1 SECTION HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section includes hollow-metal work. B. Related Requirements: 1. Section "Door Hardware" for door hardware for hollow-metal doors. 1.3 DEFINITIONS A. Minimum Thickness: Minimum thickness of base metal without coatings according to NAAMM-HMMA 803 or SDI A COORDINATION A. Coordinate anchorage installation for hollow-metal frames. Furnish setting drawings, templates, and directions for installing anchorages, including sleeves, concrete inserts, anchor bolts, and items with integral anchors. Deliver such items to Project site in time for installation. 1.5 SUBMITTALS A. Product Data: For each type of product. 1. Include construction details, material descriptions, core descriptions, fire-resistance ratings, and finishes. B. Shop Drawings: Include the following: 1. Elevations of each door type. 2. Details of doors, including vertical- and horizontal-edge details and metal thicknesses. 3. Frame details for each frame type, including dimensioned profiles and metal thicknesses. 4. Locations of reinforcement and preparations for hardware. 5. Details of each different wall opening condition. 6. Details of anchorages, joints, field splices, and connections. 1.6 DELIVERY, STORAGE, AND HANDLING A. Deliver hollow-metal work palletized, packaged, or crated to provide protection during transit and Project-site storage. Do not use nonvented plastic. 1. Provide additional protection to prevent damage to factory-finished units. HOLLOW METAL DOORS AND FRAMES

2 B. Deliver welded frames with two removable spreader bars across bottom of frames, tack welded to jambs and mullions. C. Store hollow-metal work vertically under cover at Project site with head up. Place on minimum 4-inch- (102-mm-) high wood blocking. Provide minimum 1/4-inch (6-mm) space between each stacked door to permit air circulation. PART 2 - PRODUCTS 2.1 MANUFACTURERS A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following: 1. Curries Company; an Assa Abloy Group company. 2. Mesker Door Inc. 3. Steelcraft; an Ingersoll-Rand company. B. Source Limitations: Obtain hollow-metal work from single source from single manufacturer. 2.2 REGULATORY REQUIREMENTS A. Fire-Rated Assemblies: Complying with NFPA 80 and listed and labeled by a qualified testing agency acceptable to authorities having jurisdiction for fire-protection ratingsindicated, based on testing at positive pressure according to NFPA 252 or UL 10C. 2.3 INTERIOR DOORS AND FRAMES A. Construct interior doors and frames to comply with the standards indicated for materials, fabrication, hardware locations, hardware reinforcement, tolerances, and clearances, and as specified. B. Heavy-Duty Doors and Frames: SDI A250.8, Level Physical Performance: Level B according to SDI A Doors: a. Type: As indicated in the Door and Frame Schedule. b. Thickness: 1-3/4 inches (44.5 mm). c. Face: Uncoated, cold-rolled steel sheet, minimum thickness of inch (1.0 mm). d. Edge Construction: Model 1, Full Flush. e. Core: Manufacturer's standard kraft-paper honeycomb, polystyrene, polyurethane, polyisocyanurate, mineral-board, or vertical steel-stiffener core at manufacturer's discretion. 3. Frames: a. Materials: Uncoated steel sheet, minimum thickness of inch (1.3 mm). b. Construction: Full profile welded. HOLLOW METAL DOORS AND FRAMES

3 4. Exposed Finish: Prime. 2.4 FRAME ANCHORS A. Jamb Anchors: 1. Stud-Wall Type: Designed to engage stud, welded to back of frames; not less than inch (1.0 mm) thick. 2. Postinstalled Expansion Type for In-Place Concrete or Masonry: Minimum 3/8-inch- (9.5-mm-) diameter bolts with expansion shields or inserts. Provide pipe spacer from frame to wall, with throat reinforcement plate, welded to frame at each anchor location. B. Floor Anchors: Formed from same material as frames, minimum thickness of inch (1.0 mm), and as follows: 1. Monolithic Concrete Slabs: Clip-type anchors, with two holes to receive fasteners. 2.5 MATERIALS A. Cold-Rolled Steel Sheet: ASTM A 1008/A 1008M, Commercial Steel (CS), Type B; suitable for exposed applications. B. Hot-Rolled Steel Sheet: ASTM A 1011/A 1011M, Commercial Steel (CS), Type B; free of scale, pitting, or surface defects; pickled and oiled. C. Metallic-Coated Steel Sheet: ASTM A 653/A 653M, Commercial Steel (CS), Type B. D. Frame Anchors: ASTM A 879/A 879M, Commercial Steel (CS), 04Z (12G) designation; mill phosphatized. coating 1. For anchors built into exterior walls, steel sheet complying with ASTM A 1008/A 1008M or ASTM A 1011/A 1011M, hot-dip galvanized according to ASTM A 153/A 153M, Class B. E. Inserts, Bolts, and Fasteners: Hot-dip galvanized according to ASTM A 153/A 153M. F. Power-Actuated Fasteners in Concrete: Fastener system of type suitable for application indicated, fabricated from corrosion-resistant materials, with clips or other accessory devices for attaching hollow-metal frames of type indicated. 2.6 FABRICATION A. Fabricate hollow-metal work to be rigid and free of defects, warp, or buckle. Accurately form metal to required sizes and profiles, with minimum radius for metal thickness. Where practical, fit and assemble units in manufacturer's plant. To ensure proper assembly at Project site, clearly identify work that cannot be permanently factory assembled before shipment. B. Hollow-Metal Doors: 1. Vertical Edges for Single-Acting Doors: Bevel edges 1/8 inch in 2 inches (3.2 mm in 51 mm). HOLLOW METAL DOORS AND FRAMES

4 2. Top Edge Closures: Close top edges of doors with inverted closures of same material as face sheets. 3. Bottom Edge Closures: Close bottom edges of doors with end closures or channels of same material as face sheets. C. Hollow-Metal Frames: Where frames are fabricated in sections due to shipping or handling limitations, provide alignment plates or angles at each joint, fabricated of same thickness metal as frames. 1. Provide countersunk, flat- or oval-head exposed screws and bolts for exposed fasteners unless otherwise indicated. 2. Floor Anchors: Weld anchors to bottoms of jambs with at least four spot welds per anchor; however, for slip-on drywall frames, provide anchor clips or countersunk holes at bottoms of jambs. 3. Jamb Anchors: Provide number and spacing of anchors as follows: a. Stud-Wall Type: Locate anchors not more than 18 inches (457 mm) from top and bottom of frame. Space anchors not more than 32 inches (813 mm) o.c. and as follows: 1) Three anchors per jamb up to 60 inches (1524 mm) high. 2) Four anchors per jamb from 60 to 90 inches (1524 to 2286 mm) high. b. Postinstalled Expansion Type: Locate anchors not more than 6 inches (152 mm) from top and bottom of frame. Space anchors not more than 26 inches (660 mm) o.c. 4. Door Silencers: Except on weather-stripped frames, drill stops to receive door silencers as follows. Keep holes clear during construction. a. Single-Door Frames: Drill stop in strike jamb to receive three door silencers. D. Fabricate concealed stiffeners and edge channels from either cold- or hot-rolled steel sheet. E. Hardware Preparation: Factory prepare hollow-metal work to receive templated mortised hardware; include cutouts, reinforcement, mortising, drilling, and tapping according to SDI A250.6, the Door Hardware Schedule, and templates. 1. Reinforce doors and frames to receive nontemplated, mortised, and surface-mounted door hardware. 2. Comply with applicable requirements in SDI A250.6 and BHMA A for preparation of hollow-metal work for hardware. F. Stops and Moldings: Provide stops and moldings around glazed lites and louvers where indicated. Form corners of stops and moldings with butted or mitered hairline joints. 1. Provide fixed frame moldings on outside of exterior and on secure side of interior doors and frames. 2. Provide loose stops and moldings on inside of hollow-metal work. HOLLOW METAL DOORS AND FRAMES

