1 7.1 INTRODUCTION CHAPTER 7 CAPITAL IMPROVEMENT PLAN This Chapter presents the District s Capital Improvement Plan (CIP) in accordance with the requirements of WAC Wastewater capital improvements have been scheduled and prioritized on the basis of growth, regulatory requirements, component reliability, system benefit, and cost. For the proposed projects identified in this Chapter, more detailed project descriptions and preliminary project cost estimates are presented in Appendix K. A wastewater base map illustrating the conceptual locations of the proposed improvement projects is included in the jacket of the Plan. Other capital improvement projects may arise in the future that are not identified as part of the District s CIP presented in this Chapter. Such projects may be deemed necessary for remedying an emergency situation, accommodating improvements proposed by other agencies or land development, or addressing unforeseen problems with the District s wastewater system. Due to budgetary constraints, the construction of these projects may require that the proposed completion date for projects in the CIP be rescheduled. When new information becomes available, the District retains the flexibility to reschedule, add to, or delete proposed projects and to expand or reduce the scope of the projects, as best determined by the District. Additionally, future planning efforts by the Cities of Issaquah and Sammamish, or King County may affect land use zoning and service requirements within the District. Developments may create streets or provide alignments and locations of facilities that are different than shown on the Plan. Each capital improvement project will be reevaluated to consider the most recent planning efforts as the proposed completion date for the project approaches. Funding for CIPs will be assigned on the basis of each project s purpose and benefit, and project funding may come from various sources, such as general facility charges, local facility charges and capital replacement reserves. 7.2 PROPOSED SYSTEM IMPROVEMENTS The proposed system improvements in the CIP are based on projects identified in the collection system hydraulic model, problematic gravity mains and lift station issues identified by the District operational staff, on-going programs intended to reduce infiltration and inflow, and projects previously scheduled by the District WASTEWATER COMPREHENSIVE PLAN AND GENERAL SEWER PLAN 7-1 DECEMBER 2014

2 CHAPTER 7 CAPITAL IMPROVEMENT PLAN Each project cost estimate includes design and engineering, construction with a 20 percent contingency, 9.5 percent sales tax, and construction management. All project costs are based on 2013 dollars (ENR CCI = 9552) with future projects adjusted for inflation using a 3 percent annual interest rate. Projects that span multiple years or have annual recurring costs include escalated costs to adjust for inflation for each year beyond The recommended CIP projects are summarized below using the following abbreviations: R Regional projects INT Interceptor ( >8-inch diameter) projects CS Collection system ( < 8-inch diameter) projects CL Critical link projects LS Lift station and force main projects M Miscellaneous system and planning projects OM Operation and maintenance projects All projects from 2013 through 2018 are listed and described herein. Non-lift station projects included in the 10-year and 20-year CIP are also briefly discussed. The year shown for each project is the anticipated year of construction. New Lift Station projects anticipated for construction in the 10-year and 20-year CIP capital improvement projects, (i.e., after 2018), are listed together, and included in Table REGIONAL CAPITAL IMPROVEMENTS Currently, the District s entire sanitary sewer enters the KCDNR collection system on the south side of Lake Sammamish, near the entrance to Lake Sammamish State Park. When the District and KCDNR designed and constructed the project to increase the capacity of the sanitary sewer system to the KCDNR system at the Lake Sammamish State Park location, it was decided that ultimately the District flows would be split to south and north connections to the KCDNR system. The District is evaluating system and operational changes to accommodate future growth and increase efficiency that would augment the sanitary sewer volume and add the planned northern location for the District connection to the KCDNR collection system R-1A North Diversion Project The District is anticipating significant growth and increased sanitary sewer flows in the North Lake Sammamish, Tiburon, Inglewood East, and Northeast Plateau WASTEWATER COMPREHENSIVE PLAN AND GENERAL SEWER PLAN DECEMBER 2014

3 CHAPTER 7 CAPITAL IMPROVEMENT PLAN sewer basins. The District plans to divert flows from these District sewer basins to the KCDNR collection system in Redmond. King County has the flexibility to send this flow to be treated at Brightwater, the new regional wastewater treatment facility north of Woodinville. The North Diversion would provide relief to facilities downstream of the Inglewood and North Lake Sammamish lift stations in the future that would otherwise require costly upgrades. Seven scenarios for the North Diversion Project were evaluated in Chapter 4 comprised of three primary alignments. These alignments included the Hill Top, East Lake Sammamish Parkway, and the East Lake Sammamish Trail alignments. For scenarios 1, 2 and 3 the North Lake Sammamish Lift Station would pump south. In scenarios 4, 5 and 6 the North Lake Sammamish Lift Station would pump north as part of the North Diversion. Scenario 7 posited no foreseeable change of the collection system with all sanitary sewers flowing south to the KCDNR connection point. From the analysis in Chapter 4, the preferred alignment for the North Diversion is Scenario 6: the East Lake Sammamish Trail with the North Lake Sammamish Lift Station pumping to the north. This alternative includes the installation of approximately 3,700 linear feet of 18-inch HDPE pipe in the Inglewood area and approximately 18,000 linear feet of 24-inch HDPE pipe along the East Lake Sammamish Trail to the connection point in Redmond. This portion of the Project would be funded by King County. The cost to the District would include upgrades to the North Lake Sammamish Lift Station and approximately 4,800 linear feet of 16-inch force main to the connection point with the North Diversion. However, once the flows from the Inglewood Lift Station and the Tiburon Sewer Basin are diverted north, the North Lake Sammamish Lift Station will have additional capacity and would not require immediate upgrades. Therefore, the timing of the North Lake Sammamish Lift Station upgrades would depend on the growth rates in the North Lake Sammamish sewer basin and the capacity of the downstream infrastructure, specifically the Central Lake Sammamish Lift Station. From growth projections forecasted in Chapter 2 and the North Diversion Project evaluation in Chapter 4, the District is planning for construction of Scenario 6 to begin in The North Diversion Project, including project alternatives and cost estimates, is discussed in Chapter 4. North Lake Sammamish Lift Station and force main upgrades are discussed in LS-2B. Estimated Project Cost: $14,330, WASTEWATER COMPREHENSIVE PLAN AND GENERAL SEWER PLAN 7-3 DECEMBER 2014

4 CHAPTER 7 CAPITAL IMPROVEMENT PLAN R-1B North Diversion Delay Project The North Diversion Project, as defined in project R-1A, assumes King County will begin design and construction of the North Diversion in If, however, the North Diversion is delayed or does not meet King County s prioritization of imminent conveyance system improvement projects, the District anticipates other downstream facilities and infrastructure will require intermediate upgrades due to the expected population growth within the District s sewer service area. These upgrades include: Interim Facility Project Cost North Lake Lift Station and force main improvements $4,052,500 North Lake gravity sewer main improvements $2,791,800 Central Lake Lift Station and force main improvements $1,394,500 Central Lake gravity sewer main improvements $3,451,200 Total Interim Facility Project Cost $11,690,000 Estimated Project Cost: $11,690, R-2 Control Structure Modifications Modify current operations at the Control Structure site. Modifications include: Replace the east sewer bay with bypass sewer main and backfill to the existing surface elevation. Replace existing bar rack with in-channel grinder, or mechanical screen. Install a metering method, such as a Parshall Flume flow monitor, with telemetry to connect to the District s SCADA system. Remove existing structure above sewer bays and cover with concrete slabs and access hatches. Install ventilation and odor control. Replace roof on remaining structure. Estimated Project Cost: $750, INTERCEPTOR CAPITAL IMPROVEMENTS The interceptor and transmission main improvements identified are designed to increase capacity, repair or replace failing and problematic mains, and to improve WASTEWATER COMPREHENSIVE PLAN AND GENERAL SEWER PLAN DECEMBER 2014

5 CHAPTER 7 CAPITAL IMPROVEMENT PLAN access to the mains for operational staff. For this plan, interceptors and transmission mains are defined as gravity and low-pressure sewer pipes larger than eight inches in diameter. For budgeting purposes, the cost estimates shown here assume open trench construction in existing right-of-way. The District may be able to realize cost savings by using trenchless technologies. The District should investigate these alternative construction methods during the design phase of these projects INT-1 East Lake Sammamish Parkway SE Gravity Sewer Replacement at Montage (SE 4 th Street), 12 Inch to 15 Inch Increase the capacity of the existing gravity sewer main along East Lake Sammamish Parkway SE, at approximately SE 4 th Street (if extended), by replacing approximately 310 LF of existing 12-inch-diameter sewer pipe with 15-inchdiameter sewer pipe. This project will correct an existing deficiency. Estimated Project Cost: $352, INT-2 Issaquah-Pine Lake Road and 234 th Avenue SE Gravity Sewer Main Replacement, 8 Inch to 12 Inch Replace approximately 310 LF of 8-inch gravity sewer main along Issaquah-Pine Lake Road, near the intersection of 234 th Avenue SE with 12-inch-diameter main. This project will correct an existing deficiency. Estimated Project Cost: $231, INT st Place SE and SE 56 th Street Gravity Sewer Main Replacement, 12 Inch to 18 Inch Replace approximately 650 LF of 12-inch gravity sewer main along 221 st Place SE, just south of SE 56 th Street, with 18-inch-diameter sewer pipe. This project will increase the capacity of the existing gravity sewer main for anticipated development and population growth in the future. Estimated Project Cost: $442, INT-4 SE 62 nd Street and East Lake Sammamish Parkway SE Gravity Sewer Main Replacement, 8 Inch to 12 Inch Replace approximately 1,250 LF of 8-inch gravity sewer main along SE 62 nd Street, east and west of East Lake Sammamish Parkway SE, with 12-inch-diameter sewer 2013 WASTEWATER COMPREHENSIVE PLAN AND GENERAL SEWER PLAN 7-5 DECEMBER 2014

6 CHAPTER 7 CAPITAL IMPROVEMENT PLAN pipe. This project is identified to increase the capacity of the existing gravity sewer main for anticipated development and population growth in the future. Estimated Project Cost: $494, INT-5 South Plateau Parallel Conveyance Interceptor, 20 Inch and 36 Inch Install approximately 4,500 linear feet of new 20-inch low pressure sewer main along SE 43 rd Way extending from the Highland Creek Parallel sewer to the Control Structure. The extension will be used for redundancy and to potentially reduce high velocities by splitting the flows as the District s sanitary sewer increases in the future. Project also includes approximately 750 linear feet of 36- inch sewer pipe along SE 42 ND Street to parallel the existing 24-inch sewer main from Klahanie. Estimated Project Cost: $6,300, INT-6 South Pine Lake Interceptor Replacement 228 th Avenue SE to 219 th Avenue SE, 10 Inch and 12 Inch The existing condition of the South Pine Lake gravity interceptor is poor. The interceptor is comprised of 10-inch-diameter AC pipe and contains several sags through a generally flat slope. The District plans to replace it with approximately 4,000 linear feet of 12-inch-diameter sewer pipe. For budget planning purposes, the cost estimate assumed replacement of the existing interceptor by open trench. The method for replacement of the existing interceptor will be selected during design. Estimated Project Cost: $1,182, COLLECTION SYSTEM CAPITAL IMPROVEMENTS Collection system improvement projects include gravity or low pressure sewer mains with diameters equal to, or less than 8 inches. These projects may either improve existing facilities or extend new collection systems to currently unsewered areas. For this reason, collection system improvement may have a variety of funding sources and the identified projects could potentially be installed by DEA, ULID, or CIP for the District WASTEWATER COMPREHENSIVE PLAN AND GENERAL SEWER PLAN DECEMBER 2014

7 CHAPTER 7 CAPITAL IMPROVEMENT PLAN CS-1 Water s Edge Lift Station Collection Sewer System Install approximately 1,450 linear feet of 8-inch sewer pipe for the gravity collection sewer to connect Pine Lake Heights Lift Station and First Branch Lift Station to the Water s Edge Lift Station (See LS-3). Estimated Project Cost: $1,600, CS-2A Camden Park Shallow Sewer Replacement Install approximately 300 linear feet of replacement deep sewer main in Camden Park to connect to the Camden Park Lift Station. Estimated Project Cost: $450, CS-2B Camden Park Gravity Connection Install approximately 2,000 linear feet of new sewer main to connect the gravity collection system from 244 th Avenue NE (at the Good Samaritan Lift Station) to the Camden Park Lift Station. Estimated Project Cost: $1,319, CRITICAL LINK PROJECTS Critical link projects provide access to sewer service for large unsewered areas or to areas where customers have expressed interest in obtaining sewer service, but have not been successful in extending the service CL-1 South End East Lake Sammamish Parkway/Place Crossing, Gravity Sewer, 8 Inch Install approximately 200 lineal feet of 8-inch gravity sewer main across East Lake Sammamish Parkway to connect Sammamish Woods Highlands area. Estimated Project Cost: $184, WASTEWATER COMPREHENSIVE PLAN AND GENERAL SEWER PLAN 7-7 DECEMBER 2014

8 CHAPTER 7 CAPITAL IMPROVEMENT PLAN CL-2 Upper Waverly Connecting Sewer, Gravity Sewer, 8 Inch Install approximately 950 lineal feet of 8-inch gravity sewer main to provide sanitary sewer service to Upper Waverly. Estimated Project Cost: $434, CL-3 Louis Thompson Sewer Main, Gravity Sewer, 8 Inch Install approximately 1600 lineal feet of 8-inch gravity sewer main along Louis Thompson Road NE to provide sewer service to the District s North Lake Sammamish sewer basin. Estimated Project Cost: $1,194, CL-4A Sammamish Town Center Initiation Support (SE 4 th and Other Gravity) This project is in support of providing service to the Sammamish Town Center. Funding for this project will likely be provided by the developer or as part of a ULID. Estimated Project Cost: $861, CL-4B Sammamish Town Center Collection System This project consists of new sewer piping installed as part of the Sammamish Town Center project. Funding for this project will likely be provided by the developer. Estimated Project Cost: $18,357, LIFT STATION AND FORCE MAIN CAPITAL IMPROVEMENTS The following lift station and force main projects are designed to improve operation of the existing lift station and construct new lift stations LS-1 Central Lake Sammamish Lift Station Improvements Improvements include installing a third pump at the Central Lake Sammamish Lift Station. The additional pump will be used to improve reliability, and to supplement the existing pumping capacity to sustain current peak wastewater flows from the Inglewood and North Lake Lift Stations. The additional capacity WASTEWATER COMPREHENSIVE PLAN AND GENERAL SEWER PLAN DECEMBER 2014

