1 GEOTECHNICAL EXPLORATION on TWO MEDICAL OFFICE BUILDINGS N. Beach Street and Heritage Glen Drive Fort Worth, Texas ALPHA Report No. G Prepared for: CASTLE DEVELOPMENT GROUP P. O. Box Southlake, Texas Attention: Mr. Jesse Gober December 31, 2015 Prepared By: ALPHA TESTING, INC Wisconsin Street, Suite 100 Dallas, Texas 75229

2

3 TABLE OF CONTENTS On ALPHA REPORT NO. G PURPOSE AND SCOPE PROJECT CHARACTERISTICS FIELD EXPLORATION LABORATORY TESTS GENERAL SUBSURFACE CONDITIONS DESIGN RECOMMENDATIONS Existing Fill Drilled and Underreamed Piers Floor Slabs for Pier-Supported Structures Subgrade Improvement Utilizing Moisture-Conditioned Soil Seismic Considerations Flatwork Pavement Pavement Subgrade Preparation Portland-Cement Concrete (PCC) Pavement Drainage and Other Considerations GENERAL CONSTRUCTION PROCEDURES AND RECOMMENDATIONS Site Preparation and Grading Foundation Excavations Fill Compaction Groundwater LIMITATIONS...17 APPENDIX A-1 Methods of Field Exploration Boring Location Plan Figure 1 B-1 Methods of Laboratory Testing Swell Test Results Figure 2 Logs of Borings Key to Soil Symbols and Classifications

4 1.0 PURPOSE AND SCOPE The purpose of this geotechnical exploration is for ALPHA TESTING, INC. ( ALPHA ) to evaluate for the Client some of the physical and engineering properties of subsurface materials at selected locations on the subject site with respect to formulation of appropriate geotechnical design parameters for the proposed new construction. The field exploration was accomplished by securing subsurface samples from widely spaced test borings performed across the proposed new construction areas. Engineering analyses were performed from results of the field exploration and results of laboratory tests performed on representative samples. Also included are general comments pertaining to reasonably anticipated construction problems and recommendations concerning earthwork and quality control testing during construction. This information can be used to evaluate subsurface conditions and to aid in ascertaining construction meets project specifications. Recommendations provided in this report were developed from information obtained in test borings depicting subsurface conditions only at the specific boring locations and at the particular time designated on the logs. Subsurface conditions at other locations may differ from those observed at the boring locations, and subsurface conditions at boring locations may vary at different times of the year. The scope of work may not fully define the variability of subsurface materials and conditions that are present on the site. The nature and extent of variations between borings may not become evident until construction. If significant variations then appear evident, our office should be contacted to re-evaluate our recommendations after performing on-site observations and possibly other tests. 2.0 PROJECT CHARACTERISTICS It is proposed to construct two (2) new medical office buildings on a site located west of N. Beach Street and about 1,550 ft north of Heritage Glen Drive in Fort Worth, Texas. A site plan illustrating the general outline of the property is provided as Figure 1, the Boring Location Plan, in the Appendix of this report. At the time of the field exploration, the site was relatively open with a few scattered trees. An existing creek borders along the northern and western portion of the proposed new construction. Visible fill was observed on the site. According to online maps available from the North Central Texas Council of Governments (found at the topography of the site generally slopes downward toward the creek with a maximum change in surface elevation of about 10 ft (about Elev. 700 to 690). Present plans consist of constructing two (2) new single story buildings (6,000 and 8,000 SF) with associated paving and driveways. Based on our conversations with the Client, it is anticipated the new structures will be supported using drilled pier foundation systems. Pavement will consist of Portland cement concrete (PCC). Grading plans were not available for this study. For the purpose of our analysis, we have assumed maximum cuts and fills of about 2 ft to achieve final grade in the building pad areas. 1

5 Retaining walls may be planned in some areas of the site. These walls should be properly designed and constructed. Specific design parameters (including global stability) for retaining walls are considered beyond the scope of this study. 3.0 FIELD EXPLORATION Subsurface conditions were explored by drilling a total of six (6) test borings in general accordance with ASTM Standard D 420. Borings 1, 2 and 3 were drilled in the building areas to a depth of 25 ft each. Borings 4, 5 and 6 were drilled in the paving areas to a depth of 5 ft each. The approximate location of each test boring is shown on the Boring Location Plan, Figure 1, enclosed in the Appendix of this report. Details of drilling and sampling operations are briefly summarized in Methods of Field Exploration, Section A-1 of the Appendix. Subsurface types encountered during the field exploration are presented on Log of Boring sheets included in the Appendix of this report. The boring logs contain our Field Technician's and Engineer's interpretation of conditions believed to exist between actual samples retrieved. Therefore, these boring logs contain both factual and interpretive information. Lines delineating subsurface strata on the boring logs are approximate and the actual transition between strata may be gradual. 4.0 LABORATORY TESTS Selected samples of the subsurface materials were tested in the laboratory to evaluate their engineering properties as a basis in providing recommendations for foundation design and earthwork construction. A brief description of testing procedures used in the laboratory can be found in Methods of Laboratory Testing, Section B-1 of the Appendix. Individual test results are presented either on Log of Boring sheets or on summary data sheets also enclosed in the Appendix. 5.0 GENERAL SUBSURFACE CONDITIONS The project site lies in an area of undivided Pawpaw Formation, Weno Limestone and Denton Clay near the undivided Grayson Marl and Main Street Limestone Formation. The undivided Pawpaw/Weno/Denton Clay generally consists of limestone, clay shale, and/or shale. Residual soils generally consist of highly plastic clays and shaly clays. These residual soils typically have high seasonal shrink-swell potential with changes in soil moisture content. The Grayson Marl and Main Street Formation consists of variable thicknesses of moderate to high plasticity clay soils over the limestone and/or shale associated with this formation. Subsurface materials at the borings consists of clayey (CH/CL) fill material to the boring termination depth of 5 ft in Borings 4, 5 and 6 and to depths of about 6 to 7 ft in Borings 1, 2 and 3 followed by native clay/shaly clay (CH), limestone and clay shale to the boring termination depth of 25 ft. Tan and/or gray limestone was encountered in Borings 1, 2 and 3 at depths of about 15 to 17 ft below existing grade and extended to depths of about 18 to 22 ft followed by clay shale to the boring termination depth of 25 ft. The existing fill material in the borings was 2

6 identified by visual observations. The letters in parenthesis represent the soils' classification according to the Unified Soil Classification System (ASTM D 2488). More detailed stratigraphic information is presented on the Log of Boring sheet attached to this report. Most of the subsurface materials are relatively impermeable and are anticipated to have a relatively slow response to water movement. Therefore, several days of observation will be required to evaluate actual groundwater levels within the depths explored. Also, the groundwater level at the site is anticipated to fluctuate seasonally depending on the amount of rainfall, prevailing weather conditions and subsurface drainage characteristics. During field explorations, groundwater was encountered in Boring 1 during drilling and immediately upon completion of the boring at a depth of about 24 ft below existing grade. In Boring 2, groundwater was encountered during drilling at a depth of about 6 ft below existing grade; however, the borehole was dry immediately upon completion of the boring. Free groundwater was not encountered in the other borings. It is common to detect shallower seasonal groundwater from within the fill material, in the native clayey matrix, in or above the limestone/clay shale, particularly during or after periods of precipitation. If more detailed groundwater information is required, monitoring wells or piezometers can be installed. Further details concerning subsurface materials and conditions encountered can be obtained from the Log of Boring sheets provided in the Appendix of this report. 6.0 DESIGN RECOMMENDATIONS The following design recommendations were developed on the basis of the previously described Project Characteristics (Section 2.0) and General Subsurface Conditions (Section 5.0). If project criteria should change, including building locations on the site, our office should conduct a review to determine if modifications to the recommendations are required. Further, it is recommended our office be provided with a copy of the final plans and specifications for review prior to construction. Design criteria given in this report were developed assuming the floor slabs are constructed within 2 ft of existing grade. Substantial cutting and filling on the site (more than 2 ft) can alter the recommended foundation design parameters. Therefore, it is recommended our office be contacted before performing other cutting and filling on site to verify the appropriate design parameters are utilized for final foundations design. 6.1 Existing Fill Based on visual examination of the samples obtained, the upper 6 to 7 ft of clayey material in Borings 1, 2 and 3 is considered fill. The fill material in Borings 4, 5 and 6 extended to at least 5 ft, the maximum depth explored. Also, deeper fill could exist in other areas. Composition of the fill was evaluated based on samples retrieved from 6- inch maximum diameter boreholes. 3

7 Subgrade improvement method consisting of moisture conditioning (as discussed below in Section 6.3.1) to reduce potential movements would over-excavate and replace all existing fill in the building areas. Pavement areas in existing fill should be properly prepared and tested as discussed in Section 7.1 of this report. Any rock pieces or concrete/brick encountered in the fill could be re-used as fill provided the material is sorted and processed to a size less than 4 inches and there are sufficient fines to prevent nested voids in the backfill. Although not encountered at the borings, uncontrolled fill can contain large concrete pieces, rubble, organic material, wood, reinforcement steel, plastic and other debris. This debris is not suitable for reuse as replacement fill and should be removed from the site. Test pits could be performed prior to construction to assess the lateral extent, depth and nature of the existing fill. ALPHA TESTING would be pleased to assist with a test pit program if desired. 6.2 Drilled and Underreamed Piers The structural frame of the proposed new buildings could be supported using a system of drilled and underreamed piers. We recommend these piers bear in clayey soils and/or on top of the limestone/clay shale at a depth of about 16 ft below final grade. Please note, groundwater was encountered in Boring 2 during drilling at a depth of about 6 ft below existing grade; however, the borehole was dry immediately upon completion of the boring. In addition, groundwater was encountered in Boring 1 at a depth of about 24 ft below existing grade. Adjustments in the depths of the piers may be required in some areas to maintain the bottom of the piers above limestone, and/or groundwater; however, underreamed piers should be constructed below the depth of moisture improvement. Adjustments in the depths of the piers should be observed in the field by ALPHA. Due to the presence of groundwater and relatively deep moisture improvement, it is recommended test piers be installed to determine the feasibility of constructing under-reamed piers at this site. Drilled and underreamed piers can be dimensioned using a net allowable end bearing pressure of 5.0 kips per sq ft and no skin friction component of resistance. The above bearing pressure contains a factor of safety of at least three (3) considering a general bearing capacity failure. Normal elastic settlement of piers under loading is estimated to be about 1 inch. Each pier should contain full length steel reinforcing and be designed to resist the uplift pressure (soil-to-pier adhesion) due to potential soil swell along the shaft from post construction heave and other uplift forces applied by structural loadings. The magnitude of uplift adhesion due to soil swell along the pier shaft cannot be defined accurately and can vary according to the actual in-place moisture content of the soils during construction. It is estimated this uplift adhesion will not exceed about 2.0 kips per sq ft. This soil adhesion is approximated to act uniformly over the upper 10 ft of the pier shaft in contact with clayey soils. If subgrade soils are improved as recommended in Section 6.2 to reduce potential floor slab movements to about 1 inch, this uplift adhesion will not exceed about 1.2 kips per sq ft to a depth of 10 ft. Uplift adhesion due to soil heave can 4