5 2.7 STEEL FINISHES A. Prime Finish: Clean, pretreat, and apply manufacturer's standard primer. 1. Shop Primer: Manufacturer's standard, fast-curing, lead- and chromate-free primer complying with SDI A250.10; recommended by primer manufacturer for substrate; compatible with substrate and field-applied coatings despite prolonged exposure. 2.8 ACCESSORIES A. Louvers: Provide louvers for interior doors, where indicated, which comply with SDI 111C, with blades or baffles formed of inch- (0.5-mm-) thick, cold-rolled steel sheet set into inch- (0.8-mm-) thick steel frame. 1. Sightproof Louvers: Stationary louvers constructed with inverted-v or inverted-y blades with 50% minimum free area. PART 3 - EXECUTION 3.1 EXAMINATION A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of the Work. B. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 PREPARATION A. Remove welded-in shipping spreaders installed at factory. Restore exposed finish by grinding, filling, and dressing, as required to make repaired area smooth, flush, and invisible on exposed faces. B. Drill and tap doors and frames to receive non-templated, mortised, and surface-mounted door hardware. 3.3 INSTALLATION A. General: Install hollow-metal work plumb, rigid, properly aligned, and securely fastened in place. Comply with Drawings and manufacturer's written instructions. B. Hollow-Metal Frames: Install hollow-metal frames of size and profile indicated. Comply with SDI A or NAAMM-HMMA 840 as required by standards specified. 1. Set frames accurately in position; plumbed, aligned, and braced securely until permanent anchors are set. After wall construction is complete, remove temporary braces, leaving surfaces smooth and undamaged. a. At fire-rated openings, install frames according to NFPA 80. b. Remove temporary braces necessary for installation only after frames have been properly set and secured. HOLLOW METAL DOORS AND FRAMES

6 c. Check plumb, square, and twist of frames as walls are constructed. Shim as necessary to comply with installation tolerances. 2. Floor Anchors: Provide floor anchors for each jamb and mullion that extends to floor, and secure with postinstalled expansion anchors. a. Floor anchors may be set with power-actuated fasteners instead of postinstalled expansion anchors if so indicated and approved on Shop Drawings. 3. Metal-Stud Partitions: Solidly pack mineral-fiber insulation inside frames. 4. In-Place Concrete or Masonry Construction: Secure frames in lace with postinstalled expansion anchors. Countersink anchors, and fill and make smooth, flush, and invisible on exposed faces. 5. Installation Tolerances: Adjust hollow-metal door frames for squareness, alignment, twist, and plumb to the following tolerances: a. Squareness: Plus or minus 1/16 inch (1.6 mm), measured at door rabbet on a line 90 degrees from jamb perpendicular to frame head. b. Alignment: Plus or minus 1/16 inch (1.6 mm), measured at jambs on a horizontal line parallel to plane of wall. c. Twist: Plus or minus 1/16 inch (1.6 mm), measured at opposite face corners of jambs on parallel lines, and perpendicular to plane of wall. d. Plumbness: Plus or minus 1/16 inch (1.6 mm), measured at jambs at floor. C. Hollow-Metal Doors: Fit hollow-metal doors accurately in frames, within clearances specified below. Shim as necessary. 1. Non-Fire-Rated Steel Doors: a. Between Door and Frame Jambs and Head: 1/8 inch (3.2 mm) plus or minus 1/32 inch (0.8 mm). b. At Bottom of Door: 3/4 inch (19.1 mm) plus or minus 1/32 inch (0.8 mm). c. Between Door Face and Stop: 1/16 inch (1.6 mm) to 1/8 inch (3.2 mm) plus or minus 1/32 inch (0.8 mm). 2. Fire-Rated Doors: Install doors with clearances according to NFPA ADJUSTING AND CLEANING A. Final Adjustments: Check and readjust operating hardware items immediately before final inspection. Leave work in complete and proper operating condition. Remove and replace defective work, including hollow-metal work that is warped, bowed, or otherwise unacceptable. B. Prime-Coat Touchup: Immediately after erection, sand smooth rusted or damaged areas of prime coat and apply touchup of compatible air-drying, rust-inhibitive primer. END OF SECTION HOLLOW METAL DOORS AND FRAMES

7 SECTION ACCESS DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Special Conditions of Division 01 Specification, apply to this Section. 1.2 SUMMARY A. Section Includes: 1. Access doors and frames for walls and ceilings. 1.3 ACTION SUBMITTALS A. Product Data: For each type of product. 1. Include construction details, fire ratings, materials, individual components and profiles, and finishes. PART 2 - PRODUCTS 2.1 PERFORMANCE REQUIREMENTS A. Fire-Rated Access Doors and Frames: Units complying with NFPA 80 that are identical to access door and frame assemblies tested for fire-test-response characteristics according to the following test method and that are listed and labeled by UL or another testing and inspecting agency acceptable to authorities having jurisdiction: 1. NFPA 252 or UL 10B for fire-rated access door assemblies installed vertically. 2.2 ACCESS DOORS AND FRAMES FOR WALLS AND CEILINGS A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following: 1. Babcock-Davis. 2. Larsen's Manufacturing Company. 3. Milcor Inc. B. Source Limitations: Obtain each type of access door and frame from single source from single manufacturer. C. Fire-Rated, Flush Access Doors with Exposed Flanges: 1. Assembly Description: Fabricate door to fit flush to frame. Provide self-latching door with automatic closer and interior latch release. Provide manufacturer's standard-width exposed flange, proportional to door size. 2. Locations: Wall. ACCESS DOORS AND FRAMES

8 3. Fire-Resistance Rating: Not less than 2 hours. 4. Uncoated Steel Sheet for Door: Nominal inch (0.91 mm), 20 gage. a. Finish: Factory prime. 5. Frame Material: Same material, thickness, and finish as door. 6. Hinges: Manufacturer's standard. 7. Hardware: Latch. D. Hardware: 1. Latch: Cam latch operated by screwdriver. 2.3 MATERIALS A. Steel Plates, Shapes, and Bars: ASTM A 36/A 36M. B. Steel Sheet: Uncoated or electrolytic zinc coated, ASTM A 879/A 879M, with cold-rolled steel sheet substrate complying with ASTM A 1008/A 1008M, Commercial Steel (CS), exposed. C. Frame Anchors: Same type as door face. D. Inserts, Bolts, and Anchor Fasteners: Hot-dip galvanized steel according to ASTM A 153/A 153M or ASTM F FABRICATION A. General: Provide access door and frame assemblies manufactured as integral units ready for installation. B. Metal Surfaces: For metal surfaces exposed to view in the completed Work, provide materials with smooth, flat surfaces without blemishes. Do not use materials with exposed pitting, seam marks, roller marks, rolled trade names, or roughness. C. Doors and Frames: Grind exposed welds smooth and flush with adjacent surfaces. Furnish attachment devices and fasteners of type required to secure access doors to types of supports indicated. 1. Provide mounting holes in frames for attachment of units to metal or wood framing. D. Latching Mechanisms: Furnish number required to hold doors in flush, smooth plane when closed. 2.5 FINISHES A. Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for recommendations for applying and designating finishes. B. Protect mechanical finishes on exposed surfaces from damage by applying a strippable, temporary protective covering before shipping. ACCESS DOORS AND FRAMES

9 C. Appearance of Finished Work: Noticeable variations in same piece are not acceptable. Variations in appearance of adjoining components are acceptable if they are within the range of approved Samples and are assembled or installed to minimize contrast. D. Steel and Metallic-Coated-Steel Finishes: 1. Factory Prime: Apply manufacturer's standard, fast-curing, lead- and chromate-free, universal primer immediately after surface preparation and pretreatment. PART 3 - EXECUTION 3.1 EXAMINATION A. Examine substrates for compliance with requirements for installation tolerances and other conditions affecting performance of the Work. B. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 INSTALLATION A. Comply with manufacturer's written instructions for installing access doors and frames. B. Install doors flush with adjacent finish surfaces or recessed to receive finish material. 3.3 ADJUSTING A. Adjust doors and hardware, after installation, for proper operation. B. Remove and replace doors and frames that are warped, bowed, or otherwise damaged. END OF SECTION ACCESS DOORS AND FRAMES

