Using Composite Materials to Reinforce Onshore Pipelines: New Insights and Lessons Learned

Size: px
Start display at page:

Download "Using Composite Materials to Reinforce Onshore Pipelines: New Insights and Lessons Learned"

Transcription

1 Evaluation, Repair and Rehabilitation of Pipelines Conference and Exhibition October 31-November 3, 2011 Houston Marriott West Loop, Houston, Texas, USA Using Composite Materials to Reinforce Onshore Pipelines: New Insights and Lessons Learned Chris Alexander Stress Engineering Services, Inc. Houston, Texas Julian Bedoya Stress Engineering Services, Inc. Houston, Texas ABSTRACT A significant amount of knowledge has been gained in studying the performance of composite materials used to repair high pressure gas and liquid pipelines. Much of this work has been sponsored and funded by the composite manufacturers, as well as the Pipeline Research Council International, Inc. In particular, PRCI is currently cosponsoring seven programs focused specifically on composite materials. Initial efforts focused on repairing corrosion; however, as confidence in composite repair technology improved the pipeline industry showed greater interest in expanding its usage to repair and reinforce other anomalies. The repair of dents and mechanical damage was evaluated through research efforts and the results showed significant promise. The reinforcement of other features such as wrinkle bends, branch connections, and corrosion in bends have also been evaluated. In this paper the authors provide results and insights associated with several current research programs, as well as providing information on evaluating the design of composite repair systems for long-term service. The ongoing focus of these efforts has been to demonstrate to industry via full-scale testing the capabilities that composite repair systems have to provide long-term reinforcement to damaged pipelines. INTRODUCTION At the core of proving the worthiness of composite repair systems is full-scale testing, where damage is recreated and loading is generated to simulate actual real-world loading conditions. These real-world conditions include, but are not limited to, static and cyclic internal pressure, axial tension and bending loads, and exposure to environmental conditions. These efforts are essential to establish the long-term viability of composite repair systems. As the pipeline industry continues to expand the use of composite materials beyond repairing corrosion, full-scale validation becomes even more important. The purpose of this paper is to provide a high-level overview of recent testing and analysis to evaluate the performance of composite repair systems, including testing methods, results, and implications. The following assessments are discussed in this paper: Pressure cycle testing of corroded pipes Composite reinforcement (inter-layer strain distribution), including discussion on long-term design including ASME PCC-2 philosophy Wrinkle bend tension testing and composite reinforcement Upcoming research programs o Girth weld study (tension and bending) o Subsea composite reinforcement of corroded pipes (pressure, tension, and bending) Also included is a discussion on performing a risk analysis for composite repair using the elements included in Paragraph 1.3 of ASME PCC-2 Part 4. Finally, a Closing Comments section provides comments for the reader in relation to how composite materials can and will be used to ensure the long-term integrity of identified pipeline anomalies.

2 TESTING EFFORTS This section of the paper provides details on prior and ongoing studies developed to evaluate the performance of composite materials. One of techniques employed by the authors involves the use of strain gages installed on the damage test pipes beneath the composite reinforcement. The reason for acquiring strain measurements beneath the composite materials is to evaluate the level of reinforcement that they provide, with a specific interest in determining if the strain in the pipe remains within an acceptable level. Although there is no designated acceptable strain level in a composite reinforced pipe section, it is possible to utilize strain measurements to assess the long-term viability and performance of the repair. Fundamentally, the success of a composite repair is related to its ability to ensure that the damaged section of pipe is able to function per its required service conditions. In addition to evaluating the integrity of the reinforced pipe material via strain gages installed on the pipe, it is also possible to measure strains within the composite material itself. The benefit associated with this technique is that the stress in the composite material can be measured, which can then be compared to an allowable design stress. In contrast to the absence of strain limits for composite-reinforced steel, there are allowable design stresses (and strains) for composite materials based on the requirements designated in ASME PCC-2, Repair of Pressure Equipment and Piping. For purposes of this discussion, the stress limit will correspond to the long-term design stress designated in ASME PCC-2. Pressure cycle testing of corroded pipes While burst testing test pipes having simulated corrosion is the backbone of any composite assessment program, an equally important testing effort involves pressure cycling. Over the course of several years, pressure cycle testing was conducted on inch x inch, Grade X42 pipe samples having 75% deep corrosion that were pressure cycled with a range equal to 36% SMYS. Refer to the schematic provided in Figure 1 for details on the test sample. As of the current time, eight different composite repair systems have been tested. Fatigue life results are provided below for the tested systems, with the minimum and maximum values noted. E-glass system: 19,411 cycles to failure (MIN) E-glass system: 32,848 cycles to failure E-glass system: 129,406 cycles to failure E-glass system: 140,164 cycles to failure E-glass system: 165,127 cycles to failure Carbon system (Pipe #1): 212,888 cycles to failure Carbon system (Pipe #2): 256,344 cycles to failure Carbon system (Pipe #3): 202,903 cycles to failure E-glass system: 259,537 cycles to failure Carbon system (Pipe #4): 532,776 cycles (run out, no failure) Hybrid steel/e-glass system: 767,816 cycles to failure (MAX) Figure 2 and Figure 3 show hoop strain as functions of cyclic pressure and cycle number for one of the corroded fatigue test samples (the E-glass system that achieved 259,537 cycles to failure), respectively. Of particular note in Figure 3 is the change in strain range and maximum strain that occur as functions of cycle number. As observed, the maximum strain increases with increasing cycle number, while the strain range remains relatively constant over the period of measurement, which for this case happened to be almost 100,000 cycles. The tests associated with this particular effort are critically important for evaluating the overall integrity of composite repair systems. To convert the above fatigue failure data into a meaningful design condition, it is recommended that the experimental data be divided by a value between 10 and 20. For the system having minimum performance, the design fatigue life at 36% SMYS ranges between 1,000 and 2,000 cycles (i.e. approximately 20,000 cycles to failure divided by 10 or 20), while for the maximum fatigue life the design fatigue life is between 38,000 and 76,000 cycles. In terms of applying these results to an actual pipeline, once the number of annual pressure cycles is obtained for a given system the calculation is relatively simple. For example, if a liquid pipeline experienced 2,000 cycles at a pressure range of 36% SMYS, the design life for the 38,000 cycle condition is 19 years. Composite reinforcement (inter-layer strain distribution) When designing a composite repair system for long-term service, it is essential that the magnitude of stresses in the composite material not exceed a designated level (i.e. long-term design stress). ASME PCC-2 provides a means for determining the long-term design stress based on using results from either 1,000 hour or 10,000 hour pressurized pipe samples. Until relatively recently there has been no attempt to actually quantify at a designated pressure level, the hoop stresses in the composite material of a repair used to reinforce a corroded section of the pipe. This section of the paper provides the reader with data acquired from two different composite repair test samples. Strain gages were installed within the composite repair system (i.e. on layers as they were installed around the pipe) to measure strains within the repair. This approach reduces the guesswork associated with trying to determine actual

3 stresses in the composite material during pressurization of the pipe. For composite materials, and purposes of this discussion, stress is the product of strain and elastic modulus for the composite. It is necessary to measured via mechanical testing the elastic modulus in order for this calculation to be made. It is the authors opinion that this type of testing is essential to ensure that composite materials are not overstressed. Without measurements of these types there is no assurance that the repair materials are not overstressed, as overstressing could lead to failure of the material. Equally important, when composite reinforcement materials are overstressed their ability to provide the required reinforcement to damaged sections of pipe is reduced. Tests were conducted on two different composite repair systems, both of which used E-glass fibers. The objectives in testing were two-fold. The first was to determine the actual distribution of strain in the layers of the composite reinforcement; specifically, determining which layers carried the greatest percentage of the load. The second objective was to measure the maximum strain in the composite material for comparison to the ASME PCC-2 longterm design stress (determine by a 1,000 hour test for both of the tested systems). Figure 4 and Figure 5 plot hoop strain in the composite materials at 72% SMYS for Systems #1 and #2 as a function of radial position, respectively. Figure 6 plots hoop stress as a function of internal pressure using data collected during testing for System #2. Included in this plot are average hoop strain data collected for 12 composite repair systems participating in the Pipeline Research Council International, Inc. (PRCI) MATR-3-4 long-term composite reinforcement study. Table 1 presents a summary of data for both systems measured at 72% SMYS, along with a comparison of the measured stresses to the respective long-term design stresses. Table 1 Comparison of Measured Stresses to PCC-2 Design Stresses Stress Value Calculation System #1 System #2 Variable (t comp = 0.76 inches) (t comp = 0.63 inches) Mean Tensile Stress (based on short-term tensile testing) A 51,700 psi 72,088 psi Long-term Design Stress, S lt (based on PCC-2 Appendix V testing) B 20,369 psi 23,836 psi Allowable Stress (based on short-term tensile testing) C 10,184 psi 11,918 psi Maximum stress in composite (based on measured strain values) D 4,806 psi 9,438 psi Maximum measured strain in steel (75% corroded region) 2,976 με 3,125 με Resulting Design Margins Mean Tensile Stress vs. Allowable Stress (A/C) Mean Tensile Stress vs. Maximum Stress (A/D) Usage factor (percentage of allowable, D/C) 47% 79% Note: 10,000 microstrain (με) equals 1 percent strain. As a point of reference in referencing the pressure cycle data previously discussed, System #1 achieved 140,164 cycles to failure, while Sample #2 was cycled 259,537 times before a failure occurred. Also, both of these systems ensured that strains in the corroded region of the pipe were limited to approximately 0.3 percent when the test sample was pressurized to 72% SMYS. One of the most important observations made in reviewing the data presented in Table 1 is the relatively large design margin that exists for both systems, especially in relation to the short-term tensile strength. When comparing the measured stresses in System #1 and #2, the ratios of mean tensile strength to maximum stress for the composite materials are 10.8 and 7.6, respectively. If we consider the average stresses in the composite based on the strain gage results, as opposed to the maximum stress that is reported in Table 1, the design margins are even larger. The significance of these design margins should not be understated. In order for a composite material to provide longterm reinforcement, it is essential that stresses in the composite material and reinforced steel are kept to a minimum. Wrinkle bend tension testing and composite reinforcement It is recognized throughout the transmission pipeline industry that failures in wrinkle bends have occurred. While identifying the causes and contributors to wrinkle bend failures are the subjects of several ongoing studies, in 2010 six full-scale tests were conducted to evaluate the performance of wrinkle bends, including the assessment of composite materials (3 sets with each set having one reinforced and one unreinforced test sample). Figure 7 and Figure 8 are photographs showing the test set-up and composite installation, respectively.

