1 SPECIFICATION OF NEOPRENE RUBBER SEALS 1.0 SCOPE This specification establishes the requirements for the manufacture, inspection, testing, packing, guarantee & supply of Neoprene Rubber Seals for Fuelling System Sealing Doors. 2.0 APPLICABLE SPECIFICATIONS AND DRAWINGS Latest issues of the following specifications and standards in effect at the time of manufacture shall constitute a part of this specification to the extent indicated herein. 2.1 Specifications ASTM D-395 ASTM D-573 Description Method B (Test for compression set) (Test for heat aging) ASTM D-2000-SAE 1200 (Elastomeric Materials Classification) Refer Annexure I for Salient Test Requirements of above ASTM Specification. 2.2 Drawings Sr. No. Drawing No. Description 1. NAPP-1/21321/2138/DD Seal for F/M Vault Access Door Flapper-I 2. NAPP-1/21321/2139/DD Seal for F/M Vault Access Door Flapper-II 3. NAPP-1/21325/2114/DD Seals for F/M Service Area Access Door Flapper-I 4. NAPP-1/21325/2115/DD Seals for F/M Service Area Access Door Flapper-II 5. NAPP-1/21321/2163/DD Seal for Built-in Personnel Access Door ENDLESS SEAL (Item No. 10 of drawing.) NOTE:- Quantity is one no. for one door (Quantity indicated in drawing as 3 nos. to read as 1 no. only.) Total quantity required in the indent is 10 Nos. only and supplied has to quote for 10 Nos. as per the requirement. 6. NAPP-1/21324/2123/DD Seals for West Accessible Area & F/T Auxiliary Room Sealing Doors. Seal for Door Flapper-I. 7. NAPP-1/21324/2124/DD Seals for West Accessible Area & F/T Auxiliary Room Sealing Doors. Seal for Door Flapper-II. Note:- CS profile & dimensions of the seals should be as per the enclosed Annexure- 2 of the specification. However length & other dimensions shall be as per respective drawings. Page 1 of 7

2 3.0 MATERIALS AND WORKMANSHIP Materials which are not specifically designated herein and which are necessary for the fulfillment of this specification shall be of good quality. Workmanship shall be consistent with high grade industrial practice and shall be adequate to achieve the accuracies and dimensional requirements called up in the drawings and this Specification and to ensure satisfactory operation and service life of the equipment. 4.0 GENERAL FUNCTION AND DESCRIPTION The seal assemblies as shown in the drawings when mounted on the door flappers of various sealing doors shall provide a leak tight barrier between F/M Vault / F/M Service Area / West Accessible Area / F/T Auxiliary Room and Accessible Areas in the closed (locked) position of the sealing doors. 5.0 REQUIREMENTS 5.1 Material of Seals The seals shall be made of Neoprene Rubber. No other type of rubber shall be mixed with it. The rubber compound used shall be non-corrosive to steel, resistant to air, ordinary water and heavy water (PH 9.5) and shall be suitable for continuous operation at a temperature of 55 deg. C. and 50% relative humidity and shall not become sticky. The mechanical properties of the material shall be as follows: Shore Hardness : 38 to 42 Durometer A Tensile Strength : 105 Kg/cm 2 (min.) Ultimate Elongation : 350% (min.) Supplier shall manufacture the rubber seal with shore hardness 38 to 45 in place of shore hardness mentioned in the drawing. 5.2 Quality of the Seals and Dimensional Tolerances All the seals shall be free from voids, cracks, depressions or improper blending. All seals shall be moulded to the shapes as shown on respective drawings. They may be moulded in parts and joined together to form the specified shapes. The joints shall be made in the factory and shall satisfy all requirements regarding strength and dimensional tolerance. The seals shall have the following dimensional tolerances: Radius : 1.0 mm Height and other dimensions : + 0 mm - 1 mm Page 2 of 7

3 5.3 Compression Characteristics The cross section of seals shall be such that the compression stiffness (load per unit compression) shall be about 6 kg/mm checked on a 200 mm length of the seal. Minor changes in seal configuration may be required to achieve the above stiffness. The above value is applicable for seal as per serial no. 1, 2, 4 & 5 as mentioned in para 2.2. For seal at serial no. 3 of para 2.2 supplier shall check the stiffness of the seal. The value shall be less than 6 kg/mm. Manufacture of seals shall be taken up only after establishing the stiffness as mentioned and clearance by NPCIL in writing. 5.4 Compression Set The seals shall not have more than 25 % compression set when tested as per ASTM D-395 Method B for 22 hours at 100 deg. C. 5.5 Heat Aging Samples shall be heat aged at 100 deg. C. for 70 hours and tested as per ASTM D-573. Changes in properties shall not exceed the following limits: Tensile Strength : 30% Ultimate Elongation : 50% (max.) Durometer Hardness : 15 points 5.6 Operating life The seals shall be manufactured for an estimated life of 3 years and 5000 cycles of 8 mm compression. The fatigue test as described in Section 7.3 of this specification shall be carried out on the test seal for 5000 cycles. There shall be no physical damage or failure of the seal. The permanent set after 5000 cycles shall not be more than 1 mm. 6.0 MANUFACTURE OF SEALS FOR TESTING & SUPPLY 6.1 The supplier shall manufacture first, three samples of test seal for compression test and test them for determining compression stiffness and fatigue life. The supplier may make suitable changes in the suggested shape, if necessary, in consultation with the Purchaser to get the properties specified herein. Three samples each of test seals with modified shape shall be similarly subjected to compression test and fatigue test to ensure that they meet the requirements. 6.2 Bulk manufacture of the seals shall be taken up only after the test seals have been tested and results are approved by the Purchaser. The bulk seals shall be manufactured by following the same manufacturing procedures as the test seals. All dimensional requirements specified in the drawing shall be met. Representative samples shall be prepared for each batch of bulk supply seals and tested as per ASTM Specification D-395, D-573 to establish the requirements of compression set and heat aging. Page 3 of 7