8 be neglected over the portion of the pier shaft in contact with any non-expansive material used to reduce potential movement in the building pad area. The uplift force due to swelling of active clays should be resisted by the underreamed portion of the pier. The underreamed portion should be at least two (2) and not exceeding three (3) times the diameter of the shaft. The minimum clear spacing between edges of adjacent piers should be at least one (1) underream diameter, based on the larger underream. All grade beams connecting piers should be formed and not cast in earthen trenches. Grade beams should be formed with a nominal 8-inch void at the bottom. Commercially available cardboard box forms (cartons) are made for this purpose. The cardboard cartons should extend the full length and width of the grade beams. Prior to concrete placement, the cartons should be inspected to verify they are firm, properly placed, and capable of supporting wet concrete. Some type of permanent soil retainer, such as precast concrete panels, must be provided to prevent soils adjacent to grade beams from sloughing into the void space at the bottom of the grade beams. Additionally, backfill soils placed adjacent to grade beams must be compacted as outlined in Section 7.3 of this report. 6.3 Floor Slab for Pier-Supported Structures Considering the subsurface conditions encountered at this site, floor slabs for the proposed new buildings could experience soil-related potential movements on the order of about 4 inches if constructed within 2 ft of existing grade. These potential seasonal movements were estimated using results of absorption swell tests, in general accordance with methods outlined by Texas Department of Transportation (TxDOT) Test Method Tex-124-E and engineering judgment and experience. Estimated movements were calculated assuming the moisture content of the in-situ soil within the normal zone of seasonal moisture content change varies between a "dry" condition and a "wet" condition as defined by Tex-124-E. Also, it was assumed a 1 psi surcharge load from the slab acts on the subgrade soils. Movements exceeding those predicted above could occur if positive drainage of surface water is not maintained or if soils are subject to an outside water source, such as leakage from a utility line or subsurface moisture migration from off-site locations. In view of these potential seasonal movements, the most positive floor system for the building is a slab suspended completely above the existing highly expansive soils. A 12- inch void space should be provided between the bottom of the slab (and lowest suspended fixture/utility) and top surface of the underlying expansive clays. Cardboard carton forms or a deeper crawl space can be used to create the minimum void space. A ventilated crawl space is preferred. Provisions should be made for (a) adequate drainage of the under-floor space and (b) differential movement of utility lines, including areas where the utility penetrates through the grade beam and/or where the utility penetrates below grade areas. 5

9 If some slab movement is tolerable (about 1 inch), an alternate method is for the floor system of the buildings to consist of a concrete slab designed to bear uniformly on improved soils. Considering the existing fill encountered in the borings, the most appropriate method of subgrade improvement at this site includes over-excavating a portion of the existing clayey soils and then re-placing the same over-excavated soils at elevated moisture levels in conjunction with select, non-expansive material. The extent (or depth) of the subgrade improvement for the planned building is discussed below in more detail in Section In choosing this method of floor slab movement reduction, the Owner is accepting some post construction seasonal movement of floor slabs (1 inch). Movement of the floor slab could be reduced to about 1 inch by placing at least 2 ft of select, non-expansive material between the bottom of the floor slab and the top surface of 8 ft of moisture-conditioned soil. If a soil-supported floor slab is utilized for the planned building, consideration should be given to a "floating" (fully ground supported, and not structurally connected to walls or foundations) floor slab. This can reduce the risk of cracking and displacement of the floor slab due to differential movements between the slab and foundations. A floor slab doweled into perimeter grade beams can develop a plastic hinge (crack) parallel to and approximately 5 to 10 ft inside the building perimeter. Differential movements can still occur between the grade beam and a floating floor slab. The structural engineer should determine the need for connections between the slab and structural elements and determine if control joints to limit cracking are needed. A properly designed and constructed moisture barrier should be placed between the slab and subgrade soils to retard moisture migration through the slab Subgrade Improvement Utilizing Moisture-Conditioned Soil Movement of the floor slabs could be reduced to about 1 inch by placing at least 2 ft of non-expansive material between the bottom of the floor slab and the top surface of 8 ft of moisture-conditioned soil. Moisture conditioning will also serve to re-work the existing fill material. Any remaining uncontrolled fill below the depth of moisture conditioning should be removed and replaced per the recommendations in Section 7.3. Moisture-conditioning consists of over-excavating the site soils, then processing and compacting the specified minimum thickness of soil at a target moisture content approximated to be at least 5 percentage points (with a higher limit of 7 percentage points) above the material s optimum moisture content as determined by the standard Proctor method (ASTM D 698). Materials with relatively lower plasticity index values (clayey soil with a plasticity index of 25 or less) may need to be placed at moisture contents at about 3 percentage points above the material s optimum moisture content as determined by the standard Proctor method (ASTM D 698) to allow compaction. 6

10 The moisture-conditioned soil should be placed in 8-in thick loose lifts and compacted to a dry density of 93 to 97 percent of standard Proctor maximum dry density. Moisture conditioning of the on-site soil should extend throughout the entire building pad area and at least 5 ft beyond the perimeter of the building (including adjoining flatwork). In entrance areas, the moisture conditioning process should extend at least 10 ft beyond the perimeter of the building. However, select, nonexpansive material should not extend beyond the building limits. If flatwork or paving is not planned adjacent to the structures (i.e. above the moisture-conditioned soils), a moisture barrier consisting of a minimum of 10 mil plastic sheeting with 8 to 12 inches of soil cover should be provided above the moisture conditioned soils. Moisture-conditioned soils should be maintained in a moist condition prior to placement of the required thickness of select, non-expansive material, plastic sheeting or flatwork. The resulting estimated potential seasonal movement (about 1 inch) was calculated assuming the moisture content of the moisture-conditioned soil varies between the target moisture content and the wet condition while the deeper undisturbed insitu soil within the normal zone of seasonal moisture content change varies between the "dry" condition and the "wet" condition as defined by methods outlined in TxDOT Test Method Tex-124-E. Please note, it is the intent of the moisture-conditioning process described above to reduce the free swell potential of the moisture-conditioned soil to about 1 percent or less. Additional laboratory tests (i.e., standard Proctors, absorption swell tests, etc.) should be conducted during construction to verify the target moisture content for moisture-conditioning (estimated at 5 percentage points above the material s optimum moisture content as defined by ASTM D 698) is sufficient to reduce the free swell potential of the processed soil to 1 percent or less. In addition, it is recommended samples of the moisture-conditioned material be routinely obtained during construction to verify the free swell of the improved material is 1 percent or less. Installation of moisture-conditioned soils should be monitored and tested on a fulltime basis by a representative of ALPHA TESTING, INC., to verify the soils tested were placed with the proper lift thickness, moisture content, and degree of compaction. 6.4 Seismic Considerations The Site Class for seismic design is based on several factors that include soil profile (soil or rock), shear wave velocity, and strength, averaged over a depth of 100 ft. Since our borings did not extend to 100-foot depths, we based our determinations on previous experience in the area considering the subsurface materials encountered at the termination depths of the deepest boring. Based on Section of the 2012 International Building Code and Table in the 2010 ASCE-7, we recommend using Site Class C (very dense soil and soft rock) for seismic design at this site. 7

11 6.5 Flatwork Flatwork, pavement and any other soil-supported structural elements will be subjected to the same level of movement as discussed in Section 6.3. If this level of movement is not acceptable, flatwork could be supported on drilled pier foundations as described in Section 6.1 above. As an alternative, subgrade improvements as described in Section 6.3 could be considered for reduction in soil movements in any areas where post-construction movements would be critical. 6.6 Pavement Clayey fill soils encountered near the existing ground surface or similar materials used as engineered fill for site grading will probably constitute the subgrade for most parking and drive areas. Pavements can generally tolerate more movement than building structures. Therefore, it is recommended the existing subsurface materials be improved prior to construction as recommended in Section 7.1 and below. A qualified Geotechnical Engineer should be retained to provide subgrade monitoring and testing during construction. If there is any change in project criteria, the recommendations contained in this report should be reviewed by our office. Calculations used to determine the required pavement thickness are based only on the physical and engineering properties of the materials and conventional thickness determination procedures. Pavement joining the buildings should be constructed with a curb and the joint between the building and curb should be sealed. Related civil design factors such as subgrade drainage, shoulder support, cross-sectional configurations, surface elevations, reinforcing steel, joint design and environmental factors will significantly affect the service life and must be included in preparation of the construction drawings and specifications, but were not included in the scope of this study. Normal periodic maintenance will be required for all pavement to achieve the design life of the pavement system. Please note, the recommended pavement sections provided below are considered the minimum necessary to provide satisfactory performance based on the expected traffic loading. In some cases, City minimum standards for pavement section construction may exceed those provided below Pavement Subgrade Preparation After final subgrade elevation is achieved, the exposed surface of the pavement subgrade soil should be scarified to a depth of 6 inches and mixed with a minimum of 7 percent hydrated lime (by dry soil weight) in conformance with TxDOT Standard Specifications Item 260. Assuming an in-place unit weight of 100 pcf for the pavement subgrade soils, this percentage of lime equates to about 32 lbs of lime per sq yard of treated subgrade. The actual amount of lime required should be confirmed by additional laboratory tests (ASTM C 977 Appendix XI) prior to construction. 8