4 Of the three sets of tests that were performed, results are presented in this paper for one set of wrinkle bends fabricated from 26-inch x inch, Grade X52 pipe material. The test effort included the installation of strain gages near the wrinkle bends to monitor strain during testing. Internal pressure was held constant, while axial tension loads were increased until failure occurred in the pipe material or a plastic collapse condition (i.e. unbounded displacements with minimum increases in loading) was observed via the strain gage readings. Prior to testing, SES contracted services to measure the geometry using an optical mapping tool (results not included in this paper). One of the test samples was reinforced using Armor Plate Pipe Wrap, while the other sample was tested without reinforcement. Of particular note in this study was corrosion that was present near the wrinkle bends. Although difficult to measure due to the presence of the wrinkles, pitting on the order of 30% of the pipe s nominal wall was detected in both the unreinforced and reinforced test samples. The wrinkle bend severity ratios, h/l, were measured to be and for the unreinforced and reinforced samples, respectively. During the test, an internal pressure of 900 psi was applied to the sample and held constant while an axial tension load was applied to the samples. The unrepaired sample failed by leaking at a combined load of 1,527 kips, while the repaired sample failed by rupture at a combined load of 1,815 kips. The unrepaired sample developed a leak in the corroded region near a wrinkle bend. Figure 9 plots axial strain as a function of axial tension loading. Provided below are several noteworthy observations made in reviewing the data plotted in Figure 9 that was generated during the course of this study. At an axial stress of 36% SMYS (455 kips), the following strains were measured (where 10,000 microstrain, με, equals 1% strain): o Base pipe without wrinkle bend (calculated): 593 με o Unreinforced wrinkle bend (h/l = 0.123): -3,508 με o Reinforced wrinkle bend (h/l = 0.137): -1,611 με While the reduction in strain provided by the composite material is critically important, it should also be noted that the composite material increased the ultimate load capacity of the pipe having wrinkle bends. Corrosion pitting in both samples was on the order of 30%, yet the composite-reinforced sample increased the tensile capacity to achieve a stress level in the base pipe on the order 71 ksi (i.e. 1,815 kips / [π 26 inches x inches]). This stress level is in excess of the minimum tensile strength of the Grade X52 pipe material (i.e. 66 ksi) assuming that no corrosion is present. Because the fractures that typically develop in wrinkle bends are circumferentially-oriented, any composite reinforcement must be able to provide significant levels of axial reinforcement. The Armor Plate Pipe Wrap system uses E-glass material with a tensile strength and elastic modulus of 72 ksi and 4.4 Msi. To be effective, 50% of the composite material was oriented in the axial direction. One reason for the success of this particular system, as demonstrated in this particular test program, are the relatively high strength and stiffness values. The length of the composite repair is extremely important. As part of the composite design, calculations should be made to ensure that the calculated product of the repair area (π x pipe diameter x repair length) and the adhesives lap shear strength are sufficient. Any repair where axial reinforcement is required should consider this issue, including the reinforcement of wrinkle bends and girth welds. Upcoming research programs The backbone of knowledge that has been acquired over the past decade is the result of significant financial sponsorship contributions provided by the pipeline operators (primarily via the Pipeline Research Council International, Inc.) and the composite manufacturers. Since 2006 more than $5 million have been invested in the assessment and evaluation of composite repair materials via full-scale testing programs. In coordination with prior research efforts, several upcoming programs are being sponsored by PRCI and the composite repair manufacturers. A brief discussion on each program is provided below. Girth weld study (tension and bending) This program, known as PRCI MATR-3-7, is being co-sponsored by PRCI and five composite manufacturers. The purpose of this program is to evaluate the use of composite materials to reinforce pipelines having vintage girth welds that do not meet workmanship criteria. Figure 10 provides the geometry for girth weld test samples, including the location of the installed strain gages. Listed below are the companies participating in the current study: Armor Plate o E-glass system o Carbon System Air Logistics Citadel Pipe Wrap, LLC Western Specialties The purpose of this program is to shore up knowledge gaps associated with the following subjects:

5 Design to account for adhesive shear strength Effects of composite stiffness (i.e. modulus and thickness) Design to account for bending loads Reduction in pipe strain due to reinforcement. Full-scale destructive testing will be conducted involving the following sample types: Girth weld subjected to pressure and tension loads (unreinforced) Girth weld subjected to pressure, tension, and bending loads (unreinforced) Girth weld subjected to pressure and tension loads (reinforced) Girth weld subjected to pressure and tension loads (reinforced with reduced bonding area where packing tape is installed on the outside surface of the pipe to simulate areas of reduced bonding) Girth weld subjected to pressure, tension, and bending loads (reinforced) It is expected that this program will be completed by the end of Subsea composite reinforcement of corroded pipes (pressure, tension, and bending) Like the MATR-3-7 girth weld study, another program (PRCI MATR-3-6) is underway to evaluate the performance of composite materials in reinforcing corroded subsea pipelines and risers. However, one element integrated into this particular study involves evaluating the long-term performance of composite repair systems in a seawater environment. Test samples will be placed in a seawater test facility for 10,000 hours and then removed for destructive testing. Figure 11 is a schematic diagram showing the proposed test facility. In this program the repaired test samples will be pressurized for the duration of the 10,000 hour period, with periodic pressure cycling. The composite repairs will be performed underwater. Listed below are the companies participating in the current study: Armor Plate o E-glass system o Carbon System Air Logistics Neptune Research Walker Technical Resources RISK ANALYSIS As more sophisticated methods are being employed by pipeline operators in managing integrity, performing risk analyses has become an important part of the process. The use of composite materials has become an important part of many company s integrity management programs, so a discussion on conducting a proper risk analysis is warranted. Actually conducting a risk analysis has occurred on a limited basis based on the authors experience, although the ASME PCC-2 provides a comprehensive list of items that can be used. Provided in Paragraph 1.3 of Article 4.1 of ASME PCC-2 are guidelines for performing a risk analysis on a composite repair. Provided below is the text from this document. An assessment of the risks associated with the defect and repair method shall be completed in line with the relevant industry best practice. When applying a Repair System in accordance with this Article the following items shall be considered: (a) assessment of the nature and location of the defects (b) design and operating conditions for the pipe and contents (including pressure, temperature, sizes, and combinations thereof) (c) repair life (see para. 1.4) (d) geometry of the pipe being repaired (e) hazards associated with system service (f) the availability of the personnel with the necessary skills (g) the ease with which it is practicable to execute surface preparation operations (h) performance under upset and major incident situations including impact, abrasion, fire, explosion, collision, and environmental loading (i) failure modes (j) inspectability (k) the Repair System materials The information and data describing any hazards shall be included in the method statement (para.4.4) to be used on site.

6 The application of these Repair Systems will typically change the mode of failure from rupture to a leak; the consequences of failure will therefore be reduced. A repair applied in accordance with this Article will also reduce the probability of failure. As noted in (c) above, Paragraph 1.4 is referenced; the associated text is provided below. The repair life is the useful service period of the Repair System, as defined by the design assessment. This may be limited by the defect type and service conditions (e.g., internal corrosion). The repair life will depend on the Repair System. Also referenced in Paragraph 1.3 is Paragraph 4.4, Method Statements. Listed below are the tasks covered by this particular method statements Health and Safety Repair Design Repair Application Quality Assurance Environmental The intent in conducting a risk analysis based on the guidelines provided in ASME PCC-2 is to provide operators with pertinent information related to each item to ensure that an optimum repair solution is developed. For those areas where a greater perceived risk is identified, measures should be taken to either minimize this risk, or eliminate it altogether. An extension of the risk analysis effort involves the execution of a Failure Modes and Effects Analysis (FMEA). An indepth discussion on performing an FMEA is outside the scope of this study; however, provided a formal definition of FMEA is provided as follow. A failure modes and effects analysis (FMEA) is a procedure in product development and operations management for analysis of potential failure modes within a system for classification by the severity and likelihood of the failures. A successful FMEA activity helps a team to identify potential failure modes based on past experience with similar products or processes, enabling the team to design those failures out of the system with the minimum of effort and resource expenditure, thereby reducing development time and costs. It is widely used in manufacturing industries in various phases of the product life cycle and is now increasingly finding use in the service industry. Failure modes are any errors or defects in a process, design, or item, especially those that affect the customer, and can be potential or actual. Effects analysis refers to studying the consequences of those failures. 1 By conducting an FMEA, a user of composite repair materials is in a position to actually quantify the risk associated with a given installation. Quantifying risk is achieved by assigning to each identified risk a numerical value associated with the occurrence, severity, and likelihood of detection. The product of these three numbers is known as the Risk Priority Number (RPN). Provided in Table 2 is a Failure Modes and Effects Analysis Worksheet that includes the factors of interest and their associated risk factors. As an example, the authors have provided a list of RPNs based on an assessment conduced for an operator in evaluating the repair of a given corrosion defect in a process piping facility. The following FMEA risk ranking was determined as presented by the data in Table 2. Included in the following list are the calculated RPN values; the product of the Occurrence, Severity, and Detection values: (RPN = O x S x D). Adhesive bond failure RPN = 360 Insufficient number of axial fibers RPN = 200 Composite degradation due to high temperatures RPN = 108 Outer layer degradation RPN = 60 Composite material thickness insufficient RPN = 54 As seen in the above listing, the adhesive bond failure is the primary concern for this particular installation. As a result, the operator was encouraged to take all steps necessary and reasonable to achieve the best bond possible. This example provides a clear demonstration in how operators and composite manufacturers can work together to minimize risk by determining the steps required to design and install an optimized composite repair system. The benefit in conducting the FMEA is that the Risk Priority Numbers help determine the order of focus and concern, thus reducing a subjective-based decision making that might result. 1 Information obtained from