4 Supplier shall make the suitable simple template to check the proper fitment of the seal. This will ensure the correct fitment of seal in door flappers. 7.0 SHOP TESTS The supplier shall conduct the following tests in a manner satisfactory to the Purchaser or his authorised representative. Prior to commencement to shop test the supplier shall prepare detailed procedure for tests specified herein and furnished these for approval by the purchaser. 7.1 Determination of Compression Set The compression set for the seals shall be determined by ASTM D-395 Method B except that the test specimen shall be compressed to 50% of its original thickness. The test temperature shall be 100 deg. C. and period of test shall be 22 hours. 7.2 Compression Stiffness Test This test shall be carried out using a suitable testing fixture where compression load and deflection can be measured. The seal shall be loaded without impact, in steps of 5 kg. The loading of seal shall be uniform along the length of seal. The loading shall continue till a minimum of 8 mm compression of seal is achieved. A graph of load versus compression shall be plotted and furnished to the Purchaser. 7.3 Fatigue Test The test set up shall be capable of applying cyclic load on the seal. An eccentric on a rotating shaft or by a hydraulic cylinder with suitable stroke may be used. The sample of test seal, suitably held by the retainer plates shall be subjected to 5000 cycles of 8 mm compression. All samples shall be checked visually and dimensionally immediately after the test and the compression set shall be determined. The dimensions of samples shall be again recorded 15 days after the test to determine any delayed recovery. 7.4 Heat Aging Test Standard specimens shall be made and tested as per the requirements of ASTM D TEST CERTIFICATION Following certificates and test reports, signed by a responsible technical representative of the supplier shall be sent to the purchaser along with the material: a) Test report pertaining to all the tests carried out by the supplier for the material of seals. b) Test report pertaining to all tests as per the specification. c) Dimensional inspection report for each seal. d) Certificate of compliance that the seals conform to requirements of this specification. Page 4 of 7

5 9.0 QUALITY SURVAILLANCE The seals shall be subject to Quality Surveillance by the purchaser or his authorised representative at all stages of manufacture, for which purpose the Supplier shall : a) Allow access at all reasonable times during manufacture, inspection and testing. i) To premises in which work is being carried out, ii) iii) Drawings and all tooling involved, Gauges, instruments testing equipment etc. required for inspecting the work. b) Obtain acceptance of material in the form of Shipping Release before delivery PACKING Prior to packing, each set of seal shall be mounted on suitable wooden frame work to retain its shape and prevent twisting. The wooden frame work containing a set of seal shall be covered with weatherproof barrier in the form of a polyethylene cover. All such wooden frame works shall be clearly marked with their identities such as name of sealing door, door flapper number etc. All the wooden frame works containing seals shall be further packed in sturdy wooden boxes to provide protection against deterioration, deformation or damage during transport and storage in a tropical climate. Page 5 of 7

6 SALIENT TEST REQUIREMENTS AS PER ASTM STANDARDS ASTM D-395 METHOD B (TEST FOR COMPRESSION SET) A1.1 Test Specimen ANNEXURE-I The test specimen shall be a cylindrical disc of dia mm and mm thick. The specimen may be prepared by direct moulding or cutting with dye. A1.2 Compression Device The compression device shall consist of two flat plates spaced apart and bolted. The specimen will be compressed between parallel faces of the plates. The plates shall be made of steel of sufficient thickness to withstand the compressive loading without bending. The surface against which the specimen is held shall have a highly polished chromium plated finish and shall be thoroughly cleaned and wiped dry before test. To maintain the constant deflection required, spacer bars having thickness of mm shall be used. A1.3 Procedure Measure the original thickness of the specimen to the nearest 0.02 mm using dial micrometer. Place the specimen between the plates of compression device with the spacers on each side. Tighten the bolts uniformly until plates compress the specimen upto the spacer thickness. Place the assembled specimen in the oven for 2 hours and allow it to remain at 100 deg. C. for 22 hours. After 30 min. cooling, measure final thickness at centre of test specimen. ASTM D-573 (Test for Heat Aging) A2.1 Test Specimen Dumbbell shaped test specimens of 2 mm thickness will be used for this test. Their forms shall be such that no mechanical, chemical or heat treatment will be required after aging. At least 3 test specimens to determine the original physical properties of each sample and also three specimens of the same material for each exposure period of the test and after aging properties shall be used for this test. At least 24 hours must elapse between vulcanisation of specimen and start of the test. A2.2 Heating Device The heating device shall be air oven with provision for suspending the specimens vertically without touching each other or sides of the oven. A thermometer located in upper central portion of the oven shall record the actual aging temperature. Page 6 of 7

7 A2.3 Procedure Determine the hardness, tensile strength and ultimate elongation of the original 3 un-aged specimens within 96 hours of the start of the aging test. Place the other 3 test specimens in oven after operating temperature of 100 deg. C. has been attained. Age the specimens for 70 hours. Determine the hardness, tensile strength, ultimate elongation of aged specimen after cooling to room temperature for not less than 16 hours nor more than 96 hours. Page 7 of 7

Standard Test Methods for Rubber Property Compression Set 1

Standard Test Methods for Rubber Property Compression Set 1 Designation: D 395 03 Standard Test Methods for Rubber Property Compression Set 1 This standard is issued under the fixed designation D 395; the number immediately following the designation indicates the

More information

A PRODUCT FROM KANTAFLEX (INDIA) PVT LIMITED

A PRODUCT FROM KANTAFLEX (INDIA) PVT LIMITED ELASTOMERIC BRIDGE BEARING TO LATEST IRC: 83-015 (PART - II) Kanta System of Elastomeric bridge bearing is made out of Poly chloroprene rubber having low crystallization rates and adequate shelf life,

More information

Remember, on shop drawings for elastomeric bearings (Method B) to verify: 1. Vulcanize pad to sole plate - adhesives (epoxies) are unacceptable;

Remember, on shop drawings for elastomeric bearings (Method B) to verify: 1. Vulcanize pad to sole plate - adhesives (epoxies) are unacceptable; Handwritten: CIRCULATE 2-16/95 Engineers - Remember, on shop drawings for elastomeric bearings (Method B) to verify: 1. Vulcanize pad to sole plate - adhesives (epoxies) are unacceptable; 2. Pad orientation

More information

MATERIAL SPECIFICATION FOR BEARINGS - ELASTOMERIC PLAIN AND STEEL LAMINATED

MATERIAL SPECIFICATION FOR BEARINGS - ELASTOMERIC PLAIN AND STEEL LAMINATED ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 1202 NOVEMBER 2003 MATERIAL SPECIFICATION FOR BEARINGS - ELASTOMERIC PLAIN AND STEEL LAMINATED TABLE OF CONTENTS 1202.01 SCOPE 1202.02 REFERENCES 1202.03

More information

SPECIFICATIONS - DETAILED PROVISIONS Section Stainless Steel Sluice Gates C O N T E N T S

SPECIFICATIONS - DETAILED PROVISIONS Section Stainless Steel Sluice Gates C O N T E N T S SPECIFICATIONS - DETAILED PROVISIONS Section 11294 - Stainless Steel Sluice Gates C O N T E N T S PART 1 - GENERAL... 1 1.01 SUMMARY... 1 1.02 REFERENCES... 1 1.03 DEFINITIONS... 1 1.04 DESIGN REQUIREMENTS...

