Special Provision No. 421F01 April 2006

Size: px
Start display at page:

Download "Special Provision No. 421F01 April 2006"

Transcription

1 RIGID PIPE CULVERTS Item No. FLEXIBLE PIPE CULVERTS Item No. CSP ARCH CULVERTS Item No. STRUCTURAL PLATE CSP Item No. CORRUGATED STEEL PIPE EXTENSIONS Item No. ROCK EXCAVATION FOR CULVERTS Item No. CLAY SEAL Item No. CONCRETE APPURTENANCES Item No. Special Provision No. 421F01 April 2006 OPSS 421, April 1999, Construction Specification for Pipe Culverts is deleted in its entirety and replaced with the following: SCOPE This special provision covers the requirements for installing pipe culverts, pipe culvert end sections and concrete appurtenances in open cut REFERENCES This special provision refers to the following standards, specifications, or publications: Ontario Provincial Standards Specifications, Construction: OPSS 206 Grading OPSS 501 Compacting OPSS 517 Dewatering OPSS 539 Protection Systems OPSS 904 Concrete Structures OPSS 905 Steel Reinforcement for Concrete Ontario Provincial Standard Specifications, Materials: OPSS 1004 Aggregates - Miscellaneous OPSS 1205 Clay Seal OPSS 1301 Cementing Materials OPSS 1302 Water OPSS 1350 Concrete - Materials and Production OPSS 1440 Steel Reinforcement for Concrete OPSS 1801 Corrugated Steel Pipe Products OPSS 1820 Circular Concrete Pipe OPSS 1840 Non-Pressure Polyethylene Pipe Products OPSS 1841 Polyvinyl Chloride (PVC) Pipe Products OPSS 1860 Geotextiles April 2006 Pg. 1 of 9 SSP421F01

2 American Society for Testing and Materials: ASTM C171-97a - Sheet Materials for Curing Concrete ASTM C507-95a - Reinforced Concrete Elliptical Culvert, Storm Drain and Sewer Pipe ASTM A760M-90 - Smooth Inside Wall Spiral Rib Steel Pipe DEFINITIONS Backfilling: means the operation of filling the trench with embedment and backfill material. Concrete Appurtenances: mean concrete head walls, cut-off walls, stiffeners, aprons, collars and any other concrete fixtures associated with the pipe culvert excluding concrete bedding or concrete structures covered elsewhere in the Contract and specified as such. Excavation, Earth and Rock: means the excavation classified as earth and rock according to OPSS 206. Flexible Pipe: includes polyvinyl chloride pipe (PVC), polyethylene (PE), corrugated steel pipe (CSP) or smooth inside wall spiral rib steel pipe. Pipe Culvert: means an installation designed to provide for the conveyance of surface water, pedestrians or livestock using preformed or precast pipe sections, circular or non-circular in cross-section, laid end to end using suitable joint materials * Designer Fill-in See Notes to Designer MATERIALS Pipe Materials General Pipe type and class shall be selected according to the terms of the Contract. The pipe size shall be according to the size specified; however, if the size specified is not available then the next larger size pipe shall be used. Fittings shall be suitable for and compatible with the class and type of pipe for which they will be used. Couplers that do not follow the contour of the flexible pipe require a polyethylene gasket, which shall consist of a 2 m wide strip of 150 µm polyethylene film and shall be folded so as to produce a 1 m wide strip. The polyethylene shall be according to ASTM C 171. When flexible pipe culvert is specified, the Contractor may supply culvert pipe with a smooth or corrugated inside wall. When rigid pipe culvert is specified, the Contractor may only supply culvert pipe with a smooth inside wall. If the Contractor chooses to install concrete pipe, the bedding for that pipe shall be constructed according to the contract requirements for rigid pipe. All other pipe shall be constructed according to the contract requirements for the appropriate flexible pipe. April 2006 Pg. 2 of 9 SSP421F01

3 Concrete Pipe Circular concrete pipe and joints shall be according to OPSS Elliptical concrete pipe and joints shall be according to ASTM C Corrugated Steel Pipe Products Corrugated steel pipe products shall be according to OPSS Polyethylene Plastic Pipe Products Polyethylene plastic pipe products shall be according to OPSS Polyvinyl Chloride Plastic Pipe Products Polyvinyl chloride plastic pipe products shall be according to OPSS Smooth Inside Wall Spiral Rib Steel Pipe Smooth inside wall spiral rib steel pipes shall be according to ASTM A760M Mortar Mortar for joints shall be composed of one part normal Portland cement and two parts mortar sand, wetted with only sufficient water to make the mixture plastic. The mortar sand shall be according to OPSS 1004, the normal Portland cement shall be according to OPSS 1301, and the water shall be according to OPSS Clay Seal Clay seal material shall be according to OPSS Concrete Concrete for concrete appurtenances shall be according to OPSS 1350 with a nominal minimum 28 day compressive strength of 30 MPa Reinforcing Steel Reinforcing steel shall be of the size and grade specified and shall be according to OPSS Geotextile Geotextile shall be according to OPSS Backfill Backfill shall be earth, granular or native material and free of boulders over 150 mm, topsoil and other deleterious material as specified elsewhere in the Contract. The Contractor shall be responsible for ensuring the suitability of April 2006 Pg. 3 of 9 SSP421F01

4 the material used for backfill, and shall be supported by test results from a qualified and recognized testing laboratory. Rock fill surplus to the requirements of the Contract can be used provided that the pipe is protected by a minimum of cover material as specified in the contract CONSTRUCTION Protection Against Floatation Damage to the culvert due to floatation shall be prevented during construction and until completion of the work Cold Weather Work All work shall be protected from freezing. Pipes and bedding material shall not be installed on frozen ground. All ice and snow shall be removed from all portions of the work area. Frozen materials shall not be incorporated into the work. Material shall not be placed over frozen ground, ice or snow, except, at the Contractor's option, a single lift may be placed over frozen ground in which case final grading and compaction shall be done after the underlying materials have thawed Transporting, Unloading, Storing and Handling Pipe All pipes, fittings and gaskets that are unsound or damaged shall be rejected. Manufacturer's handling and storage recommendations shall be followed Excavation The excavation for installation of the pipe culvert shall be as specified elsewhere in the contract. The Contractor shall be responsible for excavating the trench within the horizontal and vertical limits specified in the contract. The variation in invert-elevation shall not exceed plus or minus 150 mm and any change within this limit shall not constitute a change in the scope of the work specified in the contract. Bedding elevation shall be adjusted according to the invert level. Where excavation of the trench exceeds the limits specified in the contract, the Contractor shall be responsible to reinstate the required trench limits using suitable material. Replacement material other than concrete shall be compacted to the density requirements of OPSS 501. Alternately, the Contractor shall submit a structurally acceptable design applicable to the revised trench limits and the Contractor shall be responsible for the design and construction of the revised pipe culvert Shoring and Bracing Where, due to the nature of the work, the Contractor shores or braces the excavation during the construction of the work, the Contractor shall carry out the work in accordance with OPSS 538. April 2006 Pg. 4 of 9 SSP421F01