12 It is recommended lime stabilization procedures extend at least 1 ft beyond the edge of the pavement to reduce effects of seasonal shrinking and swelling upon the extreme edges of pavement. The soil-lime mixture should be compacted to at least 95 percent of standard Proctor maximum dry density (ASTM D 698) and within the range of 0 to 4 percentage points above the mixture's optimum moisture content. In all areas where hydrated lime is used to stabilize subgrade soil, routine Atterberg-limit tests should be performed to verify the resulting plasticity index of the soil-lime mixture is at/or below 15. Mechanical lime stabilization of the pavement subgrade soil will not prevent normal seasonal movement of the underlying untreated materials. Pavement and other flatwork will have the same potential for movement as slabs constructed directly on the existing undisturbed soils. Therefore, good perimeter surface drainage with a minimum slope of 2 percent away from the pavement is recommended. The use of sand as a leveling course below pavement supported on expansive clays should be avoided. Normal maintenance of pavement should be expected over the life of the structures Portland-Cement Concrete (PCC) Pavement Following subgrade improvement as recommended in Section above, the following PCC (reinforced) pavement sections are recommended. TABLE A RECOMMENDED PCC PAVEMENT SECTIONS Paving Areas and/or Type PCC Thickness, Inches Parking Areas Subjected Exclusively to Passenger Vehicle Traffic* 5 Drive Lanes, Fire Lanes, Areas Subject to Light Volume Truck Traffic 6 Dumpster Traffic Areas 7 *Note: Lime treatment of the pavement subgrade is not necessary for pavements subjected exclusively to passenger vehicle traffic, although lime treatment in these areas would be generally beneficial to the long-term performance of the pavement and improve constructability. Prior to construction of pavement on untreated clay subgrade soil, the exposed subgrade should be scarified to a depth of at least 6 inches and compacted to at least 95 percent of standard Proctor maximum dry density (ASTM D 698) and within the range of 1 percentage point below to 3 percentage points above the material's optimum moisture content. Portland-cement concrete should have a minimum compressive strength of 3,000 lbs per sq inch (psi) at 28 days in parking areas subjected exclusively to passenger vehicle traffic. We recommend a minimum compressive strength of 3,500 per sq inch (psi) at 28 days for the street, drive lanes, fire lanes, and truck areas. Concrete should be designed with percent entrained air. Joints in concrete paving should not 9

13 exceed 15 ft. Reinforcing steel should consist of No. 3 bars placed at 18 inches oncenter in two directions. Alternately, mechanical lime stabilization of the pavement subgrade could be eliminated by increasing the PCC thickness in the pavement sections presented above by 1 inch. Prior to construction of pavement on untreated clay subgrade soil, the exposed subgrade should be scarified to a depth of at least 6 inches and compacted to at least 95 percent of standard Proctor maximum dry density (ASTM D 698) and within the range of 1 percentage point below to 3 percentage points above the material's optimum moisture content. 6.7 Drainage and Other Considerations Adequate drainage should be provided to reduce seasonal variations in the moisture content of foundation soils. All pavement and sidewalks within 5 ft of the structure should be sloped away from the building to prevent ponding of water around the foundations. Final grades within 5 ft of the structure should be adjusted to slope away from the structure at a minimum slope of 2 percent. Maintaining positive surface drainage throughout the life of the structure is essential. In areas with pavement or sidewalks adjacent to the new structure, a positive seal must be maintained between the structure and the pavement or sidewalk to minimize seepage of water into the underlying supporting soils. Post-construction movement of pavement and flatwork is common. Normal maintenance should include examination of all joints in paving and sidewalks, etc. as well as resealing where necessary. Several factors relate to civil and architectural design and/or maintenance, which can significantly affect future movements of the foundation and floor slab systems: 1. Preferably, a complete system of gutters and downspouts should carry runoff water a minimum of 5 feet from the completed structure. 2. Large trees and shrubs should not be allowed closer to the foundations than a horizontal distance equal to roughly one-half of their mature height due to their significant moisture demand upon maturing. 3. Moisture conditions should be maintained "constant" around the edge of the slabs. Ponding of water in planters, in unpaved areas, and around joints in paving and sidewalks can cause slab movements beyond those predicted in this report. 4. Planter box structures placed adjacent to the building should be provided with a means to assure concentrations of water are not available to the subsoil stratigraphy. 5. Architectural design of the floor slab and slab foundations should avoid additional features such as wing walls as extensions of the slab. 10

14 Trench backfill for utilities should be properly placed and compacted as outlined in Section 7.3 of this report and in accordance with requirements of local City standards. Since granular bedding backfill is used for most utility lines, the backfilled trench should not become a conduit and allow access for surface or subsurface water to travel toward the new structure. Concrete cut-off collars or clay plugs should be provided where utility lines cross building lines to prevent water from traveling in the trench backfill and entering beneath the structures. 11

15 7.0 GENERAL CONSTRUCTION PROCEDURES AND RECOMMENDATIONS Variations in subsurface conditions could be encountered during construction. To permit correlation between test boring data and actual subsurface conditions encountered during construction, it is recommended a registered Professional Engineering firm be retained to observe construction procedures and materials. Some construction problems, particularly degree or magnitude, cannot be anticipated until the course of construction. The recommendations offered in the following paragraphs are intended not to limit or preclude other conceivable solutions, but rather to provide our observations based on our experience and understanding of the project characteristics and subsurface conditions encountered in the borings. 7.1 Site Preparation and Grading All areas supporting the floor slabs, pavement, flatwork and areas to receive new fill should be properly prepared. After completion of the necessary stripping, clearing, and excavating and prior to placing any required fill, the exposed soil subgrade should be carefully evaluated by probing and testing. Any undesirable material (organic material, wet, soft, or loose soil) still in place should be removed. The exposed soil subgrade should be further evaluated by proof-rolling with a heavy pneumatic tired roller, loaded dump truck or similar equipment weighing approximately 25 tons to check for pockets of soft or loose material hidden beneath a thin crust of possibly better soil. Proof-rolling procedures should be observed routinely by a Professional Engineer, or his designated representative. Any undesirable material (organic material, wet, soft, or loose soil) exposed during the proofroll should be removed and replaced with well-compacted material as outlined in Section 7.3. Prior to placement of any fill, the exposed soil subgrade should then be scarified to a minimum depth of 6 inches and recompacted as outlined in Section 7.3. If fill is to be placed on existing slopes (natural or constructed) steeper than six horizontal to one vertical (6:1), the fill materials should be benched into the existing slopes in such a manner as to provide a minimum bench-key width of five (5) feet. This should provide a good contact between the existing soils and new fill materials, reduce potential sliding planes, and allow relatively horizontal lift placements. Even if fill is properly compacted, fills in excess of about 10 ft are still subject to settlements over time of up to about 1 to 2 percent of the total fill thickness. This should be considered when designing utility lines under pavements. 12

16 Slope stability analysis of embankments (natural or constructed) was not within the scope of this study. The contractor is responsible for designing any excavation slopes, temporary sheeting or shoring. Design of these structures should include any imposed surface surcharges. Construction site safety is the sole responsibility of the contractor, who shall also be solely responsible for the means, methods and sequencing of construction operations. The contractor should also be aware that slope height, slope inclination or excavation depths (including utility trench excavations) should in no case exceed those specified in local, state and/or federal safety regulations, such as OSHA Health and Safety Standard for Excavations, 29 CFR Part 1926, or successor regulations. Stockpiles should be placed well away from the edge of the excavation and their heights should be controlled so they do not surcharge the sides of the excavation. Surface drainage should be carefully controlled to prevent flow of water over the slopes and/or into the excavations. Construction slopes should be closely observed for signs of mass movement, including tension cracks near the crest or bulging at the toe. If potential stability problems are observed, a geotechnical engineer should be contacted immediately. Shoring, bracing or underpinning required for the project (if any) should be designed by a professional engineer registered in the State of Texas. Due to the nature of the clayey soils found near the surface at the borings, traffic of heavy equipment (including heavy compaction equipment) may create pumping and general deterioration of shallow soils. Therefore, some construction difficulties should be anticipated during periods when these soils are saturated. 7.2 Foundation Excavations All foundation excavations should be monitored to verify foundations bear on suitable material. The bearing stratum exposed in the base of all foundation excavations should be protected against any detrimental change in conditions. Surface runoff water should be drained away from excavations and not allowed to collect. All concrete for foundations should be placed as soon as practical after the excavation is made. Drilled piers should be excavated and concrete placed within the same day after the design penetration is begun. Prolonged exposure of the bearing surface to air or water will result in changes in strength and compressibility of the bearing stratum. Therefore, if delays occur, underreamed pier excavations should be slightly widened and cleaned to provide a fresh bearing surface. All pier shafts should be at least 1.5 ft in diameter to facilitate clean-out of the base and proper monitoring. Concrete placed in pier holes should be directed through a tremie, hopper, or equivalent. Placement of concrete should be vertical through the center of the shaft without hitting the sides of the pier or reinforcement to reduce the possibility of segregation of aggregates. Concrete placed in piers should have a minimum slump of 5 inches (but not greater than 7 inches) to avoid potential honey-combing. 13

17 Observations during pier drilling should include, but not necessarily be limited to, the following items: Verification of proper bearing strata and consistency of subsurface stratification with regard to boring logs, Confirmation the minimum required penetration into the bearing strata is achieved, Complete removal of cuttings from bottom of pier holes, Proper handling of any observed water seepage and sloughing of subsurface materials, No more than 2 inches of standing water should be permitted in the bottom of pier holes prior to placing concrete, and Verification of pier diameter, underream size and steel reinforcement. Groundwater was encountered in Boring 2 during drilling at a depth of about 6 ft below existing grade. In addition, groundwater was encountered in Boring 1 at a depth of about 24 ft below existing grade. Adjustments in the depths of the piers may be required in some areas to maintain the bottom of the piers in clayey soils above the groundwater and/or limestone; however, underreams should be constructed below the depth of moisture improvement. Adjustments in the depths of the piers should be observed in the field by ALPHA. Due to the presence of groundwater and relatively deep moisture improvement, it is recommended test piers be installed to determine the feasibility of constructing under-reamed piers at this site. Temporary casing may be useful for controlling groundwater seepage that could occur in the clayey soils. Immediate placement of concrete after constructing the underream and/or the use of submersible pumps may be adequate to control underream collapse and/or seepage. As casing is extracted, care should be taken to maintain a positive head of plastic concrete and minimize the potential for intrusion of water seepage. It is recommended a separate bid item be provided for casing on the contractors' bid schedule. We should be contacted for further review and evaluation if groundwater seepage and/or underream collapse occurs during pier installation. 7.3 Fill Compaction Select, Non-Expansive Fill: Materials used as select, non-expansive fill should have a liquid limit less than 35, a plasticity index (PI) not less than 5 nor greater than 15. All select, non-expansive fill should contain no deleterious material and should be compacted to a dry density of at least 98 percent standard Proctor maximum dry density (ASTM D 698) and within the range of 1 percentage point below to 3 percentage points above the material's optimum moisture content. (Note: The plasticity index and liquid limit of 14

