PROJECT MANUAL AND SPECIFICATIONS CAMPUS WATER INTRUSION REPAIRS

Size: px
Start display at page:

Download "PROJECT MANUAL AND SPECIFICATIONS CAMPUS WATER INTRUSION REPAIRS"

Transcription

1 PROJECT MANUAL AND SPECIFICATIONS CAMPUS WATER INTRUSION REPAIRS UNIVERSITY OF NORTH FLORIDA JACKSONVILLE, FLORIDA 100% Submittal Set November 21, 2016 TTV ARCHITECTS, INC. 115 E. Forsyth Street JACKSONVILLE, FLORIDA Florida License #AA (904) FAX (904)

2 NOTICE: WHEREVER IT OCCURS IN THIS DOCUMENT DELETE ALL REFERENCES TO THE BOARD OF REGENTS AND SUBSITUTE THE UNIVERISITY OF NORTH FLORIDA, BOARD OF TRUSTEES, A PUBLIC BODY CORPORATE

3 UNIVERSITY OF NORTH FLORIDA Jacksonville, Florida TABLE OF CONTENTS 100% Submittal Set SPECIFICATIONS November 21, 2016 TTV Project No DIVISIONS 0 THROUGH 41 DIVISION 0 BIDDING REQUIREMENTS AND CONDITIONS OF THE CONTRACT Standard Form of Agreement between Owner and Contractor General Conditions To be provided by UNF Supplement Conditions List of Drawings DIVISION 1 GENERAL REQUIREMENTS Construction Waste Management and Disposal Quality Control Cutting & Patching DIVISION 2 EXISTING CONDITIONS Selective Demolition DIVISION 3 CONCRETE Not Used Concrete Beam & Column Repairs (By UNF Structural Engineer) DIVISION 4 MASONRY Not Used DIVISION 5 METALS Not Used DIVISION 6 WOOD, PLASTICS, AND COMPOSITES Rough Carpentry DIVISION 7 THERMAL AND MOISTURE PROTECTION Masonry Sealer Fluid Applied Roof Flashing Sheet Metal Work Sealants & Calking DIVISION 8 OPENINGS Not Used DIVISION 9 FINISHES Not Used TOC - 1

4 DIVISION 10 SPECIALTIES Not Used DIVISIONS 11 THROUGH 41 Not Used TOC - 2

5 1.1 DESCRIPTION SECTION LIST OF DRAWINGS A. Applicable Drawings: The drawings applicable to this Project are titled: Campus Water Intrusion Repairs Jacksonville, Florida Project No B. The drawings are part of the Contract documents and are bound separately. In case of dispute, the Architect will identify the drawings. The applicable drawings consist of the following sheets: COVER SHEET G1.0 COVER SHEET & PROJECT INFORMATION ARCHITECTURAL A1.1 NEW WORK PLAN & PHOTO REFERENCE- BUILDING 1 A1.2 NEW WORK PLAN & PHOTO REFERENCE- BUILDING 2 A1.3 NEW WORK PLAN & PHOTO REFERENCE- BUILDING 10 A1.4 NEW WORK PLAN & PHOTO REFERENCE- BUILDING 12 A1.4A DETAILS- BUILDING 12 A1.5 NEW WORK PLAN & PHOTO REFERENCE- BUILDING 39 A1.6 NEW WORK PLAN & PHOTO REFERENCE- BUILDING 42 A1.7 NEW WORK PLAN & PHOTO REFERENCE- BUILDING 48 A1.8 NEW WORK PLAN & PHOTO REFERENCE- BUILDING 51 A1.9 NEW WORK PLAN & PHOTO REFERENCE- BUILDING 60 END OF SECTION

6 THIS PAGE INTENTIONALLY LEFT BLANK

7 SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL PART 1 - GENERAL 1.1 SUMMARY A. This Section includes administrative and procedural requirements for the following: 1. Salvaging nonhazardous construction waste. 2. Recycling nonhazardous demolition and construction waste. 3. Disposing of nonhazardous demolition and construction waste. 1.2 DEFINITIONS A. Construction Waste: Building and site improvement materials and other solid waste resulting from construction, remodeling, renovation, or repair operations. Construction waste includes packaging. B. Demolition Waste: Building and site improvement materials resulting from demolition or selective demolition operations. C. Disposal: Removal off-site of demolition and construction waste and subsequent sale, recycling, reuse, or deposit in landfill or incinerator acceptable to authorities having jurisdiction. D. Recycle: Recovery of demolition or construction waste for subsequent processing in preparation for reuse. E. Salvage: Recovery of demolition or construction waste and subsequent sale or reuse in another facility. F. Salvage and Reuse: Recovery of demolition or construction waste and subsequent incorporation into the Work. 1.3 PERFORMANCE REQUIREMENTS A. General: Develop waste management plan that results in end-of-project rates for salvage/recycling of 50% percent by weight of total waste generated by the Work. 1.4 SUBMITTALS A. Waste Management Plan: Submit three (3) copies of plan within 14 days of date established for the Notice to Proceed. B. Waste Reduction Progress Reports: Concurrent with each Application for Payment, submit two copies of report. Include the following information: 1. Material category. 2. Generation point of waste. 3. Total quantity of waste in tons. 4. Quantity of waste salvaged, both estimated and actual in tons. 5. Quantity of waste recycled, both estimated and actual in tons. 6. Total quantity of waste recovered (salvaged plus recycled) in tons. 7. Total quantity of waste recovered (salvaged plus recycled) as a percentage of total waste

8 C. Waste Reduction Calculations: Before request for Substantial Completion, submit three (3) copies of calculated end-of-project rates for salvage, recycling, and disposal as a percentage of total waste generated by the Work. D. Records of Donations: Indicate receipt and acceptance of salvageable waste donated to individuals and organizations. Indicate whether organization is tax exempt. E. Records of Sales: Indicate receipt and acceptance of salvageable waste sold to individuals and organizations. Indicate whether organization is tax exempt. F. Recycling and Processing Facility Records: Indicate receipt and acceptance of recyclable waste by recycling and processing facilities licensed to accept them. Include manifests, weight tickets, receipts, and invoices. G. Landfill and Incinerator Disposal Records: Indicate receipt and acceptance of waste by landfills and incinerator facilities licensed to accept them. Include manifests, weight tickets, receipts, and invoices. H. LEED Letter template: LEED letter template for Credit MR 2.1and 2.2, signed by Contractor, tabulating total waste material, quantities diverted and means by which it is diverted, and statement that requirements for the credit have been met. Template is NOT to be submitted to USGBC I. Qualification Data: For Waste Management Coordinator and refrigerant recovery technician. 1.5 QUALITY ASSURANCE A. Waste Management Coordinator Qualifications: Documented experience in waste management procedures in at least 2 building projects. B. Refrigerant Recovery Technician Qualifications: Certified by EPA-approved certification program. C. Waste Management Conference: Conduct conference at Project site with all subcontractors. 1.6 WASTE MANAGEMENT PLAN A. General: Develop plan consisting of waste identification and waste reduction work plan. Indicate quantities by weight or volume, but use same units of measure throughout waste management plan. B. Waste Identification: Indicate anticipated types and quantities of demolition, siteclearing, and construction waste generated by the Work. Include estimated quantities and assumptions for estimates. C. Waste Reduction Work Plan: List each type of waste and whether it will be salvaged, recycled, or disposed of in landfill or incinerator. Include points of waste generation, total quantity of each type of waste, quantity for each means of recovery, and handling and transportation procedures. 1. Salvaged Materials for Reuse: For materials that will be salvaged and reused in this Project, describe methods for preparing salvaged materials before incorporation into the Work

9 2. Salvaged Materials for Sale: For materials that will be sold to individuals and organizations, include list of their names, addresses, and telephone numbers. 3. Salvaged Materials for Donation: For materials that will be donated to individuals and organizations, include list of their names, addresses, and telephone numbers. 4. Recycled Materials: Include list of local receivers and processors and type of recycled materials each will accept. Include names, addresses, and telephone numbers. 5. Disposed Materials: Indicate how and where materials will be disposed of. Include name, address, and telephone number of each landfill and incinerator facility. 6. Handling and Transportation Procedures: Include method that will be used for separating recyclable waste including sizes of containers, container labeling, and designated location on Project site where materials separation will be located. D. Forms: Prepare waste management plan on forms included at end of Part 3. PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION 3.1 PLAN IMPLEMENTATION A. General: Implement waste management plan as approved by Architect. Provide handling, containers, storage, signage, transportation, and other items as required to implement waste management plan during the entire duration of the Contract. B. First-Right-of-Refusal: UNF retains first right of refusal for all items with in the scope of work to be removed, reused, salvaged, or recycled. Coordinate items with Elton Brown (UNF) C. Waste Management Coordinator: Engage a waste management coordinator to be responsible for implementing, monitoring, and reporting status of waste management work plan. Coordinator shall be present at Project site full time for duration of Project. D. Training: Train workers, subcontractors, and suppliers on proper waste management procedures, as appropriate for the Work occurring at Project site. 1. Distribute waste management plan to everyone concerned within three (3) days of submittal return. 2. Distribute waste management plan to entities when they first begin work on-site. Review plan procedures and locations established for salvage, recycling, and disposal. E. Site Access and Temporary Controls: Conduct waste management operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities. 1. Designate and label specific areas on Project site necessary for separating materials that are to be salvaged, recycled, reused, donated, and sold. 2. Comply with Division 01 Section "IAQ Management for controlling dust and dirt, environmental protection, and noise control

