permit may be generated by anyone as Permit to Work Initiator, but shall only be approved by an appointed Ground Disturbance/ Surface Penetration Permit Authoriser. A Permit to Work acceptor by signing the Permit to work takes on responsibility for performance of the work and as such shall be a suitably competent person for the work Adherence to the notifications process outlined below will enable prompt completion of the authorisation process. 2.2 Risk Assessment As per POL-3203 UC Risk Management Plan and POL-1000 Permit to Work System Guideline, a formal Risk Assessment Shall be conducted before Ground Disturbance/ Surface Penetration work may be authorised Participants in the Risk Assessment shall be knowledgeable, competent and experienced in the work to be performed The Risk Assessment shall include, but not be limited to: The nature and inherent hazards of the ground disturbance / surface penetration. The work required to be done, including the permission requirements Isolation systems located within the area of work The range of methods by which the work can be performed Hazards and associated risks of the chosen work method and equipment Additional controls required to ensure risk is reduced to an acceptable level Emergency and rescue / recovery plan Safe access and egress to the work site Structural conditions of the proposed work site Other environmental issues that may affect the way in which the work is conducted Competence of persons undertaking the work The completed risk assessment is an essential element of the Permit process and shall be attached to FRM-1030 Ground Disturbance / Surface Penetration Permit for consideration by the Permit to Work Authoriser. A completed FRM-1001 Job Safety Analysis is a required component of this risk assessment. PRO-1030 V1.0 Ground Disturbance or Surface Penetration.doc Page 2 of 20

3 2.2.5 Relevant supporting documentation including maps, drawings and/or photographs shall be attached to this risk assessment and FRM-1030 Ground disturbance/ Surface Penetration Permit The Risk Assessment shall also provide methods for controlling the risks of: a person falling into an excavation/ penetration a person being trapped by the collapse of an excavation/ penetration a person working in an excavation or under a penetration being struck by a falling object A person working in an excavation being exposed to an airborne contaminant. To appropriately manage these risks, all relevant matters must be considered within the risk assessment including: the nature of the excavation/ penetration, the nature of the excavation/ penetration work including the range of possible methods of carrying out the work, and The means of entry into and exit from the excavation/ penetration (if applicable). 2.3 Hazard Identification Hazards associated with proposed Ground Disturbance/ Surface Penetration activities shall be identified in the risk assessment. These include but are not limited to: Presence of services including gas, sewerage, telecommunications, electricity, chemical, fuel pipes and lines. Operation of moving equipment both in the immediate vicinity and during task The fall or dislodgement of earth and rock Falling objects Inappropriate placement of excavated materials, plant or other loads The instability of any adjoining structure caused by the excavation Possibility of an inrush of water, mud or other liquid Hazardous chemicals (e.g. these may be present within the soil where an excavation is carried out) Uncontrolled introduction of gas, water or other liquid. Development of a Hazardous atmosphere within the excavation or penetration (e.g. The uses of a solvent upon PVC pipes, such solvents often contain Methyl Ethol Ketone (MEK). Electricity Explosion or fire Temperature PRO-1030 V1.0 Ground Disturbance or Surface Penetration.doc Page 3 of 20

4 Noise Requirement for manual handling Lighting Possible movements of surrounding ground / structures or inundations of surrounding materials The Permit to Work Initiator and/ or Permit to Work Acceptor shall inspect the proposed work area to ascertain the presence of any of the following services prior to seeking approval of the Permit to Work: Gas lines Air lines Fuel lines Electrical cables Water lines Drainage or Sewer lines 2.4 Assessing the Risks All hazards identified for an excavation or penetration are to be assessed for likelihood and consequence. This will assist in determining the control measures to implement. This assessment process shall also: Identify which workers are at risk Determine what sources and processes are causing that risk Identify if and what kind of control measures should be implemented, and Check the effectiveness of existing control measures. When assessing the risks associated with excavation work you should consider things such as: Local site conditions including access, ground slope, adjacent buildings and structures, water courses (including underground) and trees depth of the excavation soil properties including variable soil types, stability, shear strength, cohesion, presence of ground water, effect of exposure to the elements fractures or faults in rocks including joints, bedding planes, dip and strike directions and angles, clay seams any specialised plant or work methods required (e.g. ground support) the method(s) of transport, haul routes and disposal what exposures might occur, such as to noise, ultra violet rays or hazardous chemicals the number of people involved the possibility of unauthorized access to the work area Local weather conditions, and The length of time that the excavation will be open. PRO-1030 V1.0 Ground Disturbance or Surface Penetration.doc Page 4 of 20

5 2.5 Control Measures If not possible to eliminate identified risks, these shall be minimized by implementing the risk control measures recommended in the completed risk assessment. Below are examples of minimum control measures expected for some common hazard types: Potential Hazard Minimum Expected Control Measure Ground Collapse The use of benching or the installation of ground support (e.g. shoring) Water inrush Pumps or other dewatering systems to remove water and prevent build-up Falls Installation of ramps, steps or other appropriate access into the excavation or penetration Hazardous manual tasks Rotation of these tasks between workers Airborne contaminates Mechanical ventilation to remove airborne contaminants Buried/ hidden contaminants (e.g. asbestos) Underground/ hidden services Ground collapse of trench edge due to nearby vehicle movement and material storage. Ground collapse of trench edge due to the slope of land. Heavy machinery traveling too close to the edge of an excavation and causing ground collapse. Training to identify buried or hidden contaminants and what action is to be taken by workers when identified. Obtain plans and maps from UC and other relevant authorities (Dial before you Dig). Placement of a test hole at each end of the proposed trench or penetration potholing. Excavated material will be stored outside the excavation zone of influence and shoring used will be designed to carry vehicle weight load. Excavation material will be placed on the lower side of the trench, downhill from the excavation. Wheel stoppers placed along zone of influence Energy sources in the proposed work site shall be isolated in accordance with PRO-1060 Isolation and Tagging An emergency response plan shall be developed and communicated to relevant personnel. The emergency response plan shall include but is not limited to: PRO-1030 V1.0 Ground Disturbance or Surface Penetration.doc Page 5 of 20

