CS ENERGY PROCEDURE FOR A JOB SAFETY AND ENVIRONMENTAL ANALYSIS CS-OHS-11

Size: px
Start display at page:

Download "CS ENERGY PROCEDURE FOR A JOB SAFETY AND ENVIRONMENTAL ANALYSIS CS-OHS-11"

Transcription

1 CS-OHS-11 (Amd 09/11) CS ENERGY PROCEDURE FOR A JOB SAFETY AND ENVIRONMENTAL ANALYSIS CS-OHS-11 Responsible Officer: Group Manager Health and Safety Approved: EGM Corporate CONTENTS 1 Purpose Context Scope Responsibilities General Manager Manager Superintendents and Supervisors Principal s Site Representative Health and Safety Specialists/Advisors Officers in Charge / Person in Charge of Work Work Party Members, Other Employees and Contractors Application When to Use a JSEA When to Modify a JSEA Completing a JSEA Identifying the Tasks for the Work Being Assessed Identifying Hazards and Environmental Impacts Assess the Risk Initial Determine the Control Measures Assess the Risk with the Control Measures Residual Checking, authorisation and sign-off Recording Monitoring and Review Training Reference Documentation... 8

2 10 Definitions Appendix 1 JSEA Flow Chart Appendix 2 Sample JSEA Form Appendix 3 JSEA Quality Checklist and Score Version History 4 Review of content to reflect Risk Management Framework by Risk and Assurance B Johnson Updated to include latest risk management framework F Welch Updated to include new JSEA form and consistent with training package F Welch Modified F Welch Issued for implementation F Welch Revision Description Originator Date Job Safety and Environmental Analysis, CS-OHS-11 2

3 1 PURPOSE The purpose of this procedure is to provide the minimum requirements for personnel to conduct a Job Safety and Environmental Analysis (JSEA) effectively across CS Energy sites. The aim of a Job Safety and Environmental Analysis is to evaluate, select, record and specify safe systems of work to eliminate or minimise the risk of injury, illness, hazard exposure, near miss, property damage, environmental impact and process loss in the performance of work and enable the work to be completed with the risk level as low as is reasonably practicable. 2 CONTEXT The JSEA is a formalised and structured process within the CS Energy risk management system following the standards set out in the CS Energy Risk Management Framework. It is an essential part of a safe system of work as it provides a process for hazard identification, risk assessment and implementing suitable control measures based on the hierarchy of control. It is a mandatory component of the Permit To Work (PTW) system. The JSEA is a higher level risk management tool to the Task Risk Analysis (TRA). While the TRA is the initial risk assessment tool for any work, its resulting outcome determines whether a JSEA is required, such as if the risk is significant or high and/or a PTW is required. The aim of the JSEA is to eliminate a hazard or where this is not possible; the risks associated with the hazard are reduced to as low as is reasonably practicable. 3 SCOPE This procedure applies to all CS Energy company employees, and any other persons working for, or on behalf of CS Energy and its associated operations. This procedure is not intended to consider specialist plant control, reliability, efficiency and risk analysis methods that may be used via specific and specialised risk management tools e.g. fault tree analysis, outcome analysis and hazard and operability studies. All personnel shall be informed of this procedure at induction. Additional competency based training shall be undertaken as part of the company health and safety training program. Contractors may use the risk analysis tool specific to their organisation, only if it does not compromise the integrity of the requirements of CS Energy s procedures and format, i.e. must include a breakdown of the task or activity, task steps, hazards identified, control measures proposed and an assessment of the risk outcome. These are to be approved by site management. 4 RESPONSIBILITIES 4.1 General Manager The General Manager is responsible for authorisation of any JSEA completed where the residual risk assessed is high. 4.2 Manager Managers are responsible for: implementation of this procedure; ensuring sufficient resources are provided to effectively conduct JSEAs; provision of appropriate training; authorisation of a completed JSEA where the residual risk is significant; and ensuring quality and effective JSEAs are carried out. Job Safety and Environmental Analysis, CS-OHS-11 3

4 4.3 Superintendents and Supervisors Superintendents and Supervisors are responsible for: monitoring compliance with this procedure and the risk control measures being implemented by the work party/team members; conducting periodic review of process, completed JSEA s for quality and adherence to the PTW scope of work and report on effectiveness and application; provision of appropriate training and other support to all personnel in application of this procedure; conducting and/or assisting personnel with JSEAs; and authorisation of a completed JSEA where the residual risk is moderate. 4.4 Principal s Site Representative The CS Energy principal s site representative is responsible for: ensuring contractors are aware of the requirement to provide JSEAs for the work they perform on site; reviewing contractors completed JSEAs for compliance with CS Energy s health and safety site rules and conditions; and obtaining assistance from the relevant site specialist, where necessary, to review and comment on contractor developed JSEAs. 4.5 Health and Safety Specialists/Advisors The Health and Safety Specialists/Advisors are responsible for: providing support and advice to personnel regarding a JSEA; periodic monitoring and review of completed JSEA s to the CS Energy standard; and ensure the procedure and form is relevant and current. 4.6 Officers in Charge / Person in Charge of Work Officers in Charge (OIC) and Persons in Control of Work (PCW) are responsible for: preparing the JSEA prior to the work being performed and modifying the JSEA if conditions or the scope of work change; involving team members or work party members in the development of the JSEA; seeking assistance from the technical/experienced persons on site in identifying hazards and implementing appropriate control measures; monitoring the work tasks to verify the control measures are implemented, effective and appropriate for the work; identifying any new hazards in the work activity that have been previously overlooked, have appeared due to a change in work conditions or if the controls put in place have not been effective in controlling the risk; and Communicating the JSEAs to work party team members via training and or site instruction. 4.7 Work Party Members, Other Employees and Contractors Work party members are responsible for: being involved in developing and reviewing the JSEA; knowing and understanding the hazards and control measures on the JSEA; asking their OIC/Supervisor if they are unsure about any control measures to be used; sign the JSEA sign on sheet, only once you are satisfied with the control measures, before commencing the activities; and Job Safety and Environmental Analysis, CS-OHS-11 4