5 Dewatering Dewatering shall be according to OPSS Protection Systems The construction of all protection systems shall be according to OPSS 539. Where the stability, safety or function of an existing roadway, railway, other works, or proposed works may be impaired due to the method of operation, such protection as may be required shall be provided Pipe Installation General If a universal dimple coupler or any other coupler which does not follow the contour of the flexible pipe sections to be joined, then polyethylene gaskets shall be installed at all joints where such couplers are used. Polyethylene gaskets shall be installed symmetrically about the pipe joint, between the coupler and the pipe, and should be of sufficient length to equal the circumference of the pipe plus a minimum overlap of 300 mm. Pipe shall be laid within the specified alignment and grade tolerances. When bell and spigot pipe is laid, the bell end of the pipe shall be laid upgrade. Pipe shall be kept clean as work progresses. Water shall not be allowed to flow through the pipe during construction. The trench shall be kept dry. When approved by the Contract Administrator the raising or lowering of the invert of a pipe culvert by up to 150 mm, will not constitute a Change in the Work and no adjustment will be made to the payment. Where the invert of a pipe culvert is raised or lowered by more than 150 mm, then this shall constitute a Change in the Work for the full extent of the change from the original grade. The pipe culvert cut-end finish and end sections shall be as specified. When installing gaskets all pipe ends shall be thoroughly cleaned and lubricated with a lubricant recommended by the pipe manufacturer. When gaskets have been affixed, the pipe shall be handled so the gasket is not damaged, displaced, or contaminated with foreign matter. Any gasket displaced or contaminated shall be removed, cleaned and lubricated if required, and reinstalled before closure of the joint is attempted. Once the pipe has been jointed, a test shall be made with a feeler gauge at intervals around the joint to make sure the gasket has not been displaced from the spigot groove. If the gasket is found out of position, the joint shall be opened and the gasket placed in its proper position. If necessary, a new gasket shall be installed Circular Concrete Pipe All circular concrete pipe joints shall have elastomeric gaskets. April 2006 Pg. 5 of 9 SSP421F01

6 Non-circular Concrete Pipe Pipe with lift holes shall be laid so that the lift holes are at the 12 o'clock position of the pipe. The lift holes shall be filled with non-shrink mortar before the trench is backfilled. All non-circular concrete pipe joints shall be wrapped with geotextile unless mortar joints are specified in the Contract. A 600 mm wide strip of geotextile shall be placed to form a continuous barrier centred around the exterior of the buried joints. Geotextile shall be of the type, class and filtration opening size specified in the Contract. Geotextiles shall be free of folds, tears and wrinkles. The geotextile shall be joined to conform to the seam requirements of OPSS Joints to be mortared shall be thoroughly cleaned and wetted before placing mortar Corrugated Steel Pipe The Contractor shall place the corrugated steel pipe according to recommendations of the manufacturer. The Contractor shall prevent any structural damage or distortion to the structural plate culvert when it is assembled and moved to the specified alignment and grade. The Contractor shall ensure that all assembly bolts are re-tightened with a minimum torque of 200 N m for gauge size less than 3.5 mm and 340 N m for gauge size greater than 3.5 mm Smooth Inside Wall Spiral Rib Steel Pipe The Contractor shall place the smooth inside wall spiral rib steel pipe according to recommendations of the manufacturer. The Contractor shall prevent any structural damage or distortion to the structural plate culvert when it is assembled and moved to the specified alignment and grade. The Contractor shall ensure that all assembly bolts are re-tightened with a minimum torque of 200 N m for gauge size less than 3.5 mm and 340 N m for gauge size greater than 3.5 mm Polyethylene Pipe The Contractor shall follow the recommendations given by the manufacturer for the pipe joints and ensure that the gasket is not damaged, displaced or contaminated with foreign matter. Polyethylene pipe couplers shall be connected such that the corrugations or projections of the coupler properly engage the pipe corrugations. The Contractor shall be responsible for replacing any displaced or out of position gasket and placing in its proper position before closure of the joints is attempted Polyvinyl Chloride Pipe Polyvinyl chloride plastic pipe shall be jointed using a bell and spigot joint with elastomeric gaskets. The Contractor shall follow the recommendations given by the manufacturer for the pipe joints and ensure that the gasket is not damaged, displaced or contaminated with foreign matter. The Contractor shall be responsible for replacing any displaced or out of position gasket and placing in its proper position before closure of the joint is attempted. April 2006 Pg. 6 of 9 SSP421F01

7 Cleaning and Flushing Pipe Culverts When specified, pipe culverts shall be cleaned and flushed just prior to inspection and acceptance Clay Seals Clay seals shall be placed as specified and compacted to 95% of the maximum dry density Concrete Appurtenances Concrete appurtenances shall be constructed as specified. Concrete in concrete appurtenances shall be placed according to OPSS 904. Reinforcing steel shall be placed according to OPSS 905. Steel grating shall be installed when specified Protection from Traffic Before allowing the movement of construction equipment or any vehicular traffic over the completed structure the depth of backfill over the pipe culvert shall be at least equal to the minimum specified for protection as specified in the Contract Backfilling and Compacting The Contractor shall prevent any structural damage or distortion to the pipe culvert during backfill and cover placement and compaction. Compaction of backfill material shall conform to OPSS 501 Backfill material shall be placed in uniform layers not exceeding 300 mm in loose depth for the full width of the trench and each layer shall be compacted to the density specified elsewhere in the Contract Documents. Protection system sheathing and any shoring and bracing required shall be withdrawn gradually as backfilling progresses. Backfill shall be placed and compacted in a manner that fills the voids left by pulled sheathing and shoring. Backfill shall be placed and compacted around and over sheathing and shoring left in place MEASUREMENT FOR PAYMENT Plan Quantity Measurement Rigid Pipe Culverts Flexible Pipe Culverts CSP Arch Culverts Structural Plate CSP Measurement for payment for these items is by Plan Quantity, as may be revised by Adjusted Plan Quantity, of the horizontal length of the pipe in metres, from one end of the pipe or pipe end section to the other end of the pipe or the other pipe end section. Where the grade of the pipe culvert is 10% or greater, then the above measurement is of the slope length. April 2006 Pg. 7 of 9 SSP421F01