10 THIS PAGE INTENTIONALLY LEFT BLANK

11 SECTION DOOR HARDWARE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section includes: 1. Mechanical door hardware for the following: B. Related Sections: a. Swinging doors. 1. Section "Hollow Metal Doors and Frames" for door silencers provided as part of hollow-metal frames. 2. Section "Access Doors and Frames" for access door hardware. 1.3 SUBMITTALS A. Product Data: For each type of product indicated. Include construction and installation details, material descriptions, dimensions of individual components and profiles, and finishes. 1.4 INFORMATIONAL SUBMITTALS A. Warranty: Special warranty specified in this Section. 1.5 QUALITY ASSURANCE A. Installer Qualifications: Supplier of products and an employer of workers trained and approved by product manufacturers and an Architectural Hardware Consultant who is available during the course of the Work to consult with Contractor, Architect, and Owner about door hardware and keying. B. Source Limitations: Obtain each type of door hardware from a single manufacturer. C. Fire-Rated Door Assemblies: Where fire-rated door assemblies are indicated, provide door hardware rated for use in assemblies complying with NFPA 80 that are listed and labeled by a qualified testing agency, for fire-protection ratings indicated, based on testing at positive pressure according to NFPA 252 or UL 10C, unless otherwise indicated. D. Accessibility Requirements: For door hardware on doors in an accessible route, comply with the U.S. Architectural & Transportation Barriers Compliance Board's ADA-ABA Accessibility Guidelines. DOOR HARDWARE

12 1. Provide operating devices that do not require tight grasping, pinching, or twisting of the wrist and that operate with a force of not more than 5 lbf (22.2 N). 2. Comply with the following maximum opening-force requirements: a. Fire Doors: Minimum opening force allowable by authorities having jurisdiction. 3. Adjust door closer sweep periods so that, from an open position of 70 degrees, the door will take at least 3 seconds to move to a point 3 inches (75 mm) from the latch, measured to the leading edge of the door. 1.6 DELIVERY, STORAGE, AND HANDLING A. Inventory door hardware on receipt and provide secure lock-up for door hardware delivered to Project site. B. Tag each item or package separately with identification coordinated with the final door hardware schedule, and include installation instructions, templates, and necessary fasteners with each item or package. C. Deliver keys to manufacturer of key control system for subsequent delivery to Owner. 1.7 COORDINATION A. Coordinate layout and installation of floor-recessed door hardware with floor construction. Cast anchoring inserts into concrete. B. Installation Templates: Distribute for doors, frames, and other work specified to be factory prepared. Check Shop Drawings of other work to confirm that adequate provisions are made for locating and installing door hardware to comply with indicated requirements. 1.8 WARRANTY A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace components of door hardware that fail in materials or workmanship within specified warranty period. 1. Failures include, but are not limited to, the following: a. Structural failures including excessive deflection, cracking, or breakage. b. Faulty operation of doors and door hardware. c. Deterioration of metals, metal finishes, and other materials beyond normal weathering and use. 2. Warranty Period: Three years from date of Substantial Completion, unless otherwise indicated. a. Manual Closers: 10 years from date of Substantial Completion. DOOR HARDWARE

13 PART 2 - PRODUCTS 2.1 SCHEDULED DOOR HARDWARE A. Provide door hardware for each door as scheduled in Part 3 "Door Hardware Schedule" Article to comply with requirements in this Section. 1. Door Hardware Sets: Provide quantity, item, size, finish or color indicated, and named manufacturers' products B. Designations: Requirements for design, grade, function, finish, size, and other distinctive qualities of each type of door hardware are indicated in Part 3 "Door Hardware Schedule" Article. Products are identified by using door hardware designations, as follows: 1. Named Manufacturers' Products: Manufacturer and product designation are listed for each door hardware type required for the purpose of establishing minimum requirements. Manufacturers' names are abbreviated in Part 3 "Door Hardware Schedule" Article. 2. References to BHMA Designations: Provide products complying with these designations and requirements for description, quality, and function. 2.2 HINGES A. Hinges: BHMA A Provide template-produced hinges for hinges installed on hollowmetal doors and hollow-metal frames. 1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following: a. Bommer Industries, Inc. b. Hager Companies. c. Stanley Commercial Hardware; Div. of The Stanley Works. 2.3 MECHANICAL LOCKS AND LATCHES A. Lock Functions: As indicated in door hardware schedule. B. Lock Throw: Comply with testing requirements for length of bolts required for labeled fire doors, and as follows: 1. Bored Locks: Minimum 1/2-inch (13-mm) latchbolt throw. C. Lock Backset: 2-3/4 inches (70 mm), unless otherwise indicated. D. Lock Trim: 1. Operating Device: Lever with escutcheons (roses). E. Strikes: Provide manufacturer's standard strike for each lock bolt or latchbolt complying with requirements indicated for applicable lock or latch and with strike box and curved lip extended to protect frame; finished to match lock or latch. DOOR HARDWARE

14 1. Flat-Lip Strikes: For locks with three-piece antifriction latchbolts, as recommended by manufacturer. F. Bored Locks: BHMA A156.2; Grade 1; Series Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following: 2.4 LOCK CYLINDERS a. Best Access Systems; Div. of Stanley Security Solutions, Inc. A. Lock Cylinders: Tumbler type, constructed from brass or bronze, stainless steel, or nickel silver. 1. Manufacturer: Same manufacturer as for locking devices, Best 7 pin cylinder to match existing building standard. B. Standard Lock Cylinders: BHMA A156.5; Grade 1; permanent cores that are removable; face finished to match lockset. 2.5 KEYING A. Keying System: Complying with guidelines in BHMA A156.28, Appendix A. Incorporate decisions made in keying conference. 1. Existing System: a. Final keying is to be by owner. Furnish blank cores to owner. B. Keys: Nickel silver. 1. Stamping: Permanently inscribe each key with a visual key control number and include the following notation: 2.6 SURFACE CLOSERS a. Notation: Information to be furnished by Owner. A. Surface Closers: BHMA A156.4; rack-and-pinion hydraulic type with adjustable sweep and latch speeds controlled by key-operated valves and forged-steel main arm. Comply with manufacturer's written recommendations for size of door closers depending on size of door, exposure to weather, and anticipated frequency of use. Provide factory-sized closers, adjustable to meet field conditions and requirements for opening force. 1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following: a. LCN Closers; an Ingersoll-Rand company. DOOR HARDWARE

15 2.7 FABRICATION A. Manufacturer's Nameplate: Do not provide products that have manufacturer's name or trade name displayed in a visible location except in conjunction with required fire-rated labels and as otherwise approved by Architect. 1. Manufacturer's identification is permitted on rim of lock cylinders only. B. Base Metals: Produce door hardware units of base metal indicated, fabricated by forming method indicated, using manufacturer's standard metal alloy, composition, temper, and hardness. Furnish metals of a quality equal to or greater than that of specified door hardware units and BHMA A C. Fasteners: Provide door hardware manufactured to comply with published templates prepared for machine, wood, and sheet metal screws. Provide screws that comply with commercially recognized industry standards for application intended, except aluminum fasteners are not permitted. Provide Phillips flat-head screws with finished heads to match surface of door hardware, unless otherwise indicated. 1. Concealed Fasteners: For door hardware units that are exposed when door is closed, except for units already specified with concealed fasteners. Do not use through bolts for installation where bolt head or nut on opposite face is exposed unless it is the only means of securely attaching the door hardware. Where through bolts are used on hollow door and frame construction, provide sleeves for each through bolt. 2. Fire-Rated Applications: a. Wood or Machine Screws: For the following: 1) Hinges mortised to doors or frames. 2) Strike plates to frames. 3) Closers to doors and frames. b. Steel Through Bolts: For the following unless door blocking is provided: 1) Closers to doors and frames. 3. Spacers or Sex Bolts: For through bolting of hollow-metal doors. 2.8 FINISHES A. Provide finishes complying with BHMA A as indicated in door hardware schedule. B. Protect mechanical finishes on exposed surfaces from damage by applying a strippable, temporary protective covering before shipping. C. Appearance of Finished Work: Variations in appearance of abutting or adjacent pieces are acceptable if they are within one-half of the range of approved Samples. Noticeable variations in the same piece are not acceptable. Variations in appearance of other components are acceptable if they are within the range of approved Samples and are assembled or installed to minimize contrast. DOOR HARDWARE