9 CHAPTER 7 CAPITAL IMPROVEMENT PLAN from the third pump is anticipated to be sufficient for buildout according to the model and the preceding analysis in Chapter 2. Estimated Project Cost: $195, LS-2A North Lake Sammamish Lift Station Improvement, Phase I 3 rd Pump Installation Phase I improvements include installing a third pump at the North Lake Sammamish Lift Station. The additional pump will be used to improve reliability, and to supplement the existing pumping capacity to sustain current peak wastewater flows and increased future flows. Estimated Project Cost: $195, LS-2B North Lake Sammamish Lift Station Improvement, Phase II Capacity and Force Main Upgrade Phase II improvements include increasing the capacity at the lift station for anticipated growth within the sewer basin, and installation of a new force main that would connect to the North Diversion Project (see R-1A). Phase II improvements are contingent on the expediency of the North Diversion Project and likely to be implemented beyond the District s 6-year planning period. These improvements are discussed in Chapter 4. Estimated Project Cost: $4,300, LS-4A Flow Meter Installation Program (Todd s Landing, Pine Lake Glen, Beaver Lake Estates, Freegard) Install magnetic flow meters at multiple sewer lift stations. The flow meter will include telemetry with continuous monitoring capabilities via the District s SCADA system. The District plans to install flow meters at the following lift stations: Beaver Lake Estates Pine Lake Glen Todd s Landing Freegard 2013 WASTEWATER COMPREHENSIVE PLAN AND GENERAL SEWER PLAN 7-9 DECEMBER 2014

10 CHAPTER 7 CAPITAL IMPROVEMENT PLAN The project cost for installation of a flow meter varies for each lift station identified. Estimated Project Cost: $25,000-$30,000/each ($110,000 total) LS-4B Flow Meter Replacement Program (Beaver Dam, Aldarra, Central Lake Sammamish) Replace existing flow meters at the following sewer lift stations. The project cost for installation of a flow meter varies for each lift station identified. However, for budgeting purposes, the estimated project cost will be based on the most expensive application anticipated. Beaver Dam Aldarra Central Lake Sammamish Estimated Project Cost: $10,000/each ($30,000 total) LS-5A Freegard Lift Station Replacement, Phase I Wet Well Replace the Freegard lift station wet well and related improvements. Improvements would include: Increase storage in the wet well. Replace existing isolation valves. Estimated Project Cost: $1,113, LS-5B Freegard Lift Station Replacement, Phase II Mechanical, Electrical and Flow Meter Replace the Freegard lift station mechanical and electrical equipment and install a magnetic flow meter with telemetry. Estimated Project Cost: $617, LS-6 Inglewood Odor Evaluation Evaluate the use of calcium nitrate injection into the force main to address odors at various locations including air vacuum valves and the manhole at which the force main transitions to open-channel flow. Alternatives to address these odors will be evaluated and include point-source carbon canisters at air vacuum valves WASTEWATER COMPREHENSIVE PLAN AND GENERAL SEWER PLAN DECEMBER 2014

11 CHAPTER 7 CAPITAL IMPROVEMENT PLAN and manhole lids, oxygen injection, and increasing the dosing rate/volume of calcium nitrate into the force main. The estimated project cost will be adjusted depending on the alternative selected during design. Estimated Project Cost: $297, LS-24 Trossachs Lift Station Pump Replacement Improvements will include replacement of the two 75-hp pumps at the Trossachs Lift Station, and an evaluation of incoming flow conditions that may be causing cavitation of the impellers. Estimated Project Cost: $55, FUTURE LIFT STATION PROJECTS Future lift station projects include those projects that are unlikely to be implemented in the District s 6-year planning period or are likely to be funded by DEA or ULID. Costs for future lift stations are based on costs developed initially for the District s 2003 Wastewater Comprehensive Plan. The list of future lift station projects is provided in Table 7-1. New Lift Stations in the 10-year CIP LS-3 Water s Edge Lift Station: Estimated Project Cost: $1,551,940 Located along 222 nd Place SE on the south side of Pine Lake. Note: This will replace Pine Lake Heights and First Branch Lift Stations upon completion of connecting collection sewers. LS-7 Tiburon Lift Station: Estimated Project Cost: $1,886,627 Located near the intersection of 216 th Avenue NE and NE 4 th Street. LS-10 Broadmoore Estates Lift Station: Estimated Project Cost: $2,644,229 Located along NE 31 st Way near 240 th Avenue NE. LS rd Lift Station: Estimated Project Cost: $662,902 Located on 223 rd Avenue SE, near SE 12 th WASTEWATER COMPREHENSIVE PLAN AND GENERAL SEWER PLAN 7-11 DECEMBER 2014

12 CHAPTER 7 CAPITAL IMPROVEMENT PLAN LS-15 Inglewood Lift Station Capacity Evaluation and Pump Upgrade: The evaluation will consider the North Diversion Project status, hydraulics associated with the chosen alternative, as well as revised growth projections. Estimated Project Cost: $323,790 Located at NE Inglewood Hill Rd. LS-16 Wesley Cove Lift Station: Estimated Project Cost: $581,730 Located west of 244 th Avenue NE, between NE 22 nd and NE 24 th. LS-17 Swan Ridge Interim Lift Station: Estimated Project Cost: $614,937 Located in the Swan Ridge development area, east of 244 th Avenue NE and north of NE 8 th Street. LS-18 High Country 3 Lift Station: Estimated Project Cost: $843,693 Located in High Country Division 3, along SE 25 th, at approximately 265 th SE, if extended. LS-20 Providence Ridge Lift Station: Estimated Project Cost: $614,937 Located south of SE 43 rd Way at approximately 220 th SE if extended. LS-21 Tibbetts Station Lift Station: Estimated Project Cost: $712,097 Located SE 33 rd Place and 264 th Avenue SE. LS-22 Sunnyhills Estates 2 Lift Station: Estimated Project Cost: $696,109 Located SE 31 st Place and 254 th Avenue SE. LS-23 French SE 8th Lift Station: Estimated Project Cost: $1,543,492 Located near the intersection of SE 8 th Street and 214 th Avenue SE New Lift Stations in the 20-year CIP LS-9 North Fork Lift Station: Estimated Project Cost: $735,693 Located at approximately 220 th Avenue SE and SE 60 th, west of the North Fork of Issaquah Creek. LS-11 Treefarm East Lift Station: Estimated Project Cost: $795,575 Located on the south end of 242 nd Avenue NE in or adjacent to the Treefarm development at approximately the alignment of NE 4 th WASTEWATER COMPREHENSIVE PLAN AND GENERAL SEWER PLAN DECEMBER 2014

13 CHAPTER 7 CAPITAL IMPROVEMENT PLAN LS-12 Aldarra Golf South Lift Station: Estimated Project Cost: $1,140,609 Located north of Old Issaquah-Fall City Road, south of The Members Club at Aldarra golf course, between 287 th Avenue SE and 292 nd Avenue SE (if both extended). LS-14 Loree Estates Lift Station: Estimated Project Cost: $2,352,505 Located near the west end of SE 19 th Street, at approximately 204 th Avenue NE (if extended). LS-19 High Country Entrance Lift Station: Estimated Project Cost: $950,983 Located near the Duthie Hill entrance to High Country, at SE 31st Street and 266 th Avenue SE MISCELLANEOUS SYSTEM CAPITAL IMPROVEMENTS The District has identified miscellaneous or general projects that will be fully or partially funded by the wastewater utility. Estimated project costs represent only the cost for sewer for those projects shared by both the water and sewer utility M-2 District Headquarters Site Expansion 60 Percent Water/ 40 Percent Sewer Improvements include: New fuel facility Decant facility Vehicle washing station Material Storage Site fencing Estimated Sewer Portion of Project Cost: $1,650, M-3A New Vehicles 60 Percent Water/40 Percent Sewer The District budgets an amount annually to cover periodic purchases of vehicles. Estimated Sewer Portion of Project Cost through 2018: $580,660 (6-year CIP) 10-year CIP: $689,169 additional 20-year CIP: $2,265,227 additional 2013 WASTEWATER COMPREHENSIVE PLAN AND GENERAL SEWER PLAN 7-13 DECEMBER 2014

14 CHAPTER 7 CAPITAL IMPROVEMENT PLAN M-3B New Equipment 60 Percent Water/40 Percent Sewer The District budgets an amount annually to cover periodic purchases of large equipment. Estimated Sewer Portion of Project Cost: $49,330 for 2013 & $42,228 for 2014 $56,000/year after M Seismic VA 60 Percent Water/40 Percent Sewer Conduct a seismic vulnerability assessment at the District s water and sewer facilities (i.e., wells, storage tanks, lift stations, pump stations) to evaluate and determine facilities at risk of damage or failure. The study will also identify retrofits that may improve reliability and continued operation during and following an earthquake. Estimated Sewer Portion of Project Cost: $42, M-5 Environmental Protection Program 60 Percent Water/40 Percent Sewer The District maintains an environmental protection plan to guide the development of District processes and methods that have less impact on the natural environment. The program will include operation and maintenance of water and sewer systems, construction activities, and District administrative operations. Estimated Sewer Portion of Project Cost: $41, M-6 Security Improvements 60 Percent Water/40 Percent Sewer The District maintains a security improvement plan that includes ongoing assessment of the District s facilities and identifies areas where security could be improved. Current security improvements include perimeter fencing along the south boundary of the District Headquarters and motion detection for the District s water and wastewater facilities. Estimated Sewer Portion of Project Cost: $90,120 6-year CIP $19,680 additional 10-year CIP WASTEWATER COMPREHENSIVE PLAN AND GENERAL SEWER PLAN DECEMBER 2014

15 CHAPTER 7 CAPITAL IMPROVEMENT PLAN M-9 Sewer Comprehensive Plan Update (Every 6 Years) Every 6 years the District must update its wastewater comprehensive plan. Capital funds are allocated periodically to support these updates. Estimated Project Cost: 569,188 in 6-year CIP OPERATION AND MAINTENANCE PROJECTS The District has identified operation and maintenance projects that will be fully or partially funded by the wastewater utility OM-1 District Headquarter Maintenance Program 60 Percent Water/40 Percent Sewer The District maintains a program for larger repair and replacement and upgrade projects for the District headquarters facilities. Estimated Project Cost: $113,105 in the 6-year CIP OM-2 Repair and Replacement Program The District maintains a repair and replacement (R&R) program that identifies existing and potential future projects that need to be improved as part of the CIP. R&R projects that the District plans to implement within the 6-year planning period have been identified as individual projects within the CIP. However, future projects beyond the 6-year planning period but within the 20-year planning period must still be included in the District s future budget planning. Estimated Project Cost: $2,459,748 in the 10-year CIP $6,415,924 additional in the 20-year CIP OM-3 Grinder Pump Replacement Program The District maintains the residential grinder pump systems in their sewer service area. Each grinder pump is estimated to have a service life of 15 years. Therefore, the District maintains a program to replace aging grinder pump system every 15 years. Estimated Project Cost: $950,000in the 6-year CIP $360,000 additional in the 10-year CIP $1,320,000 additional in the 20-year CIP 2013 WASTEWATER COMPREHENSIVE PLAN AND GENERAL SEWER PLAN 7-15 DECEMBER 2014

16 CHAPTER 7 CAPITAL IMPROVEMENT PLAN OM-4 Cities Overlay and Road Improvements The District must respond to work to adjust the sewer system components when the land use jurisdiction has an overlay project. Estimated Project Cost: $37,500/year in the 6-year CIP 7.3 CAPITAL IMPROVEMENTS PLAN SCHEDULE Table 7-1 provides a summary of each capital improvement project and the proposed schedule for implementation. Several projects span multiple years. The District can reschedule its capital improvement projects as needed to accommodate unanticipated projects in the future. Wastewater base maps illustrating the conceptual location of the proposed capital improvement projects identified for each of the District s 13 sewer basins are presented in Figures 7-1 through A listing of the Sewer Basins is provided here for reference. An overall map is also provided as a pull-out map. Figure 7-1: Northeast Plateau Figure 7-8: Trossachs Figure 7-2: Beaver Dam Figure 7-9: Yellow Lake Figure 7-3: Inglewood East Figure 7-10: North Sunny Hills Figure 7-4: Tiburon Figure 7-11: Laughing Jacobs Figure 7-5: North Lake Sammamish Figure 7-12: South Pine Lake Figure 7-6: Central Lake Sammamish Figure 7-13: Freegard Figure 7-7: Mallard Bay WASTEWATER COMPREHENSIVE PLAN AND GENERAL SEWER PLAN DECEMBER 2014

17 240th Ave NE 259th Way NE LS-10 NE Redmond Fall City Rd NE 34th St 260th Ave NE NE 29th Ct NE 30th Pl 234th Pl NE NE 29th Pl NE 28th Pl NE 29th St NE 29th St 259th Ave NE NE 32nd St NE 29th Pl NE 27th St NE 27th Pl 233rd Ave NE NE 21st Pl NE 18th St 233rd Pl NE 234th Ave NE 232nd Pl NE NE 20th Pl 235th Ave NE NE 23rd St 234th Ave NE NE 19th Dr NE 17th St NE 16th Pl NE 21st St 236th Ave NE NE 24th Pl NE 22nd St NE 25th Way 238th Pl NE 239th Pl NE LS-16 NE 20th St GOOD SAMARITAN LS NE 25th St 244th Pl NE NE 19th St 245th Pl NE NE 26th St NE 24th St 246th Pl NE 247th Ct NE 247th Pl NE NE 18th St Pedestrian Walk 248th Pl NE 248th Ter NE CS-2A Easement CAMDEN PARK LS NE Ames Lake Rd NE 27th Dr 232nd Ave NE NE 15th St 233rd Ave NE NE 16th St NE 14th St NE 14th St 243rd Ave NE 244th Ave NE NE 11th Pl NE 11th St CS-2B 250th Ave NE 238th Ave NE NE 10th St 258th Ave NE 233rd Ave NE LEGEND: NE 8th St!! INGLEWOOD EAST NE 6th St NE 5th St NE 5th St 242nd Ave NE 245th Pl NE LS th Ln NE 254th Ave NE NE 8th Way NE 10th St NE 9th St! GRINDER PUMPS EXISTING LIFT STATION FUTURE LIFT STATION LOW PRESSURE FORCE MAIN FORCEMAINS & TIGHTLINES SAMMAMISH PLATEAU WATER & SEWER DISTRICT GRAVITY FUTURE SEWER MAINS: GRAVITY FORCE MAIN LOW PRESSURE FORCE MAIN FUTURE DISTRICT SEWER SERVICE BOUNDARY KING COUNTY PARCELS NORTHEAST PLATEAU ³ WASTEWATER COMPREHENSIVE PLAN FIGURE 7-1 NORTHEAST PLATEAU BASIN CAPITAL IMPROVEMENT PROJECT LEGEND: CS-X LS-X COLLECTION SYSTEM PROJECT ( 8" DIAMETER ) LIFT STATION & FORCEMAIN PROJECT ,200 Feet M:\SammPlat\11475 WW Comp Plan\GIS\Basins_CIP\Northeast_Plateau.mxd