10 3.2 SALVAGING DEMOLITION WASTE A. Salvaged Items for Reuse in the Work: 1. Clean salvaged items. 2. Pack or crate items after cleaning. Identify contents of containers. 3. Store items in a secure area until installation. 4. Protect items from damage during transport and storage. 5. Install salvaged items to comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make items functional for use indicated. B. Salvaged Items for Sale and Donation: Not permitted on Project site. 1. Clean Salvaged items. 2. Pack or crate items after cleaning. Identify contents of containers. 3. Store items in a secure area off site until delivery to buyer 4. Pack and transport items off site C. Salvaged Items for Owner's Use: 1. Clean salvaged items. 2. Pack or crate items after cleaning. Identify contents of containers. 3. Store items in a secure area until delivery to Owner. 4. Transport items to Owner's storage area designated by Owner. 5. Protect items from damage during transport and storage. 3.3 RECYCLING DEMOLITION AND CONSTRUCTION WASTE, GENERAL A. General: Recycle paper and beverage containers used by on-site workers. B. Recycling Receivers and Processors: List below is provided for information only; available recycling receivers and processors include, but are not limited to, the following: BFI 7580 Philips Hwy, (904) Commercial Metal Co 2038 Lane Ave N, (904) Jax Recycling Inc 2111 N Liberty St, (904) Main Recycling Co PO Box2348, (904) Realco Recycling Co 8707 Somers Rd S, (904) C. Recycling Incentives: Revenues, savings, rebates, tax credits, and other incentives received for recycling waste materials shall be shared equally by Owner and Contractor. D. Procedures: Separate recyclable waste from other waste materials, trash, and debris. Separate recyclable waste by type at Project site to the maximum extent practical. Co-mingling recyclable waste is only permitted where recycling facilities accept co-mingled waste

11 1. Provide appropriately marked containers or bins for controlling recyclable waste until they are removed from Project site. Include list of acceptable and unacceptable materials at each container and bin. a. Inspect containers and bins for contamination and remove contaminated materials if found. 2. Stockpile processed materials on-site without intermixing with other materials. Place, grade, and shape stockpiles to drain surface water. Cover to prevent windblown dust. 3. Stockpile materials away from construction area. Do not store within drip line of remaining trees. 4. Store components off the ground and protect from the weather. 5. Remove recyclable waste off Owner's property and transport to recycling receiver or processor. 3.4 RECYCLING DEMOLITION WASTE (IF APPLICABLE) A. Asphaltic Concrete Paving: Break up and transport paving to asphalt-recycling facility. B. Concrete: Remove reinforcement and other metals from concrete and sort with other metals. Break up and transport concrete to recycling facility. C. Masonry: Remove metal reinforcement, anchors, and ties from masonry and sort with other metals. 1. Clean and stack undamaged, whole masonry units on wood pallets. D. Wood Materials: Sort and stack members according to size, type, and length. Separate lumber, engineered wood products, panel products, and treated wood materials. E. Metals: Separate metals by type. 1. Structural Steel: Stack members according to size, type of member, and length. 2. Remove and dispose of bolts, nuts, washers, and other rough hardware. F. Asphalt Shingle Roofing: Separate organic and glass-fiber asphalt shingles and felts. Remove and dispose of nails, staples, and accessories. G. Gypsum Board: Stack large clean pieces on wood pallets and store in a dry location. Remove edge trim and sort with other metals. Remove and dispose of fasteners. H. Acoustical Ceiling Panels and Tile: Stack large clean pieces on wood pallets and store in a dry location. 1. Separate suspension system, trim, and other metals from panels and tile and sort with other metals. I. Carpet and Pad: Roll large pieces tightly after removing debris, trash, adhesive, and tack strips. 1. Store clean, dry carpet and pad in a closed container or trailer provided by Carpet Reclamation Agency or carpet recycler. J. Equipment: Drain tanks, piping, and fixtures. Seal openings with caps or plugs. Protect equipment from exposure to weather. K. Plumbing Fixtures: Separate by type and size

12 L. Piping: Reduce piping to straight lengths and store by type and size. Separate supports, hangers, valves, sprinklers, and other components by type and size. M. Lighting Fixtures: Separate lamps by type and protect from breakage. N. Electrical Devices: Separate switches, receptacles, switchgear, transformers, meters, panelboards, circuit breakers, and other devices by type. O. Conduit: Reduce conduit to straight lengths and store by type and size. 3.5 RECYCLING CONSTRUCTION WASTE A. Packaging: 1. Cardboard and Boxes: Break down packaging into flat sheets. Bundle and store in a dry location. 2. Polystyrene Packaging: Separate and bag materials. 3. Pallets: As much as possible, require deliveries using pallets to remove pallets from Project site. For pallets that remain on-site, break down pallets into component wood pieces and comply with requirements for recycling wood. 4. Crates: Break down crates into component wood pieces and comply with requirements for recycling wood. B. Site-Clearing Wastes: Chip brush, branches, and trees at landfill facility. C. Wood Materials: 1. Clean Cut-Offs of Lumber: Grind or chip into small pieces. 2. Clean Sawdust: Bag sawdust that does not contain painted or treated wood. D. Gypsum Board: Stack large clean pieces on wood pallets and store in a dry location. 1. Clean Gypsum Board: Grind scraps of clean gypsum board using small mobile chipper or hammer mill. Screen out paper after grinding. 3.6 DISPOSAL OF WASTE A. General: Except for items or materials to be salvaged, recycled, or otherwise reused, remove waste materials from Project site and legally dispose of them in a landfill or incinerator acceptable to authorities having jurisdiction. 1. Except as otherwise specified, do not allow waste materials that are to be disposed of accumulate on-site. 2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas. B. Burning: Do not burn waste materials. C. Disposal: Transport waste materials off Owner's property and legally dispose of them. END OF SECTION

13 SECTION QUALITY CONTROL PART 1 - GENERAL 1.1 SUMMARY A. This section includes administrative and procedural requirements for quality control services to verify quality assurance requirements specified in the Construction Contract Clauses, individual specification sections and elsewhere in the Contract Documents. B. The quality control services include storefront tests, roof flashing assembly tests, inspections and related actions, including reports, performed by the Contractor, independent agencies or governing authorities. C. Specific quality control requirements for individual construction activities are included in the sections that specify those construction activities. D. These services do not relieve the Contractor of responsibility for compliance with Contract Document requirements, and do not limit the Contractor's quality control procedures that facilitate compliance with Contract Document requirements. E. AS NOTED IN THE DRAWINGS, ALL AREAS AS PART OF THESE WATER INTRUSION REPAIRS ARE REQUIRED TO BE WATER TESTED TO VALIDATE REPAIR SUCCESS. 1.2 RESPONSIBILITIES A. Contractor Responsibilities: Unless specifically indicated otherwise, the Contractor shall provide for all tests, inspections and other quality control services specified or required by authorities having jurisdiction. Costs for these services are included in the Contract price. B. Where individual sections specifically indicate that certain tests, inspections or other quality control services are to be provided by a testing agency, the Contractor shall employ and pay for a qualified independent testing agency to perform the quality control services. C. Contractor shall submit each testing agency's firm name, and credentials to perform the specified services, to UNF for approval at least 15 calendar days before scheduled inspections or tests. D. Retesting: The Contractor is responsible for retesting, including repeated inspections and other services, where results of the initial tests, inspections or other quality control services indicate noncompliance with the requirements of the Contract Document, regardless of whether or not the original test, inspection or service was the Contractor's responsibility. Costs for retesting, and for revising or replacing non-complying construction, shall be the Contractor's responsibility. E. Associated Services: The Contractor shall cooperate with UNF and others performing required tests, inspections and other quality control services, and shall provide reasonable auxiliary services as requested. Contractor shall notify the testing and inspection entities sufficiently in advance of operations to permit their timely assignment of personnel

14 F. Provide access to the work. G. Furnish incidental labor and facilities necessary to facilitate inspections and tests. H. Take adequate quantities of representative samples of materials that require testing or assist the agency in taking samples. 1. Provide facilities for storage and curing of test samples. 2. Deliver samples to testing laboratories. 3. Provide the agency with a preliminary design mix proposed for material mixes that that require control by the testing agency. 4. Provide security and protection of samples and test equipment at the Project site. I. Duties of the Testing Agency: An independent testing agency engaged to perform tests, inspections and other quality control services shall cooperate with the Contracting Officer's representative and the Contractor in performance of the agency's duties. J. The agency shall provide qualified personnel to perform required inspections and tests. K. The agency shall notify the Architect and the Contractor of irregularities or deficiencies observed in the Work during performance of their services. L. The agency is not authorized to release, revoke, alter or enlarge requirements of the Contract Documents or approve or accept any portion of the Work. M. The agency shall not perform any duties of the Contractor. N. Coordination: The Contractor shall coordinate the sequence of activities to accommodate required services with a minimum of delay. O. Activities shall be coordinated to avoid the necessity of removing and replacing construction to accommodate inspections and tests. P. The Contractor shall be responsible for scheduling times for inspections, tests, taking samples and similar activities. 1.3 QUALIFICATIONS OF INDEPENDENT TESTING AGENCIES A. Curtainwall Testing: Testing shall be performed per the requirements of AAMA by a qualified independent testing agency. B. Roof Flashing Assembly Testing: Testing to be performed per the requirements of Modified ASTM E1105 check for water penetration resistance. C. A qualified independent testing agency shall be an accredited entity engaged to perform tests or inspections, either at the Project site or elsewhere, and to report on and, if required, to interpret results of those tests or inspections. D. Refer to Drawings for Basis of Design Water Testing Agencies. E. Unless other accreditation is specifically specified in the applicable individual section, each testing agency shall be pre-qualified as complying with the American Council of Independent Laboratories "Recommended Requirements for Independent Laboratory Qualifications", or shall be recognized by the Occupational Safety and Health Administration (OSHA) in accordance with 29 CFR Part to test and approve