8 Corrugated Steel Pipe Extensions Measurement for payment for Corrugated Steel Pipe Extensions is by Plan Quantity as may be revised by Adjusted Plan Quantity, of the horizontal length of the pipe extension in metres Rock Excavation for Culverts Measurement for payment for rock excavation for pipe culverts is by Plan Quantity as may be revised by Adjusted Plan Quantity, of the volume in cubic metres below the upper limit. The upper limit is the existing rock surface as measured after removal of overburden but before rock excavation or the top of shatter whichever is lower. Where the excavation for the above item overlaps excavation required for other work, the measurement shall be made as specified with no deduction for overlaps. The volume of boulders in an excavation shall be determined on the basis of the three maximum rectilinear dimensions. Where boulders classified as rock, are measured for payment, only the amount actually removed shall be considered for payment. The total volume of rock considered for payment shall not exceed the calculated volume of excavation within the theoretical lines Concrete Appurtenances Measurement for payment for concrete appurtenances is by Plan Quantity as may be revised by Adjusted Plan Quantity, of the volume of concrete placed in cubic metres BASIS OF PAYMENT Rigid Pipe Culvert - Item Flexible Pipe Culvert - Item CSP Arch Culverts - Item Structural Plate CSP -Item Payment at the contract price for these items shall be full compensation for all labour, equipment and materials for dewatering, installation and removal of shoring and bracing, earth excavation, bedding and backfill, including frost taper and earth excavation for concrete appurtenances or end sections, for removal of pavement, curb and gutter and sidewalk, except where there is a separate item for removal of pavement, curb and gutter and sidewalk which overlaps pavement curb and gutter, and sidewalk removal required for culvert placement, for the installation of the culvert, for the placing and compacting of bedding, cover and backfill material, and for the disposal of surplus excavated materials Should the earth excavation for pipe bedding and backfill, frost tapers, concrete appurtenances and end sections, overlap excavation required for any other work under the contract, then payment shall be made in accordance with the specification for such other work as though no excavation were required for the pipe installation. The Contractor shall be responsible for all additional costs involved with substituting the earth backfill material for the native material including disposal of the native materials. When native material is deemed unsuitable for reuse for reasons other than those attributable to the Contractor s mode of operation, any additional work done to provide acceptable earth backfill, beyond that work included in the original bid, shall be paid for as extra work according to the General Conditions of the Contract. April 2006 Pg. 8 of 9 SSP421F01

9 Corrugated Steel Pipe Extensions - Item Payment at the contract price for the corrugated steel pipe extensions specified shall be full compensation for all labour, equipment and material required to construct the corrugated steel pipe extensions as per the contract requirements Rock Excavation for Culverts - Item When the contract contains an item for rock excavation for culverts, payment at the contract price for rock excavation shall be full compensation for all labour, equipment and material required to excavate the rock and no alternations shall be made to the meter tender item for the pipe culverts so affected Concrete Appurtenances - Item Payment at the contract price for the concrete appurtenance specified shall be full compensation for all labour, equipment and material required to construct the concrete appurtenances as per the contract requirements Clay Seal - Item Payment at the contract price for clay seal shall be full compensation for supplying all labour, equipment and material required to perform the work of placing and trimming the clay seal as specified in the contract Swamp Excavation Where the Contract requires swamp excavation to place a pipe culvert, payment for the swamp excavation shall be under the tender item covering the swamp excavation for earth embankment construction. No alterations shall be made to the tender item for the pipe culvert so affected Closed Circuit Television Inspection When a CCTV inspection of pipe culverts is specified, payment for the CCTV inspection shall be included with the appropriate tender item. April 2006 Pg. 9 of 9 SSP421F01

Special Provision No. 421S01 November 2006

Special Provision No. 421S01 November 2006 RIGID PIPE CULVERTS (75 Year DSL) Item No. RIGID PIPE CULVERTS (50 Year DSL) Item No. RIGID PIPE CULVERTS (25 Year DSL) Item No. FLEXIBLE PIPE CULVERTS (75 Year DSL) Item No. FLEXIBLE PIPE CULVERTS (50

More information

CONSTRUCTION SPECIFICATION FOR PIPE CULVERT INSTALLATION IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PIPE CULVERT INSTALLATION IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 421 NOVEMBER 2007 CONSTRUCTION SPECIFICATION FOR PIPE CULVERT INSTALLATION IN OPEN CUT TABLE OF CONTENTS 421.01 SCOPE 421.02 REFERENCES 421.03 DEFINITIONS

More information

CONSTRUCTION SPECIFICATION FOR PIPE CULVERT INSTALLATION IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PIPE CULVERT INSTALLATION IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 421 NOVEMBER 2012 CONSTRUCTION SPECIFICATION FOR PIPE CULVERT INSTALLATION IN OPEN CUT TABLE OF CONTENTS 421.01 SCOPE 421.02 REFERENCES 421.03 DEFINITIONS

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 APRIL 2004 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT TABLE OF CONTENTS 422.01 SCOPE 422.02

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 APRIL 2004 (Reissued November 2010) CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT TABLE OF

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 November 2015 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS IN OPEN CUT TABLE OF CONTENTS D 422.01 D 422.02 D 422.03