18 material used as select, non-expansive fill should be verified during fill placement using laboratory tests. Visual observation and classification should not be relied upon to confirm the material to be used as select, non-expansive fill satisfies the above Atterberglimit criteria.). Atterberg-limits tests to verify the select, non-expansive fill shall be performed at a frequency of at least one test per every 2 ft (thick) per every 5,000 sq ft. Atterberg-limit tests shall be staggered between various lifts within each 5,000 sq ft. Flexible Base Material: Flexible Base material used as non-expansive fill for the building pad area should meet the requirements of TxDOT Item 247, Type A, Grade 1 or 2. Processed concrete meeting TxDOT Item 247, Grade 1 or 2, Type D is also acceptable for as non-expansive material. The material should be compacted to a minimum 95 percent of standard Proctor maximum dry density (ASTM D 698) and within 3 percentage points of the material's optimum moisture content. The following recommendations pertain to fill soils placed for general site grading outside the designated building pad areas. All fill within the designated building pad areas, plus at least 5 ft outside the limits of the building pad areas, should meet the requirements of Section discussed earlier. Clayey soils with a plasticity index equal to or greater than 25 should be compacted to a dry density between 93 and 98 percent of standard Proctor maximum dry density (ASTM D 698). The compacted moisture content of the clays during placement should be within the range of 2 to 6 percentage points above optimum. Clayey materials with a plasticity index below 25 should be compacted to a dry density of at least 95 percent of standard Proctor maximum dry density (ASTM D 698) and within the range of 1 percentage point below to 3 percentage points above the material's optimum moisture content. Clayey materials used as fill should be processed and the largest particle or clod should be less than 6 inches prior to compaction. In cases where either mass fills or utility lines are more than 10 ft deep, the fill/backfill below 10 ft should be compacted to at least 98 percent of standard Proctor maximum dry density (ASTM D-698) and within 2 percentage points of the material's optimum moisture content. The portion of the fill/backfill shallower than 10 ft should be compacted as outlined above. Compaction should be accomplished by placing fill in about 8-inch thick loose lifts and compacting each lift to at least the specified minimum dry density. Field density and moisture content tests should be performed on each lift. As a guide, one test per 2,500 sq ft per lift is recommended in the building area. Utility trench backfill should be tested at a rate of one test per lift per each 300 lineal feet of trench. 15

19 7.4 Groundwater Groundwater was encountered in Boring 1 at a depth of about 24 ft below existing grade and at a depth of about 6 ft in Boring 2. From our experience with similar soils, groundwater seepage could be encountered in relatively shallow excavations for foundations, utility conduits, and other general excavations. The risk of seepage increases with depth of excavation and during or after periods of precipitation. Standard sump pits and pumping may be adequate to control seepage on a local basis. Where sump pits and pumping are not adequate to control seepage, supplemental dewatering measures (such as, but not limited to, submersible pumps in slotted casings and wellpoints) may be required. In any areas where cuts are made to establish final grades for the site, attention should be given to possible seasonal water seepage that could occur through natural cracks and fissures in the newly exposed stratigraphy. In these cases, subsurface drains may be required to intercept seasonal groundwater seepage. The need for these or other dewatering devices should be carefully addressed during construction. Our office could be contacted to visually observe the final grade to evaluate the need for such drains. 16

20 8.0 LIMITATIONS Professional services provided in this geotechnical exploration were performed, findings obtained, and recommendations prepared in accordance with generally accepted geotechnical engineering principles and practices. The scope of services provided herein does not include an environmental assessment of the site or investigation for the presence or absence of hazardous materials in the soil, surface water or groundwater. ALPHA, upon written request, can be retained to provide these services. ALPHA TESTING, INC. is not responsible for conclusions, opinions or recommendations made by others based on this data. Information contained in this report is intended for the exclusive use of the Client (and their designated design representatives), and is related solely to design of the specific structures outlined in Section 2.0. No party other than the Client (and their designated design representatives) shall use or rely upon this report in any manner whatsoever unless such party shall have obtained ALPHA s written acceptance of such intended use. Any such third party using this report after obtaining ALPHA s written acceptance shall be bound by the limitations and limitations of liability contained herein, including ALPHA s liability being limited to the fee paid to it for this report. Recommendations presented in this report should not be used for design of any other structures except those specifically described in this report. In all areas of this report in which ALPHA may provide additional services if requested to do so in writing, it is presumed that such requests have not been made if not evidenced by a written document accepted by ALPHA. Further, subsurface conditions can change with passage of time. Recommendations contained herein are not considered applicable for an extended period of time after the completion date of this report. It is recommended our office be contacted for a review of the contents of this report for construction commencing more than one (1) year after completion of this report. Non-compliance with any of these requirements by the Client or anyone else shall release ALPHA from any liability resulting from the use of, or reliance upon, this report. Recommendations provided in this report are based on our understanding of information provided by the Client about characteristics of the project. If the Client notes any deviation from the facts about project characteristics, our office should be contacted immediately since this may materially alter the recommendations. Further, ALPHA TESTING, INC. is not responsible for damages resulting from workmanship of designers or contractors. It is recommended the Owner retain qualified personnel, such as a Geotechnical Engineering firm, to verify construction is performed in accordance with plans and specifications. 17

21 APPENDIX

22 A-1 METHODS OF FIELD EXPLORATION Using standard rotary drilling equipment, a total of three six (6) test borings were performed for this geotechnical exploration at the approximate locations shown on the Boring Location Plan, Figure 1. The test boring locations were staked by either pacing or taping and estimating right angles from landmarks which could be identified in the field and as shown on the site plan provided during this study. The locations of test borings shown on the Boring Location Plan are considered accurate only to the degree implied by the method used to locate the borings. Relatively undisturbed samples of the cohesive subsurface materials were obtained by hydraulically pressing 3-inch O.D. thin-wall sampling tubes into the underlying soils at selected depths (ASTM D 1587). These samples were removed from the sampling tubes in the field and examined visually. One representative portion of each sample was sealed in a plastic bag for use in future visual examinations and possible testing in the laboratory. The Texas Cone Penetration (TCP) test was used to assess the apparent in-place strength characteristics of the rock type materials. The TCP test consists of a 3-inch diameter steel cone driven by a 170-pound hammer dropped 24 inches (340 ft-pounds of energy) and is the basis for TxDOT strength correlations. Depending on the resistance (strength) of the materials, either the number of blows of the hammer required to provide 12 inches of penetration, or the inches of penetration of the cone due to 100 blows of the hammer are recorded on the field logs and are shown on the Log of Boring sheets as TX Cone (reference: TxDOT Test Method TEX 132-E). Logs of all borings are included in the Appendix of this report. The logs show visual descriptions of subsurface strata encountered using the Unified Soil Classification System. Sampling information, pertinent field data, and field observations are also included. Samples not consumed by testing will be retained in our laboratory for at least 14 days and then discarded unless the Client requests otherwise.

23

24 B-1 METHODS OF LABORATORY TESTING Representative samples were examined and classified by a qualified member of the Geotechnical Division and the boring logs were edited as necessary. To aid in classifying the subsurface materials and to determine the general engineering characteristics, natural moisture content tests (ASTM D 2216), Atterberg-limit tests (ASTM D 4318) and dry unit weight determinations were performed on selected samples. In addition, unconfined compression (ASTM D 2166) and pocket-penetrometer tests were conducted on selected soil samples to evaluate the soil shear strength. Results of all laboratory tests described above are provided on the accompanying Log of Boring sheets. In addition to the Atterberg-limit tests, the expansive properties of the clay soils were further analyzed by absorption swell tests. The swell test is performed by placing a selected sample in a consolidation machine and applying either the approximate current or expected overburden pressure and then allowing the sample to absorb water. When the sample exhibits very little tendency for further expansion, the height increase is recorded and the percent free swell and total moisture gain calculated. Results of the absorption swell tests are provided on the Swell Test Data sheet, Figure 2 included in this appendix.

25 SWELL TEST DATA Boring No. Average Depth, ft Dry Unit Weight, pcf Liquid Limit Plastic Limit Plasticity Index Initial Moisture Content Final Moisture Content Free Swell % 21% 20% 17% 28% 24% 21% 20% 0.0% 0.1% 0.0% 0.0% Geotechnical Exploration Two Medical Office Buildings (6,000 & 8,000 SF) N. Beach Street and Heritage Glen Fort Worth, Texas Alpha Project No. G Swell Test Data Figure 2

26 2209 Wisconsin Street Suite 100 Dallas, Texas Phone: Fax: LOG OF BORING NO.: 1 PROJECT NO.: Sheet 1 of 1 G Client: Castle Development Group Project: Two Medical Office Buildings (6,000 & 8,000 SF) Start Date: 12/17/2015 End Date: 12/17/2015 Drilling Method: CONTINUOUS FLIGHT AUGER Location: Fort Worth, Texas Surface Elevation: West: North: Hammer Drop (lbs / in): 170 / 24 Depth, feet Graphic Log GROUND WATER OBSERVATIONS. On Rods (ft): After. Drilling (ft): After Hours (ft): Sample Type Recovery % RQD TX Cone or Std. Pen. (blows/ft,in) Pocket Penetrometer (tsf) Unconfined Comp. Strength (tsf) % Passing No. 200 Sieve Unit Dry Weight (pcf) Water Content, % Liquid Limit Plastic Limit Plasticity Index MATERIAL DESCRIPTION Dark Brown, Brown, and Tannish Brown CLAY with gravel, calcareous deposits, and sand-fill Dark Brown CLAY Brown CLAY Tan LIMESTONE with clay seams and layers Gray LIMESTONE with shale seams / 0.25" Gray CLAY SHALE TEST BORING TERMINATED AT 25 FT

27 2209 Wisconsin Street Suite 100 Dallas, Texas Phone: Fax: LOG OF BORING NO.: 2 PROJECT NO.: Sheet 1 of 1 G Client: Castle Development Group Project: Two Medical Office Buildings (6,000 & 8,000 SF) Start Date: 12/17/2015 End Date: 12/17/2015 Drilling Method: CONTINUOUS FLIGHT AUGER Location: Fort Worth, Texas Surface Elevation: West: North: Hammer Drop (lbs / in): 170 / 24 Depth, feet Graphic Log GROUND WATER OBSERVATIONS. On Rods (ft): 6 After. Drilling (ft): Dry. After Hours (ft): Sample Type Recovery % RQD TX Cone or Std. Pen. (blows/ft,in) Pocket Penetrometer (tsf) Unconfined Comp. Strength (tsf) % Passing No. 200 Sieve Unit Dry Weight (pcf) Water Content, % Liquid Limit Plastic Limit Plasticity Index MATERIAL DESCRIPTION Dark Brown, Brown, and Tannish Brown CLAY with gravel and sand-fill Dark Brown CLAY brown to tan and gray below 12' Tan LIMESTONE Gray CLAY SHALE TEST BORING TERMINATED AT 25 FT