7 CLOSING COMMENTS The use of composite materials has had a profound impact on the integrity management programs of most pipeline companies. Early efforts dating back to the mid-1990s focused on using composite materials for the repair of corrosion defects; however, over time the use of composite materials has evolved into the reinforcement of pipeline anomalies/features including dents, girth welds, wrinkle bends, branch connections, and seam weld defects. The key to achieving confidence in the composite repair solution has been the use of full-scale destructive testing, in conjunction with designing repairs using sound engineering principles based on design documents like ASME PCC-2. This paper has provided for the reader an overview of recent activities associated with the assessment of composite repair solutions. As new composite materials are brought to market, and improved confidence in composite performance is achieved, it is envisioned that greater uses of composite materials for repairing damaged high pressure transmission pipelines using full-scale testing will occur. REFERENCES 1. American Society of Mechanical Engineers, Liquid Transportation System for Hydrocarbons, Liquid Petroleum Gas, Anhydrous Ammonia and Alcohols, ASME B31.4, New York, New York, 2003 edition. 2. American Society of Mechanical Engineers, Gas Transmission and Distribution Piping Systems, ASME B31.8, New York, New York, 2003 edition. 3. American Society of Mechanical Engineers, Manual for Determining the Remaining Strength of Corroded Pipelines, ASME B31G-1991, New York, New York, 1991 edition. 4. Design, Construction, Operation, and Maintenance of Offshore Hydrocarbon Pipelines (Limit State Design) API Recommended Practice 1111, Third Edition, American Petroleum Institute, Washington, D. C., July American Society of Mechanical Engineers, Rules for Construction of Pressure Vessels, Section VIII, Division 2 - Alternative Rules, New York, New York, 2004 edition. 6. Fawley, N. C., Development of Fiberglass Composite Systems for Natural Gas Pipeline Service, Final Report prepared for the Gas Research Institute, GRI-95/0072, March Stephens, D. R. and Kilinski, T. J., Field Validation of Composite Repair of Gas Transmission Pipelines, Final Report to the Gas Research Institute, Chicago, Illinois, GRI-98/0032, April Kuhlman, C. J., Lindholm, U. S., Stephens, D. R., Kilinski, T. J., and Francini, R. B., Long-Term Reliability of Gas Pipeline Repairs by Reinforced Composites, Final Report to the Gas Research Institute, Chicago, Illinois, GRI-95/0071, December Alexander, C. R., Pitts, D. A., Evaluation of the Aquawrap TM System in Repairing Mechanically-damaged Pipes, Report prepared for Air Logistics Corporation, Azusa, California, September Worth, F., Analysis of Aquawrap for use in Repairing Damaged Pipeline: Environmental Exposure Conditions, Property Testing Procedures, and Field Testing Evaluations, Report prepared for Air Logistics Corporation, Azusa, California, September 28, Pipeline Safety: Gas and Hazardous Liquid pipeline Repair, Federal Register, Vol. 64, No. 239, Tuesday, December 14, 1999, Rules and Regulations, Department of Transportation, Research and Special Programs Administration, Docket No. RSPA ; Amdt ; (Effective date: January 13, 2000). 12. STP-PT Design Factor Guidelines for High-Pressure Composite Hydrogen Tanks, American Society of Mechanical Engineers, New York, New York, ASTM D2992, Standard Practice for Obtaining Hydrostatic or Pressure Design Basis for Fiberglass (Glass-Fiber- Reinforced Thermosetting-Resin) Pipe and Fittings, ASTM International, Alexander, C., Cercone, L., and Lockwood, J., (June 2008), Development of a Carbon-Fiber Composite Repair System for Offshore Risers, Paper No. OMAE , The 27th International Conference on Offshore Mechanics and Arctic Engineering, June 15-20, 2008, Estoril, Portugal. 15. ANSI/ASME PCC , Repair of Pressure Equipment and Piping, American Society of Mechanical Engineers, New York, American Society of Mechanical Engineers, ASME Boiler and Pressure Vessel Code, Section VIII, Division 3: Alternative Rules for Construction of High Pressure Vessels, New York, New York, 2004 edition 17. Biel, R.C., and Alexander, C.R.; Applications of Limit Load Analyses to Assess the Structural Integrity of Pressure Vessels, PVP , ASME, Denver, CO, July API 5L, Specification for Line Pipe, 43rd Edition, American Petroleum Institute, Washington, D.C., March American Society of Mechanical Engineers, ASME Post Construction SC-Repair & Testing, PCC-2, Repair Standard, Article 4.1, Non-metallic Composite Repair Systems for Pipelines and Pipework: High Risk Applications, New York, New York, 2007 edition. 20. Alexander, C., and Kulkarni, S., Evaluating the Effects of Wrinkle Bends on Pipeline Integrity, Proceedings of IPC2008 (Paper No. IPC ), 7th International Pipeline Conference, September 29-October 3, 2008, Calgary, Alberta, Canada.

8 8 feet (center machined area on sample) 8 inches long 0.75-inch radius (at least) Break corners (all around) inches 75% corrosion: remaining wall of inches NOTE: Perform all machining 180 degrees from longitudinal ERW seam. 6 inches Note uniform wall in machined region Measure wall thickness at 9 locations in the machined area using a UT meter. Details on machining (machined area is 8 inches long by 6 inches wide) 1 Gage #4 on repair 2 3 Location of strain gages installed on the test sample Photograph of strain gages installed in the machined corrosion region Figure 1 Layout for 75% corrosion in inch x inch, Grade X42 pipe

9 2000 Hoop Strain as a Function of Cyclic Pressure Pressre cycle test of inch x inch, Grade X42 pipe w ith 75 % corrosion. Pressure cycling at 1,000 cycles betw een 36% and 72% SMYS (890 psi to 1,780 psi). Cyclic Pressure (psi) Gage #1 (beneath repair: center) Gage #2 (beneath repair: 2" offset) Gage #3 (base pipe outside repair) Gage #4 (outside composite) Hoop Strain (microstrain) (10,000 microstrain is equal to 1 percent strain) Figure 2 Hoop strain as a function of cyclic pressure for corroded fatigue test sample Hoop Strain Beneath Repair (microstrain, 10,000 µe = 1 percent) Strain as a Function of Cycle Number Fatigue test of inch x inch, Grade X42 pipe with 75 % corrosion cycled from 890 to 1,780 psi (72% SMYS) with inches of the composite material.. Maximum Strain Strain Range Cycle Number Figure 3 Hoop strain as a function of cycle number for corroded fatigue test sample

10 Hoop Stress (psi) Hoop Stress th Layer 8th Layer 12th Layer 16th Layer 20th Layer 24th Layer 28th Layer 32nd Layer 36th Layer (outside) Radial Position Figure 4 Hoop Strain at 72% SMYS as a Function of Radial Position for System #1 (Hoop stress calculated as the product of the measured strain and the composite s elastic modulus) Hoop Stress (psi) nd layer 4th layer 6th layer 8th layer 10th layer (outside) Radial Position Figure 5 Hoop Strain at 72% SMYS as a Function of Radial Position for System #2 (Hoop stress calculated as the product of the measured strain and the composite s elastic modulus)

11 4,000 Burst test of inch x inch, Grade X42 pipe with 75 % Corrosion with Gages #1 and #2 beneath 0.63-inch repair on steel. Failure at 3,936 psi (1.59 times SMYS pressure of 2,470 psi). Failure pressure of 3,936 psi 3,500 3,000 Internal Pressure (psi) 2,500 2,000 1,500 1,000 SMYS, ε max = 5,397 εμ MAOP, ε max = 3,215 εμ E-Glass Material Only PRCI average measured strain values for 75% corrosion MAOP 4,497 με SMYS 5,692 με MAOP min 2,667 με MAOP pressure of 1,778 psi SMYS Pressure of 2,470 psi MAOP max 8,852 με SMYS min 3,185 με SMYS max 8,472 με (actually higher, gage failed) Hoop (Under Repair) 2 Hoop (Under Repair 2" Offset) 3 Hoop (Base Pipe) 4 Hoop (On Top of Repair) 0 0 2,000 4,000 6,000 8,000 10,000 12,000 Hoop Strain (microstrain) (10,000 microstrain is equal to 1 percent strain) Figure 6 Measurement of strain in 75% corroded region for System #2 End view of 6 million lbs load frame Figure 7 Photographs showing testing set-up for wrinkle bend testing