5 during the work, notify the OIC/Supervisor if additional hazards are observed and further control measures need to be added to the JSEA. 5 APPLICATION The application and process steps outlined in this section are illustrated in Appendix 1, JSEA Flow Chart. 5.1 When to Use a JSEA A JSEA must be completed: (i) (ii) (iii) (iv) (v) (vi) (vii) (viii) (ix) for any work that is assessed with a residual risk rating as moderate, significant or high (following the outcomes from a TRA; refer to CS-OHS-46, Procedure for Conducting a 2X2 Task Risk Analysis); for any work requiring a PTW and prior to the issue of the PTW; before introducing any new plant, machinery, equipment, hazardous substances or work practices; prior to making design changes or modifications to plant or equipment that will affect the way the plant is used, the procedures associated with the plant or the location of the plant; when work activities or modifications to any plant or equipment has the potential to release a contaminant to the environment or storm water or to exceed site license conditions; prior to removing or installing safety features (guardrails, machinery guards, interlocks, covers, flooring); prior to conducting live electrical work; prior to performing work in proximity to or with bonded asbestos containing materials and friable asbestos; or prior to working with or adjacent to areas or plant with explosive atmospheres, excessive temperatures, vibration and flammable substances. 5.2 When to Modify a JSEA A JSEA shall be modified in consultation with personnel involved in the work: (i) (ii) (iii) (iv) when changes to work are identified and additional hazards are introduced needing further control measures to be implemented; after an incident or near miss to review/modify control measures to satisfy a safe system of work; when information becomes known about a hazardous workplace environmental condition, hazardous work activity, process or behavior; or where a control measure is changed to improve its effectiveness. 5.3 Completing a JSEA To effectively conduct a JSEA, the following key steps and criteria are to be applied and documented on Form S1878, Job Safety and Environment Analysis. This process adheres to the CS Energy Risk Management Procedure. A form is detailed in Appendix 2, Sample JSEA Form Identifying the Tasks for the Work Being Assessed The work to be undertaken must be analysed and broken down into the individual tasks. Each of these tasks is recorded on the form in sequence of doing the work. Job Safety and Environmental Analysis, CS-OHS-11 5

6 Sufficient detail should be provided so that other people can understand and follow the work. Where possible, discuss the job tasks and activities with another person (i.e. work party member) who is familiar with the job to validate the tasks and sequence to efficiently and safely perform the work. Also, the JSEA must include: specific people and skills required for each step e.g. licensed person, rigger, crane driver etc; tools and equipment e.g. scaffolding, slings and crane etc; personal protective equipment required e.g. fall restraint harness etc; drawings e.g. P&ID, etc; and MSDS, e.g. chemicals Identifying Hazards and Environmental Impacts Potential hazards and environmental impacts are to be identified for each task and recorded on the JSEA form. The first page of the JSEA form provides a list of typical hazards and the relevant hazards can be documented against the relevant task Assess the Risk Initial Use the CS Energy 6x5 Risk Matrix (detailed in Appendix 2) to assess the risk for each task by determining the likelihood and consequence. This is the initial risk score to initiate what control measures are to be implemented. The risk matrix is detailed on Form S1878, Job Safety and Environment Analysis Determine the Control Measures Where a hazard has been identified, the preferred method to control the hazard is by eliminating the hazard. However, this is not always possible and risks associated with the hazard must be reduced so far as reasonably practicable. While there is no definite level of what represents reasonably practicable, it is essentially where the organisation has applied reasonable controls to reduce the risk to a safe level given the conditions present. CS Energy follows the hierarchy of controls 1 in determining the most appropriate manner in reducing risk Assess the Risk with the Control Measures Residual Apply the CS Energy 6x5 Risk Matrix (detailed in Appendix 2) to assess the risk for each task with the identified control measures implemented. This new risk score is the residual risk for the work. This determines the level of authorisation required for work to proceed ensuring a safe system of work is followed. 1 Workplace Heath and Safety Act 27A Managing exposure to risks (2) To properly manage exposure to risks, a person should consider the appropriateness of control measures in the following order - (a) eliminating the hazard or preventing the risk; (b) if eliminating the hazard or preventing the risk is not possible, minimising the risk by measures that must be considered in the following order - (i) substituting the hazard giving rise to the risk with a hazard giving rise to a lesser risk; (ii) isolating the hazard giving rise to the risk from anyone who may be at risk; (iii) minimising the risk by engineering means; (iv) applying administrative measures; (v) using personal protective equipment. Job Safety and Environmental Analysis, CS-OHS-11 6

7 5.3.6 Checking, authorisation and sign-off After the JSEA has been completed, and all details are recorded on the form, the JSEA must be checked by a second person. This may be a peer, supervisor or site specialist (e.g., Health and Safety / Environmental Coordinator, Chemist, Engineer etc.) dependant on the complexity and risk level of the work. The following authorisations are required: (i) (ii) (iii) if the residual risk is moderate; authorisation by the Supervisor; if the residual risk is significant; authorisation by the Site Manager; and if the residual risk is high; authorisation by the General Manager. Once authorisations are complete, all personnel working on the job specific to the JSEA are to sign on to the JSEA form before they commence work, i.e. before the initial commencement of the job. Note: The hazards and risk shall be monitored/reviewed periodically throughout the job typically at the start of each shift using either the TRA or by updating the JSEA as determined by the conditions/risks. 6 RECORDING Completed JSEA forms shall be maintained by the PTW Officer for all JSEAs associated to a PTW. All other JSEAs are maintained by the relevant supervisor. These are to be available for review and monitoring purposes. Records shall be kept and maintained for at least 5 years 7 MONITORING AND REVIEW Periodic monitoring and review of JSEAs shall be conducted to determine and maintain the quality and effectiveness of JSEAs. Monitoring and review shall be conducted at each site: at a frequency nominated by the site manager; and by senior staff nominated by the site manager. This will also be supplemented with periodic monitoring and review by CS Energy health and safety. A checklist to qualify monitoring and review performed on JSEAs is detailed in Appendix 3. Additionally, CS Energy Health & Safety will conduct a formal review of this procedure every two years. The review will evaluate the effectiveness of the Job Safety Analysis Procedure, to prioritise, identify, assess and control risks. 8 TRAINING All personnel, both employees and contractors, are to be appropriately trained in the risk management process including hazard identification and risk assessment, i.e. JSEA process. All personnel shall be given basis risk management training during their induction. The level of training required for personnel with the functions within the roles of the PTW process is to follow the requirements outlined in: CS Energy PTW Manual, CS-PTW-01; and Training and Authorisation of Roles in the PTW System, CS-PTW-SOP-02; refer to Section 5, Training and Competency Matrix The CS Energy preferred training is the Hazard Identification Risk Assessment (HIRA). Job Safety and Environmental Analysis, CS-OHS-11 7