16 PART 3 - EXECUTION 3.1 EXAMINATION A. Examine doors and frames, with Installer present, for compliance with requirements for installation tolerances, labeled fire-rated door assembly construction, wall and floor construction, and other conditions affecting performance. B. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 PREPARATION A. Steel Doors and Frames: For surface applied door hardware, drill and tap doors and frames according to ANSI/SDI A INSTALLATION A. Mounting Heights: Mount door hardware units at heights to comply with the following unless otherwise indicated or required to comply with governing regulations. 1. Standard Steel Doors and Frames: ANSI/SDI A B. Install each door hardware item to comply with manufacturer's written instructions. Where cutting and fitting are required to install door hardware onto or into surfaces that are later to be painted or finished in another way, coordinate removal, storage, and reinstallation of surface protective trim units with finishing. Do not install surface-mounted items until finishes have been completed on substrates involved. 1. Set units level, plumb, and true to line and location. Adjust and reinforce attachment substrates as necessary for proper installation and operation. 2. Drill and countersink units that are not factory prepared for anchorage fasteners. Space fasteners and anchors according to industry standards. C. Hinges: Install types and in quantities indicated in door hardware schedule but not fewer than the number recommended by manufacturer for application indicated or one hinge for every 30 inches (750 mm) of door height, whichever is more stringent, unless other equivalent means of support for door, such as spring hinges or pivots, are provided. 3.4 ADJUSTING A. Initial Adjustment: Adjust and check each operating item of door hardware and each door to ensure proper operation or function of every unit. Replace units that cannot be adjusted to operate as intended. Adjust door control devices to compensate for final operation of heating and ventilating equipment and to comply with referenced accessibility requirements. 1. Door Closers: Adjust sweep period to comply with accessibility requirements and requirements of authorities having jurisdiction. 3.5 CLEANING AND PROTECTION A. Clean adjacent surfaces soiled by door hardware installation. DOOR HARDWARE

17 B. Clean operating items as necessary to restore proper function and finish. C. Provide final protection and maintain conditions that ensure that door hardware is without damage or deterioration at time of Substantial Completion. 3.6 DOOR HARDWARE SCHEDULE Group 1 3 each Butts BB1279 4½ x 4½ 626 Hager 1 each Storeroom Lock 93K7D15KS3 626 Best 1 each Closer 4040 Alum. LCN Group 2 2 each Butts BB1279 4½ x 4½ 626 Hager 1 each Storeroom Lock 93K7D15KS3 626 Best 1 each Closer 4040 Alum. LCN END OF SECTION DOOR HARDWARE

18 THIS PAGE INTENTIONALLY LEFT BLANK

19 SECTION FIXED LOUVERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section Includes: 1. Fixed, extruded-aluminum louvers. 1.3 DEFINITIONS A. Louver Terminology: Definitions of terms for metal louvers contained in AMCA 501 apply to this Section unless otherwise defined in this Section or in referenced standards. B. Horizontal Louver: Louver with horizontal blades (i.e., the axes of the blades are horizontal). C. Drainable-Blade Louver: Louver with blades having gutters that collect water and drain it to channels in jambs and mullions, which carry it to bottom of unit and away from opening. 1.4 SUBMITTALS A. Product Data: For each type of product. B. Shop Drawings: For louvers and accessories. Include plans, elevations, sections, details, and attachments to other work. Show frame profiles and blade profiles, angles, and spacing. 1. Show weep paths, gaskets, flashing, sealant, and other means of preventing water intrusion. C. Samples: For each type of metal finish required. D. Delegated-Design Submittal: For louvers indicated to comply with structural performance requirements, including analysis data signed and sealed by the qualified professional engineer responsible for their preparation. 1.5 INFORMATIONAL SUBMITTALS A. Product Test Reports: Based on evaluation of comprehensive tests performed according to AMCA 500-L by a qualified testing agency or by manufacturer and witnessed by a qualified testing agency, for each type of louver and showing compliance with performance requirements specified. 1.6 QUALITY ASSURANCE A. Welding Qualifications: Qualify procedures and personnel according to the following: FIXED LOUVERS

20 1. AWS D1.2/D1.2M, "Structural Welding Code - Aluminum." 1.7 FIELD CONDITIONS A. Field Measurements: Verify actual dimensions of openings by field measurements before fabrication. PART 2 - PRODUCTS 2.1 MANUFACTURERS A. Source Limitations: Obtain louvers from single source from a single manufacturer where indicated to be of same type, design, or factory-applied color finish. 2.2 PERFORMANCE REQUIREMENTS A. Delegated Design: Design louvers, including comprehensive engineering analysis by a qualified professional engineer, using structural and seismic performance requirements and design criteria indicated. B. Structural Performance: Louvers shall withstand the effects of gravity loads and the following loads and stresses within limits and under conditions indicated without permanent deformation of louver components, noise or metal fatigue caused by louver-blade rattle or flutter, or permanent damage to fasteners and anchors. Wind pressures shall be considered to act normal to the face of the building. 1. Wind Loads: Determine loads based on a uniform pressure of 20 lbf/sq. ft. (957 Pa), acting inward or outward. C. Seismic Performance: Louvers, including attachments to other construction, shall withstand the effects of earthquake motions determined according to ASCE/SEI 7. D. Louver Performance Ratings: Provide louvers complying with requirements specified, as demonstrated by testing manufacturer's stock units identical to those provided, except for length and width according to AMCA 500-L. E. Thermal Movements: Allow for thermal movements from ambient and surface temperature changes. 1. Temperature Change (Range): 120 deg F (67 deg C), ambient; 180 deg F (100 deg C), material surfaces. F. SMACNA Standard: Comply with recommendations in SMACNA's "Architectural Sheet Metal Manual" for fabrication, construction details, and installation procedures. 2.3 FIXED, EXTRUDED-ALUMINUM LOUVERS A. Horizontal, Drainable-Blade Louver: FIXED LOUVERS

21 1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following: a. Airolite Company, LLC (The). b. Greenheck Fan Corporation. c. Ruskin Company; Tomkins PLC; Basis-of-Design. 2. Louver Depth: 4 inches (100 mm). 3. Frame and Blade Nominal Thickness: Not less than inch (2.03 mm). 4. Mullion Type: Exposed. 5. Louver Performance Ratings: 2.4 LOUVER SCREENS a. Free Area: Not less than 54% for 48-inch- (1220-mm-) wide by 48-inch- (1220- mm-) high louver. b. Point of Beginning Water Penetration: Not less than 803 fpm. c. Air Performance: Not more than 0.10-inch wg (25-Pa) static pressure drop at 800- fpm (4.1-m/s) free-area exhaust velocity. A. General: Provide screen at each exterior louver. 1. Screen Location for Fixed Louvers: Interior face. a. Screening Type: Insect screening. 2. Screen Location for Fixed Louvers: Exterior face. a. Screening Type: Bird Screening. B. Secure screen frames to louver frames with stainless-steel machine screws, spaced a maximum of 6 inches (150 mm) from each corner and at 12 inches (300 mm) o.c. C. Louver Screen Frames: Fabricate with mitered corners to louver sizes indicated. 1. Metal: Same type and form of metal as indicated for louver to which screens are attached. Reinforce extruded-aluminum screen frames at corners with clips. 2. Finish: Mill finish unless otherwise indicated. 3. Type: Non-rewirable, U-shaped frames. D. Louver Screening for Aluminum Louvers: 1. Insect Screening: Aluminum, 18 x 16 mesh inch wire. 2. Bird Screening: Flattened, expanded aluminum, 5/8 inch x.040 inch in removable frame. Color to match louver. 2.5 BLANK-OFF PANELS A. Insulated, Blank-Off Panels: Laminated panels consisting of an insulating core surfaced on back and front with metal sheets and attached to back of louver. FIXED LOUVERS

