1 AGI Project No. -11 Subsurface Investigation Report For the Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois Prepared for Mr. Steve Panko Key Development Partners, LLC North State Street, Suite 660 Chicago, Illinois 6064 Prepared by 38 Hammond Dr., Suite 6 Schaumburg, Illinois July 6, 0

2 July 6, 0 Mr. Steve Panko Key Development Partners, LLC North State Street, Suite 660 Chicago, Illinois 6064 Re: Subsurface Investigation Report Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois AGI Project No. -11 Dear Mr. Panko: The subsurface exploration at the above-referenced site has been completed. The attached report represents the findings of the subsurface exploration and provides the geotechnical analysis for the project. We appreciate the opportunity to be of service to you on this project. If you have any questions concerning the contents of this report, or if we may be of further service to you in any way, please do not hesitate to contact us. Sincerely, APPLIED GEOSCIENCE, INC. Adam M. Moghamis, P.E. Principal Engineer enc.

3 6447 Grand Avenue Gurnee, Illinois INTRODUCTION The purpose of this exploration was to evaluate the subsurface soil conditions at the site and to formulate conclusions and guideline recommendations pertaining to the influence of these conditions upon the proposed site improvements. The subject site is located at 6447 Grand Avenue in Gurnee, Illinois, as shown on Appendix A, Boring Location Diagram. It is our understanding that the proposed improvements are to include a new one-story building without a basement. Site improvements will presumably include paved driveways and underground utilities. It is anticipated that proposed grades will be approximately equivalent to existing grades. Results of field and laboratory testing and final guideline recommendations based upon these data are included in this report. The soil borings performed at the site, a site location map, the results of the exploration, and general notes, are included with this report. The purpose of this report is to describe the subsurface conditions encountered in the borings, to summarize the test data and to provide guideline recommendations regarding design and construction of foundations of the proposed site development. SUBSURFACE EXPLORATION PROCEDURES Five () soil borings were extended to a depth of.0 feet below the ground surface as part of the soils exploration on July 1 and, 0. (AGI) personnel established boring locations in the field, without the aid of sophisticated surveying techniques; and as such, the locations are considered approximate. The soil borings were performed using a truck-mounted rotary drilling rig using continuous flight augers. Representative samples were obtained using the split-barrel sampling procedure according to ASTM Specification D-86. In the split-barrel sampling procedure, a -inch O.D. split-barrel sampling spoon is driven into the ground with a 140-pound hammer, free falling a distance of 30 inches. The blows required to advance the sampling spoon by 1 inches after an initial 6 inch penetration are reported as the penetration resistance (N) values. These values are shown on the boring log at their test depths. The penetration resistance value is an indication of the relative density of in-place granular soil and, to a lesser degree of accuracy, the consistency of cohesive soil. Cohesive soil samples were tested for unconfined compressive strength using a calibrated penetrometer test device. Upon completion of the drilling, the borings were filled with auger cuttings. All soil samples obtained from the drilling operation were visually classified in the field. Samples were sealed and returned to AGI s laboratory for further examination, classification and testing. Field logs of each boring were prepared by our field engineer. These logs include visual classifications of the materials encountered during drilling as well as the engineer s interpretation of the subsurface conditions between samples. Final boring logs, included with this report in Appendix July 6, 0 Page 1

4 6447 Grand Avenue Gurnee, Illinois B, represent an interpretation of the field logs and include modifications based on the laboratory testing of the samples. SOIL CONDITIONS In general, the borings encountered. to 3. inches of asphalt over 10.0 to 1. inches of crushed stone and gravel at the ground surface. The pavement subbase was underlain by silty clay fill materials extending to depths of. to 3.0 feet below the ground surface. The fill materials were underlain by brown silty clay in a very stiff condition extending to depths of. to 8.0 feet below the ground surface. In all borings, except boring B-, the brown silty clay was underlain by gray silty clay in a very stiff to stiff condition extending to the boring termination depth of.0 feet. In boring B-, the brown silty clay was underlain by brown and gray silt in a medium dense condition extending to a depth of 7. feet below the ground surface. The silt was underlain by gray silty clay in a very stiff to hard condition extending to the boring termination depth of.0 feet. The enclosed boring logs provide descriptions of the soil conditions encountered at the boring locations. The stratification lines shown on the boring logs represent the approximate boundary between soil types; the actual transition between materials may be gradual. LABORATORY TESTING PROGRAM The geotechnical testing program consisted of performing water content tests on selected soil samples according to ASTM D-16 and calibrated penetrometer tests on the cohesive samples recovered. These tests were performed upon representative portions of the samples obtained in the field. The results of all testing performed, along with a visual classification of the material based upon both a textural analysis and the Unified Soil Classification System, are indicated on the boring logs. GROUNDWATER CONDITIONS Water level observations were recorded while drilling and immediately after completion of the borings. Groundwater was not encountered in any of the borings. The borings were backfilled immediately after drilling for safety reasons. Groundwater observations in the borings provide an approximate indication of the groundwater conditions at the time the borings were drilled. Since the soils encountered were predominately cohesive, which have a low coefficient of permeability, much time is required for the groundwater to seep into the boreholes and attain an equilibrium level. Longer-term observations in cased holes or piezometers would be necessary for a more accurate evaluation of the groundwater conditions at this site. Fluctuations in the groundwater level and the possible development of perched water table should be anticipated throughout the year depending on variations in climatological conditions and other factors not apparent at the time the borings were performed. The possibility of groundwater level fluctuation should be considered when developing the design and construction plans for the project. July 6, 0 Page

5 6447 Grand Avenue Gurnee, Illinois ANALYSIS AND GUIDELINE RECOMMENDATIONS The following guideline recommendations assume that the scope of the project as described in the beginning of this report does not change, and that no significant variations in soil conditions occur from those reported on our final boring logs. The boring logs and laboratory test results depict subsurface conditions only at the specified locations on the site. Our recommendations are based upon the assumption that the proposed grades will be approximately equivalent to the existing grades. With these limitations, the following geotechnical recommendations are given for the proposed new 1-story building. Foundation for Proposed One-Story Building For this structure, foundation loads are expected to be light. Based on the soil boring data, we recommend a shallow spread footing type foundation for the support of this structure. Based on the boring information and the anticipated site preparation, building foundations extending to minimum depths required for frost protection should bear in the very stiff silty clay soils encountered 3.0 feet below the existing grade. If unsuitable bearing soils such as old footing foundation, loose, soft silty clay, or organic materials are encountered in a footing excavation, the footing should be deepened to competent bearing soil and the footing could be lowered or an overexcavation and backfill procedure could be performed. An overexcavation and backfill treatment would require widening the deepened excavation in all directions at least 8 inches beyond the edges of the footing for each 1 inches of overexcavation depth. The overexcavation should then be backfilled in maximum 9-inch thick loose lifts with suitable granular fill material, such as IDOT gradation CA-1 or equivalent capped with CA-6 or equivalent, compacted to at least 9 percent of the maximum modified Proctor dry density (ASTM D-7). Shallow footings bearing on the natural silty clay soils encountered below the minimum depths required for frost protection, tested and evaluated by an experienced geotechnical professional, could be designed using a maximum net allowable soil bearing pressure of 3,00 psf. The net pressure is the pressure in excess of the minimum surrounding overburden pressure at the footing base elevation. A one-third increase in the allowable design bearing pressure could be used for design of footings for added temporary live loads such as those due to wind gusts or seismic activity. Perimeter footings and footings beneath unheated areas should extend at least 48 inches beneath the lowest adjacent finished grade for frost protection. Interior footings should also be founded at least 4 inches below floor slab level for confinement of the bearing soils. Isolated footings should have a minimum width of 30 inches, and continuous formed footings should have a minimum width of 0 inches. Anticipated long-term settlement of the footing foundation designed and constructed as recommended above should be on the order of less than 1-inch with a differential settlement of less July 6, 0 Page 3