More information

CONSTRUCTION SPECIFICATION FOR PIPE SEWER INSTALLATION IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PIPE SEWER INSTALLATION IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 410 NOVEMBER 2006 CONSTRUCTION SPECIFICATION FOR PIPE SEWER INSTALLATION IN OPEN CUT TABLE OF CONTENTS 410.01 SCOPE 410.02 REFERENCES 410.03 DEFINITIONS

More information

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.MUNI 401 NOVEMBER 2015 (Formerly OPSS 401, November 2013) CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING TABLE OF CONTENTS 401.01

More information

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING AND COMPACTING

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING AND COMPACTING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 514 APRIL 1999 CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING AND COMPACTING TABLE OF CONTENTS 514.01 SCOPE 514.02 REFERENCES 514.03 DEFINITIONS

More information

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 514 NOVEMBER 2005 CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING TABLE OF CONTENTS 514.01 SCOPE 514.02 REFERENCES 514.03 DEFINITIONS

More information

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 514 APRIL 2008 CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING TABLE OF CONTENTS 514.01 SCOPE 514.02 REFERENCES 514.03 DEFINITIONS

More information

CONSTRUCTION SPECIFICATION FOR PIPE SEWER INSTALLATION IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PIPE SEWER INSTALLATION IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 410 APRIL 2008 CONSTRUCTION SPECIFICATION FOR PIPE SEWER INSTALLATION IN OPEN CUT TABLE OF CONTENTS 410.01 SCOPE 410.02 REFERENCES 410.03 DEFINITIONS

More information

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 401 NOVEMBER 2010 CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING TABLE OF CONTENTS 401.01 SCOPE 401.02 REFERENCES 401.03 DEFINITIONS

More information

CONSTRUCTION SPECIFICATION FOR PIPE SEWER INSTALLATION IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PIPE SEWER INSTALLATION IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 410 NOVEMBER 2012 CONSTRUCTION SPECIFICATION FOR PIPE SEWER INSTALLATION IN OPEN CUT TABLE OF CONTENTS 410.01 SCOPE 410.02 REFERENCES 410.03 DEFINITIONS

More information

Construction Specification for Trenching, Backfilling and Compacting

Construction Specification for Trenching, Backfilling and Compacting Engineering & Construction Services Division Standard Specifications for Sewers and Watermains TS 401 November 2016 Amendment to OPSS.MUNI 401 (Nov 2015) Construction Specification for Trenching, Backfilling

More information

CONSTRUCTION SPECIFICATION FOR PIPE SEWER INSTALLATION IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PIPE SEWER INSTALLATION IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 410 NOVEMBER 2018 CONSTRUCTION SPECIFICATION FOR PIPE SEWER INSTALLATION IN OPEN CUT TABLE OF CONTENTS 410.01 SCOPE 410.02 REFERENCES 410.03 DEFINITIONS

More information

SECTION 303 CULVERTS

SECTION 303 CULVERTS 303.01 Scope - This section covers the construction of pipe culverts. 303.01.01 Definitions for the purposes of this section, the following general terms are defined as follows: a) Backfilling means the

More information

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS 701-1 DESCRIPTION 701-1.1 This item shall consist of the construction of pipe culverts, and storm drains, removal of existing storm pipes, connections to existing

More information

Special Provision No. 405F03 March 2005

Special Provision No. 405F03 March 2005 PIPE SUBDRAINS - Item No. VIDEO CAMERA INSPECTION Item No. Special Provision No. 405F03 March 2005 OPSS 405, February 1990, Construction Specification for Pipe Subdrains is deleted in its entirety and

More information

Amendment to OPSS.MUNI 410 (Nov 2015) Construction Specification for Pipe Sewer Installation in Open Cut

Amendment to OPSS.MUNI 410 (Nov 2015) Construction Specification for Pipe Sewer Installation in Open Cut Engineering & Construction Services Division Standard Specifications for Sewers and Watermains TS 410 September 2017 Amendment to OPSS.MUNI 410 (Nov 2015) Construction Specification for Pipe Sewer Installation

More information

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.PROV 602 NOVEMBER 2017 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS TABLE OF CONTENTS 602.01 SCOPE 602.02 REFERENCES 602.03 DEFINITIONS

More information

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1 March 2002 No. 400 INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS 400. 1 SCOPE... 1 400. 2 REMOVING CULVERTS AND TIMBER STRUCTURES 2.1 Concrete and Metal Pipe Culverts... 1 2.2 Structural

More information

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2 INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS 410. 1 SCOPE... 2 410. 2 DEFINITIONS 2.1 Tunneling and Jacking... 2 2.2 Tunneling... 2 2.3 Jacking... 2 410. 3 MATERIALS 3.1 General...

More information

406 - PIPE SEWERS - MTC FORM 406

406 - PIPE SEWERS - MTC FORM 406 406 - - MTC FORM 406 INDEX 406.1 GENERAL Types of Pipe Pipe Strength, Rigid Pipes Polyethylene Pipe Strength - Rigid or Flexible Pipe Strength and Treatment, Flexible Pipes Selection of Type, Strength

More information

Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS

Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS TABLE OF CONTENTS 2.18 CONCRETE AND/OR CORRUGATED STEEL STORM SEWER... 1 2.18.1 GENERAL... 1 2.18.2 MATERIALS... 1 2.18.2.1 Storm Sewer Pipe... 1 2.18.2.2 Cement Mortar... 1 2.18.2.3 Granular Materials...

More information

SPECIAL SPECIFICATION 4425 Thermoplastic Pipe

SPECIAL SPECIFICATION 4425 Thermoplastic Pipe 2004 Specifications CSJ 0264-07-028 SPECIAL SPECIFICATION 4425 Thermoplastic Pipe 1. Description. Furnish and install thermoplastic pipe for constructing thermoplastic pipe culverts or thermoplastic storm

More information

CONSTRUCTION SPECIFICATION FOR NEW MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION

CONSTRUCTION SPECIFICATION FOR NEW MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 407 NOVEMBER 2015 CONSTRUCTION SPECIFICATION FOR NEW MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION TABLE OF CONTENTS 407.01

More information

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 602 MARCH 1993 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER 602.01 SCOPE 602.02 REFERENCES 602.05 MATERIALS TABLE OF CONTENTS