18

19 240th Ave NE 245th Pl NE Windsor Dr SE 238th Ave NE 238th Ave NE NE 6th Pl INGLEWOOD EAST Easement NE 5th St NE 5th Pl 242nd Ave NE NE 7th Pl NE 10th St 244th Ave NE 245th Pl NE NE 8th St NORTHEAST PLATEAU LS-4B 250th Ln NE BEAVER DAM LS 250th Ave NE 254th Ave NE NE 10th St NE 8th Way 258th Ave NE NE 9th St 244th Walk NE NE 4th St NE 3rd Pl 246th Ct NE NE 3rd Pl 244th Ave NE NE 2nd Ct 249th Pl NE E Main Dr E Plateau Dr E Main St NE 1st Pl 244th Ave SE 245th Pl SE SE 3rd Ct 246th Way SE 1st St SE 2nd Pl 247th Ave SE SE 4th Pl 245th Ave SE SE Windsor Blvd SE 8th St INGLEWOOD EAST SE 14th St 248th Ave SE NORTH SUNNYHILLS 254th Pl SE LEGEND: EXISTING LIFT STATION FUTURE LIFT STATION LOW PRESSURE FORCE MAIN FORCEMAINS & TIGHTLINES GRAVITY FUTURE SEWER MAINS: GRAVITY FORCE MAIN LOW PRESSURE FORCE MAIN FUTURE DISTRICT SEWER SERVICE BOUNDARY KING COUNTY PARCELS BEAVER DAM CAPITAL IMPROVEMENT PROJECT LEGEND: LS-X LIFT STATION & FORCEMAIN PROJECT ³ ,000 Feet SAMMAMISH PLATEAU WATER & SEWER DISTRICT WASTEWATER COMPREHENSIVE PLAN FIGURE 7-2 BEAVER DAM BASIN M:\SammPlat\11475 WW Comp Plan\GIS\Basins_CIP\Beaver_Dam.mxd

20

21 218th Ave NE 227th Ave SE 219th Pl NE 240th Ave NE NE 17th Pl 217th Pl NE 217th Pl NE E Main St TIBURON SE 3rd Pl SE 5th Pl 218th Ave SE NE 16th St NE 9th St 218th Pl NE NE 17th Ct 219th Ave NE LS-15 SE 1st St SE 8th St NE 1st St 220th Ave SE NE 18th St 220th Pl NE 221st Ave NE SE 4th St 221st Pl NE NE 15th St NE 12th Pl 222nd Pl NE NE 9th Dr NE Inglewood Hill Rd NE 13th Pl 11th Pl NE 223rd Ct NE 222nd Pl SE 223rd Pl NE NE 14th Dr 224th Pl NE NE 10th St NE 7th St NE 6th Ct 224th Ave SE 225th Ave NE 224th Ave NE 224th Pl SE 225th Pl SE 225th Pl NE 226th Pl NE NE 12th Pl 225th Ct NE 227th Ave NE NE 18th Pl NE 16th St 227th Pl NE 228th Ave NE LS-6 228th Ave SE 228th Pl NE 229th Ave NE 231st Pl NE INGLEWOOD LS SE 6th Pl 229th Pl NE 230th Ave NE NE 17th Pl NE 13th St NE 4th St E Main St NE 18th St SE 1st St 232nd Ave NE 232nd Pl NE NE 10th Pl 233rd Ave NE 233rd Pl NE NE 17th St CL-4B NE 16th Pl NE 14th Pl NE 14th St E Main St 234th Pl NE 234th Ave SE 235th Ave NE SE 8th St 236th Ave NE 233rd Ave NE NE 8th St 237th Pl NE NE 4th Pl 238th Ave NE LS th Ave NE E Main St NORTHEAST PLATEAU NE 6th Pl NE 5th St Easement NE 5th Pl NE 14th St 242nd Ave NE 243rd Ave NE 244th Ave SE 244th Ave NE NE 10th St 244th Walk NE 244th Ave NE NE 4th St E Main Dr 245th Pl SE SE 4th Pl NE 16th St 245th Ave NE 245th Pl NE 246th Way NE 18th St NE 11th St 245th Ave SE NE 3rd Pl 247th Ave SE 246th Ct NE Windsor Dr SE BEAVER DAM CL-4A NORTH LAKE SAMMAMISH SE 16th Pl 223rd Ave SE SE 12th Pl SE 13th St SE 15th Pl SE 16th Pl SE 16th St SE 17th St SE 12th St 233rd Ave SE SE 15th Ct 235th Ave SE SE 16th Pl 238th Ave SE NORTH SUNNYHILLS SE Windsor Blvd SE 14th St 248th Ave SE LEGEND: EXISTING LIFT STATION FUTURE LIFT STATION LOW PRESSURE FORCE MAIN SAMMAMISH PLATEAU WATER & SEWER DISTRICT FORCEMAINS & TIGHTLINES GRAVITY FUTURE SEWER MAINS: GRAVITY FORCE MAIN LOW PRESSURE FORCE MAIN FUTURE DISTRICT SEWER SERVICE BOUNDARY KING COUNTY PARCELS WASTEWATER COMPREHENSIVE PLAN FIGURE 7-3 INGLEWOOD EAST BASIN Inglewood East CAPITAL IMPROVEMENT PROJECT LEGEND: LS-X CL-X LIFT STATION & FORCEMAIN PROJECT CRITICAL LINK PROJECT ³ ,400 Feet M:\SammPlat\11475 WW Comp Plan\GIS\Basins_CIP\Inglewood_East.mxd

22

23 209th Ave NE 210th Pl NE 211th Ave NE 217th Ave NE 218th Pl NE 219th Pl NE 222nd Ave NE NE 13th St 208th Ave NE NE 16th St 209th Ave NE NE 14th St NE Inglewood Hill Rd 209th Ave NE NE 11th St 210th Ave NE NE 15th St 210th Ave NE 208th Ave NE NE 9th St 211th Ave NE 211th Ave NE 211th Pl NE 211th Pl NE NE 15th St 212th Ave NE NE 15th St NE 14th Pl NE 13th Ct NE 8th St LS-8 NE 6th St NE 12th St 213th Pl NE NE 14th St NE 10th Pl NE 9th Pl NE 14th Pl NE 11th Pl 217th Pl NE 218th Ave NE 218th Ave NE NE 16th St 220th Pl NE 221st Ct NE NE 11th St 221st Ave NE NE 15th St NE 12th Pl 222nd Pl NE NE 13th Pl 222nd Pl NE 11th Pl NE 223rd Pl NE 22nd Pl NE 224th Pl NE NE 14th Dr NE 12th Ct NE 10th St 224th Ave NE 223rd Pl NE 208th Ave NE 209th Ave NE NE 8th Pl 214th Pl NE NE 8th St 216th Pl NE 217th Pl NE NE 9th St NE 9th Dr NE 6th Pl 216th Ave NE 216th Pl NE 218th Ave NE 218th Pl NE 219th Ave NE INGLEWOOD EAST 222nd Pl NE NE 7th St 208th Ave NE NE 5th Pl 208th Ave NE 210th Ave NE 210th Ave NE NE 4th St 211th Pl NE 212th Ave NE LS-7 NE 2nd St 218th Ave NE NE 4th St 219th Ave NE 221st Ave NE NE 3rd Pl 222nd Pl NE NE 2nd St NE 6th Ct 223rd Pl NE Louis Thompson Rd SE NORTH LAKE SAMMAMISH E Main St 210th Pl SE 211th Pl SE NE 1st St E Main St 214th Ave NE 214th Ave SE 215th Ave NE 216th Ave NE E Main St NE 1st St 223rd Ave NE LEGEND: EXISTING LIFT STATION FUTURE LIFT STATION LOW PRESSURE FORCE MAIN FORCEMAINS & TIGHTLINES GRAVITY FUTURE SEWER MAINS: GRAVITY FORCE MAIN LOW PRESSURE FORCE MAIN FUTURE DISTRICT SEWER SERVICE BOUNDARY KING COUNTY PARCELS TIBURON CAPITAL IMPROVEMENT PROJECT LEGEND: LS-X LIFT STATION & FORCEMAIN PROJECT ³ Feet SAMMAMISH PLATEAU WATER & SEWER DISTRICT WASTEWATER COMPREHENSIVE PLAN FIGURE 7-4 TIBURON BASIN M:\SammPlat\11475 WW Comp Plan\GIS\Basins_CIP\Tiburon.mxd

24

25 202nd Pl SE 208th Ave SE 210th Pl NE 218th Ave NE 227th Ave SE 227th Pl NE LS-2A NORTH LAKE SAMMAMISH LS LEGEND: LS-2B R-1B 190th Pl SE East Lake Sammamish Pkwy SE 192nd Ave SE SE 26th St EXISTING LIFT STATION FUTURE LIFT STATION LS-2B INT-1 193rd Ave SE SE 25th St LOW PRESSURE FORCE MAIN FORCEMAINS & TIGHTLINES GRAVITY FUTURE SEWER MAINS: GRAVITY FORCE MAIN LOW PRESSURE FORCE MAIN 194th Ave SE SE 16th St SE 24th Pl 196th Ave SE SE 28th Pl SE 27th Pl SE 28th Pl FUTURE DISTRICT SEWER SERVICE BOUNDARY KING COUNTY PARCELS NORTH LAKE SAMMAMISH CAPITAL IMPROVEMENT PROJECT LEGEND: INT-X R-X INTERCEPTOR PROJECT ( > 8" DIAMETER ) REGIONAL PROJECT R-1A R-1B 197th Ave SE SE 21st St SE 24th Way SE 29th St SE 10th St LS-14 SE 19th St SE 23rd St SE 25th Pl 200th Ave SE 201st Ave SE CL-3 204th Ave SE SE 8th St CENTRAL LAKE SAMMAMISH 202nd Ave SE 205th Ave NE NE 7th Ct ³ 205th Ave SE 205th Ave NE 206th Ave NE 206th Pl NE Louis Thompson Rd NE 205th Ct NE 206th Ave NE 207th Ave NE 207th Ave NE 207th Ave SE 207th Pl NE 207th Pl NE NE 16th St NE 8th St NE 3rd St 208th Ave SE NE 15th St NE 13th St 208th Ave SE NE 11th St NE 5th Pl 208th Ave NE 209th Pl SE 210th Ave NE NE 9th St NE 8th Pl Louis Thompson Rd SE SE 3rd Way 209th Ave NE 210th Ave NE 211th Ave NE SE 4th St SE 20th St SE 24th St SE 7th St SE 12th St 211th Ave NE 211th Pl NE 211th Pl NE 211th Pl SE 212th Ave SE NE 15th St 213th Pl NE NE 6th St NE 4th St SE 5th Pl SE 11th St 214th Ave SE SE 13th Pl SOUTH PINE LAKE R-1A NE 10th Pl NE Inglewood Hill Rd 214th Ave NE E Main St SE 1st St SE 26th St NE 9th Pl NE 6th Pl TIBURON 215th Pl SE SE 20th St NE 16th St 216th Ave NE E Main St 218th Ave SE LS-23 SE 16th Pl 215th Ln SE NE 8th St SE 8th St 216th Ave SE NE 4th St 217th Ave NE SE 3rd Pl 217th Ave SE SE 28th St NE 9th St 218th Pl NE 219th Ave NE SE 1st St 218th Ct SE 218th Ln SE 219th Ave NE 219th Ln SE 220th Ave SE 219th Pl SE 220th Pl NE 221st Ave NE 221st Ave NE NE 1st St 220th Ave SE 11th Pl NE 222nd Pl NE 222nd Ave NE INGLEWOOD EAST SE 4th St 223rd Ave SE NE 14th Dr 224th Pl NE Lancaster Way SE NE 9th Dr NORTH SUNNYHILLS SE 21st Pl 221st Pl SE NE 13th Pl NE 12th Pl SAMMAMISH PLATEAU WATER & SEWER DISTRICT 222nd Pl SE 223rd Ave NE 225th Ave NE NE 6th Ct 223rd Pl NE 225th Ave SE 225th Pl SE SE 23rd Pl WASTEWATER COMPREHENSIVE PLAN FIGURE 7-5 NORTH LAKE SAMMAMISH BASIN NE 12th Pl 226th Ave SE 225th Ct NE NE 2nd St SE 12th Pl SE 13th St 227th Ave NE SE 21st Pl SE 22nd Pl SE 23rd Pl SE 29th St 228th Ave SE LS-X LIFT STATION & FORCEMAIN PROJECT CL-X CRITICAL LINK PROJECT ,800 Feet M:\SammPlat\11475 WW Comp Plan\GIS\Basins_CIP\North_Lake_Sammamish.mxd

26

27 Easement 202nd Ave SE 202nd Pl SE SE 17th St SE 19th St 203rd Ave SE 190th Pl SE 192nd Ave SE SE 22nd Pl 193rd Ave SE 197th Ave SE SE 21st St SE 23rd St SE 20th Pl 201st Ave SE SE 23rd Pl NORTH LAKE SAMMAMISH 207th Ave SE SE 20th St 196th Ave SE SE 24th St CL 1 R-1B CL 2 East Lake Sammamish Pl SE 194th Ave SE 194th Pl SE SE 24th Pl SE 27th Pl SE 24th Way SE 28th Pl 196th Ave SE East Lk Sammamish Sh Ln SE SE 31st Pl 197th Ave SE SE 30th St 196th Ave SE SE 32nd St SE 25th Pl 200th Ave SE SE 29th St 199th Ave SE Easement SE 27th Pl 201st Ave SE 202nd Pl SE SE 26th St SE 30th St 204th Ave SE SE 26th St SE 28th Pl SOUTH PINE LAKE R-1B SE 33rd St 198th Pl SE CENTRAL LAKE SAMMAMISH LS SE 34th St SE 35th Pl LS-1 207th Ave SE LS-4B SE 39th St SE 39th Pl 212th Way SE SE 40th St LEGEND: EXISTING LIFT STATION FUTURE LIFT STATION LOW PRESSURE FORCE MAIN FORCEMAINS & TIGHTLINES GRAVITY East Lake Sammamish Pkwy SE 203rd Ave SE MALLARD BAY SAMMAMISH PLATEAU WATER & SEWER DISTRICT SE 40th Pl FUTURE SEWER MAINS: GRAVITY FORCE MAIN LOW PRESSURE FORCE MAIN FUTURE DISTRICT SEWER SERVICE BOUNDARY KING COUNTY PARCELS CENTRAL LAKE SAMMAMISH ³ WASTEWATER COMPREHENSIVE PLAN FIGURE 7-6 CENTRAL LAKE SAMMAMISH BASIN CAPITAL IMPROVEMENT PROJECT LEGEND: R-X REGIONAL PROJECT LS-X CL-X LIFT STATION & FORCEMAIN PROJECT CRITICAL LINK PROJECT ,000 Feet M:\SammPlat\11475 WW Comp Plan\GIS\Basins_CIP\Central_Lake_Sammamish.mxd

