TABLE OF CONTENTS I. PARTIES TO THE CONSTRUCTION PROJECT...1 A. OWNER...1 B. ARCHITECT...1 C. INSPECTING ARCHITECT...1 D. CONTRACTOR...

Size: px
Start display at page:

Download "TABLE OF CONTENTS I. PARTIES TO THE CONSTRUCTION PROJECT...1 A. OWNER...1 B. ARCHITECT...1 C. INSPECTING ARCHITECT...1 D. CONTRACTOR..."

Transcription

1 Page TABLE OF CONTENTS I. PARTIES TO THE CONSTRUCTION PROJECT...1 A. OWNER...1 B. ARCHITECT...1 C. INSPECTING ARCHITECT...1 D. CONTRACTOR...1 E. SUBCONTRACTOR...1 F. CONSTRUCTION MANAGER...1 II. THE CONTRACT DOCUMENTS...2 A. BASIC CONTRACT...2 B. GENERAL CONDITIONS...2 C. SUPPLEMENTAL GENERAL CONDITIONS...2 D. PLANS...2 III. PROJECT DELIVERY SYSTEMS...2 A. DESIGN-BID-BUILD...2 B. CONSTRUCTION MANAGEMENT (Not at Risk)...3 C. CONSTRUCTION MANAGEMENT (At Risk As The Constructor)...4 D. DESIGN BUILD...4 IV. CONTRACTING FOR CONSTRUCTION SERVICES...5 A. PRICING CONCERNS...5 B. CONTRACT DOCUMENTS...5 C. AMERICAN INSTITUTE OF ARCHITECTS (AIA) CONSTRUCTION DOCUMENTS...6 V. AIA A 201 GENERAL CONDITIONS...10 ARTICLE 1. GENERAL PROVISIONS...10

2 Page ARTICLE 2. OWNER...11 ARTICLE 3. CONTRACTOR...12 ARTICLE 4 ADMINISTRATION OF THE CONTRACT...15 ARTICLE 5 SUBCONTRACTORS...16 ARTICLE 6 CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS16 ARTICLE 7 CHANGES IN THE WORK...16 ARTICLE 10 PROTECTION OF PERSONS AND PROPERTY...18 ARTICLE 12 UNCOVERING AND CORRECTION OF WORK...19 ARTICLE 13 MISCELLANEOUS PROVISIONS...20 ARTICLE 14 TERMINATION OR SUSPENSION OF THE CONTRACT...20 VII. EARLY SIGNALS OF THE TROUBLED PROJECT...23 VIII. PROTECTION AGAINST MECHANICS' LIEN CLAIMS...24 A. GENERAL CONTRACTOR'S STATEMENT...24 B. WAIVERS OF MECHANICS' LIEN...24 IX. PERFORMANCE GUARANTEES...25 A. NATURE OF SURETYSHIP...25 B. THE BID BOND...25 C. THE PERFORMANCE BOND...25 D. THE PAYMENT BOND...25 X. ALTERNATE DISPUTE RESOLUTION METHODS...26

3 I. PARTIES TO THE CONSTRUCTION PROJECT A. OWNER The person or entity which owns the project. An owner may also be the general contractor for the project, provided it has experience to do so. The inexperienced owner should avoid assuming such a responsibility, but if it wishes to do so, however, it should consider employing a construction manager rather than a general contractor. B. ARCHITECT The person or entity licensed by the state to practice architecture or it may be a structural engineer employed by the Owner to design the project and who will monitor the construction of the project in order to assure that construction is in accordance with the plans and specifications prepared by the Architect and approved by the Owner and Contractor. C. INSPECTING ARCHITECT The person or entity engaged by the lender to independently check and verify that the progress of construction conforms to the plans, specifications and Contract Documents in order to permit construction loan payments to the contractor. Her responsibility is not to the Owner but to the lender, to assure the lender that the lender is paying for true construction costs and not "dreams and to assure lender priority. D. CONTRACTOR The person or entity who has been employed directly by the Owner to build or coordinate construction of the project in accordance with the plans, specifications and Contract Documents. The General or Prime Contractor has the overall responsibility of construction of the job as opposed to the Subcontractor. E. SUBCONTRACTOR The entity engaged by the Contractor to perform a specific portion of the work, such as plumbing, excavation, heating, ventilating, and air conditioning. F. CONSTRUCTION MANAGER The person or entity that performs the planning, advisory and supervisory functions that would otherwise be divided among the Architect, Owner and General Contractor. Unlike the traditional General Contractor, is not "at risk" if it is an agency construction Manager. He does not pay the subcontractors from his own funds but acts as a conduit for payment by the Owner, and as such he is the agent of the Owner and can legally bind the owner to his acts.