22 1. Thickness: 1 inch (25 mm). 2. Metal Facing Sheets: Galvanized-steel sheet, not less than inch (0.71-mm) nominal thickness. 3. Insulating Core: Rigid, glass-fiber-board insulation or extruded-polystyrene foam. 4. Edge Treatment: Trim perimeter edges of blank-off panels with louver manufacturer's standard channel frames, with corners mitered and with same finish as panels. 5. Seal perimeter joints between panel faces and louver frames with gaskets or sealant. 6. Panel Finish: Same type of finish applied to louvers, but black color. 7. Attach blank-off panels with sheet metal screws. 2.6 MATERIALS A. Aluminum Extrusions: ASTM B 221 (ASTM B 221M), Alloy 6063-T5, T-52, or T6. B. Fasteners: Use types and sizes to suit unit installation conditions. 1. Use hex-head or Phillips pan-head screws for exposed fasteners unless otherwise indicated. 2. For fastening aluminum, use aluminum or 300 series stainless-steel fasteners. 3. For color-finished louvers, use fasteners with heads that match color of louvers. 2.7 FABRICATION A. Factory assembled louvers to minimize field splicing and assembly. Disassemble units as necessary for shipping and handling limitations. Clearly mark units for reassembly and coordinated installation. B. Maintain equal louver blade spacing to produce uniform appearance. C. Fabricate frames, including integral sills, to fit in openings of sizes indicated, with allowances made for fabrication and installation tolerances, adjoining material tolerances, and perimeter sealant joints. 1. Frame Type: Channel unless otherwise indicated. D. Include supports, anchorages, and accessories required for complete assembly. E. Provide subsills made of same material as louvers for recessed louvers. F. Join frame members to each other and to fixed louver blades with fillet welds, threaded fasteners, or both, as standard with louver manufacturer unless otherwise indicated or size of louver assembly makes bolted connections between frame members necessary. 2.8 ALUMINUM FINISHES A. Finish louvers after assembly. B. Color Anodic Finish: AAMA 611, AA-M12C22A42/A44, Class I, mm or thicker. 1. Color: As selected by Owner from manufacturers full range of colors. FIXED LOUVERS

23 PART 3 - EXECUTION 3.1 EXAMINATION A. Examine substrates and openings, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of the Work. B. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 PREPARATION A. Coordinate setting drawings, diagrams, templates, instructions, and directions for installation of anchorages that are to be embedded in concrete or masonry construction. Coordinate delivery of such items to Project site. 3.3 INSTALLATION A. Locate and place louvers level, plumb, and at indicated alignment with adjacent work. B. Use concealed anchorages where possible. Provide brass or lead washers fitted to screws where required to protect metal surfaces and to make a weathertight connection. C. Form closely fitted joints with exposed connections accurately located and secured. D. Provide perimeter reveals and openings of uniform width for sealants and joint fillers, as indicated. E. Install concealed gaskets, flashings, joint fillers, and insulation as louver installation progresses, where weathertight louver joints are required. Comply with Section "Joint Sealants" for sealants applied during louver installation. 3.4 ADJUSTING AND CLEANING A. Clean exposed louver surfaces that are not protected by temporary covering, to remove fingerprints and soil during construction period. Do not let soil accumulate during construction period. B. Before final inspection, clean exposed surfaces with water and a mild soap or detergent not harmful to finishes. Thoroughly rinse surfaces and dry. C. Restore louvers damaged during installation and construction so no evidence remains of corrective work. If results of restoration are unsuccessful, as determined by Architect, remove damaged units and replace with new units. 1. Touch up minor abrasions in finishes with air-dried coating that matches color and gloss of, and is compatible with, factory-applied finish coating. END OF SECTION FIXED LOUVERS

24 THIS PAGE INTENTIONALLY LEFT BLANK

1. Bullet resistant hollow metal door and frame assemblies tested in accordance with UL 7 52 and in compliance with the following:

1. Bullet resistant hollow metal door and frame assemblies tested in accordance with UL 7 52 and in compliance with the following: Various Locations PROJECT#: R1401-01 SECTION 083400 -BULLET RESISTANT DOOR AND FRAMES PART 1-GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary

More information

Division 8 Section "Flush Wood Doors" for louvers in wood doors. Division 15 Sections for louvers that are a part of mechanical equipment.

Division 8 Section Flush Wood Doors for louvers in wood doors. Division 15 Sections for louvers that are a part of mechanical equipment. 0 0 0 0 0 SECTION 000 - LOUVERS AND VENTS PART GENERAL RELATED DOCUMENTS EASTLAKE FIRE STATION REPLACEMENT HILLSBOROUGH COUNTY CIP # Drawings and general provisions of the Contract, including General and

More information

SECTION HOLLOW METAL DOORS AND FRAMES

SECTION HOLLOW METAL DOORS AND FRAMES SECTION 081113 HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Standard hollow metal doors frames. Minimum Thickness: Minimum thickness of base metal without coatings.

Standard hollow metal doors frames. Minimum Thickness: Minimum thickness of base metal without coatings. SECTION 081113 - PART 1 - GENERAL 1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this

More information

DIVISION 8 OPENINGS SECTION HOLLOW METAL DOORS AND FRAMES

DIVISION 8 OPENINGS SECTION HOLLOW METAL DOORS AND FRAMES DIVISION 8 OPENINGS SECTION 08 11 13 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

A. Minimum Thickness: Minimum thickness of base metal without coatings according to NAAMM-HMMA 803 or SDI A250.8.

A. Minimum Thickness: Minimum thickness of base metal without coatings according to NAAMM-HMMA 803 or SDI A250.8. SECTION 08 11 13 - HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

B. Hollow Metal work for Interior frames, including Glazing Stops.

B. Hollow Metal work for Interior frames, including Glazing Stops. SECTION 081113 - HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

B. Related Requirements: 1. [Section "Door Hardware"] for door hardware for hollow metal doors.

B. Related Requirements: 1. [Section Door Hardware] for door hardware for hollow metal doors. SECTION 08 11 13 HOLLOW METAL DOORS AND FRAMES PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

RAMAPO COLLEGE OF NEW JERSEY PHASE II HOUSING REHABILITATION C 2012

RAMAPO COLLEGE OF NEW JERSEY PHASE II HOUSING REHABILITATION C 2012 SECTION 10200 - LOUVERS AND VENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 08 1113 - HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

SECTION STEEL DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION STEEL DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 08110 - STEEL DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General, Supplementary, and Special Conditions and Division 1 Specification

More information

A. Access doors and frames are part of an access door and frame allowance.

A. Access doors and frames are part of an access door and frame allowance. SECTION 08 31 13 ACCESS DOORS AND FRAMES PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018 SECTION 08 1119 - STAINLESS STEEL DOOR AND FRAMES GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Lykes Steamship Building 1770 Tchoupitoulas St. New Orleans, LA

Lykes Steamship Building 1770 Tchoupitoulas St. New Orleans, LA SECTION 08110 - STEEL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standard hollow metal doors and frames. 1.2 SUBMITTALS A. Product Data: For each type of product indicated. B.

More information

Banyan Air Service November 18, 2011 AVE Aviation and Commerce Center Building 1 Miami, FL

Banyan Air Service November 18, 2011 AVE Aviation and Commerce Center Building 1 Miami, FL SECTION 08111 - STANDARD STEEL DOOR AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions apply to this Section.