8 Refresher training for those people trained to the HIRA or equivalent level is required at least every 2 years. Refresher training shall cover any changes/improvements to the JSEA and/or TRA process and be a forum for discussion about the process. 9 REFERENCE DOCUMENTATION All applications of these guidelines incorporate the requirements of the following: Workplace Health and Safety Act 1995 Electrical Safety Act 2002 Code of Practice Risk Management AS/NZS 4360 Risk Management CS Energy Health and Safety Manual, CS-OHS-M-01 CS Energy PTW Manual, CS-PTW-01 CS Energy Risk Management Framework CS Energy Job Safety Environmental Analysis Form, S1878 CS Energy Procedure for Conducting 2X2 Task Risk Analysis, CS-OHS DEFINITIONS Hazard Office in Charge (OIC) Permit to Work Officer (PTWO) Person in Charge of Work (PICW) Principal s Site Representative Risk Risk Assessment Risk Matrix Work Party A source of potential harm to personnel, plant or the environment An authorised person who has successfully completed all appropriate OIC training and is deemed competent. They coordinate the work and where applicable, a workgroup which is operating within a specific PTW. The OIC carries the responsibility for the PTW once issued. An authorised person who has successfully completed all appropriate PTW training and is deemed competent to isolate the plant and issue a PTW allowing work to safely proceed, then on return close the PTW and restore the plant An authorised person who has successfully completed the required training and is authorised as competent to coordinate and manage work under a PTW. This role is responsible for managing the work party signed onto the PTW to complete work within the isolation boundary. A site based person representing the Principal for the overall management of technical / commercial aspect of the contract for the Principal. Effect of uncertainty on objectives Overall process of risk identification, risk analysis and risk evaluation. A table to analyse risk resulting in the magnitude of risk expressed in terms of the combination of consequences and their likelihood. All persons who perform specific work activities as coordinated by an Officer In Charge under a Permit To Work. Job Safety and Environmental Analysis, CS-OHS-11 8

9 11 APPENDIX 1 JSEA FLOW CHART Job to be performed Risk Assessment Process - JSEA Is a JSEA required for work? Yes Identify individual Tasks If conditions change or control measures are ineffective No Conduct a Task Risk Analysis Identify Hazards Assess the RISK (Initial) Determine Control Measures Assess the Risk (Residual) Acknowledgement and Authorisation Process JSEA Check (by another person) Authorisation Perform Task Sign off by work party Monitor Conditions (use TRA) Records (PTW Office or supervisor) JSEA PROCESS FLOW Job Safety and Environmental Analysis, CS-OHS-11 9

10 12 APPENDIX 2 SAMPLE JSEA FORM Job Safety and Environmental Analysis, CS-OHS-11 10

11 Job Safety and Environmental Analysis, CS-OHS-11 11

12 Job Safety and Environmental Analysis, CS-OHS-11 12

13 Job Safety and Environmental Analysis, CS-OHS-11 13

14 13 APPENDIX 3 JSEA QUALITY CHECKLIST AND SCORE Checklist against CS Energy Procedure for a Job Safety and Environmental Analysis, CS-OHS-11 Effectiveness Measure: 1 = Not established, not effective 5 = Fully established, fully effective JSEA Quality Elements 1. Supervisor conducted JSEA review and provided for feedback/input from all workers. Effectiveness (1 to 5) Comments 2. All workers participated in the JSEA review before starting work. 3. JSEA is readily visible and appropriately maintained at job location. 4. JSEA includes all job steps for specific task. 5. JSEA identifies and records all actual or potential safety/health hazards. 6. JSEA identifies that all associated hazards are eliminated or mitigated. 7. Required PPE is listed on JSEA and all PPE properly used by workers. 8. JSEA signed by OIC/Supervisor 9. JSEA has been authorised by appropriate person. 10. All nominated personnel have signed onto the JSEA. 11. Field observations at job location indicate all workers are following JSEA. 12. JSEA records all modifications when the work scope or job conditions change. 13. Steps and work instructions for job task are provided to all workers. 14. JSEA training has been completed by all work party members on task. Score : % Effectiveness : (100 x Score / 70) Job Safety and Environmental Analysis, CS-OHS-11 14

JOB SAFETY ENVIRONMENT ANALYSIS (JSEA) CS-OHS-11

JOB SAFETY ENVIRONMENT ANALYSIS (JSEA) CS-OHS-11 CS ENERGY PROCEDURE FOR JOB SAFETY ENVIRONMENT ANALYSIS (JSEA) CS-OHS-11 Responsible Officer: HSSE Management Systems Specialist Responsible Executive: Group Manager Health Safety Security and Environment

More information

CONDUCTING 2X2 TASK RISK ANALYSIS CS-OHS-46

CONDUCTING 2X2 TASK RISK ANALYSIS CS-OHS-46 CS-OHS-46 (Amd 01/11) CS ENERGY PROCEDURE FOR A CONDUCTING 2X2 TASK RISK ANALYSIS CS-OHS-46 Responsible Officer: Group Manager Health and Safety Approved: GM Corporate CONTENTS 1 Purpose... 2 2 Context...

More information

CONDUCTING SAFETY INTERACTIONS CS-OHS-19

CONDUCTING SAFETY INTERACTIONS CS-OHS-19 CS ENERGY PROCEDURE FOR CONDUCTING SAFETY INTERACTIONS CS-OHS-19 Responsible Officer: Health, Safety and Security Coordinator Responsible Executive: Group Manager Health Safety Security and Environment

More information

CONDUCTING CRITICAL CONTROL AUDITS CS-OHS-60

CONDUCTING CRITICAL CONTROL AUDITS CS-OHS-60 CS ENERGY PROCEDURE FOR CONDUCTING CRITICAL CONTROL AUDITS CS-OHS-60 Responsible Officer: Health and Safety Specialist Responsible Executive: Group Manager Safety Environment and Quality DOCUMENT HISTORY

More information

Safe Operating Procedures 1 SECTION 1 INTRODUCTION 2 PURPOSE 2 SCOPE 2 DEFINITIONS 2 LEGISLATIVE CONTEXT 4

Safe Operating Procedures 1 SECTION 1 INTRODUCTION 2 PURPOSE 2 SCOPE 2 DEFINITIONS 2 LEGISLATIVE CONTEXT 4 OH&S Guideline Name: Approved by: Safe Operating Procedures Director Human Resources Last reviewed: December 2013 Safe Operating Procedures 1 SECTION 1 INTRODUCTION 2 PURPOSE 2 SCOPE 2 DEFINITIONS 2 LEGISLATIVE

More information

WHS Management Plans

WHS Management Plans WHS Management Plans Disclaimer This Guide provides general information about the obligations of persons conducting a business or undertaking and/or persons in control of premises and workers under the

More information

Permit to Work Manual

Permit to Work Manual Permit to Work Manual Release Date March 2016 CS-PTW-01 Version 3.1 Originator PTW Committee For further information, contact your supervisor or the site safety department. THIS DOCUMENT IS UNCONTROLLED

More information

GUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08

GUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08 CS ENERGY PROCEDURE FOR GUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08 Responsible Officer: Manager Environment Approved: Executive General Manager Asset Strategy DOCUMENT HISTORY Date