6 6447 Grand Avenue Gurnee, Illinois than ½ to ¾ inch. Reinforcement should be provided in the walls to minimize cracking from differential settlement. Floor Slab Available information indicated that the existing silty clay soils and silty clay fill materials are capable of providing support for the proposed floor slab situated on grade. Any asphalt pavement should be removed and the exposed surface be observed by a soil engineer to determine if there are any localized deposits of soft or unsuitable material. Any such deposit, as observed by the soil engineer, should be removed and replaced with an approved fill free of organic matter and debris. A 6-inch layer of gravel meeting IDOT gradation CA-7 or equivalent should be provided below the floor slab to minimize dangers from capillary rise of moisture. Stabilization of Subgrade Soils We recommend that all asphalt pavement, loose, soft, organic, or otherwise unsuitable materials be removed from any new pavement area. The necessary stripping depths will vary and should be closely monitored during construction to verify that all unsuitable materials have been removed. Prior to fill placement and after rough grading is completed, the exposed subgrade should be proofrolled if space allows. Proofrolling aids in providing a firm subgrade for new pavement and for delineating soft or disturbed areas that may exist at or slightly below subgrade level. Unsuitable areas observed at this time should be undercut and replaced with suitable fill if they cannot be compacted in place. Proofrolling may be accomplished with a fully loaded, tandem-axle dump truck or other equipment providing an equivalent subgrade loading. A minimum gross weight of tons is recommended for the proofrolling equipment. Proofrolling should be performed in dry weather conditions only as a wet subgrade will not allow detection of buried weak soils. The gravel and crushed stone subbase encountered below the asphalt pavement at the site may be stockpiled and reused as engineering backfill material. All fill materials should be properly placed and compacted as described above. Appropriate laboratory testing should be performed on samples of proposed off-site borrow materials before they are used for fill, particularly if they are to be placed within feet of the finished pavement subgrade elevation. Borrow materials should consist of only clay to silty clay soils. CONSTRUCTION CONSIDERATIONS As a general precaution, the exposed subgrade soils should be kept free of standing water or excessive runoff. Due to the potential for soil variations and loose natural soils, it is recommended that soils at subgrade elevation be observed and tested by an representative prior to concrete or asphalt placement to evaluate the suitability and uniformity of the soils for support of the design at any structure or pavement areas. It is our understanding that the existing structure will be demolished. It is recommended that all existing footings and other debris be completely removed from the new footing areas, and that the former building structure be backfilled with IDOT gradation CA-1 crushed stone. The CA-1 should be placed in maximum 9-inch loose lifts and compacted to 9% of its maximum modified Proctor dry July 6, 0 Page 4

7 6447 Grand Avenue Gurnee, Illinois density, or to the Resident Engineer s satisfaction. Continuous observation by a geotechnical engineer or his representative should be maintained during site preparation and compaction of all fill and backfill material. If the former footings are located below the proposed slab-on-grade, the old footings should be removed a minimum of two feet below the proposed slab-on-grade and backfilled with compacted engineering fill materials to avoid hard spots. All excavation should be performed in accordance with the most recent Occupational Safety and Health Administration requirements. No unique soil-related construction problems other than those discussed in previous sections are foreseen. An experienced soil engineer should be retained to oversee all soil-related operations. GENERAL COMMENTS The analysis and recommendations presented in this report are based upon the data obtained from the soil borings performed at the indicated locations and from any other information discussed in this report. This report does not reflect any variations that may occur across the site. The nature and extent of such variations may not become evident until construction. If variations appear evident, it will be necessary to reevaluate the recommendations of the report. It is recommended that an geotechnical engineer be given the opportunity to review the plans and specifications so that comments can be made regarding the interpretation and implementation of our geotechnical recommendations in the design and specifications. It is further recommended that the geotechnical engineer be retained for testing and observation during earthwork construction phases to help determine that the design requirements are fulfilled. This report has been prepared for the exclusive use of our client for specific application to the project discussed and has been prepared in accordance with generally accepted geotechnical engineering practices. No other warranties, either expressed or implied, are intended or made. In the event that any changes in the nature, design or location of the project as outlined in this report are planned, the conclusions and recommendations contained in this report shall not be considered valid unless the changes are reviewed and the conclusions of this report modified or verified in writing by the geotechnical engineer. July 6, 0 Page

8 APPENDIX A Boring Location Diagram

9 4.'.' B- B-3 3' 4' 77' B- 7' 36' 68' 10' 6' 6' B-1 B-4 16' PROJECT NUMBER: -11 CLIENT: Key Development DATE: July 1 &, 0 APPENDIX A: Boring Location Diagram PROJECT LOCATION: 6447 Grand Avenue Gurnee, Illinois N Not to Scale 38 Hammond Drive, Suite 6 Schaumburg, Illinois (847)

10 APPENDIX B Soil Boring Logs

11 AGI Job No. -11 BORING LOG NO. B-1 Sheet 1 of 1 CLIENT Key Development PROJECT Proposed New 1-Story Building STATION AND OFFSET(ft): LOCATION 6447 Grand Avenue COUNTY: Lake SAMPLES TESTS CITY & STATE: SURFACE ELEVATION 1.3. Gurnee, Illinois Datum:. inches asphalt over 1. inches gravel FILL, silty clay, trace sand & gravel, brown & gray, stiff SILTY CLAY, trace sand & gravel, brown, very stiff, with silty sand seams, (CL) GRAPHIC LOG DEPTH (FT.) SPT-N BLOWS / FT NUMBER 1 TYPE % RECOVERY 6 78 MOISTURE, % 8 16 DRY DENSITY PCF Qu tsf Failure Type 1.. HNu Units ppm ORGANIC CONTENT, % SILTY CLAY, trace sand & gravel, gray, very stiff, (CL) End Of Boring WATER LEVEL OBSERVATIONS Dry AGI COPY GRAND GURNEE- KEY DEVELOPMENT.GPJ 7/6/ 38 Hammond Drive, Suite 6 Schaumburg, Illinois Tel: (847) Fax: (847) STARTED DRILL CO. DRILLER ENG/GEOL WDI Pecka FINISHED DRILL RIG A'T DRILLER APPROVED 7-1- AMM

12 AGI Job No. -11 BORING LOG NO. B- Sheet 1 of 1 CLIENT Key Development PROJECT Proposed New 1-Story Building STATION AND OFFSET(ft): LOCATION 6447 Grand Avenue COUNTY: Lake SAMPLES TESTS CITY & STATE: SURFACE ELEVATION 1.1. Gurnee, Illinois Datum: 3 inches asphalt over 10 inches gravel FILL, silty clay, with sand & gravel, brown & gray, very stiff SILTY CLAY, trace sand & gravel, brown, very stiff, (CL) GRAPHIC LOG DEPTH (FT.) SPT-N BLOWS / FT. 7 8 NUMBER 1 TYPE % RECOVERY 7 89 MOISTURE, % 13 DRY DENSITY PCF Qu tsf Failure Type 3.. HNu Units ppm ORGANIC CONTENT, % SILTY CLAY, trace sand & gravel, gray, very stiff, with sand seams, (CL) End Of Boring WATER LEVEL OBSERVATIONS 14. Cave-In AB AGI COPY GRAND GURNEE- KEY DEVELOPMENT.GPJ 7/6/ 38 Hammond Drive, Suite 6 Schaumburg, Illinois Tel: (847) Fax: (847) STARTED DRILL CO. DRILLER ENG/GEOL. 7-- WDI Pecka FINISHED DRILL RIG A'T DRILLER APPROVED 7-- AMM