4 II. THE CONTRACT DOCUMENTS A. BASIC CONTRACT This is the agreement which defines the project scope, penalties for failure to perform on schedule and in accordance with the plans and specifications, the payment process and documents required for each payment request, usually referred to as the Draw. Simply stated, it contains the business terms of the transaction. Contract Price is usually fixed at the inception of the project by the subcontractor prices, the so-called Buyout. B. GENERAL CONDITIONS While considered a Contract Document, it contain the administrative procedures such as definitions, owner responsibility, contractor responsibility, dispute resolution procedures, payment procedures and insurance requirements as well as termination procedures. The most widely accepted form of General Condition is that which is published by the American Institute of Architects and commonly referred to the A201. The most recent edition was published in Fall, C. SUPPLEMENTAL GENERAL CONDITIONS This is also considered a Contract Document and is customarily produced by the architect or other design professional and is tailored to the specific project. D. PLANS This represents the graphic depiction of the project. E. SPECIFICATIONS This Contract Documents expands upon the Plans and is a narrative of details not readily apparent from the Plans. It customarily follows the format of the Construction Specifications Institute (CSI) and consists of 12 sections, one for each trade or building component. III. PROJECT DELIVERY SYSTEMS A. DESIGN-BID-BUILD 1. Defined A tri-party, three phase linear sequencing system with Owner/contractor/design professional, where the owner has separate, independent contracts with contractor and design professional /C/1 8NFF01_ 2

5 2. Use It is most often used for conventional projects and is readily usable for virtually any type of project. However, public agencies use it due to statutory requirements that public owners must award the contract to the lowest responsible bidder which can only be properly administered by this process. 3. Advantages It is familiar and easy to understand and it is also easier to compare costs due to the use of the competitive bidding process. The roles and designated functions of the parties minimize potential conflicts of interest. Completion of design prior to commencement of construction leads to reliable cost of construction. It is also easier for owners to manage due to linear sequencing making scheduling a sequential and linear process without overlapping activities. Architect allegiance is only to owner and not to the contractor. 4. Disadvantages Linear sequencing can cause a lengthy construction process and a delay in any one sequence impacts upon other sequences causing further delays. The separation of design and construction functions can inhibit communications between design professional and constructor and increases potential for litigation Accurate cost of construction cannot be complete until design is completed by the architect, and if the responsive bids too high there could be a further delay due to necessity to redesign and re-bid B. CONSTRUCTION MANAGEMENT (Not at Risk) 1. Defined The Construction Manager acts in advisory role with design professional and contractor in their conventional roles There are four prime parties: Owner, Construction Manager, Contractor and Design Professional. It is the Construction Manager who oversees design in terms of cost, schedule and constructibility and then oversees the construction phase as an advisor or agent of the owner. 2. Use It is often used on large, complex projects. 3. Advantages /C/1 8NFF01_ 3

Project Delivery Options: Pros and Cons

Project Delivery Options: Pros and Cons Project Delivery Options: and Traditional Design-Bid-Build Design-bid-build s linear process is easy for owners to manage and understand Owners can actively participate in the design process Scheduling

More information

DESIGN IS GOOD BUSINESS

DESIGN IS GOOD BUSINESS PROJECT DELIVERY: AN INTRODUCTION A profound design process eventually makes the patron, the architect, and every occasional visitor in the building a slightly better human being. JUHANI PALLASMAA The

More information

Construction Documents Education Program

Construction Documents Education Program PLANNING AND PRE-DESIGN THE CONSTRUCTION SPECIFICATIONS INSTITUTE 110 South Union Street, Suite 100 Alexandria, VA 22314-3351 www.csinet.org CDEP 1.0.1: 03-1 Copyright Materials This presentation is protected

More information

G , Request for Proposal Land Survey

G , Request for Proposal Land Survey G601 1994, Request for Proposal Land Survey AIA Document G601 1994 allows owners to request proposals from a number of surveyors based on information deemed necessary by the owner and architect. G601 1994

More information

The documents in the A-Series relate to various forms of agreement between an owner and a contractor.

The documents in the A-Series relate to various forms of agreement between an owner and a contractor. A-Series A- S E R I E S The documents in the A-Series relate to various forms of agreement between an owner and a contractor. A101 Owner-Contractor Agreement Form Stipulated Sum Basis of payment is a stipulated

More information

EJCDC Contract Documents for America s Infrastructure Buy online at

EJCDC Contract Documents for America s Infrastructure Buy online at EJCDC Contract Documents for America s Infrastructure Buy online at www.booksforengineers.com N-122 Uniform Location of Subject Matter (2012) Published jointly with AIA and CSI. FREE DOWNLOAD Construction

More information

Jim Porter is the Director of Public Works for the County of San Mateo. The Department of Public Works has a staff of over 300 and performs a wide

Jim Porter is the Director of Public Works for the County of San Mateo. The Department of Public Works has a staff of over 300 and performs a wide Jim Porter is the Director of Public Works for the County of San Mateo. The Department of Public Works has a staff of over 300 and performs a wide array of design, construction, construction administration,

More information

AIA Contract Documents: Retail Price List

AIA Contract Documents: Retail Price List A Series (Owner-Contractor) Documents The Prices Below are for Single Purchases and Do Not Include Shipping, Handling and Tax AIA Contract Documents: Retail Price List A101-2007 Standard Form of Agreement

More information

COLLINS COCKREL & COLE A PROFESSIONAL CORPORATION

COLLINS COCKREL & COLE A PROFESSIONAL CORPORATION COLLINS COCKREL & COLE A PROFESSIONAL CORPORATION PAUL R. COCKREL JAMES P. COLLINS ROBERT G. COLE TIMOTHY J. FLYNN EVAN D. ELA LINDA M. GLESNE DAVID A. GREHER ATTORNEYS AT LAW 390 UNION BOULEVARD, SUITE

More information

A101 Standard form of agreement between Owner and Contractor-Stipulated sum with instruction sheet wrapped (2017) $55.98