More information

Construction Safety Audit Scoring System (ConSASS) Audit Checklist

Construction Safety Audit Scoring System (ConSASS) Audit Checklist I 1.1 1 OSH Policy The occupier's management with executive or site responsibility shall define and document its policy for safety including objectives for its commitment to safety. (CP79 - Section 1.2)

More information

UNCONTROLLED IF PRINTED. Issued with the authority of the Chief Commissioner and General Manager of Scouts Australia NSW

UNCONTROLLED IF PRINTED. Issued with the authority of the Chief Commissioner and General Manager of Scouts Australia NSW PROCEDURE Contractor Safety Issued with the authority of the Chief Commissioner and General Manager of Chief Commissioner signature Chief Executive Officer signature Sponsor Head of Risk Document type

More information

Health and Safety Management Standards

Health and Safety Management Standards Management Standards Curtin University Sept 2011 PAGE LEFT INTENTIONALLY BLANK Management Standards Page 2 of 15 CONTENTS 1. Introduction... 4 1.1 Hierarchy of Documents... 4 2. Management System Model...

More information

Phoenix Energy Holdings Gas Ltd Health & Safety Policy

Phoenix Energy Holdings Gas Ltd Health & Safety Policy Phoenix Energy Holdings Gas Ltd Health & Safety Policy July 2017 Phoenix Energy Holdings Ltd Health & Safety Policy July 2017 Contents 1.0 Introduction 2.0 Purpose 3.0 Scope 4.0 References 5.0 Definitions

More information

Asbestos Management Policy

Asbestos Management Policy ECM Document Set ID Number: 3428289 Revision Date: August 2016 July 2016 20 th July 2016 Risk Principal Approval Date: 20 th July 2016 Manager Works 20 th July 2016 Manager Building and Property Review

More information

Health & Safety Policy & Management Systems. Guidance Note 13

Health & Safety Policy & Management Systems. Guidance Note 13 Health & Safety Policy & Management Systems Guidance Note 13 1 Health & Safety Policy & Management Systems Introduction This Guidance Note gives practical information regarding basic health and safety

More information

HAZARD / IMPROVEMENT REPORTING CS-OHS-51

HAZARD / IMPROVEMENT REPORTING CS-OHS-51 CS ENERGY PROCEDURE FOR HAZARD / IMPROVEMENT REPORTING CS-OHS-51 Responsible Officer: Group Manager Health Safety Security and Environment Responsible Executive: Chief Executive Officer (CEO) DOCUMENT

More information

OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable)

OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable) OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable) 4.1 General Requirements 4.2 OHS policy Has the organisation an established and maintained

More information

The Health & Safety Policy

The Health & Safety Policy The Health & Safety Policy April 2014 Issue: 3 Page 1 of 16 Review Date: April 2015 Introduction This document sets out the Health & Safety arrangements for Astra Signs Ltd and represents our commitment

More information

WHSE POL 1 WORK HEALTH, SAFETY & ENVIRONMENT MANAGEMENT POLICY

WHSE POL 1 WORK HEALTH, SAFETY & ENVIRONMENT MANAGEMENT POLICY Issue Number: 5 Prepared by (author): Greg McDonald, Group Manager WHSE Authorised by: Chen Wei Ng, Managing Director Date of release: 01 January 2014 Date of review 01 December 2015 WHSE POL 1 WORK HEALTH,

More information

PETROLEUM AND GAS SAFETY MANAGEMENT CS-OHS-02

PETROLEUM AND GAS SAFETY MANAGEMENT CS-OHS-02 CS ENERGY PROCEDURE FOR PETROLEUM AND GAS SAFETY MANAGEMENT CS-OHS-02 Responsible Manager: Group Manager Health Safety Security and Environment Responsible Executive: Chief Executive Officer (CEO) DOCUMENT

More information

Health & Safety Policy

Health & Safety Policy Health & Safety Policy Policy Statement What is Comms-care s commitment to H&S Comms-care Group Ltd places the highest priority on protecting the health, safety and wellbeing of its employees and others,

More information

Apply for Confined Space Permit

Apply for Confined Space Permit Apply for Confined Space Permit Details of revisions Level Details Date Initial 1 Creation of initial document for use MW Title: Apply for Confined space Permit (Guide) Date Published: ID: 000275 Version:

More information

Apply for Confined Space Permit

Apply for Confined Space Permit Apply for Confined Space Permit Details of revisions Level Details Date Initial 1 Creation of initial document for use MW 2 Amendment 16/01/2019 MW Title: Apply for Confined space Permit (Guide) Date Published:

More information

TECHNICAL SUPPORT ASSOCIATES HEALTH AND SAFETY POLICY STATEMENT

TECHNICAL SUPPORT ASSOCIATES HEALTH AND SAFETY POLICY STATEMENT TECHNICAL SUPPORT ASSOCIATES HEALTH AND SAFETY POLICY STATEMENT Technical Support Associates 57-59 High Street Bagshot Surrey GU19 5AH Tel: 01276 476237 Email: enquiries@tsaservices.co.uk Website: www.tsaservices.co.uk

More information

National self-insurer OHS management system audit tool. Version 3

National self-insurer OHS management system audit tool. Version 3 National self-insurer OHS management system audit tool Version 3 Release Date: 4 August 2014 Next Review Date: 2016 Approval Status: Prepared by: Approved by Heads of Workers Compensation Authorities WorkCover

More information

Release: 1. CPCCBC4002A Manage occupational health and safety in the building and construction workplace

Release: 1. CPCCBC4002A Manage occupational health and safety in the building and construction workplace Release: 1 CPCCBC4002A Manage occupational health and safety in the building and construction workplace CPCCBC4002A Manage occupational health and safety in the building and construction workplace Modification

More information

HEALTH & SAFETY POLICY AND ORGANISATIONAL ARRANGEMENTS

HEALTH & SAFETY POLICY AND ORGANISATIONAL ARRANGEMENTS HEALTH & SAFETY POLICY AND ORGANISATIONAL ARRANGEMENTS Enquin Environmental Limited 1 Ringside Business Centre Heol Y Rhosog Wentloog Cardiff CF3 2EW Enquin Environmental Ltd Page 1 of 10 March 2016 Introduction

More information

National Health and Safety Function, Workplace Health and Wellbeing Unit, National HR Division. Guideline Document

National Health and Safety Function, Workplace Health and Wellbeing Unit, National HR Division. Guideline Document National Health and Safety Function, Workplace Health and Wellbeing Unit, National HR Division Guideline Document Ref: GD:004:00 RE: Completion of Occupational Safety and Health Risk Assessments Issue