More information

TECHNICAL REQUIREMENTS FOR PRECIPITATION HARDENING (SS 17-4 PH and PH 13-8 MO) STAINLESS STEEL BARS

TECHNICAL REQUIREMENTS FOR PRECIPITATION HARDENING (SS 17-4 PH and PH 13-8 MO) STAINLESS STEEL BARS TECHNICAL REQUIREMENTS FOR PRECIPITATION HARDENING (SS 17-4 PH and PH 13-8 MO) STAINLESS STEEL BARS 1.0 SCOPE This Specification establishes the requirements for manufacture, inspection, testing and supply

More information

MATERIAL SPECIFICATION FOR BEARINGS - ELASTOMERIC PLAIN AND STEEL LAMINATED

MATERIAL SPECIFICATION FOR BEARINGS - ELASTOMERIC PLAIN AND STEEL LAMINATED ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 1202 NOVEMBER 2016 MATERIAL SPECIFICATION FOR BEARINGS - ELASTOMERIC PLAIN AND STEEL LAMINATED TABLE OF CONTENTS 1202.01 SCOPE 1202.02 REFERENCES

More information

SECTION SOUND CONTROL DOORS

SECTION SOUND CONTROL DOORS SECTION 08380 SOUND CONTROL DOORS 1.0 GENERAL 1.1 DESCRIPTION OF WORK A. Furnish and install Sound Control Doors specified herein and per the locations and orientations shown on the Contract Documents.

More information

THERMOFIT AP2000 TUBING HEAT-SHRINKABLE CROSSLINKED MODIFIED POLYOLEFIN, ADHESIVE LINER

THERMOFIT AP2000 TUBING HEAT-SHRINKABLE CROSSLINKED MODIFIED POLYOLEFIN, ADHESIVE LINER Product Brand:Raychem 305 Constitution Drive, Menlo Park, CA 94025 SPECIFICATION: RW-1001 THIS ISSUE: ISSUE 3 DATE: April 11, 2003 REPLACES: ISSUE 2 THERMOFIT AP2000 TUBING HEAT-SHRINKABLE CROSSLINKED

More information

SECTION METAL FRAMED SKYLIGHT. A. Engineering, preparation of fabrication drawings and structural calculations for the entire skylight system.

SECTION METAL FRAMED SKYLIGHT. A. Engineering, preparation of fabrication drawings and structural calculations for the entire skylight system. SECTION 08625 METAL FRAMED SKYLIGHT PART 1 GENERAL 1.01 SECTION INCLUDES: A. Engineering, preparation of fabrication drawings and structural calculations for the entire skylight system. B. Fabrication

More information

CONTRACT SPECIFICATIONS DISK BEARINGS

CONTRACT SPECIFICATIONS DISK BEARINGS 1.0 DESIGN CONTRACT SPECIFICATIONS DISK BEARINGS 1.1 Scope of Work 1.1.1 This work shall consist of furnishing Multi-Rotational, High Load Disk Bearings and installing Disk Bearing Assemblies at the locations

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION ITEM 00437 ELASTOMERIC MATERIALS 437.1 Description. This item shall govern for the materials, testing, fabrication and placement of elastomeric materials, except as otherwise covered

More information

PTFE BELLOWS POLY FLUORO LTD. POLY FLUORO LTD.260A. Bommasandra Industrial Area, Hosur Road, Bangalore TECHNICAL SPECIFICATION

PTFE BELLOWS POLY FLUORO LTD. POLY FLUORO LTD.260A. Bommasandra Industrial Area, Hosur Road, Bangalore TECHNICAL SPECIFICATION PTFE BELLOWS TECHNICAL SPECIFICATION 1. MATERIALS 1.1 PTFE Only virgin (not reprocessed) PTFE conforming to ASTM D 1457, type III, IV or V shall be used for the production of bellows; the PTFE raw material

More information

ITEM 435 ELASTOMERIC MATERIALS

ITEM 435 ELASTOMERIC MATERIALS ITEM 4 ELASTOMERIC MATERIALS 4.1. Description. This Item shall govern for the furnishing and installation of elastomeric materials in accordance with the details shown on the plans and the requirements

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 102239 - FOLDING PANEL PARTITIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION / STC 52 METAL SOUND CONTROL DOORS

SECTION / STC 52 METAL SOUND CONTROL DOORS SECTION 08 34 73 / 08 34 73.13 STC 52 METAL SOUND CONTROL DOORS PART 1 GENERAL 1.1 RELATED DOCUMENTS: A. Drawings and general provisions of the Contract, including general and Supplementary Conditions

More information

NUCLEAR POWER CORPORATION OF INDIA LTD. (A GOVT. OF INDIA ENTERPRISE) SPECIFICATION NO.PB-E-542/REV. No.0

NUCLEAR POWER CORPORATION OF INDIA LTD. (A GOVT. OF INDIA ENTERPRISE) SPECIFICATION NO.PB-E-542/REV. No.0 REVISION NO. 0 NUCLEAR POWER CORPORATION OF INDIA LTD. (A GOVT. OF INDIA ENTERPRISE) SPECIFICATION NO.PB-E-542/REV. No.0 PAGE NO. 1 OF 24 DATE OF ISSUE (MONTH/YEAR) TOTAL NO. OF PAGES (Including cover

More information

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM Page 1 of 6 SECTION 08 32 20 LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS SLIDING DOORS. SECTION INCLUDES OVERHEAD SLIDING TUBE ASSEMBLY, MOUNTING

More information

SECTION MANUAL FOUR FOLD DOORS MODEL 38 DECORATIVE PANEL DESIGN

SECTION MANUAL FOUR FOLD DOORS MODEL 38 DECORATIVE PANEL DESIGN SECTION 08350 MANUAL FOUR FOLD DOORS MODEL 38 DECORATIVE PANEL DESIGN PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

