1 AGENDA TITLE: Rivanna Water & Sewer Authority (RWSA) Monthly Update STAFF CONTACT(S)/PREPARER: Gary O Connell, Executive Director AGENDA DATE: February 16, 2017 CONSENT AGENDA: Informational ATTACHMENTS: None BACKGROUND: This report continues the monthly updates on the Rivanna Water & Sewer Authority (RWSA) projects and Board meetings. Below are some updates on RWSA projects and issues, including updates from the January 24, 2017 RWSA Board Meeting. Drinking Water GAC (Granular Activated Carbon) Project To meet new water quality standards, the RWSA has Granular Activated Carbon (GAC) advanced filtering projects underway at all the five (5) water treatment plants. In addition, water plant improvements, upgrades, and rehabilitation are underway at the South Fork, Crozet and Observatory Water Treatment Plants (WTPs). The anticipated completion dates for all the water treatment plant projects is December, South Rivanna WTP - Construction of additional clearwell storage; installation of a chlorine contact tank; replacement of the lime feed system; upgrades to the filter underdrains and backwash system; replacement of the filter media; sound attenuation and ventilation improvements for the high service pump station; installation of a variable frequency drive and soft start motor for pumps at the raw water pump station; installation of new raw water and finished water flow meters, and several improvements to the residuals management facilities. Work is generally complete on the reinforced concrete placement for structure foundations. The GAC building foundation is 95% complete and the chlorine contact tank and equalization basin are complete. Large diameter ductile iron pipe installation between the existing filter building and the new chlorine contact tank and GAC facility is complete, including the connection to the filtered water pipe gallery. Work has been completed on the installation of the new GAC building electrical service line. The new wash water recycle line is about 95% complete, and piping realignment in the sludge pumping station is nearly complete. Rehabilitation of filter No. 3 has been completed and is back in service. Filter No. 2 is being rehabilitated. Observatory WTP Construction of a new chlorine contact tank; upgrades to chemical feed systems, and installation of a finished water flow meter. The foundation excavation for the intermediate pump station, new GAC building, and chlorine contact tank are complete. The

2 reinforced concrete foundations for the GAC building, chlorine contact tank, and intermediate pump station are complete. Various large diameter ductile iron pipes have been installed, as well as the vertical turbine pump chambers for the intermediate pump station. The GAC contactor vessels are 95% complete. Various large diameter ductile iron pipes have been installed, as well as the vertical turbine pump chambers for the intermediate pump station. Various electrical conduit and wiring have been installed at the site. The equipment for the flocculator rehabilitation, including the wiring in the electrical room has been installed. Work has started on upgrades to the existing chemical feed equipment in the filter building. North Rivanna WTP Installation of new filter control valves; new pump control valves; new filter sludge removal equipment; new electrical system upgrades throughout the plant; new finished water flow meter, and the installation of a surge relief mechanism. A new finished water flow meter and filter backwash water piping connection are complete. The intermediate pump station, and the GAC building foundation work is 85% complete. The new finished water pipe connection to the existing clearwell has been completed. The new filter backwash is complete. Crozet WTP Upgrade of the chlorine feed system to a modern hypochlorite feed system, install a finished water meter with appurtenances, and replacement of the existing fluoride and corrosion inhibitor chemical feed systems. The GAC building and intermediate pump station concrete foundation work is 85% complete. Some of the new storm sewer system is installed, as well as new waterline piping. New waterline connections for potable water and backwash water to the GAC building will begin soon. Scottsville WTP The GAC building and intermediate pump station, and the reinforced concrete foundation work is 85% complete. The storm water sand filter excavation is complete. Additional waterline construction for the GAC process will be starting soon. Rivanna Pump Station Work is ongoing on the Rivanna Pump Station on RWSA property and the tunnel work is completed, with pipe installation also complete. Reinforcing steel, conduit installation, and concrete pours for the concrete walls of the new pump station have been completed up to ground level. The 1,600 foot tunnel and installation of a new 60 inch sewer interceptor pipe is complete. Construction of the pump station structure, including the roof, is nearly complete. The project continues to be several months behind, with expected completion in June The new pump station is expected to

3 be in service in the spring, and then the contractor will demolish the existing pump station in Riverview Park. Project is 84% complete. Schenk s Branch Sewer Line This is a 100% City funded project serving only the City, and City customers. This project is part of the DEQ Consent Order requiring completion. The project has been divided into two phases (1) a section between Schenk s Greenway (at Allied Street) to the McIntire Recycling Center and (2) the Recycling Center to the Preston Avenue section (under negotiation between the City and County, which has not been finalized). The Phase 1 construction contract has been awarded and work began in early July Excavation is ongoing on the project along McIntire Road in the Schenk s greenway area. The project construction has been slowed with difficulties in excavating in rock, unsuitable material and contaminated soils with a deep sewer installation, including adverse weather conditions. Construction completion of phase I is expected in March 2017, sewer pipe and manhole installation work will continue over the next several months, to be followed by completion of the Greenway, including extending the walking path and installation of landscaped areas. A change order was approved due to rock removal that was unanticipated. See attached memo for further background information. Project is 85% complete. Reservoir Management Study The project work by Dinatale Water Consulting is well underway, and they are reviewing the background information that has been provided. The primary goal for the study is recommendations for improved reservoir water quality, especially dealing with the algal bloom issues that occur seasonally. The study includes all five reservoirs used for the public water supply: Beaver Creek, Ragged Mountain, South Fork Rivanna, Sugar Hollow and Totier Creek. Additional water quality monitoring will occur during the winter to determine the feasibility of in-reservoir air machines to reduce algae growth. Final report is due November Work is 60% complete. Wholesale Water Metering This was a project required in the Water Supply Agreement to assure accurate water use data for future City and ACSA cost allocations. Additional easements were needed and have been granted. New metering has been installed at three of the urban water plants with the GAC/Water Plant Improvement Projects. The contract for $2.07 million has been approved. Construction is underway and is behind schedule. Construction of the first nine meter sites is complete, and two more are underway, out of 27 locations overall. The contractor has brought in an additional crew to speed up progress, and a third crew is planned to start in February. Project is 40% complete Working Agreement ( Working Agreement on Urban Area Wholesale Flow Allocation and Billing Methodology ) The existing 1983 Working Agreement for water is currently used to establish monthly billings by RWSA to the ACSA and the City for the Urban water bill. The Wholesale Water Metering Project, once complete, will change the approach and consequently the Working