More information

The following is a description of the type of work that our Company undertakes:

The following is a description of the type of work that our Company undertakes: Health & Safety Introduction K9 Patrol is committed to providing a workplace that is healthy and safe for our employees and anyone who interacts with us e.g. customers and members of the public. Conformance

More information

Health and Safety Manual

Health and Safety Manual Health and Safety Manual CS-OHS-M-01 Version 2 Effective date: 30 November 2012 Next review date: 01 November 2014 Health and Safety Manual CS-OHS-M-01 FOREWORD The foundation of CS Energy s success as

More information

Evaluation of Occupational Health & Safety Management System

Evaluation of Occupational Health & Safety Management System Section 1 Legal Obligation Employers have a duty of care to provide a safe workplace and systems of work, to consult with workers, to identify and manage workplace hazards and to keep them informed about

More information

WORK METHOD STATEMENT CABINETRY/JOINERY

WORK METHOD STATEMENT CABINETRY/JOINERY ORGANISATION DETAILS Organisation Name: Gedoun Constructions Pty Ltd Contact Name: Joe Gedoun ACN/ABN: 73 Contact Position: Director Address: PO Box 3, Townsville QLD 0 Contact Phone Number: 0 96 97 PROJECT

More information

Procedure. Work Health and Safety Pre-approved work. Document number: PRO Rev no.

Procedure. Work Health and Safety Pre-approved work. Document number: PRO Rev no. Procedure Work Health and Safety Pre-approved work Document number: PRO-01488 This document is the property of Seqwater. It must not be copied or reproduced in any way whatsoever without the authority

More information

SECTION 1 - INTRODUCTION 2 PURPOSE 2 SCOPE 2 DEFINITIONS 2 LEGISLATIVE CONTEXT 4 RESPONSIBILITIES 4

SECTION 1 - INTRODUCTION 2 PURPOSE 2 SCOPE 2 DEFINITIONS 2 LEGISLATIVE CONTEXT 4 RESPONSIBILITIES 4 OH&S Procedure Name: Manual Handling Procedure Approved by: Director Human Resources Last reviewed: December 2013 SECTION 1 - INTRODUCTION 2 PURPOSE 2 SCOPE 2 DEFINITIONS 2 LEGISLATIVE CONTEXT 4 RESPONSIBILITIES

More information

HEALTH AND SAFETY POLICY AND PROCEDURES

HEALTH AND SAFETY POLICY AND PROCEDURES HEALTH AND SAFETY POLICY AND PROCEDURES Relevant Legislation The Health and Safety At Work Act 1974 The Management of Health and Safety At Work Regulations 1999(as amended) All associated Health and Safety

More information

Apply for Crane Permit

Apply for Crane Permit Apply for Crane Permit Details of revisions Level Details Date Initial 1 Creation of initial document for use 20/08/2016 J.O S 2 Implementation of time frames 23/03/2018 MW Title: Apply for Crane Permit

More information

Management of Risk Assessment

Management of Risk Assessment Health and Safety Services WELLBEING, SAFETY AND HEALTH Management of Risk Assessment Guidance for Heads of School/ Service This is a controlled document whilst viewed at www.leeds.ac.uk/safety. Once downloaded

More information

SHE Training Procedure

SHE Training Procedure APAC SHE Procedure S3[APAC]-003-PR1 1. Purpose and Scope AECOM will ensure that all employees and persons under their control receive appropriate SH&E training to allow them to carry out their work in

More information

CONTRACTOR WHS SYSTEM STANDARD RISK MANAGEMENT EXTERNAL USE ONLY

CONTRACTOR WHS SYSTEM STANDARD RISK MANAGEMENT EXTERNAL USE ONLY CONTRACTOR WHS SYSTEM STANDARD RISK MANAGEMENT EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION Requisition

More information

PROGRAM OVERVIEW JOB HAZARD ANALYSIS (JHA) SAFETY PROGRAM REGULATORY STANDARD: 29 CFR

PROGRAM OVERVIEW JOB HAZARD ANALYSIS (JHA) SAFETY PROGRAM REGULATORY STANDARD: 29 CFR PROGRAM OVERVIEW JOB HAZARD ANALYSIS (JHA) SAFETY PROGRAM REGULATORY STANDARD: 29 CFR 1910.132-138. INTRODUCTION: Injuries in the workplace often occur because employees are not adequately trained in the

More information

Critical Elements from the Arrium Codes of Practice (Including Arrium Mining Codes of Practice)

Critical Elements from the Arrium Codes of Practice (Including Arrium Mining Codes of Practice) Critical Elements from the Arrium Codes of Practice (Including Arrium Mining Codes of Practice) Version 3 June 2014 Authorised by Arrium Safety Council TOOL75.WHS.COP.001 Critical Elements from the Code

More information

MANUAL HANDLING PROCEDURE

MANUAL HANDLING PROCEDURE Document uncontrolled when printed Procedure ID no 0480/05 MANUAL HANDLING PROCEDURE This procedure is applicable to: All Department of Education and Children's Services employees. DOCUMENT CONTROL Managed

More information

Contractor Selection & Management Guideline Rev01. Revision 00. April 2011

Contractor Selection & Management Guideline Rev01. Revision 00. April 2011 Contractor Selection and Management Guideline Revision 00 April 2011 Document Details and Issue Record Rev No. Details Date Author 00 Draft 10/04/2011 CJMD Checked Text Calcs Approved Document Reference:

More information

PGR Innovations Limited. Company Policy For Health & Safety

PGR Innovations Limited. Company Policy For Health & Safety PGR Innovations Limited Company Policy For Health & Safety January 2012 CONTENTS Company Policy Statement 1.0 Organisation Duties And Responsibilities 2.0 Managing Director 2.1 Projects Managers and Site

More information

S25 Risk Assessment & Safe Systems of Work - 1 / 5

S25 Risk Assessment & Safe Systems of Work - 1 / 5 S25 Opening Statement Risk Assessment & Safe Systems of Work Risk assessment is the fundamental process for health and safety management. When investigating accidents and incidents it is nearly always

More information

Safe Work Method Statement. 14/4/16 Approved by (Snr Management Rep):

Safe Work Method Statement. 14/4/16 Approved by (Snr Management Rep): ABN 39 137 318 873 Unit 2, 36 Lidco St Arndell Park NSW 2148 QAC swms2 Phone: 1300 121 544 Fax 1300 078 877 Safe Work Method Statement SWMS No: 1 Revision Date: 14/4/16 Approved by (Snr Management Rep):

More information

MVDC F041 Safety Inspection Checklist

MVDC F041 Safety Inspection Checklist MVDC F041 Safety Inspection Checklist JOB TITLE: DEPARTMENT: JOB NO.: DATE: LEGEND 1 Satisfactory 2 Requires Improvement 3 Non Existent 4 Not Applicable EMERGENCY PREPAREDNESS Emergency procedure is posted

More information

Hazard Identification & Risk Assessment

Hazard Identification & Risk Assessment Purpose/ Objective: Berland River Safety Inc. has established this written safety policy and implemented procedures to ensure that hazard identification and risk assessment will be part of routine safety

More information

WORK HEALTH AND SAFETY AUDIT STANDARD

WORK HEALTH AND SAFETY AUDIT STANDARD WORK HEALTH AND SAFETY AUDIT STANDARD FORESTRY INDUSTRY South Australia, Victoria and Tasmania Safety Standards 2017 2017 Content I. Introduction... 2 II. Audit Criteria and Indicators... 3 1 PLANNING...