6 Availability and serviceability of requisite first response equipment Notification protocol Evacuation protocol To prevent unauthorized access of the work area, barricades and signage shall be installed in accordance with PRO-1080 Barriers and Barricades. 2.6 Completion and Authorisation of FRM-1031 Ground Disturbance/ Surface Penetration Permit to Work FRM-1031 Ground Disturbance/ Surface Penetration Permit shall be authorized in conjunction with a FRM-1001 Job Safety Analysis form before Ground disturbance or surface penetration activities may commence The permit to work initiator and Permit to Work acceptor shall have all required services maps and plans for the area of works with any affected services identified and a plan formulated for the effective protection/ Lockout and Tagging of these, as part of the completed risk assessment prior to applying for authorization The Permit to Work Initiator shall complete all relevant sections of Ground Disturbance/ Surface Penetration FRM-1031 and Job Safety Analysis Form FRM- 1001, assemble all the required risk documents, applicable drawings or photographs and provide them to Authoriser The Excavation/ Penetration Permit Authoriser shall review all risk documentation and control measures provided and discuss with the Permit to work acceptor (person in control of the work) prior to authorising FRM-1031 Excavation/ Penetration Permit to Work When authorising the task, the Permit to Work Authoriser shall pass all approved documentation to the Permit to Work Acceptor (Person in Control of Work) and ensure the process is fully understood and all recommended controls have been implemented. PRO-1030 V1.0 Ground Disturbance or Surface Penetration.doc Page 6 of 20

7 2.7 Conducting Ground Disturbance/ Surface Penetration Activities Personnel working under the permit shall be under the direction of the Permit to Work Acceptor who shall ensure workers are fully apprised of all aspects of the task All work shall be performed by persons deemed competent for the activities being conducted and in accordance with the requirements defined in the FRM Ground Disturbance/ Surface Penetration Permit to Work If ground disturbance/ surface penetration activities do not commence within 30 days of the date of permit approval, the Permit shall be deemed invalid. A new Permit to Work shall be completed and approvals sought If contact is made with a Service during excavation activities, work shall immediately cease and the Emergency Response Plan executed. The Permit to Work Acceptor shall contact estate and facilities management to organise a worksite inspection. The situation shall be treated as a near miss incident and investigated, the controls included within the original Permit to Work and their effectiveness as controls shall be reviewed as part of this process. 2.8 Closure of FRM-1031 Ground Disturbance/ Surface Penetration Permit to Work The Permit to Work Authoriser shall close the Permit after verifying the work is complete and the area deemed safe to return to service The Permit to Work Authoriser shall ensure all documentation is retained in accordance with the UC Document Management and Control Policy. 2.9 Training All personnel required to perform activities described within this procedure shall be trained and competent Relevant area inductions shall include reference to processes around the ground disturbance / Surface Penetration activities. PRO-1030 V1.0 Ground Disturbance or Surface Penetration.doc Page 7 of 20

8 2.10 Records Management Documents pertaining to Excavation Activities shall be stored and archived as UC Document Management and Control Policy Excavation Activities documents that are relevant to an incident investigation or claim against University of Canberra shall be retained with the incident investigation documentation and a copy filed Management of Ground Disturbance/ Surface Penetration Incidents Any areas of non-conformance or inconsistent application of processes related to Ground Disturbance / Surface Penetration shall be reported and investigated as per PRO-1110 Contractor Incident Management and Investigation. PRO-1030 V1.0 Ground Disturbance or Surface Penetration.doc Page 8 of 20

9 3 DEFINITIONS Barricade A structure that creates a barrier obstacle to control, block passage or force the flow of traffic in the desired direction. Backfill A material used for refilling excavations. Battering To form the face or side of an excavation to an angle, usually less than the natural angle of repose, to prevent earth slippage. Bench A horizontal step cut into the face or side or wall of an excavation to provide horizontal bearing and sliding resistance. Benching The horizontal stepping of the face, side or wall of an excavation. Closed Sheeting A continuous frame with vertical or horizontal sheathing planks placed side by side to form a continuous retaining wall supported by other members of a support system used to hold up the face of an excavation. Exclusion Zone An area from which all persons are excluded during excavation work. Face The exposed sloping or vertical surface resulting from the excavation work. Hazardous Substances Hazardous Substances are toxic, flammable, corrosive, asphyxiate, radioactive, pyrophoric, explosive, extremely hot or cold, or otherwise capable of causing harm to people Information Tag Tag used to pass on information about equipment condition Isolation The process of removing hazards by isolating energy sources and hazardous substances, locking and tagging out Isolation Accessory A device that is used in conjunction with an Isolation Lock to inhibit the operation of an isolation point. Isolation Equipment Includes but not limited to, Isolation Tags, Out of Service Tags, Personal Isolation Locks, Lock box, Lockout Scissors, Signs, Chains and barricades PRO-1030 V1.0 Ground Disturbance or Surface Penetration.doc Page 9 of 20

10 Isolation Lock An individually keyed padlock with a minimum of 6 pin tumbler which is used to lock a piece of plant or equipment in a safe state to protect personnel from hazards. Out of Service Tag Tag used to protect equipment, or to alert others of potential danger. Overburden The surface soil that is moved during excavation. Operator protective device Mean a roll-over protective structure (ROPS), falling object protective structure (FOPS), operator restraining device and seat belt. Personal Isolation Tag Tag attached by an individual to their Isolation Lock. Plant and Equipment Includes units, mobile equipment, appliances, pressure vessels, implement tools, personal protective equipment, or a component of plant and a fitting, connection, accessory or adjunct to plant. Safe Slope The steepest slope at which an excavated face is stable against slips and slides, having regard to the qualities of the material in the face, the height of the face, the load above the face and the moisture conditions for the time being existing. Shaft A vertical or inclined way or opening from the surface downwards or from any underground working, the dimensions of which (apart from the perimeter) are less than its depth. Sheet piling A vertical, close-spaced, or interlocking planks of steel, reinforced concrete or other structural material driven to form a continuous wall ahead of the excavation and supported either by tiebacks into solid ground structural members from within the excavation as the work proceeds. Shoring The use of timber, steel or other structural material to support an excavation in order to prevent collapse so that construction can proceed. Soldier Vertical upright steel or timber element used for supporting a trench wall. Trench means a horizontal or inclined way or opening: the length of which is greater than its width and greater than or equal to its depth; and that commences at and extends below the surface of the ground; and that is open to the surface along its length. PRO-1030 V1.0 Ground Disturbance or Surface Penetration.doc Page 10 of 20