More information

HOTEL SPECIFICATION SECTION 08100

HOTEL SPECIFICATION SECTION 08100 Part 1 General HOTEL SPECIFICATION SECTION 08100 1.01 Work Included A. The work under this section shall include the furnishing of all items shown on the drawings and as specified including, but not limited

More information

1. Include construction details, materials, individual components and profiles, and finishes.

1. Include construction details, materials, individual components and profiles, and finishes. SECTION 08 31 13 - ACCESS DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings,and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100

COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100 COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100 Part 1 General 1.01 Work Included A. The work under this section shall include the furnishing of all items shown on the drawings and as specified,

More information

B. Related Sections: The following Sections contain requirements that relate to this Section:

B. Related Sections: The following Sections contain requirements that relate to this Section: SECTION 08111 - STEEL DOOR FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

Section Addendum No. 1

Section Addendum No. 1 Section 00 9113 Addendum No. 1 2018 AERATION OF WWTP EFFLUENT DURAND, MICHIGAN To all prospective bidders and others concerned, YOU ARE HEREBY ADVISED THAT the Contract Documents for the above referenced

More information

HOLLOW METAL DOORS AND FRAMES SECTION HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL

HOLLOW METAL DOORS AND FRAMES SECTION HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 13686.00 HOLLOW METAL DOORS AND FRAMES 081113-1 SECTION 081113 - HOLLOW METAL DOORS AND FRAMES 1.1 RELATED DOCUMENTS: PART 1 - GENERAL A. Drawings and general provisions of Contract, including General

More information

SECTION (10705) EXTERIOR SUN CONTROL DEVICES

SECTION (10705) EXTERIOR SUN CONTROL DEVICES 10 71 13 SECTION (10705) EXTERIOR SUN CONTROL DEVICES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION DOOR HARDWARE

SECTION DOOR HARDWARE SECTION 087100 -DOOR HARDWARE PART 1- GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

The fire resistance required for doors in this building is 1 (one) hour resistance in compliance with the below general specifications:

The fire resistance required for doors in this building is 1 (one) hour resistance in compliance with the below general specifications: Query No.1 ; we need more specs. about fire resistant doors Answer to Query No. 1: The fire resistance required for doors in this building is 1 (one) hour resistance in compliance with the below general

More information

SECTION HOLLOW METAL DOORS AND FRAMES. A. Section includes steel doors and frames (hollow metal) indicated and as specified.

SECTION HOLLOW METAL DOORS AND FRAMES. A. Section includes steel doors and frames (hollow metal) indicated and as specified. SECTION 08 11 13 HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section includes steel doors and frames (hollow metal) indicated and as specified. 1.2 SUBMITTALS A. Product Data: Submit

More information

SECTION METAL DOORS & FRAMES

SECTION METAL DOORS & FRAMES SECTION 08100 METAL DOORS & FRAMES PART 1 GENERAL 1.1 SCOPE Drawings and general provisions of the Contract, including General and Supplementary General Conditions and other Division 00 & 01 specification

More information

Hollow Metal Doors and Frames

Hollow Metal Doors and Frames University of New Hampshire University of New Hampshire Scholars' Repository Division 08 Openings Chapter 5 Technical Construction and Renovation Standards 1-25-2013 081113 - Hollow Metal Doors and Frames

More information

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection SECTION 13090 RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13090-1 LOW INTENSITY RADIATION PROTECTION

More information

DETAILED METAL DOOR SPECIFICATION. UNIVERSITY CONTACT: Mark Golden, Supervisor of Structural Services (302)

DETAILED METAL DOOR SPECIFICATION. UNIVERSITY CONTACT: Mark Golden, Supervisor of Structural Services (302) DETAILED METAL DOOR SPECIFICATION UNIVERSITY CONTACT: Mark Golden, Supervisor of Structural Services (302) 831-8456 PART 1 GENERAL DOORS 1.01 GENERAL PROVISIONS I. The Drawings and General Provisions of

More information

1. Temperature Change: 120 deg F (67 deg C), ambient; 180 deg F (100 deg C), material surfaces.

1. Temperature Change: 120 deg F (67 deg C), ambient; 180 deg F (100 deg C), material surfaces. SECTION 05500- METAL FABRICATIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

1. Seismic Loads: Reference structural drawings.

1. Seismic Loads: Reference structural drawings. SECTION 102213 ~WIRE MESH PARTITIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general prov1s1ons of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION FIBERGLASS REINFORCED POLYESTER (FRP) DOORS AND ALUMINUM FRAMES

SECTION FIBERGLASS REINFORCED POLYESTER (FRP) DOORS AND ALUMINUM FRAMES SECTION 081613 FIBERGLASS REINFORCED POLYESTER (FRP) DOORS AND ALUMINUM FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary

More information

Preassembled steel stairs with concrete-filled treads.

Preassembled steel stairs with concrete-filled treads. SECTION 055113 - PART 1 - GENERAL 1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this

More information

PRESTON HEALTH SERVICES ARCHITECT'S NO MITCHELL-HOLLINGSWORTH NURSING & REHAB ADPH #B

PRESTON HEALTH SERVICES ARCHITECT'S NO MITCHELL-HOLLINGSWORTH NURSING & REHAB ADPH #B SECTION 05 5213 - PIPE RAILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

PART 1 GENERAL HOLLOW METAL DOORS AND FRAMES

PART 1 GENERAL HOLLOW METAL DOORS AND FRAMES SECTION 08 11 13 (08110) PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Interior Hollow Metal Doors and Frames 2. Exterior Hollow Metal Doors and Frames 1.2 REFERENCES A. ASTM International (ASTM)

More information

[PROJECT NAME] [PROJECT NUMBER] [CITY AND STATE]

[PROJECT NAME] [PROJECT NUMBER] [CITY AND STATE] SECTION 083953 - BLAST RESISTANT DOOR AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

A NEW SCHOOL ATHENS BIBLE SCHOOL FOR THE PRESIDENT AND BOARD OF DIRECTORS ATHENS, ALABAMA

A NEW SCHOOL ATHENS BIBLE SCHOOL FOR THE PRESIDENT AND BOARD OF DIRECTORS ATHENS, ALABAMA McKee and Associates Architecture and Interior Design Addendum No. TWO Date: 09.27.17 Project: A NEW SCHOOL ATHENS BIBLE SCHOOL FOR THE PRESIDENT AND BOARD OF DIRECTORS ATHENS, ALABAMA A2.1 GENERAL PROJECT

More information

C. Samples: For each door face material, at least 3 by 5 inches (75 by 125 mm) in size, in specified finish.

C. Samples: For each door face material, at least 3 by 5 inches (75 by 125 mm) in size, in specified finish. SECTION 083113 - ACCESS DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

1. Include plans, elevations, sections, details, and attachments to other work.

1. Include plans, elevations, sections, details, and attachments to other work. SECTION 102213- PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to

More information

Architectural Wall Products Guide Specifications

Architectural Wall Products Guide Specifications Western States Metal Roofing 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 Architectural Wall Products Guide Specifications FORMED METAL WALL PANELS This Guide Specification is

More information

SECTION HVAC GRAVITY VENTILATORS

SECTION HVAC GRAVITY VENTILATORS SECTION 23 37 23 HVAC GRAVITY VENTILATORS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Construction Standards PAGE

Construction Standards PAGE Construction Standards PAGE 083113-1 SECTION 083113 - PART 1 - GENERAL 1.1 M.S.U ISSUES A. M.S.U. avoids access doors whenever possible by using lay-in type ceilings, but all valves and equipment requiring

More information

Northpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017

Northpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017 SECTION 055213 - PIPE AND TUBE RAILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION METAL STAIRS

SECTION METAL STAIRS SECTION 05 51 00 METAL STAIRS PART 1 GENERAL 1.1 SUMMARY A. Section includes steel stair frame of structural sections, with closed risers; pan to receive concrete fill stair treads and landings; integral

More information

SECTION MISCELLANEOUS METALS

SECTION MISCELLANEOUS METALS PART 1 GENERAL 1.1 WORK OF THIS SECTION A. Contractor shall provide all labor, materials, equipment and incidentals as shown, specified and required to furnish and install all miscellaneous metal fabrications

More information

Section PANEL SIGNAGE

Section PANEL SIGNAGE Section 10 14 23 PANEL SIGNAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including FDOT DIVISION I GENERAL REQUIREMENTS & COVENANTS Specification Sections,

More information

Wall Louvers (10200)

Wall Louvers (10200) Wall Louvers 08 90 00 (10200) PART 1 GENERAL SECTION INCLUDES A. Fixed, extruded-aluminum horizontal storm resistant louver RELATED SECTIONS A. Section 05120 - Structural Steel: Supports for penthouses.