A101 Standard form of agreement between Owner and Contractor-Stipulated sum with instruction sheet wrapped (2017) $55.98 Please note new address! 310 SE 1 Street Miami, Fl 33131 QUESTIONS ABOUT AIA DOCUMENT CONTENT docinfo@aia.org 202.626.7526 Contact: Marilyn Lugo 305.448.7488 WEB: www.aia.org/contractdocs/reference A SERIES

More information

EJCDC Contract Documents for America s Infrastructure Buy online at

EJCDC Contract Documents for America s Infrastructure Buy online at EJCDC Contract Documents for America s Infrastructure Buy online at www.booksforengineers.com N-122 Uniform Location of Subject Matter (2012) Published jointly with AIA and CSI. FREE DOWNLOAD Construction

More information

AIA Contract Documents

AIA Contract Documents AIA Contract Documents Contract Relationship Diagrams April 2017 Conventional (A201) Design-Bid-Build For use when the s project is divided into separate contracts for design () and construction (Contractor).

More information

CONSTRUCTION MANAGEMENT CORE COMPETENCIES

CONSTRUCTION MANAGEMENT CORE COMPETENCIES CONSTRUCTION MANAGEMENT CORE COMPETENCIES A Guide to the Construction Management Core Competencies and their Body of Knowledge CM PROFESSIONAL PRACTICE... 1 CM PROJECT MANAGEMENT... 4 COST MANAGEMENT...

More information

Construction Family of Documents

Construction Family of Documents Construction Family of Documents The EJCDC Construction Family Documents (C-Series) is intended for engineered construction projects. The current edition (2013) is endorsed by both the Construction Specifications

More information

DESIGN CONSTRUCTION: PROJECT DELIVERY METHODS (SUPERPOWERS OPTIONAL!) FISHBECK, THOMPSON, CARR & HUBER engineers scientists architects constructors

DESIGN CONSTRUCTION: PROJECT DELIVERY METHODS (SUPERPOWERS OPTIONAL!) FISHBECK, THOMPSON, CARR & HUBER engineers scientists architects constructors DESIGN CONSTRUCTION: PROJECT DELIVERY METHODS (SUPERPOWERS OPTIONAL!) FISHBECK, THOMPSON, CARR & HUBER engineers scientists architects constructors YOUR SUPERHERO TRAINERS TODAY ADAM NELSON Senior Architectural

More information

A , Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum

A , Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum A101 2007, Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AIA Document A101 2007 is a standard form of agreement between owner and contractor for

More information

EJCDC Contract Documents for America s Infrastructure Buy online at the ACEC Business Resource Center

EJCDC Contract Documents for America s Infrastructure Buy online at the ACEC Business Resource Center EJCDC Contract Documents for America s Infrastructure Buy online at the ACEC Business Resource Center N-122 Uniform Location of Subject Matter (2012) Published jointly with AIA and CSI. FREE DOWNLOAD Construction

More information

Publicly Bid: Negotiated, Non-Bid: Hybrid: 5/12/2017. Design-Bid-Build Multiple-Prime Contracting. Lease-Leaseback* Design-Build

Publicly Bid: Negotiated, Non-Bid: Hybrid: 5/12/2017. Design-Bid-Build Multiple-Prime Contracting. Lease-Leaseback* Design-Build 1 Leigh Sata, Santa Rosa Junior College Kelle Lynch McMahon, Peralta Community College Mark Kelley, Dannis Woliver Kelley Deidree Sakai, Dannis Woliver Kelley 2 1 Publicly Bid: Design-Bid-Build Multiple-Prime

More information

This is EXHIBIT A, consisting of [ ] pages, referred to in and part of the Task Order dated [ ]. Engineer's Services for Task Order

This is EXHIBIT A, consisting of [ ] pages, referred to in and part of the Task Order dated [ ]. Engineer's Services for Task Order This is EXHIBIT A, consisting of [ ] pages, referred to in and part of the Task Order dated [ ]. Engineer's Services for Task Order [Introductory Note to User: The following text as published describes

More information

Document Synopses by Series

Document Synopses by Series Document Synopses by Series AIA Contract Documents are divided into six alphanumeric series by document use or purpose: A Series: Owner/Contractor Agreements B Series: Owner/Architect Agreements (p. 13)

More information

ROLES AND RESPONSIBILITIES

ROLES AND RESPONSIBILITIES Audio Sessions Session 2 ROLES AND RESPONSIBILITIES Education Program Certified Construction Contract Administrator (CCCA) Preparatory Course 2011 The Construction Specifications Institute www.csinet.org

More information

Document Price List Prices effective June 1, 2016

Document Price List Prices effective June 1, 2016 Document Price List Prices effective June 1, 2016 30 N. 3rd Avenue, Suite 200 Phoenix, AZ 85003 (602) 252-4200 (602) 273-6814 Fax www.aia-arizona.org A-series Owner Contractor Agreements A101 2007 Standard

More information

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE St. Charles County Ambulance District Base 3 & Training Facility Construction 4169 Old Mill Parkway St. Peters, MO 63376 September

More information

Audio Sessions. Session 4 PROCUREMENT. Construction Contract Administration Education Program

Audio Sessions. Session 4 PROCUREMENT. Construction Contract Administration Education Program Audio Sessions Session 4 PROCUREMENT Construction Contract Administration Education Program Certified Construction Contract Administrator (CCCA) Preparatory Course 2011 The Construction Specifications