More information

CONSTRUCTION SPECIFICATION FOR EXCAVATING AND BACKFILLING - STRUCTURES

CONSTRUCTION SPECIFICATION FOR EXCAVATING AND BACKFILLING - STRUCTURES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 902 DECEMBER 1983 CONSTRUCTION SPECIFICATION FOR EXCAVATING AND BACKFILLING - STRUCTURES 902.01 SCOPE 902.02 REFERENCES 902.03 DEFINITIONS TABLE OF

More information

Section 401. PIPE CULVERTS

Section 401. PIPE CULVERTS 401.02 Section 401. PIPE CULVERTS 401.01. Description. This work consists of constructing pipe culverts of the size and class required, including excavation and backfill. 401.02. Materials. Provide materials

More information

CONSTRUCTION SPECIFICATION FOR PIPE SUBDRAINS

CONSTRUCTION SPECIFICATION FOR PIPE SUBDRAINS ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 405 NOVEMBER 2017 (Formerly OPSS 405, November 2008) Note: The MUNI implemented in November 2017 replaces OPSS 405 COMMON, November 2008 with no technical

More information

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION SPECIFICATION FOR PIPE CULVERT CONSTRUCTION 1. SCOPE Pipe culverts shall be constructed in accordance with this specification and in conformity with the lines, levels and cross-sections shown on the drawings.

More information

CONSTRUCTION SPECIFICATION FOR PIPE SUBDRAINS

CONSTRUCTION SPECIFICATION FOR PIPE SUBDRAINS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 405 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR PIPE SUBDRAINS TABLE OF CONTENTS 405.01 SCOPE 405.02 REFERENCES 405.03 DEFINITIONS 405.04 DESIGN AND

More information

CONSTRUCTION SPECIFICATION FOR PIPE CULVERT INSTALLATION IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PIPE CULVERT INSTALLATION IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 421 NOVEMBER 2015 CONSTRUCTION SPECIFICATION FOR PIPE CULVERT INSTALLATION IN OPEN CUT TABLE OF CONTENTS 421.01 SCOPE 421.02 REFERENCES 421.03

More information

Section Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Storm Sewers. B. Abandonment of Storm Sewers

Section Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Storm Sewers. B. Abandonment of Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm Sewers B. Abandonment of Storm Sewers 1.02 DESCRIPTION OF WORK A. Construct storm sewers. B. Abandon storm sewers. 1.03 SUBMITTALS Comply with

More information

Construction Specification for General Excavation

Construction Specification for General Excavation Engineering & Construction Services Division Standard Specifications for Road Works TS 2.10 September 2018 for General Excavation Table of Contents TS 2.10.01 SCOPE... 2 TS 2.10.02 REFERENCES... 2 TS 2.10.03

More information

AMENDMENTS TO OPSS 408 (OCT 89) CONSTRUCTION SPECIFICATION FOR ADJUSTING OR REBUILDING MANHOLES, CATCH BASINS, DITCH INLETS AND VALVE CHAMBERS

AMENDMENTS TO OPSS 408 (OCT 89) CONSTRUCTION SPECIFICATION FOR ADJUSTING OR REBUILDING MANHOLES, CATCH BASINS, DITCH INLETS AND VALVE CHAMBERS Works and Emergency Services CITY OF TORONTO WATER AND WASTEWATER SERVICES STANDARD CONSTRUCTION SPECIFICATIONS TS 408 November 2010 AMENDMENTS TO OPSS 408 (OCT 89) CONSTRUCTION SPECIFICATION FOR ADJUSTING

More information

Construction Specification for Concrete Unit Pavers

Construction Specification for Concrete Unit Pavers Engineering & Construction Services Division Standard Specifications for Road Works TS 3.80 September 2017 for Concrete Unit Pavers Table of Contents TS 3.80.01 SCOPE... 2 TS 3.80.02 REFERENCES... 2 TS

More information

SPECIAL SPECIFICATION 4653 Polypropylene Pipe

SPECIAL SPECIFICATION 4653 Polypropylene Pipe 2004 Specifications CSJ 2158-01-013, Etc. SPECIAL SPECIFICATION 4653 Polypropylene Pipe 1. Description. Furnish and install polypropylene pipe for constructing polypropylene pipe culverts or polypropylene

More information

421 - PIPE CULVERTS - OPSS 421 INDEX

421 - PIPE CULVERTS - OPSS 421 INDEX 421 - PIPE CULVERTS - OPSS 421 INDEX 421.1 GENERAL 421.1.1 Environmental Concerns 421.1.2 Pipe Culvert Materials 421.1.3 Pipe Diameter 421.1.4 Corrugated Steel Pipe Extensions 421.1.5 Bedding 421.1.6 Embedment

More information

CONSTRUCTION SPECIFICATION FOR TUNNELLING

CONSTRUCTION SPECIFICATION FOR TUNNELLING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 415 FEBRUARY 1990 CONSTRUCTION SPECIFICATION FOR TUNNELLING 415.01 SCOPE 415.02 REFERENCES 415.03 DEFINITIONS TABLE OF CONTENTS 415.04 SUBMISSION AND

More information

Construction Specification for Utility Adjustments

Construction Specification for Utility Adjustments Engineering & Construction Services Division Standard Specifications for Road Works TS 4.50 September 2017 for Utility Adjustments Table of Contents TS 4.50.01 SCOPE... 2 TS 4.50.02 REFERENCES... 2 TS

More information

STANDARD SPECIFICATIONS JULY 2012 S-11 CULVERTS, HEADWALLS AND ROADSIDE DRAINAGE TABLE OF CONTENTS

STANDARD SPECIFICATIONS JULY 2012 S-11 CULVERTS, HEADWALLS AND ROADSIDE DRAINAGE TABLE OF CONTENTS TABLE OF CONTENTS 11.01 SCOPE OF WORK... 1 11.02 REFERENCES... 1 11.03 MATERIALS... 2 11.04 GRANULAR & NATIVE BACKFILL... 2 11.05 CONSTRUCTION... 2 11.06 MEASUREMENT FOR PAYMENT... 5 11.07 BASIS OF PAYMENT...