13 AGI Job No. -11 BORING LOG NO. B-3 Sheet 1 of 1 CLIENT Key Development PROJECT Proposed New 1-Story Building STATION AND OFFSET(ft): LOCATION 6447 Grand Avenue COUNTY: Lake SAMPLES TESTS CITY & STATE: SURFACE ELEVATION 1.1 Gurnee, Illinois Datum: 3 inches asphalt over 10 inches gravel SILTY CLAY, trace sand & gravel, brown, very stiff, (CL) GRAPHIC LOG DEPTH (FT.) SPT-N BLOWS / FT. NUMBER 1 TYPE % RECOVERY 7 MOISTURE, % 14 DRY DENSITY PCF Qu tsf Failure Type HNu Units ppm ORGANIC CONTENT, % 6.0 SILTY CLAY, trace sand & gravel, gray, very stiff to stiff, (CL) End Of Boring WATER LEVEL OBSERVATIONS Dry AGI COPY GRAND GURNEE- KEY DEVELOPMENT.GPJ 7/6/ 38 Hammond Drive, Suite 6 Schaumburg, Illinois Tel: (847) Fax: (847) STARTED DRILL CO. DRILLER ENG/GEOL. 7-- WDI Pecka FINISHED DRILL RIG A'T DRILLER APPROVED 7-- AMM

14 AGI Job No. -11 BORING LOG NO. B-4 Sheet 1 of 1 CLIENT Key Development PROJECT Proposed New 1-Story Building STATION AND OFFSET(ft): LOCATION 6447 Grand Avenue COUNTY: Lake SAMPLES TESTS CITY & STATE: SURFACE ELEVATION Gurnee, Illinois Datum: 3 inches asphalt over 11 inches gravel FILL, silty clay, with sand & gravel, brown, gray & black SILTY CLAY, trace sand & gravel, brown to brown & gray, very stiff, (CL) SILTY CLAY, trace sand & gravel, gray, very stiff, with moist sand seams, (CL) GRAPHIC LOG DEPTH (FT.) SPT-N BLOWS / FT NUMBER 1 3 TYPE % RECOVERY MOISTURE, % DRY DENSITY PCF Qu tsf Failure Type 3. HNu Units ppm ORGANIC CONTENT, % End Of Boring WATER LEVEL OBSERVATIONS Dry AGI COPY GRAND GURNEE- KEY DEVELOPMENT.GPJ 7/6/ 38 Hammond Drive, Suite 6 Schaumburg, Illinois Tel: (847) Fax: (847) STARTED DRILL CO. DRILLER ENG/GEOL. 7-- WDI Pecka FINISHED DRILL RIG A'T DRILLER APPROVED 7-- AMM

15 AGI Job No. -11 BORING LOG NO. B- Sheet 1 of 1 CLIENT Key Development PROJECT Proposed New 1-Story Building STATION AND OFFSET(ft): LOCATION 6447 Grand Avenue COUNTY: Lake SAMPLES TESTS CITY & STATE: SURFACE ELEVATION Gurnee, Illinois Datum: 3. inches asphalt over 11 inches gravel FILL, silty clay, with sand & gravel, trace topsoil, brown, gray & black SILTY CLAY, trace sand, gravel & mottle, brown, very stiff, (CL) SILT, brown & gray, medium dense, moist, (ML) SILTY CLAY, trace sand & gravel, gray, very stiff to stiff, (CL) GRAPHIC LOG DEPTH (FT.) 10 SPT-N BLOWS / FT NUMBER TYPE % RECOVERY MOISTURE, % DRY DENSITY PCF Qu tsf Failure Type 3.7 HNu Units ppm ORGANIC CONTENT, % End Of Boring WATER LEVEL OBSERVATIONS Dry AGI COPY GRAND GURNEE- KEY DEVELOPMENT.GPJ 7/6/ 38 Hammond Drive, Suite 6 Schaumburg, Illinois Tel: (847) Fax: (847) STARTED DRILL CO. DRILLER ENG/GEOL. 7-- WDI Pecka FINISHED DRILL RIG A'T DRILLER APPROVED 7-- AMM

16

17 UNIFIED SOIL CLAIFICATION SYSTEM Note: Dual symbols are used to indicate borderline soil classifications Geotechnical, Environmental & Materials Engineering

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois AGI Project No. 13-276 Subsurface Investigation Report For the Proposed New Retail Center 9601 South Pulaski Road Evergreen Park, Illinois Prepared for Mr. Feras Sweis FHS Design + Build LLC 2010 West

More information

Subsurface Investigation Report

Subsurface Investigation Report AGI Project No. 17-154 Subsurface Investigation Report For the Proposed New One-Story Building Addition 7030 West 111 th Street Worth, Illinois Prepared for T63 Development LLC 11052 Mayflow er Lane Orland

More information

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois AGI Project No. 13-109B Subsurface Investigation Report For the Proposed Roosevelt Middle School Site Improvements 7560 Oak Avenue River Forest, Illinois Prepared for Mr. Jerry Pilipowicz Terra Engineering,

More information

SUBSURFACE INVESTIGATION & GEOTECHNICAL RECOMMENDATIONS PROPOSED MONOPOLE CELL TOWER INDIANAPOLIS, INDIANA A&W PROJECT NO: 15IN0464

SUBSURFACE INVESTIGATION & GEOTECHNICAL RECOMMENDATIONS PROPOSED MONOPOLE CELL TOWER INDIANAPOLIS, INDIANA A&W PROJECT NO: 15IN0464 SUBSURFACE INVESTIGATION & GEOTECHNICAL RECOMMENDATIONS PROPOSED MONOPOLE CELL TOWER INDIANAPOLIS, INDIANA A&W PROJECT NO: 15IN0464 PREPARED FOR: AAA DEVELOPMENT AND CONSULTING, INC GREENFIELD, INDIANA

More information

May 2, Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC Washington Street Raleigh, NC

May 2, Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC Washington Street Raleigh, NC Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC. 1030 Washington Street Raleigh, NC 27605-1258 May 2, 2017 Re: Report of Subsurface Investigation Westfield Rehabilitation & Health Care Additions

More information

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1 PUBLIC WORKS DEPARTMENT David A. Jones, P.E., Director April 7, 2017 Webster Street Sub-Surface Stormwater Storage System Bid No. 2017-022 Bid Date: 4/13/17 ADDENDUM NO 1 Please make the following changes

More information

REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES

REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES FAMILY DOLLAR OF ROCKFORD 09 & CHARLES STREET ROCKFORD, ILLINOIS ECS PROJECT NO. 16:1181 FOR NATIONAL RETAIL DEVELOPMENT LLC CHICAGO,

More information

Geotechnical Engineering Report

Geotechnical Engineering Report The Residence at Yukon Hills Cornwell Drive and Vandament Avenue Yukon, Oklahoma May 20, 2016 Terracon Project No. 03165108 Prepared for: Jones Gillam Renz Architects, Inc. Salina, Kansas Prepared by:

More information

EXHIBIT G GEOTECHNICAL REPORT (DRAFT)

EXHIBIT G GEOTECHNICAL REPORT (DRAFT) EXHIBIT G GEOTECHNICAL REPORT (DRAFT) APPENDIX 1 PROJECT SITE 'B' B-1 B-2 I-2 B-3 B-4 B-5 I-1 PROJECT LOCATION LEGEND B-1 = APPROXIMATE BORING LOCATION I-1 = APPROXIMATE INFILTRATION

More information

SECTION SOILS REPORT

SECTION SOILS REPORT SECTION 02300 SOILS REPORT 1. GENERAL: 1.1 All work included under this heading shall be subject to the General Conditions of the entire operation. This Contractor is required to refer especially thereto.