More information

North Hanover Township School District North Hanover Township, New Jersey

North Hanover Township School District North Hanover Township, New Jersey SECTION 084413 - GLAZED ALUMINUM CURTAIN WALLS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

A. This Section includes automatic entrance door systems operating as follows: 1. Swinging operation.

A. This Section includes automatic entrance door systems operating as follows: 1. Swinging operation. SECTION 08462 - SWINGING AUTOMATIC ENTRANCE DOORS PART 1 - GENERAL.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General, Supplementary, and Special Conditions and Division

More information

SECTION EXPANSION CONTROL

SECTION EXPANSION CONTROL SECTION 07 95 00 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

AMBICO Limited Section and ACOUSTIC STEEL DOOR AND FRAME ASSEMBLIES Page 1

AMBICO Limited Section and ACOUSTIC STEEL DOOR AND FRAME ASSEMBLIES Page 1 Page 1 This section includes AMBICO Acoustic Steel Doors and Frames as well as perimeter and bottom acoustic seals, and glazing if required all of which can be fire rated or non-rated. The aforementioned

More information

SECTION METAL DOORS & FRAMES

SECTION METAL DOORS & FRAMES SECTION 08-10-00 METAL DOORS & FRAMES Part 1 General 1.00 Scope of Work: Contractor shall provide labor and materials for a complete steel door install. 1.01 Section Includes A. Steel doors. B. Steel frames

More information

A. This Section includes the following: 1. Aluminum pipe and tube handrails and railings.

A. This Section includes the following: 1. Aluminum pipe and tube handrails and railings. SECTION 05521 - PIPE AND TUBE RAILINGS PART 1 - GENERAL.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

Architectural Roof and Wall Products Guide Specifications

Architectural Roof and Wall Products Guide Specifications Architectural Roof and Wall Products Guide Specifications Western States Metal Roofing 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 FORMED METAL WALL PANELS This Guide Specification

More information

SECTION EXPANSION CONTROL

SECTION EXPANSION CONTROL SECTION 07 95 00 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

SECTION EXPANSION CONTROL

SECTION EXPANSION CONTROL SECTION 07 95 00 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

AMBICO Limited Section and DETENTION STEEL DOOR AND FRAME ASSEMBLIES Page 1

AMBICO Limited Section and DETENTION STEEL DOOR AND FRAME ASSEMBLIES Page 1 Page 1 This section includes AMBICO Detention Steel Door and Frame assemblies that can be fire rated or non-rated. This section relies on both the Canadian Steel Door Manufacturers Association (CSDMA.org)

More information

K. ASTM F436- Standard Specification for Hardened Steel Washers; 2011.

K. ASTM F436- Standard Specification for Hardened Steel Washers; 2011. DIVISION 05 METALS 05 12 00 STRUCTURAL STEEL FRAMING PART 1 GENERAL 1.1 SECTION INCLUDES A. Structural steel framing members, support members. 1.2 RELATED REQUIREMENTS A. Section 05 50 00 - Metal Fabrications:

More information

Architectural Roof and Wall Products Guide Specifications

Architectural Roof and Wall Products Guide Specifications Architectural Roof and Wall Products Guide Specifications 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 FORMED METAL ROOF AND WALL PANELS This Guide Specification is to be used

More information

DIMENSIONAL LETTER SIGNAGE

DIMENSIONAL LETTER SIGNAGE SECTION - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this

More information

SECTION COLD-FORMED METAL TRUSSES

SECTION COLD-FORMED METAL TRUSSES SECTION 054400 COLD-FORMED METAL TRUSSES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 102239 - FOLDING PANEL PARTITIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

ST. JOHNS COUNTY ARCH. PROJ. NO SECTION PREFABRICATED ALUMINUM CANOPIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

ST. JOHNS COUNTY ARCH. PROJ. NO SECTION PREFABRICATED ALUMINUM CANOPIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 10530 PREFABRICATED ALUMINUM CANOPIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

SECTION ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

SECTION ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS SECTION 08 4113 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Aluminum entrance doors and frames. 2. Glass infill panels. 3. Door hardware. B. Related Sections:

More information

Central Dartmouth Section Exterior Envelope Renovations METAL-CLAD WOOD DOORS Page 1 of 5 Dartmouth, NS

Central Dartmouth Section Exterior Envelope Renovations METAL-CLAD WOOD DOORS Page 1 of 5 Dartmouth, NS Exterior Envelope Renovations METAL-CLAD WOOD DOORS Page 1 of 5 Part 1 General 1. RELATED SECTIONS 1. Section 07 92 10 Joint Sealing 2. Section 08 71 00 Door Hardware 2. REFERENCES 1. American Society

More information

SECTION EXPANSION CONTROL

SECTION EXPANSION CONTROL SECTION 07 95 00 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

Architectural Roof Products Guide Specifications

Architectural Roof Products Guide Specifications Western States Metal Roofing 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 Architectural Roof Products Guide Specifications FORMED METAL ROOF AND WALL PANELS This Guide Specification

More information

COUNTY OF KINGS KINGS COUNTY JAIL EXPANSION PHASE III

COUNTY OF KINGS KINGS COUNTY JAIL EXPANSION PHASE III SECTION 101419 - DIMENSIONAL CHARACTER SIGNAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

SECTION ALUMINUM HANDRAIL SYSTEMS

SECTION ALUMINUM HANDRAIL SYSTEMS SECTION 05520 ALUMINUM HANDRAIL SYSTEMS PART 1 - GENERAL 1.01 SUMMARY A. Section includes aluminum handrails and railings. B. Related Work: 1. Section 03300 - Cast-in-Place Concrete C. References: 1. American

More information

PIPE AND TUBE RAILINGS. Evansville Christian High School RELATED DOCUMENTS 1.1

PIPE AND TUBE RAILINGS. Evansville Christian High School RELATED DOCUMENTS 1.1 SECTION 055213 - PART 1 - GENERAL 1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this

More information

Architectural Roof Products Guide Specifications

Architectural Roof Products Guide Specifications Western States Metal Roofing 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 Architectural Roof Products Guide Specifications FORMED METAL ROOF AND WALL PANELS This Guide Specification

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 095423 - LINEAR METAL CEILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION ACCESS DOORS AND FRAMES

SECTION ACCESS DOORS AND FRAMES SECTION 08310 ACCESS DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. [Fire rated] [and] [Non-fire rated] wall access panels. 2. [Fire rated] [and] [Non-fire rated] ceiling access

More information

SPECIFICATION SECTION PART 1 GENERAL

SPECIFICATION SECTION PART 1 GENERAL PART 1 GENERAL 1.01 Summary A. Furnish and install louvers, bird screens, blank-off panels, structural supports and attachment brackets as shown on the drawings, as specified, and as needed for a complete

More information

Division 08 Openings Section Ohio Utilities Protection Service New Office Building Bid Package B METAL DOORS AND FRAMES

Division 08 Openings Section Ohio Utilities Protection Service New Office Building Bid Package B METAL DOORS AND FRAMES SECTION 08 11 00 METAL DOORS AND FRAMES PART 1 GENERAL 1.1 SUMMARY A. Section includes: 1. Hollow Metal Doors. 2. Hollow Metal Frames. B. Related Sections: Documents relating to the work of this section

More information

SECTION HANDRAILS AND RAILINGS. A. Section Cast-In-Place Concrete; coordination with substrate.

