Special Provision No. 405F03 March 2005
|
|
- Juliet Harrison
- 6 years ago
- Views:
Transcription
1 PIPE SUBDRAINS - Item No. VIDEO CAMERA INSPECTION Item No. Special Provision No. 405F03 March 2005 OPSS 405, February 1990, Construction Specification for Pipe Subdrains is deleted in its entirety and replaced with the following: SCOPE This special provision covers the requirements for the construction of pipe subdrains REFERENCES This special provision refers to the following standards, specifications and publications: Ontario Provincial Standard Specifications, Construction: OPSS 180 OPSS 421 OPSS 501 Management of Surplus Material Pipe Culverts Compacting Ontario Provincial Standard Specifications, Material: OPSS 1004 OPSS 1010 OPSS 1801 OPSS 1840 OPSS 1841 OPSS 1860 Aggregates Miscellaneous Aggregates Base, Subbase, Select Subgrade and Backfill Material Corrugated Steel Pipe Products Non-pressure Polyethylene Plastic Pipe Products Polyvinyl Chloride Pipe (PVC) Products Geotextiles Canadian Standards Association: CSA G164-M1981 Hot Dip Galvanizing of Irregularly Shaped Articles Canadian General Standards Board: CGSB 41-GP-29Ma-1983 Tubing, Plastic, Corrugated, Drainage DEFINITIONS Geotextile-knitted sock: Means a textile structure produced by knitting in a continuous tube specifically intended to cover perforated plastic subdrain pipe and corrugated steel pipe. Knitted geotextiles are suitable only for wrapping of perforated plastic subdrain and corrugated steel pipe unless otherwise specified in the Contract. Outlet: means the terminal 2.5 m of the outlet pipe. March 2005 Page 1 of 5 SSP405F03
2 Subdrain: means a small diameter pipe, perforated or non-perforated, which is placed for the purpose of collecting sub-surface water and conveying it to a proper outlet. Subdrain may be corrugated steel, polyethylene or polyvinyl pipe product MATERIALS General The subdrain shall be a perforated corrugated steel pipe, perforated polyvinyl chloride pipe or perforated polyethylene pipe. Previously used pipe shall not be used for the proposed subdrain installation Corrugated Steel Pipe Products Corrugated steel pipe products shall be according to OPSS of the corrugated steel pipe with a geotextile knitted sock, by the manufacturer, is not required Polyethylene Pipe Products Polyethylene pipe products shall be according to OPSS 1840 and CGSB 41-GP-29M. of the polyethylene pipe with a geotextile knitted sock, by the manufacturer, is not required Polyvinyl Chloride Pipe Products Polyvinyl chloride pipe products shall be according to OPSS of the polyvinyl chloride pipe with a geotextile knitted sock, by the manufacturer, is not required Geotextile Geotextiles shall be according to OPSS Fittings Fittings shall be suitable for and compatible with the class and type of pipe with which they will be used. Plugs where used shall be polyethylene. Galvanizing of rodent gates shall be according to CSA G Outlets The outlets shall be constructed of non-perforated corrugated steel pipe or double walled polyethylene or polyvinyl chloride pipe having a minimum stiffness of 300 kpa. A material specification from the manufacturer shall be submitted upon request by the Contract Administrator to verify the material supplied meets Contract requirements. March 2005 Page 2 of 5 SSP405F03
3 Granular Backfill and Bedding Granular material for backfill and bedding shall be according to OPSS Clear stone shall be according to OPSS CONSTRUCTION Roadway Installations by Trenching Excavations Trenches shall be excavated to the width, grade and alignment specified in the Contract Documents. The stability of the trench shall be maintained at all times during excavation and backfilling. The excavation shall be inspected with grade checks and certified by the Contractor prior to placement of the pipe bedding. An inspection report shall be submitted to the Contract Administrator upon request Pipe Bedding Trenches shall be excavated a minimum of 50 mm below the pipe bottom. The additional depth below the bottom of the pipe shall be backfilled with pipe bedding consisting of granular material conforming to the contract requirements. The pipe bedding shall be inspected with grade checks and certified by the Contractor prior to laying the pipe. An inspection report shall be submitted to the Contract Administrator upon request Unstable Foundations The Contractor shall take the necessary steps to ensure a stable foundation when unstable foundations conditions are encountered. An inspection report to verify the foundations stability shall be submitted to the Contract Administrator upon request Laying Pipe General The Contractor shall replace any pipe or geotextile damaged by exposure to sunlight or damaged by any other means. Where a geotextile wrapped trench is required, the geotextile shall be placed prior to placement of the bedding and backfill material. Where granular backfill is specified, the geotextile shall be installed as detailed elsewhere in the Contract Documents with the ends overlapped 300 mm minimum. Pipe installation shall be according to OPSS 421. The pipe shall be placed firmly on the bedding and secured in place to prevent any movement or disturbance during backfilling. Pipe with one side perforation shall be installed with perforations down. Pipe shall not be laid in water or on wet bedding. The pipe shall not be used as a drain for the Contractor s operation. Connections to outlet pipes shall be made with prefabricated 45 elbows or pre-manufactured pipe curves as required. March 2005 Page 3 of 5 SSP405F03