28 2209 Wisconsin Street Suite 100 Dallas, Texas Phone: Fax: LOG OF BORING NO.: 3 PROJECT NO.: Sheet 1 of 1 G Client: Castle Development Group Project: Two Medical Office Buildings (6,000 & 8,000 SF) Start Date: 12/17/2015 End Date: 12/17/2015 Drilling Method: CONTINUOUS FLIGHT AUGER Location: Fort Worth, Texas Surface Elevation: West: North: Hammer Drop (lbs / in): 170 / 24 Depth, feet Graphic Log GROUND WATER OBSERVATIONS. On Rods (ft): None After. Drilling (ft): Dry. After Hours (ft): Sample Type Recovery % RQD TX Cone or Std. Pen. (blows/ft,in) Pocket Penetrometer (tsf) Unconfined Comp. Strength (tsf) % Passing No. 200 Sieve Unit Dry Weight (pcf) Water Content, % Liquid Limit Plastic Limit Plasticity Index MATERIAL DESCRIPTION Brown and Tan CLAY with gravel and sand-fill Dark Brown CLAY brown to tan and gray below 8' Tannish Brown and Gray SHALY CLAY with calcareous deposits Tan LIMESTONE Gray CLAY SHALE TEST BORING TERMINATED AT 25 FT

29 2209 Wisconsin Street Suite 100 Dallas, Texas Phone: Fax: LOG OF BORING NO.: 4 PROJECT NO.: Sheet 1 of 1 G Client: Castle Development Group Project: Two Medical Office Buildings (6,000 & 8,000 SF) Start Date: 12/17/2015 End Date: 12/17/2015 Drilling Method: CONTINUOUS FLIGHT AUGER Location: Fort Worth, Texas Surface Elevation: West: North: Hammer Drop (lbs / in): Depth, feet Graphic Log GROUND WATER OBSERVATIONS. On Rods (ft): None After. Drilling (ft): Dry. After Hours (ft): Sample Type Recovery % RQD TX Cone or Std. Pen. (blows/ft,in) Pocket Penetrometer (tsf) Unconfined Comp. Strength (tsf) % Passing No. 200 Sieve Unit Dry Weight (pcf) Water Content, % Liquid Limit Plastic Limit Plasticity Index MATERIAL DESCRIPTION Dark Brown, Brown, and Tannish Brown CLAY with sand and gravel-fill reddish tan layer 2-4' TEST BORING TERMINATED AT 5 FT

30 2209 Wisconsin Street Suite 100 Dallas, Texas Phone: Fax: LOG OF BORING NO.: 5 PROJECT NO.: Sheet 1 of 1 G Client: Castle Development Group Project: Two Medical Office Buildings (6,000 & 8,000 SF) Start Date: 12/17/2015 End Date: 12/17/2015 Drilling Method: CONTINUOUS FLIGHT AUGER Location: Fort Worth, Texas Surface Elevation: West: North: Hammer Drop (lbs / in): 170 / 24 Depth, feet Graphic Log GROUND WATER OBSERVATIONS. On Rods (ft): None After. Drilling (ft): Dry. After Hours (ft): Sample Type Recovery % RQD TX Cone or Std. Pen. (blows/ft,in) Pocket Penetrometer (tsf) Unconfined Comp. Strength (tsf) % Passing No. 200 Sieve Unit Dry Weight (pcf) Water Content, % Liquid Limit Plastic Limit Plasticity Index MATERIAL DESCRIPTION Dark Brown and Brown CLAY with sand and gravel-fill calcareous deposits below 2' trace of brick below 4' TEST BORING TERMINATED AT 5 FT

31 2209 Wisconsin Street Suite 100 Dallas, Texas Phone: Fax: LOG OF BORING NO.: 6 PROJECT NO.: Sheet 1 of 1 G Client: Castle Development Group Project: Two Medical Office Buildings (6,000 & 8,000 SF) Start Date: 12/17/2015 End Date: 12/17/2015 Drilling Method: CONTINUOUS FLIGHT AUGER Location: Fort Worth, Texas Surface Elevation: West: North: Hammer Drop (lbs / in): 170 / 24 Depth, feet Graphic Log GROUND WATER OBSERVATIONS. On Rods (ft): None After. Drilling (ft): Dry. After Hours (ft): Sample Type Recovery % RQD TX Cone or Std. Pen. (blows/ft,in) Pocket Penetrometer (tsf) Unconfined Comp. Strength (tsf) % Passing No. 200 Sieve Unit Dry Weight (pcf) Water Content, % Liquid Limit Plastic Limit Plasticity Index MATERIAL DESCRIPTION Dark Brown, Brown, and Tan CLAY with sand, gravel, and calcareous deposits-fill TEST BORING TERMINATED AT 5 FT

32 KEY TO SOIL SYMBOLS AND CLASSIFICATIONS SOIL & ROCK SYMBOLS RELATIVE DENSITY OF COHESIONLESS SOILS (blows/ft) (CH), High Plasticity CLAY (CL), Low Plasticity CLAY (SC), CLAYEY SAND VERY LOOSE LOOSE MEDIUM DENSE VERY DENSE 0 TO 4 5 TO TO TO 50 OVER 50 (SP), Poorly Graded SAND (SW), Well Graded SAND (SM), SILTY SAND (ML), SILT (MH), Elastic SILT LIMESTONE SHALE / MARL SANDSTONE (GP), Poorly Graded GRAVEL SHEAR STRENGTH OF COHESIVE SOILS (tsf) VERY SOFT SOFT FIRM STIFF VERY STIFF HARD LOW MEDIUM HIGH VERY HIGH LESS THAN TO TO TO TO 4.00 OVER 4.00 RELATIVE DEGREE OF PLASTICITY (PI) 4 TO TO TO 35 OVER 35 (GW), Well Graded GRAVEL (GC), CLAYEY GRAVEL (GM), SILTY GRAVEL (OL), ORGANIC SILT (OH), ORGANIC CLAY TRACE LITTLE SOME AND RELATIVE PROPORTIONS (%) 1 TO TO TO TO 50 FILL SAMPLING SYMBOLS PARTICLE SIZE IDENTIFICATION (DIAMETER) SHELBY TUBE (3" OD except where noted otherwise) SPLIT SPOON (2" OD except where noted otherwise) AUGER SAMPLE TEXAS CONE PENETRATION ROCK CORE (2" ID except where noted otherwise) BOULDERS COBBLES COARSE GRAVEL FINE GRAVEL COURSE SAND MEDIUM SAND FINE SAND SILT CLAY 8.0" OR LARGER 3.0" TO 8.0" 0.75" TO 3.0" 5.0 mm TO 3.0" 2.0 mm TO 5.0 mm 0.4 mm TO 5.0 mm 0.07 mm TO 0.4 mm mm TO 0.07 mm LESS THAN mm

GEOTECHNICAL EXPLORATION. DENTAL DEPOT 5014 Main Street The Colony, Texas ALPHA Report No. G Prepared for:

GEOTECHNICAL EXPLORATION. DENTAL DEPOT 5014 Main Street The Colony, Texas ALPHA Report No. G Prepared for: GEOTECHNICAL EXPLORATION on DENTAL DEPOT 5014 Main Street The Colony, Texas ALPHA Report No. G151847 Prepared for: FITZGERALD & ASSOCIATES 3900 N. Santa Fe Avenue Oklahoma City, Oklahoma 73118 Attention:

More information

GEOTECHNICAL EXPLORATION. JA-LU PARK RENOVATIONS 4807 Stonewall Street Greenville, Texas ALPHA Report No. G Prepared for:

GEOTECHNICAL EXPLORATION. JA-LU PARK RENOVATIONS 4807 Stonewall Street Greenville, Texas ALPHA Report No. G Prepared for: GEOTECHNICAL EXPLORATION on JA-LU PARK RENOVATIONS 4807 Stonewall Street Greenville, Texas ALPHA Report No. G161511 Prepared for: CITY OF GREENVILLE 2821 Washington Street, P.O. Box 1049 Greenville, Texas

More information

GEOTECHNICAL EXPLORATION. NEW CONCESSIONS BUILDING Wheat Middle School Woodward Avenue & North Colonial Drive Cleburne, Texas ALPHA Report No.

GEOTECHNICAL EXPLORATION. NEW CONCESSIONS BUILDING Wheat Middle School Woodward Avenue & North Colonial Drive Cleburne, Texas ALPHA Report No. GEOTECHNICAL EXPLORATION on NEW CONCESSIONS BUILDING Wheat Middle School Woodward Avenue & North Colonial Drive Cleburne, Texas ALPHA Report No. W140346 Prepared for: CLEBURNE ISD 505 N. Ridgeway, #100

More information

GEOTECHNICAL EXPLORATION. HESTER PROPERTY E. Rocky Creek Road Fort Worth, Texas ALPHA Report No. W152959

GEOTECHNICAL EXPLORATION. HESTER PROPERTY E. Rocky Creek Road Fort Worth, Texas ALPHA Report No. W152959 GEOTECHNICAL EXPLORATION on HESTER PROPERTY 11103 E. Rocky Creek Road Fort Worth, Texas Geotechnical Construction Materials Environmental GEOTECHNICAL EXPLORATION on HESTER PROPERTY 11103 E. Rocky Creek

More information

SECTION SOILS REPORT

SECTION SOILS REPORT SECTION 02300 SOILS REPORT 1. GENERAL: 1.1 All work included under this heading shall be subject to the General Conditions of the entire operation. This Contractor is required to refer especially thereto.

More information

GEOTECHNICAL INVESTIGATION. Proposed WONDERLAND MONTESSORI ACADEMY Legacy Drive Prosper, Texas PROJECT NO. 18-DG9174.

GEOTECHNICAL INVESTIGATION. Proposed WONDERLAND MONTESSORI ACADEMY Legacy Drive Prosper, Texas PROJECT NO. 18-DG9174. GEOTECHNICAL INVESTIGATION Proposed WONDERLAND MONTESSORI ACADEMY PROJECT NO. 18-DG9174 Prepared for: Mr. SANJAY JOSHI Flower Mound, Texas Prepared by: GEOSCIENCE ENGINEERING & TESTING, INC. Dallas, Texas

More information

GEOTECHNICAL INVESTIGATION. Proposed RETAIL DEVELOPEMNT 1300 W. Pflugerville Parkway Pflugerville, Texas PROJECT NO. 17-DG8780.