DETAIL SPECIFICATION SHEET. CLAMP, LOOP, TUBE-17-7 PH CRES, 500 o F

DETAIL SPECIFICATION SHEET. CLAMP, LOOP, TUBE-17-7 PH CRES, 500 o F INCH-POUND MIL-DTL-85052/3C 30 March 2005 SUPERSEDING MIL-C-85052/3B 30 MAY 1984 DETAIL SPECIFICATION SHEET CLAMP, LOOP, TUBE-17-7 PH CRES, 500 o F This specification is approved for use by all Departments

More information

CITY OF ODESSA SPECIAL SPECIFICATIONS ITEM 1000 GLASS-FIBER REINFORCED POLYESTER (FRP) REHAB/REPLACEMENT MANHOLE

CITY OF ODESSA SPECIAL SPECIFICATIONS ITEM 1000 GLASS-FIBER REINFORCED POLYESTER (FRP) REHAB/REPLACEMENT MANHOLE CITY OF ODESSA SPECIAL SPECIFICATIONS ITEM 1000 GLASS-FIBER REINFORCED POLYESTER (FRP) REHAB/REPLACEMENT MANHOLE 1000.1 DESCRIPTION These specifications shall govern the furnishing of glass-fiber reinforced

More information

1. SCOPE 2. REFERENCED DOCUMENTS

1. SCOPE 2. REFERENCED DOCUMENTS Illinois Test Procedure 405 Effective Date: January 1, 2016 Determining the Fracture Potential of Asphalt Mixtures Using the Illinois Flexibility Index Test (I-FIT) 1. SCOPE 1.1. This test method covers

More information

2000-SG STAINLESS STEEL SLIDE GATES

2000-SG STAINLESS STEEL SLIDE GATES 2000-SG STAINLESS STEEL SLIDE GATES 1. GENERAL CONDITIONS 1.1. SCOPE. This section covers Stainless Steel Flow Control Slide Gates and operators. 1.2. GENERAL. Slide gates, including actuation devices,

More information

NUCLEAR POWER CORPORATION OF INDIA LIMITED (A Government of India Enterprise) Coolant Channel Design Group. SPECIFICATION No: PP-C-00003

NUCLEAR POWER CORPORATION OF INDIA LIMITED (A Government of India Enterprise) Coolant Channel Design Group. SPECIFICATION No: PP-C-00003 NUCLEAR POWER CORPORATION OF INDIA LIMITED (A Government of India Enterprise) Coolant Channel Design Group SPECIFICATION No: PP-C-00003 TECHNICAL SPECIFICATION ON MANUFACTURE OF ROLLER OF END FITTING PRESSURE

More information

SPECIFICATIONS - DETAILED PROVISIONS Section Progressing Cavity Pump C O N T E N T S

SPECIFICATIONS - DETAILED PROVISIONS Section Progressing Cavity Pump C O N T E N T S SPECIFICATIONS - DETAILED PROVISIONS Section 11938 - Progressing Cavity Pump C O N T E N T S PART 1 - GENERAL... 1 1.01 GENERAL... 1 1.02 RELATED SPECIFICATION SECTIONS... 1 1.03 MANUFACTURERS... 1 PART

More information

SECTION ALUMINUM GLASS FLOOR SKYLIGHT SYSTEMS

SECTION ALUMINUM GLASS FLOOR SKYLIGHT SYSTEMS PART 1: GENERAL 1.01 SUMMARY SECTION 04818 ALUMINUM GLASS FLOOR SKYLIGHT SYSTEMS A. Structural glass floor system, consisting of structural extruded aluminum System or Stainless Steel system and laminated

More information

SPECIAL SPECIFICATION 4401 Prestressed Ground Anchors

SPECIAL SPECIFICATION 4401 Prestressed Ground Anchors 2004 Specifications CSJ 0581-02-121 & 0200-11-100 SPECI SPECIFICATION 4401 Prestressed Ground Anchors 1. Description. Install post-tensioned permanent ground anchors in place, with grouting as required

More information

SECTION ROLLER GATES

SECTION ROLLER GATES GENERAL SUMMARY A. The Contractor shall provide all labor, materials, equipment, and incidentals required to furnish and install roller gates, complete and operational with all necessary accessories as

More information

MATERIAL SPECIFICATION FOR DECK JOINT ASSEMBLIES

MATERIAL SPECIFICATION FOR DECK JOINT ASSEMBLIES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 1210 NOVEMBER 2016 1210.01 SCOPE 1210.02 REFERENCES 1210.03 DEFINITIONS MATERIAL SPECIFICATION FOR DECK JOINT ASSEMBLIES TABLE OF CONTENTS 1210.04

More information

SECTION MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS

SECTION MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS SECTION 11000 MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 DESCRIPTION A. This section contains general information required to install mechanical equipment as shown on the plans and

More information

SECTION ALUMINUM WINDOWS

SECTION ALUMINUM WINDOWS SECTION 08520 ALUMINUM WINDOWS 1. PART 1 GENERAL 1.1 WORK INCLUDED: 1. Provide labor, material, equipment and services to furnish and install aluminum windows shown on drawings and specified herein. Window

More information

AMERICAN INSTITUTE OF TIMBER CONSTRUCTION AITC

AMERICAN INSTITUTE OF TIMBER CONSTRUCTION AITC AMERICAN INSTITUTE OF TIMBER CONSTRUCTION 7012 South Revere Parkway Suite 140 Centennial, Colorado 80112 Telephone (303) 792-9559 http://www.aitc-glulam.org AITC 115-2009 STANDARD FOR FABRICATED STRUCTURAL

More information

Wabo Modular STM and D Series Large movement expansion joint system

Wabo Modular STM and D Series Large movement expansion joint system Wabo Modular STM and D Series Large movement expansion joint system Features Benefits Watertight Durable Versatile DESCRIPTION: The continuous elastomeric gland prevents runoff water from passing through

More information

Corium Brick Rainscreen System Specifications

Corium Brick Rainscreen System Specifications CORIUM BRICK RAINSCREEN SYSTEM PART 1 - GENERAL 1.1 SUMMARY A. Work Included: The Work of this Section shall include but not be limited to the following: 1. Corium brick plates 2. Galvanized and coated

More information

Wabo ElastoFlex Bridge Series Continuous Membrane Sealing System

Wabo ElastoFlex Bridge Series Continuous Membrane Sealing System Wabo ElastoFlex Bridge Series Continuous Membrane Sealing System Features Benefits Non- Metallic Versatile Skid Resistant DESCRIPTION: With the anchor blocks and membrane both produced from high quality

More information

SINGLE SWING DOOR PAIRED SWING DOOR

SINGLE SWING DOOR PAIRED SWING DOOR Rev. 091416 SINGLE SWING DOOR PAIRED SWING DOOR Drawing No.: Revision: Date: If you need to contact Customer Service Please complete the following information and retain for future reference: Serial Number:

More information

PART-II SPECIFICATION OF 22KV PIN INSULATORS. This specification covers 22KV Pin Type Insulators for 22KV H.T. over head power lines.