15 equipment or materials for their safe intended use. Each testing agency shall specialize in the types of tests or inspections to be performed. 1.4 SUBMITTALS A. Reports: The Contractor, or the testing agency where they perform the services, shall submit a certified written report, in duplicate, of each test, inspection or other quality control service to the Architect. 1.5 Submit additional copies of each written report directly to the governing authority, when directed by the authority. A. Written reports shall include but not be limited to the following: 1. Date of issue. 2. Project title and number. 3. Name, address, and telephone number of testing agency. 4. Dates and locations of samples and tests or inspections. 5. Names of individuals making the test or inspection. 6. Designation of the work and test method. 7. Identifications of product and specification section. 8. Complete test or inspection data. 9. Test results and an interpretation of test results. 10. Ambient conditions at the time of sample taking and testing. 11. Comments or professional opinion on whether tested or inspected Work complies with Contract Document requirements. 12. Name and signature of laboratory inspector. 13. Recommendations on retesting. B. Permits, Licenses, and Certificates: For UNF s records, submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, correspondence, records, and similar documents, established for compliance with standards and regulations bearing on performance of the Work. PART 2 - PRODUCTS (Not applicable) PART 3 - EXECUTION 3.1 FIELD QUALITY CONTROL A. Field Tests: Architect shall select curtain wall sections to be tested as soon as a representative portion of the project has been re- installed, glazed, perimeter sealants have been applied and cured. Conduct AAMA field quality control check for water penetration resistance. Test areas shall not evidence any water on the interior of the system or surrounding construction. Curtain wall sections not meeting specified performance requirements and units having deficiencies will be corrected at no additional cost to the owner and as part of the original contract amount. 3.2 REPAIR AND PROTECTION A. Upon completion of testing, inspection, sample taking and other quality control services, repair damaged construction and restore substrates and finishes. Comply with the requirements of the Contract Document, including Division 1 Section "Cutting and Patching."

16 B. Protect construction exposed by or for quality control service activities, and protect repaired construction. C. Repair and protection is the Contractor's responsibility, regardless of the assignment of responsibility for testing, inspection or other quality control services. END OF SECTION

17 SECTION CUTTING AND PATCHING PART 1 - GENERAL 1.1 SUMMARY A. This section includes procedural requirements for cutting and patching. B. Definition: Cutting and patching includes cutting into existing construction to provide for the installation or performance of other work and subsequent fitting and repair required to restore surfaces to their original condition. C. Refer to other sections for other requirements and limitations applicable to cutting and patching individual parts of the Work. D. Coordinate cutting and patching with demolition requirements specified in Division 2 Section "Selective Demolition". 1.2 SUBMITTALS A. Cutting and Patching Plan: Submit a proposal describing procedures at least 14 calendar days in advance of the time cutting and patching will initially be performed. 1. Include the following information, as applicable: a. Description of the extent of cutting and patching required. Show how it will be performed and indicate why it cannot be avoided. b. Description of the anticipated results in terms of changes to existing construction. Include changes to structural elements and operating components as well as changes in appearance and other significant visual elements. c. List of products to be used and entities that will perform work. d. Dates and hours of operation when cutting and patching will be performed. e. Compatibility and cohesion characteristics of patching compounds with adjacent materials. f. Details and engineering calculations showing integration of reinforcement with the original structure, where cutting and patching involves adding reinforcement to structural elements. 2. Approval by UNF to proceed with cutting and patching does not waive the right to later require complete removal and replacement of unsatisfactory work. B. Samples: Provide cutting and patching samples for the following items within 14 calendar days after notice to proceed in order that special reviews and coordination can be arranged with approval authorities: 1.3 QUALITY ASSURANCE A. Requirements for Structural Work: Do not cut and patch structural elements in a manner that would change their load-carrying capacity or load-deflection ratio. 1. The cutting and patching plan shall include but not be necessarily limited to work required at the following structural elements: a. Bearing walls. b. Structural concrete. c. Structural steel. d. Lintels

18 e. Structural decking. f. Miscellaneous structural metals. g. Exterior curtain-wall construction. h. Equipment supports. i. Piping, ductwork, vessels, and equipment. j. Structural systems of other construction. B. Operational Limitations: Do not cut and patch operating elements, safety related systems, or related components in a manner that would result in reducing their capacity to perform as intended. Do not cut and patch operating elements, safety related systems or related components in a manner that would result in increased maintenance or decreased operational life or safety. 1. The cutting and patching plan shall include but not be necessarily limited to work required at the following operating elements or safety related systems: a. Primary operational systems and equipment. b. Air or smoke barriers. c. Water, moisture, or vapor barriers. d. Membranes and flashings. e. Fire protection systems. f. Noise and vibration control elements and systems. g. Control systems. h. Communication systems. i. Electrical wiring systems. j. Operating systems of other construction. C. Visual Requirements: Do not cut and patch construction exposed on the exterior or in occupied spaces in a manner that would, in the Architect s opinion, reduce the building's aesthetic qualities. Do not cut and patch construction in a manner that would result in visual evidence of cutting and patching. Remove and replace construction that is cut and patched in a visually unsatisfactorily manner. 1. Retain the original installer or fabricator to cut and patch exposed work if the original installer or fabricator is identified in the Contract Documents or is known to the Contractor and is available for the work. 2. If it is not possible to engage the original installer or fabricator, engage a Specialist who is specifically experienced in the work. 3. The cutting and patching plan shall include but not be necessarily limited to work required at the following visual elements: a. Firestopping. b. Window wall system. c. Acoustical & Drywall walls/ceilings/soffits. d. Wall covering. e. Mechanical system enclosures, cabinets, or covers. 1.4 EXISTING WARRANTIES A. Replace, patch, and repair material and surfaces cut or damaged by methods and with materials in such a manner as not to avoid any existing warranties. PART 2 - PRODUCTS 2.1 MATERIALS A. Use materials identical to existing materials to the maximum extent available

19 B. For exposed surfaces, use materials that visually match existing adjacent surfaces to the fullest extent possible. C. Use materials whose installed performance will equal or surpass that of existing materials. PART 3 - EXECUTION 3.1 INSPECTION A. Before cutting, examine surfaces to be cut and patched and conditions under which cutting and patching is to be performed. If unsafe or unsatisfactory conditions are encountered, take corrective action before proceeding. B. Before proceeding with cutting and patching involving two or more trades, meet at the Project site with the entities providing or affected by the cutting and patching. Review areas of potential interference and conflict. Coordinate procedures and resolve potential conflicts before proceeding. 3.2 PREPARATION A. Provide temporary support of work to be cut. B. Protect existing conditions during cutting and patching to prevent damage. Provide protection from adverse weather conditions for portions of the Project that might be exposed during cutting and patching operations. C. Avoid interference with use of adjoining areas or interruption of free passage to adjoining areas. D. Bypass in-service existing pipe, conduit, or ductwork scheduled to be removed or relocated before cutting. 3.3 PERFORMANCE A. Employ skilled workmen to perform cutting and patching. Proceed with cutting and patching at the earliest feasible time and complete without delay. B. Cutting: Cut existing construction using methods least likely to damage elements retained and adjoining construction. Where possible, review proposed procedures with the original installer and comply with the original installer's recommendations. 1. In general, use hand or small power tools designed for sawing or grinding, not for hammering and chopping. 2. Cut holes and slots as small as possible, neatly to size required, and with minimum disturbance of adjacent surfaces. Temporarily cover openings when not in use. 3. To avoid marring existing finished surfaces, cut or drill from the exposed or finished side into concealed surfaces. 4. Cut through concrete and masonry using a cutting machine, such as a Carborundum saw or a diamond-core drill. 5. Comply with requirements of applicable Division 2 sections where cutting and patching requires excavating and backfilling

20 6. After utility services are bypassed, cut-off pipe or conduit in walls or partitions to be removed. Cap, valve or plug and seal the remaining portion of pipe or conduit to prevent entrance of moisture or other foreign matter after by-passing and cutting. C. Patching: Patch with durable seams that are as invisible as possible. Comply with specified tolerances. 1. Where feasible, inspect and test patched areas to demonstrate integrity of the installation. 2. Restore exposed finishes of patched areas and extend finish restoration into adjoining construction in a manner that will eliminate evidence of patching and refinishing. 3. Where removed walls or partitions extends one finished area into another finished area, patch and repair floor and wall surfaces to provide an even surface of uniform color and appearance. Remove existing floor and wall coverings and replace with new materials, if necessary, to achieve uniform color and appearance. 4. Where patching occurs in a smooth painted surface, extend final paint coat over entire unbroken surface that contains the patch after the area has received primer and other undercoats. 5. Patch, repair or rehang existing ceilings as necessary to provide an even-plane surface of uniform appearance. 3.4 CLEANING A. Clean areas and spaces where cutting and patching are performed. Completely remove paint, mortar, oils, putty, and similar items. B. Thoroughly clean piping, conduit, and similar features before applying paint, restored pipe coverings, or other finishing materials. END OF SECTION