11 Trench box means a structure with four vertical side plates permanently braced apart by bracing designed to resist the pressure from the walls of a trench and capable of being moved as a unit. Trench shield means a steel or metal structure with two vertical side plates permanently braced apart by cross frames or struts designed to resist the pressure from the walls of a trench and capable of being moved as a unit. Tunnel means an underground passage or opening that is approximately horizontal and commences at the surface of the ground or an excavation. Waler means a horizontal steel or timber element used for supporting a trench wall. Water scouring means an erosion process resulting from the action of the flow of water. Zone of influence means the volume of soil around the excavation affected by any external load (for example vehicles, plant, and excavated material). Technical Expert A person that has knowledge of plant / equipment or process that requires isolation. PRO-1030 V1.0 Ground Disturbance or Surface Penetration.doc Page 11 of 20

12 4 ACCOUNTABILITIES Role Responsibilities General Managers Ensure compliance with the requirements of this procedure within their Department or school Maintain and support a risk management culture by endorsing the risk management requirements within this procedure Ensure adequate resources are provided to meet the requirements as defined within this procedure Estate and Facilities Management Manager Ensure systems are established and maintained to support the requirements of this procedure Department Managers Ensure systems are established and maintained to support and comply with the requirements of this procedure within their department Ensure adequate resources are provided to meet the Departments requirements as identified in this procedure Ensure that all new items of plant, equipment or systems shall be designed and installed with the ability to be isolated in accordance with this procedure Ensure Training programs applicable to the task being peformed on the job are recorded appropriately in Training Plans / Role Requirements Ensure appropriate Training programs exist applicable to the tasks being performed Ensure Ground Disturbance/ Surface Penetration is included in any workplace observation audit program for the department Safety Manager, Officers or Advisors Workplace Supervisor, Workers and Contractors Support the Departments Manager to achieve the requirements of this procedure Support Department personnel and contractors to meet the requirements of this procedure Facilitate and/or participate in any risk management activities associated with lockout and tagging processes Ensure Ground Disturbance/ Surface Penetration observations are conducted on a random basis to ensure compliance with this procedure. Ensure the requirements of this procedure are met during daily work activities and the identified Isolation, Lockout and Tagging tools are used as required Report any potential new risks or hazards that are identified during work activities Participate in risk managements as and when requested PRO-1030 V1.0 Ground Disturbance or Surface Penetration.doc Page 12 of 20

13 5 REFERENCES POL-1000 Permit to Work System - Guideline PRO-1080 PRO-1060 PRO-1070 Barriers and Barricades Isolation and Tagging Electrical Safety Management Safe Work Australia Code of Practice Excavation Work 2015 Work Health and Safety Act 2011 Work Health and Safety Regulation 2011 PRO-1030 V1.0 Ground Disturbance or Surface Penetration.doc Page 13 of 20

14 APPENDIX Appendix 1 Appendix 2 Appendix 3 Appendix 4 Appendix 5 Appendix 6 Zone of Influence and the use of Shoring The Effect of Slope on Excavations Risks Associated with Mobile Equipment during Earth Works Preventing a fall around ground excavations or penetrations. Trench Collapse and associated Ground Forces Permit to Work (PTW) SYSTEM PRO-1030 V1.0 Ground Disturbance or Surface Penetration.doc Page 14 of 20

15 APPENDIX 1 Zone of Influence and the Use of Shoring PRO-1030 V1.0 Ground Disturbance or Surface Penetration.doc Page 15 of 20

16 APPENDIX 2 The Effect of Slope on Excavations PRO-1030 V1.0 Ground Disturbance or Surface Penetration.doc Page 16 of 20

17 APPENDIX 3 Risks Associated with Mobile Equipment during Earth Works PRO-1030 V1.0 Ground Disturbance or Surface Penetration.doc Page 17 of 20

18 APPENDIX 4 Preventing a fall near ground excavations or surface penetrations. PRO-1030 V1.0 Ground Disturbance or Surface Penetration.doc Page 18 of 20

19 APPENDIX 5 Trench Collapse and associated Ground Forces PRO-1030 V1.0 Ground Disturbance or Surface Penetration.doc Page 19 of 20

20 APPENDIX 6 Permit to Work (PTW) SYSTEM This document provides an overview to Ground Disturbance and Surface Penetration Requirements that form part of the University of Canberra PTW system. The PTW is a formalised process to identify high risk activities and to ensure that appropriate controls are in place to remove or control these risks. The PTW is designed to provide measures to reduce the occurrence of incidents, illness or injuries to employees, students, visitors, contractors and damage to property. PRO-1030 V1.0 Ground Disturbance or Surface Penetration.doc Page 20 of 20

Excavation Safety Program

Excavation Safety Program Excavation Safety Program Excavation, Trenching & Shoring Safety I. Purpose The purpose of this policy is to establish safe operating procedures for any earthwork or underground work that is done on a

More information

Field Instruction. All Horizon Power workers who work in and around excavations.

Field Instruction. All Horizon Power workers who work in and around excavations. 6.4 Excavation work and directional drilling Purpose This instruction provides the minimum requirements for: All Horizon Power workers who work in and around excavations. All Horizon Power workers who

More information

PRO Ground Disturbance

PRO Ground Disturbance MS&L Procedure PRO-4.5-0001-1-03 Ground Disturbance Version: 3 Authorised by: Tom Angliss & Owen Quake Authorisation Date: 21/11/2017 This document has been approved for release and changed as per the

More information

OUTLAW AUTOMATION INC. Safety Management System

OUTLAW AUTOMATION INC. Safety Management System Preparation: Safety Mgr Authority: President Issuing Dept: Safety Page: Page 1 of 6 Purpose The purpose of this program is to provide employees general information for working on owner client or other

More information

SAFE WORK METHOD STATEMENT

SAFE WORK METHOD STATEMENT SAFE WORK METHOD STATEMENT Principal Contractor: ROBERT LIVINGSTONE Project Address: 123 SYDNEY ROAD SYDNEY NSW 2000 High Risk Work Hazards and Risks Identified Control Measures Persons working at a height

More information

Central Washington University

Central Washington University Central Washington University Excavation, Trenching and Shoring Program Plan prepared by: Central Washington University Office of Environmental Health & Safety 400 East University Way Ellensburg, WA 98926

