DIVISION 02 SELECTIVE DEMOLITION

Size: px
Start display at page:

Download "DIVISION 02 SELECTIVE DEMOLITION"

Transcription

1 DIVISION 02 SELECTIVE DEMOLITION

2 SECTION SELECTIVE DEMOLITION PART 1 - GENERAL 1.01 SUMMARY A. This Section includes the following: 1. Demolition and removal of selected portions of a building. 2. Demolition and removal of selected building elements. 3. Saw cutting/core drilling 4. Patching and repairs. B. Related Sections: The following also contain requirements that relate to this Section: 1.02 DEFINITIONS 1. Division 0 Specifications and Notes on the Contract Drawings also clarify use of the building and phasing requirements. 2. Division 23 Sections for cutting, patching, or relocating and replacing mechanical items and installing new equipment and installations. 3. Division 26 Sections for cutting, patching, or relocating and replacing electrical items and installing new equipment and installations. A. Remove: Remove and legally dispose of items except those indicated to be reinstalled, salvaged, or to remain the Owner s property. B. Existing to Remain: Protect construction indicated to remain against damage and soiling during selective demolition MATERIALS OWNERSHIP A. Except for items or materials indicated to be reused, salvaged, reinstalled, or otherwise indicated to remain the Owner s property, demolished materials shall become the Contractor s property and shall be removed from the site with further disposition at the Contractor s option QUALITY ASSURANCE AND PROTECTION A. Regulatory Requirements: Comply with governing EPA notification regulations before starting selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction. B. Coordinate all hazardous material demolition with the Mississippi Division of Environmental Quality (MDEQ) with their mandatory prior notice requirement (minimum 10 days). OCTOBER 2017 SELECTIVE DEMOLITION PAGE 1 OF 5

3 C. The Contractor shall provide for a safe and secure healthy working environment at all times per OSHA, local code and safe practice. Refer to the Hazardous Material Survey Report attached hereto. D. Temporary barrier, railing fencing, etc. shall be provided and a safely installed to limit access to unauthorized personnel to work areas, limit the spread of construction duct/debris to User occupied spaces, and security for construction trailers, equipment and supplies. E. Any Owner furniture, especially cloth materials, shall be substantially protected. Contractor shall cover all furniture and protect blinds, curtains, etc. in demolition and other areas where demolition occurs or where construction routes and/or dust may be interactive PROJECT CONDITIONS A. Owner shall occupy building continually during construction. B. Owner will occupy all buildings and grounds immediately adjacent to this building and some selective demolition areas. Conduct selective demolition so that Owner s operations will not be disrupted. Provide not less than 72 hours prior notice to Owner of activities that will affect Owner s operations, including traffic dust, noise, etc. C. Owner assumes no responsibility for actual condition of buildings or systems to be selectively demolished. D. Asbestos and Lead Based Paint: If any materials suspected of containing asbestos are encountered, do not disturb the materials. Immediately notify the Professional and the Owner. See Hazardous Material Survey Report attached hereto. E. Storage or sale of removed items or materials on-site will not be permitted. F. Removal, relocation of some of the furniture in construction areas shall be by Using Agency. The remainder of furniture, fixtures and built-ins shall be protected by the Contractor during all construction. All areas, furniture and fixtures left in the construction area shall be daily cleaned and thereafter comprehensively cleaned after construction is complete in each space or room, at the Contractor s expense SCHEDULING A. Arrange selective demolition schedule so as not to interfere with Owner s on-site operations. Significant nighttime, after hours, and weekend work should be expected WARRANTY A. Existing Special Warranty: Remove, replace, patch, and repair materials and surfaces cut or damaged during selective demolition, by methods and with materials so as not to void existing warranties and to provide a neat finish to match existing adjacent finishes and material. PART 2 - PRODUCTS 2.01 REPAIR MATERIALS OCTOBER 2017 SELECTIVE DEMOLITION PAGE 2 OF 5

4 A. Use repair materials identical to existing materials. PART 3 - EXECUTION 3.01 EXAMINATION 1. Where identical materials are unavailable or cannot be used for exposed surfaces, use materials that visually match existing adjacent surfaces to the fullest extent possible as approved by Professional A. Verify that utilities have been disconnected and capped, as appropriate, to safety protect occupants and the facilities. B. Survey existing conditions and correlate with requirements indicated to determine extent of selective demolition required. Minimally demolish to match the extent to adequately access for repair or replacement work necessary. C. When unanticipated mechanical, electrical, or structural elements that conflict with the intended function or design are encountered, investigate and measure the nature and extent of the conflict. Promptly submit a written report to the Professional and provide suggested remedial action and cost estimate(s). D. Survey the condition of the building to determine whether removing any element might result in structural deficiency or unplanned collapse of any portion of the structure or adjacent structures during selective demolition. Contact the Professional immediately if an unsafe condition is noted. Protect people first and foremost UTILITY SERVICES A. Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations PREPARATION 1. Do not interrupt existing utilities serving occupied or operating facilities, except when authorized in writing by Owner and authorities having jurisdiction. Provide temporary services during interruptions to existing utilities, as acceptable to Owner and to governing authorities. a. Provide not less than seven (7) days written prior notice to Owner if shutdown of service is required during any changeover, replacement, repair, etc. b. Utility Requirements: Refer to Division 20, 22, 23 and 26 Sections for shutting off, disconnecting, removing, and sealing or capping utility services. Do not start selective demolition work until utility disconnecting and sealing have been completed and verified in writing. A. Conduct demolition operations to prevent injury to people and damage to adjacent buildings and facilities to remain. Ensure safe passage of unauthorized non construction personnel around selective demolition area(s). OCTOBER 2017 SELECTIVE DEMOLITION PAGE 3 OF 5