PART-II SPECIFICATION OF 22KV PIN INSULATORS. This specification covers 22KV Pin Type Insulators for 22KV H.T. over head power lines. 1. SCOPE: PART-II SPECIFICATION OF 22KV PIN INSULATORS This specification covers 22KV Pin Type Insulators for 22KV H.T. over head power lines. 2. APPLICABLE STANDARDS: Except when they conflict with specific

More information

SECTION MECHANICALLY ASSISTED MOBILE STORAGE SHELVING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION MECHANICALLY ASSISTED MOBILE STORAGE SHELVING PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 10560 MECHANICALLY ASSISTED MOBILE STORAGE SHELVING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

SPECIFICATION FOR HT PIN (11KV & 22KV) AND 11KV DISC. INSULATORS:

SPECIFICATION FOR HT PIN (11KV & 22KV) AND 11KV DISC. INSULATORS: SPECIFICATION FOR HT PIN (11KV & 22KV) AND 11KV DISC. INSULATORS: - [THIS TENDER IS FOR PURCHASE OF HT (11KV) PIN INSULATORS ONLY] 1. SCOPE: - This specification covers 11KV Disc Type & 11KV / 22KV Pin

More information

SPECIAL SPECIFICATION 4492 Tie Back Anchors

SPECIAL SPECIFICATION 4492 Tie Back Anchors 2004 Specifications CSJ 0504-02-022 SPECI SPECIFICATION 4492 Tie Back Anchors 1. Description. This Item shall govern for the installation of tie-back anchors in place, with grouting as required in accordance

More information

SUGGESTED MANHOLE FRAME SEALING SPECIFICATION (Rehabilitation)

SUGGESTED MANHOLE FRAME SEALING SPECIFICATION (Rehabilitation) PART 1 GENERAL SUGGESTED MANHOLE FRAME SEALING SPECIFICATION (Rehabilitation) 1.01 SCOPE This specification includes the materials and procedures required for the internal sealing of the frame-chimney

More information

SECTION INDUSTRIAL ACCESS / INSPECTION HATCH. A. Industrial Access / Inspection Hatch: Model AH-710

SECTION INDUSTRIAL ACCESS / INSPECTION HATCH. A. Industrial Access / Inspection Hatch: Model AH-710 Page 1 of 6 PART 1 - GENERAL SECTION 08370 INDUSTRIAL ACCESS / INSPECTION HATCH 1.1 SECTION INCLUDES A. Industrial Access / Inspection Hatch: Model AH-710 1.2 RELATED SECTIONS A. Section 04810 - Unit Masonry

More information

Specific Accreditation Criteria

Specific Accreditation Criteria Specific Accreditation Criteria ISO/IEC 17025 Application Document Manufactured Goods - Annex Physical July 2018 Copyright National Association of Testing Authorities, Australia 2013 This publication is

More information

MATERIAL SPECIFICATION FOR DECK JOINT ASSEMBLIES

MATERIAL SPECIFICATION FOR DECK JOINT ASSEMBLIES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 1210 NOVEMBER 2014 MATERIAL SPECIFICATION FOR DECK JOINT ASSEMBLIES TABLE OF CONTENTS 1210.01 SCOPE 1210.02 REFERENCES 1210.03 DEFINITIONS 1210.04

More information

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including:

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including: Page 1 of 7 SECTION 083925 MECHANICAL ROOM FLOOD DOORS AND FRAMES **Note to Specifier** This specification contains component and configuration options. Where indicated, choose the appropriate choice for

More information

SPECIFICATION FOR ZIRCONIUM AND ZIRCONIUM ALLOY BAR AND WIRE

SPECIFICATION FOR ZIRCONIUM AND ZIRCONIUM ALLOY BAR AND WIRE Company Website: www.metalspiping.com Your Reliable Supplier of Special Alloys! SPECIFICATION FOR ZIRCONIUM AND ZIRCONIUM ALLOY BAR AND WIRE SB-550/SB-550M (Identical with ASTM Specification B550/B550M-07(R2).)

More information

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including:

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including: Page 1 of 8 SECTION 083921 PEDESTRIAN FLOOD DOORS AND FRAMES **Note to Specifier** This specification contains component and configuration options. Where indicated, choose the appropriate choice for your

More information

SECTION CRL70 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION CRL70 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 SECTION 08 32 20 CRL70 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS [OR WOOD] PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

SPECIFICATION RW-2514 Document Number NBC MARKER SYSTEM (Ladder Form) NBC-SCE

SPECIFICATION RW-2514 Document Number NBC MARKER SYSTEM (Ladder Form) NBC-SCE SPECIFICATION: RW 2514 THIS ISSUE: ISSUE 2 DATE: February 2014 SPECIFICATION RW-2514 Document Number 108-121017 NBC MARKER SYSTEM (Ladder Form) NBC-SCE 1. SCOPE NBC-SCE Markers are designed for use where

More information

3B CERTIFIED SILICONES WITH HIGH FLEX-FATIGUE RESISTANCE

3B CERTIFIED SILICONES WITH HIGH FLEX-FATIGUE RESISTANCE JANUARY 2017 WHITE PAPER 3B CERTIFIED SILICONES WITH HIGH FLEX-FATIGUE RESISTANCE By: Modus TM Technical Team Modus Advanced, Inc. 2016 www.modusadvanced.com sales@modusadvanced.com (925) 248-9493 Silicones

More information

SECTION Temperature Change: 120 deg F, ambient; 180 deg F, material surfaces.