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE UNIT PAVERS

CONSTRUCTION SPECIFICATION FOR CONCRETE UNIT PAVERS CITY OF TORONTO STANDARD CONSTRUCTION SPECIFICATIONS FOR ROADS TS 3.80 November 2010 CONSTRUCTION SPECIFICATION FOR CONCRETE UNIT PAVERS INDEX TS 3.80.01 SCOPE... 2 TS 3.80.02 REFERENCES... 2 TS 3.80.03

More information

(SIZE) MANHOLES CATCH BASINS AND DITCH INLETS -Item No. ADJUSTING AND REBUILDING MANHOLES, CATCH BASINS AND DITCH INLETS - Item No.

(SIZE) MANHOLES CATCH BASINS AND DITCH INLETS -Item No. ADJUSTING AND REBUILDING MANHOLES, CATCH BASINS AND DITCH INLETS - Item No. (SIZE) MANHOLES CATCH BASINS AND DITCH INLETS -Item No. ADJUSTING AND REBUILDING MANHOLES, CATCH BASINS AND DITCH INLETS - Item No. Special Provision No. 407S06 July 2010 Aggregate Requirements, Lift Rings,

More information

1 Revised: 2019 Edition

1 Revised: 2019 Edition STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm Sewers B. Abandonment of Storm Sewers 1.02 DESCRIPTION OF WORK A. Construct storm sewers. B. Abandon storm sewers. 1.03 SUBMITTALS Comply with

More information

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 602 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS TABLE OF CONTENTS 602.01 SCOPE 602.02 REFERENCES 602.03 DEFINITIONS

More information

SECTION STORM DRAINAGE AND STORMWATER MANAGEMENT

SECTION STORM DRAINAGE AND STORMWATER MANAGEMENT SECTION 322 - STORM DRAINAGE AND STORMWATER MANAGEMENT 322.01 DESCRIPTION Work includes all labor, material and equipment to construct storm drain systems and stormwater management facilities, including

More information

CONSTRUCTION SPECIFICATION FOR PIPE SEWER INSTALLATION IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PIPE SEWER INSTALLATION IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 410 NOVEMBER 2015 CONSTRUCTION SPECIFICATION FOR PIPE SEWER INSTALLATION IN OPEN CUT TABLE OF CONTENTS 410.01 SCOPE 410.02 REFERENCES 410.03 DEFINITIONS

More information

SECTION STORM DRAINAGE

SECTION STORM DRAINAGE SECTION 02720 STORM DRAINAGE PART 1 - GENERAL 1.01 WORK INCLUDED A. Trenching and other excavation. B. Ground water control. C. Pipe bedding. D. Installation of storm drains and appurtenances. E. Installation

More information

REGIONAL CONSTRUCTION STANDARDS

REGIONAL CONSTRUCTION STANDARDS REGIONAL CONSTRUCTION STANDARDS SIXTH EDITION Publication Update 6.5 (Full Committee Approved Proposed Revision 6.5 Storm Sewer Joint Wrap - Section 302 As Publication Update 6.5) March 27, 2018 Copyright

More information

CONSTRUCTION SPECIFICATION FOR UNTREATED GRANULAR, SUBBASE, BASE, SURFACE SHOULDER AND STOCKPILING

CONSTRUCTION SPECIFICATION FOR UNTREATED GRANULAR, SUBBASE, BASE, SURFACE SHOULDER AND STOCKPILING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 314 DECEMBER 1993 CONSTRUCTION SPECIFICATION FOR UNTREATED GRANULAR, SUBBASE, BASE, SURFACE SHOULDER AND STOCKPILING 314.01 SCOPE 314.02 REFERENCES

More information

SPECIAL SPECIFICATION 4xxx Thermoplastic Pipe

SPECIAL SPECIFICATION 4xxx Thermoplastic Pipe 2004 Specifications SPECIAL SPECIFICATION 4xxx Thermoplastic Pipe 1. Description. Furnish and install thermoplastic pipe for constructing thermoplastic pipe culverts or thermoplastic storm sewer mains,

More information

CONSTRUCTION SPECIFICATION FOR ADJUSTING OR REBUILDING MAINTENANCE HOLES, CATCH BASINS, DITCH INLETS, AND VALVE CHAMBERS

CONSTRUCTION SPECIFICATION FOR ADJUSTING OR REBUILDING MAINTENANCE HOLES, CATCH BASINS, DITCH INLETS, AND VALVE CHAMBERS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 408 NOVEMBER 2015 CONSTRUCTION SPECIFICATION FOR ADJUSTING OR REBUILDING MAINTENANCE HOLES, CATCH BASINS, DITCH INLETS, AND VALVE CHAMBERS TABLE OF

More information

SECTION TRENCHING

SECTION TRENCHING SECTION 31 23 17 TRENCHING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating trenches for utilities and utility structures. 2. Bedding. 3. Backfilling and compacting to subgrade elevations.

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS

CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 353 NOVEMBER 2006 CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS TABLE OF CONTENTS 353.01 SCOPE 353.02 REFERENCES 353.03 DEFINITIONS

More information

AMENDMENTS TO OPSS 410 (DEC 88) CONSTRUCTION SPECIFICATION FOR PIPE SEWER CONSTRUCTION BY OPEN CUT METHOD

AMENDMENTS TO OPSS 410 (DEC 88) CONSTRUCTION SPECIFICATION FOR PIPE SEWER CONSTRUCTION BY OPEN CUT METHOD Works and Emergency Services CITY OF TORONTO WATER AND WASTEWATER SERVICES STANDARD CONSTRUCTION SPECIFICATIONS TS 410 November 2010 AMENDMENTS TO OPSS 410 (DEC 88) CONSTRUCTION SPECIFICATION FOR PIPE

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS SCOPE...3 TS DEFINITIONS...3

CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS SCOPE...3 TS DEFINITIONS...3 CITY OF TORONTO TS 3.70 TRANSPORTATION SERVICES STANDARD CONSTRUCTION SPECIFICATIONS June 2001 CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS 3.70.01 SCOPE...3 TS

More information

Special Provision No. 599F01 May 2004 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF NOISE BARRIER TABLE OF CONTENTS

Special Provision No. 599F01 May 2004 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF NOISE BARRIER TABLE OF CONTENTS ... m NOISE BARRIER - Item No.... m NOISE BARRIER INCLUDING PRECAST NOISE/TRAFFIC BARRIER - Item No.... m NOISE BARRIER ON STRUCTURES - Item No.... m SALVAGEABLE NOISE BARRIER - Item No.... m SALVAGEABLE

More information

ITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES

ITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES AFTER MARCH 1, 2012 ITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES 430.1 Description. This item shall govern for all excavation required for the construction of sewers, sewer structures, pipe culverts,

More information

50.20 Drainage Structure Design

50.20 Drainage Structure Design 50.20 Drainage Structure Design All drainage structures, with the exception of bridges, culvert bridges and, in some cases, culverts, shall be designed for HS20-44 loading. Refer to Section 50.22 for design

More information

SECTION STORM DRAINAGE SYSTEM Excavating, Backfilling, and Compaction for Utilities Cast-in-place Concrete.