More information

Florida Cleanroom Systems

Florida Cleanroom Systems Florida Cleanroom Systems Design Build Projects / Project Quality Control Plan (PQCP) Quality Control / Quality Assurance Manual May 2010 1 TABLE OF CONTENTS Section 1: Introduction 3 1.1 Defining Plan

More information

PROGRESSIVE DESIGN-BUILD. Praful M. Kulkarni, AIA Iraj Ghaemi, P.E. J. Brandon Dekker, M.S., DBIA

PROGRESSIVE DESIGN-BUILD. Praful M. Kulkarni, AIA Iraj Ghaemi, P.E. J. Brandon Dekker, M.S., DBIA PROGRESSIVE DESIGN-BUILD Praful M. Kulkarni, AIA Iraj Ghaemi, P.E. J. Brandon Dekker, M.S., DBIA ADVANTAGES/DISADVANTAGES DESIGN BID BUILD (HARD BID) The traditional project delivery method, which customarily

More information

SEPARATED PROJECT DELIVERY SYSTEMS

SEPARATED PROJECT DELIVERY SYSTEMS SEPARATED PROJECT DELIVERY SYSTEMS Separated (aka Traditional) The traditional delivery method typically involves three sequential project phases: The design phase, which requires the services of a designer

More information

Document B Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition

Document B Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition Document B132 2009 Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition AGREEMENT made as of the in the year (In words, indicate day, month and year.) BETWEEN

More information

AIA Contract Documents

AIA Contract Documents AIA Contract Documents Availability by series Series Document # Former # Document Title Software Available at AIAOC DOD aia.org A101 2007* A101 2007 SP* A101 2017 A102 2007* A111 1997 A102 2017 A103 2007*

More information

Document B252TM 2007

Document B252TM 2007 Document B252TM 2007 Standard Form of Architect s Services: Architectural Interior Design for the following PROJECT: (Name and location or address) This document has important legal consequences. Consultation

More information

Standard Form of Agreement Between Owner and Contractor where the basis

Standard Form of Agreement Between Owner and Contractor where the basis AIA Rochester - A Chapter of The American Institute of Architects 205 St. Paul Street, 1st Floor, Rochester, NY 14604 (585) 232-7650Telephone Office Hours: Monday Friday 9:00AM 2:00 PM Please call before

More information

AIA Contract Documents

AIA Contract Documents AIA Contract Documents Availability by series Series Document # Former # Document Title Family Software Paper DOD aia.org A101 2007* A101 2007 SP* A101 2017 A102 2007* A111 1997 A102 2017 A103 2007* A114

More information

PROFESSIONAL PRACTICE 544

PROFESSIONAL PRACTICE 544 PROFESSIONAL PRACTICE 544 April 20, 2015 Contracting Methods Alternative Project Delivery Methods Michael J. Hanahan, Esq. Schiff Hardin LLP 233 S. Wacker, Ste. 6600 Chicago, IL 60606 312-258-5701 mhanahan@schiffhardin.com

More information

Educational Use Only S A M P L E S A M P L E

Educational Use Only S A M P L E S A M P L E CONSENSUSDOCS 240 STANDARD FORM OF AGREEMENT BETWEEN OWNER AND ARCHITECT/ENGINEER This document was developed through a collaborative effort of entities representing a wide cross-section of the construction

More information

REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT at RISK SERVICES FOR THE BECKER COUNTY JAIL DETROIT LAKES, MN

REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT at RISK SERVICES FOR THE BECKER COUNTY JAIL DETROIT LAKES, MN REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT at RISK SERVICES FOR THE BECKER COUNTY JAIL DETROIT LAKES, MN Introduction Becker County is issuing a RFQ for Construction Management at Risk Services

More information

CONSTRUCTION DOCUMENTS Part 1

CONSTRUCTION DOCUMENTS Part 1 Audio Presentation Session 4 CONSTRUCTION DOCUMENTS Part 1 Project Delivery Education Program Construction Document Technology (CDT) Preparatory Course 2011 The Construction Specifications Institute www.csinet.org

More information

Procurement Guidelines

Procurement Guidelines Reference 21 CM@Risk Procurement Guidelines Draft June 5, 2014 Purpose: These guidelines are intended to provide (1) assistance to those who may be responsible for implementation, processing and/or management

More information

ALTERNATIVE CONTRACTING METHODS

ALTERNATIVE CONTRACTING METHODS ALTERNATIVE CONTRACTING METHODS Conventional Design-Bid-Build Design/Build Negotiated General Contractor By Jeff Warner, AIA, LEED AP Principal, ALSC Architects CONVENTIONAL DESIGN-BID-BUILD The most traditional

More information

Standard Form of Agreement Between Owner and Architect with Standard Form of Architect s Services

Standard Form of Agreement Between Owner and Architect with Standard Form of Architect s Services B-Series B- S E R I E S The documents in the B Series relate to various forms of agreement between an owner and an architect for professional services. B141 Standard Form of Agreement Between Owner and

More information

ALTERNATE FORMS OF PROJECT DELIVERY

ALTERNATE FORMS OF PROJECT DELIVERY ALTERNATE FORMS OF PROJECT DELIVERY 1 INTRODUCTION 1.1 BACKGROUND.1 In the building industry today, conventional methods of project delivery are being challenged by Clients, Consultants and Contractors

More information

The construction phase, of course, is the execution of the work as required by the contract documents when the building is finally built.