5 1. Erect temporary protection, such as walks, fences railings, canopies, temporary construction barriers, and covered passageways, where required by authorities having jurisdiction. 2. Provide temporary weather protection, during interval between demolition and removal of existing construction, on exterior surfaces and new construction to ensure that no water leakage or damage occurs to structure or interior areas SELECTIVE DEMOLITION A. Demolish and remove existing construction only to the extent required by new construction and as indicated for renovation, etc. Use methods required to complete work within limitations of governing regulations, high quality of Standard of Care, and as follows: 1. Proceed with selective demolition systematically, from higher to lower level. Complete selective demolition work above each floor or tier before disturbing supporting members on lower levels. 2. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction. To minimize disturbance of adjacent surfaces, use hand or small power tools designed for sawing or grinding, not hammering and chopping. Temporarily cover openings to remain. 3. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces. 4. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable firesuppression devices during flame-cutting operations. 5. Maintain adequate ventilation when using cutting torches, welding, brazing, soldering, etc. 6. Remove decayed, vermin-infested, or otherwise dangerous or unsuitable materials and promptly dispose of off-site. 7. Remove structural framing members and lower to ground by methods suitable to avoid free fall and to prevent ground impact or dust generation. 8. Locate selective demolition equipment throughout the structure and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing. 9. Dispose of demolished items and materials promptly. On-site storage or sale of removed items is prohibited. 10. Return elements of construction and surfaces to remain to condition existing before start of selective demolition operations. OCTOBER 2017 SELECTIVE DEMOLITION PAGE 4 OF 5

6 B. Demolish concrete and masonry in small sections. Cut concrete at junctures with construction to remain, using power-driven masonry saw or hand tools; do not use power-driven impact tools during Owner s normal building use periods. C. Break up and remove concrete slabs on grade, as shown. D. Remove resilient floor coverings and adhesive according to recommendations of the Resilient Floor Covering Institute s (RFCI) Recommended Work Practices for the Removal of Resilient Floor Coverings and Addendum. 1. Remove residual adhesive and prepare substrate for new floor coverings by one of the methods recommended by RFCI. E. Remove no more existing walls or roofing than can be promptly covered and interior areas protected. F. Remove air-conditioning equipment without releasing refrigerants. Recover all refrigerants and oils per governing codes. G. Provide temporary walls and seal air tight between construction areas and Owner occupied spaces. Construction barriers shall be provided where shown and as required, per Professional directive PATCHING AND REPAIRS A. Patching is specified in Division 1 and on Drawings 3.06 DISPOSAL OF DEMOLISHED MATERIALS A. General: Promptly dispose of demolished materials to an appropriate disposal site per local code requirements. Do not allow demolished materials to accumulate on-site or in building renovation areas. B. Burning: Do not burn demolished materials on-site. C. Promptly haul off debris and demolition and unused construction material and equipment CLEANING A. Sweep the building, equipment room and outdoor concrete spaces, broom clean and provide for a thorough comprehensive vacuuming and dust removal on completion of selective demolition operation, at minimum daily intervals and prior to next day Owner occupancy of premises. B. All areas affected by construction dust shall be thoroughly cleaned. All furniture, plumbing and light fixtures, wall, ceiling, and floor surfaces shall be cleaned. --END OF SECTION-- OCTOBER 2017 SELECTIVE DEMOLITION PAGE 5 OF 5

B. Remove and Salvage: Carefully detach from existing construction, in a manner to prevent damage, and deliver to Owner.

B. Remove and Salvage: Carefully detach from existing construction, in a manner to prevent damage, and deliver to Owner. SECTION 02 41 19 - SELECTIVE STRUCTURE DEMOLITION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

A. Section includes: removal of paving, pipes and utilities, and other site items as required by the project drawings.

A. Section includes: removal of paving, pipes and utilities, and other site items as required by the project drawings. SECTION 024113 - SITE DEMOLITION PART 1 -GENERAL 1.1 SUMMARY A. Section includes: removal of paving, pipes and utilities, and other site items as required by the project drawings. 1.2 SUBMITTALS A. Obtain

More information

1. Before selective demolition, Owner will remove the following items:

1. Before selective demolition, Owner will remove the following items: SECTION 024119 - SELECTIVE STRUCTURE DEMOLITION PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Demolition and removal of selected portions of building or structure. 2. Demolition and removal of selected

More information

HOTEL SANDFORD. C. Remove and Reinstall: Detach items from existing construction, prepare for reuse, and reinstall where indicated.

HOTEL SANDFORD. C. Remove and Reinstall: Detach items from existing construction, prepare for reuse, and reinstall where indicated. SECTION 024119 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

SAN DIEGO STATE UNIVERSITY PACIFIC CORNERSTONE ARCHITECTS TENOCHCA HALL PROJECT NO FAN COIL UNITS, RESTROOM AND FINISH RENOVATION

SAN DIEGO STATE UNIVERSITY PACIFIC CORNERSTONE ARCHITECTS TENOCHCA HALL PROJECT NO FAN COIL UNITS, RESTROOM AND FINISH RENOVATION SECTION 02 41 14 SELECTIVE BUILDING DEMOLITION PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Procedures for systematic removal of site improvements or portions of exterior and interior of buildings

More information

DIVISION 2- EXISTING CONDITIONS

DIVISION 2- EXISTING CONDITIONS DIVISION 2- EXISTING CONDITIONS 024100- SELECTIVE DEMOLITION PART 1 - GENERAL: 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 024116 - STRUCTURE DEMOLITION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION SELECTIVE DEMOLITION

SECTION SELECTIVE DEMOLITION SECTION 024113- PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to the

More information

Richmond Hill Primary Renovation SECTION SELECTIVE DEMOLITION

Richmond Hill Primary Renovation SECTION SELECTIVE DEMOLITION SECTION 024119 SELECTIVE DEMOLITION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