4 Agreement will need to be amended. We are reviewing the agreement and will be having discussions with RWSA and City staff as a next step. The metering project has been delayed and work is slow. Due to the construction delay, it is not anticipated that the meters will be in place for the 2018 Budget. Initial drafting work and discussions have started occurring. VDOT Route 29 Solutions Route 29 Widening and Berkmar Drive Extension The VDOT Route 29 Widening project includes widening of Route 29 (Seminole Trail) from a four-lane divided highway to a six-lane divided highway from Polo Grounds Road to Town Center Drive at Hollymead Town Center. Due to the proposed grade changes and full depth pavement replacement, VDOT has determined that RWSA s existing 12-inch cast iron water line along Route 29 is in conflict and must be relocated for the entire length of the project. RWSA had previously identified through master planning that a 24-inch water main will be needed from the South Rivanna Water Treatment Plant to Hollymead Town Center, in order to meet future water demands. RWSA has requested that VDOT and its Design-Build Contractor relocate the existing 12-inch water main as a 24- inch water main, and according to VDOT policy, VDOT would bear the cost of relocation as a 12-inch line and RWSA would bear the additional cost for the betterment from 12-inch to 24-inch. Construction is underway and 33% complete, with estimated completion by April Moore s Creek AWRRF (Advanced Water Resource Recovery Facility-new name) Odor Control Recommendations for odor control improvements that would significantly control odors from traveling beyond the Moore s Creek AWRRF fence line were presented to the RWSA Board of Directors (BOD) in December, 2014 and a CIP project for $9.33 million was approved at the January, 2015 BOD meeting. The design for odor control improvements includes covering the head works and screening channels, installing grit facilities, constructing a bypass line through on equalization basin, covering the primary clarifiers, building additional odor scrubbing facilities to treat the foul air from the covered sources and the New Rivanna Pump Station, removing the postdigestion clarifiers from service, modifying the handling, hauling and storage of biosolids on-site, cleaning the equalization basins and holding ponds, and coating the interior of the digesters. Construction work on the odor control project is completed with pouring the concrete foundation for the new biological scrubber. Demolition has begun on the concrete bottoms of the existing grit chambers. Additional construction work includes driving helical piles to provide additional structural support for the new second floor of the grit building. Mechanical installation work will proceed once demolition and subsurface activities are complete. The project is anticipated to be completed in January RWSA is also purchasing new covered trailers for sludge storage, which may help in the short-term with odors in the Moores Creek area. Digester sealing bidding to seal the interior and eliminate gas emission. Holding ponds, which are the source of the odors, are being cleaned out. Project is 25% complete.

5 Crozet Pump Station Odor Control Odor control efforts are being made to the Rt. 250 west area of the Crozet wastewater pump stations, where recent citizen complaints have originated. New odor control chemical contract to better manage pump station odors. South Rivanna Hydropower Plant Rehabilitation RWSA constructed a hydropower plant at the South Fork Rivanna Dam in Power generation at the plant was limited for a number of years due to various mechanical issues and has been completely offline for the past two years. The Board approved surrendering the license and decommissioning the facility based on the lack of a return on the capital investment, and impacts on managing the water supply and flow releases to the river. South Fork Reservoir to Ragged Mountain Pipeline The adopted RWSA CIP Budget has $2,295,000 budgeted to the right-of-way and feasibility phase, with funding beginning in July, 2017 (FY 2018). The future construction of a new pipeline is part of the 50-year Community Water Supply Plan to increase the future transfer capacity through replacement of the Sugar Hollow Pipeline along an alternative alignment to be determined. The pipeline project will involve a more detailed routing study to determine the most feasible alignment with work to begin in July, Crozet Water Plant Capacity Study As Crozet continues to grow, RWSA monitors the water treatment plant sizing to meet water demand (use) on the maximum day (24 hour period) of each calendar year. RWSA will be conducting a preliminary engineering evaluation of a future water plant expansion at Crozet, as part of the FY 2017 CIP. Current trending is indicating that the maximum day demand could reach the current capacity (1 MGD) of the Crozet Water Treatment Plant as soon as An engineering firm was approved to conduct this engineering study, and the ACSA is gathering consumption data for the study. Crozet Finished Water Pump Station As part of the current FY 2016 CIP, the Crozet Water Treatment Plant is being studied to expand the treatment capacity to secure future demand needs of the Crozet community. Prior to any plant expansion, it has been determined that the finished water pumping facilities are in dire need of replacement. The Finished Water Pump Station (FWPS) is a new design project to fully replace the antiquated existing pump station, and will be constructed ahead of any plant upgrades. The existing pump station is very small and was constructed as part of the original plant construction in the late 1960s. The pumping equipment and controls are out dated, and operational reliability and efficiency have been drastically impaired. Operational reliability is limited, and the pump house has inadequate heating and cooling. The pump house is located in a low, poorly drained area near the ground storage clearwell, and drainage issues exist. Due to the age and condition of pumps, electrical systems, building systems, and controls, it has been determined that a full station replacement is necessary. The

6 new pump station building will be of similar construction as what is being built for the GAC facility at Crozet WTP. The preliminary engineering report is complete and approved by the Virginia Department of Health. Design plans and specifications are being developed. Meetings with Albemarle County staff have been held in an effort to facilitate the regulatory approvals for the new pump station building. The pump station building design is 100% complete with bidding planned for early Observatory Water Treatment Plant The Observatory Water Plant was built in 1949, with some rehabilitation work done in There are several water treatment plant projects at Observatory scheduled in the Capital Improvements Plan (CIP). The most immediate project is to replace the existing flocculator equipment and repair basin inlet troughs, replace valves, install a new baffle wall and SCADA control equipment. The flocculator work has begun. Further work is phased over the five year CIP. Rivanna Water and Sewer Authority Strategic Plan The Board of Directors has requested that a Strategic Plan be developed for the Rivanna Water and Sewer Authority (RWSA). Project is on hold until the summer. Moore s Creek AWRRF (Advanced Water Resource Recovery Facility Wastewater Treatment) Roof Replacements Major maintenance work to replace aging roofs (35 years plus in age). Project was approved in the CIP (Capital Improvement Program). Crozet Flow Equalization Tank (FET) Rehabilitation work in the RWSA and Albemarle County Service Authority (ACSA) sewer systems is on-going to meet inflow and infiltration (I&I) reduction goals in the Crozet Interceptor sewer basin based on the flow metering and modeling results of the Comprehensive Sanitary Sewer Model and Study conducted in The intent was to reduce I&I in the system to meet the 2020 two-year storm flow targets. Based on the results of that study, it was determined that the Crozet Interceptor system and namely the existing Crozet Pump Stations (1 through 4) have adequate capacity to handle the 2015 peak wet weather flow from the Crozet service area during a two-year storm. However, as projected growth in the service area occurs, peak wet weather flows in the area under the storm conditions established in the updated model will begin to exceed the firm capacities of the pump stations by The construction of a flow equalization tank was identified as the best method to alleviate wet weather capacity issues. RWSA is performing a siting study for the flow equalization tank project which is due to be completed in These services will include the sizing of the flow equalization tank and the pumping station based on information from the updated model, a preliminary site selection process based on the sizing requirements identified, and an alternatives analysis performed for each selected site to evaluate the feasibility of locating the