The construction phase, of course, is the execution of the work as required by the contract documents when the building is finally built. L1C4: Commercial Building Fundamentals Lesson 7 Study Guide Construction The construction phase, of course, is the execution of the work as required by the contract documents when the building is finally

More information

State Historic Preservation Office. Bidding, Contracting, and Construction Guidelines for the Historic Restoration Fund

State Historic Preservation Office. Bidding, Contracting, and Construction Guidelines for the Historic Restoration Fund State Historic Preservation Office Bidding, Contracting, and Construction Guidelines for the Historic Restoration Fund April 2014 Table of Contents Conflict of Interest... 3 Floodplains... 3 Hazardous

More information

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk REQUEST FOR PROPOSAL Construction Management Services Not at Risk The St. Charles County Ambulance District proposes to retain a qualified firm/team for the Construction Management Services Not at Risk

More information

Document B101 TM. Standard Form of Agreement Between Owner and Architect

Document B101 TM. Standard Form of Agreement Between Owner and Architect Document B101 TM 2007 Standard Form of Agreement Between Owner and Architect AGREEMENT made as of the day of in the year Two Thousand and BETWEEN the Architect s client identified as the Owner: Capitol

More information

Professional Practice 544

Professional Practice 544 Spring Semester 2017 Professional Practice 544 Michael J. Hanahan Partner Schiff Hardin LLP 233 S. Wacker, Ste. 6600 Chicago, IL 60606 312-258-5701 mhanahan@schiffhardin.com Schiff Hardin LLP. All rights

More information

AMERICAN INSTITUTE OF ARCHITECTS (AIA) DOCUMENT SUMMARY

AMERICAN INSTITUTE OF ARCHITECTS (AIA) DOCUMENT SUMMARY AMERICAN INSTITUTE OF ARCHITECTS (AIA) DOCUMENT SUMMARY Conventional Project Family A101 2007 (formerly A101 1997) Standard Form of Agreement Between Owner and Contractor where the basis of payment is

More information

Professional Practice 544

Professional Practice 544 Spring Semester 2018 Professional Practice 544 Michael J. Hanahan Partner Schiff Hardin LLP 233 S. Wacker, Ste. 6600 Chicago, IL 60606 312-258-5701 mhanahan@schiffhardin.com Schiff Hardin LLP. All rights

More information

AIA Contract Documents Price List

AIA Contract Documents Price List The American Institute of Architects AIA Contract Documents Price List All products may be purchased from your local AIA Contract Documents Distributor or by calling (800) 365-2724 1/9/2018 Document No.

More information

Analysis I: 4D CAD Analysis

Analysis I: 4D CAD Analysis Analysis I: 4D CAD Analysis Background Combining 3D CAD elements with the schedule of the project produces an image that aids in visualizing the schedule, determining any inconsistencies in the schedule

More information

Project Delivery Systems

Project Delivery Systems Project Delivery Systems National Society of Professional Engineers Alaska Society of Professional Engineers 2011 Western and Pacific Region Annual Meeting and Conference Jeffrey Callahan April 1, 2011

More information

Chapter 4 State Requirements for Educational Facilities Section 4.1

Chapter 4 State Requirements for Educational Facilities Section 4.1 providential cause, other impending danger to life safety, or pursuant to Section 1013.46(1)(b), F.S., the board can declare an emergency, can negotiate a contract with a design-build firm, design professional,

More information

CONSTRUCTION MANAGEMENT. By GREEN PLANET SERVICES Lesley Padayachee Cell:

CONSTRUCTION MANAGEMENT. By GREEN PLANET SERVICES Lesley Padayachee Cell: CONSTRUCTION MANAGEMENT By GREEN PLANET SERVICES Lesley Padayachee Cell: 084 525 4720 Lesley.gpes@gmail.com 5 th FEBRUARY 2013 CONSTRUCTION MANAGEMENT - DEFINED Act of managing the construction process

More information

AIA Arizona Document Price List Prices effective April 2013

AIA Arizona Document Price List Prices effective April 2013 AIA Arizona Document Price List Prices effective April 2013 30 N. 3rd Avenue, Suite 200 Phoenix, AZ 85003 (602) 252-4200 (602) 273-6814 Fax www.aia-arizona.org A-series Owner Contractor Agreements A101

More information

Construction Contracts

Construction Contracts Construction Contracts By Dr. Ibrahim Assakkaf Construction Contracts By Dr. Ibrahim Assakkaf 1 The Need Web-based Contracts Supporting scheduling Controlling Regulating Analyzing Auditing the procurement

More information

Professional Practice 544

Professional Practice 544 February 22, 2016 February 29, 2016 Professional Practice 544 AIA-B101 Owner - Architect Agreement Michael J. Hanahan Schiff Hardin LLP 233 S. Wacker, Ste. 6600 Chicago, IL 60606 312-258-5701 mhanahan@schiffhardin.com

More information

IRVINE UNIFIED SCHOOL DISTRICT CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20

IRVINE UNIFIED SCHOOL DISTRICT CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20 CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20 The Irvine Unified School District ( District ) has determined that bidders on an annual basis must be prequalified prior to submitting a bid on a project

More information

APPENDIX D Forms for Analytical Delivery Decision Approach (Tier 1)