28

29 220th Pl SE SE 50th St SE 32nd St 198th Pl SE SE 33rd St East Lake Sammamish Pkwy SE East Lk Sammamish Sh Ln SE 199th Ave SE SE 30th St CENTRAL LAKE SAMMAMISH 207th Ave SE SE 34th St 212th Ave SE SE 35th Pl SE 34th Pl 211th Pl SE 212th Ct SE 212th Pl SE 213th Pl SE 213th Pl SE SE 28th Ln 214th Pl SE 214th Pl SE SE 35th Way SE 33rd Pl 216th Ave SE 216th Ct SE 216th Pl SE 217th Ave SE SE 30th Pl SE 32nd Pl 217th Pl SE SE 35th St SE 30th Ct 218th Ave SE 219th Pl SE 220th Ave SE 220th Pl SE 220th Pl SE SE 29th Pl SE 32nd St SE 32nd St SE 33rd St SE 34th St SE 35th St 221st Ave SE 222nd Pl SE 223rd Ave SE SE 39th St 202nd Pl SE 212th Way SE SE 37th St SE 39th St SOUTH PINE LAKE 221st Ave SE 221st Pl SE SE 38th St R-1B 203rd Ave SE 205th Ave SE SE 40th Pl R-2 SE 40th Ct SE 40th Ln SE 41st Ln 226th Pl SE 206th Ave SE SE 42nd St East Lk Sammamish Sh Ln SE SE 42nd Pl SE 42nd Ln 221st Pl SE 223rd Pl SE SE 42nd Ln ALEXANDER'S LS SE 43rd Way INT-5 MALLARD BAY LS SE 44th St Pedestrian Opas Pedestrian Walk FREEGARD LEGEND: EXISTING LIFT STATION FUTURE LIFT STATION LOW PRESSURE FORCE MAIN FORCEMAINS & TIGHTLINES GRAVITY FUTURE SEWER MAINS: GRAVITY FORCE MAIN LOW PRESSURE FORCE MAIN FUTURE DISTRICT SEWER SERVICE BOUNDARY KING COUNTY PARCELS MALLARD BAY CAPITAL IMPROVEMENT PROJECT LEGEND: R-X INT-X REGIONAL PROJECT INTERCEPTOR PROJECT ( > 8" DIAMETER ) ³ ,100 Feet SAMMAMISH PLATEAU WATER & SEWER DISTRICT WASTEWATER COMPREHENSIVE PLAN FIGURE 7-7 MALLARD BAY BASIN M:\SammPlat\11475 WW Comp Plan\GIS\Basins_CIP\Mallard_Bay.mxd

30

31 287th Ave SE 300th Ave SE 292nd Ave SE Redmond Fall City Rd 286th Ave SE SE 8th St 290th Ave SE 292nd Ave NE Snoqualmie River Rd SE SE 5th St West Beaver Lake Dr SE SE 18th Pl East Beaver Lake Dr SE 259th Pl SE 259th Pl SE Beaver Lake Way SE LS-18 YELLOW LAKE SE 34th St SE 36th St SE 33rd St 262nd Ave SE 261st Ave SE 264th Ave SE SE Duthie Hill Rd SE 37th St SE 25th St 271st Ave SE TROSSACHS LS LS-24 SE 22nd Way SE 25th Pl 274th Ave SE SE 26th Pl Trossachs Blvd SE 275th Ct SE SE 27th St LS-4B ALDARRA LS 292nd Ave SE ALDARRA CLUB LS LS-12 SR 202 SE 39th Way 262nd Ave SE SE 40th St 262nd Pl SE SE 42nd St SE 39th St 280th Ave SE SE Issaquah Fall City Rd SE 41st St 287th Ave SE 295th Ave SE LEGEND: EXISTING LIFT STATION FUTURE LIFT STATION LOW PRESSURE FORCE MAIN FORCEMAINS & TIGHTLINES GRAVITY FUTURE SEWER MAINS: GRAVITY FORCE MAIN LOW PRESSURE FORCE MAIN FUTURE DISTRICT SEWER SERVICE BOUNDARY KING COUNTY PARCELS TROSSACHS CAPITAL IMPROVEMENT PROJECT LEGEND: LS-X LIFT STATION & FORCEMAIN PROJECT ³ ,700 Feet SAMMAMISH PLATEAU WATER & SEWER DISTRICT WASTEWATER COMPREHENSIVE PLAN FIGURE 7-8 TROSSACHS BASIN M:\SammPlat\11475 WW Comp Plan\GIS\Basins_CIP\Trossachs.mxd

32

33 SE 44th St 256th Ave SE 236th Ave SE SE 32nd Way Issaquah Pine Lake Rd SE SE 24th St 241st Ave SE LAUGHING JACOBS SE 18th St SE 44th St 238th Ave SE 238th Ave SE SE 42nd Ct SE 42nd Pl 239th Ave SE Easement SE 33rd St SE 41st St SE 42nd St 239th Pl SE 239th Pl SE SE 25th Ct SE 40th Pl SE 44th Ct 239th Ave SE 240th Ave SE SE 28th St 240th Ave SE 239th Pl SE SE 39th Ct 240th Pl SE SE 41st Pl SE 42nd Pl SE 43rd Pl SE 22nd St SE 23rd St 241st Pl SE 243rd Ave SE 242nd Pl SE SE 44th St SE 18th Pl SE 37th Pl SE 40th Pl SE 44th Pl SE 45th Pl SE 21st St 242nd Ave SE SE 36th Pl SE 38th Pl SE 39th St SE 40th St SE 41st Ln SE 41st Pl 243rd Pl SE SE 45th St 242nd Ave SE 243rd Ave SE SE 35th Pl 244th Pl SE SE 46th Way SE 17th Pl SE 20th Pl SE 25th St 244th Ave SE SE 30th St SE 32nd St SE 34th Pl SE 39th Pl 245th Ave SE SE 42nd Pl 245th Ave SE SE 46th Ct 244th Ave SE SE 37th St 245th Pl SE SE 46th Pl SE 42nd Ct SE 46th St 246th Ave SE 248th Ave SE NORTH SUNNYHILLS SE 36th Ct 247th Ave SE SE 43rd Pl SE 44th Pl 246th Pl SE SE 44th Ct SE 45th St 247th Ave SE 247th Pl SE SE 31st Pl 248th Ave SE SE 38th St SE 45th Pl SE 28th Pl 248th Pl SE 248th Ct SE 248th Ln SE SE 46th Pl SE 17th St 249th Ave SE SE Issaquah-Fall City Rd LS-22 SE Klahanie Blvd SE 40th Dr SE 41st Dr SE 42nd Dr 251st Ave SE SE 31st Pl SE 42nd St 249th Ave SE 252nd Ave SE 252nd Ave SE 252nd Pl SE SE 43rd Way SE 43rd St Easement SE 43rd Pl LS-4A 253rd Pl SE SE 42nd St SE 18th Pl 255th Pl SE SE 19th Pl SE 28th St 254th Ave SE SE 41st Ct 257th Pl SE West Beaver Lake Dr SE SE 27th St East Beaver Lake Dr SE SE Issaquah Beaver Lake Rd Klahanie Dr SE SE 31st Pl SE 42nd Way 258th Ave SE 257th Ave SE SE 30th St SE 32nd Pl SE 35th Pl SE 41st St SE 39th St SE 40th St 257th Pl SE 258th Ave SE SE 22nd Pl 258th Pl SE SE 34th St 260th Ave SE SE 39th Way 259th Way SE SE 41st Pl SE 38th Ct SE 39th Pl SE 40th Ct 259th Ave SE 261st Ave SE SE 30th St SE 38th St SE 36th St 262nd Pl SE SE 27th St 262nd Ave SE SE 40th St SE 18th Pl East Beaver Lake Dr SE SE 29th St 261st Ave SE 262nd Ave SE SE 42nd St 263rd Ave SE 262nd Pl SE 263rd Pl SE 264th Ave SE SE Duthie Hill Rd SE 39th St 263rd Ct SE TROSSACHS BEAVER LAKE ESTATES LS 266th Ave SE SE 31st St SE 37th St SE Issaquah Fall City Rd LS-19 LS-21 LEGEND: EXISTING LIFT STATION FUTURE LIFT STATION LOW PRESSURE FORCE MAIN FORCEMAINS & TIGHTLINES GRAVITY FUTURE SEWER MAINS: GRAVITY FORCE MAIN LOW PRESSURE FORCE MAIN FUTURE DISTRICT SEWER SERVICE BOUNDARY KING COUNTY PARCELS YELLOW LAKE CAPITAL IMPROVEMENT PROJECT LEGEND: LS-X LIFT STATION & FORCEMAIN PROJECT ³ ,500 Feet SAMMAMISH PLATEAU WATER & SEWER DISTRICT WASTEWATER COMPREHENSIVE PLAN FIGURE 7-9 YELLOW LAKE BASIN M:\SammPlat\11475 WW Comp Plan\GIS\Basins_CIP\Yellow_Lake.mxd

34

35 Windsor Dr SE 218th Ave SE 218th Ave NE NE 1st St 220th Ave SE LS rd Ave NE SE 4th St NORTH LAKE SAMMAMISH 224th Ave SE 224th Pl SE 225th Pl SE NE 2nd St 228th Ave NE 228th Ave SE E Main St SE 1st St 232nd Ave NE E Main St INGLEWOOD EAST REDFORD HUDSON LS E Main St SE 8th St Easement 244th Ave NE 244th Ave SE NE 3rd Pl 245th Pl SE SE 4th Pl 246th Way SE Windsor Blvd 247th Ave SE NE 3rd Pl 249th Pl NE BEAVER DAM E Main Dr E Plateau Dr M-2 217th Ave SE 218th Ln SE 219th Ln SE LS-4A 219th Pl SE SE 37th St SE 16th Pl 219th Pl SE SE 20th St SE 32nd St 223rd Ave SE SOUTH PINE LAKE 220th Pl SE SE 21st Pl SE 28th St LEGEND: 220th Ave SE SE 29th Pl 220th Pl SE SE 33rd St 221st Ave SE 222nd Pl SE SE 38th St 221st Pl SE 223rd Ave SE 223rd Pl SE 224th Ave SE EXISTING LIFT STATION FUTURE LIFT STATION 224th Ln SE 225th Ave SE LOW PRESSURE FORCE MAIN FORCEMAINS & TIGHTLINES GRAVITY FUTURE SEWER MAINS: GRAVITY FORCE MAIN LOW PRESSURE FORCE MAIN SE 15th Pl 225th Pl SE SE 16th Pl 226th Ave SE SE 36th Ln 224th Ln SE SE 18th St SE 29th St SE 16th St SE 35th St SE 17th St SE 21st Pl SE 22nd Pl FUTURE DISTRICT SEWER SERVICE BOUNDARY KING COUNTY PARCELS NORTH SUNNYHILLS CAPITAL IMPROVEMENT PROJECT LEGEND: INT-X LS-X INTERCEPTOR PROJECT ( > 8" DIAMETER ) LIFT STATION & FORCEMAIN PROJECT SE 21st St 229th Ave SE OM-1 TODD'S LANDING LS SE 27th Ct SE 37th St SE 40th St 230th Pl SE SE 42nd Ct 230th Ln SE 231st Ave SE Audubon Park Dr SE 231st Ln SE SE 35th Pl 234th Ave SE 235th Ave SE 234th Pl SE SE 26th Pl SE 31st St 236th Ave SE SE 32nd Way SE 18th St 238th Ave SE 238th Ave SE LAUGHING JACOBS ³ 238th Ave SE SE 35th St SE 24th St 239th Ave SE Easement SE 40th Pl 239th Pl SE SE 25th Ct 239th Pl SE 240th Pl SE 241st Ave SE SE 41st Pl SE 18th Pl SE 22nd St SE 23rd St 242nd Ave SE SE 28th St SE 16th Pl SE 21st St 243rd Ave SE SE 32nd St SE 17th Pl SE 34th Pl 245th Ave SE INT-2 SE 40th St SE 40th Pl SE 41st Ln SE 41st Pl 244th Pl SE SE 20th Pl 244th Ave SE 244th Ave SE 246th Ave SE SE 30th St SE 14th St 247th Ave SE 248th Ave SE YELLOW LAKE SE 37th St SE 37th Pl SE 38th St SE 28th Pl 248th Pl SE SE 17th St 249th Ave SE SE Klahanie Blvd SE 40th Dr Easement 251st Pl SE SE 41st Dr 251st Ave SE 251st Ave SE SE 42nd St SE 23rd St 252nd Ave SE 252nd Ave SE Easement 252nd Pl SE 254th Pl SE SE Issaquah Beaver Lake Rd 253rd Ct SE 253rd Pl SE 255th Pl SE West Beaver Lake Dr SE SE 19th Pl 254th Ave SE East Beaver Lake Dr SE 254th Ave SE SE 28th St 256th Ave SE Klahanie Dr SE SE 31st Pl SE 41st St SE 27th St SE 30th St SE 32nd Pl SE 35th Pl SE 37th Way SE 40th St SAMMAMISH PLATEAU WATER & SEWER DISTRICT SE 34th St 260th Ave SE SE 39th Way 259th Way SE WASTEWATER COMPREHENSIVE PLAN FIGURE 7-10 NORTH SUNNYHILLS BASIN SE 22nd Pl Beaver Lake Way SE 259th Ave SE 260th Pl SE 36th St SE 38th St 261st Ave SE 262nd Ave SE SE 40th St M-X MISCELLANEOUS PROJECT OM-X OPERATION AND MAINTENANCE PROJECT ,900 Feet M:\SammPlat\11475 WW Comp Plan\GIS\Basins_CIP\North_Sunnyhills.mxd