7 facility. Pump testing is being performed at the four pump stations that are part of the Crozet interceptor system. South Rivanna Water Plant Screen Replacement The 1965 raw water pump station screen (leaf screen) at the South Rivanna Water Treatment Plant is in need of replacement. A contract notice to proceed has been issued. South Rivanna Water Treatment Plant Attached is a presentation on the operation of the plant and the current construction. Moore s Creek Advanced Water Resource Recovery Facility Change order requested and Board approved to add a second centrifuge to create redundancy for sludge management at the plant. See the attached memorandum for additional background information on this item. Attachments RWSAUpdateExecSumm021617

8

9

10

ALBEMARLE COUNTY SERVICE AUTHORITY

ALBEMARLE COUNTY SERVICE AUTHORITY AGENDA TITLE: Rivanna Water & Sewer Authority (RWSA) Monthly Update STAFF CONTACT(S)/PREPARER: Gary O Connell, Executive Director AGENDA DATE: May 18, 2017 CONSENT AGENDA: Informational ATTACHMENTS: None

More information

Capital Improvement Plan. Fiscal Years ADOPTED June Crozet Finished Water Pump Station. Wholesale Master Metering.

Capital Improvement Plan. Fiscal Years ADOPTED June Crozet Finished Water Pump Station. Wholesale Master Metering. Capital Improvement Plan Crozet Finished Water Pump Station Fiscal Years 2019 2023 ADOPTED June 2018 Wholesale Master Metering Odor Control Granular Activated Carbon Odor Control Rivanna Water & Sewer

More information

Performance Evaluation of the Moores Creek Advanced Water Resource Recovery Facility

Performance Evaluation of the Moores Creek Advanced Water Resource Recovery Facility Performance Evaluation of the Moores Creek Advanced Water Resource Recovery Facility Richard W. Gullick, Ph.D. Director of Operations Timothy Castillo Wastewater Manager Presented to the Albemarle County

More information

RWSA BOARD OF DIRECTORS Minutes of Regular Meeting April 25, 2017

RWSA BOARD OF DIRECTORS Minutes of Regular Meeting April 25, 2017 695 MOORES CREEK LANE CHARLOTTESVILLE, VA 22902-9016 TEL: 434.977.2970 FAX: 434.293.8858 WWW.RIVANNA.ORG 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

More information

CHAPTER 8 CAPITAL IMPROVEMENT PLAN

CHAPTER 8 CAPITAL IMPROVEMENT PLAN INTRODUCTION CHAPTER 8 CAPITAL IMPROVEMENT PLAN This chapter presents a 10-year Capital Improvement Plan (CIP). Wastewater capital improvements have been scheduled and prioritized on the basis of growth,

More information

Zero Liquid Discharge Project Extends Potable Water Supplies

Zero Liquid Discharge Project Extends Potable Water Supplies http://dx.doi.org/10.5991/opf.2014.40.0078 Ryan R. Popko, PE, and Phillip J. Locke, PE, are with McKim & Creed (www.mckimcreed.com), Clearwater, Fla. Fred J. Greiner is with the city of Palm Coast, Fla.

More information

Index to Technical Specifications

Index to Technical Specifications Index to Technical Specifications Item Number Subject I II EXCAVATION 1.01 Trenching and Excavation Regulations 1.02 Site Grading or General Excavation 1.03 Structural Excavation 1.04 Trench Excavation

More information

Study Session Wastewater Enterprise, Proposed Improvement Projects and Projected Funding Needs Update

Study Session Wastewater Enterprise, Proposed Improvement Projects and Projected Funding Needs Update Study Session Wastewater Enterprise, Proposed Improvement Projects and Projected Funding Needs Update February 24, 2015 Overview Wastewater Collection System Customer Base 16,276 SFR 1,968 MFR 1,364 COM/IND

More information

Capital Investment Plan (CIP) Quarterly Report for the period ending December 2013

Capital Investment Plan (CIP) Quarterly Report for the period ending December 2013 Report Engineering Services Group Capital Investment Plan (CIP) Quarterly Report for the period ending December 2013 Summary This report provides a summary of fiscal year accomplishments, capital expenditures

More information

City of Fairfax, Virginia City Council Regular Meeting. Honorable Mayor and Members of Cfy ;ouncil Robert L. Sisson, City Manager /I.

City of Fairfax, Virginia City Council Regular Meeting. Honorable Mayor and Members of Cfy ;ouncil Robert L. Sisson, City Manager /I. City of Fairfax, Virginia City Council Regular Meeting Agenda Item #..,.,C:::o~Or!---!h~--- city Council Meeting q+----4-j/.-...:cx:l..-.>o?...~-/_,_j-=2=; r 1 TO: FROM: SUBJECT: ISSUE(S): SUMMARY: Honorable

More information

Ann Arbor Wastewater Treatment Plant Facilities Renovations Project October 2017

Ann Arbor Wastewater Treatment Plant Facilities Renovations Project October 2017 Ann Arbor Wastewater Treatment Plant Facilities Renovations Project October 2017 The Facilities Master Plan was completed in 2004 and identified the need for improvements to the City of Ann Arbor s Wastewater

More information

biologically active filtration

biologically active filtration biologically active filtration FOR TASTE AND ODOR CONTROL AT LAKE MANATEE WATER TREATMENT PLANT BY MIKE NIXON, EI, ENGINEER INTERN, MCKIM & CREED PHIL LOCKE, PE, SENIOR PROJECT MANAGER, MCKIM & CREED KATIE

More information

Massachusetts Water Resources Authority Update on 2018 Water and Wastewater Master Plan

Massachusetts Water Resources Authority Update on 2018 Water and Wastewater Master Plan Massachusetts Water Resources Authority Update on 2018 Water and Wastewater Master Plan February 12, 2019 Background 33 Years of MWRA Capital Investment FY86 18 $8.3 Billion Capital Spending 70% on Wastewater

More information

Louisville & Jefferson County Metropolitan Sewer District Infrastructure Upgrades Overview. Wet Weather Team Stakeholder Group Meeting July 20, 2006

Louisville & Jefferson County Metropolitan Sewer District Infrastructure Upgrades Overview. Wet Weather Team Stakeholder Group Meeting July 20, 2006 Louisville & Jefferson County Metropolitan Sewer District Infrastructure Upgrades Overview Wet Weather Team Stakeholder Group Meeting July 20, 2006 AGENDA MSD Capital Spending Trends Capital Project Accomplishments