More information

REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA

REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA AREHNA PROJECT NO. B-15-008 March 11, 2015 Prepared For: City of Tampa Stormwater Division 306 W. Jackson Street, 6N Tampa, Florida

More information

Geotechnical Investigation Long Timber Brewing Building Highway 99 and Kelly Street Monroe, Oregon TABLE OF CONTENTS

Geotechnical Investigation Long Timber Brewing Building Highway 99 and Kelly Street Monroe, Oregon TABLE OF CONTENTS Highway 99 and Kelly Street TABLE OF CONTENTS PROJECT INFORMATION... 1 FIELD EXPLORATION... 1 SITE CONDITIONS... 2 Surface Conditions:... 2 Subsurface Conditions:... 2 FILL.... 2 Topsoil.... 2 Clay Alluvium....

More information

5.0 SITE CONDITIONS. 5.1 Surface Conditions

5.0 SITE CONDITIONS. 5.1 Surface Conditions 5.0 SITE CONDITIONS 5.1 Surface Conditions The project site is located at approximately along Ashdown Forest Road and Nichols Canyon Road in the Fiddlers Canyon Area of Cedar City, Utah. At the time of

More information

GEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO E

GEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO E GEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO. 15-945E TO VILLAGE OF TIKI ISLAND TIKI ISLAND, TEXAS BY SERVICING TEXAS, LOUISIANA, NEW MEXICO, OKLAHOMA

More information

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO. 1140198001 Reported to: SIRRUS ENGINEERS, INC. Houston, Texas Submitted by: GEOTEST

More information

Please include this addendum in your Bid proposal for the above referenced project. Questions are in black ink, and the answers are in red ink.

Please include this addendum in your Bid proposal for the above referenced project. Questions are in black ink, and the answers are in red ink. JAHarchitects, LLC PROJECT NO. 393 RIVERCREST CDD 11560 RAMBLE CREEK DRIVE, RIVERVIEW FL ADDENDUM TO BID PROJECT: RIVERCREST CDD MULTI PURPOSE FIELD MAINTENANCE BUILDING & DOG PARK POOL & CABANNA JAH PROJECT

More information

REPORT OF GEOTECHNICAL EXPLORATION PEPSI PLACE WATER MAIN REPLACEMENT JACKSONVILLE, FLORIDA E&A PROJECT NO CLIENT ID: 4784

REPORT OF GEOTECHNICAL EXPLORATION PEPSI PLACE WATER MAIN REPLACEMENT JACKSONVILLE, FLORIDA E&A PROJECT NO CLIENT ID: 4784 REPORT OF GEOTECHNICAL EXPLORATION PEPSI PLACE WATER MAIN REPLACEMENT JACKSONVILLE, FLORIDA E&A PROJECT NO. 35-55 CLIENT ID: 78 Prepared for: Construction & Engineering Services Consultants, Inc. 93 Baymeadows

More information

GEOTECHNICAL ENGINEERING REPORT. KU Parking Lot 300E Southeast of Lied Center Lawrence, Kansas. Project No. D16G1696. KU No. Lz_n/11062.

GEOTECHNICAL ENGINEERING REPORT. KU Parking Lot 300E Southeast of Lied Center Lawrence, Kansas. Project No. D16G1696. KU No. Lz_n/11062. GEOTECHNICAL ENGINEERING REPORT KU Parking Lot 300E Southeast of Lied Center Lawrence, Kansas April 1, 2016 Prepared for: University of Kansas Bartlett & West Prepared by: GeoSource, LLC April 1, 2016

More information

GEOTECHNICAL INVESTIGATION

GEOTECHNICAL INVESTIGATION GEOTECHNICAL INVESTIGATION SHEETZ CONVENIENCE STORE FREEPORT ROAD AND CALIFORNIA AVENUE NATRONA HEIGHTS, PENNSYLVANIA Prepared For: Mr. David J. Mastrostefano, P.E. Sheetz Incorporated 817 Brookfield Drive

More information

Geotechnical Exploration and Evaluation Report

Geotechnical Exploration and Evaluation Report Geotechnical Exploration and Evaluation Report Nassau Reclaimed Water Main From Radio Avenue to Harts Road Nassau County, Florida CSI Geo Project No.: 71-17-329-04 Client Project No.: JEA 09302-049-01

More information

LETTER OF TRANSMITTAL AS REQUESTED FOR REVIEW AND COMMENT FOR APPROVAL PLEASE RECYCLE

LETTER OF TRANSMITTAL AS REQUESTED FOR REVIEW AND COMMENT FOR APPROVAL PLEASE RECYCLE 199 Highland Vista Dr., Suite 170 (703) 726-8030 www.geoconcepts-eng.com TO: LETTER OF TRANSMITTAL Mr. Rob McGinnis FASLA FROM: Rebecca L. Smith-Zakowicz, CPG 108 Second Street, SW, Unit #36 Charlottesville,

More information

For. Report of Geotechnical Exploration. University of North Florida Parking Lot 47 Jacksonville, Florida

For. Report of Geotechnical Exploration. University of North Florida Parking Lot 47 Jacksonville, Florida Report of Geotechnical Exploration For University of North Florida Parking Lot 47 Jacksonville, Florida MAE Project No. 0019-0009 April 5, 2017 Revised: April 6, 2017 Prepared for: Prepared by: Jacksonville,

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Caswell County Public Library Yanceyville, North Carolina June 15, 2017 Project No. 75175054 Revised Prepared for: Gunn Memorial Public Library Yanceyville, North Carolina

More information

REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES

REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES NORTH SHORE SCHOOL DISTRICT 11 HIGHLAND PARK, ILLINOIS ECS PROJECT NO. 1:8 FOR NORTH SHORE SCHOOL DISTRICT 11 SEPTEMBER, 1 REPORT

More information

Woodhaven Retirement Community Addition Wentworth Street Livonia, Michigan 48154

Woodhaven Retirement Community Addition Wentworth Street Livonia, Michigan 48154 Report of Geotechnical Investigation Woodhaven Retirement Community Addition 9 Wentworth Street Livonia, Michigan 81 Latitude.08 N Longitude 8.898 W Prepared for: Fusco, Shaffer & Pappas, Inc. 0 E. Nine

More information

mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida

mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA 14-3001 - Construct Bin Wall at HERD Eglin AFB, Florida MTEC Project Number 2014-101 November 10, 2014 Revised: January 5, 2015 Prepared For: Peterson Engineering,

More information

DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET. Revised Soil Survey Report November 24, 2015 Matthew G. Moore, P.E.

DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET. Revised Soil Survey Report November 24, 2015 Matthew G. Moore, P.E. LD-0 /12/09 DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET Revised Soil Survey Report November 2, 201 Matthew G. Moore, P.E. VDOT (Division) or Company Name Insert Location, Virginia

More information

REPORT OF GEOTECHNICAL EXPLORATION GLYNN COUNTY DETENTION CENTER GLYNN COUNTY, GEORGIA E&A PROJECT NO

REPORT OF GEOTECHNICAL EXPLORATION GLYNN COUNTY DETENTION CENTER GLYNN COUNTY, GEORGIA E&A PROJECT NO REPORT OF GEOTECHNICAL EXPLORATION GLYNN COUNTY DETENTION CENTER GLYNN COUNTY, GEORGIA E&A PROJECT NO. - Prepared for: IPG Architects, Inc. Northwood Park Drive Valdosta, Georgia Prepared by: Ellis & Associates,

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Proposed Abbington Crossing Apartments 119 Lipscomb Road Wilson, North Carolina March 18, 2016 Project No. 7216011 Prepared for: Rea Ventures Group, LLC Atlanta, Georgia

More information

GEOTECHNICAL ENGINEERING REPORT

GEOTECHNICAL ENGINEERING REPORT GEOTECHNICAL ENGINEERING REPORT Project: NW Bucklin Hill at Silverdale Way NW Project Number: 12023 Prepared for: Barber Development P.O. Box 473 Redmond, WA 98073 Prepared by: South Sound Geotechnical

More information

March 10, 2017 SITE AND PROJECT INFORMATION

March 10, 2017 SITE AND PROJECT INFORMATION March 10, 2017 Derek Hawkes, PE NASH COUNTY 120 W. Washington Street - Suite 2004 Nashville, NC 27856 Re: Report of Subsurface Investigation Middlesex Corporate Park, Lot 3 Middlesex, North Carolina GeoTechnologies

More information

EEI PROJECT NUMBER 5891G-NC PREPARED FOR: HILCO LTD 1435 US HIGHWAY 285 N KINSTON, NC SUBMITTED BY: MATTHEW C. KIRCHNER, E.I.