21 PART 1 GENERAL SECTION SELECTIVE DEMOLITION 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract. B. Specification Section Cutting & Patching 1.2 SUMMARY A. This section includes the following: 1. Demolition and removal of selected portions of a building. 2. Patching and repairs. 1.3 DEFINITIONS A. Remove: Remove and legally dispose of items except those indicated to be reinstalled, salvaged, or to remain the Owner s property. B. Remove and Reinstall: Remove items indicated; clean, service, and otherwise prepare them for reuse; store and protect against damage. Reinstall items in the same locations or in locations indicated. C. Existing to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by the Architect, items may be removed to a suitable, protected storage location during selective demolition and then cleaned and reinstalled in their original locations. 1.4 MATERIALS OWNERSHIP A. UNF retains first right of refusal for all items with in the scope of work to be removed, reused, salvaged, or recycled. Coordinate items with Elton Brown (UNF) All UNF refused demolished materials shall become the Contractor s property and shall be removed from the site with further disposition at the Contractor s option. 1. Remove and salvage the following items that are in good condition: lighting fixtures, doors and frames. See Specification Section Construction Waste Management and Disposal 1.5 SUBMITTALS A. General: Submit each item in this Article according to the Conditions of the Contract and Division 1 Specification sections, for information only, unless otherwise indicated. B. Proposed noise-control measures. C. Schedule of selective demolition activities indicating the following: 1. Detailed sequence of selective demolition and removal work with starting and ending dates for each activity. 2. Use of corridor and entrances. 3. Coordination of Owner s continuing occupancy of portions of existing building

22 4. Location of duct partitions and any other temporary partitions. 5. Inventory of items to be removed, salvaged and returned to Owner. D. Photographs or videotape, sufficiently detailed, of existing conditions of adjoining construction and site improvements that might be misconstrued as damage caused by selective demolition operations. 1.6 QUALITY ASSURANCE A. Regulatory Requirements: Comply with governing EPA notification regulations before starting selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction. 1.7 PROJECT CONDITIONS A. Owner will occupy portions of the building immediately adjacent to selective demolition area. Conduct selective demolition so that Owner s operations will not be disrupted. 1. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical. 2. Coordination meeting shall be scheduled with Owner, Contractor, and any other parties involved in this area of operation. Meeting shall be held prior to commencing any selective demolition work. 3. Contractor will be furnished with list of any other items to be salvaged and returned to the Owner. This list will include items in addition to any listed in Part Contractor to coordinate locations for debris containers and any other equipment necessary for demolition operations with UNF in advance. 5. At all times when working on the premises the general contractors and subcontractors will be responsible for maintaining control of their tools and materials to prevent access of the general public to potentially harmful situations. While work is progressing, access to building will need to be maintained for ingress and egress by staff and visitors. B. Storage or sale of removed items or materials on-site will not be permitted unless agreed to by UNF in advance. 1.8 SCHEDULING PART 2 (Not Used) A. Arrange selective demolition schedule so as not to interfere with Owner s daily use of adjacent area or means of egress from building. B. The work performed under this contract will be taking place in active college academic building. In the building, the contractor is required to perform the noisy work such as drilling, grinding, sawing, hammering and setting screws during the hours of 6:00pm until 8:00am and/or on weekends. Noisy or disruptive work will not be permitted during business normal UNF hours. No contract increase adjustment in time or money shall be made if contractor is stopped due to work being conducted by contractor due to objectionable noise, fumes, or dust. All work will be subject to re-scheduling if so requested by UNF and may occur at the their discretion

23 PART 3 - EXECUTION 3.1 EXAMINATION A. In company with Owner or Owner s Representative, the Contractor is to survey existing conditions and correlate with requirements indicated on drawings to determine extent of selective demolition required. B. Inventory and record the condition of items to be removed and reinstalled, items to be removed and salvaged, and items to be removed and returned to the Owner. C. When unanticipated mechanical, electrical, or structural elements that conflict with the intended function or design are encountered, investigate and measure the nature and extent of the conflict. Promptly submit a written report to the Owner and Architect. D. Perform surveys as the work progresses to detect hazards resulting from selective demolition activities. 3.2 PREPARATION A. Conduct demolition operations and remove debris to ensure minimum interference with other adjacent occupied and used spaces. B. Conduct demolition operations to prevent injury to people and damage to adjacent facilities to remain. Ensure safe passage of people around selective demolition area. 1. Erect temporary protection where required by authorities having jurisdiction. 2. Protect walls, ceilings, floors, and other existing finish work that are to remain and are exposed during selective demolition operations. 3. Utilize the safest method possible for removing while protecting existing finished materials. 3.3 POLLUTION CONTROLS A. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas. B. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before start of selective demolition. 3.4 SELECTIVE DEMOLITION A. Demolish and remove existing construction only to the extent required by new construction and as indicated on drawings. Use methods required to complete work within limitations of governing regulations and as follows: 1. Proceed with selective demolition systematically in area as scheduled. 2. Mark interface surfaces as required to enable workmen to identify items to be removed and items to be left in place intact. 3. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction. To minimize disturbance of adjacent surfaces, use hand or small

24 power tools designed for sawing or grinding, not hammering and chopping. Temporarily cover openings to remain. 4. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces. 5. Do not use cutting torches. 6. Return elements of construction and surfaces to remain to condition existing before start of selective demolition operations. 7. Do not cut any building structure without written authorization of the Architect. Any structural members accidentally or intentionally cut without proper authorization shall be restored to their original integrity and condition. 3.5 PATCHING AND REPAIRS A. Promptly patch and repair holes and damaged surfaces caused to adjacent construction by selective demolition operations. B. Where repairs to existing surfaces are required, patch to produce surfaces suitable for new materials. 1. Completely fill holes and depressions in existing walls to remain with an approved patching material, applied according to manufacturer s printed recommendations. C. Restore exposed finishes of patched areas and extend finish restoration into adjoining construction to remain in a manner that eliminates evidence of patching and refinishing. D. Use repair materials identical to existing materials. 1. Where identical materials are unavailable or cannot be used for exposed surfaces, use materials that visually match existing adjacent surfaces to the fullest extent possible. 2. Use materials whose installed performance equals or surpasses that of existing materials. 3.6 DISPOSAL OF DEMOLISHED MATERIALS A. General: Promptly dispose of demolished materials. Do not allow demolished materials to accumulate on-site. B. Debris to be hauled off. Coordinate with the Owner the debris-hauling route. C. Disposal: Transport demolished materials off Owner s property and legally dispose of them. 3.7 CLEANING A. Sweep the area affected by demolition and the debris-hauling route broom clean on completion of selective demolition operation. END OF SECTION

25 SECTION CONCRETE BEAM & COLUMN REPAIRS (BY UNF STRUCTURAL ENGINEER) October 28, 2016 Mr. Stephen B. Fagan, BA, Arch., MAOM Assistant Director Physical Facilities 1 UNF Drive Jacksonville, Florida RE: UNF Founders Hall, (Building 2), Jacksonville, FL Investigation of concrete beam and column spall G.M. Hill Engineering Project Dear Mr. Fagan; At your request a registered engineer from this office visited the above referenced building on September 30, The purpose of the visit was to make visual observations of the existing structural conditions to allow us to render an opinion regarding a cracks and spalls in the 2 nd floor beams and column at the north-west corner of building 2. Building 2 is a two-story building approximately 140 feet by 140 feet. The structure for the building consists of a concrete frame with infill brick walls. The 2 nd floor and roof are pre-cast concrete double-tee slabs. The original building was constructed around 1973 with a later addition to the southwest corner. Information on the existing structure was obtained from a set of As-Built drawings prepared by Reynolds Smith and Hills. Observations At the north-west corner of building 2, there is spalling and cracking in the corner of the 2 nd floor beam on both the west and north faces. There are diagonal cracks in the column at both the west and north faces that run from the top and bottom of the beam. The crack in the column below the 2 nd floor runs from the bottom of the beam to the top of a concrete cap beam cast over the top of the infill brick wall. The cracks in the beam and column have been previously caulked. (See Pictures 1, 2, 3 and 4). The area on the corner of the beam was sounded with a hammer and evidenced an unsound condition. The verticality of the column was checked with a 4 foot bubble level. The bottom of the column, up to the level of the concrete cap beam at the top of the first floor brick wall was found to be vertically plumb in both the northsouth and east-west directions. The north face of the column from about the level of the concrete cap beam up to the bottom of the 2 nd floor beam is deflected toward the south approximately ½. (See picture 5). Building 1 is of similar age and construction to building 2. The south-west corner of building 1 has cracking in the beam and column similar, to that observed in building 2. (See picture 6)