More information

NEW CLOTH MEDIA FILTER SYSTEM REPLACES 4 MGD TRAVELING BRIDGE FILTERS WITH 12 MGD CAPACITY IN EXISTING TANKAGE

NEW CLOTH MEDIA FILTER SYSTEM REPLACES 4 MGD TRAVELING BRIDGE FILTERS WITH 12 MGD CAPACITY IN EXISTING TANKAGE NEW CLOTH MEDIA FILTER SYSTEM REPLACES 4 MGD TRAVELING BRIDGE FILTERS WITH 12 MGD CAPACITY IN EXISTING TANKAGE Keith C. Dayton Department of Utilities Stafford County, Virginia P. O. Box 339 Stafford,

More information

Report on Feasibility Assessment and Proposed Consolidation Agreement Maumelle Water Management September 22, 2015

Report on Feasibility Assessment and Proposed Consolidation Agreement Maumelle Water Management September 22, 2015 Report on Feasibility Assessment and Proposed Consolidation Agreement Maumelle Water Management September 22, 2015 Monthly Utility Bill in $ 100 Combined Average Utility Bill for 2015-2020 5/8 Meter with

More information

Well Water Quality Update and Next Steps. Public Works Commission Meeting April 17,

Well Water Quality Update and Next Steps. Public Works Commission Meeting April 17, Well Water Quality Update and Next Steps Public Works Commission Meeting April 17, 2017 1 Background The Water Treatment Plant (WTP) was taken off-line in February 2015 for maintenance rehab & upgrades

More information

2016 Summary Report Capital Improvement Projects

2016 Summary Report Capital Improvement Projects 2016 Summary Report Capital Improvement Projects The City Commission adopted the Water and Wastewater 2013-2017 Capital Improvement Program (CIP) on March 12, 2013. The CIP identifies water and wastewater

More information

Chapter 7 Plan for Community Facilities & Services

Chapter 7 Plan for Community Facilities & Services Chapter 7 Plan for Community Facilities & Services Crozet is served by numerous County facilities and services, some of which are located within the Development Area. These facilities and services are

More information

This is the title of the proposed project. A CIP contract or project number will be assigned to the projects as funding is established.

This is the title of the proposed project. A CIP contract or project number will be assigned to the projects as funding is established. WATER PROJECTS PROJECT DESCRIPTIONS The CIP includes a general list of projects scheduled during each of the five years of the program, followed by detailed project sheets arranged by project category,

More information

A. Introduction 7 1. Purpose 7 2. Authority 7 3. Contact 8 4. Plan Submittal Process 8 B. Design Standards General 11 a. Future Extensions 11

A. Introduction 7 1. Purpose 7 2. Authority 7 3. Contact 8 4. Plan Submittal Process 8 B. Design Standards General 11 a. Future Extensions 11 A. Introduction 7 1. Purpose 7 2. Authority 7 3. Contact 8 4. Plan Submittal Process 8 B. Design Standards 11 1. General 11 a. Future Extensions 11 b. Design Calculations 11 c. Easements and Property 12

More information

UTILITY SYSTEM OVERVIEW. Water Source Water Distribution Wastewater Collection Wastewater Treatment

UTILITY SYSTEM OVERVIEW. Water Source Water Distribution Wastewater Collection Wastewater Treatment 1 UTILITY SYSTEM OVERVIEW Water Source Water Distribution Wastewater Collection Wastewater Treatment 2 AGENDA Overview of the Utility System (building on the Council tours) ARWA Petersburg SCWWA Infrastructure

More information

Wastewater Collection System Infrastructure Condition Update

Wastewater Collection System Infrastructure Condition Update Wastewater Collection System Infrastructure Condition Update Planning Committee May 12, 2015 Agenda Background Condition Assessment Findings Gravity Interceptors Force Mains Pump Stations Phased Capital

More information

Presenter: Peter C. Gorham, P.E. Director of Engineering

Presenter: Peter C. Gorham, P.E. Director of Engineering Presenter: Peter C. Gorham, P.E. Director of Engineering Project Management Group 3 Engineers 5 Construction Inspectors 1 Environmental Compliance Specialist 1 Regulatory Compliance Specialist 1 Engineering

More information

City Hall ADA Ramp Grand Prairie, TX Cooper Square Addition Land Planning and Development Mansfield, TX Cavender s Boot City Hurst, TX January 2015

City Hall ADA Ramp Grand Prairie, TX Cooper Square Addition Land Planning and Development Mansfield, TX Cavender s Boot City Hurst, TX January 2015 Civil Engineering City Hall ADA Ramp Grand Prairie, TX Project involved the design of a new ADA ramp for Grand Prairie s City Hall. Services included land planning, storm sewer installation, site erosion

More information

Wilmette - Background

Wilmette - Background Reducing Basement Backups through Intergovernmental Cooperation and Design-Build Presented By Michael N. Young, P.E. Brigitte Ann Berger, P.E. Wilmette - Background North Shore Suburb of Chicago 5 Square

More information

REGIONAL WATER SUPPLY PLAN FOR. Albemarle County City of Charlottesville Town of Scottsville

REGIONAL WATER SUPPLY PLAN FOR. Albemarle County City of Charlottesville Town of Scottsville REGIONAL WATER SUPPLY PLAN FOR Albemarle County City of Charlottesville Town of Scottsville Prepared by Rivanna Water and Sewer Authority Charlottesville, Virginia September 30, 2011 TABLE OF CONTENTS

More information

Agenda Item IV A-1 (TAHOE) Meeting Date: Douglas County Sewer Improvement District #1. Wastewater Reclamation Facilities

Agenda Item IV A-1 (TAHOE) Meeting Date: Douglas County Sewer Improvement District #1. Wastewater Reclamation Facilities Agenda Item IV A-1 (TAHOE) Meeting Date: 11-04-16 Douglas County Sewer Improvement District #1 Wastewater Reclamation Facilities Douglas County Sewer Improvement District No. 1 Wastewater Reclamation Plant

More information

Capital Investment Plan Quarterly Report for period ending September 2017

Capital Investment Plan Quarterly Report for period ending September 2017 Report Engineering Services Group Capital Investment Plan Quarterly Report for period ending September 2017 Summary This report provides a summary of accomplishments to date on the Capital Investment Plan

More information

EAST CENTRAL REGIONAL WATER RECLAMATION FACILITY PROCESS WATER SYSTEM PROJECT

EAST CENTRAL REGIONAL WATER RECLAMATION FACILITY PROCESS WATER SYSTEM PROJECT EAST CENTRAL REGIONAL WATER RECLAMATION FACILITY PROCESS WATER SYSTEM PROJECT Addendum No. 2 Attachment B Contract Document Revisions Specifications: TABLE OF CONTENTS ADDENDUM NO. 2 Attachment B Contract