EEI PROJECT NUMBER 5891G-NC PREPARED FOR: HILCO LTD 1435 US HIGHWAY 285 N KINSTON, NC SUBMITTED BY: MATTHEW C. KIRCHNER, E.I. SUMMARY REPORT OF GEOTECHNICAL SUBSURFACE EXPLORATION AND ENGINEERING EVALUATION PROPOSED PINEY GROVE NURSING & REHABILIATION CENTER EXPANSION 728 PINEY GROVE RD KERNERSVILLE, NORTH CAROLINA EEI PROJECT

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Pavement Subgrade Survey State Highway 125 over Hudson Creek Ottawa County, Oklahoma September 23, 21 Terracon Project No. 415121 Prepared for: Guy Engineering Services,

More information

Subsurface Investigation and Geotechnical Engineering Report Proposed Volvo Dealership 1022 Hingham Street Rockland, Massachusetts

Subsurface Investigation and Geotechnical Engineering Report Proposed Volvo Dealership 1022 Hingham Street Rockland, Massachusetts HML ASSOCIATES Geotechnical and Civil Engineers March 31, 17 19 Rockwood Road Hingham, MA 43 (Phone/Fax)781-74-9999 Mr. Joe Rose Prime Motor Group 42 Providence Highway Westwood, MA 9 RE: Subsurface Investigation

More information

This report presents the findings of the subsurface exploration concerning the design of the taxiway rehabilitation. Description

This report presents the findings of the subsurface exploration concerning the design of the taxiway rehabilitation. Description September 22, 2016 American Infrastructure Development, Inc. 3810 Northdale Boulevard, Suite 170 Tampa, Florida 33624 Attn: Mr. Mohsen Mohammadi, Ph.D., P.E. Senior Consultant Mob: (813) 244-6609 E-mail:

More information

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 6 SANFORD, FLORIDA

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 6 SANFORD, FLORIDA PRELIMINARY GEOTECHNICAL STUDY ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 6 SANFORD, FLORIDA November 9, 2015 Prepared For: Ms. Diane H. Crews, A.A.E. Sanford Airport Authority 1200 Red Cleveland

More information

April 21, Odom Investments, Inc. Attn: Mr. Jerry Odom 7100 Westwind Dr., Suite 230 El Paso, TX 79912

April 21, Odom Investments, Inc. Attn: Mr. Jerry Odom 7100 Westwind Dr., Suite 230 El Paso, TX 79912 April 21, 2016 Odom Investments, Inc. Attn: Mr. Jerry Odom 7100 Westwind Dr., Suite 230 El Paso, TX 79912 Re: GEOTECHNICAL ENGINEERING REPORT Proposed San Elizario Retail Center Socorro Road & Chicken

More information

1.0 PROJECT INFORMATION. 1.1 Site Location and Description. October 31, 2017

1.0 PROJECT INFORMATION. 1.1 Site Location and Description. October 31, 2017 October 31, 2017 City of Oelwein c/o Fox Engineering 414 South 17 th Street, Suite 107 Ames, IA 50010 Attn: Re: Ms. Jessica M.B. Fisher, P.E. Project Manager P: (515) 233-0000 E: jmf@foxeng.com Proposal

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Parking Lot Evaluation & Physical Plant Additions Rogers State University Claremore, Oklahoma May 20, 2015 Terracon Project No. 04155080 Prepared for: Rogers State University

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION ANALYSIS AND RECOMMENDATIONS PROPOSED WEIRS AT STATIONS 130+00 AND 16+00 DRAINAGE IMPROVEMENTS TO THE FOUR CORNERS MSBU HENDRY COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical,

More information

MEMORANDUM. TO: STUART OLSON DOMINION CONSTRUCTION LTD. DATE: JANUARY 31, 14 ATTENTION: MR. Dave Bauder, Construction Manager KENNY K. C.KO, P.ENG.

MEMORANDUM. TO: STUART OLSON DOMINION CONSTRUCTION LTD. DATE: JANUARY 31, 14 ATTENTION: MR. Dave Bauder, Construction Manager KENNY K. C.KO, P.ENG. MEMORANDUM Levelton Consultants Ltd. 150-12791 Clarke Place Richmond, BC V6V 2H9 Canada Tel: 604 278-1411 Fax: 604 278-1042 E-Mail: rhillaby@levelton.com Web Site: www.levelton.com TO: STUART OLSON DOMINION

More information

GEOTECHNICAL ENGINEERING REPORT

GEOTECHNICAL ENGINEERING REPORT GEOTECHNICAL ENGINEERING REPORT PROJECT MINECRAFT ACCESS ROAD BOYDTON PLANK ROAD DINWIDDIE COUNTY, VIRGINIA JOB NUMBER: 37775.003 PREPARED FOR: DINWIDDIE COUNTY PO BOX 70 DINWIDDIE COUNTY, STATE 23841

More information

PROJECT INFORMATION... 1 SITE AND SUBSURFACE CONDITIONS... 2 EVALUATION AND RECOMMENDATIONS... 4 CONSTRUCTION CONSIDERATIONS... 5

PROJECT INFORMATION... 1 SITE AND SUBSURFACE CONDITIONS... 2 EVALUATION AND RECOMMENDATIONS... 4 CONSTRUCTION CONSIDERATIONS... 5 TABLE OF CONTENTS Page No. PROJECT INFORMATION... 1 Project Authorization... 1 Project Description... 1 Purpose and Scope of Services... 1 SITE AND SUBSURFACE CONDITIONS... 2 Site Location and Description...