BuildingName The Description of the Project P DOCUMENTS

BuildingName The Description of the Project P DOCUMENTS ARCHITECTURE, ENGINEERING AND CONSTRUCTION P00000000 0000 DOCUMENTS ARCHITECTURE & ENGINEERING 326 East Hoover, Mail Stop B Ann Arbor, MI 48109-1002 Phone: 734-764-3414 Fax: 734-936-3334 SPECIFICATION

More information

C. Type of Selective Demolition Work: Demolition requires the selective removal and subsequent off-site disposal of:

C. Type of Selective Demolition Work: Demolition requires the selective removal and subsequent off-site disposal of: 02070 - SELECTIVE DEMOLITION PART 1 - GENERAL 1.1 STIPULATIONS A. The specifications sections " General Conditions of the Construction Contract ", "Special Conditions", and "Division 1 - General Requirements"

More information

A. The extent of Selective Demolition Work is that Work necessary, and required to facilitate the new construction indicated.

A. The extent of Selective Demolition Work is that Work necessary, and required to facilitate the new construction indicated. Project No. El611-0l SECTION 02 41 00 - SELECTIVE DEMOLITION PART1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

INTRODUCTION. A. Overview. A. Scope of Work. B. Additional Requirements

INTRODUCTION. A. Overview. A. Scope of Work. B. Additional Requirements RFP 2019-01 Reeta s Building Demolition City of Morgantown REQUEST FOR PROPOSALS Demolition Contractors INTRODUCTION A. Overview This Request for Proposals ( RFP ) is being issued by the City of Morgantown

More information

FILED: NEW YORK COUNTY CLERK 05/04/ :16 PM

FILED: NEW YORK COUNTY CLERK 05/04/ :16 PM EXHIBIT P SECTION 01 73 10 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

SECTION A. Examination, preparation, and general installation procedures.

SECTION A. Examination, preparation, and general installation procedures. SECTION 01 7000 PART 1 GENERAL 1.1 SECTION INCLUDES A. Examination, preparation, and general installation procedures. B. Cutting and patching. C. Cleaning and protection. D. Substantial Completion E. Final

More information

I hereby certify that Drawing Sheets F-100, F-101, M-001, M-100, M-101, M-200, M-400, M-

I hereby certify that Drawing Sheets F-100, F-101, M-001, M-100, M-101, M-200, M-400, M- PROJECT MANUAL FOR: MUHC EMERGENCY POWER SYSTEM MODIFICATIONS - UNIVERSITY OF MISSOURI COLUMBIA, MISSOURI FOR: THE CURATORS OF THE UNIVERSITY OF MISSOURI PREPARED BY: BURNS & MCDONNELL 9400 WARD PARKWAY

More information

EXECUTION REQUIREMENTS

EXECUTION REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Section includes: Execution requirements. B. Related Requirements: 1. Specification Sections 2 through 49. PART 2 - PRODUCTS (Not Used). PART 3 - EXECUTION 3.1 SAFETY 01

More information

SECTION ALTERATION PROJECT PROCEDURES

SECTION ALTERATION PROJECT PROCEDURES SECTION 013516 ALTERATION PROJECT PROCEDURES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Requirements for protection of existing facilities during construction operations. 2. Demolition and removals

More information

B. Sections and all references contained therein form a part of this Section of the Specifications.

B. Sections and all references contained therein form a part of this Section of the Specifications. KARGES-FAULCONBRIDGE, INC. KFI: 14-044.00 SEWARD MONTESSORI SCHOOL ADDITION & REMODELING SECTION 260010 - PART 1 - GENERAL 1.01 SCOPE OF WORK A. Drawings and general provisions of the Contract, including

More information

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION 820-1 SCOPE OF WORK: SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION a. Furnish all labor, materials, equipment, and incidentals required for demolition and/or removal and disposal of existing

More information

Ft. Clinch State Park 09/09

Ft. Clinch State Park 09/09 SECTION 01100 - SUMMARY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections,

More information

STATE COLLEGE OF FLORIDA Building 7 Finance Interior Upgrades BRADENTON CAMPUS SCF Project Number :

STATE COLLEGE OF FLORIDA Building 7 Finance Interior Upgrades BRADENTON CAMPUS SCF Project Number : STATE COLLEGE OF FLORIDA Building 7 Finance Interior Upgrades BRADENTON CAMPUS SCF Project Number : 2-19-1-20 CONSTRUCTION DOCUMENTS Project Manual February 04, 2019 ARCHITECT HEPNER ARCHITECTS, INCORPORATED

More information

A. Section includes general administrative and procedural requirements governing execution of the Work including, but not limited to, the following:

A. Section includes general administrative and procedural requirements governing execution of the Work including, but not limited to, the following: SECTION 01 73 00 - EXECUTION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

Lantz-Boggio Architects, P.C LBA Project No

Lantz-Boggio Architects, P.C LBA Project No SECTION 01 7000- PART 1 GENERAL 1.01 SECTION INCLUDES A. Examination, preparation, and general installation procedures. B. Pre-installation meetings. C. Cutting and patching. D. Surveying for laying out

More information

MEB AV TRAINING CENTER PROJECT MANUAL

MEB AV TRAINING CENTER PROJECT MANUAL MEB AV TRAINING CENTER PROJECT MANUAL LSU Health New Orleans MEDICAL EDUCATION BUILDING 1901 PERDIDO ST NEW ORLEANS, LA 70112 November 30, 2018 1 LSU Health New Orleans MEB AV TRAINING CENTER 3 RD FLOOR