SECTION STORM DRAINAGE SYSTEM Excavating, Backfilling, and Compaction for Utilities Cast-in-place Concrete. SECTION 02720 STORM DRAINAGE SYSTEM PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02221 - Excavating, Backfilling, and Compaction for Utilities. 2. 03300 - Cast-in-place Concrete. 1.02 REFERENCES

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS

CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 353 NOVEMBER 2010 CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS TABLE OF CONTENTS 353.01 SCOPE 353.02 REFERENCES 353.03 DEFINITIONS

More information

***************************************************************************************************************

*************************************************************************************************************** 02720 STORM DRAINAGE SYSTEM *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 33 40 00. ***************************************************************************************************************

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS

SECTION 39 - MANHOLES TABLE OF CONTENTS Section SECTION 39 - MANHOLES TABLE OF CONTENTS Page 39-1 GENERAL... 39.1 39-2 CONCRETE MANHOLES... 39.1 39-2.01 NOT USED... 39.1 39-2.02 Concrete Storm Drain Manholes... 39.1 39-3 SADDLE SEWER MANHOLES...

More information

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 616 APRIL 2018 CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT TABLE OF CONTENTS 616.01 SCOPE 616.02 REFERENCES 616.03 DEFINITIONS

More information

CONSTRUCTION SPECIFICATION FOR GRADING

CONSTRUCTION SPECIFICATION FOR GRADING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 206 DECEMBER 1993 CONSTRUCTION SPECIFICATION FOR GRADING 206.01 SCOPE 206.02 REFERENCES 206.03 DEFINITIONS 206.04 Not Used 206.05 Not Used 206.06 Not

More information

B701 WATERMAINS- OPSS 701

B701 WATERMAINS- OPSS 701 B701 - OPSS 701 701.1 GENERAL Watermains are a component of a water supply network. Watermains are a system of engineered hydraulic components designed for the conveyance of water from storage to consumption.

More information

CONSTRUCTION SPECIFICATION FOR UNTREATED SUBBASE, BASE, SURFACE, SHOULDER, SELECTED SUBGRADE, AND STOCKPILING

CONSTRUCTION SPECIFICATION FOR UNTREATED SUBBASE, BASE, SURFACE, SHOULDER, SELECTED SUBGRADE, AND STOCKPILING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 314 NOVEMBER 2015 CONSTRUCTION SPECIFICATION FOR UNTREATED SUBBASE, BASE, SURFACE, SHOULDER, SELECTED SUBGRADE, AND STOCKPILING TABLE OF CONTENTS

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK

CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 351 NOVEMBER 2015 CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK TABLE OF CONTENTS 351.01 SCOPE 351.02 REFERENCES 351.03 DEFINITIONS 351.04 DESIGN

More information

DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA SPECIAL PROVISION. Section 550 Storm Drain Pipe, Pipe-Arch Culverts, and Side Drain Pipe

DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA SPECIAL PROVISION. Section 550 Storm Drain Pipe, Pipe-Arch Culverts, and Side Drain Pipe Revised: October 25, 2007 Revised: June 11, 2010 DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA SPECIAL PROVISION Section 550 Storm Drain Pipe, Pipe-Arch Culverts, and Side Drain Pipe Delete Section 550

More information

902 - EXCAVATION AND BACKFILL FOR STRUCTURES - OPSS Bridges - Working slabs/pads - footings for piers and abutments - wingwalls

902 - EXCAVATION AND BACKFILL FOR STRUCTURES - OPSS Bridges - Working slabs/pads - footings for piers and abutments - wingwalls 902 - - OPSS 902 902.1 GENERAL 902.1.1 Excavation for Structures Excavation for structures deals with excavation in earth or rock for the placement of the following structures: - Bridges - Working slabs/pads

More information

B410 - PIPE SEWERS - OPSS 410

B410 - PIPE SEWERS - OPSS 410 B410 - - OPSS 410 410.1 GENERAL A sewer network is required in an urban setting or where open ditches in combination with pipe culverts cannot accomplish drainage of a roadway system, due to restricted

More information

410 PIPE SEWERS- OPSS 410

410 PIPE SEWERS- OPSS 410 410 - OPSS 410 410.1 GENERAL A storm sewer network is required in an urban setting or where open ditches in combination with pipe culverts due to restricted property limits or susceptibility of a terrain

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS

CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.MUNI 353 NOVEMBER 2016 CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS TABLE OF CONTENTS 353.01 SCOPE 353.02 REFERENCES 353.03 DEFINITIONS

More information

REGIONAL CONSTRUCTION STANDARDS Proposed Revision Form

REGIONAL CONSTRUCTION STANDARDS Proposed Revision Form Proposed Revision To: REGIONAL CONSTRUCTION STANDARDS Proposed Revision Form General Provisions (Division 1) Technical Specifications (Divisions 2-8) Standard Details Change No. Hampton Roads Planning

More information

B410 - PIPE SEWERS OPSS.PROV 410

B410 - PIPE SEWERS OPSS.PROV 410 B410 - OPSS.PROV 410 410.1 GENERAL A sewer network is required in an urban setting or where open ditches in combination with pipe culverts cannot accomplish drainage of a roadway system, due to restricted

More information

SECTION STORM DRAIN

SECTION STORM DRAIN PART 1 - GENERAL 1-01 SECTION INCLUDED A. Furnishing and installing storm drainage facilities, including pipe, cleanout, manhole structures and inlet structures. 1-02 RELATED SECTIONS A. Division 00 Contract