More information

Subsurface Environmental Investigation

Subsurface Environmental Investigation Subsurface Environmental Investigation Lake Development East Lake and 21 st Avenue South February 23, 201 Terracon Project No. MP14738A Prepared for: Minneapolis Public Schools Prepared by: Terracon Consultants,

More information

REPORT OF GEOTECHNICAL EXPLORATION KINLOCK FM REPLACEMENT NEW MANHOLE STRUCTURE JACKSONVILLE, FLORIDA ECS PROJECT NO A CLIENT ID: 0199

REPORT OF GEOTECHNICAL EXPLORATION KINLOCK FM REPLACEMENT NEW MANHOLE STRUCTURE JACKSONVILLE, FLORIDA ECS PROJECT NO A CLIENT ID: 0199 REPORT OF GEOTECHNICAL EXPLORATION KINLOCK FM REPLACEMENT NEW MANHOLE STRUCTURE JACKSONVILLE, FLORIDA ECS PROJECT NO. 3-6187-A CLIENT ID: 0199 Prepared for: JEA 1 West Church Street Jacksonville, Florida

More information

SUBSURFACE EXPLORATION & GEOTECHNICAL ENGINEERING EVALUATION

SUBSURFACE EXPLORATION & GEOTECHNICAL ENGINEERING EVALUATION Report of Subsurface Exploration and Geotechnical Engineering Evaluation Proposed Courtyard Marriott Phenix City, Alabama BHATE Project Number: 112263 October 9, 2012 SUBSURFACE EXPLORATION & GEOTECHNICAL

More information

GEOTECHNICAL ENGINEERING REPORT

GEOTECHNICAL ENGINEERING REPORT GEOTECHNICAL ENGINEERING REPORT INNSBROOK DOMINION BOULEVARD OUTPARCEL 4101 DOMINION BOULEVARD HENRICO COUNTY, VIRGINIA JOB NUMBER: 36310 PREPARED FOR: BELLEAU WOOD DEVELOPMENT P.O. BOX 2022 BURLINGTON,

More information

For. Report of Geotechnical Exploration. University of North Florida Parking Lot 11 Jacksonville, Florida

For. Report of Geotechnical Exploration. University of North Florida Parking Lot 11 Jacksonville, Florida Report of Geotechnical Exploration For University of North Florida Parking Lot 11 Jacksonville, Florida MAE Project No. 0019-0008 January 13, 2017 Prepared for: GAI Consultants 1301 Riverplace Boulevard,

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report O Reilly Auto Parts Store 1311 E. Nine Mile Road Highland Springs, Virginia August 8, 2012 Project No. 70125105 Prepared for: Oglesby Partners, Inc. Chattanooga, Tennessee

More information

Sepetember 27, Florida Department of Environmental Protection Attn: Dawn Templin 160 Governmental Center Pensacola, FL

Sepetember 27, Florida Department of Environmental Protection Attn: Dawn Templin 160 Governmental Center Pensacola, FL Bay County Solid Waste 11411 Landfill Rd. Panama City Beach, Florida 32413 Telephone: (850) 236-2212 Fax: (850) 233-5053 Board of County Commissioners www.baycountyfl.gov Sepetember 27, 2018 Florida Department

More information

GEOTECHNICAL INVESTIGATION

GEOTECHNICAL INVESTIGATION GEOTECHNICAL INVESTIGATION SHEETZ CONVENIENCE STORE STEUBENVILLE PIKE ROBINSON TOWNSHIP, PENNSYLVANIA Prepared For: Mr. David J. Mastrostefano, P.E. Sheetz Incorporated 817 Brookfield Drive Seven Fields,

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Milepost 210 to 218 Drainage Structure Pipe Jacking Creek County, Oklahoma July 1, 2016 Terracon Project No. 04165017 Prepared for: Benham Tulsa,

More information

Civil Geotechnical Surveying

Civil Geotechnical Surveying Civil Geotechnical Surveying Mr. David Burnett Cabarrus County Schools 4425 Old Airport Road Charlotte, North Carolina 28025 May 16, 2017 Reference: Geotechnical Engineering Evaluation Future PLC Site

More information

TABLE OF CONTENTS 1.00 INTRODUCTION GENERAL PROJECT DESCRIPTION SUBSURFACE EXPLORATION SUBSURFACE CONDITIONS...

TABLE OF CONTENTS 1.00 INTRODUCTION GENERAL PROJECT DESCRIPTION SUBSURFACE EXPLORATION SUBSURFACE CONDITIONS... TABLE OF CONTENTS 1.00 INTRODUCTION...1 1.10 GENERAL...1 1.20 PROJECT DESCRIPTION...1 2.00 SUBSURFACE EXPLORATION...2 3.00 SUBSURFACE CONDITIONS...3 4.00 GEOTECHNICAL CONSIDERATIONS AND RECOMMENDATIONS...4

More information

August 3, 2018 TTL Project No Supplemental Test Borings Cleveland Bulk Terminal Cleveland, Ohio

August 3, 2018 TTL Project No Supplemental Test Borings Cleveland Bulk Terminal Cleveland, Ohio 1915 North 12 th Street Toledo, OH 43604-5305 T 419-324-2222 F 419-241-1808 www.ttlassoc.com August 3, 2018 TTL Project No. 1706701 Mr. Vito Melilli Coastal Engineer KS Associates, Inc. 260 Burns Road,

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Milepost 203 to 210 Drainage Structure Pipe Jacking Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC

More information

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota 57104 Phone 605-335-5512 Fax 605-335-0773 September 8, 2016 City of Viborg 101 N. Main Street 57070 Attn:

More information

REPORT OF GEOTECHNICAL CONSULTING SERVICES

REPORT OF GEOTECHNICAL CONSULTING SERVICES REPORT OF GEOTECHNICAL CONSULTING SERVICES Escambia County Public Works Department Thompson, Crary and McNeal Roadway Project Escambia County, Century,FL Thompson Engineering Project No.: 15-1101-0297

More information

TEAM Services. Subsurface Exploration Grant Wood Elementary Future Additions - Bettendorf, Iowa Project No November 29, 2016 TABLE OF CONTENTS

TEAM Services. Subsurface Exploration Grant Wood Elementary Future Additions - Bettendorf, Iowa Project No November 29, 2016 TABLE OF CONTENTS Subsurface Exploration Grant Wood Elementary Future Additions - Bettendorf, Iowa Project No. 1-00 November 29, 20 TEAM Services TABLE OF CONTENTS PROJECT INFORMATION... 1 SITE CONDITIONS... 1 FIELD EXPLORATION...

More information

Proposed Family Dollar Store Watford City, North Dakota. 7B Building & Development Lubbock, Texas January 26, Terracon Project No.

Proposed Family Dollar Store Watford City, North Dakota. 7B Building & Development Lubbock, Texas January 26, Terracon Project No. Proposed Family Dollar Store Watford City, North Dakota Terracon Project No. M5165122 Prepared for: 7B Building & Development Lubbock, Texas January 26, 2017 January 26, 2017 7B Building & Development

More information

REPORT OF GEOTECHNICAL EXPLORATION BYFORGE ENGINEERING FOR REFERENCE ONLY

REPORT OF GEOTECHNICAL EXPLORATION BYFORGE ENGINEERING FOR REFERENCE ONLY REPORT OF GEOTECHNICAL EXPLORATION BYFORGE ENGINEERING FOR REFERENCE ONLY HERITAGE BAY MASTER PUMP STATION ISSUED FOR BID REPORT OF GEOTECHNICAL EXPLORATION PROPOSED INLINE WASTEWATER BOOSTER STATION Collier

More information

Washtenaw Community College Design & Construction Facilities Management 4800 East Huron River Drive Ann Arbor, MI

Washtenaw Community College Design & Construction Facilities Management 4800 East Huron River Drive Ann Arbor, MI Washtenaw Community College Design & Construction Facilities Management 4800 East Huron River Drive Ann Arbor, MI 4810-4800 GEOTECHNICAL INVESTIGATION FOR Proposed Pavement Rehabilitation Parking Lots

More information

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota 57104 Phone 605-335-5512 Fax 605-335-0773 May 10, 2016 Banner Associates, Inc. 2307 W. 57 th Street, Suite

More information

GEOTECHNICAL ENGINEERING STUDY. MERIWETHER LEWIS ELECTRIC COOPERATIVE BUILDING Houston/Stewart County Industrial Park AG & E FILE NUMBER:

GEOTECHNICAL ENGINEERING STUDY. MERIWETHER LEWIS ELECTRIC COOPERATIVE BUILDING Houston/Stewart County Industrial Park AG & E FILE NUMBER: GEOTECHNICAL ENGINEERING STUDY MERIWETHER LEWIS ELECTRIC COOPERATIVE BUILDING Houston/Stewart County Industrial Park AG & E FILE NUMBER: 016-043 Prepared By American Geotechnical & Environmental, Inc.