SECTION Temperature Change: 120 deg F, ambient; 180 deg F, material surfaces. PART 1 - GENERAL 1.1 SUMMARY A. Section includes the following: 1. Handrails and guardrails. 1.2 PERFORMANCE REQUIREMENTS A. General: In engineering railings to withstand structural loads indicated, determine

More information

6A V CVQ cable (C rank)

6A V CVQ cable (C rank) 6A-31 600V CVQ cable (C rank) Enactment in July 1977 Approved on June 27, 2008 (revised 02) Enforcement on July 28, 2008 Distribution Department Tokyo Electric Power Company, Incorporated. 1. Scope of

More information

TECHNICAL SPECIFICATION OF UNARMOURED FLAT 1100 VOLTS L.T. PVC INSULATED TWIN CORE 4.0mm² CABLE WITH ROUND ALUMINIUM CONDUCTOR BLACK SHEATHED.

TECHNICAL SPECIFICATION OF UNARMOURED FLAT 1100 VOLTS L.T. PVC INSULATED TWIN CORE 4.0mm² CABLE WITH ROUND ALUMINIUM CONDUCTOR BLACK SHEATHED. TECHNICAL SPECIFICATION OF UNARMOURED FLAT 1100 VOLTS L.T. PVC INSULATED TWIN CORE 4.0mm² CABLE WITH ROUND ALUMINIUM CONDUCTOR BLACK SHEATHED. I. SCOPE: This specification covers Manufacture, testing at

More information

SECTION VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT

SECTION VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT Page 230548-1 SECTION 230548 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

SECTION METAL FRAMED SKYLIGHTS

SECTION METAL FRAMED SKYLIGHTS SECTION 08630 - METAL FRAMED SKYLIGHTS PART 1: GENERAL 1.01 SUMMARY A. Section includes: Design, structural engineering, manufacture, fabrication, finishing of metal-framed skylights: 1. Glass and glazing

More information

PRESTON HEALTH SERVICES ARCHITECT'S NO MITCHELL-HOLLINGSWORTH NURSING & REHAB ADPH #B

PRESTON HEALTH SERVICES ARCHITECT'S NO MITCHELL-HOLLINGSWORTH NURSING & REHAB ADPH #B SECTION 05 5213 - PIPE RAILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

PROPOSED ONTARIO PROVINCIAL STANDARD SPECIFICATION. By CATT Technical Committee Committee Chair: Alex Sandovski Phone #:

PROPOSED ONTARIO PROVINCIAL STANDARD SPECIFICATION. By CATT Technical Committee Committee Chair: Alex Sandovski Phone #: PROPOSED ONTARIO PROVINCIAL STANDARD SPECIFICATION By CATT Technical Committee Committee Chair: Alex Sandovski Phone #: 416-258-6261 18XX.01 SCOPE MATERIAL AND PERFORMANCE SPECIFICATION FOR WATERTIGHT

More information

SECTION EZ-SLIDE 80 AND 180 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION EZ-SLIDE 80 AND 180 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 SECTION 08 32 20 EZ-SLIDE 80 AND 180 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including:

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including: Page 1 of 7 SECTION 083925 MECHANICAL ROOM FLOOD DOORS AND FRAMES **Note to Specifier** This specification contains component and configuration options. Where indicated, choose the appropriate choice for

More information

MGVCL/MM/1043/13-14/11 KV Disc Insulators (Porcelain)

MGVCL/MM/1043/13-14/11 KV Disc Insulators (Porcelain) SPECIFICATION FOR 11KV DISC. INSULATORS: - 1. SCOPE: - This specification covers 11KV Disc Type Insulators for 11KV H.T. over head power lines. 2. APPLICABLE STANDARDS: - Except when they conflict with

More information

SPECIFICATION FOR HT PIN (11KV & 22KV) AND 11KV DISC. INSULATORS: -

SPECIFICATION FOR HT PIN (11KV & 22KV) AND 11KV DISC. INSULATORS: - SPECIFICATION FOR HT PIN (11KV & 22KV) AND 11KV DISC. INSULATORS: - 1. SCOPE: - This specification covers 11KV Disc Type & 11KV/ 22KV Pin Type Insulators for 11/22KV H.T. over head power lines. 2. APPLICABLE

More information

SECTION 31 ACCESS FLOORS

SECTION 31 ACCESS FLOORS SECTION 31 ACCESS FLOORS 1 GENERAL 1.1 OVERVIEW OF ACCESS FLOORS SECTION General description Work under this section includes, but is not necessarily limited to, the supply and installation of proprietary

More information

Concrete Strength Testing Technician Study Guide

Concrete Strength Testing Technician Study Guide Concrete Strength Testing Technician Study Guide ASTM C 617 CAPPING CYLINDRICAL CONCRETE SPECIMENS 1. Neat cement caps and high-strength gypsum-plaster shall be formed against a glass plate at least in.

More information

GUJARAT ENERGY TRANSMISSION CORPORATION LTD. TECHNICAL SPECIFICATIONS

GUJARAT ENERGY TRANSMISSION CORPORATION LTD. TECHNICAL SPECIFICATIONS GUJARAT ENERGY TRANSMISSION CORPORATION LTD. SARADAR PATEL VIDYUT BHAVAN, RACE COURSE, BARODA 390 007. TECHNICAL SPECIFICATIONS FOR 220, 132 & 66 COMPOSITE SOLIDCORE STATION POST INSULATORS GETCO/E/2,1,6

More information

A. Manufacturer: A firm that produces primary glass or fabricated glass as defined in referenced glazing publications.

A. Manufacturer: A firm that produces primary glass or fabricated glass as defined in referenced glazing publications. SECTION 08800 - GLAZING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS SECTION 08 32 20 CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including:

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including: Page 1 of 8 SECTION 083919 WATERTIGHT DOORS **Note to Specifier** This specification contains component and configuration options. Where indicated, choose the appropriate choice for your specific project

More information

Technical Specification for Fabrication, Testing & Supply of Back plate assembly mock-up

Technical Specification for Fabrication, Testing & Supply of Back plate assembly mock-up INSTITUTE FOR PLASMA RESEARCH (An Autonomous Institute of Department of Atomic Energy, Government of India) Near Indira Bridge; Bhat; Gandhinagar-382428; India PART-I (B) Technical Specification for Fabrication,

More information

TESTING APPLICATION STANDARD (TAS) STANDARD REQUIREMENTS FOR THERMOPLASTIC OLEFIN ELASTOMER BASED SHEET USED IN SINGLE-PLY ROOF MEMBRANE

TESTING APPLICATION STANDARD (TAS) STANDARD REQUIREMENTS FOR THERMOPLASTIC OLEFIN ELASTOMER BASED SHEET USED IN SINGLE-PLY ROOF MEMBRANE TESTING APPLICATION STANDARD (TAS) 131-95 STANDARD REQUIREMENTS FOR THERMOPLASTIC OLEFIN ELASTOMER BASED SHEET USED IN SINGLE-PLY ROOF MEMBRANE 1. 2. Scope: 1.1 This Protocol covers unreinforced and reinforced