12 Figure 8 Photographs showing installation of composite materials on wrinkle bend samples Axial Strain versus Tension Load 26-inch x inch, Grade X52 pipe having wrinkle bends with strain gages installed on pipe and monitoring during tension loading with pressure of 900 psi during testing (455 kips pressure end load) Sample ruptured by tension Tension Load (kips) Repaired Sample leaked -16,646 με -7,300 με Unrepaired Failure Loads Unrepaired: 1.27 million lbs Repaired: 1.81 million lbs Unrepaired, Gage #5 (Wrinkle Top) Unrepaired, Gage #6 (1.5 inches from Top) Gage #19 (Base Pipe of Repaired Sample) Repaired, Gage #4 (Wrinkle Top) Repaired, Gage #3 (1.5 inches from Top) Axial Strain (microstrain) (10,000 microstrain eqials 1% strain) Figure 9 Axial tension versus strain for the reinforced and unreinforced wrinkle bend test samples (The Tension Load is the sum of tension loading from the load frame and the end load due to internal pressure)

13 96-inches ACME Threaded End Caps SG: ½, 2, & 6 from toe of GW Composite repair location zone Girth weld Strain gage locations on pipe Strain gage locations on repair Figure 10 Geometry for girth weld test samples 15-feet (wide) 5-feet wide (deck) 6-inch wide (lip) 25.5-feet (length) Plan View of Pool 6-inch lip Rock waterfall feature end (not shown on figure) OPTION for pit cover: (6 high x 6 wide) 6 inch reinforced concrete / threaded anchors 30 pipe samples (will hang from 6-inch wide lip) Pit cover (option if no building is built) Installation Bay (4-ft water depth) Test Bay (8-ft water depth) Soil included to show basic layout (slope concrete as required beneath bottom of pool) 6 inch reinforced concrete thick wall 10 feet 15 feet Elevation View of Pool (cross-sectional side view) Figure 11 Test set-up for the subsea composite study

14 Table 2 Failure Modes and Effects Analysis Worksheet Potential Failure Mode Adhesive bond failure Composite material thickness insufficient Outer layer degradation Insufficient number of axial fibers Composite degradation due to high temperatures Potential Effects of Failure Failure to provide axial reinforcement Potential for burst failure Chalky outer surface, moisture ingression Insufficient axial reinforcement Loss of reinforcement Potential Cause(s) Poor surface preparation / Uncured adhesive Incorrect calculations and/or poor installation Insufficient or absent external coating O (occurrence rating) S (severity rating) D (detection rating) RPN (risk priority number) Poor design Improper material selection, operating beyond resin capacity Recommended Actions After ensuring that a sufficient amount of composite material has been installed based on the designated corrosion level, this is the most important facet of the repair. Keys to success are good surface preparation and ensuring the adhesive has cured. The key is to ensure that corrosion does NOT develop beneath the repair. This is rarely an issue as most manufacturers have calculators that determine the required composite thickness. However, post-installation inspection is critical. Most manufacturers recommend that the outer surface be coated or painted if the pipe is to be exposed to UV. This is even more important offshore. Because most repairs focus on hoop reinforcement, axial reinforcement is often neglected. The operator should ensure that adequate axial reinforcement is present. Operators should insist that manufacturers provide material strength data as a function of temperature. Idealistically, it would be good to see full-scale test data at elevated temperatures.

OTC Copyright 2012, Offshore Technology Conference

OTC Copyright 2012, Offshore Technology Conference OTC 23164 Design of an Optimized Composite Repair System for Offshore Risers Using Integrated Analysis and Testing Techniques Chris Alexander, Stress Engineering Services, Inc. Copyright 2012, Offshore

More information

Recent Advances in Evaluating Composite Repair Technology Used to Repair Transmission Pipelines

Recent Advances in Evaluating Composite Repair Technology Used to Repair Transmission Pipelines Recent Advances in Evaluating Composite Repair Technology Used to Repair Transmission Pipelines Dr. Chris Alexander Stress Engineering Services, Inc. ABSTRACT For the better part of the past 20 years,

More information

ADVANCES IN THE REPAIR OF PIPELINES USING COMPOSITE MATERIALS. Dr. Chris Alexander Stress Engineering Services, Inc.

ADVANCES IN THE REPAIR OF PIPELINES USING COMPOSITE MATERIALS. Dr. Chris Alexander Stress Engineering Services, Inc. ADVANCES IN THE REPAIR OF PIPELINES USING COMPOSITE MATERIALS Dr. Chris Alexander Stress Engineering Services, Inc. ABSTRACT For almost 20 years composite materials have been used to repair and reinforce

More information

2011 First Annual Composite Repair Users Group Workshop

2011 First Annual Composite Repair Users Group Workshop 2011 First Annual Composite Repair Users Group Workshop Meeting held at Stress Engineering Services, Inc. (Houston, Texas) Thursday, September 8, 2011 Presentation by Chris Alexander First Annual Workshop

More information

Composite Repair Performance at Elevated Temperatures

Composite Repair Performance at Elevated Temperatures 8 th Pipeline Technology Conference March 18 20, 2013 Hannover, Germany Composite Repair Performance at Elevated Temperatures James Souza Presenter Pipe Wrap, LLC Houston, Texas U.S.A. Casey Whalen Pipe

More information

REINFORCING FIELD FABRICATED BRANCH CONNECTIONS USING COMPOSITE MATERIALS

REINFORCING FIELD FABRICATED BRANCH CONNECTIONS USING COMPOSITE MATERIALS Proceedings of IPC2006 6th International Pipeline Conference September 25-29, 2006, Calgary, Alberta, Canada IPC2006-10483 REINFORCING FIELD FABRICATED BRANCH CONNECTIONS USING COMPOSITE MATERIALS Chris

More information

PVP COMPOSITE REPAIR PERFORMANCE AT ELEVATED TEMPERATURES

PVP COMPOSITE REPAIR PERFORMANCE AT ELEVATED TEMPERATURES Proceedings of the ASME 2014 Pressure Vessels & Piping Conference PVP2014 July 20-24, 2014, Anaheim, California, USA PVP2014-28255 COMPOSITE REPAIR PERFORMANCE AT ELEVATED TEMPERATURES Chris Alexander

More information

For almost 20 years, composite

For almost 20 years, composite As seen in the issue of Assessing the state of composite repair systems With improved innovations and technology, the pipeline industry will benefit from the continued development of composite materials.

More information

REINFORCING LARGE DIAMETER ELBOWS USING COMPOSITE MATERIALS SUBJECTED TO EXTREME BENDING AND INTERNAL PRESSURE LOADING

REINFORCING LARGE DIAMETER ELBOWS USING COMPOSITE MATERIALS SUBJECTED TO EXTREME BENDING AND INTERNAL PRESSURE LOADING Proceedings of the 2016 11th International Pipeline Conference IPC2016 September 26-30, 2016, Calgary, Alberta, Canada IPC2016-64311 REINFORCING LARGE DIAMETER ELBOWS USING COMPOSITE MATERIALS SUBJECTED

More information

Composite Repairs Past, Present, and Future Composite Repair Users Group Quarterly Meeting (Houston, Texas) Wednesday, December 11, 2013

Composite Repairs Past, Present, and Future Composite Repair Users Group Quarterly Meeting (Houston, Texas) Wednesday, December 11, 2013 Composite Repairs Past, Present, and Future Composite Repair Users Group Quarterly Meeting (Houston, Texas) Wednesday, December 11, 2013 Presentation by Chris Alexander Today s Presentation State of the

More information

Evaluation of the CompsiSleeve TM Pipeline Repair System

Evaluation of the CompsiSleeve TM Pipeline Repair System Evaluation of the CompsiSleeve TM Pipeline Repair System PN1151033CRA Prepared for LMC Industrial Contractors, Inc. Avon, New York June 2011 Stress Engineering Services, Inc. Houston, Texas Evaluation

More information

HYBRID COMPOSITE REPAIR for OFFSHORE RISERS

HYBRID COMPOSITE REPAIR for OFFSHORE RISERS HYBRID COMPOSITE REPAIR for OFFSHORE RISERS O. O. Ochoa and C. Alexander Mechanical Engineering Texas A&M University College Station, TX 77840 oochoa@tamu.edu SUMMARY An innovative design based on integrated

More information

INTENTIONAL DESTRUCTIVE TESTING: A MEANS FOR ESTABLISHING MECHANICAL INTEGRITY IN PLANTS, FACILITIES, AND PIPELINES

INTENTIONAL DESTRUCTIVE TESTING: A MEANS FOR ESTABLISHING MECHANICAL INTEGRITY IN PLANTS, FACILITIES, AND PIPELINES Proceedings of the ASME 2014 Pressure Vessels & Piping Conference PVP2014 July 20-24, 2014, Anaheim, California, USA PVP2014-28226 INTENTIONAL DESTRUCTIVE TESTING: A MEANS FOR ESTABLISHING MECHANICAL INTEGRITY

More information

FINITE ELEMENT ANALYSIS OF COMPOSITE REPAIRS WITH FULL-SCALE VALIDATION TESTING

FINITE ELEMENT ANALYSIS OF COMPOSITE REPAIRS WITH FULL-SCALE VALIDATION TESTING Proceedings of the 2016 11th International Pipeline Conference IPC2016 September 26-30, 2016, Calgary, Alberta, Canada IPC2016-64214 FINITE ELEMENT ANALYSIS OF COMPOSITE REPAIRS WITH FULL-SCALE VALIDATION

More information

STRAIN-BASED DESIGN METHODS FOR COMPOSITE REPAIR SYSTEMS

STRAIN-BASED DESIGN METHODS FOR COMPOSITE REPAIR SYSTEMS Proceedings of IPC2008 7th International Pipeline Conference September 29 October 3, 2008, Calgary, Alberta, Canada IPC2008-64076 STRAIN-BASED DESIGN METHODS FOR COMPOSITE REPAIR SYSTEMS Chris Alexander

More information

FINAL REPORT AIR LOGISTICS CORPORATION. Robert B. Francini and John F. Kiefner

FINAL REPORT AIR LOGISTICS CORPORATION. Robert B. Francini and John F. Kiefner Final Report No. 06-41 FINAL REPORT on EVALUATION OF THE AQUAWRAP COMPOSITE REPAIR SYSTEM to AIR LOGISTICS CORPORATION April 25, 2006 by Robert B. Francini and John F. Kiefner KIEFNER AND ASSOCIATES, INC.