More information

PROPOSED CONDOS 1129 Victoria Drive, Dunedin Parcel: , Pinellas County Geotechnical Services June Report No.

PROPOSED CONDOS 1129 Victoria Drive, Dunedin Parcel: , Pinellas County Geotechnical Services June Report No. Central Florida Testing Laboratories, Inc. Testing, Development and Research 12625-40th Street North Clearwater, Florida 33762 ENGINEERING BUSINESS NO. 1066 GEOLOGY BUSINESS NO. 224 TAMPA BAY AREA (727)

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Science & Health Careers Center Oakton Community College Des Plaines, Illinois October 4, 11 Terracon Project No. 1110 Prepared for: Oakton Community College Des Plaines,

More information

Geotechnical Exploration and Evaluation Report

Geotechnical Exploration and Evaluation Report Geotechnical Exploration and Evaluation Report Pavement Coring and Evaluation UNF Parking Lot 3 Jacksonville, Florida CSI Geo Project No.: 71-18-135-23 Prepared by CSI Geo, Inc. 2394 St. Johns Bluff Road

More information

FIGURES Printed By: aday Print Date: 3/23/2011 12:48:08 PM File Name: \\geodesign.local\files\jobs\m-r\penskeauto\penskeauto-1\penskeauto-1-01\figures\cad\penskeauto-1-01-vm01.dwg Layout: FIGURE 1 VICINITY

More information

SUBSURFACE EXPLORATION RECOMMENDATIONS

SUBSURFACE EXPLORATION RECOMMENDATIONS SUBSURFACE EXPLORATION RECOMMENDATIONS PROPOSED STONEBRIDGE INDUSTRIAL DEVELOPMENT Lafayette Center and Fogwell Drive Fort Wayne (Allen County), Indiana GME TESTING PROJECT NO. G13-052421 PREPARED FOR

More information

Mr. Cliff Bates, VP of Development The Park Companies 124 One Madison Plaza, Suite 1500 Madison, Mississippi Report No.

Mr. Cliff Bates, VP of Development The Park Companies 124 One Madison Plaza, Suite 1500 Madison, Mississippi Report No. January 29, 19 Mr. Cliff Bates, VP of Development The Park Companies 124 One Madison Plaza, Suite 0 Madison, Mississippi 391 Report No.180667 Geotechnical Exploration The Park at Barton Residential Community

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Anderson County Hospital 421 S. Maple Street Garnett, KS December 14, 2012 Terracon Project No. 021221 Prepared for: Saint Luke s Health System, Inc. Kansas City, MO Prepared

More information

PAVEMENT DESIGN SUMMARY TANGERINE ROAD CORRIDOR PROJECT INTERSTATE 10 TO LA CANADA DRIVE PIMA COUNTY, ARIZONA

PAVEMENT DESIGN SUMMARY TANGERINE ROAD CORRIDOR PROJECT INTERSTATE 10 TO LA CANADA DRIVE PIMA COUNTY, ARIZONA PAVEMENT DESIGN SUMMARY TANGERINE ROAD CORRIDOR PROJECT INTETATE 10 TO LA CANADA DRIVE PIMA COUNTY, ARIZONA Terracon Project No. 3105079, Revision 3 1.0 INTRODUCTION This report presents the results of

More information

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 1 SANFORD, FLORIDA

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 1 SANFORD, FLORIDA PRELIMINARY GEOTECHNICAL STUDY ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 1 SANFORD, FLORIDA November 9, 2015 Prepared For: Ms. Diane H. Crews, A.A.E. Sanford Airport Authority 1200 Red Cleveland

More information

Geotechnical Engineering Report Proposed Communications Tower Spain Park Site Hoover, Alabama

Geotechnical Engineering Report Proposed Communications Tower Spain Park Site Hoover, Alabama Geotechnical Engineering Report Proposed Communications Tower Spain Park Site Hoover, Alabama July 24, 2014 Terracon Project No. E1145095 Prepared for: The City Of Hoover Hoover, Alabama Prepared by: Terracon

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Proposed Dollar General Miller, Missouri December 8, 2014 Project No. B5145058 Prepared for: Overland Properties, LLC (adba) RSBR Investments, LLC (adba) RBA Investments,

More information

CONDUCTED FOR: PREPARED FOR: 5 May 2016 YPC Project No. 16GY146

CONDUCTED FOR: PREPARED FOR: 5 May 2016 YPC Project No. 16GY146 GEOTECHNICAL EXPLORATION SERVICES REPORT CONDUCTED FOR: Collier Boulevard PREPARED FOR: Mr. Christopher L. Johnson Director of Land Development Stock Development, LLC Professional Circle, Suite 01 Naples,

More information

SOIL AND FOUNDATION INVESTIGATION PROPOSED DUPLEX 3966 VRAIN STREET DENVER, COLORADO

SOIL AND FOUNDATION INVESTIGATION PROPOSED DUPLEX 3966 VRAIN STREET DENVER, COLORADO SOIL AND FOUNDATION INVESTIGATION PROPOSED DUPLEX 3966 VRAIN STREET DENVER, COLORADO Prepared for: G.J. GARDNER HOMES ATTN: DAVE PAGANO 7660 RALEIGH STREET WESTMINSTER, COLORADO 80030 PROJECT NO. 1090

More information

REPORT OF SUBSURFACE EXPLORATION. Burn and Rescue Facility Spartanburg County Emergency Services Academy Duncan, SC GeoTrack Project No.

REPORT OF SUBSURFACE EXPLORATION. Burn and Rescue Facility Spartanburg County Emergency Services Academy Duncan, SC GeoTrack Project No. 3620 Pelham Road, PMB #292 Phone: 8643290013 Greenville, SC 296155044 FAX: 8643290014 REPORT OF SUBSURFACE EXPLORATION Burn and Rescue Facility Spartanburg County Emergency Services Academy Duncan, SC

More information

GEOTECHNICAL INVESTIGATION. Proposed WONDERLAND MONTESSORI ACADEMY Legacy Drive Prosper, Texas PROJECT NO. 18-DG9174.

GEOTECHNICAL INVESTIGATION. Proposed WONDERLAND MONTESSORI ACADEMY Legacy Drive Prosper, Texas PROJECT NO. 18-DG9174. GEOTECHNICAL INVESTIGATION Proposed WONDERLAND MONTESSORI ACADEMY PROJECT NO. 18-DG9174 Prepared for: Mr. SANJAY JOSHI Flower Mound, Texas Prepared by: GEOSCIENCE ENGINEERING & TESTING, INC. Dallas, Texas

More information

GEOTECHNICAL INVESTIGATION. Proposed RETAIL DEVELOPEMNT 1300 W. Pflugerville Parkway Pflugerville, Texas PROJECT NO. 17-DG8780.