More information

Two (2) Working Days before you dig, call Underground Service Alert at (811) or 1-(800)

Two (2) Working Days before you dig, call Underground Service Alert at (811) or 1-(800) Chapter 11 Excavation & Trenching Chapter 11 - Excavation & Trenching Two (2) Working Days before you dig, call Underground Service Alert at (811) or 1-(800) 227-2600 Purpose The purpose of this policy

More information

WHS Management Plans

WHS Management Plans WHS Management Plans Disclaimer This Guide provides general information about the obligations of persons conducting a business or undertaking and/or persons in control of premises and workers under the

More information

Excavation and Trenching

Excavation and Trenching Excavation and Trenching Excavation and trenching are among the most hazardous construction operations. The Occupational Safety and Health Administration s (OSHA) Excavation standards, 29 Code of Federal

More information

TRENCHING AND EXCAVATION

TRENCHING AND EXCAVATION TRENCHING AND EXCAVATION The following guide is an aid intended for students who have completed the ClickSafety training course or module associated with Trenching and Excavation. This guide is a resource

More information

Date Prepared: Location: Time: Approximate Temperature (degrees F): Weather Conditions: Project Name:

Date Prepared: Location: Time: Approximate Temperature (degrees F): Weather Conditions: Project Name: Appendix C Hazard Assessment and Trench Entry and Authorization Form for regularly scheduled and emergency trenching activities Date Prepared: Location: Time: Approximate Temperature (degrees F): Weather

More information

TRENCH SAFETY TRAINING

TRENCH SAFETY TRAINING TRENCH SAFETY TRAINING TRENCH SAFETY TRAINING TRENCHING ACCIDENTS ACCOUNT FOR MORE THAN 100 DEATHS A YEAR ON U.S. SOIL. 11 TIMES MORE WORKERS ARE INJURED 1% OF ALL CONSTRUCTION ACCIDENTS INJURY RATE FOR

More information

!!! Sample Written Program For Your Company!!! Excavation Safety. 29 CFR 1926, Subpart P !!!!! Provided By:

!!! Sample Written Program For Your Company!!! Excavation Safety. 29 CFR 1926, Subpart P !!!!! Provided By: Sample Written Program For Your Company Excavation Safety Provided By: 29 CFR 1926, Subpart P P. O. Box 2136 Slidell, LA 70458 Phone: 985-781-1444 Fax: 985-718-4957 Email: info@se-safety.com 29 CFR 1926,

More information

Excavation and Trenching Program. Tampa Electric Company. Energy Supply

Excavation and Trenching Program. Tampa Electric Company. Energy Supply Excavation and Trenching Program Tampa Electric Company Energy Supply Creation Date: 12/11/00 Maintained by: Date of last Modification: 05/07/02 Audience: All employees PURPOSE: The following guidelines

More information

The Corporation of The City of London

The Corporation of The City of London The Corporation of The City of London Legislative Health and Safety Requirements The following is a health and safety guide for those providing a tender to assist in determining legislative health and

More information

SECTION A1 EXCAVATION AND BACKFILL GENERAL

SECTION A1 EXCAVATION AND BACKFILL GENERAL SECTION A1 EXCAVATION AND BACKFILL GENERAL The work under this section shall include all excavation to such width and depth as shown on the drawings, specified herein, or ordered by the Engineer. Such

More information

Dry structural excavation is usually done with front-end loaders, bulldozers or backhoes.

Dry structural excavation is usually done with front-end loaders, bulldozers or backhoes. 1.1 Excavation - General Excavation is the removal of all material (including ice, water, etc.) required for the construction of foundations or substructures as indicated on the drawings or as determined

More information

(c) Presentation of Information. Information is presented in several forms as follows:

(c) Presentation of Information. Information is presented in several forms as follows: CONSTRUCTION SEQUENCE FOR TIMBER SHORING FOR TRENCHES (a) Scope. This appendix contains information that can be used when timber shoring is provided as a method of protection from cave-ins in trenches

More information

This specification supplements the requirements of the Occupational Health and Safety Act, and its Regulations.

This specification supplements the requirements of the Occupational Health and Safety Act, and its Regulations. SPEC-1100 1/9 1.0 PURPOSE This specification describes the minimum requirements for general grading, excavation of earth, rock and solid slag, embankment construction, ditching, use of explosives, and

More information

WORK HEALTH AND SAFETY AUDIT STANDARD

WORK HEALTH AND SAFETY AUDIT STANDARD WORK HEALTH AND SAFETY AUDIT STANDARD FORESTRY INDUSTRY South Australia, Victoria and Tasmania Safety Standards 2017 2017 Content I. Introduction... 2 II. Audit Criteria and Indicators... 3 1 PLANNING...

More information

EXCAVATION AND TRENCHING SAFETY REQUIREMENTS

EXCAVATION AND TRENCHING SAFETY REQUIREMENTS 1.0 PURPOSE The purpose of this standard is to outline OSHA requirements as they apply to ecavations for Sierra Pacific Power Company s underground facilities. Facilitiy installation will not be accepted

More information

Excavations. OSHA (Revised)

Excavations. OSHA (Revised) Excavations OSHA 2226 2002 (Revised) Contents Introduction... 1 What is the difference between an excavation and a trench?... 1 What are the dangers of trenching and excavation operations?... 1 OSHA s

More information

TRENCH SAFETY SPECIFICATIONS FOR THE DENTAL DEPOT CITY OF THE COLONY, TEXAS. Prepared for BLUESTONE PARTNERS. Project # 18115

TRENCH SAFETY SPECIFICATIONS FOR THE DENTAL DEPOT CITY OF THE COLONY, TEXAS. Prepared for BLUESTONE PARTNERS. Project # 18115 TRENCH SAFETY SPECIFICATIONS FOR THE DENTAL DEPOT CITY OF THE COLONY, TEXAS Prepared for BLUESTONE PARTNERS Project # 18115 US TREN-TECH, LLC 828 HOWELL DR. COPPELL, TEXAS 75019 TBPE#F9824 Anderson Consultant

More information

OPTUS SUPPLIER WORK HEALTH & SAFETY POLICY

OPTUS SUPPLIER WORK HEALTH & SAFETY POLICY OPTUS SUPPLIER WORK HEALTH & SAFETY POLICY 1. Introduction 1.1 SCOPE & PURPOSE This policy (which includes this document and the work health and safety standards, policies, procedures and safety control

More information

WORK IN THE VICINITY OF POWER POLES AND OVERHEAD LINES

WORK IN THE VICINITY OF POWER POLES AND OVERHEAD LINES CONTRACTOR WHS HAZARD STANDARD WORK IN THE VICINITY OF POWER POLES AND OVERHEAD LINES EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES

More information

Weekly Safety Talks: Excavation & Trenching Application

Weekly Safety Talks: Excavation & Trenching Application Weekly Safety Talks: Excavation & Trenching Application Review when we need to go into a trench. Ask can we do it any other way? Review soil types in the area and prevention methods preferred. Discuss

More information

Copies of the written program may be obtained at Where are copies of this written plan kept? (Insert building/room, etc.).