26 Conclusions The concrete spalling and cracking in the beam and column are the result of thermal and moisture induced movement of the 2 nd floor slab. The column is restrained by the concrete cap beam at the top of the brick wall and the movement caused internal stresses that lead to the cracking of the column and beam. The cracks do not appear to be recent, and may have been caused by the initial curing and loss of moisture in the 2 nd floor slab shortly after construction. The west exposure of the wall is most likely a contributing factor as well. Recommendations The concrete spall and cracks in the beam should be repaired by chipping out the un-sound concrete and repairing with an approved concrete repair product such as SIKA Sikacrete 211 SCC PLUS, polymer-modified selfconsolidating concrete with corrosion inhibitor. The repair procedure should be per the manufacturer s recommendations. The cracks in the columns may be repaired by epoxy injection utilizing SIKA Sikadur 33 epoxy paste for sealing the cracks and injection ports and Sikadur 35 Hi-Mod LV epoxy injection. Follow the manufacturer s recommended repair procedure for specific instructions. Our review is limited to the specific area addressed in this report. Please see the following page for photos of the areas inspected. No analysis was done of the existing structure. This report does not cover architectural, mechanical, electrical, life safety or hidden items. It has been a pleasure being of service to you in this matter. If you have any questions or need additional information, please do not hesitate to contact this office. Very Truly Yours G.M. Hill Engineering, Inc. Jeffrey D. McGee, P.E. FL PE #45944 Structural Engineering Manager UNF Founders Hall Bldg. 2, Column Spall Investigation GMH Project # , Page 2

27 BLDG 1 BLDG 2 Location Map UNF Founders Hall Bldg. 2, Column Spall Investigation GMH Project # , Page 3

28 Picture 1 Area of spall and cracking in beam and column. West face. Picture 2 Area of spall and cracking in beam and column. North face. UNF Founders Hall Bldg. 2, Column Spall Investigation GMH Project # , Page 4

29 Picture 3 Close-up of crack in column. West face. Note existing caulk in crack. Picture 4 Close-up of cracking/spalling in beam. West face. Note existing caulk in crack. UNF Founders Hall Bldg. 2, Column Spall Investigation GMH Project # , Page 5

30 Picture 5 Top of column deflected toward the south approximately ½. Similar deflection toward the east. I.E. toward the interior of the building. Picture 6 Similar cracking at 2 nd floor column/beam of building #1; Southwest corner. UNF Founders Hall Bldg. 2, Column Spall Investigation GMH Project # , Page 6

31 SECTION ROUGH CARPENTRY PART 1 - GENERAL 1.1 DESCRIPTION A. Replace any rotting wood with new fire-treated framing lumber, nailers, blocking, grounds, furring and other wood items required. B. Where shown on drawings, the existing wood blocking may have to be modified using new wood to match drawings. 1.2 QUALITY ASSURANCE A. Lumber Standard: Comply with NBS Voluntary Product Standard PS 20, American Softwood Lumber Standard. B. Plywood Standard: Comply with U.S. Product Standard PS 1, Construction and Industrial Plywood. C. Wood Treatment: American Wood Preservers Assoc., (AWPA) and American Wood Preservers Bureau (AWPB). 1.3 SUBMITTALS A. Submit certification of treatment for preservative treated wood and fire retardant treated wood. B. Submit certificates of inspection for species and grade for each type lumber. C. Submit certification for each type and grade of plywood. 1.4 PRODUCT HANDLING A. Keep materials dry during delivery and storage. Stack lumber and plywood, and provide air circulation within stacks. PART 2 - PRODUCTS 2.1 LUMBER A. Nominal sizes are indicated, except where shown by detail dimensions to be actual sizes, provide dressed sizes as required by PS Provide S4S lumber, unless otherwise shown or specified. 2. Provide seasoned lumber with 19% maximum moisture content at time of dressing. 2.2 FIRE RETARDANT TREATMENT A. Provide fire retardant treated lumber and plywood anywhere wood framing is indicated on drawings and where required by authorities having jurisdiction

32 B. Treatment: Conform to American Wood Preservers' Association (AWPA) standards C 20 for lumber and C 27 for plywood. Treatment shall be by pressure impregnation of fire-retardant chemicals to achieve flame-spread rating required for U.L. Classification by U.L. Test 723, ASTM E 84 or NFPA 355. C. Provide Interior type A or type B as applicable for location, type material and humidity. D. Provide exterior type treatment for exposed exterior wood. E. Provide U.L. label on each piece of fire-retardant lumber or plywood. F. Kiln-dry treated items to maximum moisture content of 19%. 2.3 FRAMING LUMBER A. Framing: Provide No. 2 Southern Pine, fire-treated, 1200 psi allowable bending stress. 2.4 BOARDS NOT EXPOSED TO VIEW A. Provide fire-treated Southern Pine No. 2 boards (SPIB) with 19% maximum moisture content. 2.5 PLYWOOD A. Plywood shall conform to PS 1 and shall have APA Grade Marks. Provide fire retardant treated plywood for interior uses and as required by authorities having jurisdiction. B. Interior Plywood: For exposed interior uses not otherwise indicated shall be Interior Type with Grade A exposed face and Grade D or B concealed face; A-D or AB-INT- APA-PSI. C. Back Boards: Plywood for backing panels for electrical and telephone equipment shall be fire-retardant treated Exterior Grade Plywood, A-C-EXT-APA-PS 1, 3/4 inch unless otherwise indicated. 2.6 PRESERVATIVE TREATED WOOD A. Pressure Treated Lumber: Comply with applicable requirements of American Wood Preservers Bureau (AWPB). Mark each treated item to comply with the AWPB Quality Mark requirements. Kiln-dry to maximum moisture content of 19%. B. Treatment Methods, preservative and analysis shall conform to American Wood Preserver's Association (AWPA), C2 for lumber and C9 for plywood. C. Provide treated wood and plywood conforming to the following: 1. Wood in Contact with Soil: AWPB Standard LP-22 with.60 net retention. 2. Wood Above Grade Not Exposed to Weather: AWPB Standard LP-2, LP-3, LP-4 or LP Wood Above Grade Exposed to Weather (Not Painted): AWPB Standard LP-22 or LP-33 with 0.05 net retention. 4. Wood Post Set in Ground: AWPB Standard MLP

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 01 GENERAL REQUIREMENTS SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 01 GENERAL REQUIREMENTS SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL SECTION 017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL PART 1 - GENERAL 1.1 SUMMARY A. This Section includes administrative and procedural requirements for the following: 1. Salvaging non-hazardous

More information

DSC BUILDING 1200 ALTERATIONS OCTOBER 2011 SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

DSC BUILDING 1200 ALTERATIONS OCTOBER 2011 SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL SECTION 017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL PART 1 - GENERAL 1.1 SUMMARY A. Section includes administrative and procedural requirements for the following: 1. Salvaging nonhazardous demolition

More information

St. Monica Food Pantry Construction Waste Management and Disposal SBA-13105

St. Monica Food Pantry Construction Waste Management and Disposal SBA-13105 St. Monica Food Pantry 01 7419-1 SECTION 01 7419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL PART 1 - GENERAL 1.1 SUMMARY: A. Work of this section includes administrative and procedural requirements for

More information

Construction Waste Management and Disposal

Construction Waste Management and Disposal University of New Hampshire University of New Hampshire Scholars' Repository Division 01 General Requirements Chapter 5 Technical Construction and Renovation Standards 1-25-2013 017419 - Construction Waste

More information

SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL. A. This Section includes administrative and procedural requirements for the following:

SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL. A. This Section includes administrative and procedural requirements for the following: SECTION 017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

APPENDIX B CONSTRUCTION WASTE MANAGEMENT SAMPLE SPECIFICATION

APPENDIX B CONSTRUCTION WASTE MANAGEMENT SAMPLE SPECIFICATION APPENDIX B CONSTRUCTION WASTE MANAGEMENT SAMPLE SPECIFICATION The following appendix includes information and standard drawings that are diagrammatic and are used only to convey intent. Construction Waste

More information

SECTION CONSTRUCTION WASTE MANAGEMENT. 1. Section Sustainable Project Requirements. 2. Section Temporary Facilities and Controls.

SECTION CONSTRUCTION WASTE MANAGEMENT. 1. Section Sustainable Project Requirements. 2. Section Temporary Facilities and Controls. Buchtel/Perldns Community Learning Center GPD 2007271.15 OSFC Project # 55-7110-9029425 Phase 3 CLC Package Bidding Documents July 1, 2010 PART 1- GENERAL 1.1 SUMMARY SECTION 01524 CONSTRUCTION WASTE MANAGEMENT

More information

DOCUMENT CONSTRUCTION WASTE MANAGEMENT

DOCUMENT CONSTRUCTION WASTE MANAGEMENT DOCUMENT 01 50 13 PART 1 - GENERAL 1.1 RELATED DOCUMENTS AND PROVISIONS: All Contract Documents should be reviewed for applicable provisions related to the provisions in this document, including without

More information

SECTION CONSTRUCTION WASTE MANAGEMENT. A. Section includes administrative and procedural requirements for Construction Waste Management.