GEOTECHNICAL INVESTIGATION. Proposed RETAIL DEVELOPEMNT 1300 W. Pflugerville Parkway Pflugerville, Texas PROJECT NO. 17-DG8780. GEOTECHNICAL INVESTIGATION PROJECT NO. 17-DG8780 Prepared for: PROFESSIONAL STRUCIVIL ENGINEERS, INC Austin, Texas Prepared by: GEOSCIENCE ENGINEERING & TESTING, INC. Dallas, Texas October, 2017 2712 Satsuma

More information

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO. 1140198001 Reported to: SIRRUS ENGINEERS, INC. Houston, Texas Submitted by: GEOTEST

More information

GEOTECHNICAL ENGINEERING STUDY Urban Reserve Development White Rock Creek at DART Railway Dallas, Texas CTL Job No. DA6526

GEOTECHNICAL ENGINEERING STUDY Urban Reserve Development White Rock Creek at DART Railway Dallas, Texas CTL Job No. DA6526 GEOTECHNICAL ENGINEERING STUDY Urban Reserve Development White Rock Creek at DART Railway Dallas, Texas CTL Job No. DA6526 October 13, 2004 Urban Edge Developers Ltd P.O. Box 191166 Dallas, Texas 75219

More information

mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida

mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA 14-3001 - Construct Bin Wall at HERD Eglin AFB, Florida MTEC Project Number 2014-101 November 10, 2014 Revised: January 5, 2015 Prepared For: Peterson Engineering,

More information

geotechnical and construction materials consultants

geotechnical and construction materials consultants geotechnical and construction materials consultants City of Dallas Public Works and Transportation Department 320 E. Jefferson Blvd, Room 307 Dallas, Texas 75203 ATTN: Mr. Vincent Lewis, P.E. Email: Vincent.lewis@dallascityhall.com

More information

Geotechnical Investigation Long Timber Brewing Building Highway 99 and Kelly Street Monroe, Oregon TABLE OF CONTENTS

Geotechnical Investigation Long Timber Brewing Building Highway 99 and Kelly Street Monroe, Oregon TABLE OF CONTENTS Highway 99 and Kelly Street TABLE OF CONTENTS PROJECT INFORMATION... 1 FIELD EXPLORATION... 1 SITE CONDITIONS... 2 Surface Conditions:... 2 Subsurface Conditions:... 2 FILL.... 2 Topsoil.... 2 Clay Alluvium....

More information

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions. SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution

More information

GEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO E

GEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO E GEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO. 15-945E TO VILLAGE OF TIKI ISLAND TIKI ISLAND, TEXAS BY SERVICING TEXAS, LOUISIANA, NEW MEXICO, OKLAHOMA

More information

SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL

SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 00 and Division

More information

EXECUTIVE SUMMARY. The soil conditions at the location of the proposed LaQuinta Inn and Suites on Medical

EXECUTIVE SUMMARY. The soil conditions at the location of the proposed LaQuinta Inn and Suites on Medical EXECUTIVE SUMMARY The soil conditions at the location of the proposed LaQuinta Inn and Suites on Medical Drive in Pearsall, Texas were explored by drilling 5 borings to depths of 7 to 30 feet. Laboratory

More information

5.0 SITE CONDITIONS. 5.1 Surface Conditions

5.0 SITE CONDITIONS. 5.1 Surface Conditions 5.0 SITE CONDITIONS 5.1 Surface Conditions The project site is located at approximately along Ashdown Forest Road and Nichols Canyon Road in the Fiddlers Canyon Area of Cedar City, Utah. At the time of

More information

DIVISION 4100 SITEWORK

DIVISION 4100 SITEWORK DIVISION 4100 SITEWORK SECTION 4115 EARTHWORK PART 1 - GENERAL 1.01 SCOPE This section covers the grading and compaction of excavations, embankments, structural foundations, and planted areas. 1.02 REFERENCES

More information

DIVISION 2100 SITEWORK

DIVISION 2100 SITEWORK DIVISION 2100 SITEWORK SECTION 2120 STABILIZED SUBGRADE PART 1 - GENERAL 1.01 SCOPE This section covers the preparation of subgrade for pavement, sidewalks, recreational trails, and drive approaches. 1.02

More information

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING PART 1 GENERAL SECTION 02221 TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING 1.01 SECTION INCLUDES A. Excavation, dewatering and backfilling with compaction of trenches for pipes, conduits, channels

More information

SECTION TRENCHING

SECTION TRENCHING SECTION 31 23 17 TRENCHING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating trenches for utilities and utility structures. 2. Bedding. 3. Backfilling and compacting to subgrade elevations.

More information

TABLE OF CONTENTS 1.0 INTRODUCTION SCOPE OF WORK SUBSURFACE EXPLORATION Sampling Techniques Sample Disposal...

TABLE OF CONTENTS 1.0 INTRODUCTION SCOPE OF WORK SUBSURFACE EXPLORATION Sampling Techniques Sample Disposal... TABLE OF CONTENTS Page No 1.0 INTRODUCTION... 1 2.0 SCOPE OF WORK... 1 3.0 SUBSURFACE EXPLORATION... 2 3.1 Sampling Techniques... 2 3.2 Sample Disposal... 2 4.0 LABORATORY TESTING... 3 5.0 SUBSURFACE STRATIGRAPHY...

More information

Let s Make a Difference. Presented by: Samuel Tran, P.E.

Let s Make a Difference. Presented by: Samuel Tran, P.E. Let s Make a Difference Presented by: Samuel Tran, P.E. October 22, 2015 OVERVIEW o Importance of Geotechnical Engineering o Geotechnical Foundation Recommendations o Geotechnical Construction Specifications

More information

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving. SECTION 312000 - EARTH MOVING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating and filling for rough grading the Site. 2. Preparing subgrades for walks, curbs, pavements, and turf and grasses.

More information

SCG INTERNATIONAL TRINIDAD AND TOBAGO LIMITED COUVA CHILDREN S HOSPITAL

SCG INTERNATIONAL TRINIDAD AND TOBAGO LIMITED COUVA CHILDREN S HOSPITAL SCG INTERNATIONAL TRINIDAD AND TOBAGO LIMITED COUVA CHILDREN S HOSPITAL GEOTECHNICAL CONSULTANT Prepared by Checked by Approved by Mr. C Allen Dr. Derek Gay Dr. Derek Gay Signature Date Signature Date

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 02222 - EXCAVATION, BACKFILL, AND COMPACTION FOR UTILITIES PART 1 - GENERAL 1.01 SECTION INCLUDES A. Excavating trenches for the installation of utilities and stormwater detention facilities. B.

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular

More information

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill.

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill. SECTION 312000- EARTHWORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Special Conditions, apply to this Section. 1.2 SUMMARY This Section

More information

May 2, Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC Washington Street Raleigh, NC

May 2, Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC Washington Street Raleigh, NC Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC. 1030 Washington Street Raleigh, NC 27605-1258 May 2, 2017 Re: Report of Subsurface Investigation Westfield Rehabilitation & Health Care Additions

More information

PRELIMINARY GEOTECHNICAL INVESTIGATION UCCS ACADEMIC OFFICE BUILDING COLORADO SPRINGS, COLORADO

PRELIMINARY GEOTECHNICAL INVESTIGATION UCCS ACADEMIC OFFICE BUILDING COLORADO SPRINGS, COLORADO PRELIMINARY GEOTECHNICAL INVESTIGATION UCCS COLORADO SPRINGS COLORADO Prepared for: UNIVERSITY OF COLORADO AT COLORADO SPRINGS Facilities Services 1420 Austin Bluffs Parkway Colorado Springs Colorado 80918

More information

SOIL AND FOUNDATION INVESTIGATION PROPOSED DUPLEX 3966 VRAIN STREET DENVER, COLORADO

SOIL AND FOUNDATION INVESTIGATION PROPOSED DUPLEX 3966 VRAIN STREET DENVER, COLORADO SOIL AND FOUNDATION INVESTIGATION PROPOSED DUPLEX 3966 VRAIN STREET DENVER, COLORADO Prepared for: G.J. GARDNER HOMES ATTN: DAVE PAGANO 7660 RALEIGH STREET WESTMINSTER, COLORADO 80030 PROJECT NO. 1090

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Circle K Veterans Memorial Veterans Memorial Drive and Spears Road Houston, Texas July 31, 2013 Terracon Project No. 92135247 Prepared for: Circle K Tempe, Arizona Prepared by: Terracon Consultants, Inc.

More information

SECTION XXXXX STONE COLUMNS PART 1 - GENERAL

SECTION XXXXX STONE COLUMNS PART 1 - GENERAL SECTION XXXXX STONE COLUMNS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 00 and Division 01

More information

CITY OF SAN ANGELO ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED)

CITY OF SAN ANGELO ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED) ITEM 275 CITY OF SAN ANGELO ITEM 275 275.1 DESCRIPTION. This Item shall govern for treating subgrade, new and/or existing base (with or without asphaltic concrete pavement (ACP)), or combinations as shown

More information

PROJECT INFORMATION. 1.1 Site Location. October 4, Jerry Schwab/President 315 Aden Ave., Suite 26 Glendale, CA 91203

PROJECT INFORMATION. 1.1 Site Location. October 4, Jerry Schwab/President 315 Aden Ave., Suite 26 Glendale, CA 91203 October 4, 2017 Jerry Schwab/President 315 Aden Ave., Suite 26 Glendale, CA 91203 P: 888.900.3823 E: jscwab@schwabeng.com Re: Geotechnical Engineering Letter Report VAMC Bldg 202 Domiciliary C-D Entryway

More information

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards...

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards... SECTION 02210 - SITE GRADING CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement and Payment...