More information

Guidelines for Using Composite Materials to Repair High Pressure Transmission. Prepared for. Dominion Energy. Project No.

Guidelines for Using Composite Materials to Repair High Pressure Transmission. Prepared for. Dominion Energy. Project No. Guidelines for Using Composite Materials to Repair High Pressure Transmission Prepared for Dominion Energy Project No. DOM-17-018 May 2018 Guidelines for Using Composite Materials to Repair High Pressure

More information

ASSESSING THE USE OF COMPOSITE MATERIALS IN RE-RATING LIQUID AND GAS TRANSMISSION PIPELINES

ASSESSING THE USE OF COMPOSITE MATERIALS IN RE-RATING LIQUID AND GAS TRANSMISSION PIPELINES ASSESSING THE USE OF COMPOSITE MATERIALS IN RE-RATING LIQUID AND GAS TRANSMISSION PIPELINES Christopher R. Alexander Stress Engineering Services, Inc. Houston, Texas Fred D. Wilson Armor Plate, Inc. Pasadena,

More information

Testing of Composite Pipe. Khalid Farrag, Ph.D., P.E. Gas Technology Institute, GTI

Testing of Composite Pipe. Khalid Farrag, Ph.D., P.E. Gas Technology Institute, GTI Testing of Composite Pipe Repair Systems CRUG 2013 Quarterly Meeting Khalid Farrag, Ph.D., P.E. Gas Technology Institute, GTI May 15, 2013 GTI at a Glance Not for profit research, with 65+ year history

More information

USE OF LIMIT ANALYSIS METHODS TO ASSESS THE STRUCTURAL CAPACITY OF SUBSEA SYSTEMS AND COMPONENTS

USE OF LIMIT ANALYSIS METHODS TO ASSESS THE STRUCTURAL CAPACITY OF SUBSEA SYSTEMS AND COMPONENTS Proceedings of Conference ASME International Offshore Pipeline Forum October 4-5, 006, Houston, Texas USA Paper No. IOPF006-010 USE OF LIMIT ANALYSIS METHODS TO ASSESS THE STRUCTURAL CAPACITY OF SUBSEA

More information

ANALYSIS, TESTING AND PROPOSED GUIDELINES FOR REPAIRING PIPELINES WITH COMPOSITE MATERIALS

ANALYSIS, TESTING AND PROPOSED GUIDELINES FOR REPAIRING PIPELINES WITH COMPOSITE MATERIALS c ANALYSIS, TESTING AND PROPOSED GUIDELINES FOR REPAIRING PIPELINES WITH COMPOSITE MATERIALS Christopher R. Alexander Stress Engineering Services, Inc. Houston, Texas Fred D. Wilson Aror Plate, Inc. Pasadena,

More information

Gas Transmission and Distribution Piping Systems

Gas Transmission and Distribution Piping Systems ASME B31.8-2007 (Revision of ASME B31.8-2003) Gas Transmission and Distribution Piping Systems ASME Code for Pressure Piping, B31 AN AMERICAN NATIONAL STANDARD Three Park Avenue New York, NY 10016 CONTENTS

More information

COMPOSITE USAGE IN THE PIPELINE INDUSTRY TAMMY BOMIA

COMPOSITE USAGE IN THE PIPELINE INDUSTRY TAMMY BOMIA COMPOSITE USAGE IN THE PIPELINE INDUSTRY TAMMY BOMIA OUTLINE What is a Composite Field Applied ARO Pipeline Integrity ASME PCC2, Article 4.1 Conclusion WHAT IS A COMPOSITE? Various Laminates FIBER-REINFORCED

More information

National Academy of Sciences

National Academy of Sciences National Academy of Sciences Transportation Research Board Study of Pipeline Transportation of Diluted Bitumen PHMSA Regulatory Authority and Keystone XL Pipeline October 23, 2012-1 - Topics for Briefing

More information

CONTENTS. Foreword... Committee Roster Introduction Summary of Changes

CONTENTS. Foreword... Committee Roster Introduction Summary of Changes CONTENTS Foreword.............................................................................. Committee Roster Introduction Summary of Changes General Provisions and Definitions 801 General... 1 802

More information

Advances In ILI Allow Assessing Unpiggable Pipelines. By Lisa Barkdull and Ian Smith, Quest Integrity Group, Houston

Advances In ILI Allow Assessing Unpiggable Pipelines. By Lisa Barkdull and Ian Smith, Quest Integrity Group, Houston As seen in Pipeline & Gas Journal, August 2011 edition Advances In ILI Allow Assessing Unpiggable Pipelines By Lisa Barkdull and Ian Smith, Quest Integrity Group, Houston Advances in in-line inspection

More information

Modelling thickness limits transition joints between pipes of different thickness

Modelling thickness limits transition joints between pipes of different thickness Institute of Materials Engineering TITLE: Modelling thickness limits transition joints between pipes of different thickness AUTHOR: Michael Law DATE OF REPORT: November 2008 APPROVED BY: W Payten ISSUED

More information

Structural Vessel Repairs Using Automated Weld Overlays

Structural Vessel Repairs Using Automated Weld Overlays Structural Vessel Repairs Using Automated Weld Overlays Mahmod Samman, Ph.D., P.E. mms@hes.us.com Houston Engineering Solutions, LLC Eric Williams George Gemmel ewilliams@cimsltd.com ggemmell@cimsltd.com

More information

GREEN THREAD Piping Systems

GREEN THREAD Piping Systems Bulletin No. A1300 February 15, 2006 SMITH FIBERCAST GREEN THREAD Piping Systems PRODUCT GREEN THREAD pipe is filament wound using an amine cured epoxy resin and fiberglass and has a resin-rich liner reinforced

More information

Abstract. 1.0 Introduction

Abstract. 1.0 Introduction Effects of Reeling on the Mechanical Properties of HFI Welded Pipes Dr. Scott McCann, David Evans and Adam Bannister, Corus Tubes, UK and Dr Hock Tan, Subsea 7 Abstract In the offshore oil and gas industry

More information

Gas Transmission and Distribution Piping Systems

Gas Transmission and Distribution Piping Systems ASME B31.8-2014 (Revision of ASME B31.8-2012) Gas Transmission and Distribution Piping Systems ASME Code for Pressure Piping, B31 AN INTERNATIONAL PIPING CODE ASME B31.8-2014 (Revision of ASME B31.8-2012)

More information

ASSESSING THE EFFECTS OF CORROSION ON THE MECHANICAL INTEGRITY OF A PIPELINE SUSPENSION BRIDGE

ASSESSING THE EFFECTS OF CORROSION ON THE MECHANICAL INTEGRITY OF A PIPELINE SUSPENSION BRIDGE ASSESSING THE EFFECTS OF CORROSION ON THE MECHANICAL INTEGRITY OF A PIPELINE SUSPENSION BRIDGE Chris Alexander Stress Engineering Services, Inc. Houston, Texas Henry Cartaya, P.E. Energistix, Inc. The

More information

GIRTH WELD FAILURE IN A LARGE DIAMETER GAS TRANSMISSION PIPELINE

GIRTH WELD FAILURE IN A LARGE DIAMETER GAS TRANSMISSION PIPELINE Proceedings of IPC2010 8th International Pipeline Conference September 27 October 1, 2010, Calgary, Alberta, Canada IPC2010-31525 GIRTH WELD FAILURE IN A LARGE DIAMETER GAS TRANSMISSION PIPELINE Ron Scrivner

More information

Engineering Critical Assessment of Vintage Girth Welds

Engineering Critical Assessment of Vintage Girth Welds Engineering Critical Assessment of Vintage Girth Welds Fan Zhang PhD, Jing Ma PhD, Mark Van Auker Michael Rosenfeld PE Kiefner and Associates, Inc. Thien-An Nguyen Pacific Gas and Electric Company AGA

More information

EVALUATING THE PERFORMANCE OF A PIPELINE PROTECTION SYSTEM TO PREVENT DAMAGE TO SUBSEA PIPELINES FROM DROPPED OBJECTS

EVALUATING THE PERFORMANCE OF A PIPELINE PROTECTION SYSTEM TO PREVENT DAMAGE TO SUBSEA PIPELINES FROM DROPPED OBJECTS Proceedings of Conference ASME International Offshore Pipeline Forum October 29-30, 2008, Houston, Texas USA Paper No. IOPF2008-903 EVALUATING THE PERFORMANCE OF A PIPELINE PROTECTION SYSTEM TO PREVENT

More information

Resin to Fiber Ratio - Maximizing Tensile Properties in a Water-Activated, Polyurethane/Carbon Fiber Composite Repair System

Resin to Fiber Ratio - Maximizing Tensile Properties in a Water-Activated, Polyurethane/Carbon Fiber Composite Repair System Resin to Fiber Ratio - Maximizing Tensile Properties in a Water-Activated, Polyurethane/Carbon Fiber Composite Repair System M. A. GREEN, M. U. FAROOQ AND C. J. LAZZARA Neptune Research, Inc., 1346 S.