Copies of the written program may be obtained at Where are copies of this written plan kept? (Insert building/room, etc.). Scaffolding Safety Procedures for Construction Purpose It is this company's purpose in issuing these procedures to further ensure a safe workplace based on the following formal, written procedures for

More information

-SQA- SCOTTISH QUALIFICATIONS AUTHORITY. Hanover House 24 Douglas Street GLASGOW G2 7NQ NATIONAL CERTIFICATE MODULE DESCRIPTOR

-SQA- SCOTTISH QUALIFICATIONS AUTHORITY. Hanover House 24 Douglas Street GLASGOW G2 7NQ NATIONAL CERTIFICATE MODULE DESCRIPTOR -SQA- SCOTTISH QUALIFICATIONS AUTHORITY Hanover House 24 Douglas Street GLASGOW G2 7NQ NATIONAL CERTIFICATE MODULE DESCRIPTOR -Module Number- 4281010 -Session-1990-91 -Superclass- TH -Title- GAS DISTRIBUTION:

More information

FACILITIES MANAGEMENT CONTRACTOR SAFETY PROGRAM

FACILITIES MANAGEMENT CONTRACTOR SAFETY PROGRAM FACILITIES MANAGEMENT CONTRACTOR SAFETY PROGRAM Document History Version Date Comments 0.1 Sept 1, 2015 Initial Draft 0.2 Sept 30, 2015 Internal Review 0.3 Jan 25, 2016 External Review 0.4 March 21, 2016

More information

Temporary Structures. Excavations and Excavation Supports

Temporary Structures. Excavations and Excavation Supports UNIVERSITY OF WASHINGTON DEPARTMENT OF CONSTRUCTION MANAGEMENT CM 420 TEMPORARY STRUCTURES Winter Quarter 2007 Professor Kamran M. Nemati Temporary Structures Excavations and Excavation Supports CM 420

More information

SECTION TRENCHING & BACKFILLING

SECTION TRENCHING & BACKFILLING SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications

More information

Freeport Site Standard

Freeport Site Standard No.: BCF020.008 Page: 1 of 11 Date Revision Number Details of Change 01/15 5 Requestor: 4.1.6 Use of Green Fluorescent paint for excavation boundaries Civil Design Engineer: 4.3.4 Locate all known lines

More information

C. Foundation stabilization for pipe and utility structures.

C. Foundation stabilization for pipe and utility structures. PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating, backfilling, and compacting for utilities, including pipe, structures, and appurtenances. B. Control of water in trenches. C. Foundation stabilization

More information

This document sets out the rules applicable to all contract companies and their personnel when working on a CF Fertilisers UK Limited (CF) site.

This document sets out the rules applicable to all contract companies and their personnel when working on a CF Fertilisers UK Limited (CF) site. CONTRACTOR EHS REQUIREMENTS FOR ON-SITE WORK Issued by:: EHS Page No: Issue No: Issue Date: Authorised By: Review date: 1 of 8 3 July 2016 N Cook July 2020 1. INTRODUCTION This document sets out the rules

More information

Excavations. Department of Consumer & Business Services Oregon Occupational Safety & Health Division (OR-OSHA)

Excavations. Department of Consumer & Business Services Oregon Occupational Safety & Health Division (OR-OSHA) Excavations Department of Consumer & Business Services Oregon Occupational Safety & Health Division (OR-OSHA) Preface This booklet provides an overview of the OR-OSHA standard on excavations, Division

More information

Excavations and Blind Penetrations into Walls & Floors

Excavations and Blind Penetrations into Walls & Floors Excavations and Blind Penetrations into Walls & Floors (Instructions for using JLab DIGGING, EXCAVATING, FLOOR/WALL PENETRATION PERMIT REQUEST) Permits are required on JLAB property for any penetrations

More information

Eurobitume UK. Site Inspection for Delivery of Bitumen

Eurobitume UK. Site Inspection for Delivery of Bitumen Eurobitume UK Site Inspection for Delivery of Bitumen June 2015 To be used in conjunction with the UK edition of the Eurobitume Guide to Safe Delivery of Bitumen Introduction and Scope This site inspection

More information

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES SECTION 02221 EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02200 - Earthwork. 2. 02660 - Water Systems. 3. 02720 - Storm Drainage System. 4.

More information

STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL

STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL 1. SCOPE 2. DESIGN 3. MATERIALS 4. CONSTRUCTION 5. METHOD OF MEASUREMENT AND PAYMENT SCOPE This Specification sets out requirements for the design,

More information

TG 127 TRENCHING & GROUND SUPPORT SYSTEMS TECHNICAL GUIDELINE. Manager Asset Management SOUTH AUSTRALIAN WATER CORPORATION

TG 127 TRENCHING & GROUND SUPPORT SYSTEMS TECHNICAL GUIDELINE. Manager Asset Management SOUTH AUSTRALIAN WATER CORPORATION SOUTH AUSTRALIAN WATER CORPORATION TG 127 TECHNICAL GUIDELINE TRENCHING & GROUND SUPPORT SYSTEMS Issued by: Manager Asset Management Issue Date: SA WATER 2007 This document is copyright and all rights

More information

LOADING UNLOADING OPERATIONS

LOADING UNLOADING OPERATIONS CONTRACTOR WHS HAZARD STANDARD LOADING UNLOADING OPERATIONS EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION

More information

CS ENERGY PROCEDURE FOR A JOB SAFETY AND ENVIRONMENTAL ANALYSIS CS-OHS-11

CS ENERGY PROCEDURE FOR A JOB SAFETY AND ENVIRONMENTAL ANALYSIS CS-OHS-11 CS-OHS-11 (Amd 09/11) CS ENERGY PROCEDURE FOR A JOB SAFETY AND ENVIRONMENTAL ANALYSIS CS-OHS-11 Responsible Officer: Group Manager Health and Safety Approved: EGM Corporate CONTENTS 1 Purpose... 3 2 Context...