More information

Wastewater Capital Projects Management Standard Construction Specification

Wastewater Capital Projects Management Standard Construction Specification CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 PRECAST CONCRETE PIPE 10.1.1 General This section covers material requirements,

More information

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS UNIFORM EVALUATION SERVICES EVALUATION CRITERIA FOR

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS UNIFORM EVALUATION SERVICES EVALUATION CRITERIA FOR INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS UNIFORM EVALUATION SERVICES EVALUATION CRITERIA FOR MINERAL COMPOSITE FIBER REINFORCED (MCFR) BUILDING SYSTEM EC 030-2018 (Proposed November

More information

30-SDMS-01 SPECIFICATIONS FOR LOAD BREAK SWITCH

30-SDMS-01 SPECIFICATIONS FOR LOAD BREAK SWITCH SPECIFICATIONS FOR LOAD BREAK SWITCH This specification is property of SEC and subject to change or modification without any notice TABLE OF CONTENTS 1.0 SCOPE 3 2.0 CROSS REFERENCES 3 3.0 APPLICABLE CODES

More information

Multi-Institutional Academic Health Science & Research Center Evansville, IN

Multi-Institutional Academic Health Science & Research Center Evansville, IN SECTION 05 5117 ALTERNATING TREAD STEEL STAIRS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

3.2 Dimensional tolerance for the expansion bellows should be as per EJMA.

3.2 Dimensional tolerance for the expansion bellows should be as per EJMA. SHEET 1 OF 6 1 GENERAL This specification covers the design, materials, construction features, manufacture and testing of Metal expansion bellows at Vendor s or/ and sub-vendor s works inclusive of painting

More information

Date Oct 5, 2015 Page 1 of 13 Sample tag No -- Ambient: 29C Humidity Sample No. 1

Date Oct 5, 2015 Page 1 of 13 Sample tag No -- Ambient: 29C Humidity Sample No. 1 Page 1 Date Oct 5, 2015 Page 1 of 13 Total Number of pages in this package _13 TEST LOCATION: [ ]QPS [X]WMT []SMT []OTHER Company Name QPS Evaluation Services Inc. Address 81 Kelfield St Unit 8, Toronto

More information

Gasketed Sewer Pipe. Storm and Sanitary pipe for use with Gasketed Sewer Fittings.

Gasketed Sewer Pipe. Storm and Sanitary pipe for use with Gasketed Sewer Fittings. Gasketed Sewer Pipe Storm and Sanitary pipe for use with Gasketed Sewer Fittings. Gasketed Sewer Pipe Installation Royal Municipal Solutions Gasketed Sewer Pipe weighs a fraction of the weight of traditional

More information

Section 4. Annex to IAEA Request for Proposal STATEMENT OF WORK. Primary/Secondary cooling water Heat Exchangers

Section 4. Annex to IAEA Request for Proposal STATEMENT OF WORK. Primary/Secondary cooling water Heat Exchangers Section 4 Annex to IAEA Request for Proposal 25919 STATEMENT OF WORK Primary/Secondary cooling water Heat Exchangers WWR-SM Research Reactor, UZBEKISTAN Page 1 of 17 1. Scope 1.1 This Statement of Work

More information

DIVISION 2 - SITE WORK

DIVISION 2 - SITE WORK Montgomery County Public Schools Facilities Guide DIVISION 2 - SITE WORK Conditions of Use/ Responsibility of Data These guideline specifications are to be used by the A/E as a base document in the development

More information

DETERMINATION OF WORKABILITY OF FRESH CONCRETE BY SLUMP TEST

DETERMINATION OF WORKABILITY OF FRESH CONCRETE BY SLUMP TEST DETERMINATION OF WORKABILITY OF FRESH CONCRETE BY SLUMP TEST Aim: To determine the workability of concrete by Slump test as per IS : 1199-1959 Mould - in the form of the frustum of a cone having the following

More information

PRICES: DESIGN: TAXES:

PRICES: DESIGN: TAXES: CLICK HERE TO START TERMS AND CONDITIONS AGREEMENTS: All agreements are subject to strikes, accidents or other causes beyond our control. GUARANTEE: We guarantee for one year from date of delivery our

More information

SECTION VIBRATION CONTROLS FOR PLUMBING PIPING AND EQUIPMENT

SECTION VIBRATION CONTROLS FOR PLUMBING PIPING AND EQUIPMENT Page 220548-1 SECTION 220548 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Technical Specifications of 8 M and 9 M PCC Poles (F.O.S.-2.5) with working load 200 Kg.

Technical Specifications of 8 M and 9 M PCC Poles (F.O.S.-2.5) with working load 200 Kg. DAKSHIN HARYANA BIJLI VITRAN NIGAM LIMITED Specification No. S-95/DD-177 Technical Specifications of 8 M and 9 M PCC Poles (F.O.S.-2.5) with working load 200 Kg. Chief Engineer/P&D, DHBVN, Hisar. Issue

More information

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS SECTION 02620 PART 1 GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials, equipment, and incidentals required to install High Density Polyethylene (HDPE) pressure pipe, fittings, and appurtenances

More information

SPECIFICATION FOR SEAMLESS AND WELDED ZIRCONIUM AND ZIRCONIUM ALLOY PIPE

SPECIFICATION FOR SEAMLESS AND WELDED ZIRCONIUM AND ZIRCONIUM ALLOY PIPE Company Website: www.metalspiping.com Your Reliable Supplier of Special Alloys! SPECIFICATION FOR SEAMLESS AND WELDED ZIRCONIUM AND ZIRCONIUM ALLOY PIPE SB-658/SB-658M (Identical with ASTM Specification

More information

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR BRIDGE DECKS, APPROACHES, RAILS AND PARAPETS PROJECT NUMBER, JP NO.