36

37 223rd Ave SE 226th Pl SE 223rd Pl SE SE 42nd Ln 224th Pl SE SE 37th Ter SE 43rd Way INT-5 SOUTH PINE LAKE 224th Ct SE SE 36th Ln 225th Pl SE SE 38th Ter Providence Point Dr SE SE 42nd Ter 228th Ave SE Providence Point Dr SE SE 42nd Ct Pedestrian Opas 228th Ave SE SE 37th St SE 40th St 229th Ave SE SE 41st Ct 229th Ct SE SE 43rd Pl 229th Pl SE SE 41st Pl SE 42nd Ct 230th Way SE 230th Pl SE 231st Ct SE SE 38th Pl 231st Ave SE 232nd Ct SE 232nd Ave SE SE 40th Pl SE 45th Pl SE 40th Ct 232nd Ave SE 234th Ave SE SE 42nd St NORTH SUNNYHILLS INT-5 Issaquah Pine Lake Rd SE 239th Pl SE SE 44th St 239th Pl SE 240th Pl SE SE 37th Pl 243rd Ave SE 244th Pl SE SE 34th Pl SE Klahanie Blvd YELLOW LAKE 246th Pl SE 225th Ave SE SE 47th Pl FREEGARD 227th Pl SE SE 53rd St SE 48th St SE 52nd St SE 51st Pl SE 47th Way 238th Pl SE 238th Pl SE SE 42nd Ct SE 42nd Pl SE 41st St SE 42nd St SE 44th Ct 241st Ave SE SE 39th Ct SE 40th Pl 241st Ct SE SE 41st Pl SE 42nd Pl SE 42nd St SE 43rd Pl 241st Pl SE 242nd Ave SE 242nd Pl SE SE 39th St SE 40th Pl SE 41st Ln 243rd Ln SE 243rd Pl SE SE 42nd Pl SE 44th St SE 44th Pl SE 45th St SE 35th Pl SE 36th Pl SE 38th Pl SE 40th St SE 41st St 245th Ave SE 246th Ave SE SE 39th Pl SE 42nd Pl 245th Ave SE SE 44th Ct SE 43rd Pl SE 44th St SE 44th Pl 245th Pl SE SE 37th St SE 36th Ct 247th Ave SE 248th Ave SE SE 38th St SE 44th Ct SE 45th St SE 37th Pl 248th Ct SE SE 45th Pl SE 50th St SE 46th Pl SE 48th Pl SE 51st St 227th Ave SE 228th Ave SE 227th Ave SE 228th Ave SE 229th Ave SE 229th Pl SE 230th Ter SE SE 47th Ct 231st Ave SE SE 45th Ct 231st Ave SE 231st Pl SE 232nd Ave SE 233rd Ave SE 234th Ave SE SE 54th Pl 235th Ave SE 236th Ave SE Summerhill Condos AcRd 238th Way SE SE Issaquah-Fall City Rd 239th Ave SE 240th Ave SE Highlands Dr NE 240th Ave SE 240th Ave SE 241st Ave SE SE 46th Pl SE 49th Pl SE 47th Pl SE Issaquah Fall City Rd SE 45th Pl 242nd Ave SE 242nd Ave SE 243rd Ct SE SE 46th Way SE 47th St SE 46th Ct 244th Ave SE 244th Pl SE SE 46th Pl SE 46th St SE Issaquah-Fall City Rd SE 45th Way 247th Pl SE LEGEND: EXISTING LIFT STATION FUTURE LIFT STATION LOW PRESSURE FORCE MAIN FORCEMAINS & TIGHTLINES GRAVITY FUTURE SEWER MAINS: GRAVITY FORCE MAIN LOW PRESSURE FORCE MAIN FUTURE DISTRICT SEWER SERVICE BOUNDARY KING COUNTY PARCELS Laughing Jacobs CAPITAL IMPROVEMENT PROJECT LEGEND: INT-X INTERCEPTOR PROJECT ( > 8" DIAMETER ) ³ ,100 Feet SAMMAMISH PLATEAU WATER & SEWER DISTRICT WASTEWATER COMPREHENSIVE PLAN FIGURE 7-11 LAUGHING JACOBS BASIN M:\SammPlat\11475 WW Comp Plan\GIS\Basins_CIP\Laughing_Jacobs.mxd

38

39 NORTH LAKE SAMMAMISH LS-4 SE34th St 211th PlSE 212th Ave SE SE35th Way SE26th St SE27th St SE28th St SE29th St 213th Ave SE SE32nd St 212th CtSE SE28th L n SE35th Pl SE34th Pl 213th PlSE 213th PlSE 214th Ave SE 214th PlSE 214th PlSE SE33rd Pl 216th Ave SE 216th CtSE 216th PlSE SE28th St 217th Ave SE SE34th Pl PINE LAKE HEIGHTS LS SE30th Pl SE32nd Pl 217th PlSE SE35th St SE30th Ct 218th Ave SE 219th PlSE 220th Ave SE 220th PlSE 220th PlSE SE33rd St CS-1 222nd PlSE SE29th Pl SE32nd St SE34th St SE35th St 221stAve SE 223rd Ave SE SE23rd Pl LS-3 FIRST BRANCH LS 225th Ave SE 226th Ave SE 224th PlSE SE23rd Pl NORTH SUNNY HILLS 226th Ave SE SE27th St SE29th St SE35th St 228th Ave SE U nnam ed SE24th St 230th Ave SE SE27th Ct U nnam ed U nnam ed Issaquah Pine L ake Rd SE 230th L n SE SE36th L n 212th Way SE SE42nd St EastL k Sam m am ish Sh L n SE LEGEND: SE40th Pl EastL ake Sam m am ish Pkwy SE EXISTIN G L IFTSTATION FU TU REL IFTSTATION L OW PRESSU REFORCEMAIN FORCEMAIN S &TIGHTL IN ES GRAV ITY FUTURE SEWER MAINS: GRAV ITY FORCEMAIN L OW PRESSU REFORCEMAIN SE39th St MALLARD BAY SE42nd Pl SE42nd L n FU TU REDISTRICTSEWERSERV ICEBOU N DARY KIN G COU N TY PARCEL S SOU THPIN EL AKE CAPITAL IMPROVEMENT PROJECT LEGEND: CS-X LS-X INT-X COL L ECTION SY STEM PROJECT ( 8"DIAMETER) L IFTSTATION &FORCEMAIN PROJECT IN TERCEPTORPROJECT (>8"DIAMETER) U nnam ed SE44th St SE38th Pl LS th Ave SE SE43rd Way SE37th St ³ ,000 Feet 221stAve SE SE40th Ct 221stPlSE 220th PlSE 221stPlSE SE38th St 222nd Ave SE SE40th L n SE41stL n 221stCtSE Pedestrian Opas Co m m unity CenterAcRd 226th PlSE 223rd PlSE SEHighland Ter 224th L n SE SE42nd L n 224th PlSE 225th PlSE SE37th Ter SE38th Ter 225th PlSE 224th L n SE INT-5 SE42nd Ter Pro vidence Heights L o o p SE43rd Ct SE42nd Ct SAMMAMISHPL ATEAU WATER&SEWERDISTRICT M:\Sam m Plat\11475WW Co m pplan\gis\basins_ CIP\So uth_ Pine_ L ake.m xd 228th Ave SE U nnam ed INT-6 229th Ave SE SE40th St 230th Way SE LAUGHING JACOBS WASTEWATERCOMPREHEN SIV EPL AN FIGU RE7-12 SOU THPIN EL AKEBASIN SE37th St SE42nd Ct 230th PlSE

40

41 Kalmia Ct NW FREEGARD LS LS-5A MALLARD BAY East Lake Sammamish Pkwy SE Parking lot AcRd 220th Ave SE SE 51st St SE 51st Pl SE 50th St 225th Ave SE SE 47th Pl SE 48th Pl SE 46th Pl 227th Ave SE 227th Pl SE 228th Ave SE 227th Ave SE 228th Ave SE 229th Ave SE 229th Pl SE 230th Way SE 231st Ave SE 230th Ter SE SE 45th Pl 231st Ave SE 231st Pl SE SE 53rd St SE 47th St SE 48th St LAUGHING JACOBS SE 52nd St 234th Ave SE SE 51st Pl SE 54th Pl SE 47th Way 235th Ave SE 236th Ave SE Issaquah Pine Lake Rd SE 238th Pl SE 238th Way SE SE Issaquah-Fall City Rd SE 45th St SE 46th Pl 240th Ave SE 240th Ave SE 240th Pl SE SE 45th Pl SE 44th Pl 242nd Ave SE SE 45th St 242nd Ave SE 243rd Ct SE SE 47th St NW Sammamish Rd LS-5B NW Sammamish Rd 221st Pl SE SE 56th St 229th Ave SE 230th Ave SE 232nd Ave SE SE 58th St SE 57th St SE Black Nugget Rd LS-4A I-90 Ramp I-90 Ramp NW Maple St NW Newport Way INT-3 LS-9 7th Ave NW NW Locust St INT-4 5th Ave NW NW Juniper St NW Gilman Blvd SE 62nd St I-90 Fwy 224th Ave SE SE 64th Pl I-90 Ramp 229th Ave SE 230th Ave SE NE Locust St NE Juniper St SE Issaquah Fall City Rd INT-4 SE 59th St 239th Ave SE NE High St 9th Ave NE Highlands Dr NE E Dr SE 60th St NE Park Dr 11th Ave NE 12th Ave NW Kalmia Pl NW NW Inneswood Dr NW Firwood Blvd Kalmia Pl NW Jasmine Pl NW Indigo Pl NW NW Everwood Dr NW Everwood Ct NW Datewood Dr Newport Way NW Dorado Dr NW NW Holly St School District Rd School District Rd 3rd Ct NW 3rd Ave NW 2nd Ave NW NW Dogwood St Rainier Blvd N Front St N NE Gilman Blvd I-90 Fwy NE Dogwood St 1st Ave NE I-90 Ramp 3rd Ave NE SE 74th St I-90 Ramp I-90 Ramp I-90 Fwy I-90 Fwy LEGEND: EXISTING LIFT STATION FUTURE LIFT STATION LOW PRESSURE FORCE MAIN FORCEMAINS & TIGHTLINES GRAVITY FUTURE SEWER MAINS: GRAVITY FORCE MAIN LOW PRESSURE FORCE MAIN FUTURE DISTRICT SEWER SERVICE BOUNDARY KING COUNTY PARCELS FREEGARD CAPITAL IMPROVEMENT PROJECT LEGEND: INT-X INTERCEPTOR PROJECT ( > 8" DIAMETER ) LS-X LIFT STATION & FORCEMAIN PROJECT ³ ,400 Feet SAMMAMISH PLATEAU WATER & SEWER DISTRICT WASTEWATER COMPREHENSIVE PLAN FIGURE 7-13 FREEGARD BASIN M:\SammPlat\11475 WW Comp Plan\GIS\Basins_CIP\Freegard.mxd

42

43 CHAPTER 7 CAPITAL IMPROVEMENT PLAN TABLE 7-1 Capital Improvements Plan Schedule Funding Information Schedule and Cost of Improvements (1) Project Project Funding Funding Source Type year CIP Total Project No. Description Purpose of Project 6-year CIP Total Regional Projects R-1A North Diversion Project Growth King County CIP $0 $0 $0 $0 $0 $0 $0 $14,330,000 $14,330,000 $0 $14,330,000 R-1B North Diversion Delay -Project Growth GFC CIP $0 $0 $0 $1,394,500 $1,700,100 $1,751,100 $4,845,700 $6,844,300 $11,690,000 $0 $11,690,000 R-2 Control Structure Modifications O&M, Improvement 50%R&R, 50% GFC CIP $0 $30,000 $120,000 $600,000 $0 $0 $750,000 $0 $750,000 $0 $750,000 Interceptor and Transmission Main Projects INT-1 East Lake Sammamish Parkway SE Gravity Sewer Replacement at Montage, 12 Inch to 15 Inch Deficiency R&R CIP $0 $0 $0 $0 $0 $0 $0 $0 $0 $352,163 $352,163 INT-2 Issaquah-Pine Lake Road and 234 th Avenue SE Gravity Sewer Main Replacement, 8 Inch to 12 Inch Deficiency R&R CIP $0 $0 $231,658 $0 $0 $0 $231,658 $0 $231,658 $0 $231,658 INT st Place SE and SE 56 th Street Gravity Sewer Main Replacement, 12 Inch to 18 Inch Growth GFC CIP $0 $0 $144,604 $297,885 $0 $0 $442,489 $0 $442,489 $0 $442,489 INT-4 SE 62 nd St and E Lake Sammamish Pkwy SE Gravity Sewer 50%Rates, Deficiency Main Replacement, 8 In to 12 In or Slope Adj. 50% GFC CIP $0 $0 $0 $494,098 $0 $0 $494,098 $0 $494,098 $0 $494,098 INT-5 South Plateau Conveyance Parallel Interceptor, 20 Inch Growth GFC CIP $0 $0 $0 $0 $0 $0 $0 $6,300,000 $6,300,000 $0 $6,300,000 INT-6 South Pine Lake Interceptor Replacement th Avenue SE to 219 th Avenue SE, 10 Inch and 12 Inch O&M R&R CIP $0 $0 $0 $0 $582,535 $600,011 $1,182,547 $0 $1,182,547 $0 $1,182,547 Collection System Projects CS-1 Water's Edge Lift Station Collection Sewer System Improvement LFC CIP $0 $0 $0 $0 $0 $0 $0 $1,600,000 $1,600,000 $0 $1,600,000 CS-2A Camden Park Shallow Sewer Replacement Deficiency GFC CIP $450,000 $0 $0 $0 $0 $0 $450,000 $0 $450,000 $0 $450,000 CS-2B Camden Park Gravity Connection Improvement LFC DEA $0 $649,801 $669,295 $0 $0 $0 $1,319,097 $0 $1,319,097 $0 $1,319,097 Critical Link Projects CL-1 South End East Lake Sammamish Parkway/Place Crossing, Gravity Sewer - 8 Inch Improvement LFC ULID/DEA $0 $0 $0 $0 $0 $0 $0 $184,481 $184,481 $0 $184,481 CL-2 Upper Waverly Connecting Sewer, Gravity Sewer - 8 Inch Improvement LFC ULID/DEA $0 $0 $0 $0 $434,728 $0 $434,728 $0 $434,728 $0 $434,728 CL-3 Louis Thompson Sewer Main, Gravity Sewer - 8 Inch Improvement LFC CIP $0 $0 $0 $0 $0 $1,194,052 $1,194,052 $0 $1,194,052 $0 $1,194,052 CL-4A Sammamish Town Center Initiation Support (SE 4 th and Other Gravity) Improvement LFC CIP $0 $0 $0 $281,377 $579,637 $0 $861,014 $0 $861,014 $0 $861,014 CL-4B Sammamish Town Center Collection System Improvement LFC ULID/DEA $0 $0 $0 $0 $997,500 $1,027,400 $2,024,900 $5,291,200 $7,316,100 $11,041,200 $18,357,300 Lift Station and Force Main Projects LS-1 Central Lake Sammamish Lift Station Improvement - 3 rd 22%R&R, Growth/Improvement Pump Installation 78% GFC CIP $190,594 $5,000 $0 $0 $0 $0 $195,594 $0 $195,594 $0 $195,594 LS-2A North Lake Sammamish Lift Station Improvement, Phase I 22%R&R, Growth/Improvement - 3 rd Pump Installation 78% GFC CIP $190,594 $5,000 $0 $0 $0 $0 $195,594 $0 $195,594 $0 $195,594 LS-2B North Lake Sammamish Lift Station Improvement, Phase II - Capacity and Force Main Upgrade Growth GFC CIP $0 $0 $0 $0 $0 $0 $0 $4,300,869 $4,300,869 $0 $4,300,869 LS-3 Water's Edge Lift Station Improvement LFC CIP $51,940 $0 $0 $0 $0 $0 $51,940 $1,500,000 $1,551,940 $0 $1,551,940 LS-4A Flow Meter Installation Program (Todds Landing, Pine 50%Rates, O&M/Growth Lake Glen, Beaver Lake Estates, Freegard) 50% GFC CIP $0 $25,000 $25,000 $30,000 $30,000 $0 $110,000 $0 $110,000 $0 $110,000 LS-4B Flow Meter Replacement Program (Beaverdam, Aldarra, Central Lake) O&M/Growth R&R CIP $0 $10,000 $10,000 $10,000 $0 $0 $30,000 $0 $30,000 $0 $30,000 LS-5A Freegard Lift Station Replacement, Phase I - Wet Well Growth GFC CIP $0 $0 $0 $548,686 $565,146 $0 $1,113,832 $0 $1,113,832 $0 $1,113,832 LS-5B Freegard Lift Station Replacement, Phase II - Mechanical, 22.5%R&R, O&M/Growth Electrical and Flow Meter 77.5% GFC CIP $0 $0 $0 $0 $304,309 $313,439 $617,748 $0 $617,748 $0 $617,748 LS-24 Trossachs Lift Station Pump Replacement O&M R&R CIP $15,000 $40,000 $0 $0 $0 $0 $55,000 $0 $55,000 $0 $55,000 LS-6 Inglewood Odor Evaluation Study 50%Rates, 50% GFC CIP $0 $70,000 $227,560 $0 $0 $0 $297,560 $0 $297,560 $0 $297, year CIP Total 2013 WASTEWATER COMPREHENSIVE PLAN AND GENERAL SEWER PLAN 7-17 DECEMBER 2014