More information

Contractor Induction Manual

Contractor Induction Manual Contractor Induction Manual Contractor Management September, 2014 Authored by: OHS Services Version 1.1 Contractor Induction Manual Table of Contents 1. INTRODUCTION... 2 2. CONTRACTOR MANAGEMENT INFORMATION...

More information

LINCOLN COUNTY REQUIRED INSPECTIONS (Last updated August 23, 2017)

LINCOLN COUNTY REQUIRED INSPECTIONS (Last updated August 23, 2017) LINCOLN COUNTY REQUIRED INSPECTIONS (Last updated August 23, 2017) It is the responsibility of the permit applicant to notify the building inspector when the work is ready for inspection. To request an

More information

Transport Sector Portfolio

Transport Sector Portfolio Transport Sector Portfolio Rehabilitation of 4.476 Kms of Asphalt Road in Shindand District, Herat Province, Afghanistan. United Nations Office for Project Services ( UNOPS ) -and- Name of Contractor Site

More information

Contents. Before you begin. Introduction: Carrying out concreting to simple forms 1. Element 1: Planning and preparing 3

Contents. Before you begin. Introduction: Carrying out concreting to simple forms 1. Element 1: Planning and preparing 3 Contents Contents Before you begin v Introduction: Carrying out concreting to simple forms 1 Element 1: Planning and preparing 3 Section 1.1: Obtaining, confirming and applying work instructions and 4

More information

Excavation and Trenching 2018 Stand Down. Jim Shelton, CAS Houston North Area Office

Excavation and Trenching 2018 Stand Down. Jim Shelton, CAS Houston North Area Office Excavation and Trenching 2018 Stand Down Jim Shelton, CAS Houston North Area Office Why a Trenching Safety Stand Down? Workers Die and Get Injured Not All Publicity is Good Publicity BLS Fatalities by

More information

GROUND DISTURBANCE, TRENCHING, & EXCAVATING SAFE WORK PRACTICE 1.0 PURPOSE

GROUND DISTURBANCE, TRENCHING, & EXCAVATING SAFE WORK PRACTICE 1.0 PURPOSE GROUND DISTURBANCE, TRENCHING, & EXCAVATING SAFE WORK PRACTICE 1.0 PURPOSE The purpose of the development of a standard excavation and shoring policy, practice and procedure is to enhance the level of

More information

Safe Work Procedure for installation of

Safe Work Procedure for installation of Safe Work Procedure for installation of external cladding This procedure has been formulated to cover safe systems of work for the installation of external cladding. This instruction will be used to reduce

More information

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION SPECIFICATION FOR PIPE CULVERT CONSTRUCTION 1. SCOPE Pipe culverts shall be constructed in accordance with this specification and in conformity with the lines, levels and cross-sections shown on the drawings.

More information

6 Preliminary Assessment of Construction Method and Constructability Issues

6 Preliminary Assessment of Construction Method and Constructability Issues 6 Preliminary Assessment of Construction Method and Constructability Issues 6.1 Construction Approach Appendix C includes conceptual designs of the alternatives discussed below. Generally, the conceptual

More information

PS 02 PLANT AND EQUIPMENT

PS 02 PLANT AND EQUIPMENT PS 02 PLANT AND EQUIPMENT PURPOSE AND SCOPE The intent of this document is to eliminate or minimise the risks of fatalities, injuries and incidents arising from mobile powered plant, static plant and equipment

More information

Self Assessment Questionnaire Inrushes and Subsidence Major Hazard Standard

Self Assessment Questionnaire Inrushes and Subsidence Major Hazard Standard WMC Environment, Health & Safety Management System Self Assessment Questionnaire Inrushes and Subsidence Major Hazard Standard MHS-09 DocsOpen : 57250, 11/07/2000 Uncontrolled copy check web for latest

More information

Emergency Management Guidelines For Wind Energy Facilities. Emergency Management Guidelines for Wind Energy Facilities

Emergency Management Guidelines For Wind Energy Facilities. Emergency Management Guidelines for Wind Energy Facilities Emergency Management Guidelines For Wind Energy Facilities Emergency Management Guidelines for Wind Energy Facilities MAY 2015 Emergency Management Guidelines For Wind Energy Facilities 1 Emergency Management

More information

JOB SAFETY ENVIRONMENT ANALYSIS (JSEA) CS-OHS-11

JOB SAFETY ENVIRONMENT ANALYSIS (JSEA) CS-OHS-11 CS ENERGY PROCEDURE FOR JOB SAFETY ENVIRONMENT ANALYSIS (JSEA) CS-OHS-11 Responsible Officer: HSSE Management Systems Specialist Responsible Executive: Group Manager Health Safety Security and Environment

More information

Scaffolding Procedures

Scaffolding Procedures Procedures Purpose It is the purpose of this company in issuing these procedures to further ensure a safe workplace based on the following formal, written procedures for scaffold work. Application This

More information

DIVISION 33 - UTILITIES SECTION UTILITY PIPE BORING AND JACKING DIVISION 33 UTILITIES SECTION UTILITY PIPE BORING AND JACKING

DIVISION 33 - UTILITIES SECTION UTILITY PIPE BORING AND JACKING DIVISION 33 UTILITIES SECTION UTILITY PIPE BORING AND JACKING DIVISION 33 UTILITIES PART 1 GENERAL 1.01 SCOPE A. This work shall consist of the underground construction of a pipeline across the state right-ofway, or other facility as indicated on the plans and as

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

Worksite Safety Update Promoting safety in road construction

Worksite Safety Update Promoting safety in road construction Worksite Safety Update Promoting safety in road construction No 122 August 2012 In this Edition: Work Near Overhead and Underground Utility Services Page 1 The Regional Rail Link Experience Page 9 This

More information

DOUBLE SLIDE RAIL INSTALLATION METHOD. Double Slide Rail August

DOUBLE SLIDE RAIL INSTALLATION METHOD. Double Slide Rail August Double Slide Rail August 2015 1 DOUBLE SLIDE RAIL INSTALLATION METHOD Introduction Slide rail shoring systems can be used for trenches up to 12m wide and 6m deep. Module length is determined by panels