More information

SECTION MECHANICALLY STABILIZED EARTH RETAINING WALLS

SECTION MECHANICALLY STABILIZED EARTH RETAINING WALLS SECTION 13100 MECHANICALLY STABILIZED EARTH RETAINING WALLS PART 1 -- GENERAL 1.01 THE REQUIREMENT A. Includes all labor, material, equipment, testing and submittals required to design and complete construction

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price) SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

Subsurface Investigation Report. Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois

Subsurface Investigation Report. Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois AGI Project No. -11 Subsurface Investigation Report For the Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois Prepared for Mr. Steve Panko Key Development Partners, LLC North State Street,

More information

SECTION / ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM)

SECTION / ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM) PART 1 GENERAL 1.01 WORK INCLUDED SECTION 02360 / 31 34 30.13 ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM) A. Provide all equipment, material, labor and supervision to design and

More information

Lantz-Boggio Architects, P.C LBA Project No

Lantz-Boggio Architects, P.C LBA Project No SECTION 313430- PART 1 GENERAL 1.1 WORK INCLUDED A. Provide all equipment, material, labor and supervision to design and install Engineered Aggregate Piers for the soil reinforcement. Design shall rely

More information

RECONSTRUCTION OF DISTRESSED PAVEMENTS Full-Depth Rehabilitation (FDR) (Portland cement)

RECONSTRUCTION OF DISTRESSED PAVEMENTS Full-Depth Rehabilitation (FDR) (Portland cement) 1.0 DESCRIPTION. RECONSTRUCTION OF DISTRESSED PAVEMENTS Full-Depth Rehabilitation (FDR) (Portland cement) This specification shall govern the process known as Full-Depth Rehabilitation (FDR). FDR consists

More information

SPECIAL SPECIFICATION 2093 LIME/CEMENT STABALIZED SUBGRADE

SPECIAL SPECIFICATION 2093 LIME/CEMENT STABALIZED SUBGRADE 2004 Specifications CSJ 0902-48-838 SPECIAL SPECIFICATION 2093 LIME/CEMENT STABALIZED SUBGRADE This item shall consist of treating the subgrade by scarifying, adding lime slurry, initial mixing and curing,

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods SECTION 2000- EARTHWORK PART 1- GENERAL 1.01 SCOPE: This Section covers excavation, fill, and compaction of earth and rock for roadway, embankments, structural foundations, and planted areas. Topics include

More information

Utility Cut Restoration

Utility Cut Restoration Design Manual Chapter 9 - Utilities 9D - Utility Cut Restoration 9D-1 Utility Cut Restoration A. General Utility cuts are made in existing pavement sections to install a myriad of utilities and to repair

More information

GEOTECHNICAL STUDY PROPOSED PRE-OWNED FACILITY TO AN EXISTING DEALERSHIP AT MASON ROAD AND KATY FREEWAY KATY, TEXAS PROJECT NO.

GEOTECHNICAL STUDY PROPOSED PRE-OWNED FACILITY TO AN EXISTING DEALERSHIP AT MASON ROAD AND KATY FREEWAY KATY, TEXAS PROJECT NO. GEOTECHNICAL STUDY PROPOSED PRE-OWNED FACILITY TO AN EXISTING DEALERSHIP AT MASON ROAD AND KATY FREEWAY KATY, TEXAS PROJECT NO. 15-290E TO CWA CONSTRUCTION, INC. WOODWAY, TEXAS BY SERVICING TEXAS, LOUISIANA,

More information

.1 Furnish all labor, material and equipment necessary to complete all Site Work as shown on the Drawings and Specifications.

.1 Furnish all labor, material and equipment necessary to complete all Site Work as shown on the Drawings and Specifications. SECTION 31 22 00- GRADING 1.0 GENERAL.1 Furnish all labor, material and equipment necessary to complete all Site Work as shown on the Drawings and Specifications.. 2 Excavate to exact line and grade as

More information

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 PART FIVE DOCUMENTS FOR SITE AND INFRASTRUCTURE 31 00 00. EARTHWORK 31 10 00. SITE CLEARING.1 STRUCTURE REMOVAL: Include

More information

Minimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08

Minimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08 Minimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08 Table of Contents 1. Title 2. Designation 3. List of Figures 4. Scope 5. Referenced

More information

Geotechnical Exploration and Evaluation Report

Geotechnical Exploration and Evaluation Report Geotechnical Exploration and Evaluation Report Pavement Coring and Evaluation UNF Parking Lot 3 Jacksonville, Florida CSI Geo Project No.: 71-18-135-23 Prepared by CSI Geo, Inc. 2394 St. Johns Bluff Road

More information

COMPACTED CLAY LINERS

COMPACTED CLAY LINERS Technical Reference Document for Liquid Manure Storage Structures COMPACTED CLAY LINERS Table of Contents SECTION 1 - PURPOSE AND SCOPE 1.1. Purpose of the Technical Reference Document 1.2. Requirement

More information

GEOTECHNICAL INVESTIGATION

GEOTECHNICAL INVESTIGATION GEOTECHNICAL INVESTIGATION 1 08 Railway Avenue South Milo, AB Prepared for: 108 Railway Avenue South Milo, Alberta TOL 1LO Date: File: 216-2883-001 GEOTECHNICAL INVESTIGATION 108 Railway Avenue South,

More information

Subsurface Exploration and Foundation Analysis Proposed New Weight Room / Fieldhouse Building 429 N Highway 83 Leakey, Texas

Subsurface Exploration and Foundation Analysis Proposed New Weight Room / Fieldhouse Building 429 N Highway 83 Leakey, Texas Subsurface Exploration and Foundation Analysis Proposed New Weight Room / Fieldhouse Building 429 N Highway 83 Leakey, Texas InTEC Project No. S161639 April 18, 2016 Leakey ISD P.O. Box 1129 Leakey, Texas

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 9/17/18)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 9/17/18) Page 1 of 8 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks

More information

SECTION UNCLASSIFIED EXCAVATION AND GRADING

SECTION UNCLASSIFIED EXCAVATION AND GRADING SECTION 02210 UNCLASSIFIED EXCAVATION AND GRADING PART 1 GENERAL 1.1 DESCRIPTION Work in this section includes the excavation, undercut excavating, grading, earthwork and compaction required as shown on

More information

GEOTECHNICAL ENGINEERING STUDY

GEOTECHNICAL ENGINEERING STUDY GEOTECHNICAL ENGINEERING STUDY FOR BROOKS DEVELOPMENT AUTHORITY OFFICE BUILDINGS PHASE I NORTH OF RESEARCH PLAZA AND INNER CIRCLE ROAD SAN ANTONIO, TEXAS GEOTECHNICAL ENGINEERING STUDY For BROOKS DEVELOPMENT

More information

SECTION STRUCTURAL EXCAVATION FOR STRUCTURES

SECTION STRUCTURAL EXCAVATION FOR STRUCTURES 1 1 1 0 1 0 1 0 1 SECTION 1. STRUCTURAL EXCAVATION FOR STRUCTURES BASED ON DFD MASTER SPECIFICATION DATED /1/1 P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of providing all

More information

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations.

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations. Item Excavation and Backfill for Structures 1. DESCRIPTION 2. MATERIALS Excavate for placement and construction of structures and backfill structures. Cut and restore pavement. Use materials that meet

More information

ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED)

ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED) ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED) 275.1. Description. This Item shall govern for treating subgrade, new and/or existing base [with or without asphaltic concrete pavement (ACP)], or

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS

SECTION 39 - MANHOLES TABLE OF CONTENTS Section SECTION 39 - MANHOLES TABLE OF CONTENTS Page 39-1 GENERAL... 39.1 39-2 CONCRETE MANHOLES... 39.1 39-2.01 NOT USED... 39.1 39-2.02 Concrete Storm Drain Manholes... 39.1 39-3 SADDLE SEWER MANHOLES...

More information

TECHNOLOGY CENTER WAREHOUSE ADDITION ADMINISTRATIVE SERVICE CENTER MOORE PUBLIC SCHOOLS 1500 S.E. 4 th Street Moore, Oklahoma

TECHNOLOGY CENTER WAREHOUSE ADDITION ADMINISTRATIVE SERVICE CENTER MOORE PUBLIC SCHOOLS 1500 S.E. 4 th Street Moore, Oklahoma 10-2-2017 October 2, 2017 ADDENDUM NO. 1, Project: Owner: Architect: TECHNOLOGY CENTER WAREHOUSE ADDITION ADMINISTRATIVE SERVICE CENTER MOORE PUBLIC SCHOOLS 1500 S.E. 4 th Street Moore, Oklahoma Moore

More information

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page SECTION 14 RESTORATION OF SURFACES... 14.1 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01

More information

SECTION FILL AND BACKFILL

SECTION FILL AND BACKFILL PART 1 GENERAL 1.1 SECTION INCLUDES A. Filling, backfilling, and compacting for building volume below grade, footings, slabs-on-grade, paving, site structures, and utilities within the building. B. Backfilling

More information

A&L ENGINEERING AND CONSULTING, INC.

A&L ENGINEERING AND CONSULTING, INC. GEOTECHNICAL SUBSURFACE INVESTIGATION Proposed Marriott Courtyard Hotel to be located at the Nortwest Corner of Graham Drive and Loy Lake Road in Sherman, Grayson County, Texas (Lot 2, Ameristate Plaza)

More information

UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04

UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04 UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04 1. Description This work shall consist of the design, manufacture and construction of a T-WALL structure

More information

MSCAA /04 ITEM P-219 RECYCLED CONCRETE CRUSHED AGGREGATE BASE COURSE DESCRIPTION MATERIALS

MSCAA /04 ITEM P-219 RECYCLED CONCRETE CRUSHED AGGREGATE BASE COURSE DESCRIPTION MATERIALS 219-1.1 ITEM P-219 RECYCLED CONCRETE CRUSHED AGGREGATE BASE COURSE DESCRIPTION This item consists of a base course composed of crushed recycled concrete aggregate, crushed to meet a particular gradation,

More information

SECTION EARTHWORK

SECTION EARTHWORK SECTION 02200 EARTHWORK PART 1 - GENERAL 1.01 WORK INVOLVED A. Provide all labor, materials and equipment as required for all excavation, grading, providing borrow materials, hauling, placing and compacting

More information

ITEM 481 MONOLITHIC REINFORCED CONCRETE BOX SEWERS

ITEM 481 MONOLITHIC REINFORCED CONCRETE BOX SEWERS AFTER FEBRUARY 1, 2011 ITEM 481 MONOLITHIC REINFORCED CONCRETE BOX SEWERS 481.1 Description. This specification shall govern for the construction of monolithic, reinforced concrete box sewers of the size,

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section CEMENT STABILIZED BASE COURSE. 1. Foundation course of cement stabilized crushed stone.