More information

Occupational Health and Safety. Improvement Standard

Occupational Health and Safety. Improvement Standard Premier s Department New South Wales Occupational Health and Safety Improvement Standard A tool for measuring OHS performance within NSW Government Agencies OHS IMPROVEMENT STANDARD NSW GOVERNMENT - REVIEW

More information

JOB SAFETY ANALYSIS (JSA) FOR. <Insert Organization Name> Adopted <Insert Date Policy Is Adopted> LC-442 Rev. 3/11

JOB SAFETY ANALYSIS (JSA) FOR. <Insert Organization Name> Adopted <Insert Date Policy Is Adopted> LC-442 Rev. 3/11 JOB SAFETY ANALYSIS (JSA) FOR Adopted LC-442 I. Introduction In an effort to identify workplace hazards, the Organization will conduct a Job Safety

More information

ASBESTOS POLICY & MANAGEMENT PLAN UNIVERSITY OF ESSEX HUMAN RESOURCES / ESTATE MANAGEMENT SERVICE

ASBESTOS POLICY & MANAGEMENT PLAN UNIVERSITY OF ESSEX HUMAN RESOURCES / ESTATE MANAGEMENT SERVICE ASBESTOS POLICY & MANAGEMENT PLAN UNIVERSITY OF ESSEX HUMAN RESOURCES / ESTATE MANAGEMENT SERVICE Version 04.04.2017 Issue 1.2 (updated 17.01.2018) Approved by USG 10.10.17 1 CONTENTS 1 POLICY STATEMENT...1

More information

OHS Management of Contractors in Capital Works and Maintenance

OHS Management of Contractors in Capital Works and Maintenance OHS Management of Contractors in Capital Works and Maintenance Physical Resources/Risk, Health and Safety Prepared by: Physical Resources/Risk, Health and Safety Version: 08/04/2008 Contents Page 1. INTRODUCTION...

More information

CITY OF DARWIN CRUISES Environmental Management System

CITY OF DARWIN CRUISES Environmental Management System CITY OF DARWIN CRUISES Environmental Management System 1. Introduction Environmental Management Systems (EMS) are designed to enable organisations to address both environmental concerns and economic imperatives

More information

This procedure applies to all personnel and departments that operate lift trucks at the University of Windsor.

This procedure applies to all personnel and departments that operate lift trucks at the University of Windsor. Revision Date: New Page: 1 of 5 1.0 PURPOSE The purpose of this procedure is to establish the requirements of training for lift truck operators and to ensure safety for personnel who utilize and/or work

More information

Work Health and Safety Management Systems and Auditing Guidelines

Work Health and Safety Management Systems and Auditing Guidelines Work Health and Safety Management Systems and Auditing Guidelines 5th edition, September 2013 (Updated May 2014) Work Health and Safety Management Systems and Auditing Guidelines These Guidelines are a

More information

Health, Safety and Environmental Management Systems Audit Report

Health, Safety and Environmental Management Systems Audit Report Health, Safety and Environmental Management Systems Audit Report SMART Group of Companies Jaunuary 2016 Page 1 of 18 1.0 Executive Summary A review of SMART Technical Services workplace health and safety

More information

JOB SAFETY ANALYSIS PROGRAM. Owner: Risk Management Revision No: 01. Document number: Q-001 Date last revised:

JOB SAFETY ANALYSIS PROGRAM. Owner: Risk Management Revision No: 01. Document number: Q-001 Date last revised: Table of Contents 1.0 Applicability...2 2.0 Scope...2 3.0 Definitions...2 4.0 Core Information and Requirements...2 5.0 Roles and Responsibilities...6 6.0 Goals, Objectives and Performance Measures...7

More information

WHS Change Management

WHS Change Management Page 1 of 6 Issue: 2 1. Intent The Salvation Army Australia Eastern Territory (TSA-AUE) is committed to the provision of a safe, healthy and injury free environment for all persons in the mission / ministry

More information

GUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08

GUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08 CS ENERGY PROCEDURE FOR GUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08 Responsible Officer: Environmental Specialist Responsible Manager: Head of Environment Responsible Executive:

More information

CHAS Assessment Standards

CHAS Assessment Standards CHAS Assessment Standards Section 1 - All Prosecutions or Enforcement Notices The Supplier has provided details of any enforcement notices or prosecutions served on them in the last three years by the

More information

Health, Safety and Environment Pre-Qualification Questionnaire Health, Safety & Environmental Long Form Questionnaire Version 1, August FINAL

Health, Safety and Environment Pre-Qualification Questionnaire Health, Safety & Environmental Long Form Questionnaire Version 1, August FINAL Health, Safety and Environment Pre-Qualification Questionnaire Health, Safety & Environmental Long Form Questionnaire Version 1, August 2016 - FIAL Contract ame: [insert name here] Company ame: [insert

More information

Procedure Plant Management Procedure

Procedure Plant Management Procedure Procedure Plant Management Procedure 1. Purpose Give guidance on the OHS management of plant and equipment items used by Greater Shepparton City Council workers. 2. Actions Required Hazard assess plant

More information

Apply for Working at Heights Permit

Apply for Working at Heights Permit Apply for Working at Heights Permit Details of revisions Level Details Date Initial 1 Creation of initial document for use 05/09/2017 MW 2 Amendment to implement time frames 23/03/2018 MW Title: Apply

More information

Workplace Safety and Health Guidelines Contractor Management

Workplace Safety and Health Guidelines Contractor Management Published in September 2011 by the Workplace Safety and Health Council in collaboration with the Ministry of Manpower. All rights reserved. This publication may not be reproduced or transmitted in any

More information

Roy Hill Inductions and Orientation Procedure Health & Safety

Roy Hill Inductions and Orientation Procedure Health & Safety 1 Purpose and scope The purpose of this procedure is to ensure all employees, contractors and visitors requiring access to Roy Hill sites are informed of relevant health, safety and environmental risks