SECTION HANDRAILS AND RAILINGS. A. Section Cast-In-Place Concrete; coordination with substrate. SECTION 05520 HANDRAILS AND RAILINGS PART 1 GENERAL 1.1 SECTION INCLUDES A. Welded stainless steel railing systems. 1.2 RELATED SECTIONS A. Section 03300 - Cast-In-Place Concrete; coordination with substrate.

More information

Door Hardware

Door Hardware 08 71 00 Door Hardware Submittals 1. Door Hardware Schedule: Prepared by or under the supervision of supplier, detailing fabrication and assembly of door hardware, as well as procedures and diagrams. Coordinate

More information

SECTION ALUMINUM-FRAMED HIGH PERFORMANCE THERMAL ENTRANCE DOORS

SECTION ALUMINUM-FRAMED HIGH PERFORMANCE THERMAL ENTRANCE DOORS PART 1 GENERAL SECTION 08 1116 ALUMINUM-FRAMED HIGH PERFORMANCE THERMAL ENTRANCE DOORS 1.01 SECTION INCLUDES A. Aluminum-framed storefront, with vision glass. B. Infill panels of glass. C. Aluminum doors

More information

SECTION Temperature Change: 120 deg F, ambient; 180 deg F, material surfaces.

SECTION Temperature Change: 120 deg F, ambient; 180 deg F, material surfaces. PART 1 - GENERAL 1.1 SUMMARY A. Section includes the following: 1. Handrails and guardrails. 1.2 PERFORMANCE REQUIREMENTS A. General: In engineering railings to withstand structural loads indicated, determine

More information

SECTION LOUVERS AND VENTS

SECTION LOUVERS AND VENTS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 08 90 00 1. Use this section only for NCA projects. 2. Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable

More information

SPECIFICATION SECTION PART 1 GENERAL

SPECIFICATION SECTION PART 1 GENERAL PART 1 GENERAL 1.01 Summary A. Furnish and install louvers, bird screens, blank-off panels, structural supports and attachment brackets as shown on the drawings, as specified, and as needed for a complete

More information

SECTION ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

SECTION ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS SECTION 084113 - ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Exterior and interior storefront framing. 2. Exterior and interior manual-swing entrance

More information

AMBICO Limited 7\2018 Section and OVERSIZED METAL DOORS AND FRAMES Page 1

AMBICO Limited 7\2018 Section and OVERSIZED METAL DOORS AND FRAMES Page 1 Page 1 This section includes Oversize Steel Doors and Frames and relies on the Canadian Steel Door Manufacturers Association (CSDMA.org) industry standard, as well as on the Hollow Metal Manufacturers

More information

SECTION FOOD DISPENSING EQUIPMENT- SNEEZE GUARDS AND PARTITION POSTS

SECTION FOOD DISPENSING EQUIPMENT- SNEEZE GUARDS AND PARTITION POSTS Page 1 of 17 SECTION 11 4600 FOOD DISPENSING EQUIPMENT- SNEEZE GUARDS AND PARTITION POSTS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and

More information

Student Services & Classroom Addition

Student Services & Classroom Addition SECTION 055113 - METAL PAN STAIRS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

B. Shop Drawings: For metal lockers. Include plans, elevations, sections, details, and attachments to other work.

B. Shop Drawings: For metal lockers. Include plans, elevations, sections, details, and attachments to other work. SECTION 10 5113 - METAL LOCKERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

TRUMAN STATE UNIVERSITY GREENWOOD SCHOOL WINDOW REPLACEMENT

TRUMAN STATE UNIVERSITY GREENWOOD SCHOOL WINDOW REPLACEMENT SECTION 085200 - WOOD WINDOWS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

DIVISION 10 SPECIALTIES SECTION METAL LOCKERS

DIVISION 10 SPECIALTIES SECTION METAL LOCKERS DIVISION 10 SPECIALTIES SECTION 10 51 13 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SPECIFICATION SECTION PART 1 GENERAL

SPECIFICATION SECTION PART 1 GENERAL PART 1 GENERAL 1.01 Summary A. Furnish and install louvers, bird screens, blank-off panels, structural supports and attachment brackets as shown on the drawings, as specified, and as needed for a complete

More information

DEPARTMENT OF WATER SUPPLY COUNTY OF HAWAI`I 345 KEKŪ ANAŌ `A STREET, SUITE 20 HILO, HAWAI`I TELEPHONE (808) FAX (808)

DEPARTMENT OF WATER SUPPLY COUNTY OF HAWAI`I 345 KEKŪ ANAŌ `A STREET, SUITE 20 HILO, HAWAI`I TELEPHONE (808) FAX (808) DEPARTMENT OF WATER SUPPLY COUNTY OF HAWAI`I 345 KEKŪ ANAŌ `A STREET, SUITE 20 HILO, HAWAI`I 96720 TELEPHONE (808) 961-8050 FAX (808) 961-8657 DEPARTMENT OF WATER SUPPLY COUNTY OF HAWAI I HILO, HAWAI I

More information

SECTION HOLLOW METALWORK. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION HOLLOW METALWORK. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 081113 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

SECTION METAL STAIRS

SECTION METAL STAIRS SECTION 05510 METAL STAIRS PART 1 GENERAL 1.01 SECTION INCLUDES A. Stairs with concrete treads. B. Stairs with metal treads. C. Structural steel stair framing and supports. D. Handrails and guards. 1.02

More information

SECTION AWNINGS

SECTION AWNINGS SECTION 10 73 13 AWNINGS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Fixed metal awnings. 1.2 DEFINITIONS A. Awning: An architectural projection that provides weather protection,

More information

University of Missouri St. Louis UMSL Project #S7628 Campus Police Building Building Modifications & Renovations R&B Project # Building Upgrades

University of Missouri St. Louis UMSL Project #S7628 Campus Police Building Building Modifications & Renovations R&B Project # Building Upgrades SECTION 08 1113 - HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Special Conditions and Division 01 Specification

More information

St. Monica Food Pantry Hollow Metal Doors and Frames SBA-13105

St. Monica Food Pantry Hollow Metal Doors and Frames SBA-13105 St. Monica Food Pantry 08 1113-1 SECTION 08 1113 - HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUBMITTALS: A. Shop drawings: Indicate door and frame elevations and sections, materials, gauges and

More information

Ice Rink Renovation & New Clubhouse

Ice Rink Renovation & New Clubhouse SECTION 074243- METAL COMPOSITE MATERIAL WALL PANELS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION ALUMINUM-FRAMED ENTRANCES AND CURTAINWALL

SECTION ALUMINUM-FRAMED ENTRANCES AND CURTAINWALL SECTION 084116 - ALUMINUM-FRAMED ENTRANCES AND CURTAINWALL PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Exterior and interior curtainwall framing. 2. Curtainwall framing for punched openings. 3.

More information

SECTION ARCHITECTURAL GLASS HANDRAIL AND RAILINGS

SECTION ARCHITECTURAL GLASS HANDRAIL AND RAILINGS SECTION 05720 ARCHITECTURAL GLASS HANDRAIL AND RAILINGS PART 1 GENERAL 1.01 WORK INCLUDED A. Furnish and install [aluminum] railings and components. 1.02 REFERENCE A. American Architectural Manufacturers

More information

PRESTON HEALTH SERVICES ARCHITECT'S NO. 2700

PRESTON HEALTH SERVICES ARCHITECT'S NO. 2700 SECTION 09 5113 - ACOUSTICAL PANEL CEILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

PART 1 GENERAL 1.04 Quality Assurance

PART 1 GENERAL 1.04 Quality Assurance PART 1 GENERAL 1.01 Summary A. Furnish and install louvers, bird screens, blank-off panels, structural supports and attachment brackets as shown on the drawings, as specified, and as needed for a complete