More information

ADDENDUM NO. 1. TO SCOPE OF WORK: Section 0220, Form 01004/5

ADDENDUM NO. 1. TO SCOPE OF WORK: Section 0220, Form 01004/5 ADDENDUM NO. 1 TO SCOPE OF WORK: Section 0220, Form 01004/5 PROJECT: Tankless Water Heaters Installation Glenn Edge and Rich Martin Apartments and Main Office Water Heater Replacement New Memorial Community

More information

SECTION TEMPORARY FACILITIES AND CONTROLS

SECTION TEMPORARY FACILITIES AND CONTROLS SECTION 015000 TEMPORARY FACILITIES AND CONTROLS PART 1 - GENERAL 1.1 GENERAL A. Each Contractor shall be responsible for arranging for and providing construction facilities and temporary controls as required

More information

PHYSICAL FACILITIES Consultant s Handbook Specifications Division 07 Thermal and Moisture Protection 8400 Firestopping

PHYSICAL FACILITIES Consultant s Handbook Specifications Division 07 Thermal and Moisture Protection 8400 Firestopping 1 General 1.1 The bidding requirements, contracting requirements, and applicable parts of Division 1 - General Requirements, as listed in the Table of Contents, shall be included in and made a part of

More information

APPENDIX 1 PROJECT REQUIREMENTS

APPENDIX 1 PROJECT REQUIREMENTS APPENDIX 1 PROJECT REQUIREMENTS I) Scope of Work This section contains a general summary of the work the Contractor shall perform under this contract. If any conflict exists between the work described

More information

SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS

SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS SECTION 01 00 00 GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Summary of Work: 1. General 2. Contract. B. Contract Considerations: 1. Schedule of values. 2. Applications for payment. 3.

More information

SECTION 23 DEMOLITION

SECTION 23 DEMOLITION SECTION 23 DEMOLITION 23.A GENERAL 23.A.01 Demolition activities shall be performed in accordance with ANSI Standard A10.6, Safety Requirements for Demolition. Surveys and planning shall meet the following:

More information

ARTICLE 4: ASBESTOS CONTROL STANDARDS

ARTICLE 4: ASBESTOS CONTROL STANDARDS ARTICLE 4: ASBESTOS CONTROL STANDARDS SECTION 4.01 ASBESTOS DEFINITIONS Adopted 06/08/95 (818) Revised 02/12/98 (863), 07/13/00 (918), 09/26/02 (978), 02/27/03 (987), 03/26/09 (1148) (a) AHERA BUILDING

More information

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 01 GENERAL REQUIREMENTS SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 01 GENERAL REQUIREMENTS SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL SECTION 017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL PART 1 - GENERAL 1.1 SUMMARY A. This Section includes administrative and procedural requirements for the following: 1. Salvaging non-hazardous

More information

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION Page 210500-1 SECTION 210500 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

INVITATION TO BID. Prospective bidders are encouraged to conduct a pre-bid site visit to aid in their bidding assessments.

INVITATION TO BID. Prospective bidders are encouraged to conduct a pre-bid site visit to aid in their bidding assessments. February 12, 2014 INVITATION TO BID The City of Coffeyville, Kansas, is accepting sealed bids for the demolition and removal of certain structures located within the City. The proposed work will be on

More information

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

SECTION BASIC ELECTRICAL MATERIALS AND METHODS SECTION 26 05 05 BASIC ELECTRICAL MATERIALS PART 1 - GENERAL 1.1 SUMMARY A. Section includes the limited scope construction materials and methods for application with electrical installations as follows:

More information

WORK INSTRUCTIONS COLORADO SPRINGS NNO FACILITY EQUIPMENT SALVAGE PLAN VERIZON WIRELESS PROJECT MANAGER PATRICK SKILLEN PREPARED FOR:

WORK INSTRUCTIONS COLORADO SPRINGS NNO FACILITY EQUIPMENT SALVAGE PLAN VERIZON WIRELESS PROJECT MANAGER PATRICK SKILLEN PREPARED FOR: 4323 ARROWSWEST DRIVE COLORADO SPRINGS, CO 80907-3451 PREPARED FOR: VERIZON WIRELESS PROJECT MANAGER PATRICK SKILLEN MARCH 10, 2009 VERIZON WIRELESS PAGE 1 PART 1 - GENERAL 1.01 PROJECT DESCRIPTION VzW

More information

Addendum #2 B14/9830. East Campus Student Life/Business Services/DSR Renovation

Addendum #2 B14/9830. East Campus Student Life/Business Services/DSR Renovation September 25, 2013 Addendum #2 B14/9830 East Campus Student Life/Business Services/DSR Renovation SPECIFICATIONS for East Campus Student Life/Business Services/DSR Renovation Dated: September 5, 2013 This

More information

DSC BUILDING 1200 ALTERATIONS OCTOBER 2011 SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

DSC BUILDING 1200 ALTERATIONS OCTOBER 2011 SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL SECTION 017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL PART 1 - GENERAL 1.1 SUMMARY A. Section includes administrative and procedural requirements for the following: 1. Salvaging nonhazardous demolition

More information

ZAIDA RODRIGUEZ E.E.S. EXTERIOR SECURITY FENCES & GATES SFUSD PROJECT NO SAN FRANCISCO UNIFIED SCHOOL DISTRICT SECTION

ZAIDA RODRIGUEZ E.E.S. EXTERIOR SECURITY FENCES & GATES SFUSD PROJECT NO SAN FRANCISCO UNIFIED SCHOOL DISTRICT SECTION SECTION 00 73 00 SPECIAL CONDITIONS 1.1 Application of Special Conditions. These Special Conditions are a part of the Contract Documents for the Work generally described as: EXTERIOR SECURITY FENCES &

More information

Demolition Safety!!!!