More information

CONTENTS MANAGEMENT STANDARDS ANGLO OCCUPATIONAL HEALTH WAY MANAGEMENT SYSTEM STANDARDS INTRODUCTION 1 3 LEGAL AND OTHER REQUIREMENTS 10

CONTENTS MANAGEMENT STANDARDS ANGLO OCCUPATIONAL HEALTH WAY MANAGEMENT SYSTEM STANDARDS INTRODUCTION 1 3 LEGAL AND OTHER REQUIREMENTS 10 Version 1 July 2007 CONTENTS INTRODUCTION 1 3 LEGAL AND OTHER REQUIREMENTS 10 OCCUPATIONAL HEALTH IN ANGLO AMERICAN OUR VISION OUR PRINCIPLES OUR POLICY 2 THE ANGLO OCCUPATIONAL HEALTH FRAMEWORK 3 CORPORATE

More information

M.B. Power Services (Essex) Ltd

M.B. Power Services (Essex) Ltd M.B. Power Services (Essex) Ltd HEALTH & SAFETY POLICY 1 POLICY STATEMENT The company recognises that under the Health & Safety at Work Act 1974 the Company has a legal duty to ensure so far as is reasonably

More information

OHS Consultation for Managers

OHS Consultation for Managers Owner: Manager HWS Last Update: 12 September 2012 Note: This document refers to the Workplace Health and Safety Act which will potentially replace the Victorian OHS Act. The current OHS Act is almost identical

More information

Work Health & Safety Procedure

Work Health & Safety Procedure 1 PURPOSE This procedure explains the process for qualification of Contractors at Port of Newcastle (PON). It outlines the responsibilities for PON Representatives and Contractors. It also provides a system

More information

PROPERTY SERVICES OPERATING PROCEDURE

PROPERTY SERVICES OPERATING PROCEDURE This is a internal document and is only applicable to the internal operations of the RMIT. OPERATING PROCEDURE INTENT The Permit to Work (PTW) procedure is a formal written system used to control certain

More information

Health and Safety Manual

Health and Safety Manual Health and Safety Manual Contents Revisions... 4 Distribution List... 4 Tower Cranes NZ Health & Safety Policy... 5 1. Introduction... 6 2. Purpose... 6 3. Scope... 6 4. Objectives... 7 5. Planning...

More information

Organisation Details:

Organisation Details: Organisation Details: Business Name Address Applicable Standard (s) ISO 45001: 2018 Audit Type Transition to ISO 45001:2018 GRS Reference Management contact: Total no of employee Risk Category High Medium

More information

CPCCCM2010A Work safely at heights

CPCCCM2010A Work safely at heights CPCCCM2010A Work safely at heights Release: 1 CPCCCM2010A Work safely at heights Modification History Not Applicable Unit Descriptor Unit descriptor This unit of competency specifies the outcomes required

More information

HEALTH AND SAFETY CONTRACT BETWEEN EMPLOYER AND MANDATORY (CONTRACTOR) SECTION 37(2) OF THE OHS ACT, ACT 85 OF 1993

HEALTH AND SAFETY CONTRACT BETWEEN EMPLOYER AND MANDATORY (CONTRACTOR) SECTION 37(2) OF THE OHS ACT, ACT 85 OF 1993 P a g e 1 SUBJECT ISSUED BY APPROVED BY CONTRACT CONTRACT BETWEEN EMPLOYER AND MANDATORY SAFETY MANAGER: SUN CITY RESORT DIRECTOR OF OPERATIONS PAGE 1 OF 15 EFFECTIVE: REVISION NO: 1 HEALTH AND SAFETY

More information

WHS Manual Insert Business Name & Logo

WHS Manual Insert Business Name & Logo WHS Manual Insert Business Name & Logo Version5 Work Health & Safety Manual INDEX OVERVIEW 4 1. WORK HEALTH AND SAFETY POLICY 5 2. PLANNING, REVIEW AND EVALUATION 9 3. HAZARD IDENTIFICATIO, ASSESSMENT

More information

Annex C TIME-OUT CHECKLIST INTRODUCTION

Annex C TIME-OUT CHECKLIST INTRODUCTION Annex C TIME-OUT CHECKLIST INTRODUCTION A. A Time-out is a Workplace Safety and Health (WSH) response measure that involves the temporary suspension of all or part of a company s operations so as to address

More information

Rail Safety Management Procedure General Engineering and Operational Systems - Asset Management of Rolling Stock

Rail Safety Management Procedure General Engineering and Operational Systems - Asset Management of Rolling Stock 1/16 Management of Rolling Stock Revision Date Comments 1 January 2011 Procedure developed to support SMS and legislative requirements. 2 February 2012 Reviewed with RISSB Standards and change of titles

More information

MECHANICAL JOINT INTEGRITY ROUTE TO COMPETENCE GUIDANCE. Working together to prevent hydrocarbon releases through safety critical competence

MECHANICAL JOINT INTEGRITY ROUTE TO COMPETENCE GUIDANCE. Working together to prevent hydrocarbon releases through safety critical competence MECHANICAL JOINT INTEGRITY ROUTE TO COMPETENCE GUIDANCE Working together to prevent hydrocarbon releases through safety critical competence Revision 2, June 2 2013 AN OVERVIEW Mechanical joints have the

More information

Health and Safety Toolkit

Health and Safety Toolkit Health and Safety Toolkit H&S Conception, Design & Planning Checklist This checklist is for use at the outset of a project and should be regularly reviewed as the concept and design phases progress. The

More information

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF) Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF) EHS Regulatory Instrument Code of Practice EHS RI - CoP 53.0 EHS Management During Construction Work Version 2.0 February 2012 ACKNOWLEDGEMENTS With gratitude

More information

Corporate Policy and Procedure

Corporate Policy and Procedure Corporate Policy and Procedure POLICY CATEGORY AUTHORITY RELATED POLICIES APPROVED BY Safety Management When Outside Contractors are Retained (Contractor Safety Management Program) (the Policy ) Health

More information

HEALTH & SAFETY POLICY Of JMC Mechanical Electrical & Air Conditioning Ltd

HEALTH & SAFETY POLICY Of JMC Mechanical Electrical & Air Conditioning Ltd HEALTH & SAFETY POLICY Of JMC Mechanical Electrical & Air Conditioning Ltd Company Trading Address 242 Fort Austin Avenue Crownhill Plymouth PL6 5NZ Tel: 01752 657227 Fax: 01752 657227 Email: enquiries@jmc-sw.com

More information

Document: HSE NET NAT SWMS APAND00002 Version: 0.01 Date: 20/11/2012 Review by: 15/01/2014 Page 1 of 9 pages

Document: HSE NET NAT SWMS APAND00002 Version: 0.01 Date: 20/11/2012 Review by: 15/01/2014 Page 1 of 9 pages Principal Contractor (PC) Approving Authority APT AM Holdings Pty. Ltd. [ABN] 95124754383 APA Group Level, HSBC Building 580 George Street Sydney NSW 2000 State Representative John Ferguson Group Executive

More information

Contents Certification, Training, Competency & Manning Introduction Certification and Competency Requirements...