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS SCOPE...3

CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS SCOPE...3 CITY OF TORONTO TS 3.65 TRANSPORTATION SERVICES STANDARD CONSTRUCTION SPECIFICATIONS June 2001 CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS 3.65.01 SCOPE...3 TS 3.65.02 TS 3.65.03 REFERENCES...3

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION

STATE OF OHIO DEPARTMENT OF TRANSPORTATION STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 802 CONSTRUCTING AND INSPECTING PIPE CULVERTS, SEWERS, DRAINS, AND DRAINAGE STRUCTURES April 15, 2011 802.01 Description 802.02 Materials

More information

Baseline Document Change Announcement

Baseline Document Change Announcement Page 1 of 11 New Jersey Department of Transportation 1035 Parkway Avenue, PO Box 600, Trenton, New Jersey 08625-0600 Baseline Document Change Announcement High Density Polyethylene (HDPE) pipe BDC03S-13

More information

CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES PRECAST BOX CULVERTS CONSTRUCTION SPECIFICATION

CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES PRECAST BOX CULVERTS CONSTRUCTION SPECIFICATION CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES C222 CONSTRUCTION SPECIFICATION CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES C222 ISSUE: NO:3 July 2018 TABLE OF CONTENTS CLAUSE CONTENTS PAGE GENERAL... 2 C222.01

More information

SECTION STORM SEWER COLLECTION SYSTEM

SECTION STORM SEWER COLLECTION SYSTEM SECTION 02722 STORM SEWER COLLECTION SYSTEM PART 1 GENERAL 1.01 SUMMARY A. This section addresses the installation of storm sewer collection mains and includes the acceptable products, materials, and construction

More information

Section 5 Specification 5.22 Supply and Install Smooth Wall Steel Pipes TABLE OF CONTENTS

Section 5 Specification 5.22 Supply and Install Smooth Wall Steel Pipes TABLE OF CONTENTS TABLE OF CONTENTS 5.22 SUPPLY AND INSTALL SMOOTH WALL STEEL PIPES... 1 5.22.1 GENERAL... 1 5.22.2 MATERIALS... 1 5.22.2.1 Culvert Material... 1 5.22.2.2 Material for Bedding, Backfill and Sealing... 1

More information

STANDARD SPECIFICATIONS SECTION 16 STORM SEWER SYSTEMS

STANDARD SPECIFICATIONS SECTION 16 STORM SEWER SYSTEMS STANDARD SPECIFICATIONS SECTION 16 STORM SEWER SYSTEMS 16.01 GENERAL Specifications in this section shall apply to the construction of storm sewer systems including excavation, trenching, backfilling,

More information

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 616 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT TABLE OF CONTENTS 616.01 SCOPE 616.02 REFERENCES 616.03

More information

SECTION 300 STORM SEWER TABLE OF CONTENTS

SECTION 300 STORM SEWER TABLE OF CONTENTS SECTION 300 STORM SEWER TABLE OF CONTENTS Starts on Page 300 GENERAL... 2 301 MATERIALS... 2 302 CONSTRUCTION PROCEDURES... 5 303 TESTING... 5 304 ABANDONMENT OF EXISTING STORM SEWER FACILITIES... 6 305

More information

CONSTRUCTION SPECIFICATION FOR EXCAVATING, BACKFILLING AND COMPACTING FOR MAINTENANCE HOLES, CATCH BASINS, DITCH INLETS AND VALVE CHAMBERS

CONSTRUCTION SPECIFICATION FOR EXCAVATING, BACKFILLING AND COMPACTING FOR MAINTENANCE HOLES, CATCH BASINS, DITCH INLETS AND VALVE CHAMBERS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 516 APRIL 1999 CONSTRUCTION SPECIFICATION FOR EXCAVATING, BACKFILLING AND COMPACTING FOR MAINTENANCE HOLES, CATCH BASINS, DITCH INLETS AND VALVE CHAMBERS

More information

SUPPLEMENTARY SECTION: STANDARD SPECIFICATIONS PAGE 1 STORMWATER MAINS & CULVERTS MAY 2018

SUPPLEMENTARY SECTION: STANDARD SPECIFICATIONS PAGE 1 STORMWATER MAINS & CULVERTS MAY 2018 STANDARD SPECIFICATIONS PAGE 1 STORMWATER MAINS & CULVERTS MAY 2018 PART 1 - GENERAL... 2 1.1 Work Included... 2 1.2 Related Sections... 2 1.3 Reference Standards... 2 1.4 Shop Drawings... 3 1.5 Certificates...

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price) SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

CITY OF WINDSOR STANDARD SPECIFICATIONS JULY 2012 S-31 KEYHOLE EXCAVATION TABLE OF CONTENTS

CITY OF WINDSOR STANDARD SPECIFICATIONS JULY 2012 S-31 KEYHOLE EXCAVATION TABLE OF CONTENTS TABLE OF CONTENTS 31.01. SCOPE OF WORK... 1 31.02. REFERENCES... 1 31.03. DEFENITIONS... 1 31.04. MATERIALS... 2 31.05. EQUIPMENT... 3 31.06. CONSTRUCTION... 4 31.07. QUALITY ASSURANCE... 6 31.08. MEASUREMENT

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

Special Provision No. 799F01 March 2012 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF NOISE BARRIER TABLE OF CONTENTS

Special Provision No. 799F01 March 2012 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF NOISE BARRIER TABLE OF CONTENTS ... m NOISE BARRIER - Item No.... m NOISE BARRIER INCLUDING PRECAST NOISE/TRAFFIC BARRIER - Item No.... m NOISE BARRIER ON STRUCTURES - Item No.... m SALVAGEABLE NOISE BARRIER - Item No.... m SALVAGEABLE

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19.1 19-1.01 Exploratory Excavation... 19.1 19-1.02 Trench Width... 19.1 19-1.02.A Storm Drain

More information

The Regional Municipality of Peel Basis of Payment

The Regional Municipality of Peel Basis of Payment Page PS-1 THE REGIONAL MUNICIPALITY OF PEEL BASIS OF PAYMENT FOR SANITARY SEWER CONSTRUCTION Page PS-2 INDEX Page No. PS.1. EXCAVATION...4 1.1. Trench Excavation...4 1.2. Asphalt/Concrete Removal...5 PS.2.

More information