44

45 CHAPTER 7 CAPITAL IMPROVEMENT PLAN TABLE 7-1 (continued) Capital Improvements Plan Schedule Funding Information Schedule and Cost of Improvements (1) Project No. Description Purpose of Project Project Funding Source Project Funding Type year CIP Total year CIP Total year CIP Total LS-7 Tiburon Lift Station Improvement LFC CIP $0 $0 $0 $0 $0 $0 $0 $1,886,627 $1,886,627 $0 $1,886,627 LS-8 NOT USED $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 LS-9 North Fork Lift Station Improvement LFC ULID/DEA $0 $0 $0 $0 $0 $0 $0 $0 $0 $735,693 $735,693 LS-10 Broadmoore Estates Lift Station Improvement LFC ULID/DEA $0 $0 $0 $0 $0 $0 $0 $2,644,229 $2,644,229 $0 $2,644,229 LS-11 Treefarm East Lift Station Improvement LFC ULID $0 $0 $0 $0 $0 $0 $0 $0 $0 $795,575 $795,575 LS-12 Aldarra Golf South Lift Station Improvement LFC DEA $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,140,609 $1,140,609 LS rd Lift Station Improvement LFC DEA $0 $0 $0 $0 $0 $0 $0 $662,902 $662,902 $0 $662,902 LS-14 Loree Estates Lift Station Improvement LFC ULID $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,352,505 $2,352,505 LS-15 Inglewood Lift Station Capacity Evaluation & Pump Upgrade for Buildout Growth GFC CIP $0 $0 $0 $0 $0 $0 $0 $0 $0 $323,790 $323,790 LS-16 Wesley Cove Lift Station Improvement LFC DEA $0 $0 $0 $0 $0 $0 $0 $581,730 $581,730 $0 $581,730 LS-17 Swan Ridge Interim Lift Station Interim Improvement LFC ULID/DEA $0 $0 $0 $0 $0 $0 $0 $614,937 $614,937 $0 $614,937 LS-18 High Country 3 Lift Station Improvement LFC ULID $0 $0 $0 $0 $0 $0 $0 $843,693 $843,693 $0 $843,693 LS-19 High Country Entrance Lift Station Improvement LFC ULID $0 $0 $0 $0 $0 $0 $0 $0 $0 $950,983 $950,983 LS-20 Providence Ridge Lift Station Improvement LFC DEA $0 $0 $0 $0 $0 $0 $0 $614,937 $614,937 $0 $614,937 LS-21 Tibbetts Station 1 Lift Station Improvement LFC ULID $0 $0 $0 $0 $0 $0 $0 $712,097 $712,097 $0 $712,097 LS-22 Sunnyhills Estates 2 Lift Station Improvement LFC ULID $0 $0 $0 $0 $0 $0 $0 $696,109 $696,109 $0 $696,109 LS-23 French SE 8th Lift Station Improvement LFC DEA $0 $0 $0 $0 $0 $0 $0 $1,543,492 $1,543,492 $0 $1,543,492 Miscellaneous Projects M-1 NOT USED $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 M-2 District Headquarters Site Expansion - 60% Water/40% 50%Rates, Improvement Sewer ( % to Rates) 50% GFC CIP $164,000 $800,000 $686,000 $0 $0 $0 $1,650,000 $0 $1,650,000 $0 $1,650,000 M-3A New Vehicles - 60% Water/40% Sewer (2013 Rates/R&R 25% Rates / Improvement Split based on actual) 75% R&R CIP $92,660 $84,000 $90,000 $98,000 $104,000 $112,000 $580,660 $689,169 $1,269,829 $2,265,527 $3,535,356 M-3B New Equipment - 60% Water/40% Sewer ( % Rates / Improvement Rates/R&R Split based on actual) 50% R&R CIP $49,330 $44,800 $56,000 $56,000 $56,000 $56,000 $318,130 $280,000 $598,130 $504,000 $1,102,130 M Seismic VA 60% Water/40% Sewer + Seismic Retrofit Program 100% Water Study Rates CIP $36,000 $6,000 $0 $0 $0 $0 $42,000 $0 $42,000 $0 $42,000 M-5 Environmental Protection Program - 60% Water/40% Sewer Study Rates CIP $0 $0 $28,840 $12,600 $0 $0 $41,440 $0 $41,440 $0 $41,440 M-6 Security Improvements - 60% Water/40% Sewer Improvement Rates CIP $0 $16,960 $17,480 $18,000 $18,560 $19,120 $90,120 $19,680 $109,800 $0 $109,800 M-7 NOT USED $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 M-8 NOT USED $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 M-9 Sewer Comprehensive Plan Update (Every 6 Years) Study GFC CIP $135,000 $15,000 $0 $0 $48,700 $451,400 $650,100 $0 $650,100 $0 $650,100 Operation & Maintenance Projects OM-1 District Headquarters Maintenance Program - 60% Water/40% Sewer O&M Rates CIP $13,105 $66,000 $18,000 $16,000 $0 $0 $113,105 $0 $113,105 $0 $113,105 NOT USED $0 $0 $0 OM-2 Repair and Replacement Program (Individual projects listed for ) O&M R&R CIP $0 $0 $0 $0 $0 $0 $0 $2,459,748 $2,459,748 $6,415,924 $8,875,672 OM-3 Grinder Pump Replacement Program O&M R&R CIP $310,000 $160,000 $160,000 $160,000 $160,000 $0 $950,000 $360,000 $1,310,000 $1,320,000 $2,630,000 OM-4 Cities Overlay & Road Improvements O&M Rates CIP $37,500 $37,500 $37,500 $37,500 $37,500 $37,500 $225,000 $0 $225,000 $0 $225, WASTEWATER COMPREHENSIVE PLAN AND GENERAL SEWER PLAN 7-18 DECEMBER 2014

46

47 CHAPTER 7 CAPITAL IMPROVEMENT PLAN TABLE 7-1 (continued) Capital Improvements Plan Schedule Funding Information Schedule and Cost of Improvements (1) Project No. Description Purpose of Project Project Funding Source Project Funding Type year CIP Total year CIP Total year CIP Total Total Costs of Sewer System Projects $2,422,776 $1,848,836 $2,223,294 $3,579,444 $4,788,487 $16,626,649 $31,489,485 $32,670,346 $64,159,831 $21,121,480 $85,281,311 $62,819,515 $23,278,427 $86,097,942 Sub Total: Funded by District Sources = General Facility Improvements (GFCs) Growth GFC CIP $882,327 $485,300 $673,884 $2,803,119 $2,564,786 $2,445,415 $9,854,831 $17,445,169 $27,300,000 $323,790 $27,623,790 Sub Total: Funded by District Sources = Capital Deficiency, O&M, Replacement (R&R) Imp R&R CIP $489,376 $290,200 $557,158 $571,500 $917,005 $782,535 $3,607,774 $3,476,624 $7,084,398 $10,039,232 $17,123,630 Sub Total: Funded by District Sources = Capital Operations (Rates) O&M, Imp, Study Rates CIP $312,081 $639,760 $621,600 $398,649 $125,060 $112,620 $2,209,770 $331,972 $2,541,742 $818,382 $3,360,124 Sub Total: Funded by District Sources = Local Facility Improvements (LFCs) Improvement LFC CIP $51,940 $0 $0 $281,377 $579,637 $1,194,052 $2,107,007 $4,986,627 $7,093,633 $0 $7,093,633 Sub Total: Funded by Other Sources - DEA or ULID = Local Facility Improvements (LFCs) Improvement LFC ULID or DEA $0 $649,801 $669,295 $0 $1,432,227 $1,027,400 $3,778,724 $14,389,807 $18,168,531 $17,016,564 $35,185,095 King Sub Total: Funded by King County = Regional CIP Growth CIP $0 $0 $0 $0 $0 $0 $0 $14,330,000 $14,330,000 $0 $14,330,000 County TOTAL $1,735,723 $2,065,061 $2,521,938 $4,054,646 $5,618,715 $5,562,022 $21,558,105 $54,960,199 $76,518,304 $28,197,968 $104,716,272 (1) Project costs are escalated based on a 3 percent annual rate of interest inflation and applied to projects implemented after Project costs for 2013 are not escalated WASTEWATER COMPREHENSIVE PLAN AND GENERAL SEWER PLAN 7-19 DECEMBER 2014

CHAPTER 8 CAPITAL IMPROVEMENT PLAN

CHAPTER 8 CAPITAL IMPROVEMENT PLAN INTRODUCTION CHAPTER 8 CAPITAL IMPROVEMENT PLAN This chapter presents a 10-year Capital Improvement Plan (CIP). Wastewater capital improvements have been scheduled and prioritized on the basis of growth,

More information

CHAPTER 8 CAPITAL IMPROVEMENT PLAN

CHAPTER 8 CAPITAL IMPROVEMENT PLAN INTRODUCTION CHAPTER 8 CAPITAL IMPROVEMENT PLAN This chapter presents 6-, 10-, and 20-year Capital Improvement Plans (CIPs) in accordance with the requirements of WAC 26-290. Water system capital improvements

More information

Table of Contents. 3.1 Source Capacity Analysis

Table of Contents. 3.1 Source Capacity Analysis Table of Contents 3.1 Source Capacity Analysis... 3-1 3.1.1. Design Criteria... 3-1 3.1.2. Source Capacity Evaluation... 3-1 3.1.2.1 Plateau Zone... 3-1 3.1.2.2 Cascade View Zone... 3-4 3.2 Storage Capacity

More information

CHAPTER 5 EXISTING FACILITIES

CHAPTER 5 EXISTING FACILITIES CHAPTER 5 EXISTING FACILITIES INTRODUCTION The District s original wastewater collection system was constructed and brought on-line in 1970 and 1971. Additional sewer facilities have been constructed within

More information

CHAPTER 6 COLLECTION SYSTEM HYDRAULIC MODEL

CHAPTER 6 COLLECTION SYSTEM HYDRAULIC MODEL CHAPTER 6 COLLECTION SYSTEM HYDRAULIC MODEL INTRODUCTION The District developed a hydraulic model of the sanitary sewer system as part the 2000 Wastewater Comprehensive Plan. The output from this model

More information

4 EXISTING FACILITIES EVALUATION

4 EXISTING FACILITIES EVALUATION 4 EXISTING FACILITIES EVALUATION The City is served by a combination of wastewater collection, conveyance, and treatment systems. The City owns and operates the collection system that collects wastewater

More information

CHAPTER 5. COLLECTION SYSTEM ALTERNATIVES

CHAPTER 5. COLLECTION SYSTEM ALTERNATIVES CHAPTER 5. COLLECTION SYSTEM ALTERNATIVES This chapter evaluates alternative wastewater collection system technologies. Each technology is described along with the relative advantages and drawbacks for

More information

CHAPTER 4 SYSTEM DESIGN CRITERIA

CHAPTER 4 SYSTEM DESIGN CRITERIA INTRODUCTION CHAPTER 4 SYSTEM DESIGN CRITERIA Adequate design of the District s wastewater conveyance facilities requires the determination of the quantity of wastewater from contributing sources. The

More information

CENTRAL KITSAP COUNTY WASTEWATER FACILITY PLAN ADDENDUM

CENTRAL KITSAP COUNTY WASTEWATER FACILITY PLAN ADDENDUM CENTRAL KITSAP COUNTY WASTEWATER FACILITY PLAN ADDENDUM Prepared for Kitsap County Department of Public works May 2013 Prepared by: TABLE OF CONTENTS CHAPTER 1: INTRODUCTION 1.1 Purpose of Addendum...

More information

Page Intentionally Left Blank

Page Intentionally Left Blank Page Intentionally Left Blank Julie Avenue and Hoeschler Drive Lift Stations Evaluation City of Sparta TABLE OF CONTENTS Page CHAPTER 1 GENERAL INFORMATION... 1 1.1 Scope of Lift Station Evaluation...

More information

Chapter 7: Sanitary Sewer Plan. Introduction. Metropolitan Council Coordination

Chapter 7: Sanitary Sewer Plan. Introduction. Metropolitan Council Coordination Chapter 7: Sanitary Sewer Plan Introduction The 2030 Sanitary Sewer Plan was prepared for two primary reasons. The first purpose is to provide recommendations and guidance to the City of Lino Lakes by

More information

Wastewater Collection. (Sewer Alternatives)

Wastewater Collection. (Sewer Alternatives) Wastewater Collection (Sewer Alternatives) Sewer Basics Collection and transport of wastewater from each home/building to the point where treatment occurs. Wastewater Characterization Solids Liquids Pipe

More information

King County Flood Control District approves grants for flood prevention projects Regional projects to benefit from district funds

King County Flood Control District approves grants for flood prevention projects Regional projects to benefit from district funds News Release Contact: Al Sanders 206-477-1016 August 31, 2015 Flood Control District approves grants for flood prevention projects Regional projects to benefit from district funds The Flood Control District

More information

SEWER SYSTEM DESIGN GUIDELINES

SEWER SYSTEM DESIGN GUIDELINES SEWER SYSTEM DESIGN GUIDELINES PART 1 GENERAL 1.1 GENERAL GUIDELINES A. The following sewer system design guidelines are based on Federal, State and Local health requirements, and the Berkeley County Water

More information

SPRINGBROOK 2017 Offsite Levies

SPRINGBROOK 2017 Offsite Levies SPRINGBROOK 2017 Offsite Levies DETAILED CALCULATIONS REPORT BYLAW No. 2017/25 SCHEDULE A December 2017 RDC 2398 Final Version Table of Contents Springbrook 2017 Offsite Levies 2017 Detailed Calculations

More information

Texas Commission on Environmental Quality Sanitary Sewer Overflow Initiative Plan

Texas Commission on Environmental Quality Sanitary Sewer Overflow Initiative Plan Texas Commission on Environmental Quality Sanitary Sewer Overflow Initiative Plan For the City of University Park Customer Number CN600292122 Regulated Entity Number RN101451243 3800 University Boulevard

More information

2010 Utility Plan Amendment Boxelder Sanitation District

2010 Utility Plan Amendment Boxelder Sanitation District 2010 Utility Plan Amendment Boxelder Sanitation District For inclusion of the Harmony Ridge Development November 7, 2014 1612 Specht Point Rd. Ste. 105 Fort Collins, Colorado 80525-9770 p 970.484.7477

More information

STEERING COMMITTEE MEETING #6

STEERING COMMITTEE MEETING #6 STEERING COMMITTEE MEETING #6 August 7 th, 2017 Topic: Infrastructure (Sewer & Water, Transportation follow up) 6:00 p.m. Transportation follow up Follow up issues map Transportation plan strategies table

More information

Final - Preliminary Design Report Interstate 10 and Indian Avenue Area Sewer System. Prepared for