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR BRIDGE DECKS, APPROACHES, RAILS AND PARAPETS PROJECT NUMBER, JP NO. 504-1(a-i) 09 OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR BRIDGE DECKS, APPROACHES, RAILS AND PARAPETS PROJECT NUMBER, JP NO. 00000(04), COUNTY These Special Provisions amend and where

More information

Page 10-1 Hubbell Power Systems, Inc. All Rights Reserved Copyright 2014 LIGHTING AND SIGNS

Page 10-1 Hubbell Power Systems, Inc. All Rights Reserved Copyright 2014 LIGHTING AND SIGNS Page 10-1 Hubbell Power Systems, Inc. All Rights Reserved Copyright 2014 FOUNDATION SYSTEM SECTION 10 CONTENTS INTRODUCTION... 10-3 PRODUCT BENEFITS... 10-3 RECOMMENDED FACTORS of SAFETY for DESIGN...

More information

TESTS ON AGGREGATES 58

TESTS ON AGGREGATES 58 TESTS ON AGGREGATES 58 59 3.1 DETERMINATION OF INDICES (FLAKINESS AND ELONGATION) STANDARD IS: 2386 (Part 1) 1963. DEFINITION The Flakiness Index of aggregates is the percentage by weight of particles

More information

SECTION ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

SECTION ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS SECTION 08 4113 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Aluminum entrance doors and frames. 2. Glass infill panels. 3. Door hardware. B. Related Sections:

More information

TECHNICAL SPECIFICATION FOR PRESTRESSED CEMENT CONCRETE POLES ( F.O.S. 2.5) FOR 11 KV AND LT LINES ( REC SPECIFICATION NO.

TECHNICAL SPECIFICATION FOR PRESTRESSED CEMENT CONCRETE POLES ( F.O.S. 2.5) FOR 11 KV AND LT LINES ( REC SPECIFICATION NO. TECHNICAL SPECIFICATION FOR PRESTRESSED CEMENT CONCRETE POLES ( F.O.S. 2.5) FOR 11 KV AND LT LINES ( REC SPECIFICATION NO. 15 / 1979) MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LTD. PAGE 1 OF 7

More information

CRITERIA FOR TESTING IMPACT & NON IMPACT RESISTANT BUILDING ENVELOPE COMPONENTS USING UNIFORM STATIC AIR PRESSURE

CRITERIA FOR TESTING IMPACT & NON IMPACT RESISTANT BUILDING ENVELOPE COMPONENTS USING UNIFORM STATIC AIR PRESSURE TESTING APPLICATION STANDARD (TAS) 202-94 CRITERIA FOR TESTING IMPACT & NON IMPACT RESISTANT BUILDING ENVELOPE COMPONENTS USING UNIFORM STATIC AIR PRESSURE 1. Scope 1.1 This protocol covers procedures

More information

TI Typical HDPE raw material and pipe test methods EDITION 0607 PAGE 1/10

TI Typical HDPE raw material and pipe test methods EDITION 0607 PAGE 1/10 PAGE 1/10 Typical HDPE raw material and pipe test methods We hereby want to provide an overview of the most common test methods Index Tests Page Density 2/10 Melt Index 2/10 Tensile Properties 3/10 Flexural

More information

SECTION HANDRAILS AND RAILINGS. A. Section Cast-In-Place Concrete; coordination with substrate.

SECTION HANDRAILS AND RAILINGS. A. Section Cast-In-Place Concrete; coordination with substrate. SECTION 05520 HANDRAILS AND RAILINGS PART 1 GENERAL 1.1 SECTION INCLUDES A. Welded stainless steel railing systems. 1.2 RELATED SECTIONS A. Section 03300 - Cast-In-Place Concrete; coordination with substrate.

More information

Standard Specification for Extruded and Compression Molded Shapes Made from Poly(Vinylidene Fluoride) (PVDF) 1

Standard Specification for Extruded and Compression Molded Shapes Made from Poly(Vinylidene Fluoride) (PVDF) 1 Designation: D 673 0 Standard Specification for Extruded and Compression Molded Shapes Made from Poly(Vinylidene Fluoride) (PVDF) This standard is issued under the fixed designation D 673; the number immediately

More information

TECHNICAL SPECIFICATIONS TECHNICAL SPECIFICATION FOR FRP FENCING AROUND DISTRIBUTION TRANSFORMER STATIONS

TECHNICAL SPECIFICATIONS TECHNICAL SPECIFICATION FOR FRP FENCING AROUND DISTRIBUTION TRANSFORMER STATIONS Page 1 of 5 TECHNICAL SPECIFICATIONS 1.0 SCOPE: TECHNICAL SPECIFICATION FOR FRP FENCING AROUND DISTRIBUTION TRANSFORMER STATIONS This specification covers the basic requirement for the complete design,

More information

SECTION 415 REINFORCING FOR CONCRETE

SECTION 415 REINFORCING FOR CONCRETE SECTION 415 REINFORCING FOR CONCRETE Module 5 August 2018 Release 10, Module 5 1 Release 10, August 2018 5-1 415 1 Description Furnish and place steel and fiber reinforced polymer (FRP) reinforcing of

More information

STRENGTH OF MATERIALS laboratory manual

STRENGTH OF MATERIALS laboratory manual STRENGTH OF MATERIALS laboratory manual By Prof. Shaikh Ibrahim Ismail M.H. Saboo Siddik College of Engineering, MUMBAI TABLE OF CONTENT Sr. No. Title of Experiment page no. 1. Study of Universal Testing

More information

MAST ARMS: ALUMINUM, TRUSS TYPE AND DAVIT TYPE

MAST ARMS: ALUMINUM, TRUSS TYPE AND DAVIT TYPE ELECTRICAL SPECIFICATION 1453 DIVISION OF ENGINEERING DEPARTMENT OF TRANSPORTATION CITY OF CHICAGO REVISED MARCH 14, 2013 MAST ARMS: ALUMINUM, TRUSS TYPE AND DAVIT TYPE SUBJECT 1. This specification covers

More information

SECTION CAST-IN-PLACE CONCRETE

SECTION CAST-IN-PLACE CONCRETE SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 SECTION INCLUDES A. The Contractor shall furnish all work and materials, including cement, sand and coarse aggregate, water, admixtures, curing

More information

A. ASTM A 36 - Standard Specification for Carbon Structural Steel.

A. ASTM A 36 - Standard Specification for Carbon Structural Steel. Page 1 of 5 SECTION XXXXX INDUSTRIAL VENTILATION LOUVER / DAMPER Part 1. GENERAL 1.1 SECTION INCLUDES A. Top Pivot Louver / Damper B. Bottom Pivot Louver / Damper C. Center Pivot Louver / Damper D. Sliding

More information

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection SECTION 13090 RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13090-1 LOW INTENSITY RADIATION PROTECTION