More information

MEMORANDUM THOMAS L. FREDERICK, EXECUTIVE DIRECTOR ANDREA TERRY, WATERSHED MANAGER DRAFT DROUGHT RESPONSE AND CONTINGENCY PLAN

MEMORANDUM THOMAS L. FREDERICK, EXECUTIVE DIRECTOR ANDREA TERRY, WATERSHED MANAGER DRAFT DROUGHT RESPONSE AND CONTINGENCY PLAN MEMORANDUM TO: FROM: SUBJECT: RIVANNA WATER & SEWER AUTHORITY BOARD OF DIRECTORS THOMAS L. FREDERICK, EXECUTIVE DIRECTOR ANDREA TERRY, WATERSHED MANAGER DRAFT DROUGHT RESPONSE AND CONTINGENCY PLAN DATE:

More information

Charleston Water System Capital Improvements Program

Charleston Water System Capital Improvements Program Charleston Water System 2019 2022 Capital Improvements Program October 2018 Introduction and Executive Summary The Charleston Water System s Capital Improvements Program (hereinafter CIP ) consists of

More information

HALIFAX WATER. Capital Budget 2015/16 Urban Core System Summary. Water - Land -- T O T A L $731,000. Water - Transmission -- T O T A L $5,297,000

HALIFAX WATER. Capital Budget 2015/16 Urban Core System Summary. Water - Land -- T O T A L $731,000. Water - Transmission -- T O T A L $5,297,000 Summary Asset Category s Water - Land -- T O T A L $731,000 Water - Transmission -- T O T A L $5,297,000 Water - Distribution -- T O T A L $4,978,000 Water - Structures -- T O T A L $608,000 Water - Treatment

More information

Volume 1 Executive Summary

Volume 1 Executive Summary 2013 Cheyenne Water and Wastewater Master Plans Final November 27, 2013 Prepared for: City of Cheyenne Board of Public Utilities 2416 Snyder Ave. Cheyenne, WY 82001 Prepared by: HDR Engineering AMEC Earth

More information

ASHCROFT PUMP STATIONS 2 & 3 CAPACITY IMPROVEMENTS PROJECT ACSA Project No Addendum 1 June 20, 2018

ASHCROFT PUMP STATIONS 2 & 3 CAPACITY IMPROVEMENTS PROJECT ACSA Project No Addendum 1 June 20, 2018 ASHCROFT PUMP STATIONS 2 & 3 CAPACITY IMPROVEMENTS PROJECT ACSA Project No. 2014-10 Addendum 1 June 20, 2018 ALBEMARLE COUNTY SERVICE AUTHORITY ALBEMARLE COUNTY, VIRGINIA Prepared for: Albemarle County

More information

CAPITAL IMPROVEMENT PROGRAM WATER

CAPITAL IMPROVEMENT PROGRAM WATER CAPITAL IMPROVEMENT PROGRAM 246 247 FUNDS (711-715) Access Road Improvements c709840 Minor road repair and pipeline clearance work to gain access to water facilities and equipment. Project Cost Estimate

More information

City of Columbus Wet Weather Management Plan Update. Dax J. Blake, P.E. Administrator City of Columbus, Ohio Division of Sewerage and Drainage

City of Columbus Wet Weather Management Plan Update. Dax J. Blake, P.E. Administrator City of Columbus, Ohio Division of Sewerage and Drainage City of Columbus Wet Weather Management Plan Update Dax J. Blake, P.E. Administrator City of Columbus, Ohio Division of Sewerage and Drainage City of Columbus, Ohio Population served ~ 1 Million 22 satellite

More information

Capital Investment Plan (CIP) Quarterly report for period ending September 2015

Capital Investment Plan (CIP) Quarterly report for period ending September 2015 Report Group Capital Investment Plan (CIP) Quarterly report for period ending September 2015 Summary This report provides a summary of fiscal year accomplishments, capital expenditures to date, and updates

More information

CHAPTER SEVEN: UTILITIES

CHAPTER SEVEN: UTILITIES CHAPTER SEVEN: UTILITIES 7.0 Introduction T he Water Works Board of the City of Auburn (AWWB) is the primary potable water service provider for the City of Auburn (City) and Auburn University. There are

More information

Amesville Water System

Amesville Water System Water system timeline System built in 1960 s Tank telemetry failed 1970 s June 2012 duracho and electric outage May 2013-29 EPA citations (see copy) June 2014 started consultation with Triad Engineering

More information

BRIDGE DISTRICT. City of West Sacramento. Phase 1 Infrastructure Improvement Project. Monthly Status Report

BRIDGE DISTRICT. City of West Sacramento. Phase 1 Infrastructure Improvement Project. Monthly Status Report BRIDGE DISTRICT Phase 1 Infrastructure Improvement Project (for work completed thru November 2011) Cover Photo: Joint Utility Trench installation along Fifth Street just north of Bridge Street. Page 1

More information

Thermal and Hydro Power Plant Maintenance Deer Island Treatment Plant

Thermal and Hydro Power Plant Maintenance Deer Island Treatment Plant Massachusetts Water Resources Authority Presentation to MWRA Board of Directors Thermal and Hydro Power Plant Maintenance Deer Island Treatment Plant March 12, 2014 On-Site Thermal/Power Plant Built in

More information

NELSONVILLE WATER TREATMENT PLANT IMPROVEMENTS

NELSONVILLE WATER TREATMENT PLANT IMPROVEMENTS Location City of Nelsonville, Ohio Environmental Engineering, Design and Bidding, Construction Administration and Observation, Start-up Services Cost $4.25 million Size 1,000 gallon per minute Professional

More information

CWRP WEEKLY CONSTRUCTION PROGRESS REPORT Week ending April 20, 2013

CWRP WEEKLY CONSTRUCTION PROGRESS REPORT Week ending April 20, 2013 CWRP WEEKLY CONSTRUCTION PROGRESS REPORT Week ending April 20, 2013 RIVER DIVERSION SEGMENT This week on the River Diversion, Ducworks completed the steel pipe installation below the waterline elevation.