APPENDIX D Forms for Analytical Delivery Decision Approach (Tier 1) APPENDIX D Forms for Analytical Delivery Decision Approach (Tier 1) The first tier in the systematic approach developed in this guidebook is the Analytical Delivery Decision Approach discussed in Chapter

More information

OSNI PONCA OFFICE REMODEL

OSNI PONCA OFFICE REMODEL OSNI PONCA OFFICE REMODEL PROJECT MANUAL OCTOBER 2016 SCHEMMER PROJECT NO. 06571.002 OSNI PONCA OFFICE REMODEL TABLE OF CONTENTS DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 000115 LIST OF DRAWING

More information

PUBLIC CONTRACT CODE SECTION

PUBLIC CONTRACT CODE SECTION PUBLIC CONTRACT CODE SECTION 22160 22169 22160. (a) The Legislature finds and declares that the design build method of project delivery, using a best value procurement methodology, has been authorized

More information

Memphis Housing Authority Capital Improvements Department 700 Adams Street, Room 107 Memphis, Tennessee

Memphis Housing Authority Capital Improvements Department 700 Adams Street, Room 107 Memphis, Tennessee Memphis Housing Authority Capital Improvements Department 700 Adams Street, Room 107 Memphis, Tennessee 38105-5029 ADDENDUM NO. 2 Issued: March 6, 2018 This addendum shall become and form a part of the

More information

APPENDIX D Forms for the Analytical Delivery Decision Approach (Tier 1)

APPENDIX D Forms for the Analytical Delivery Decision Approach (Tier 1) APPENDIX D Forms for the Analytical Delivery Decision Approach (Tier 1) The first tier in the systematic approach developed in this guidebook is the Analytical Delivery Decision Approach discussed in Chapter

More information

Eastern Michigan University

Eastern Michigan University Eastern Michigan University Prepared by: EMU Physical Plant Facilities Planning and Construction Page Intro-1 Purpose of Eastern Michigan University Physical Plant; Facilities Planning and Construction

More information

Continuing Education Credits

Continuing Education Credits Recent Developments in (IPD) for NECA Members October 14, 2013 9:00-9:50 AM Following this session, you will be able to: Explain the concept and structure of an IPD project. Identify the issues and risks

More information

Time to Build! What to Expect On Your Upcoming Design and Construction Journey PRESENTED TO

Time to Build! What to Expect On Your Upcoming Design and Construction Journey PRESENTED TO Time to Build! What to Expect On Your Upcoming and Journey PRESENTED TO Christopher is an award-winning architect with more than 20 years of diversified architectural experience in design of projects from

More information

1ARCHITECTURE TABLE OF CONTENTS

1ARCHITECTURE TABLE OF CONTENTS TABLE OF CONTENTS DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00 0102 COVER 00 0107 SEALS PAGE 00 0111 TABLE OF CONTENTS DIVISION 01 - GENERAL REQUIREMENTS 01 1000 01 2000 01 2100 01 2300 01

More information

Choosing Delivery Method

Choosing Delivery Method Page 1 of 12 Advancing Professional Construction and Program Management Worldwide home contact us site map Search Find-A-CM/PM My Account Sign In Bookstore Career Center Home Choosing Delivery Method Choosing

More information

INVITATION FOR BID (IFB):

INVITATION FOR BID (IFB): DATE: May 8, 2018 ADDENDUM NO. 1 INVITATION FOR BID (IFB): B180022132 RPD Furnish & Install Ballistic Glass Lobby Counters IFB #B180022132 WAS ISSUED: Wednesday April 25, 2018 RECEIPT DATE: May 23, 2018

More information

Maintenance and Operations 1302 Service Road Tustin, California (714) CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20

Maintenance and Operations 1302 Service Road Tustin, California (714) CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20 Maintenance and Operations 1302 Service Road Tustin, California 92780 (714) 730-7515 CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20 The Tustin Unified School District ( District ) has determined that

More information

Contracting Methods and Risk Management

Contracting Methods and Risk Management Contracting Methods and Risk Management In Tunneling and Underground Construction Michael S Schultz Senior Vice President CDM Smith Boston, Massachusetts September 12, 2016 Topics What is a Contract and

More information

Meeting the Standard of Care in an Evolving Project Delivery Environment

Meeting the Standard of Care in an Evolving Project Delivery Environment Meeting the Standard of Care in an Evolving Project Delivery Environment Russell Jumper & Tim Fandrey Gray Reed & McGraw Texas Society of Professional Engineers Denton Chapter March 9, 2018 Gray Reed &

More information

Contract Administration: Tips for Improving your Contract Administration Process. Jennifer Adling Director of Procurement Services

Contract Administration: Tips for Improving your Contract Administration Process. Jennifer Adling Director of Procurement Services Contract Administration: Tips for Improving your Contract Administration Process Jennifer Adling Director of Procurement Services Contract Administration Following the award of a contract, the management

More information

COUNTY OF SAN JOAQUIN

COUNTY OF SAN JOAQUIN June 4, 2012 COUNTY OF SAN JOAQUIN General Services Department 44 North San Joaquin Street, Suite 590 Stockton, California 95202-2778 (209) 468-3357, Fax (209) 468-2186 GABRIEL E. KARAM Director Capital

More information

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES TM Document B141 Standard Form of Architect's Services: Design and Contract Administration 1997 Part 2 TABLE OF ARTICLES 2.1 PROJECT ADMINISTRATION SERVICES 2.2 SUPPORTING SERVICES 2.3 EVALUATION AND PLANNING