Demolition Safety!!!! Sample Written Program For Your Company For Demolition Safety Provided By: P.O. Box 2136 Slidell, LA 70458 Phone: 985-781-1444 Fax: 985-718-4957 Email: info@se-safety.com Demolition Safety Program Purpose

More information

Lot C Walkway and Bridge Repair Project #23829

Lot C Walkway and Bridge Repair Project #23829 Lot C Walkway and Bridge Repair Project #23829 PREPARED BY: Moody Nolan, Inc. MKEC Engineering Consultants Inc. Division 00 through Division 33 Bid Documents, August 13, 2012 SPECIFICATIONS for Lot C

More information

St. Monica Food Pantry Construction Waste Management and Disposal SBA-13105

St. Monica Food Pantry Construction Waste Management and Disposal SBA-13105 St. Monica Food Pantry 01 7419-1 SECTION 01 7419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL PART 1 - GENERAL 1.1 SUMMARY: A. Work of this section includes administrative and procedural requirements for

More information

1. Division 01 Section General Requirements Temporary Facilities and Controls.

1. Division 01 Section General Requirements Temporary Facilities and Controls. PAGE 024210-1 SECTION 024210 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,

More information

Form 9: Infection Control Preventive Measures Level 4

Form 9: Infection Control Preventive Measures Level 4 Form 9: Infection Control This form is filled out by the construction planning team or designated person(s) to identify the required preventive measures for the activity described in Form 1 Infection Control

More information

EM385 Construction Safety and Health Certification Course Section 23 Demolition

EM385 Construction Safety and Health Certification Course Section 23 Demolition EM385 Construction Safety and Health Certification Course Section 23 Demolition EM 385 SAFETY AND HEALTH CERTIFICATION COURSE - SECTION 23 Edited by: Steven Geigle, M.A., CET, CSHM Copyright 2013 Geigle

More information

SECTION CUTTING AND PATCHING

SECTION CUTTING AND PATCHING SECTION 01 04 50 PART 1 - GENERAL 1.1 RELATED DOCUMENTS CUTTING AND PATCHING A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

DOCUMENT CONSTRUCTION WASTE MANAGEMENT

DOCUMENT CONSTRUCTION WASTE MANAGEMENT DOCUMENT 01 50 13 PART 1 - GENERAL 1.1 RELATED DOCUMENTS AND PROVISIONS: All Contract Documents should be reviewed for applicable provisions related to the provisions in this document, including without

More information

PRIVATE PLAN ROOM. Document Information Sheet

PRIVATE PLAN ROOM. Document Information Sheet PRIVATE PLAN ROOM Document Information Sheet Job Name: Partial Renovation for Lewes Streets Department Breakroom Bid Date: October 22, 2018 2:00 pm Placed on file by: George, Miles, and Buhr Contact: Lee

More information

SAFEGUARDS DURING CONSTRUCTION

SAFEGUARDS DURING CONSTRUCTION CHAPTER 14 SAFEGUARDS DURING CONSTRUCTION SECTION 1401 GENERAL [B] 1401.1 Scope. The provisions of this chapter shall govern safety during construction that is under the jurisdiction of this code and the

More information

Bucknell University. Lewisburg, Pennsylvania HUNT HALL IMPROVEMENTS 2017 PROJECT LOCATION MAP CS-1 DRAWING TITLE: PROJECT:

Bucknell University. Lewisburg, Pennsylvania HUNT HALL IMPROVEMENTS 2017 PROJECT LOCATION MAP CS-1 DRAWING TITLE: PROJECT: PROJECT LOCATION MAP N NORTH Bucknell University Lewisburg, Pennsylvania 8 www.bucknell.edu HUNT HALL IMPROVEMENTS 0 PLOT DATE: /0/ DRAWN BY: BDF SCALE: /8"='-0" CS- COVER SHEET Lewisburg, Pennsylvania

More information

SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL. A. This Section includes administrative and procedural requirements for the following:

SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL. A. This Section includes administrative and procedural requirements for the following: SECTION 017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

MECHANICAL M-1 LEGEND AND DETAILS M-2 FLOOR PLAN - DUCTWORK M-3 FLOOR PLAN - PIPING

MECHANICAL M-1 LEGEND AND DETAILS M-2 FLOOR PLAN - DUCTWORK M-3 FLOOR PLAN - PIPING SHEET TITLE ARCHITECTURAL A-0 COVER SHEET A-1 DEMOLITION NOTES A-2 DEMOLITION PLAN A-3 FLOOR PLAN NOTES A-4 FLOOR PLAN A-5 INTERIOR ELEVATIONS A-6 DOOR SCHEDULE A-7 DETAILS MECHANICAL M-1 LEGEND AND DETAILS

More information

EPA s Lead Program Rule At-A-Glance

EPA s Lead Program Rule At-A-Glance EPA s Lead Program Rule At-A-Glance FLOW CHART 1: Do the Requirements Apply to the Renovation? If you will be getting paid to do work that disturbs painted surfaces in a pre-1978 home, apartment building,

More information

SPECIFICATIONS - DETAILED PROVISIONS Section Temporary Sewage Lift Station Demolition C O N T E N T S

SPECIFICATIONS - DETAILED PROVISIONS Section Temporary Sewage Lift Station Demolition C O N T E N T S SPECIFICATIONS - DETAILED PROVISIONS Section 02051 Temporary Sewage Lift Station Demolition C O N T E N T S PART 1 - GENERAL... 1 1.01 DESCRIPTION... 1 1.02 REFERENCE SPECIFICATIONS, CODES, AND STANDARDS...