More information

Gas Transmission and Distribution Piping Systems

Gas Transmission and Distribution Piping Systems ASME B31.8-2010 (Revision of ASME B31.8-2007) Gas Transmission and Distribution Piping Systems ASME Code for Pressure Piping, B31 A N A M E R I C A N N A T I O N A L S T A N D A R D ASME B31.8-2010 (Revision

More information

Reliability Based Design for Pipelines Canadian Standard Association Approach, Industry Response, and Comparison with ISO 16708

Reliability Based Design for Pipelines Canadian Standard Association Approach, Industry Response, and Comparison with ISO 16708 Reliability Based Design for Pipelines Canadian Standard Association Approach, Industry Response, and Comparison with ISO 16708 International ISO Standardization Seminar for the Reliability Technology

More information

From the desk of G. A. Aaker, Jr., PE.

From the desk of G. A. Aaker, Jr., PE. SAMPLE CALCULATIONS TO DETERMINE THE REQUIRED MINIMUM WALL THICKNESS PER DOT 192 / ASME B31.8 FOR GAS TRANSMISSION AND DISTRIBUTION PIPING SYSTEMS 192.103 GENERAL Pipe must be designed with sufficient

More information

Guidance on the Use, Specification, and Anomaly Assessment of Modern Linepipes

Guidance on the Use, Specification, and Anomaly Assessment of Modern Linepipes Guidance on the Use, Specification, and Anomaly Assessment of Modern Linepipes Yong-Yi Wang Center for Reliable Energy Systems 5858 Innovation Dr. Dublin, OH 43016 614-376-0765 May 16, 2018 05/16/2018

More information

RECENT CHANGES IN CODE REQUIREMENTS FOR REPAIR OF IN-SERVICE PIPELINES BY WELDING. William A. Bruce Materials Section, Edison Welding Institute

RECENT CHANGES IN CODE REQUIREMENTS FOR REPAIR OF IN-SERVICE PIPELINES BY WELDING. William A. Bruce Materials Section, Edison Welding Institute IPC2000-215 RECENT CHANGES IN CODE REQUIREMENTS FOR REPAIR OF IN-SERVICE PIPELINES BY WELDING William A. Bruce Materials Section, Edison Welding Institute ABSTRACT The API code requirements for repair

More information

SEISMIC REHABILITATION OF REINFORCED CONCRETE BRIDGE COLUMNS IN MODERATE EARTHQUAKE REGIONS USING FRP COMPOSITES

SEISMIC REHABILITATION OF REINFORCED CONCRETE BRIDGE COLUMNS IN MODERATE EARTHQUAKE REGIONS USING FRP COMPOSITES 13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-6, 24 Paper No. 58 SEISMIC REHABILITATION OF REINFORCED CONCRETE BRIDGE COLUMNS IN MODERATE EARTHQUAKE REGIONS USING FRP

More information

Composite Sleeves for Permanently Restoring the Serviceability of Pipe: A review of testing and standards

Composite Sleeves for Permanently Restoring the Serviceability of Pipe: A review of testing and standards Composite Sleeves for Permanently Restoring the Serviceability of Pipe: A review of testing and standards Dr Paul Hill, Manager Composite Technology, Clock Spring Company, L.P. 4a The Causeway, Godmanchester,

More information

Furmanite s engineered composite repair technology

Furmanite s engineered composite repair technology Introducing Furmanite s engineered composite repair technology Dr Paul Hill CEng Director Furmanite Center of Excellence Composite Repairs Corporate Headquarters: Furmanite Worldwide Inc. 2435 North Central

More information

Crack Reinforcement Using the Pipestream XHab TM Repair System

Crack Reinforcement Using the Pipestream XHab TM Repair System Crack Reinforcement Using the Pipestream XHab TM Repair System Third Annual Composite Repair Users Group Workshop Hilton Garden Inn NW America Plaza (Houston, Texas) Thursday, September 26, 2013 Prepared

More information

Centricast CL-1520 Pipe Product Data

Centricast CL-1520 Pipe Product Data Centricast CL-1520 Pipe Product Data Product Name 14/15 CHEMICAL INDUSTRIAL Applications Acids Salts Oxidizing Agents Chloride Water Materials and Construction All pipe is manufactured with glass fabrics

More information

Specification for Pipe Fittings

Specification for Pipe Fittings Specification for Pipe Fittings Specification for Pipe Fittings Page 1 of 11 Table of Contents 1.0 SCOPE...3 2.0 DEFINITIONS...3 3.0 REFERENCES, CODES AND STANDARDS...3 4.0 CONTRACTOR'S RESPONSIBILITIES...4

More information

DURABILITY PERFORMANCE OF EPOXY INJECTED REINFORCED CONCRETE BEAMS WITH AND WITHOUT FRP FABRICS

DURABILITY PERFORMANCE OF EPOXY INJECTED REINFORCED CONCRETE BEAMS WITH AND WITHOUT FRP FABRICS DURABILITY PERFORMANCE OF EPOXY INJECTED REINFORCED CONCRETE BEAMS WITH AND WITHOUT FRP FABRICS Prof. John J. Myers Associate Professor CIES / Department of Civil, Arch., & Env. Engineering University

More information

Structural design criteria

Structural design criteria chapter three Structural design criteria Contents 3.1 Modes of failure... 3.2 Theories of failure... 3.3 Theories of failure used in ASME Boiler and Pressure Vessel Code... 3.4 Allowable stress limits

More information

ASSESSING THE EFFECTS OF VIBRATORY LOADING ON PIPELINES USING ANALYSIS AND MONITORING TECHNIQUES

ASSESSING THE EFFECTS OF VIBRATORY LOADING ON PIPELINES USING ANALYSIS AND MONITORING TECHNIQUES ASSESSING THE EFFECTS OF VIBRATORY LOADING ON PIPELINES USING ANALYSIS AND MONITORING TECHNIQUES Chris Alexander Stress Engineering Services, Inc. Houston, Texas Dave Runte Florida Gas Transmission Company

More information

Bend with wrinkles. Eliminate welding and X-RAY. Cigarette wrap isolated external corrosion pitting 68% wall loss.

Bend with wrinkles. Eliminate welding and X-RAY. Cigarette wrap isolated external corrosion pitting 68% wall loss. Contact Gregg Crow Phone: 817-240-6434 Email: gcrow@myoilpatch.com Web: www.myoilpatch.com Elbow Repair Weld-O-Let Repair Eliminate welding and X-RAY Bend with wrinkles Cigarette wrap isolated external

More information

IPC ABSTRACT

IPC ABSTRACT International Pipeline Conference Volume I ASME 1998 IPC1998-2028 REPAIRING PIPE DEFECTS (CRACKING, ARC BURNS, CORROSION, DENTS) WITHOUT OPERATIONAL OUTAGES USING THE PETROSLEEVE1 COMPRESSION SLEEVE REPAIR

More information

BEHAVIOR OF STEEL PIPES WITH LOCAL WALL DISTORTIONS UNDER CYCLIC LOADING

BEHAVIOR OF STEEL PIPES WITH LOCAL WALL DISTORTIONS UNDER CYCLIC LOADING Proceedings of the ASME 0 Pressure Vessels & Piping Division Conference PVP0 July 5-9, 0, Toronto, Ontario, CANADA PVP0-783-draft MECHANICAL BEHAVIOR OF STEEL PIPES WITH LOCAL WALL DISTORTIONS UNDER CYCLIC

More information

Armor Plate, Inc. Pipeline Repair Products

Armor Plate, Inc. Pipeline Repair Products Training and Certification Program History Wil-Cor, Inc. and are affiliates or sister companies. Wil-Cor, Inc. was founded in 1978 by Mr. Fred D. Wilson. Wil-Cor, Inc. formulates epoxy polyester resins

More information

Composite Repairs for Pipelines

Composite Repairs for Pipelines ABN 69 003 696 526 Composite Repairs for Pipelines TGN-W-01 Rev: 0 Date: 1 March 2006 Pages: 5 1. SCOPE This document provides an introduction to the use of composite materials as a methodology for repairing

More information

Pipeline Systems PIP PLSC0013 Non-Destructive Examination of ASME B31.4 and B31.8 Metallic Pipelines

Pipeline Systems PIP PLSC0013 Non-Destructive Examination of ASME B31.4 and B31.8 Metallic Pipelines February 2017 Pipeline Systems PIP PLSC0013 Non-Destructive Examination of ASME B31.4 and B31.8 Metallic Pipelines PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process

More information

Standard Specification for Reinforced Epoxy Resin Gas Pressure Pipe and Fittings 1