More information

Safe Work Method Statement

Safe Work Method Statement Safe Work Method Statement Disclaimer: Use of Master Builders Generic Safe Work Method Statements The Master Builders Association of Victoria expressly disclaim all and any liability to any person in respect

More information

Section Safety Section Cleanup. None Required

Section Safety Section Cleanup. None Required January 2000 Page 1 of 6 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED SECTIONS PART 2 PRODUCTS The General Conditions of the Contract, General Requirements, and Supplemental

More information

SAFE WORK METHOD STATEMENT

SAFE WORK METHOD STATEMENT SAFE WORK METHOD STATEMENT Company Name: THE GROUP PTY LTD This SWMS has been developed and: (T/A ARTHUR S CONCRETE CUTTING) Approved by: ATHANASIOS Address: 18 PANANIA AVE PANANIA NSW 2213 Position: TEL:

More information

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions. SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution

More information

WORKING AT HEIGHT PROCEDURE

WORKING AT HEIGHT PROCEDURE Page 1 of 8 AL-Yamama Engineering Company HSSE Department (s) WORKING AT HEIGHT PROCEDURE Page 1 of 8 Page 2 of 8 Introduction Work at height is any work activity that is performed where the work is to

More information

Emergency Contact Numbers: Police, Fire, Ambulance 000 SES Vic Roads EPA Vic 1300 EPA VIC ( ) Safe Work Method Statement

Emergency Contact Numbers: Police, Fire, Ambulance 000 SES Vic Roads EPA Vic 1300 EPA VIC ( ) Safe Work Method Statement Safe Work Method Statement Emergency Contact Numbers: Police, Fire, Ambulance 000 SES 132 500 Vic Roads 13 11 70 EPA Vic 1300 EPA VIC (1300 372 842) WMS No: Task/Activity Grader Operation SPH Job No: Date

More information

Reliant Holdings Ltd Safety Management System

Reliant Holdings Ltd Safety Management System Preparation: Safety Mgr Authority: President Issuing Dept: Safety Page: Page 1 of 7 Purpose The purpose of this program is to prevent injuries due to falls from elevated work areas and ensure employees

More information

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods SECTION 2000- EARTHWORK PART 1- GENERAL 1.01 SCOPE: This Section covers excavation, fill, and compaction of earth and rock for roadway, embankments, structural foundations, and planted areas. Topics include

More information

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS 6.1 DESCRIPTION This work shall consist of constructing curbs, gutters, sidewalks, ramps, local depressions and driveways of the form and dimensions shown

More information

Tabulated Data Waler Rails

Tabulated Data Waler Rails Tabulated Data Waler Rails Revised June 1, 1999 Copyright, U.S.A.,Griswold Machine & Eng., Inc., 1998 594 West Highway M-60, Union City, MI 49094 (800) 248-2054 Fax: (517) 741-7483 CAUTION EXCAVATION PROCEDURES

More information

This data sheet discusses problems

This data sheet discusses problems General excavation National Safety Council This data sheet discusses problems involved in general excavating operations where the excavation walls are vertical or nearly so, except shoreline excavating,

More information

Selection of Proprietary Shoring Equipment

Selection of Proprietary Shoring Equipment CPA Safety Guidance Selection of Proprietary Shoring Equipment Introduction Every contractor involved with groundwork must ensure the safe support of trenches and excavations as part of their risk assessment.

More information

Corporate Safety Procedure Grid Mesh, Handrail and Flooring Removal. Table of Contents

Corporate Safety Procedure Grid Mesh, Handrail and Flooring Removal. Table of Contents Table of Contents 1. Purpose... 2 2. Scope... 2 3. Roles and Responsibilities... 2 3.1 Manager/Supervisor... 2 3.2 Workers... 2 3.3 Technical Specialist/Engineer... 2 4. Definitions... 2 5. Procedure...

More information

Contractor s Guide to Applying for Permit to Dig/Excavate

Contractor s Guide to Applying for Permit to Dig/Excavate Contractor s Guide to Applying for Permit to Dig/Excavate Page 1 of 15 Contractor s Guide to Applying for Permit to Dig/Excavate Contents Purpose... 3 Inclusion Group... 3 1. Pre commencement worksite

More information

Trenching & Shoring Safety Course Outline

Trenching & Shoring Safety Course Outline Trenching & Shoring Safety Course Outline The following outline summarizes the major points of information presented in the program. The outline can be used to review the program before conducting a classroom

More information

Division 02 - Site Work Section

Division 02 - Site Work Section NWIT-11-26 Page 1 1 GENERAL 1.1 REQUIREMENTS INCLUDED.1 Furnish all labour, material, services and equipment necessary to carry out and complete excavation work and shoring, as indicated on the drawings

More information

This guide only applies for sewer assets up to and including 225mm diameter.

This guide only applies for sewer assets up to and including 225mm diameter. INTRODUCTION This guide only applies for sewer assets up to and including 225mm diameter. These guidelines (subject to change) provide an outline of the requirements which need to be considered when planning

More information

Construction Planning, Equipment, and Methods PILES AND PILE-DRIVING EQUIPMENT

Construction Planning, Equipment, and Methods PILES AND PILE-DRIVING EQUIPMENT CHAPTER Construction Planning, Equipment, and Methods PILES AND PILE-DRIVING EQUIPMENT Sixth Edition A. J. Clark School of Engineering Department of Civil and Environmental Engineering 19 By Dr. Ibrahim

More information

SCAFFOLDING PROCEDURE

SCAFFOLDING PROCEDURE SCAFFOLDING PROCEDURE 1 Table of Contents 1 PURPOSE... 3 2 PROGRAM COMPLIANCE... 3 3 SCOPE... 3 4 DEFINITIONS... 3 5 RESPONSIBILITES... 4 6 SCAFFOLD INSPECTION... 5 7 SCAFFOLD USE... 5 8 SCAFFOLD REQUIREMENTS...