More information

TECHNICAL REVIEW DESIGN DEVELOPMENT PHASE

TECHNICAL REVIEW DESIGN DEVELOPMENT PHASE TECHNICAL REVIEW DESIGN DEVELOPMENT PHASE Document Quality and Coordination Drawings, specifications and Design Report are generally neat, clear, and accurate. Design documents are generally coordinated

More information

Exhibit A Scope of Services and Deliverables

Exhibit A Scope of Services and Deliverables Exhibit A Scope of Services and Deliverables Attachment to MnDOT Contract No. for Project Name Project # 16-TZ dated Scope of Services includes: Programming / Schematic Design Phase Design Development

More information

The Home Depot U.S.A., Inc. Instructions to Bidders

The Home Depot U.S.A., Inc. Instructions to Bidders The Home Depot U.S.A., Inc. Instructions to Bidders Home Depot Page 1 of 5 Article 1 Definitions 1.1 Bidding Documents include the Bidding Requirements and the proposed Contract Documents. The Bidding

More information

CM470 Legal Issues in Construction [Onsite]

CM470 Legal Issues in Construction [Onsite] CM470 Legal Issues in Construction [Onsite] Course Description: This course explores the legal issues arising from design and construction services. Topics include contracts, land zoning and property ownership,

More information

45. Feedlot construction delivery

45. Feedlot construction delivery Client Des i gn/ Builder Design Consultant Construction Sub-contractors and suppliers FEEDLOT DESIGN AND CONSTRUCTION 45. Feedlot construction delivery AUTHORS: Rod Davis and Ross Stafford Introduction

More information

STATEMENT of WORK Survey Storage Shed 10X10X8 Beaver County, Rochester Stockpile# Project# Building#

STATEMENT of WORK Survey Storage Shed 10X10X8 Beaver County, Rochester Stockpile# Project# Building# I. SUMMARY A. The Department of Transportation (PennDOT) is issuing a solicitation to provide a Survey Storage Shed 10x10x8. The following list of documents made part of this procurement will provide the

More information

CONTRACT / CONSTRUCTION REQUIREMENTS FOR PUBLIC SCHOOLS PROJECTS. August 2005

CONTRACT / CONSTRUCTION REQUIREMENTS FOR PUBLIC SCHOOLS PROJECTS. August 2005 CONTRACT / CONSTRUCTION REQUIREMENTS FOR PUBLIC SCHOOLS PROJECTS August 2005 Projects Requiring Licensed Architect / Engineer: *Project Cost Threshold New Construction or Additions $135,000 + Major Repairs

More information

Document B105. Standard Form of Agreement Between Owner and Architect for a Residential or Small Commercial Project

Document B105. Standard Form of Agreement Between Owner and Architect for a Residential or Small Commercial Project TM Document B105 2007 Standard Form of Agreement Between Owner and Architect for a Residential or Small Commercial Project AGREEMENT made as of the in the year (In words, indicate day, month and year.)

More information

The Greater Toronto Electrical Contractors Association endorses the following CCDC/CCA Documents

The Greater Toronto Electrical Contractors Association endorses the following CCDC/CCA Documents The Greater Toronto Electrical Contractors Association endorses the following CCDC/CCA Documents CCDC Standard Construction Documents CCDC 2-1994 Stipulated Price Contract Standard prime contract between

More information

Morgan Hill Unified SCHOOL DISTRICT SEMI-ANNUAL PREQUALIFICATION QUESTIONNAIRE FOR PROSPECTIVE BIDDERS

Morgan Hill Unified SCHOOL DISTRICT SEMI-ANNUAL PREQUALIFICATION QUESTIONNAIRE FOR PROSPECTIVE BIDDERS Morgan Hill Unified SCHOOL DISTRICT SEMI-ANNUAL PREQUALIFICATION QUESTIONNAIRE FOR PROSPECTIVE BIDDERS The Morgan Hill Unified School District ( District ) has determined that contractors on future projects

More information

GENERAL GUIDELINES FOR WRITING AND EDITING SPECIFICATIONS (CSI) III. GENERAL GUIDELINES FOR WRITING AND EDITING SPECIFICATIONS (CSI)

GENERAL GUIDELINES FOR WRITING AND EDITING SPECIFICATIONS (CSI) III. GENERAL GUIDELINES FOR WRITING AND EDITING SPECIFICATIONS (CSI) III. FORMAT REQUIREMENTS Prepare Specifications as recommended by the Construction Specification Institute's (CSI) Manual of Practice, including spacing, indentation, headings and general arrangement.

More information

Definition of Terms **Non-capitalized references to a state refer to a state other than the State of Michigan.