Standard Specification for Reinforced Epoxy Resin Gas Pressure Pipe and Fittings 1 Designation: D 2517 00 e1 An American National Standard Standard Specification for Reinforced Epoxy Resin Gas Pressure Pipe and Fittings 1 This standard is issued under the fixed designation D 2517; the

More information

GRP High Pressure Pipelines for Australia -Why and How? -

GRP High Pressure Pipelines for Australia -Why and How? - GRP High Pressure Pipelines for Australia -Why and How? - Composite Glass Reinforced Plastic (GRP) is particularly suited to high pressure pipelines in corrosive services. Glass Reinforced Epoxy (GRE)

More information

COMPOSITES - CASE STUDIES OF PIPELINE REPAIR APPLICATIONS. By Andrew J. Patrick, Clock Spring Company, L.P., Huntingdon, UK

COMPOSITES - CASE STUDIES OF PIPELINE REPAIR APPLICATIONS. By Andrew J. Patrick, Clock Spring Company, L.P., Huntingdon, UK COMPOSITES - CASE STUDIES OF PIPELINE REPAIR APPLICATIONS By Andrew J. Patrick, Clock Spring Company, L.P., Huntingdon, UK ABSTRACT Composite repairs have been utilised within the transmission pipeline

More information

Methodology for design of earthquake resistant steel liquid storage tanks

Methodology for design of earthquake resistant steel liquid storage tanks Earthquake Resistant Engineering Structures V 699 Methodology for design of earthquake resistant steel liquid storage tanks M. A. Haroun & M. A. Al-Kashif University of California, Irvine, and American

More information

PREDICTIVE MAINTENANCE OF FIBERGLASS REINFORCED PLASTIC EQUIPMENT

PREDICTIVE MAINTENANCE OF FIBERGLASS REINFORCED PLASTIC EQUIPMENT PREDICTIVE MAINTENANCE OF FIBERGLASS REINFORCED PLASTIC EQUIPMENT Geoffrey E. Clarkson, P.Eng. FEC UTComp Inc. Cambridge, Ontario, Canada g.clarkson@utcomp.ca ABSTRACT For steel, stainless steel and titanium

More information

Hazardous Liquid Pipeline Integrity Verification Process (HL IVP) Overview

Hazardous Liquid Pipeline Integrity Verification Process (HL IVP) Overview Hazardous Liquid Pipeline Integrity Verification Process (HL IVP) Overview Industry (API/AOPL) Briefing November 18, 2014 1 HL IVP What is HL IVP Where would HL IVP be applicable Drivers - GT Statutory

More information

ASSET INTEGRITY Project Case Studies

ASSET INTEGRITY Project Case Studies Project Case Studies Development of Corrosion Under Insulation (CUI) Protocol and Inspection Procedure Multi-National Natural Gas Pipeline Operator Texas Contacts Background A large multi-national energy

More information

Bulging Assessment and Long- Term Repair of Coke Drums

Bulging Assessment and Long- Term Repair of Coke Drums Bulging Assessment and Long- Term Repair of Coke Drums Mahmod Samman, Ph.D., P.E. Houston Engineering Solutions (832) 512-0109 mms@hes.us.com Ediberto B. Tinoco Fábio C. Marangone Petrobras, Brazil RIO

More information

CATHODIC DISBONDMENT TESTING COMPARISON OF CARBON FIBER, FIBERGLASS, AND HYBRID COMPOSITE REPAIR SYSTEMS FOR PIPELINES

CATHODIC DISBONDMENT TESTING COMPARISON OF CARBON FIBER, FIBERGLASS, AND HYBRID COMPOSITE REPAIR SYSTEMS FOR PIPELINES Proceedings of the 2012 9th International Pipeline Conference IPC2012 September 24-28, 2012, Calgary, Alberta, Canada IPC2012-90318 CATHODIC DISBONDMENT TESTING COMPARISON OF CARBON FIBER, FIBERGLASS,

More information

2006, 2008, 2010, 2011, 2012, 2013 CTI SERVICES LLC

2006, 2008, 2010, 2011, 2012, 2013 CTI SERVICES LLC Citadel Technologies...2 DiamondWrap...4 DiamondWrap Specialty Epoxies...8 BlackDiamond... 16 DiamondWrap HP... 20 DiamondWrap SubSea...22 RhinoWrap... 24 SLS-Series... 26 Diamacorr... 32 Diamashoe...

More information

Seismic Evaluation and Retrofit of Beam- Column Joints of Mid-America Bridges Part 2: Steel Sheet and Plate Retrofit

Seismic Evaluation and Retrofit of Beam- Column Joints of Mid-America Bridges Part 2: Steel Sheet and Plate Retrofit Seismic Evaluation and Retrofit of Beam- Column Joints of Mid-America Bridges Part 2: Steel Sheet and Plate Retrofit Genda Chen, Ph.D., P.E. Associate Professor of Civil Engineering Department of Civil,

More information

Monolithic Isolation Fittings

Monolithic Isolation Fittings Monolithic Isolation Fittings The Industry s Dual O Ring Seal Standard Tests Include: 100% Hydrostatic Pressure & Electrical Tests 100% Ultrasonic of Welds 100% Magnetic Particle of Welds 100% Dye Penetrant

More information

NTPEP Evaluation of Spray Applied Non-Structural and Structural Pipe Liners for Storm Water Conveyance

NTPEP Evaluation of Spray Applied Non-Structural and Structural Pipe Liners for Storm Water Conveyance Work Plan for NTPEP Evaluation of Spray Applied Non-Structural and Structural Pipe Liners for Storm Water Conveyance AASHTO Designation: [SAL] (2018) American Association of State Highway and Transportation

More information

USING BENCHMARKING TO OPTIMISE THE COST OF PIPELINE INTEGRITY MANAGEMENT

USING BENCHMARKING TO OPTIMISE THE COST OF PIPELINE INTEGRITY MANAGEMENT USING BENCHMARKING TO OPTIMISE THE COST OF PIPELINE INTEGRITY MANAGEMENT By John Healy, David G Jones, Alasdair J Clyne, Pablo B Cazenave, Duraid Alkazraji. GE Energy, Oil & Gas, PII Pipeline Solutions

More information

Burst Pressure Prediction of Cylindrical Shell Intersection

Burst Pressure Prediction of Cylindrical Shell Intersection Burst Pressure Prediction of Cylindrical Shell Intersection Liping Xue, G. E. O. Widera Marquette University Center for Joining and Manufacturing Assembly Milwaukee, Wisconsin 53201 Zhifu Sang Nanjing

More information

Armor Plate Pipe Wrap

Armor Plate Pipe Wrap Armor Plate Pipe Wrap Training and Certification Course Course Elements Section 1 - Pipeline Repair Systems Section 2 - Pipeline Coating Systems Section 3 - Surface Preparation Section 4 - Required Number

More information

FINAL REPORT. TTO Number 11. Integrity Management Program Delivery Order DTRS56-02-D Pipe Wrinkle Study

FINAL REPORT. TTO Number 11. Integrity Management Program Delivery Order DTRS56-02-D Pipe Wrinkle Study Department of Transportation Research and Special Programs Administration Office of Pipeline Safety TTO Number 11 Integrity Management Program Delivery Order DTRS56-02-D-70036 Pipe Wrinkle Study FINAL

More information

AN INNOVATIVE DUCTILE COMPOSITE FABRIC FOR STRENGTHENING CONCRETE STRUCTURES. Abstract

AN INNOVATIVE DUCTILE COMPOSITE FABRIC FOR STRENGTHENING CONCRETE STRUCTURES. Abstract AN INNOVATIVE DUCTILE COMPOSITE FABRIC FOR STRENGTHENING CONCRETE STRUCTURES Nabil F. Grace, Lawrence Technological University, Southfield, MI George Abdel-Sayed, University of Windsor, Windsor, ON Wael

More information

UNI-BELL PVC PIPE ASSOCIATION UNI-B-15-10

UNI-BELL PVC PIPE ASSOCIATION UNI-B-15-10 UNI-BELL PVC PIPE ASSOCIATION UNI-B-15-10 RECOMMENDED STANDARD SPECIFICATION FOR POLYVINYL CHLORIDE (PVC) FABRICATED PRESSURE FITTINGS November 2010 UNI-BELL PVC PIPE ASSOCIATION 2711 LBJ Freeway, Suite

More information

Review of ASME Guidance Articles on Repair Strategies

Review of ASME Guidance Articles on Repair Strategies Review of ASME Guidance Articles on Repair Strategies Clay Rodery BP Chemicals Technology & Engineering Member/ASME Post Construction Standards Committee ASME PCC-2: Repair of Pressure Equipment and Piping

More information

Product Guide Specification

Product Guide Specification Product Guide Specification July 2010 Specifier Notes: This product specification is written according to the Construction Specifications Institute (CSI) Format, including MasterFormat (1995 Edition),

More information

USE OF ANALYTICAL AND EXPERIMENTAL MONITORING TECHNIQUES IN ASSESSING THE PERFORMANCE OF A COLD REHEAT STEAM LINE

USE OF ANALYTICAL AND EXPERIMENTAL MONITORING TECHNIQUES IN ASSESSING THE PERFORMANCE OF A COLD REHEAT STEAM LINE USE OF ANALYTICAL AND EXPERIMENTAL MONITORING TECHNIQUES IN ASSESSING THE PERFORMANCE OF A COLD REHEAT STEAM LINE Chris Alexander Stress Engineering Services, Inc. Houston, Texas chris.alexander@stress.com