More information

Developed and Presented by: Wisconsin Healthcare Engineering Association

Developed and Presented by: Wisconsin Healthcare Engineering Association Infection Control Risk Assessment (ICRA) Developed and Presented by: Wisconsin Healthcare Engineering Association What is an ICRA? An Infection Control Risk Assessment is a tool devised to protect patients

More information

Window Replacement/Restoration. McCracken County Courthouse 300 South Seventh Street Paducah, Kentucky Architect s File No. 1603

Window Replacement/Restoration. McCracken County Courthouse 300 South Seventh Street Paducah, Kentucky Architect s File No. 1603 SECTION 000110 - TABLE OF CONTENTS 300 South Seventh Street Paducah, Kentucky Architect s File No. 1603 DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS PAGES 001113 PUBLIC NOTICE... 1 000115 DRAWING

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018 SECTION 01 7300 - EXECUTION GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections,

More information

de-construction of Old City Hall

de-construction of Old City Hall de-construction of Old City Hall for the CITY OF GREEN COVE SPRINGS, FL 229 Walnut Street Green Cove Springs, Florida LOCATION MAP Sheet List Table T-1 COVER SHEET TEMPORARY FENCE PLAN LEGEND: GRAPHIC

More information

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12 SCOPE SUMMARY: DIVISION: 0 - LEGAL DOCUMENTS Complete; DIVISION: 1 - GENERAL REQUIREMENTS As Applicable; SECTION: - ATTACHED SKETCH Complete; Geotechnical Engineering Report as prepared by Building and

More information

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 311000 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

REQUEST FOR TENDER - SERVICES RFT HOUSE DEMOLITION 7958 BEAVERDAMS RD., NIAGARA FALLS, ON.

REQUEST FOR TENDER - SERVICES RFT HOUSE DEMOLITION 7958 BEAVERDAMS RD., NIAGARA FALLS, ON. REQUEST FOR TENDER - SERVICES 1. PURPOSE AND SCOPE This specification is intended to govern the supply of all labour, materials and equipment for the dismantling, demolition of a single dwelling on the

More information

Schendt Engineering Corporation 2912 Beacon Street (719)

Schendt Engineering Corporation 2912 Beacon Street (719) Schendt Engineering Corporation 2912 Beacon Street (719) 637-8850 Colorado Springs, CO 80907-9207 www.secengr.com ADDENDUM NUMBER 1 DATE: 5 July 2017 OWNER: PROJECT: University of Colorado Colorado Springs

More information

TRIAD ENGINEERING CONSULTANTS, INC.

TRIAD ENGINEERING CONSULTANTS, INC. TRIAD ENGINEERING CONSULTANTS, INC. 2638 Willard Dairy Rd Providing High Point, NC Suite 100 Plumbing, Mechanical and 27265 (336) 454-0225 Electrical Engineering Services Since 1984 admin@triadengmep.com

More information

SECTION GENERAL REQUIREMENTS

SECTION GENERAL REQUIREMENTS SECTION 01005 GENERAL REQUIREMENTS PART 1 GENERAL 1.01 WORK COVERED BY CONTRACT DOCUMENTS A. Work of this Contract comprises the chiller and cooling tower replacement at Five Oaks Middle School which includes

More information

SCOPE OF WORK AND GENERAL INSTRUCTIONS

SCOPE OF WORK AND GENERAL INSTRUCTIONS SCOPE OF WORK AND GENERAL INSTRUCTIONS SCOPE OF WORK SUMMARY FOR PROJECT CONSTRUCTION SERVICES Project: ECCC Space Optimization Project No.: GOC504787 Location: 401 Burrard Street, Vancouver The purpose

More information

Attachment 3 Statement of Work Statement PROJECT NUMBER MA DIRECTORATE OF PUBLIC WORKS FORT BRAGG, NORTH CAROLINA

Attachment 3 Statement of Work Statement PROJECT NUMBER MA DIRECTORATE OF PUBLIC WORKS FORT BRAGG, NORTH CAROLINA Request for Task Order Proposal Number: Attachment 3 Statement of Work Statement PROJECT NUMBER MA-00006-15 DIRECTORATE OF PUBLIC WORKS FORT BRAGG, NORTH CAROLINA PROJECT TITLE: Restore one Men s and one

More information

TYPICAL APARTMENT FLOOR PLAN

TYPICAL APARTMENT FLOOR PLAN PHOTO #7 PHOTO #8 EAST 8TH STREET (60' WIDE STREET) P L P L PHOTO #4 P L P L A B C D E F G H I #21 ASTOR PLACE 11 STORY BUILDING HEIGHT = 130' (11 STORIES) STAIR #3 BROADWAY (100' WIDE STREET) L STAIR

More information

FIRESTOPPING & SMOKE SEALS

FIRESTOPPING & SMOKE SEALS FIRESTOPPING & SMOKE SEALS SPECIFICATION SECTION 07860 1 General 1.1 SECTION INCLUDES.1 Comply with Division 1, General Requirements and Documents referred to therein..2 It is the intent of this section

More information

Read Health Canada s Tools for schools Action Kit s Introduction, Backgrounder and pages 14-3 to

Read Health Canada s Tools for schools Action Kit s Introduction, Backgrounder and pages 14-3 to DRAFT Renovation and Repair Checklist Excerpted from Tools for Schools Action Kit, Health Canada. Date: To be completed by: Facilities maintenance staff School Custodial staff Contract service providers

More information

CONTRACT AGREEMENT. This CONTRACT AGREEMENT is entered into by and between the CITY OF WINDER (the

CONTRACT AGREEMENT. This CONTRACT AGREEMENT is entered into by and between the CITY OF WINDER (the CONTRACT AGREEMENT This CONTRACT AGREEMENT is entered into by and between the CITY OF WINDER (the "City") and Contractor as of the date the last party to this Contract Agreement signed below. W I T N E

More information

SECTION CONSTRUCTION WASTE MANAGEMENT. 1. Section Sustainable Project Requirements. 2. Section Temporary Facilities and Controls.