GEOTECHNICAL INVESTIGATION. Proposed RETAIL DEVELOPEMNT 1300 W. Pflugerville Parkway Pflugerville, Texas PROJECT NO. 17-DG8780. GEOTECHNICAL INVESTIGATION PROJECT NO. 17-DG8780 Prepared for: PROFESSIONAL STRUCIVIL ENGINEERS, INC Austin, Texas Prepared by: GEOSCIENCE ENGINEERING & TESTING, INC. Dallas, Texas October, 2017 2712 Satsuma

More information

SECTION EARTHWORK

SECTION EARTHWORK SECTION 02200 EARTHWORK PART 1 - GENERAL 1.01 WORK INVOLVED A. Provide all labor, materials and equipment as required for all excavation, grading, providing borrow materials, hauling, placing and compacting

More information

Geotechnical Engineering Report

Geotechnical Engineering Report BIG CYPRESS SEMINOLE INDIAN RESERVATION WATER TREATMENT FACILITY October 29, 2015 Terracon Project No. HD155065 Prepared for: REISS ENGINEERING, INC. 1016 Spring Villas Pt. Winter Springs, FL 32708 Prepared

More information

PROJECT NO A. ISSUED: February 29, 2016

PROJECT NO A. ISSUED: February 29, 2016 INTERPRETIVE REPORT FOR INFILTRATION SYSTEM DESIGN, PROPOSED VILLA VERONA APARTMENT COMMUNITY, ASSESSOR S PARCEL NUMBERS 311-040-015, 311-040-021, 311-040-024, 311-040-026 AND 311-040-013, LOCATED ON THE

More information

PRELIMINARY GEOTECHNICAL INVESTIGATION UCCS ACADEMIC OFFICE BUILDING COLORADO SPRINGS, COLORADO

PRELIMINARY GEOTECHNICAL INVESTIGATION UCCS ACADEMIC OFFICE BUILDING COLORADO SPRINGS, COLORADO PRELIMINARY GEOTECHNICAL INVESTIGATION UCCS COLORADO SPRINGS COLORADO Prepared for: UNIVERSITY OF COLORADO AT COLORADO SPRINGS Facilities Services 1420 Austin Bluffs Parkway Colorado Springs Colorado 80918

More information

SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL

SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 00 and Division

More information

August 13, Geotechnical Recommendations, New Physical Education Building, Chabot College, Hayward, California

August 13, Geotechnical Recommendations, New Physical Education Building, Chabot College, Hayward, California August 13, 2008 003-09176-17 Douglas Horner, AIA Chabot Las Positas Community College District 25555 Hesperian Boulevard Hayward, California 94545 Subject: Geotechnical Recommendations, New Physical Education

More information

For. Report of Geotechnical Exploration. Beaver St Lane Ave to Carnegie St Trans Water Main Project Jacksonville, FL

For. Report of Geotechnical Exploration. Beaver St Lane Ave to Carnegie St Trans Water Main Project Jacksonville, FL Report of Geotechnical Exploration For Beaver St Lane Ave to Carnegie St Trans Water Main Project Jacksonville, FL MAE Project No. 0106-0002.02 March 30, 2017 Prepared for: CPH, Inc. 5200 Belfort Road,

More information

GEOTECHNICAL ENGINEERING REPORT

GEOTECHNICAL ENGINEERING REPORT GEOTECHNICAL ENGINEERING REPORT 58.6 ROAD (KIMBALL CREEK) 58.9 ROAD TO 58.7 ROAD MESA COUNTY, COLORADO February 9, 2018 Prepared By: Prepared For: Mr. Eric Krch, P.E. SGM, Inc. 744 Horizon Court, Suite

More information

GEOTECHNICAL EXPLORATION and ENGINEERING REPORT. Proposed Sebright Products Expansion Wayland Township, Allegan County, Michigan

GEOTECHNICAL EXPLORATION and ENGINEERING REPORT. Proposed Sebright Products Expansion Wayland Township, Allegan County, Michigan GEOTECHNICAL EXPLORATION and ENGINEERING REPORT Wayland Township, Allegan County, Michigan HOPPE DESIGN, LLC Belleville, Michigan Mr. Wayde Hoppe, AIA HOPPE Design, LLC 47032 McBride Belleville, Michigan

More information

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota 57104 Phone 605-335-5512 Fax 605-335-0773 November 1, 2016 City of Viborg PO Box 56 57070-0056 Attn: Lori

More information

REPORT GEOTECHNICAL STUDY PROPOSED 8-WARD YSA MEETINGHOUSES APPROXIMATELY 1345 EAST 1100 NORTH LOGAN, UTAH LDS PROPERTY NUMBER:

REPORT GEOTECHNICAL STUDY PROPOSED 8-WARD YSA MEETINGHOUSES APPROXIMATELY 1345 EAST 1100 NORTH LOGAN, UTAH LDS PROPERTY NUMBER: REPORT GEOTECHNICAL STUDY PROPOSED 8-WARD YSA MEETINGHOUSES APPROXIMATELY 1345 EAST 1100 NORTH LOGAN, UTAH LDS PROPERTY NUMBER: 500-6455 Submitted To: The Church of Jesus Christ of Latter-Day Saints Butler

More information

GEOTECHNICAL INVESTIGATION

GEOTECHNICAL INVESTIGATION GEOTECHNICAL INVESTIGATION 1 08 Railway Avenue South Milo, AB Prepared for: 108 Railway Avenue South Milo, Alberta TOL 1LO Date: File: 216-2883-001 GEOTECHNICAL INVESTIGATION 108 Railway Avenue South,

More information

SECTION FILL AND BACKFILL

SECTION FILL AND BACKFILL PART 1 GENERAL 1.1 SECTION INCLUDES A. Filling, backfilling, and compacting for building volume below grade, footings, slabs-on-grade, paving, site structures, and utilities within the building. B. Backfilling

More information

LEWIS COUNTY JEFFERSON COMMUNITY COLLEGE EDUCATIONAL CENTER PROJECT

LEWIS COUNTY JEFFERSON COMMUNITY COLLEGE EDUCATIONAL CENTER PROJECT LEWIS COUNTY JEFFERSON COMMUNITY COLLEGE EDUCATIONAL CENTER PROJECT Bid Package #1: Site, Utilities, and Structural Supplemental Information to the Contract Documents JUNE 22, 2018 Prepared By: C&S ENGINEERS,

More information

APPENDIX A GEOTECHNICAL REPORT

APPENDIX A GEOTECHNICAL REPORT The City of Winnipeg Bid Opportunity No. 5-06 Template Version: C40606 - RW APPENDIX A GEOTECHNICAL REPORT AECOM 99 Commerce Drive 04 477 538 tel Winnipeg, MB, Canada R3P 0Y7 04 84 040 fax www.aecom.com

More information

Report of Geotechnical Exploration For. University of North Florida Kernan Shuttle Stop Jacksonville, Florida

Report of Geotechnical Exploration For. University of North Florida Kernan Shuttle Stop Jacksonville, Florida Report of Geotechnical Exploration For University of North Florida Kernan Shuttle Stop Jacksonville, Florida MAE Project No. 0016-0023 March 18, 2015 Prepared for: Prepared by: Jacksonville, Florida 32256

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Mobile Offices and Future Service Center Range Road Eglin Air Force Base, Florida November 2, 2016 Project No. EA165075 Prepared for: American States Utility Services, Inc. Prepared by: Terracon Consultants,

More information

PROJECT INFORMATION EVALUATION PROCEDURES

PROJECT INFORMATION EVALUATION PROCEDURES April 10, 2012 Board of Directors Hunters Ridge Amenities Association, Inc. 422 Hunters Circle Greenville, SC 29617 Attention: Mr. Jerry Miller Mr. Bruce Williams Re: Engineering Evaluation of Existing

More information

T. Brian Williamson, P.E. Matthew B. Haston, P.E.

T. Brian Williamson, P.E. Matthew B. Haston, P.E. September 22, 2017 Realty Link, LLC 550 South Main Street Greenville, South Carolina 29601 ATTENTION: Subject: Mr. Chris Swale cswale@realtylinkdev.com REPORT OF GEOTECHNICAL EXPLORATION Oak Ridge Main

More information

GEOTECHNICAL EXPLORATION REPORT. For the

GEOTECHNICAL EXPLORATION REPORT. For the GEOTECHNICAL EXORATION REPORT For the Proposed North th Street to North 8 th Street Milwaukee, Wisconsin Prepared for: Housing Authority of the City of Milwaukee 89 North Broadway Prepared by: () - ()