SECTION CONSTRUCTION WASTE MANAGEMENT. A. Section includes administrative and procedural requirements for Construction Waste Management. SECTION 01 35 63 CONSTRUCTION WASTE MANAGEMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes administrative and procedural requirements for Construction Waste Management. 1.2 DEFINITIONS A. Construction

More information

SECTION DEMOLITION WASTE MANAGEMENT AND DISPOSAL

SECTION DEMOLITION WASTE MANAGEMENT AND DISPOSAL SECTION 017418 PART 1 - GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

1. Division 01 Section General Requirements Temporary Facilities and Controls.

1. Division 01 Section General Requirements Temporary Facilities and Controls. PAGE 024210-1 SECTION 024210 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,

More information

FILED: NEW YORK COUNTY CLERK 05/04/ :16 PM

FILED: NEW YORK COUNTY CLERK 05/04/ :16 PM EXHIBIT P SECTION 01 73 10 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

A. IEMA ten day notification for demolition provisions as necessary. C. IEPA Uncontaminated Soil Certification LPC 663

A. IEMA ten day notification for demolition provisions as necessary. C. IEPA Uncontaminated Soil Certification LPC 663 August 2013, Rev 00 01 7419 Construction Waste Management PART 1. GENERAL 1.01 Requirements Include: A. Each Contractor provide: 1. Participation in Construction Waste Management plan, including separation

More information

B. Remove and Salvage: Carefully detach from existing construction, in a manner to prevent damage, and deliver to Owner.

B. Remove and Salvage: Carefully detach from existing construction, in a manner to prevent damage, and deliver to Owner. SECTION 02 41 19 - SELECTIVE STRUCTURE DEMOLITION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SAN DIEGO STATE UNIVERSITY PACIFIC CORNERSTONE ARCHITECTS TENOCHCA HALL PROJECT NO FAN COIL UNITS, RESTROOM AND FINISH RENOVATION

SAN DIEGO STATE UNIVERSITY PACIFIC CORNERSTONE ARCHITECTS TENOCHCA HALL PROJECT NO FAN COIL UNITS, RESTROOM AND FINISH RENOVATION SECTION 02 41 14 SELECTIVE BUILDING DEMOLITION PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Procedures for systematic removal of site improvements or portions of exterior and interior of buildings

More information

DIVISION 02 SELECTIVE DEMOLITION

DIVISION 02 SELECTIVE DEMOLITION DIVISION 02 SELECTIVE DEMOLITION SECTION 02 41 19 - SELECTIVE DEMOLITION PART 1 - GENERAL 1.01 SUMMARY A. This Section includes the following: 1. Demolition and removal of selected portions of a building.

More information

DIVISION 2- EXISTING CONDITIONS

DIVISION 2- EXISTING CONDITIONS DIVISION 2- EXISTING CONDITIONS 024100- SELECTIVE DEMOLITION PART 1 - GENERAL: 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

1. Before selective demolition, Owner will remove the following items:

1. Before selective demolition, Owner will remove the following items: SECTION 024119 - SELECTIVE STRUCTURE DEMOLITION PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Demolition and removal of selected portions of building or structure. 2. Demolition and removal of selected

More information

A. Section includes: removal of paving, pipes and utilities, and other site items as required by the project drawings.

A. Section includes: removal of paving, pipes and utilities, and other site items as required by the project drawings. SECTION 024113 - SITE DEMOLITION PART 1 -GENERAL 1.1 SUMMARY A. Section includes: removal of paving, pipes and utilities, and other site items as required by the project drawings. 1.2 SUBMITTALS A. Obtain

More information

HOTEL SANDFORD. C. Remove and Reinstall: Detach items from existing construction, prepare for reuse, and reinstall where indicated.

HOTEL SANDFORD. C. Remove and Reinstall: Detach items from existing construction, prepare for reuse, and reinstall where indicated. SECTION 024119 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

C. Type of Selective Demolition Work: Demolition requires the selective removal and subsequent off-site disposal of:

C. Type of Selective Demolition Work: Demolition requires the selective removal and subsequent off-site disposal of: 02070 - SELECTIVE DEMOLITION PART 1 - GENERAL 1.1 STIPULATIONS A. The specifications sections " General Conditions of the Construction Contract ", "Special Conditions", and "Division 1 - General Requirements"

More information

SECTION SELECTIVE DEMOLITION

SECTION SELECTIVE DEMOLITION SECTION 024113- PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to the

More information

A. Section includes general administrative and procedural requirements governing execution of the Work including, but not limited to, the following:

A. Section includes general administrative and procedural requirements governing execution of the Work including, but not limited to, the following: SECTION 01 73 00 - EXECUTION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

SECTION ALTERATION PROJECT PROCEDURES

SECTION ALTERATION PROJECT PROCEDURES SECTION 013516 ALTERATION PROJECT PROCEDURES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Requirements for protection of existing facilities during construction operations. 2. Demolition and removals

More information

Student Services & Classroom Addition

Student Services & Classroom Addition SECTION 014000 - QUALITY REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Section includes administrative and procedural requirements for quality assurance and quality control. B. Testing and inspecting services

More information

Richmond Hill Primary Renovation SECTION SELECTIVE DEMOLITION

Richmond Hill Primary Renovation SECTION SELECTIVE DEMOLITION SECTION 024119 SELECTIVE DEMOLITION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

EXECUTION REQUIREMENTS

EXECUTION REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Section includes: Execution requirements. B. Related Requirements: 1. Specification Sections 2 through 49. PART 2 - PRODUCTS (Not Used). PART 3 - EXECUTION 3.1 SAFETY 01

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 01 4000 - QUALITY REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

BuildingName The Description of the Project P DOCUMENTS

BuildingName The Description of the Project P DOCUMENTS ARCHITECTURE, ENGINEERING AND CONSTRUCTION P00000000 0000 DOCUMENTS ARCHITECTURE & ENGINEERING 326 East Hoover, Mail Stop B Ann Arbor, MI 48109-1002 Phone: 734-764-3414 Fax: 734-936-3334 SPECIFICATION

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 024116 - STRUCTURE DEMOLITION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

QUALITY REQUIREMENTS

QUALITY REQUIREMENTS SECTION 014000 - QUALITY REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

SECTION STRUCTURAL INSULATED PANELS

SECTION STRUCTURAL INSULATED PANELS SECTION 06120 STRUCTURAL INSULATED PANELS Copyright 2011-2012 Korwall Industries, Inc. - All rights reserved PART 1 GENERAL 1.1 SECTION INCLUDES A. Structural Insulated Roof Panels. B. Structural Insulated

More information

PRODUCTION SPECIFICATIONS INSULATED CONCRETE FORMS

PRODUCTION SPECIFICATIONS INSULATED CONCRETE FORMS PRODUCTION SPECIFICATIONS SECTION 03135 INSULATED CONCRETE FORMS PART 1 GENERAL 1.1 SECTION INCLUDES A. Insulated panel permanent concrete form system for: 1. Exterior structural wall panels. 2. Interior

More information

PRODUCTION SPECIFICATIONS INSULATED CONCRETE FORMS

PRODUCTION SPECIFICATIONS INSULATED CONCRETE FORMS PRODUCTION SPECIFICATIONS SECTION 03135 INSULATED CONCRETE FORMS PART 1 GENERAL 1.1 SECTION INCLUDES A. Insulated panel permanent concrete form system for: 1. Exterior structural wall panels. 2. Interior

More information

SECTION A. Examination, preparation, and general installation procedures.

SECTION A. Examination, preparation, and general installation procedures. SECTION 01 7000 PART 1 GENERAL 1.1 SECTION INCLUDES A. Examination, preparation, and general installation procedures. B. Cutting and patching. C. Cleaning and protection. D. Substantial Completion E. Final

More information

A. The extent of Selective Demolition Work is that Work necessary, and required to facilitate the new construction indicated.

A. The extent of Selective Demolition Work is that Work necessary, and required to facilitate the new construction indicated. Project No. El611-0l SECTION 02 41 00 - SELECTIVE DEMOLITION PART1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

A. This Section includes administrative and procedural requirements for quality assurance and quality control.

A. This Section includes administrative and procedural requirements for quality assurance and quality control. SECTION 01400 - QUALITY REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection SECTION 13090 RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13090-1 LOW INTENSITY RADIATION PROTECTION

More information

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

SECTION BASIC ELECTRICAL MATERIALS AND METHODS SECTION 26 05 05 BASIC ELECTRICAL MATERIALS PART 1 - GENERAL 1.1 SUMMARY A. Section includes the limited scope construction materials and methods for application with electrical installations as follows:

More information

Gensler 2014/06/16 Hertz Global Headquarters ISSUE FOR BUILDING PERMIT Estero, Florida SECTION

Gensler 2014/06/16 Hertz Global Headquarters ISSUE FOR BUILDING PERMIT Estero, Florida SECTION SECTION 072700 VAPOR PERMEABLE AIR BARRIER LIQUID MEMBRANE PART 1 GENERAL 1.1 GENERAL REQUIREMENTS A. The Work of this Section, as shown or specified, shall be in accordance with the requirements of the

More information

SECTION COMPOSITE WALL PANELS PART 1 GENERAL 1.01 SECTION INCLUDES

SECTION COMPOSITE WALL PANELS PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 07 4243 - PART 1 GENERAL 1.01 SECTION INCLUDES A. Composite wall panel system consisting of aluminum-faced composite panels in a rainscreen application as part of the assembly described below.