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section CEMENT STABILIZED BASE COURSE. 1. Foundation course of cement stabilized crushed stone. PART 1 GENERAL 1.01 SUMMARY A. This section includes: Section 02712 1. Foundation course of cement stabilized crushed stone. 2. Foundation course of cement stabilized bank run gravel. 1.02 MEASUREMENT

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PORTLAND CEMENT. Section PORTLAND CEMENT STABILIZED SUBGRADE

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PORTLAND CEMENT. Section PORTLAND CEMENT STABILIZED SUBGRADE PART 1 GENERAL 1.01 SUMMARY Section 02338 PORTLAND CEMENT This Section includes foundation course of Portland cement stabilized natural subgrade material. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices. 1.

More information

Cement Stabilized Soil (CSS) (Portland cement)

Cement Stabilized Soil (CSS) (Portland cement) Cement Stabilized Soil (CSS) (Portland cement) 1.0 DESCRIPTION. This specification shall govern the process known as Cement Stabilized Soil (CSS). CSS consists of mixing the existing base, subbase and

More information

MagnumStone Specifications Gravity

MagnumStone Specifications Gravity MagnumStone Specifications Gravity SPECIFICATION FOR MAGNUMSTONE GRAVITY MECHANICALLY STABILIZED EARTH SYSTEM PART 1: GENERAL.01Description The work consists of supplying and installing all aspects of

More information

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES SECTION 02221 EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02200 - Earthwork. 2. 02660 - Water Systems. 3. 02720 - Storm Drainage System. 4.

More information

Civil Geotechnical Surveying

Civil Geotechnical Surveying Civil Geotechnical Surveying Mr. David Burnett Cabarrus County Schools 4425 Old Airport Road Charlotte, North Carolina 28025 May 16, 2017 Reference: Geotechnical Engineering Evaluation Future PLC Site

More information

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING Section Number Title 301 GENERAL 302 MATERIALS SPECIFICATIONS 303 CLEARING

More information

A. Texas Department Transportation 2004 Standard Specifications for Construction of Highways, Streets and Bridges (TxDOT):

A. Texas Department Transportation 2004 Standard Specifications for Construction of Highways, Streets and Bridges (TxDOT): SECTION 31 32 13.16 CEMENT STABILIZATION PART 1 GENERAL 1.1 SCOPE OF WORK A. This Section pertains to the specifications for cement stabilization of sandy or silty soil and consists of pulverizing, addition

More information

Misan University - College of Engineering Civil Engineering Department

Misan University - College of Engineering Civil Engineering Department CHAPTER 2 Soil and Excavations Soil investigation including two phases: surface investigation and subsurface investigation Surface investigation involves making a preliminary judgment about the site s

More information

Geotechnical Engineering Report

Geotechnical Engineering Report BIG CYPRESS SEMINOLE INDIAN RESERVATION WATER TREATMENT FACILITY October 29, 2015 Terracon Project No. HD155065 Prepared for: REISS ENGINEERING, INC. 1016 Spring Villas Pt. Winter Springs, FL 32708 Prepared

More information

SECTION EXCAVATION, BACKFILLING AND COMPACTING

SECTION EXCAVATION, BACKFILLING AND COMPACTING PART 1 GENERAL 1.01 SCOPE Work of this Section shall include all labor, materials, equipment, plant and incidentals required to complete all excavation, backfilling and compacting as indicated on the Drawings

More information

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois AGI Project No. 13-276 Subsurface Investigation Report For the Proposed New Retail Center 9601 South Pulaski Road Evergreen Park, Illinois Prepared for Mr. Feras Sweis FHS Design + Build LLC 2010 West

More information

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto.

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 02315-1 PART 1 GENERAL 1.1 Description of Work.1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. 1.2 Related

More information

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS.

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS. SECTION 1100 GRADING 1101 SCOPE. This section covers the performance of all work required for grading the project in coordination with all previous work performed at the locations shown on the contract

More information

Section CONCRETE SIDEWALKS. 1. Payment for concrete sidewalks is on square foot basis.

Section CONCRETE SIDEWALKS. 1. Payment for concrete sidewalks is on square foot basis. PART 1 GENERAL 1.01 SUMMARY A. This Section includes the following: Section 02775 1. Reinforced concrete sidewalks. 2. Wheelchair Ramps. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices. 1. Payment for concrete

More information

2. Pavement Materials: Consist of flexible or rigid pavements, typically HMA or PCC, respectively, or a composite of the two.

2. Pavement Materials: Consist of flexible or rigid pavements, typically HMA or PCC, respectively, or a composite of the two. Design Manual Chapter 6 - Geotechnical 6C - Pavement Systems 6C-1 Pavement Systems A. General Information This section addresses the importance of pavement foundations and the potential for pavement problems

More information

SECTION CS-2. TRENCH EXCAVATION CONSTRUCTION STANDARDS

SECTION CS-2. TRENCH EXCAVATION CONSTRUCTION STANDARDS SECTION CS-2. TRENCH EXCAVATION CONSTRUCTION STANDARDS CS-2-01. GENERAL: Trench excavation shall conform with the City Standard Specifications. In general a trench is defined as an excavation in which

More information

SECTION TRENCH SAFETY PART 1 - GENERAL

SECTION TRENCH SAFETY PART 1 - GENERAL SECTION 31 41 33 - TRENCH SAFETY PART 1 - GENERAL A. This Section is intended to provide specifications for the minimum requirements for trench safety. The Contractor shall endeavor to insure the safety

More information

EXCAVATION & BACKFILLING GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

EXCAVATION & BACKFILLING GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013 GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 PART 1 GENERAL 1.1 Description The Work of this Section shall be all labour, materials, equipment and supervision necessary

More information

1. Payment for concrete sidewalks is on square foot basis. a. Limits for measurement for trench excavation as follows:

1. Payment for concrete sidewalks is on square foot basis. a. Limits for measurement for trench excavation as follows: Section 02775 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Reinforced concrete sidewalks. B. Wheelchair ramps. C. Reinforced slope paving. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices. 1. Payment for concrete

More information

Appendix D General Earthwork and Grading Specifications for Rough Grading

Appendix D General Earthwork and Grading Specifications for Rough Grading Appendix D General Earthwork and Grading Specifications for Rough Grading LEIGHTON AND ASSOCIATES, INC. General Earthwork and Grading Specifications 1.0 General 1.1 Intent These General Earthwork and Grading

More information

ETTAMAR, INC. Engineers and Consultants TBPE # Joe DiMaggio Blvd. Suite 28, Bldg. 300 Round Rock, TX (512) (512) FAX

ETTAMAR, INC. Engineers and Consultants TBPE # Joe DiMaggio Blvd. Suite 28, Bldg. 300 Round Rock, TX (512) (512) FAX RETAINING WALL CROSS-SECTION WALLS A & F ONLY N.T.S MAX HEIGHT 4"x4"x48" FULL BENCH ADJUST THE BOTTOM (OR TOP) OF WALL LOCATION TO ACCOUNT FOR WALL BATTER. OWNER SHOULD REVIEW AND APPROVE BOTTOM OF WALL

More information

TABLE OF CONTENTS APPENDIX A

TABLE OF CONTENTS APPENDIX A TABLE OF CONTENTS SECTION GE INTRODUCTION...1 PROJECT DESCRIPTION...1 DRILLING AND SAMPLING PROCEDURES...2 LABORATORY TEING PROGRAM...3 SITE AND SUBSURFACE CONDITIONS...4 GROUNDWATER OBSERVATIONS...6 CONCLUSIONS

More information

GEOTECHNICAL ENGINEERING INVESTIGATION PROPOSED CITY OF GREENCASTLE PARKING GARAGE WALNUT STREET AND INDIANA STREET GREENCASTLE, INDIANA

GEOTECHNICAL ENGINEERING INVESTIGATION PROPOSED CITY OF GREENCASTLE PARKING GARAGE WALNUT STREET AND INDIANA STREET GREENCASTLE, INDIANA GEOTECHNICAL ENGINEERING INVESTIGATION PROPOSED CITY OF GREENCASTLE PARKING GARAGE WALNUT STREET AND INDIANA STREET GREENCASTLE, INDIANA CARDNO ATC PROJECT NO. 86.25278.0003 (REVISED) NOVEMBER 30, 2012

More information

KORA_Req._for_Eng._Studies_on_Stouffer_Apts. KU Reference No

KORA_Req._for_Eng._Studies_on_Stouffer_Apts. KU Reference No 000130 1 PURPOSE: Professional Engineering Consultants, P.A. (PEC) was engaged by University of Kansas Design & Construction Management to perform an assessment of Stouffer Place Apartment Building 20

More information

Please include this addendum in your Bid proposal for the above referenced project. Questions are in black ink, and the answers are in red ink.

Please include this addendum in your Bid proposal for the above referenced project. Questions are in black ink, and the answers are in red ink. JAHarchitects, LLC PROJECT NO. 393 RIVERCREST CDD 11560 RAMBLE CREEK DRIVE, RIVERVIEW FL ADDENDUM TO BID PROJECT: RIVERCREST CDD MULTI PURPOSE FIELD MAINTENANCE BUILDING & DOG PARK POOL & CABANNA JAH PROJECT

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION ITEM 00223 LIME-FLYASH OR FLYASH STABILIZED SUBGRADE 223.1 Description. This item shall consist of treating the subgrade by the pulverizing, addition of lime flyash and/or flyash,

More information

SECTION BITUMINOUS CONCRETE PAVING

SECTION BITUMINOUS CONCRETE PAVING PART 1 GENERAL 1.1 SECTION INCLUDES: SECTION 02400 BITUMINOUS CONCRETE PAVING A. The intent of this specification section is to provide requirements for materials, equipment, and methods for constructing

More information

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 2 SPECIAL BENCHING AND SIDEHILL EMBANKMENT FILLS Geotechnical Bulletin GB2

More information

GEOTECHNICAL ENGINEERING REPORT. KU Parking Lot 300E Southeast of Lied Center Lawrence, Kansas. Project No. D16G1696. KU No. Lz_n/11062.

GEOTECHNICAL ENGINEERING REPORT. KU Parking Lot 300E Southeast of Lied Center Lawrence, Kansas. Project No. D16G1696. KU No. Lz_n/11062. GEOTECHNICAL ENGINEERING REPORT KU Parking Lot 300E Southeast of Lied Center Lawrence, Kansas April 1, 2016 Prepared for: University of Kansas Bartlett & West Prepared by: GeoSource, LLC April 1, 2016

More information

SECTION GENERAL EXCAVATION

SECTION GENERAL EXCAVATION 02210-1 of 11 SECTION 02210 GENERAL EXCAVATION 02210.01 GENERAL A. Description 1. General excavation shall include but not necessarily be limited to, excavation and grading for general site work, roadways,

More information