Final - Preliminary Design Report Interstate 10 and Indian Avenue Area Sewer System. Prepared for Final - reliminary Design Report Interstate 10 and Indian Avenue Area Sewer System repared for Mission Springs Water District July 2012 Mission Springs Water District I-10 & Indian Area Sewer System DR

More information

ODUCTION ANITARY SEWER

ODUCTION ANITARY SEWER INTRODUCTION SANITARY SEWER Why Plan? 10 A Plan for the Community of Hastings 10 Metropolitan Council Oversight 11 Plan Organization 12 Previous Visioning and Planning 14 2040 Engagement Topics & Consensus

More information

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY EXECUTIVE SUMMARY EXECUTIVE SUMMARY INTRODUCTION AND BACKGROUND The Village of Algonquin, located along the Fox River in McHenry County, provides wastewater collection and treatment services to the entire

More information

CHAPTER 8: SANITARY SEWER

CHAPTER 8: SANITARY SEWER CHAPTER 8: SANITARY SEWER 8.1 EXECUTIVE SUMMARY The Metropolitan Land Planning Act (amended 1995) requires local governments to prepare comprehensive plans and submit them to the Metropolitan Council (MCES)

More information

Montara Water and Sanitary District 2011 New Customer CIP and Water Capacity Charge. Presentation to Board April 21, 2011

Montara Water and Sanitary District 2011 New Customer CIP and Water Capacity Charge. Presentation to Board April 21, 2011 Montara Water and Sanitary District 2011 New Customer CIP and Water Capacity Charge Presentation to Board April 21, 2011 PRESENTATION OUTLINE Master Plan Overview Purpose and Approach Supply and Demand

More information

Section 8 System Evaluation and Capacity Assurance Plan (SECAP)

Section 8 System Evaluation and Capacity Assurance Plan (SECAP) System Evaluation and Capacity Assurance Plan (SECAP) The WDR requires owners and operators of sewer collection systems to have a (SECAP). This component involves preparing and implementing a Capital Improvement

More information

VISTA TECHNOLOGY CAMPUS

VISTA TECHNOLOGY CAMPUS ENGINEER S REPORT PUBLIC SEWER EXTENSION TO SERVE THE PROPOSED VISTA TECHNOLOGY CAMPUS TOWN OF BETHLEHEM & TOWN OF NEW SCOTLAND ALBANY COUNTY, NEW YORK August 22, 2007 Revised December 31, 2007 Revised

More information

MBARI Sanitary Sewer Analysis Report

MBARI Sanitary Sewer Analysis Report Revised 9-10-08 MBARI Sanitary Sewer Analysis Report Executive Summary: This Sanitary Sewer Analysis Report has been prepared for the Monterey Bay Aquarium Research Institute (MBARI) located on Moss Landing

More information

PRELIMINARY WASTEWATER CAPACITY STUDY

PRELIMINARY WASTEWATER CAPACITY STUDY PRELIMINARY WASTEWATER CAPACITY STUDY Tentative Tract Map No. 18955 CITY OF HESPERIA Prepared for: HESPERIA VENTURES I, LLC 10410 Roberts Road Calimesa, CA 92320 Tel (714) 785 2381 Mr. John Ohanian Prepared

More information

Consultant Forum. February 17, 2016

Consultant Forum. February 17, 2016 Consultant Forum February 17, 2016 Today s Presentation King County s LEAN Initiative- Progress Report Sustainability, Equity and Social Justice Treatment and Conveyance Improvements Planning for Treatment

More information

Section 3 Modeling and Capacity Analysis

Section 3 Modeling and Capacity Analysis Section 3 Modeling and Capacity Analysis The capacity of the existing DSRSD wastewater collection system and the future capacity requirements of the system were determined through hydraulic modeling. This

More information

CITY OF MANTECA 2012 WASTEWATER COLLECTION SYSTEM MASTER PLAN UPDATE

CITY OF MANTECA 2012 WASTEWATER COLLECTION SYSTEM MASTER PLAN UPDATE CITY OF MANTECA 2012 WASTEWATER COLLECTION SYSTEM MASTER PLAN UPDATE Executive Summary The City of Manteca (City) desires to update the 2006 Wastewater Collection System Master Plan (2006 Master Plan)

More information

West Bountiful City. Water System Capital Facilities Plan

West Bountiful City. Water System Capital Facilities Plan Water System Capital Facilities Plan August 2008 TABLE OF CONTENTS 1.0 Executive Summary... 1 2.0 Definition of Terms and Abbreviations... 2 3.0 Introduction... 3 3.1 Background...3 3.2 Scope of Investigation...3

More information

Sewer Modeling of Near- Term Development Technical Memorandum

Sewer Modeling of Near- Term Development Technical Memorandum Sewer Modeling of Near- Term Development City of Reedley, CA March 8, 2018 Page Intentionally Blank The City of Reedley (City) is anticipating near-term developments to the north of the City s currently

More information

APPENDIX F: DRAINAGE AND STORMWATER MANAGEMENT

APPENDIX F: DRAINAGE AND STORMWATER MANAGEMENT APPENDIX F: DRAINAGE AND STORMWATER MANAGEMENT Downtown Ottawa Transit Tunnel: Tunney s Pasture to Blair Station via a Downtown LRT Tunnel Prepared for: City of Ottawa 110 Laurier Avenue West Ottawa, ON

More information

CHAPTER 4 DESIGN CRITERIA

CHAPTER 4 DESIGN CRITERIA CHAPTER 4 DESIGN CRITERIA 4.1 INTRODUCTION This chapter summarizes the basic design criteria necessary to develop options and sizing estimates for the components of centralized wastewater collection systems.

More information

Regional District of Okanagan-Similkameen 101 Martin Street Penticton, BC V2A 5J9. November 2008 Project No

Regional District of Okanagan-Similkameen 101 Martin Street Penticton, BC V2A 5J9. November 2008 Project No Sawmill Road Area Sanitary Sewer Feasibility Study Regional District of Okanagan-Similkameen 101 Martin Street Penticton, BC V2A 5J9 November 2008 Project No. 104258 Table of Contents SECTION TITLE PAGE

More information

PRESSURIZED IRRIGATION SYSTEM MASTER PLAN

PRESSURIZED IRRIGATION SYSTEM MASTER PLAN PRESSURIZED IRRIGATION SYSTEM MASTER PLAN (HAL Project No.: 314.04.100) FINAL REPORT January 2009 ACKNOWLEDGMENTS Successful completion of this study was made possible by the cooperation and assistance

More information

144

144 REVENUES Intergovernmental Grants $1,455,000 239,324 851,345 1,090,669 Investment Earnings 470,412 448,376 72,711 521,087 Wake County Reimbursement 131,760 131,760 --- 131,760 Developer Reimbursements

More information

EXECUTIVE SUMMARY ES.1 INTRODUCTION

EXECUTIVE SUMMARY ES.1 INTRODUCTION ES.1 INTRODUCTION The purpose of this Wastewater Collection System Master Plan (Master Plan) is to provide the City of Lake Oswego (City) a plan for management and operation of their wastewater collection

More information

EAST VALLEY WATER DISTRICT Wastewater Collection System Master Plan. Table 4-1 Capacity Evaluation d/d Criteria

EAST VALLEY WATER DISTRICT Wastewater Collection System Master Plan. Table 4-1 Capacity Evaluation d/d Criteria EAST VALLEY WATER DISTRICT Wastewater Collection System Master Plan 4 Capacity Analysis The capacity analysis used the calibrated dry weather and wet weather wastewater collection system model to evaluate

More information

Design Criteria for Greenland WRF Pipelines: Water, Reclaimed Water and Sanitary Sewer Force mains Jacksonville, FL

Design Criteria for Greenland WRF Pipelines: Water, Reclaimed Water and Sanitary Sewer Force mains Jacksonville, FL Design Criteria for Greenland WRF Pipelines: Water, Reclaimed Water and Sanitary Sewer Force mains Jacksonville, FL PREPARED FOR: JEA PREPARED BY: FOUR WATERS ENGINEERING, INC. DATE: FRIDAY, DECEMBER 21,

More information

Volume 1 Executive Summary

Volume 1 Executive Summary 2013 Cheyenne Water and Wastewater Master Plans Final November 27, 2013 Prepared for: City of Cheyenne Board of Public Utilities 2416 Snyder Ave. Cheyenne, WY 82001 Prepared by: HDR Engineering AMEC Earth

More information

Chapter 5 Existing Wastewater Facilities

Chapter 5 Existing Wastewater Facilities Chapter 5 Existing Wastewater Facilities \\7348101\TOC.doc CHAPTER 5 Existing Wastewater Facilities 5.1 INTRODUCTION Lacey s wastewater utility serves over 21,000 acres (33 square miles) of residential

More information

Sanitary Sewer Service Alternatives. Presented by Paul Dietz, III, PE PD Cubed LLC Prepared in cooperation with Value Engineering Inc

Sanitary Sewer Service Alternatives. Presented by Paul Dietz, III, PE PD Cubed LLC Prepared in cooperation with Value Engineering Inc Sanitary Sewer Service Alternatives Presented by Paul Dietz, III, PE PD Cubed LLC Prepared in cooperation with Value Engineering Inc Discussion of Sanitary Sewer Options for the proposed Melbourne Hill

More information

ALBEMARLE COUNTY SERVICE AUTHORITY

ALBEMARLE COUNTY SERVICE AUTHORITY AGENDA TITLE: Rivanna Water & Sewer Authority (RWSA) Monthly Update STAFF CONTACT(S)/PREPARER: Gary O Connell, Executive Director AGENDA DATE: February 16, 2017 CONSENT AGENDA: Informational ATTACHMENTS:

More information

Public Utilities - Sewer

Public Utilities - Sewer County of Henrico, Virginia Capital Improvement Program FY 2017-18 through FY 2021-22 Fund 51 Enterprise Fund - W&S Request Request Request Request Request Project/Work Phase Priority FY 17-18 FY18-19

More information

3.9 times the average 3.8 times the average 3.6 times the average

3.9 times the average 3.8 times the average 3.6 times the average ARTICLE VI DESIGN OF SANITARY SEWERS M'RSMIN. VOL.281 JA 2 4 2001 IMAGE; Section 601 Determination of the Amount of Sewage for Sanitary Sewers A. MSD Design Standards for estimating sanitary sewage flow

More information

City of Medora, ND Wastewater Infrastructure Needs Assessment November 2012

City of Medora, ND Wastewater Infrastructure Needs Assessment November 2012 City of Medora, ND Wastewater Infrastructure Needs Assessment November 2012 Project made possible by US Dept. of HUD Regional Substantiality Planning Grant and ND Energy Development Infrastructure and

More information

Appendix J Effluent Pump Station

Appendix J Effluent Pump Station Appendix J Effluent Pump Station TECHNICAL MEMORANDUM Salmon Creek Treatment Plant Effluent Pump Station Hydraulics and Phasing Analysis for the Phase 5A Project Columbia River Outfall and Effluent Pipeline

More information

CIP-01: Stream Channel Stabilization, Silver Creek

CIP-01: Stream Channel Stabilization, Silver Creek CIP-01 CIP-01: Stream Channel Stabilization, Silver Creek HIGHEST PRIORITY This project consists of stream channel stabilization to address channel incision and the replacement of two cross-culverts. Preferred

More information

Wastewater Facilities Master Plan

Wastewater Facilities Master Plan Executive Summary Wastewater Facilities Master Plan for the Project Number 54793 2012 July 25, 2012 Mr. David Wagner Utilities Director Department of Utilities 720 West 3 rd Street Lawrence, KS 66044-0708

More information

Public Information Centre No. 1

Public Information Centre No. 1 Public Information Centre No. 1 City of Timmins Schedule B Class Environmental Assessment for the WHITNEY TISDALE SANITARY SYSTEM UPGRADES Welcome Please Sign In Class EA Process & Public Consultation

More information

Chapter 10: Conveyance Recommended Plan

Chapter 10: Conveyance Recommended Plan 2020 Facilities Plan Conveyance Report Chapter 10: Conveyance Recommended Plan 10.1 Introduction and Plan Summary 10.1.1 Background As a regional governmental agency providing wastewater treatment and

More information

City of Crosby, ND Municipal Infrastructure Needs Assessment September 2012

City of Crosby, ND Municipal Infrastructure Needs Assessment September 2012 City of Crosby, ND Municipal Infrastructure Needs Assessment September 2012 Project made possible by US Dept. of HUD Regional Substantiality Planning Grant and ND Energy Development Infrastructure and

More information

System Evaluation and Capacity Assurance Plan

System Evaluation and Capacity Assurance Plan City of Cedar Hills System Evaluation and Capacity Assurance Plan The City of Cedar Hills believes that one of the keys to preventing sanitary sewer overflows is to evaluate system capacity and to monitor

More information

Chapter 9 Sanitary Sewers

Chapter 9 Sanitary Sewers Chapter 9 Sanitary Sewers I:\AD\030\U30\U30009.docx 4-8-16 Section 9.1 Topic General Requirements Chapter 9 Sanitary Sewers Page 9-1 9.2 Plan Submittals 9-1 9.3 Determination of Flow 9-1 9.4 Facility Design

More information

Technical Memorandum No. 1

Technical Memorandum No. 1 DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY Serving the Public Protecting the Environment Technical Memorandum No. 1 Multi-Jurisdictional Use Facilities Capital Cost Allocation DRAFT April 17, 2013

More information

Preliminary Design Report: Prices Subdivision Drainage Improvements & Wastewater Servicing

Preliminary Design Report: Prices Subdivision Drainage Improvements & Wastewater Servicing B.5.1 Preliminary Design Report: Prices Subdivision Drainage Improvements & Wastewater Servicing --Greenland Consulting Engineers-- 1 The Study Location (Prices Subdivision) consists of the lots fronting

More information

W ASTEWATER AND T RUNK S EWER T ECHNICAL M EMO

W ASTEWATER AND T RUNK S EWER T ECHNICAL M EMO A P P E N D I X I W ASTEWATER AND T RUNK S EWER T ECHNICAL M EMO... W ES T YO S T ~A SS O C IATE S Consulting Engineers MEMORANDUM DATE: TO: CC: FROM : February 10,2012 Joanna Jansen, The Planning Center

More information

Environmental Task Force SSSMP Summary, September 18, 2011 Scheduled for City Council Approval September 26, 2017

Environmental Task Force SSSMP Summary, September 18, 2011 Scheduled for City Council Approval September 26, 2017 Attachment 1 Environmental Task Force SSSMP Summary, September 18, 2011 Scheduled for City Council Approval September 26, 2017 Sanitary Sewer System Master Plan Summary Points - City s sanitary system

More information

Lake Samish Comprehensive Stormwater Plan Capital Improvement Recommendations

Lake Samish Comprehensive Stormwater Plan Capital Improvement Recommendations Lake Samish Comprehensive Stormwater Plan Capital Improvement Recommendations drainage. The easement could potentially be used to site a surface water quality treatment facility for the flow. The design