More information

Improving API 1104 for the Twenty-second Edition

Improving API 1104 for the Twenty-second Edition Improving API 1104 for the Twenty-second Edition API-AGA Joint Committee on Oil and Gas Pipeline Field Welding Practices Bill Bruce Secretary January 17-19, 2017 JW Marriott Austin Austin, Texas 1 SAFER,

More information

NAPCA Workshop August 19, 2010 Houston, Texas Kenneth Y. Lee Office of Pipeline Safety

NAPCA Workshop August 19, 2010 Houston, Texas Kenneth Y. Lee Office of Pipeline Safety Pipeline Construction Challenges NAPCA Workshop August 19, 2010 Houston, Texas Kenneth Y. Lee Office of Pipeline Safety PHMSA Mission To ensure the operation of the Nation s pipeline transportation system

More information

Gas Transmission MAOP Verification Integrity Verification Process Oklahoma CC Pipeline Safety Conference

Gas Transmission MAOP Verification Integrity Verification Process Oklahoma CC Pipeline Safety Conference Gas Transmission MAOP Verification Integrity Verification Process Oklahoma CC Pipeline Safety Conference U.S. DOT / PHMSA Steve Nanney November 19, 2014 1 Integrity Verification Process Drivers Overview

More information

Pipeline Research Council International

Pipeline Research Council International Catalog No. L52047 Pipeline Research Council International PIPELINE REPAIR MANUAL Contract PR-186-0324 Prepared for the Pipeline Research Council International, Inc. Prepared by the following Research

More information

POLYGUARD RD-6 A FAIL SAFE PIPELINE COATING SYSTEM FOR REHABILITATION OR GIRTH WELDS ON CATHODICALLY PROTECTED PIPELINES

POLYGUARD RD-6 A FAIL SAFE PIPELINE COATING SYSTEM FOR REHABILITATION OR GIRTH WELDS ON CATHODICALLY PROTECTED PIPELINES POLYGUARD RD-6 A FAIL SAFE PIPELINE COATING SYSTEM FOR REHABILITATION OR GIRTH WELDS ON CATHODICALLY PROTECTED PIPELINES A large percent of corrosion failures on cathodically protected structures are associated

More information

Monolithic Isolation Fittings

Monolithic Isolation Fittings Monolithic Isolation Fittings The ElectroStop TM monolithic isolation fittings will serve as a positive leak proof, long lasting block against the flow of electric current in all piping systems. When you

More information

Steam Turbine Critical Crack Evaluation and Ranking Cracks to Prioritize Inspection

Steam Turbine Critical Crack Evaluation and Ranking Cracks to Prioritize Inspection Steam Turbine Critical Crack Evaluation and Ranking Cracks to Prioritize Inspection G. Thorwald, V. Garcia, R. Bentley, and O. Kwon Quest Integrity Abstract: The objective of this paper is to evaluate

More information

PIPE GRADE DETERMINATION AND MAOP VALIDATION USING SOPHISTICATED SCRAPER TECHNOLOGY

PIPE GRADE DETERMINATION AND MAOP VALIDATION USING SOPHISTICATED SCRAPER TECHNOLOGY PIPE GRADE DETERMINATION AND MAOP VALIDATION USING SOPHISTICATED SCRAPER TECHNOLOGY Thomas Eiken, Werner Thale, Mohammed Jaarah 7 th MENDT Conference Bahrain 09/15/2015 CONTENT 1. Pipe Grade in the Context

More information

Full-Scale Bending Tests of Strongwell s SE28 Fiberglass-Reinforced Polymer Poles

Full-Scale Bending Tests of Strongwell s SE28 Fiberglass-Reinforced Polymer Poles Test Report: Full-Scale Bending Tests of Strongwell s SE28 Fiberglass-Reinforced Polymer Poles Submitted to: May 23 EDM International, Inc. i Table of Contents 1. INTRODUCTION... 3 2. POLE PREPARATION...

More information

TECHNICAL SPECIFICATION FOR CURED-IN-PLACE MANHOLE REHABILITATION LINER SYSTEM

TECHNICAL SPECIFICATION FOR CURED-IN-PLACE MANHOLE REHABILITATION LINER SYSTEM TECHNICAL SPECIFICATION FOR CURED-IN-PLACE SYSTEM PART 1 GENERAL 1.01 SCOPE OF WORK Furnish all materials, labor, equipment, tools and required incidentals for providing and installing a resin impregnated

More information

Series 400 Structural repair system that doubles the strength of the original timber pile. SeaShield Marine Systems. Features

Series 400 Structural repair system that doubles the strength of the original timber pile. SeaShield Marine Systems. Features SeaShield Marine Systems The SeaShield Series 400 System has been independently tested by Texas A&M University, Department of Civil Engineering, Structural and Materials Testing Laboratory. Features Provides

More information

Ceram Core Product Data

Ceram Core Product Data Ceram Core Product Data Product Name 14/15 CHEMICAL & INDUSTRIAL Applications Bottom Ash Wet Fly Ash Vanadium Ore Slurries Potash Tailings Zinc Tailings Taconite Tailings Heavy Salt Slurries Uranium Ore

More information

Bondstrand Series 3000 Fiberglass Pipe for General Industrial Service

Bondstrand Series 3000 Fiberglass Pipe for General Industrial Service Bondstrand Series 3000 Fiberglass Pipe for General Industrial Service Uses and Applications Boiler feed water Bridge, roof and floor drains Brine and brackish water Chemical process piping Cooling water

More information

This study is concerned with mechanical damage experienced by steel pipes transporting gas and liquids for energy-related applications.

This study is concerned with mechanical damage experienced by steel pipes transporting gas and liquids for energy-related applications. MECHANICAL DAMAGE (1) Preamble This study is concerned with mechanical damage experienced by steel pipes transporting gas and liquids for energy-related applications. (2) Definition In the context of the

More information

RESEARCH IN PROGRESS: FATIGUE OF CFRP COMPOSITES

RESEARCH IN PROGRESS: FATIGUE OF CFRP COMPOSITES RESEARCH IN PROGRESS: FATIGUE OF CFRP COMPOSITES Cornelia E. Demers, Ph.D. 1, Amir Abdelgadir 2 1 Department of Civil Engineering and Engineering Mechanics, The University of Arizona Tucson, Arizona, 85721,

More information

SPECIFICATIONS FOR PREMIER-PIPE USA CURED-IN-PLACE TECH LINER

SPECIFICATIONS FOR PREMIER-PIPE USA CURED-IN-PLACE TECH LINER SPECIFICATIONS FOR PREMIER-PIPE USA CURED-IN-PLACE TECH LINER 1. General Statement: This specification is for the Cured in Place Pipe process (CIPP) of pipe rehabilitation using a glass fiber reinforced

More information

Buckling Strength Tests of Strongwell s SE28 Fiberglass-Reinforced Polymer Poles

Buckling Strength Tests of Strongwell s SE28 Fiberglass-Reinforced Polymer Poles Test Report: Buckling Strength Tests of Strongwell s SE28 Fiberglass-Reinforced Polymer Poles Submitted to: May 2003 EDM International, Inc. Table of Contents 1.0 INTRODUCTION... 3 2.0 POLE PREPARATION...

More information

COMPARISON OF LIMIT LOAD, LINEAR AND NONLINEAR FE ANALYSES OF STRESSES IN A LARGE NOZZLE-TO-SHELL DIAMETER RATIO APPLICATION

COMPARISON OF LIMIT LOAD, LINEAR AND NONLINEAR FE ANALYSES OF STRESSES IN A LARGE NOZZLE-TO-SHELL DIAMETER RATIO APPLICATION COMPARISON OF LIMIT LOAD, LINEAR AND NONLINEAR FE ANALYSES OF STRESSES IN A LARGE NOZZLE-TO-SHELL DIAMETER RATIO APPLICATION Michael A. Porter Dynamic Analysis 2815 Stratford Road Lawrence, Kansas 6649

More information

Correlating Aldyl A and Century PE Pipe Rate Process Method Projections With Actual Field Performance

Correlating Aldyl A and Century PE Pipe Rate Process Method Projections With Actual Field Performance Correlating Aldyl A and Century PE Pipe Rate Process Method Projections With Actual Field Performance Dr. Gene Palermo Consulting for: Jana Laboratories Aurora, Ontario, Canada Abstract The recent Department

More information

STANDARDIZED STRUCTURES

STANDARDIZED STRUCTURES Q, QH & QL TOWERS 16.1 Q, QH, and QL Towers General Description The series includes three and four leg angle towers, which are suited for a variety of antenna mounting positions and load conditions. The

More information

Fast quench problems and how they damage coke drums

Fast quench problems and how they damage coke drums Coke Drum Reliability Workshop Fast quench problems and how they damage coke drums Rio De Janeiro, Brazil August 7, 2009 Presented by: Julian Bedoya Julian.bedoya@stress.com Prepared by: Richard Boswell

More information

APPLICATIONS OF LIMIT LOAD ANALYSES TO ASSESS THE STRUCTURAL INTEGRITY OF PRESSURE VESSELS

APPLICATIONS OF LIMIT LOAD ANALYSES TO ASSESS THE STRUCTURAL INTEGRITY OF PRESSURE VESSELS Proceedings of PVP2005 2005 ASME Pressure Vessels and Piping Division Conference July 17-21, 2005, Denver, Colorado USA PVP2005-71724 APPLICATIONS OF LIMIT LOAD ANALYSES TO ASSESS THE STRUCTURAL INTEGRITY

More information