Definition of Terms **Non-capitalized references to a state refer to a state other than the State of Michigan. Definition of Terms **Non-capitalized references to a state refer to a state other than the State of Michigan. Addenda - Documents used by the Owner to incorporate interpretations or clarifications, modifications,

More information

Chapter 2 Parties to the Contract

Chapter 2 Parties to the Contract Chapter 2 Parties to the Contract 2.1 Introduction Construction work may include building of a new structure, additions, alterations, expansion, replacement, dismantling, erection, commissioning, rehabilitation,

More information

REQUEST FOR QUALIFICATIONS AND PROPOSALS

REQUEST FOR QUALIFICATIONS AND PROPOSALS REQUEST FOR QUALIFICATIONS AND PROPOSALS CONSTRUCTION MANAGER AT RISK SERVICES Preconstruction Phase Services and Construction Phase Services Sheridan Economic and Educational Development Authority Sheridan

More information

SANTA PAULA UNIFIED SCHOOL DISTRICT 201 S. Steckel Drive Santa Paula, California (805)

SANTA PAULA UNIFIED SCHOOL DISTRICT 201 S. Steckel Drive Santa Paula, California (805) SANTA PAULA UNIFIED SCHOOL DISTRICT 201 S. Steckel Drive Santa Paula, California 93060 (805) 933-3908 Annual Pre-Qualification for MEP Contractors per Public Contract Code 20111.6 License Classifications:

More information

AIA Paper Contract Documents Price List, prices as of March 1, 2014

AIA Paper Contract Documents Price List, prices as of March 1, 2014 A Chapter of the American Institute of Architects AIA Paper Contract Documents Price List, prices as of March 1, 2014 The AIA provides free PDF copies certain Documents and Guides, General Guides, and

More information

REQUEST FOR PROPOSALS (RFP) FOR ARCHITECTURAL SERVICES CLEARWATER PUBLIC SCHOOLS EWING PUBLIC SCHOOLS NELIGH-OAKDALE PUBLIC SCHOOLS

REQUEST FOR PROPOSALS (RFP) FOR ARCHITECTURAL SERVICES CLEARWATER PUBLIC SCHOOLS EWING PUBLIC SCHOOLS NELIGH-OAKDALE PUBLIC SCHOOLS REQUEST FOR PROPOSALS (RFP) FOR ARCHITECTURAL SERVICES CLEARWATER PUBLIC SCHOOLS EWING PUBLIC SCHOOLS NELIGH-OAKDALE PUBLIC SCHOOLS 1. REQUEST FOR PROPOSALS. Clearwater Public Schools, Ewing Public Schools,

More information

SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS

SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS SECTION 01 00 00 GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Summary of Work: 1. General 2. Contract. B. Contract Considerations: 1. Schedule of values. 2. Applications for payment. 3.

More information

The Practitioner s Blueprint to Construction Auditing Ron Risner, MBA, CIA, CCA, CCP 2012, The IIA Research Foundation.

The Practitioner s Blueprint to Construction Auditing Ron Risner, MBA, CIA, CCA, CCP 2012, The IIA Research Foundation. The Practitioner s Blueprint to Construction Auditing Ron Risner, MBA, CIA, CCA, CCP 2012, The IIA Research Foundation Table of Contents List of Figures Executive and Preface Acknowledgments About the

More information

PROJECT PROCUREMENT MANAGEMENT. 1 Powered by POeT Solvers Limited

PROJECT PROCUREMENT MANAGEMENT. 1  Powered by POeT Solvers Limited PROJECT PROCUREMENT MANAGEMENT 1 www.pmtutor.org Powered by POeT Solvers Limited CONDUCT PROCUREMENT PROCESSES BY PROCESS GROUP Planning Executing Monitoring and controlling Closing 12.1 12.2 12.3 12.4

More information

Appendix D University of Maine System. Supplementary Requirements to AIA Document B Standard Form of Architect s Services

Appendix D University of Maine System. Supplementary Requirements to AIA Document B Standard Form of Architect s Services Appendix D University of Maine System Supplementary Requirements to AIA Document B201-2007 Standard Form of Architect s Services This document provides the Architect s scope of services only and must be

More information

PROJECT SPECIFICATIONS VOL. I: ARCHITECTURAL & STRUCTURAL APRIL 25, 2011 BIRKS RESIDENCE AT BIRCH COVE COLCHESTER, VERMONT

PROJECT SPECIFICATIONS VOL. I: ARCHITECTURAL & STRUCTURAL APRIL 25, 2011 BIRKS RESIDENCE AT BIRCH COVE COLCHESTER, VERMONT PROJECT SPECIFICATIONS VOL. I: ARCHITECTURAL & STRUCTURAL APRIL 25, 2011 COLCHESTER, VERMONT ARCHITECT CIVIL ENGINEER Brad Rabinowitz Architect 200 Main Street Burlington, VT 05401 (802) 658-0430 Krebs

More information

PREQUALIFICATION QUESTIONNAIRE

PREQUALIFICATION QUESTIONNAIRE PREQUALIFICATION QUESTIONNAIRE FOR HUENEME ROAD RECYCLED WATER PIPELINE PROJECT PHASE II THE PROJECTS AND PREQUALIFICATION In the coming months, the City of Oxnard ( City ) will be bidding a project for

More information

ANNEXURE A SCOPE OF WORK FOR PROFESSIONAL SERVICES: RESTORATION OF NON PAREILLE BUILDINGS. Principal Agent and Professional Architectural Services

ANNEXURE A SCOPE OF WORK FOR PROFESSIONAL SERVICES: RESTORATION OF NON PAREILLE BUILDINGS. Principal Agent and Professional Architectural Services T: +27 21 462 4502 F: +27 21 462 4509 E: info@sahra.org.za South African Heritage Resources Agency - Head Office 111 Harrington Street Cape Town P.O. Box 4637 Cape Town 8001 ANNEXURE A SCOPE OF WORK FOR

More information