More information

Massachusetts Water Resources Authority. Water and Wastewater System. Briefing to WSCAC and WAC

Massachusetts Water Resources Authority. Water and Wastewater System. Briefing to WSCAC and WAC Massachusetts Water Resources Authority 2013 MWRA Master Plan Water and Wastewater System Briefing to WSCAC and WAC November 19, 2013 Presentation Outline Introduction Water System Wastewater System 2

More information

DC WATER CAPITAL IMPROVEMENT PROGRAM (CIP)

DC WATER CAPITAL IMPROVEMENT PROGRAM (CIP) DC WATER CAPITAL IMPROVEMENT PROGRAM (CIP) District of Columbia Water and Sewer Authority of Maryland Thursday, April 7, 2016 George S. Hawkins, General Manager Presented by: Liliana Maldonado, Director,

More information

Water and Wastewater Capital Improvement Plan Options and Revenue Requirements

Water and Wastewater Capital Improvement Plan Options and Revenue Requirements Water and Wastewater Capital Improvement Plan Options and Revenue Requirements The Master Plan s objectives are to assess our needs and recommend Capital Improvement Plans that address the following: Infrastructure

More information

Innovative Improvements to a 53-Year Old Water Plant for HABs, Crypto, and Whatever Else the Maumee River Brings

Innovative Improvements to a 53-Year Old Water Plant for HABs, Crypto, and Whatever Else the Maumee River Brings Innovative Improvements to a 53-Year Old Water Plant for HABs, Crypto, and Whatever Else the Maumee River Brings Robert T. Shoaf, P.E., BCEE AECOM (Columbus, Ohio) Scott Hoover, Plant Superintendent Napoleon,

More information

Pittsburgh Water Treatment Plant Projects. by Jay R. Lucas, P.E. Senior Project Manager

Pittsburgh Water Treatment Plant Projects. by Jay R. Lucas, P.E. Senior Project Manager Pittsburgh Water Treatment Plant Projects by Jay R. Lucas, P.E. Senior Project Manager Who Is American Water We are the largest publicly traded water and wastewater utility in the United States Broad national

More information

APPENDIX I. Conceptual Design - Salem Road and McKay Road Trunk Watermain and Sanitary Sewer

APPENDIX I. Conceptual Design - Salem Road and McKay Road Trunk Watermain and Sanitary Sewer APPENDIX I Conceptual Design - Salem Road and McKay Road Trunk Watermain and Sanitary Sewer THE CITY OF BARRIE PROJECT NO. 15M-00594-01 CONCEPTUAL DESIGN SALEM ROAD AND MCKAY ROAD TRUNK WATERMAIN AND SANITARY

More information

Public Utilities Department April 13, 2017 Delaware Citizens Academy Brad Stanton, Director

Public Utilities Department April 13, 2017 Delaware Citizens Academy Brad Stanton, Director Public Utilities Department April 13, 2017 Delaware Citizens Academy Brad Stanton, Director Utility Fast Facts Average household uses 107,000 gallons of water each year. 1,851 gallons of water to refine

More information

Departments Public Works Department

Departments Public Works Department Departments Public Works Department Public Works REQUEST FOR COUNCIL CONSIDERATION MEETING DATE: August 21, 2017 AGENDA ITEM: CITY GOAL: Discussion: the Installment of the Staff Work Plan Public Works

More information

Sustainability and Asset Protection at MWRA

Sustainability and Asset Protection at MWRA Massachusetts Water Resources Authority Sustainability and Asset Protection at MWRA Frederick A. Laskey Executive Director October 10, 2017 What Is MWRA? MWRA provides wholesale water and wastewater services

More information

MINUTES ENGINEERING AND OPERATIONS COMMITTEE Special Meeting May 3, 2018

MINUTES ENGINEERING AND OPERATIONS COMMITTEE Special Meeting May 3, 2018 MINUTES ENGINEERING AND OPERATIONS COMMITTEE Special Meeting May 3, 2018 EVMWD BOARD ACTION APPROVED APPROVED AS AMENDED DENIED CONTINUED The Engineering and Operations Committee Meeting was held at 31315

More information

Town of New Castle, New Hampshire Sewer Infrastructure Evaluation

Town of New Castle, New Hampshire Sewer Infrastructure Evaluation Town of New Castle, New Hampshire Sewer Infrastructure Evaluation March 2016 EXECUTIVE SUMMARY The Town of New Castle (Town) is working collaboratively with the City of Portsmouth (City) to consider options

More information

T a b l e o f C o n t e n t s

T a b l e o f C o n t e n t s C i t y o f G l a d s t o n e P u b l i c W o r k s D e s i g n S t a n d a r d s T a b l e o f C o n t e n t s SECTION THREE SANITARY SEWER REQUIREMENTS... 1 3.0000 SANITARY SEWERS... 1 3.0010 General

More information

Army Base Treatment Plant

Army Base Treatment Plant Army Base Treatment Plant Norfolk Berthed at Nauticus, the Battleship Wisconsin is one of the largest and last battleships ever built by the U.S. Navy. 3Q Army Base AB010000 AB010500 3Q Legend Army Base

More information

DRINKING WATER CONSTRUCTION PERMIT APPLICATON

DRINKING WATER CONSTRUCTION PERMIT APPLICATON DRINKING WATER CONSTRUCTION PERMIT APPLICATON Addition to existing water system New drinking water system Facilities to be added Surface Plant (new or expansion) New Well or Spring Source Booster Pump

More information

GUIDANCE MEMO NO : GUIDANCE CRITERIA FOR THE SEPARATION OF WATER MAINS AND NON-POTABLE PIPELINES

GUIDANCE MEMO NO : GUIDANCE CRITERIA FOR THE SEPARATION OF WATER MAINS AND NON-POTABLE PIPELINES State of California Memorandum Department of Health Services Date: April 4, 2003 To: From: Subject: Regional and District Engineers David P. Spath, Ph.D., Chief (Original signed by Dave) Drinking Water

More information

WASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES

WASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES WASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES A range of potential ammonia limits were identified for alternatives evaluation, as discussed in Section 2.2.5. This chapter

More information

F. Provide at least 2 feet of vertical separation between a water line and any utility or stormdrain crossing it.

F. Provide at least 2 feet of vertical separation between a water line and any utility or stormdrain crossing it. Section 3 F. Provide at least 2 feet of vertical separation between a water line and any utility or stormdrain crossing it. 3.8 Highway Crossings The design engineer shall, prior to the design of any highway

More information

Army Base Treatment Plant

Army Base Treatment Plant Treatment Plant Norfolk Berthed at Nauticus, the Battleship Wisconsin is one of the largest and last battleships ever built by the U.S. Navy. 3Q AB010500 3Q Legend Treatment Plant CIP Interceptor Point

More information

DROUGHT RESPONSE AND CONTINGENCY PLAN

DROUGHT RESPONSE AND CONTINGENCY PLAN DROUGHT RESPONSE AND CONTINGENCY PLAN 1. Background and Purpose In 2004, a Rivanna Regional Drought Response Committee was formed to work cooperatively to provide a coordinated response to drought in this

More information

Improvements to the Missouri River Wastewater Treatment Plant- Schedule BProject. Public Meeting June 4, 2013 South Omaha Public Library

Improvements to the Missouri River Wastewater Treatment Plant- Schedule BProject. Public Meeting June 4, 2013 South Omaha Public Library Improvements to the Missouri River Wastewater Treatment Plant- Schedule BProject Public Meeting June 4, 2013 South Omaha Public Library Agenda Welcome and Introductions CSO Program Overview Missouri River