SECTION CONSTRUCTION WASTE MANAGEMENT. 1. Section Sustainable Project Requirements. 2. Section Temporary Facilities and Controls. Buchtel/Perldns Community Learning Center GPD 2007271.15 OSFC Project # 55-7110-9029425 Phase 3 CLC Package Bidding Documents July 1, 2010 PART 1- GENERAL 1.1 SUMMARY SECTION 01524 CONSTRUCTION WASTE MANAGEMENT

More information

WESTERN CONNECTICUT STATE UNIVERSITY ASBESTOS ABATEMENT PROCEDURE E-101

WESTERN CONNECTICUT STATE UNIVERSITY ASBESTOS ABATEMENT PROCEDURE E-101 WESTERN CONNECTICUT STATE UNIVERSITY ASBESTOS ABATEMENT PROCEDURE E-101 Issued 6/1/95 Revised 11/08/2004; 3/6/06 Please direct any questions or comments about the applicability of this document to Luigi

More information

Asbestos Consulting Radon Measurements Lead Assessments Indoor Air Quality Testing Mold Investigations. Project Number: Page 1 of 22

Asbestos Consulting Radon Measurements Lead Assessments Indoor Air Quality Testing Mold Investigations. Project Number: Page 1 of 22 Page 1 of 22 Asbestos Survey Project Summary Pursuant to your request; Environmental, Inc., has performed an Asbestos Building Survey on 8/13/2014 and limited to the above referenced location. The Interior/Exterior/Roof

More information

Indoor Air Quality Management Plan for LEED

Indoor Air Quality Management Plan for LEED Terminal Development Program Contract 1: 201301B San Diego Airport Terminal 2 West Expansion Indoor Air Quality Management Plan for LEED Prepared by HVAC Design Builder: California Comfort Systems USA

More information

MITTERSILL WARMING HUT

MITTERSILL WARMING HUT STATE OF NEW HAMPSHIRE DEPARTMENT OF RESOURCES AND ECONOMIC DEVELOPMENT DIVISION OF PARKS AND RECREATION PROJECT #: CAP 1786 FRANCONIA NOTCH STATE PARK FRANCONIA, NEW HAMPSHIRE DRAWING LIST: COVER SHEET

More information

HELEN C. WHITE COLLEGE LIBRARY RESTROOM RENOVATION UNIVERSITY OF WISCONSIN - MADISON UWSA Project No. A

HELEN C. WHITE COLLEGE LIBRARY RESTROOM RENOVATION UNIVERSITY OF WISCONSIN - MADISON UWSA Project No. A ADDENDUM NO ISSUE DATE: December, 0 RE: HELEN C. WHITE COLLEGE LIBRARY RESTROOM RENOVATION UNIVERSITY OF WISCONSIN - MADISON UWSA Project No. A--00 BID OPENING: For MEP BIDDERS: :00 P.M., THURSDAY, JANUARY,

More information

SPECIFICATION DIVISION 7 NUMBER SECTION DESCRIPTION DIVISION 07 THERMAL AND MOISTURE PROTECTION SECTION THROUGH-PENETRATION FIRESTOP SYSTEMS

SPECIFICATION DIVISION 7 NUMBER SECTION DESCRIPTION DIVISION 07 THERMAL AND MOISTURE PROTECTION SECTION THROUGH-PENETRATION FIRESTOP SYSTEMS BuildingName The Description of the Project P00000000 0000 DOCUMENTS Title Page Table of Contents Instruction to Bidders Form of Proposal Equal Opportunity Statement Form of Guarantee Supplemental General

More information

END OF SECTION SECTION FINAL CLEANING PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDE

END OF SECTION SECTION FINAL CLEANING PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDE d. Clean exposed hard-surfaced finishes to a dirt-free condition, free of stains, films, and similar foreign substances. Avoid disturbing natural weathering of exterior surfaces. Plumbing Contractor: Clean

More information

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department:

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department: Permit Requirements: Any owner, authorized agent, or contractor who desires to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install,

More information

SECTION CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

SECTION CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS PART 1 GENERAL 1.1 DESCRIPTION A. Temporary Utilities: Electricity, lighting, heating, cooling, ventilation, water, and sanitary facilities. B. Temporary Controls: Barriers, fencing, erosion control, exterior

More information

LOWE S INSTALLER LRRP CHECKLIST FOR RENOVATIONS PERFORMED IN PRE-1978 HOUSING AND CHILD-OCCUPIED FACILITIES

LOWE S INSTALLER LRRP CHECKLIST FOR RENOVATIONS PERFORMED IN PRE-1978 HOUSING AND CHILD-OCCUPIED FACILITIES LOWE S INSTALLER LRRP CHECKLIST FOR RENOVATIONS THE PURPOSE OF THIS FORM IS TO DOCUMENT COMPLIANCE WITH THE U.S. ENVIRONMENTAL PROTECTION AGENCY S LEAD RENOVATION, REPAIR, AND PAINTING RULE ( RRP RULE

More information

ACADEMIC SUCCESS CENTER THE COLLEGE AT BROCKPORT STATE UNIVERSITY OF NEW YORK PROJECT NO

ACADEMIC SUCCESS CENTER THE COLLEGE AT BROCKPORT STATE UNIVERSITY OF NEW YORK PROJECT NO SECTION 09 65 16 - RESILIENT SHEET FLOORING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

DIVISION 02 EXISTING CONDITIONS

DIVISION 02 EXISTING CONDITIONS DIVISION 02 EXISTING CONDITIONS 02 00 00 EXISTING CONDITIONS 02 01 00 Maintenance of Existing Conditions 02 01 50 Maintenance of Site Remediation 02 01 65 Maintenance of Underground Storage Tank Removal

More information

A. IEMA ten day notification for demolition provisions as necessary. C. IEPA Uncontaminated Soil Certification LPC 663

A. IEMA ten day notification for demolition provisions as necessary. C. IEPA Uncontaminated Soil Certification LPC 663 August 2013, Rev 00 01 7419 Construction Waste Management PART 1. GENERAL 1.01 Requirements Include: A. Each Contractor provide: 1. Participation in Construction Waste Management plan, including separation

More information

TILE TILE

TILE TILE 09300 - TILE 09300-1 PART ONE: GENERAL 1.1 Description TILE 1.1.1 Work of this Section, as shown or specified, shall be provided by the Interior Contractor and shall be in accordance with the requirements

More information

SECTION SPECIAL PROCEDURES. A. Section includes: Administrative and procedural requirements for special project procedures.