More information

CHAPTER 12: SANITARY SEWER SYSTEM

CHAPTER 12: SANITARY SEWER SYSTEM CHAPTER 12: SANITARY SEWER SYSTEM Chapter 12 includes the following information: 1. System Overview 2. On Site Sewage Treatment 3. Inter Community Services 4. Future Demand Forecast 5. Infiltration and

More information

CHAPTER 12: SANITARY SEWER SYSTEM

CHAPTER 12: SANITARY SEWER SYSTEM CHAPTER 12: SANITARY SEWER SYSTEM Chapter 12 includes the following information: 1. System Overview 2. On-Site Sewage Treatment 3. Inter-Community Services 4. Future Demand Forecast 5. Infiltration and

More information

Public Notice for Comment

Public Notice for Comment Water Pollution Control District Public Notice for Comment The Logan County Water Pollution Control District is revising its Construction Standards regarding the installation, repair and inspection of

More information

APPENDIX E. Cost Estimating Assumptions

APPENDIX E. Cost Estimating Assumptions E.1 OVERVIEW This appendix provides the assumptions used by West Yost Associates (West Yost) to estimate the construction costs for the planning and design of recommended water system facilities for the

More information

INFRASTRUCTURE FINANCING PLAN FOR THE WOODGLEN SPECIFIC PLAN

INFRASTRUCTURE FINANCING PLAN FOR THE WOODGLEN SPECIFIC PLAN FINAL REPORT INFRASTRUCTURE FINANCING PLAN FOR THE WOODGLEN SPECIFIC PLAN Prepared for: City of Modesto Prepared by: Willdan Financial Services Approved by Modesto City Council on July 9, 2013 Resolution

More information

WEF Collection Systems Conference 2017

WEF Collection Systems Conference 2017 Davenport, Iowa 14th District Diversion Study Karol Giokas, P.E., RJN Group Tom Leabhart, P.E., Davenport, IA ABSTRACT The 14 th District sanitary sewer basin in Davenport, Iowa has high levels of inflow

More information

Sanitation District No.1 Cost Effectively Reduces Overflows Into the Ohio River

Sanitation District No.1 Cost Effectively Reduces Overflows Into the Ohio River Sanitation District No. 1 of Northern Kentucky Sanitation District No.1 Cost Effectively Reduces Overflows Into the Ohio River Ohio WEA Collection Systems Workshop May 5, 2011 Sanitation District No. 1

More information

Sanitary Sewer System Master Plan for Water Environment Services. Final January

Sanitary Sewer System Master Plan for Water Environment Services. Final January Sanitary Sewer System Master Plan for Water Environment Services Final January 2 0 1 9 JETT Number: A X 0 9 0 7 1 8 1 1 2 2 P D X Document Title Final January 2019 Project No: 672585.03.30.10.12.02 Document

More information

Calendar Year capital improvement. Program

Calendar Year capital improvement. Program Calendar Year 2010 capital improvement Program Important Notice: The information found in this file concerning the 2010 Capital Improvements Program, has been extracted from the San Antonio Water System

More information

WATER AND SEWER CAPACITY FEE STUDY

WATER AND SEWER CAPACITY FEE STUDY DRAFT WATER AND SEWER CAPACITY FEE STUDY MCKINLEYVILLE COMMUNITY SERVICES DISTRICT MAY 5, 2011 OVERVIEW McKinleyville Community Services District (the District) retained Willdan to prepare a capacity fee

More information

Chapter 3 Previous Studies

Chapter 3 Previous Studies Chapter 3 Previous Studies The Vista Grande stormwater conveyance system and watershed area has been evaluated in a number of reports and studies for the CCSF, the Daly City and San Mateo County over the

More information

PLANNING FOR THE FUTURE: A REGIONAL MASTER PLAN APPROACH WITH THE OPPORTUNITY TO MINIMIZE FUTURE OPERATION AND MAINTENANCE CONCERNS

PLANNING FOR THE FUTURE: A REGIONAL MASTER PLAN APPROACH WITH THE OPPORTUNITY TO MINIMIZE FUTURE OPERATION AND MAINTENANCE CONCERNS PLANNING FOR THE FUTURE: A REGIONAL MASTER PLAN APPROACH WITH THE OPPORTUNITY TO MINIMIZE FUTURE OPERATION AND MAINTENANCE CONCERNS ABSTRACT Robert Skip Notte*, PE, LEED AP, Dewberry, snotte@dewberry.com

More information

The South Hartford Conveyance and Storage Tunnel

The South Hartford Conveyance and Storage Tunnel The South Hartford Conveyance and Storage Tunnel South Hartford The Metropolitan District June 16 th -17 th, 2015 Purpose of This Public Meeting Communicate with Residents Directly Adjacent to the Project

More information

WATER RESOURCES CHAPTER 7 INTRODUCTION KEY PRINCIPLES TO IMPLEMENTING THE WATER RESOURCES PLAN INCLUDE: WATER SUPPLY AND DISTRIBUTION INTRODUCTION

WATER RESOURCES CHAPTER 7 INTRODUCTION KEY PRINCIPLES TO IMPLEMENTING THE WATER RESOURCES PLAN INCLUDE: WATER SUPPLY AND DISTRIBUTION INTRODUCTION WATER RESOURCES CHAPTER 7 INTRODUCTION KEY PRINCIPLES TO IMPLEMENTING THE WATER RESOURCES PLAN INCLUDE: Greenway Connections Protect and enhance drainage corridors Compact Development Continue efficient,

More information

Functional Servicing Report. Winston Park West Proposed Business Park Development Project. Infrastructure Ontario (IO) September MU1

Functional Servicing Report. Winston Park West Proposed Business Park Development Project. Infrastructure Ontario (IO) September MU1 Functional Servicing Report Winston Park West Proposed Business Park Development Project (IO) September 2011 14-11208-001-MU1 Winston Park West 2 TABLE OF CONTENTS Page 1.0 INTRODUCTION... 3 1.1 SITE DESCRIPTION...

More information

Cypress Waters: TIF Plan and MOU Amendments, Related Service Plan/Development Agreements and Boundary Adjustments

Cypress Waters: TIF Plan and MOU Amendments, Related Service Plan/Development Agreements and Boundary Adjustments Cypress Waters: TIF Plan and MOU Amendments, Related Service Plan/Development Agreements and Boundary Adjustments Economic Development Committee June 1, 2015 Purpose Update status of Cypress Waters project

More information

TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK

TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK COST EVALUATION FOR ROLLING HILLS AREA WATER MAIN EXTENSION PROFESSIONAL CONSULTING, LLC. Octagon 10, Office Center 1719 Route 10, Suite 225 Parsippany,

More information

CHAPTER 6. Sanitary Sewer

CHAPTER 6. Sanitary Sewer CHAPTER 6 Sanitary Sewer A. Introduction All proposed developments, subdivisions, and buildings must have a properly designed and constructed sanitary sewer collection system. The system shall provide

More information

Wilmette - Background

Wilmette - Background Reducing Basement Backups through Intergovernmental Cooperation and Design-Build Presented By Michael N. Young, P.E. Brigitte Ann Berger, P.E. Wilmette - Background North Shore Suburb of Chicago 5 Square

More information

Jacobi, Toombs, and Lanz, Inc.

Jacobi, Toombs, and Lanz, Inc. Area 5: Blackiston Mill Road at Dead Man's Hollow Flooding Assessment Jacobi, Toombs, and Lanz, Inc. This document summarizes an assessment of drainage and flooding concerns and provides recommendations

More information

WATER AND SEWER INFRASTRUCTURE PROGRAMS

WATER AND SEWER INFRASTRUCTURE PROGRAMS Arlington County, Virginia WATER AND SEWER INFRASTRUCTURE PROGRAMS Program Description This program provides and maintains water delivery, sanitary sewer collection, and wastewater treatment systems that

More information

KINGSTON WASTEWATER FACILITIES PLAN UPDATE ADDENDUM

KINGSTON WASTEWATER FACILITIES PLAN UPDATE ADDENDUM KINGSTON WASTEWATER FACILITIES PLAN UPDATE ADDENDUM May 2013 Prepared for Kitsap County Department of Public Works Prepared By: KITSAP COUNTY KINGSTON WASTEWATER FACILITY PLAN UPDATE ADDENDUM TABLE OF

More information

SANITARY SEWER FEASIBILITY STUDY AND REPORT NORTH SEBASTIAN AREA

SANITARY SEWER FEASIBILITY STUDY AND REPORT NORTH SEBASTIAN AREA SANITARY SEWER FEASIBILITY STUDY AND REPORT FOR THE NORTH SEBASTIAN AREA INDIAN RIVER COUNTY, FLORIDA November 2013 Prepared for: Indian River County Utilities Prepared by: MASTELLER & MOLER, INC. ~ CONSULTING

More information

CHAPTER 18: SANITARY SEWER SYSTEMS Introduction and Goals Administration Standards Standard Attachments 18.

CHAPTER 18: SANITARY SEWER SYSTEMS Introduction and Goals Administration Standards Standard Attachments 18. 18.00 Introduction and Goals 18.01 Administration 18.02 Standards 18.03 Standard Attachments 18.1 18.00 INTRODUCTION AND GOALS The purpose of this chapter is to provide guidance and outline specific standards

More information

Dual Water Systems in Northern Colorado. Wayne E. Eckas, P.E. Aqua Engineering, Inc., Fort Collins, Colorado

Dual Water Systems in Northern Colorado. Wayne E. Eckas, P.E. Aqua Engineering, Inc., Fort Collins, Colorado Dual Water Systems in Northern Colorado By Wayne E. Eckas, P.E. Aqua Engineering, Inc., Fort Collins, Colorado In northern Colorado, the cost of water rights acquisition has risen dramatically over the

More information

WATER AND SEWER CAPACITY FEE STUDY

WATER AND SEWER CAPACITY FEE STUDY DRAFT WATER AND SEWER CAPACITY FEE STUDY MCKINLEYVILLE COMMUNITY SERVICES DISTRICT APRIL 4, 2011 OVERVIEW McKinleyville Community Services District (the District) retained Willdan to prepare a capacity

More information

PCI-5, PCI-6, PCI-7, PCI-8, PCI-9, PCI-10A, PCI-10B, PCI-11A

PCI-5, PCI-6, PCI-7, PCI-8, PCI-9, PCI-10A, PCI-10B, PCI-11A SAW Grant 1099-01 Summary Asset Management Plan for Oakland Macomb Interceptor Drain Drainage District (OMIDDD) Sewers PCI-5, PCI-6, PCI-7, PCI-8, PCI-9, PCI-10A, PCI-10B, PCI-11A The purpose of this document

More information

Sewer Facilities 102. Hampstead Sewer Service Area. Carroll County Water & Sewer Master Plan. Current Conditions

Sewer Facilities 102. Hampstead Sewer Service Area. Carroll County Water & Sewer Master Plan. Current Conditions Sewer Facilities 102 Hampstead Sewer Service Area Current Conditions Carroll County owns and operates the public sewer system that serves both the Town of Hampstead and adjoining areas in the county. The

More information

Chapter 8-Sanitary Sewer

Chapter 8-Sanitary Sewer Chapter -Sanitary Sewer Executive Summary Background The Metropolitan Land Planning Act (amended 1995) requires local governments to prepare comprehensive plans and submit them to the Metropolitan Council

More information

DERRY GREEN BUSINESS PARK WATER AND WASTEWATER SERVICING AREA SERVICING PLAN

DERRY GREEN BUSINESS PARK WATER AND WASTEWATER SERVICING AREA SERVICING PLAN DERRY GREEN BUSINESS PARK WATER AND WASTEWATER SERVICING AREA SERVICING PLAN Submitted to: Town of Milton Regional Municipality of Halton Submitted by: AMEC Earth & Environmental 3215 North Service Road

More information

Permit for Construction of an Extension to a JEA Drinking Water Distribution System and/or JEA Wastewater Collection/Transmission System

Permit for Construction of an Extension to a JEA Drinking Water Distribution System and/or JEA Wastewater Collection/Transmission System Permit for Construction of an Extension to a JEA Drinking Water Distribution System and/or JEA Wastewater Collection/Transmission System INSTRUCTIONS: This form shall be completed and submitted (in duplicate)

More information

Chapter 4. Capital Facilities and Utilities Report

Chapter 4. Capital Facilities and Utilities Report Chapter 4 Capital Facilities and Utilities Report Capital Facilities and Utilities in the R-1 Area City of Woodinville Prepared January 2007 Revised February 2007 Revised September 2007 Revised October

More information

401 Sanitary Sewer System Design Criteria. The following additional design requirements shall also apply:

401 Sanitary Sewer System Design Criteria. The following additional design requirements shall also apply: SECTION 400 SANITARY SEWER SYSTEM The design of sanitary sewers shall be in conformance with the applicable sections of the State of Washington, Department of Ecology manual, Criteria for Sewage Works

More information

Chapter 6 Collection System

Chapter 6 Collection System Chapter 6 Collection System 6.1 Introduction Collection System The following chapter details the evaluation process and findings for the City s existing sewer collection system. Generally the existing

More information

Hydraulic Modeling of Deep Tunnel Provides Cost Savings

Hydraulic Modeling of Deep Tunnel Provides Cost Savings 5 Hydraulic Modeling of Deep Tunnel Provides Cost Savings Taymour El-Hosseiny, Karen Reinhart and M. P. Cherian In 2005, the City of Columbus, Ohio submitted a plan to the Ohio Environmental Protection

More information

Chapter 7 Existing Wastewater System Evaluation

Chapter 7 Existing Wastewater System Evaluation Chapter 7 Existing Wastewater System Evaluation 7.1 General This chapter of the master plan evaluates the existing condition of each wastewater system and presents improvements to address any deficiencies.

More information

Design Criteria for Walnut Street Emergency Bypass Force Main Jacksonville, FL

Design Criteria for Walnut Street Emergency Bypass Force Main Jacksonville, FL Design Criteria for Walnut Street Emergency Bypass Force Main Jacksonville, FL PREPARED FOR: PREPARED BY: JEA Elizabeth DiMeo, P.E. JEA Manager,W/WW Distribution & Collection E&C DATE: December 18, 2018

More information

A. Introduction 7 1. Purpose 7 2. Authority 7 3. Contact 8 4. Plan Submittal Process 8 B. Design Standards General 11 a. Future Extensions 11

A. Introduction 7 1. Purpose 7 2. Authority 7 3. Contact 8 4. Plan Submittal Process 8 B. Design Standards General 11 a. Future Extensions 11 A. Introduction 7 1. Purpose 7 2. Authority 7 3. Contact 8 4. Plan Submittal Process 8 B. Design Standards 11 1. General 11 a. Future Extensions 11 b. Design Calculations 11 c. Easements and Property 12

More information

West Hernando County Sewer Master Plan SECTION 7.0 RECLAIMED WATER

West Hernando County Sewer Master Plan SECTION 7.0 RECLAIMED WATER SECTION 7.0 RECLAIMED WATER 7.1 Introduction The use of highly treated wastewater effluent, or reclaimed water, has expanded greatly in Florida over the past several decades. In particular, the use of

More information