More information

SEWER SYSTEM DESIGN GUIDELINES

SEWER SYSTEM DESIGN GUIDELINES SEWER SYSTEM DESIGN GUIDELINES PART 1 GENERAL 1.1 GENERAL GUIDELINES A. The following sewer system design guidelines are based on Federal, State and Local health requirements, and the Berkeley County Water

More information

Calendar Year capital improvement. Program

Calendar Year capital improvement. Program Calendar Year 2010 capital improvement Program Important Notice: The information found in this file concerning the 2010 Capital Improvements Program, has been extracted from the San Antonio Water System

More information

144

144 REVENUES Intergovernmental Grants $1,455,000 239,324 851,345 1,090,669 Investment Earnings 470,412 448,376 72,711 521,087 Wake County Reimbursement 131,760 131,760 --- 131,760 Developer Reimbursements

More information

CHAPTER SEVEN: UTILITIES

CHAPTER SEVEN: UTILITIES CHAPTER SEVEN: UTILITIES 7.1 Introduction The Water Works Board of the City of Auburn (AWWB) is the primary potable water service provider for the City of Auburn (City) and Auburn University. There are

More information

2018 Proposed Budget PRESENTED TO UTILITIES COMMISSION OCTOBER 2 ND 2017

2018 Proposed Budget PRESENTED TO UTILITIES COMMISSION OCTOBER 2 ND 2017 2018 Proposed Budget PRESENTED TO UTILITIES COMMISSION OCTOBER 2 ND 2017 Proposed Budget Reflects Council s Goals Overview FY2018 Budget at a glance Overview General Fund Open Lake Nighthorse General Fund

More information

North Harris County Regional Water Authority TABLE OF CONTENTS. CONTRACT DOCUMENTS Section No. Title

North Harris County Regional Water Authority TABLE OF CONTENTS. CONTRACT DOCUMENTS Section No. Title TABLE OF CONTENTS CONTRACT DOCUMENTS 00001 Inside Title Page 00003 Table of Contents 00004 List of Drawings 00020 Invitation to Bid 00100 Instructions to Bidders 00300 Bid 00500 Agreement 00610 Construction

More information

LIMITED ENVIRONMENTAL REVIEW (LER) Black River Wastewater Treatment Plant Mechanical Bar Screen Project (aka Traveling Bar Screen Addition)

LIMITED ENVIRONMENTAL REVIEW (LER) Black River Wastewater Treatment Plant Mechanical Bar Screen Project (aka Traveling Bar Screen Addition) LIMITED ENVIRONMENTAL REVIEW (LER) Date: March 18, 2019 Project Identification Name: Address: Loan No.: City of Lorain Black River Wastewater Treatment Plant Mechanical Bar Screen Project (aka Traveling

More information

Horizon 2020 Steering Committee Water and Wastewater Master Plan Overview

Horizon 2020 Steering Committee Water and Wastewater Master Plan Overview Horizon 2020 Steering Committee Water and Wastewater Master Plan Overview August 11, 2014 Let s Look at the Numbers Water System 2 - Raw Water Sources Clinton Reservoir Kansas River 2 - Water Treatment

More information

Water Treatment Plant Phase 1 Upgrades CMAR Selection Pre-Submittal Meeting

Water Treatment Plant Phase 1 Upgrades CMAR Selection Pre-Submittal Meeting Water Treatment Plant Phase 1 Upgrades CMAR Selection Pre-Submittal Meeting October 12, 2017 Water Treatment Plant Phase 1 Upgrades 22 mgd WTP Expand capacity to 32 mgd Upgrades to most processes Only

More information

Historic Bristol Borough. Wastewater treatment facilities upgrade & improvement program:

Historic Bristol Borough. Wastewater treatment facilities upgrade & improvement program: Historic Bristol Borough Wastewater treatment facilities upgrade & improvement program: 2015-2018 Project Summary 2 of the original 10 projects identified in 2012 have been completed (Lakeland PS, WWTP

More information

Green River Filtration Facility Plant Overview

Green River Filtration Facility Plant Overview Green River Filtration Facility Plant Overview PNWS-AWWA Conference Bellevue, WA Gary Fox & Hilary Lorenz April 29, 2015 2 IN THE BEGINNING 3 PILOT PLANT OWNED AND OPERATED BY TACOMA WATER STAFF ALL THAT

More information

AECOM Amendment 2. Thien Ng Interim Public Works Director. December 13, 2017

AECOM Amendment 2. Thien Ng Interim Public Works Director. December 13, 2017 AECOM Amendment 2 Thien Ng Interim Public Works Director December 13, 2017 AECOM Agreements to be Combined Public Works Department On-Call Engineering Services $250,000 Increase $250,000 Existing Water

More information

Utility Partner Data Report

Utility Partner Data Report Utility Partner Data Report Project Title: Studying Distribution System Hydraulics and Flow Dynamics to Improve Water Utility Operational Decision Making Water Distribution System: Nicholasville, Kentucky

More information

UNITED STATES DISTRICT COURT for the DISTRICT OF MASSACHUSETTS

UNITED STATES DISTRICT COURT for the DISTRICT OF MASSACHUSETTS UNITED STATES DISTRICT COURT for the DISTRICT OF MASSACHUSETTS UNITED STATES OF AMERICA, Plaintiff, CIVIL ACTION v No 85-0489-MA METROPOLITAN DISTRICT COMMISSION, et al, Defendants CONSERVATION LAW FOUNDATION

More information

DESIGN OF SEWER SYSTEMS

DESIGN OF SEWER SYSTEMS Wastewater Engineering (MSc program) DESIGN OF SEWER SYSTEMS Prepared by Dr.Khaled Zaher Assistant Professor, Public Works Engineering Department, Faculty of Engineering, Cairo University 1. Sewer Materials

More information

Section 403. DRAINAGE STRUCTURES

Section 403. DRAINAGE STRUCTURES 403.01 Section 403. DRAINAGE STRUCTURES 403.01. Description. This work consists of adjusting, constructing, or temporarily lowering drainage structures and cleaning existing drainage structures and leads

More information

Joshua H. Reynolds, P.E.