SECTION SPECIAL PROCEDURES. A. Section includes: Administrative and procedural requirements for special project procedures. PART 1 - GENERAL 1.1 SUMMARY SECTION 01 35 00 A. Section includes: Administrative and procedural requirements for special project procedures. B. Related Requirements: 1. General Conditions 2. Section 01

More information

INFORMAL BID SPECIFICATIONS FOR LDS ISLAND PARK ANNEX FURNACE. Island Park, Idaho. December, 2013

INFORMAL BID SPECIFICATIONS FOR LDS ISLAND PARK ANNEX FURNACE. Island Park, Idaho. December, 2013 INFORMAL BID SPECIFICATIONS FOR LDS ISLAND PARK ANNEX FURNACE Island Park, Idaho December, 2013 Prepared by Engineered Systems Associates, Inc, 1355 East Center Pocatello, Idaho 83201 Phone: 208-233-0501

More information

SECTION PROJECT SUMMARY-PROJECT SCHEDULE

SECTION PROJECT SUMMARY-PROJECT SCHEDULE 01 10 00 SECTION 01 10 00 PROJECT SUMMARY-PROJECT SCHEDULE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions, Supplementary Conditions

More information

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions. SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution

More information

BID FORMS AND SPECIFICATIONS FOR THE DEMOLITION OF COMMERCIAL STRUCTURES IN THE 1700 BLOCK OF M STREET. CITY OF BELLEVILLE

BID FORMS AND SPECIFICATIONS FOR THE DEMOLITION OF COMMERCIAL STRUCTURES IN THE 1700 BLOCK OF M STREET. CITY OF BELLEVILLE BID FORMS AND SPECIFICATIONS FOR THE DEMOLITION OF COMMERCIAL STRUCTURES IN THE 1700 BLOCK OF M STREET. CITY OF BELLEVILLE BIDS DUE: December 22 nd 2016 @ 2:00 P.M. Belleville City Hall City Hall 1819

More information

A. Hazardous Areas: Hazardous areas as defined by the NEC as Class I, Division 1, Group D, or Class I, Division 2, Group D hazardous are as follows:

A. Hazardous Areas: Hazardous areas as defined by the NEC as Class I, Division 1, Group D, or Class I, Division 2, Group D hazardous are as follows: SECTION 16050 PART 1 GENERAL 1.1 SUMMARY A. Section Includes: General requirements for providing basic electrical materials and methods. B. Related Work Specified in Other Sections Includes: 1. Certain

More information

Certification Number: NAT Lead Renovation, Repair and Painting Program

Certification Number: NAT Lead Renovation, Repair and Painting Program Certification Number: NAT-117534-2 Lead Renovation, Repair and Painting Program August 2018 Lead Renovation, Repair and Painting Program TABLE of CONTENTS I. Purpose II. Risk Identification III. Responsibilities

More information

STATE UNIVERSITY CONSTRUCTION FUND

STATE UNIVERSITY CONSTRUCTION FUND DIRECTIVE 1A-8 Issue date: October 2014 CONSTRUCTABILITY REVIEW 1. The Consultant shall be required to perform a constructability review with the College, Fund s Design Coordinator, Fund s Construction

More information

New Jersey Home Inspection - Standards of Practice

New Jersey Home Inspection - Standards of Practice New Jersey Home Inspection - Standards of Practice 13:40-15.16 Standards of Practice (a) All NJ home inspectors and associate NJ home inspectors shall comply with the standards of practice contained in

More information

SECTION WELDED STEEL PICKET FENCE. 1. Fusion welded and rackable ornamental steel picket fence system.

SECTION WELDED STEEL PICKET FENCE. 1. Fusion welded and rackable ornamental steel picket fence system. PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Fusion welded and rackable ornamental steel picket fence system. B. Related sections: 1. Section 03310 Concrete Work for post support. 2. Section 09960

More information

The Hong Kong Polytechnic University Facilities Management Office

The Hong Kong Polytechnic University Facilities Management Office The Hong Kong Polytechnic University Facilities Management Office Safety Precautions and Requirements The Contractor shall ensure as a priority in all activities connected with the Works, the safety and

More information

Rowan University Asbestos Management Program

Rowan University Asbestos Management Program Rowan University Asbestos Management Program Table of Contents I. Introduction II. Regulatory Compliance III. Department Responsibilities for Asbestos A. EHS (Safety Specialist Staff) B. EHS (Asbestos

More information

6. ENGINEERING SYSTEMS REQUIREMENTS F20 SELECTIVE BUILDING DEMOLITION

6. ENGINEERING SYSTEMS REQUIREMENTS F20 SELECTIVE BUILDING DEMOLITION 6. ENGINEERING SYSTEMS REQUIREMENTS F20 SELECTIVE BUILDING DEMOLITION SYSTEMS REQUIREMENTS SELECTIVE BUILDING DEMOLITION TEMPLATE 02/18 Instructions for using this template: There are template files for

More information