More information

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION Page 210500-1 SECTION 210500 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Multi-Institutional Academic Health Science & Research Center Evansville, IN

Multi-Institutional Academic Health Science & Research Center Evansville, IN SECTION 061600 - SHEATHING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 102239 - FOLDING PANEL PARTITIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

A. Dimension Lumber: Lumber of 2 inches nominal or greater but less than 5 inches nominal in least dimension.

A. Dimension Lumber: Lumber of 2 inches nominal or greater but less than 5 inches nominal in least dimension. SECTION 06 10 53 - MISCELLANEOUS ROUGH CARPENTRY PART 1 - [Editor: Display hidden text before editing.] 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary

More information

A. Dimension Lumber: Lumber of 2 inches nominal or greater but less than 5 inches nominal in least dimension.

A. Dimension Lumber: Lumber of 2 inches nominal or greater but less than 5 inches nominal in least dimension. SECTION 06 10 53 MISCELLANEOUS ROUGH CARPENTRY PART 1 [Editor: Display hidden text before editing.] 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary

More information

PHYSICAL FACILITIES Consultant s Handbook Specifications Division 07 Thermal and Moisture Protection 8400 Firestopping

PHYSICAL FACILITIES Consultant s Handbook Specifications Division 07 Thermal and Moisture Protection 8400 Firestopping 1 General 1.1 The bidding requirements, contracting requirements, and applicable parts of Division 1 - General Requirements, as listed in the Table of Contents, shall be included in and made a part of

More information

Expansion Joint Covers (079513)

Expansion Joint Covers (079513) Expansion Joint Covers 07 95 00 (079513) PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions, Supplementary Conditions and Division-1

More information

Division 00 Procurement and Contracting Requirements

Division 00 Procurement and Contracting Requirements SECTION 00 01 10 TABLE OF CONTENTS Division SECTION NO. VOLUME ONE Title SECTION TITLE Division 00 Procurement and Contracting Requirements 00 11 00 Invitation to Bidders 00 21 00 Instructions to Bidders

More information

SECTION METAL PLATE CONNECTED WOOD TRUSSES PART 1 - GENERAL 1.01 RELATED DOCUMENTS

SECTION METAL PLATE CONNECTED WOOD TRUSSES PART 1 - GENERAL 1.01 RELATED DOCUMENTS SECTION 06192 - PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to

More information

Expansion Joint Covers

Expansion Joint Covers Expansion Joint Covers 07 95 00 (079513) PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions, Supplementary Conditions and Division-1

More information

SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS

SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS INDIANA UNIVERSITY BIDDING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 (REVISED 2005) MINORITY,

More information

SECTION A. ACSE 7 Minimum Loads for Buildings and other Structures.

SECTION A. ACSE 7 Minimum Loads for Buildings and other Structures. SECTION 06 12 00 STRUCTURAL INSULATED PANELS ------------------------------------------------------------------------------------------------------------ PART 1- GENERAL ----------------------------- 1.1

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

SECTION A. ACSE 7 Minimum Loads for Buildings and other Structures.

SECTION A. ACSE 7 Minimum Loads for Buildings and other Structures. SECTION 06 12 00 STRUCTURAL INSULATED PANELS ------------------------------------------------------------------------------------------------------------ PART 1- GENERAL ----------------------------- 1.1

More information

SECTION WOOD FRAMING. A. Includes But Not Limited To 1. Furnish and install wood framing and blocking as described in Contract Documents.

SECTION WOOD FRAMING. A. Includes But Not Limited To 1. Furnish and install wood framing and blocking as described in Contract Documents. SECTION 06110 WOOD FRAMING PART 1 GENERAL 1.1 SUMMARY A. Includes But Not Limited To 1. Furnish and install wood framing and blocking as described in Contract Documents. B. Products Installed But Not Supplied

More information

University of New Hampshire Scholars' Repository

University of New Hampshire Scholars' Repository University of New Hampshire University of New Hampshire Scholars' Repository Division 07 Thermal and Moisture Protection Chapter 5 Technical Construction and Renovation Standards 1-25-2013 075423 - TPO

More information

Project Manual Index of Specifications Shenandoah Schools Concession Building

Project Manual Index of Specifications Shenandoah Schools Concession Building INDEX OF SPECIFICATIONS Division 0..BIDDING AND CONTRACT REQUIREMENTS 00 11 13 Advertisement for Bids 00 21 13 Instructions to Bidders 00 41 00 Bid Forms 00 43 13 Bid Security Form 00 72 00 General Conditions

More information

PROJECT MANUAL. for. NEW MEXICO STATE UNIVERSITY GERALD THOMAS HALL Fume Hood Replacement at the MAIN CAMPUS for LAS CRUCES, NEW MEXICO

PROJECT MANUAL. for. NEW MEXICO STATE UNIVERSITY GERALD THOMAS HALL Fume Hood Replacement at the MAIN CAMPUS for LAS CRUCES, NEW MEXICO PROJECT MANUAL for NEW MEXICO STATE UNIVERSITY GERALD THOMAS HALL Fume Hood Replacement at the MAIN CAMPUS for LAS CRUCES, NEW MEXICO FOR REVIEW ONLY NOT FOR CONSTRUCTION December 2016 SET NO. 6501 Americas

More information

Alameda County Waste Management Authority Model Specification Update March 2004 SECTION CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

Alameda County Waste Management Authority Model Specification Update March 2004 SECTION CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT SECTION 01505 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT 1.01 SUMMARY A. Section specifies diversion of construction and demolition (non-hazardous) debris from landfill. B. Related requirements specified

More information

TerraClad TM General Specifications

TerraClad TM General Specifications TerraClad TM General Specifications PRODUCT NAMES: Terra cotta Baguettes/Louvers and Related Work MANUFACTURER: Boston Valley Terra Cotta 6860 S. Abbott Road Orchard Park, NY 14127 Phone: 888-214-3655

More information

CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL FORM CWM-1

CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL FORM CWM-1 FORM CWM-1 FORM CWM-1: CONSTRUCTION WASTE IDENTIFICATION Packaging: Cardboard Packaging: Boxes Sheet or Film Packaging: Polystyrene Packaging: Pallets or Skids Packaging: Crates Packaging: Paint Cans Pails

More information

SECTION INJECTED or CAVITY-FILL POLYURETHANE FOAM (IPF)

SECTION INJECTED or CAVITY-FILL POLYURETHANE FOAM (IPF) SECTION 07200 INJECTED or CAVITY-FILL POLYURETHANE FOAM (IPF) Specifier Note: This specification is provided as guidelines for your use. Please review before publishing. PART 1.00 - GENERAL 1.01 DESCRIPTION:

More information

SECTION THERMOPLASTIC POLYOLEFIN (TPO) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION THERMOPLASTIC POLYOLEFIN (TPO) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 075423 - THERMOPLASTIC POLYOLEFIN (TPO) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including Division 00 Bidding Requirements and other Division

More information

SECTION PENETRATION FIRESTOPPING PART 1- GENERAL PART 2- PRODUCTS 1.1 RELATED DOCUMENTS

SECTION PENETRATION FIRESTOPPING PART 1- GENERAL PART 2- PRODUCTS 1.1 RELATED DOCUMENTS SECTION 07 8413- PENETRATION FIRESTOPPING PART 1- GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

HOLLOW METAL DOORS AND FRAMES SECTION HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL

HOLLOW METAL DOORS AND FRAMES SECTION HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 13686.00 HOLLOW METAL DOORS AND FRAMES 081113-1 SECTION 081113 - HOLLOW METAL DOORS AND FRAMES 1.1 RELATED DOCUMENTS: PART 1 - GENERAL A. Drawings and general provisions of Contract, including General

More information

Master Specifications for Microcotta November 2017

Master Specifications for Microcotta November 2017 SECTION 042130 - MICROCOTTA PART 1 - GENERAL 1.1 SUMMARY A. Provide Architectural Microcotta, cast architectural polymer resin units manufactured in accordance with the Contract Documents. 1.2 WORK INCLUDED

More information

SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS

SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS SECTION 01 00 00 GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Summary of Work: 1. General 2. Contract. B. Contract Considerations: 1. Schedule of values. 2. Applications for payment. 3.

More information

SECTION EXTERIOR SOLID PHENOLIC RAINSCREEN PANELS

SECTION EXTERIOR SOLID PHENOLIC RAINSCREEN PANELS SECTION 074233 EXTERIOR SOLID PHENOLIC RAINSCREEN PANELS PART 1 - GENERAL 1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

A. Omega-Lite aluminum-faced composite panels, air and vapor barrier, attachments and sealants.

A. Omega-Lite aluminum-faced composite panels, air and vapor barrier, attachments and sealants. Section 07 42 13 Page 1 PART 1 GENERAL 1.1 SECTION INCLUDES A. Omega-Lite aluminum-faced composite panels, air and vapor barrier, attachments and sealants. 1.2 RELATED SECTIONS A. Section 06112 - Framing

More information

SECTION EXPANSION CONTROL

SECTION EXPANSION CONTROL SECTION 07 95 00 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

SECTION EXPANSION CONTROL

SECTION EXPANSION CONTROL SECTION 07 95 00 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

SECTION EMBEDDED CMU/SPLIT FACE ARCHITECTURAL PRECAST/SITECAST CONCRETE. A. Site Cast or Tilt-Up CMU/Split Face Concrete Panels.