Joshua H. Reynolds, P.E. Joshua H. Reynolds, P.E. Education B.S., Civil Engineering, California Polytechnic University, San Luis Obispo, CA Professional Registrations Professional Engineer - Civil, California, No. C65400 Professional

More information

CUYAHOGA COUNTY, OHIO ADDENDUM NUMBER 1, APRIL 25, 2018 FOR THE CITY OF BRECKSVILLE,

CUYAHOGA COUNTY, OHIO ADDENDUM NUMBER 1, APRIL 25, 2018 FOR THE CITY OF BRECKSVILLE, CUYAHOGA COUNTY, OHIO ADDENDUM NUMBER 1, APRIL 25, 2018 FOR THE FOR THE CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS RQ# 41677 BIDS DUE ON: May 1, 2018, at 2:00 p.m. ADDENDUM NUMBER 1, April 25, 2018, Page

More information

HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN

HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN Introduction Donna Kaluzniak, CEP, Utility Director, City of Atlantic Beach, Florida John E. Collins, Jr., P.E., J. Collins

More information

UTILITY RATE REPORT. City of Charlottesville. To Be One Community Filled With Opportunity PROPOSED FY 2018

UTILITY RATE REPORT. City of Charlottesville. To Be One Community Filled With Opportunity PROPOSED FY 2018 City of Charlottesville UTILITY RATE REPORT PROPOSED FY 2018 Prepared June 1, 2017 by the Department of Finance & Department of Utilities To Be One Community Filled With Opportunity City of Charlottesville

More information

Monthly Operating Report

Monthly Operating Report Executive Summary Wastewater Treatment Plant Operations staff is working with partners to evaluate 1) a system to automate control of the solids balance aspect of the treatment plant s activated sludge

More information

PUBLIC UTILITIES. Water Service

PUBLIC UTILITIES. Water Service PUBLIC UTILITIES Planning for public utilities is crucial to the successful growth of any community. The following section describes the current services provided to residents of Gloucester County and

More information

Lynn Township Sewer Authority. Corrective Action Plan. March 2007

Lynn Township Sewer Authority. Corrective Action Plan. March 2007 Lynn Township Sewer Authority Corrective Action Plan March 2007 4130.00 Prepared By: ARRO Consulting, Inc. 400 Washington Street, Suite 602 Reading, Pennsylvania 19610 610 374 5285 Corrective Action Plan

More information

Water Treatment Plant Year-end Report for 2014

Water Treatment Plant Year-end Report for 2014 Water Treatment Plant Year-end Report for 2014 Water demand The total influent volume of water drawn from the Assiniboine River for treatment was approximately 6.03 % higher in 2014 than in 2013. 2013

More information

Capital Improvement Plan Update:

Capital Improvement Plan Update: Board of Supervisors Meeting Carson City Public Works Department Capital Improvement Plan Update: Wastewater Collection, Treatment and Reuse March 14, 2013 Topics of Discussion Regionalization Existing

More information

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY EXECUTIVE SUMMARY EXECUTIVE SUMMARY INTRODUCTION AND BACKGROUND The Village of Algonquin, located along the Fox River in McHenry County, provides wastewater collection and treatment services to the entire

More information

Irvine Ranch Water District Michelson Water Recycling Plant. Irvine, CA LOCATION: MBR MANUFACTURER: COMMENTS:

Irvine Ranch Water District Michelson Water Recycling Plant. Irvine, CA LOCATION: MBR MANUFACTURER: COMMENTS: FACILITY: Irvine Ranch Water District Michelson Water Recycling Plant LOCATION: Irvine, CA GEO. AREA: Southern California STATUS 07/14: Operational CONSTRUCTION: FILANC ENGINEERING: HDR Engineering MBR

More information

2017 Summary Report Capital Improvement Projects

2017 Summary Report Capital Improvement Projects 2017 Summary Report Capital Improvement Projects The City Commission adopted the Water and Wastewater 2013-2017 Capital Improvement Program (CIP) on March 12, 2013. The $151 million CIP identifies water

More information

Fencing, locks on access manholes, and other necessary precautions shall be provided to prevent trespassing, vandalism, and sabotage.

Fencing, locks on access manholes, and other necessary precautions shall be provided to prevent trespassing, vandalism, and sabotage. previous start next FINISHED WATER STORAGE 7.0 GENERAL 7.1 TREATMENT PLANT STORAGE 7.2 HYDROPNEUMATIC TANK SYSTEMS 7.3 DISTRIBUTION SYSTEM STORAGE 7.0 GENERAL The materials and designs used for finished

More information

MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT SCHEDULE B REPORT MUNICIPALITY OF TRENT HILLS CAMPBELLFORD POTABLE WATER SUPPLY AND DISTRIBUTION SYSTEM

MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT SCHEDULE B REPORT MUNICIPALITY OF TRENT HILLS CAMPBELLFORD POTABLE WATER SUPPLY AND DISTRIBUTION SYSTEM Background MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT SCHEDULE B REPORT MUNICIPALITY OF TRENT HILLS CAMPBELLFORD POTABLE WATER SUPPLY AND DISTRIBUTION SYSTEM - EXECUTIVE SUMMARY - The Municipality of Trent

More information

HAMPTON ROADS SANITATION DISTRICT CAPITAL IMPROVEMENT PROGRAM FY 2003 to 2007 PROJECT SUMMARY

HAMPTON ROADS SANITATION DISTRICT CAPITAL IMPROVEMENT PROGRAM FY 2003 to 2007 PROJECT SUMMARY 56 Nansemond Project Name Bowers Hill and Deep Creek Pressure Reducing Stations Generator Upgrades Line/PS No. Account No. 3-3325-XXXXX-2320 VRLF No. Replacement Design Underway This project will design

More information

Storm Water and Sanitary Sewer

Storm Water and Sanitary Sewer Public Works Department Summary Report on Planned Capital Improvements Storm Water and Sanitary Sewer Introduction Public Works has assembled this summary report to highlight major capital improvements

More information

Greater Kegalle Water Treatment Plant Kegalle, Sri Lanka

Greater Kegalle Water Treatment Plant Kegalle, Sri Lanka Greater Kegalle Water Treatment Plant Kegalle, Sri Lanka 1. Background information of the water treatment plant Kegalle is located about 80 Km East of Colombo and the Greater Kegalle water treatment plant

More information

Sewer Facilities 102. Hampstead Sewer Service Area. Carroll County Water & Sewer Master Plan. Current Conditions

Sewer Facilities 102. Hampstead Sewer Service Area. Carroll County Water & Sewer Master Plan. Current Conditions Sewer Facilities 102 Hampstead Sewer Service Area Current Conditions Carroll County owns and operates the public sewer system that serves both the Town of Hampstead and adjoining areas in the county. The

More information

Report. Engineering Services Group. Capital Investment Plan (CIP) Quarterly Report for the period ending September Summary.

Report. Engineering Services Group. Capital Investment Plan (CIP) Quarterly Report for the period ending September Summary. Report Engineering Services Group Capital Investment Plan (CIP) Quarterly Report for the period ending September 2012 Summary This report provides a summary of fiscal year accomplishments, capital expenditures

More information

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION 820-1 SCOPE OF WORK: SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION a. Furnish all labor, materials, equipment, and incidentals required for demolition and/or removal and disposal of existing

More information