Contents Certification, Training, Competency & Manning Introduction Certification and Competency Requirements... Contents 5 Certification, Training, Competency & Manning 5-1 5.1 Introduction... 5-1 5.1.1 KATE... 5-1 5.2 Certification and Competency Requirements... 5-1 5.2.1 General Maritime Personnel Certification...

More information

Procedure: Fixed plant and equipment - machine guarding

Procedure: Fixed plant and equipment - machine guarding Procedure: Fixed plant and equipment - machine guarding Purpose The purpose of this procedure is to define the requirements for machine guarding used to control the risk of injury arising from the use

More information

OPTUS SUPPLIER WORK HEALTH & SAFETY POLICY

OPTUS SUPPLIER WORK HEALTH & SAFETY POLICY OPTUS SUPPLIER WORK HEALTH & SAFETY POLICY 1. Introduction 1.1 SCOPE & PURPOSE This policy (which includes this document and the work health and safety standards, policies, procedures and safety control

More information

SUBCONTRACTOR SAFETY, HEALTH, AND ENVIRONMENTAL MINIMUM PERFORMANCE STANDARD (MPS)

SUBCONTRACTOR SAFETY, HEALTH, AND ENVIRONMENTAL MINIMUM PERFORMANCE STANDARD (MPS) Title: Subcontractor Control Document Effective Date: 2/3/2012 Control Number: THG_0007 Revision Number: 1 Date: 10/6/2015 Annual Review Completed: 5/13/2015 CONTENTS SUBCONTRACTOR SAFETY, HEALTH, AND

More information

Martial Arts Training Company - Occupational Health & Safety Manual OH&S Manual

Martial Arts Training Company - Occupational Health & Safety Manual OH&S Manual Martial Arts Training Company - Occupational Health & Safety Manual OH&S Manual Page!1 Index Martial Arts Training Company - Occupational Health & Safety Manual Index 2 Overview 4 1. Occupational Health

More information

POLICY. Occupational Health and Safety Policy. (from Complispace) Approved: 18 April 2018

POLICY. Occupational Health and Safety Policy. (from Complispace) Approved: 18 April 2018 POLICY Occupational Health and Safety Policy (from Complispace) Approved: 18 April 2018 Version: 2.1 Page 0 18 April 2018 This is a controlled document. Hardcopies of this document are considered uncontrolled.

More information

Quality, Health Safety & Environment Code: 2013

Quality, Health Safety & Environment Code: 2013 Price: AUD 35 Quality, Health Safety & Environment Code Quality, Health Safety & Environment Code: 2013 Published by: TQCS International Pty Ltd Head Office: 117A Tapleys Hill Road HENDON SA 5014 AUSTRALIA

More information

at work Health and safety p o l i c y d o c u m e n t

at work Health and safety p o l i c y d o c u m e n t Employees & visitors Safety Champion Supporting teams Roles & responsibilities Health and safety at work p o l i c y d o c u m e n t The Health and Safety at Work Policy provides a framework to ensure

More information

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF) Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF) EHS Regulatory Instrument Code of Practice EHS RI - CoP 40.0 False Work (Formwork) Version 2.0 February 2012 ACKNOWLEDGEMENTS With gratitude Abu Dhabi

More information

HAZARD IDENTIFICATION AND RISK ASSESSMENT Revision Date: 04/2017

HAZARD IDENTIFICATION AND RISK ASSESSMENT Revision Date: 04/2017 HAZARD IDENTIFICATION AND RISK ASSESSMENT 23.1 PURPOSE 23.1.1 The purpose of this policy is to help employees identify, analyze and apply control strategies to eliminate or reduce hazardous conditions

More information

PROCESS SAFETY MANAGEMENT FRAMEWORK GUIDANCE DOCUMENT

PROCESS SAFETY MANAGEMENT FRAMEWORK GUIDANCE DOCUMENT PROCESS SAFETY MANAGEMENT FRAMEWORK GUIDANCE DOCUMENT AIGA 099/17 Asia Industrial Gases Association 52 Jurong Gateway Road,JEM, #15-02, Singapore 608550 Tel : +65 6276 0160 Fax : +65 6274 9379 Internet

More information

Health and Safety Management Systems Interfacing. Guidance

Health and Safety Management Systems Interfacing. Guidance Health and Safety Management Systems Interfacing Guidance Re-issue 2003 INTRODUCTION 2 Background to the Guidance 2 The Need for SMS Interfacing Arrangements 2 APPLYING THE GUIDANCE 3 GUIDING PRINCIPLES

More information

Five Star Process Safety Audit Specification October 2017

Five Star Process Safety Audit Specification October 2017 Five Star Process Safety Audit Specification October 2017 Membership Training Qualifications Audit and Consultancy Policy and Opinion Awards Contents Page 1 Introduction to the Five Star Process Safety

More information

Working for business. Workplace Safety Discount Application For those with employees

Working for business. Workplace Safety Discount Application For those with employees Working for business Workplace Safety Discount Application For those with employees What is the Workplace Safety Discount programme? The Workplace Safety Discount programme provides a framework for building

More information

JBS Pollution Incident Response Management Plan

JBS Pollution Incident Response Management Plan JBS Pollution Incident Response Management Plan JBS Australia Pty Limited Prime City Feedlot, NSW Document Owner Troy White, Group Environment Manager Printed copies of this document are deemed uncontrolled

More information

University of Portsmouth Safe System of Work Policy

University of Portsmouth Safe System of Work Policy University of Portsmouth Safe System of Work Policy Document title University of Portsmouth Safe System of Work Policy Document author and department Jonathan Latter Health & Safety Compliance Manager

More information

LEICESTERSHIRE COUNTY COUNCIL HEALTH, SAFETY & WELLBEING POLICY. July 2011 To be reviewed: July 2014

LEICESTERSHIRE COUNTY COUNCIL HEALTH, SAFETY & WELLBEING POLICY. July 2011 To be reviewed: July 2014 LEICESTERSHIRE COUNTY COUNCIL HEALTH, SAFETY & WELLBEING POLICY July 2011 To be reviewed: July 2014 Policy Prepared By: Colin Jones CMIOSH Corporate Health, Safety and Wellbeing Manager 1 CONTENTS 1. INTRODUCTION

More information