More information

Scissor Lift Safety. Supervisor Manual 29 CFR , 451, 452, 454. Page 0

Scissor Lift Safety. Supervisor Manual 29 CFR , 451, 452, 454. Page 0 Scissor Lift Safety 29 CFR.1926.450, 451, 452, 454 Supervisor Manual Page 0 Table of Contents Purpose... 2 Program Responsibilities... 2 Management... 2 Supervisors... 2 Employees... 2 Definitions... 3

More information

Excavation & Trenching Study Guide

Excavation & Trenching Study Guide Excavation & Trenching Study Guide For XYZ Company Complies with Provisions of Excavations OSHA 29 CFR 1926.650 Subpart P Table of Contents Chapter Description Page 1. Introduction 3 2. Definitions 4 3.

More information

SAFETY FACT SHEETS. Working with and around High Risk Plant Safety Non Negotiable. G-HS-ST Working with and around High Risk Plant

SAFETY FACT SHEETS. Working with and around High Risk Plant Safety Non Negotiable. G-HS-ST Working with and around High Risk Plant SAFETY FACT SHEETS Working with and around High Risk Plant Safety Non Negotiable G-HS-ST-00741 Working with and around High Risk Plant Safety Non-Negotiables (SNN) Zinfra Group is committed to providing

More information

Level 2 NVQ Diploma in Construction Operations and Civil Engineering Services Construction Operations (Construction)

Level 2 NVQ Diploma in Construction Operations and Civil Engineering Services Construction Operations (Construction) Civil Engineering Services Construction Operations (Construction) Qualification Specification ProQual 2014 Contents Page Introduction 3 The Qualifications and Credit Framework (QCF) 3 Qualification profile

More information

(6) Crawl boards and ladders used for roof work shall be securely fastened over the ridge of the roof or be otherwise effectively anchored.

(6) Crawl boards and ladders used for roof work shall be securely fastened over the ridge of the roof or be otherwise effectively anchored. Newfoundland & Labrador - Terre-Neuve-et-Labrador Ladder Safety - Sécurité des échelles This material has been extracted from the Acts and Regulations of the Province to help students understand the subject.

More information

Excavations & Breaking Ground

Excavations & Breaking Ground Excavations & Breaking Ground Contents Breaking Ground Before you start (planning) Permits Scanning Emergency plan Excavations Formation Hazards Inspection Summary What is breaking ground? Any disturbance

More information

SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006

SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006 Michigan Department Of Transportation 3703C (11/06) 1 Materials 1.1 Pipe SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006 Page 1 of 5 The type of pipe used for the pipe jacking method shall be capable

More information

SECTION CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

SECTION CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS PART 1 GENERAL 1.1 DESCRIPTION A. Temporary Utilities: Electricity, lighting, heating, cooling, ventilation, water, and sanitary facilities. B. Temporary Controls: Barriers, fencing, erosion control, exterior

More information

Underground Exhaust System

Underground Exhaust System Operation and Maintenance Manual Underground Exhaust MONOXIVENT - SOURCE CAPTURE SYSTEMS - info@ Oct. - 2015 Underground Duct Construction Standards 1. Dig trench depth to allow for minimum distance from

More information

CPCCLSF3001A Licence to erect, alter and dismantle scaffolding intermediate level

CPCCLSF3001A Licence to erect, alter and dismantle scaffolding intermediate level CPCCLSF3001A Licence to erect, alter and dismantle scaffolding intermediate level Release: 1 CPCCLSF3001A Licence to erect, alter and dismantle scaffolding intermediate level Modification History Not Applicable

More information

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) PART 1 - GENERAL TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) 1.01 SECTION INCLUDES A. Trenchless Installation of Carrier Pipe with Casing Pipe B. Trenchless Installation of Carrier Pipe without

More information

HFM Asset Management Contractor Induction Queens Riverside Apartments

HFM Asset Management Contractor Induction Queens Riverside Apartments HFM Asset Management Contractor Induction Queens Riverside Apartments Contents Purpose About HFM Asset Management HFM Asset Management s Responsibilities Contractors Responsibilities Commencing Work Working

More information

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1 March 2002 No. 400 INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS 400. 1 SCOPE... 1 400. 2 REMOVING CULVERTS AND TIMBER STRUCTURES 2.1 Concrete and Metal Pipe Culverts... 1 2.2 Structural

More information

MANUFACTURING MODULE

MANUFACTURING MODULE MANUFACTURING MODULE Standard Operating Procedure (SOP) All tasks within a manufacturing process should have a Standard Operating Procedure (SOP) or Safe Work Instruction (SWI) linked to it. The purpose

More information

RIIMPO323A Conduct civil construction dozer operations Unit descriptor

RIIMPO323A Conduct civil construction dozer operations Unit descriptor RIIMPO323A Unit descriptor Employability skills Application of the unit Competency field Conduct civil construction dozer operations This unit covers conducting dozer operations in the civil construction

More information

Bi-Directional Static Load Testing of Drilled Shafts

Bi-Directional Static Load Testing of Drilled Shafts Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (01/18) 1.0 GENERAL This work shall consist of furnishing all materials, equipment,

More information

Inrushes and Subsidence

Inrushes and Subsidence PURPOSE AND SCOPE... 2 DETAILS... 2 Appendices... 11 A Definitions... 11 B Related Documents... 11 C Revision Information... 11 1. Responsibility... 2 2. Hazard Management Process... 3 2.1 Overview...3

More information

[ sample ] Copyright 2014 by PEC Safety, Inc. First Edition, revised October 23, 2014

[ sample ] Copyright 2014 by PEC Safety, Inc. First Edition, revised October 23, 2014 Copyright 2014 by PEC Safety, Inc. First Edition, revised October 23, 2014 All rights reserved. Printed in the United States of America. Per the United States Copyright Act of 1976, no part of this publication

More information

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 616 APRIL 2018 CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT TABLE OF CONTENTS 616.01 SCOPE 616.02 REFERENCES 616.03 DEFINITIONS

More information

Auckland Transport Code of Practice 2013

Auckland Transport Code of Practice 2013 26 Corridor Access Management 26.1 Background Auckland Transport is the Road Controlling Authority and Corridor Manager for all public roads within the Auckland Region (except motorways and state highways

More information

Level 2 Diploma in Construction Operations (Construction)

Level 2 Diploma in Construction Operations (Construction) (Construction) Qualification Specification ProQual 2015 Contents Page Introduction 3 The Qualifications and Credit Framework (QCF) 3 Qualification profile 4 Rules of combination 5 Centre requirements 6

More information