SECTION EMBEDDED CMU/SPLIT FACE ARCHITECTURAL PRECAST/SITECAST CONCRETE. A. Site Cast or Tilt-Up CMU/Split Face Concrete Panels. SECTION 03460 EMBEDDED CMU/SPLIT FACE ARCHITECTURAL PRECAST/SITECAST CONCRETE PART 1 GENERAL 1.1 SECTION INCLUDES A. Site Cast or Tilt-Up CMU/Split Face Concrete Panels. B. Shop/Plant Cast CMU/Split Face

More information

SECTION EXPANSION CONTROL

SECTION EXPANSION CONTROL SECTION 07 95 00 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

FIRESTOPPING & SMOKE SEALS

FIRESTOPPING & SMOKE SEALS FIRESTOPPING & SMOKE SEALS SPECIFICATION SECTION 07860 1 General 1.1 SECTION INCLUDES.1 Comply with Division 1, General Requirements and Documents referred to therein..2 It is the intent of this section

More information

A. Section includes surface preparation and application of wood finishes[.]

A. Section includes surface preparation and application of wood finishes[.] SECTION 09 93 00 - STAINING AND TRANSPARENT FINISHING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

Residential Building Inspections

Residential Building Inspections Residential Building Inspections Foundations, Grade Beams, Pile Caps, Foundation Pads 1. All trenches or excavations and formwork shall be in accordance with the size(s) and configuration(s) as per approved

More information

MECHANICAL M-1 LEGEND AND DETAILS M-2 FLOOR PLAN - DUCTWORK M-3 FLOOR PLAN - PIPING

MECHANICAL M-1 LEGEND AND DETAILS M-2 FLOOR PLAN - DUCTWORK M-3 FLOOR PLAN - PIPING SHEET TITLE ARCHITECTURAL A-0 COVER SHEET A-1 DEMOLITION NOTES A-2 DEMOLITION PLAN A-3 FLOOR PLAN NOTES A-4 FLOOR PLAN A-5 INTERIOR ELEVATIONS A-6 DOOR SCHEDULE A-7 DETAILS MECHANICAL M-1 LEGEND AND DETAILS

More information

SECTION EZ-SLIDE 80 AND 180 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION EZ-SLIDE 80 AND 180 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 SECTION 08 32 20 EZ-SLIDE 80 AND 180 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

SECTION INTUMESCENT MASTIC FIREPROOFING

SECTION INTUMESCENT MASTIC FIREPROOFING PART 1 GENERAL 1.01 SUMMARY SECTION 07 81 23 - INTUMESCENT MASTIC FIREPROOFING A. Section Includes: 1. Intumescent Mastic Fireproofing for Application to Exposed Steel 2. Protection of Adjacent Surfaces

More information

by Rollfab Metal Products

by Rollfab Metal Products by Rollfab Metal Products SECTION 07460 ALUMINUM SIDING AND SOFFITS PART 1 GENERAL 1.2 RELATED SECTIONS 1.3 REFERENCES A. SECTION INCLUDES B. Aluminum Siding. C. Aluminum Soffits. D. Aluminum trim and

More information

A. Section includes Sprayed Fire-Resistive Materials: (SFRM) A. Pre-Installation Conference: Conduct conference at Project Site.

A. Section includes Sprayed Fire-Resistive Materials: (SFRM) A. Pre-Installation Conference: Conduct conference at Project Site. SECTION 078100 - APPLIED FIREPROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Amendments to General Conditions and Division 01 Specification

More information

RENOVATE BUILDING 18-C FTFA SECTION GYPSUM BOARD 05/11

RENOVATE BUILDING 18-C FTFA SECTION GYPSUM BOARD 05/11 SECTION 09 29 00 GYPSUM BOARD 05/11 PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text

More information

SECTION GYPSUM BOARD & SHEATHING SYSTEMS

SECTION GYPSUM BOARD & SHEATHING SYSTEMS PART 1!GENERAL! 1.01! SECTION INCLUDES SECTION 09260 GYPSUM BOARD & SHEATHING SYSTEMS! Metal stud wall framing. Metal channel ceiling framing.! Gypsum board.! Sheathing.! Taped and sanded joint treatment.!

More information

(August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS **************************************************************************

(August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** USACE / NAVFAC / AFCEC / NASA UFGS-02 42 91 (May 2010) ------------------------- Preparing Activity: USACE Nontechnical Title Revision (August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS SECTION TABLE

More information

ADDENDUM NO. 1. TO SCOPE OF WORK: Section 0220, Form 01004/5

ADDENDUM NO. 1. TO SCOPE OF WORK: Section 0220, Form 01004/5 ADDENDUM NO. 1 TO SCOPE OF WORK: Section 0220, Form 01004/5 PROJECT: Tankless Water Heaters Installation Glenn Edge and Rich Martin Apartments and Main Office Water Heater Replacement New Memorial Community

More information

SECTION ROUGH CARPENTRY

SECTION ROUGH CARPENTRY SECTION 06100 PART 1 GENERAL 1.1 QUALITY ASSURANCE A. Lumber Grading: Lumber Grading Rules and Wood Species in accordance with Voluntary Product Standards. Grading rules of following associations apply

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 092216 - NON-STRUCTURAL METAL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Cardinal Commercial Products ALUMINUM STOREFRONT SYSTEM SERIES CF450 GUIDE SPECIFICATIONS SECTION ALUMINUM ENTRANCES AND STOREFRONT SYSTEMS

Cardinal Commercial Products ALUMINUM STOREFRONT SYSTEM SERIES CF450 GUIDE SPECIFICATIONS SECTION ALUMINUM ENTRANCES AND STOREFRONT SYSTEMS Cardinal Commercial Products ALUMINUM STOREFRONT SYSTEM SERIES CF450 GUIDE SPECIFICATIONS SECTION 08410 ALUMINUM ENTRANCES AND STOREFRONT SYSTEMS This suggested guide specification has been developed using

More information

SECTION WOOD FRAMING. A. Includes But Not Limited To: 1. Furnish and install wood framing and blocking as described in Contract Documents.

SECTION WOOD FRAMING. A. Includes But Not Limited To: 1. Furnish and install wood framing and blocking as described in Contract Documents. SECTION 06 1100 WOOD FRAMING PART 1 - GENERAL 1.1 SUMMARY A. Includes But Not Limited To: 1. Furnish and install wood framing and blocking as described in Contract Documents. B. Products Installed But

More information

PROTECTION OF HISTORIC FEATURES STANDARDS Los Angeles World Airports

PROTECTION OF HISTORIC FEATURES STANDARDS Los Angeles World Airports PROTECTION OF HISTORIC FEATURES PART 1 - GENERAL 1.1 SUMMARY A. Includes (but Is Not Necessarily Limited to): 1.2 REFERENCES 1. Protection of all historic features to remain from damage due to construction

More information

SECTION EXPANSION CONTROL

SECTION EXPANSION CONTROL SECTION 07 95 00 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

Life Hall Renovation Issued: July 9, 2014 Montclair State University Addendum No. 1 Owner's Project No Cannon Design Project No

Life Hall Renovation Issued: July 9, 2014 Montclair State University Addendum No. 1 Owner's Project No Cannon Design Project No SECTION 078100 - APPLIED FIREPROOFING PART 1 - GENERAL 1.1 SUMMARY A. Section includes sprayed fire-resistive materials (SFRM). 1.2 PREINSTALLATION MEETINGS A. Preinstallation Conference: Conduct conference

More information

SECTION FOAMED-IN-PLACE INSULATION

SECTION FOAMED-IN-PLACE INSULATION SWD Urethane 540 South Drew Street Mesa, AZ 85201 Phone: 800-828-1394 Fax: 480-461-6936 This ManuSpec utilizes the Construction Specifications Institute (CSI) Project Resource Manual (PRM), including MasterFormat,

More information

SECTION GREEN BUILDING POLICY IMPLEMENTATION

SECTION GREEN BUILDING POLICY IMPLEMENTATION SECTION 01390 [Note: The intent of this section is to identify Contractor specific work required for achievement of the University Green Building Policy. The policy applies to all new facilities, and partially

More information

[Project Name] Section [ ]

[Project Name] Section [ ] Page 1 PART 1 - GENERAL 1.1 SECTION INCLUDES 1.1.1 Design, labor, products, equipment and services necessary for interior/exterior Aluminum Facade System (AFS) work, in accordance with the Contract Documents.

More information

All Metals Fabrication AMF FUSION DRILLFREE ALUMINUM COMPOSITE METAL (ACM) WALL PANEL SPECIFICATION

All Metals Fabrication AMF FUSION DRILLFREE ALUMINUM COMPOSITE METAL (ACM) WALL PANEL SPECIFICATION SECTION 07 42 43 All Metals Fabrication AMF FUSION DRILLFREE ALUMINUM COMPOSITE METAL (ACM) WALL PANEL SPECIFICATION SPEC NOTE: Optional text is indicated by square brackets []. Delete unwanted items and

More information

SECTION ORNAMENTAL ALUMINUM RAILING

SECTION ORNAMENTAL ALUMINUM RAILING SECTION 05730 ORNAMENTAL ALUMINUM RAILING PART 1 GENERAL 1.1 SECTION INCLUDES A. Decorative Wire Rope Railing 1.2 RELATED SECTIONS A. Section 03300 Cast-In-Place Concrete: Placement of sleeves cast in

More information