4 The pipe installation shall be inspected and approved by the Contractor prior to backfilling. An inspection report shall be submitted to the Contract Administrator upon request Installation of Subdrain Outlets General Outlets shall be installed at all low lying areas, at the end of subdrain pipes, and at a uniform spacing of 100 m along the length of the subdrain pipe. The ends of all outlets shall be fitted with galvanized rodent gates. Outlets shall be of similar inside diameter as the outlet pipe, yet large enough so the outlet pipe can be inserted into the outlet. Outlets shall extend beyond the front of the ditch or fill slope for a distance of 300 mm. The outlet pipes shall be inserted a minimum distance of 300 mm into the outlet. The joint between the outlet and the outlet pipe shall be wrapped with a 0.5 m width of geotextile Marking of Outlets The Contractor shall mark each outlet location with 25 x 25 mm square galvanized steel bar, 2.2 m long embedded a minimum of 0.6 m and a maximum of 1.0 m into the ground, adjacent to the outlet clearly visible from the driving portion of the roadway Connection to Drainage Structures Subdrain connections to concrete manholes, catch basins and ditch inlets shall be grouted. Subdrain connections to corrugated steel pipe manholes, catchbasins and ditch inlets shall include a 1.0 m corrugated steel pipe section which shall be welded to the corrugated steel pipe manhole, catchbasin or ditch inlet Backfilling Backfill for all subdrain and outlet pipes shall consist of 19 mm clear stone or granular material as specified in the Contract Documents. Any earth from cave-ins, and all other unsuitable material shall be removed. Cracked or crushed pipes shall be removed and replaced before any backfilling is commenced. At the termination of a day s work, backfilling shall be complete to the end of the subdrain pipe and outlet pipe. Where 19 mm clear stone is specified, the subdrain trench and the outlet trench shall be wrapped with a nonwoven geotextile as specified in the Contract Document. The Contractor shall ensure that the subdrain pipe and outlet pipe is not damaged or dislodged during the placement and compaction of the backfill. Compaction of backfill material shall be according to OPSS 501. March 2005 Page 4 of 5 SSP405F03
5 Winter Grading of Material All ice and snow shall be removed from all portions of the work area. Frozen materials shall not be incorporated into the work. Material shall not be placed over frozen ground, ice or snow, except, at the Contractor's option, a single lift may be placed over frozen ground in which case final grading and compaction shall be done after the underlying materials have thawed Management of Surplus Material Management of all surplus material shall be according to OPSS 180 unless specified elsewhere in the Contract Documents. * Designer fill-in, see Notes to Designer MEASUREMENT FOR PAYMENT Pipe Subdrain Measurement is by Plan Quantity as may be revised by Adjusted Plan Quantity in metres horizontally over the centreline of the pipe between the ends of the pipe subdrain including outlets where applicable or between the upstream end and the centre of the manholes, catchbasin or inlets. ** Designer fill-in, see Notes to Designer BASIS OF PAYMENT Pipe Subdrain Item Payment at the contract price for the above tender item shall be full compensation for all labour, equipment and materials to do the work. Where excavation and backfilling of subdrains overlaps excavation and backfilling required for other work, then payment for overlapping excavation and backfilling will be made in accordance with the specifications for such other work as though no excavation and backfilling were required for pipe subdrains. Where the subdrain is below subgrade, and the subdrain backfill placed below the subgrade is the same material that is used in the roadbed, the granular backfill shall be paid for with the granular item for the roadbed. Where the subdrain granular backfill placed below the subgrade is material other than the one used for the roadbed, payment for the backfill shall be included in the contract price for the pipe subdrain. *** Designer fill-in, see Notes to Designer March 2005 Page 5 of 5 SSP405F03
CONSTRUCTION SPECIFICATION FOR PIPE SUBDRAINS
ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 405 NOVEMBER 2017 (Formerly OPSS 405, November 2008) Note: The MUNI implemented in November 2017 replaces OPSS 405 COMMON, November 2008 with no technical
More informationCONSTRUCTION SPECIFICATION FOR PIPE SUBDRAINS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 405 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR PIPE SUBDRAINS TABLE OF CONTENTS 405.01 SCOPE 405.02 REFERENCES 405.03 DEFINITIONS 405.04 DESIGN AND
More informationCONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 602 MARCH 1993 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER 602.01 SCOPE 602.02 REFERENCES 602.05 MATERIALS TABLE OF CONTENTS
More informationB405 - PIPE SUBDRAINS - OPSS 405
B405 - - OPSS 405 405.1 GENERAL Subdrains are small diameter pipes, perforated or non-perforated, which are placed for the purpose of collecting sub-surface water and conveying it to a proper outlet. Guidelines
More informationCONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS
ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.PROV 602 NOVEMBER 2017 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS TABLE OF CONTENTS 602.01 SCOPE 602.02 REFERENCES 602.03 DEFINITIONS
More information406 - PIPE SEWERS - MTC FORM 406
406 - - MTC FORM 406 INDEX 406.1 GENERAL Types of Pipe Pipe Strength, Rigid Pipes Polyethylene Pipe Strength - Rigid or Flexible Pipe Strength and Treatment, Flexible Pipes Selection of Type, Strength
More informationSpecial Provision No. 421F01 April 2006
RIGID PIPE CULVERTS Item No. FLEXIBLE PIPE CULVERTS Item No. CSP ARCH CULVERTS Item No. STRUCTURAL PLATE CSP Item No. CORRUGATED STEEL PIPE EXTENSIONS Item No. ROCK EXCAVATION FOR CULVERTS Item No. CLAY
More informationSTANDARD SPECIFICATIONS JULY 2012 S-11 CULVERTS, HEADWALLS AND ROADSIDE DRAINAGE TABLE OF CONTENTS
TABLE OF CONTENTS 11.01 SCOPE OF WORK... 1 11.02 REFERENCES... 1 11.03 MATERIALS... 2 11.04 GRANULAR & NATIVE BACKFILL... 2 11.05 CONSTRUCTION... 2 11.06 MEASUREMENT FOR PAYMENT... 5 11.07 BASIS OF PAYMENT...
More informationCONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING AND COMPACTING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 514 APRIL 1999 CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING AND COMPACTING TABLE OF CONTENTS 514.01 SCOPE 514.02 REFERENCES 514.03 DEFINITIONS
More informationCONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 602 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS TABLE OF CONTENTS 602.01 SCOPE 602.02 REFERENCES 602.03 DEFINITIONS
More informationSITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013
WATSON ROAD FACILITY PAGE 1 OF 6 PART 1 GENERAL 1.1 Description The work covered by this Section includes all labour, materials, equipment, and supervision necessary to complete the site services as shown
More informationSpecial Provision No. 421S01 November 2006
RIGID PIPE CULVERTS (75 Year DSL) Item No. RIGID PIPE CULVERTS (50 Year DSL) Item No. RIGID PIPE CULVERTS (25 Year DSL) Item No. FLEXIBLE PIPE CULVERTS (75 Year DSL) Item No. FLEXIBLE PIPE CULVERTS (50
More informationCONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.MUNI 401 NOVEMBER 2015 (Formerly OPSS 401, November 2013) CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING TABLE OF CONTENTS 401.01
More informationCONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 514 NOVEMBER 2005 CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING TABLE OF CONTENTS 514.01 SCOPE 514.02 REFERENCES 514.03 DEFINITIONS
More informationSpecial Provision No. 599F01 May 2004 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF NOISE BARRIER TABLE OF CONTENTS
... m NOISE BARRIER - Item No.... m NOISE BARRIER INCLUDING PRECAST NOISE/TRAFFIC BARRIER - Item No.... m NOISE BARRIER ON STRUCTURES - Item No.... m SALVAGEABLE NOISE BARRIER - Item No.... m SALVAGEABLE
More informationSECTION 303 CULVERTS
303.01 Scope - This section covers the construction of pipe culverts. 303.01.01 Definitions for the purposes of this section, the following general terms are defined as follows: a) Backfilling means the
More informationConstruction Specification for Trenching, Backfilling and Compacting
Engineering & Construction Services Division Standard Specifications for Sewers and Watermains TS 401 November 2016 Amendment to OPSS.MUNI 401 (Nov 2015) Construction Specification for Trenching, Backfilling
More information(SIZE) MANHOLES CATCH BASINS AND DITCH INLETS -Item No. ADJUSTING AND REBUILDING MANHOLES, CATCH BASINS AND DITCH INLETS - Item No.
(SIZE) MANHOLES CATCH BASINS AND DITCH INLETS -Item No. ADJUSTING AND REBUILDING MANHOLES, CATCH BASINS AND DITCH INLETS - Item No. Special Provision No. 407S06 July 2010 Aggregate Requirements, Lift Rings,
More informationCONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 APRIL 2004 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT TABLE OF CONTENTS 422.01 SCOPE 422.02
More informationCONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 514 APRIL 2008 CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING TABLE OF CONTENTS 514.01 SCOPE 514.02 REFERENCES 514.03 DEFINITIONS
More informationCONSTRUCTION SPECIFICATION FOR CONCRETE BARRIERS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 553 FEBRUARY 1991 CONSTRUCTION SPECIFICATION FOR CONCRETE BARRIERS 553.01 SCOPE 553.02 REFERENCES 553.03 DEFINITIONS TABLE OF CONTENTS 553.04 SUBMISSION
More informationCONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 401 NOVEMBER 2010 CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING TABLE OF CONTENTS 401.01 SCOPE 401.02 REFERENCES 401.03 DEFINITIONS
More informationSpecial Provision No. 799F01 March 2012 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF NOISE BARRIER TABLE OF CONTENTS
... m NOISE BARRIER - Item No.... m NOISE BARRIER INCLUDING PRECAST NOISE/TRAFFIC BARRIER - Item No.... m NOISE BARRIER ON STRUCTURES - Item No.... m SALVAGEABLE NOISE BARRIER - Item No.... m SALVAGEABLE
More informationCW 3120 INSTALLATION OF SUBDRAINS TABLE OF CONTENTS
December 2010 CW 3120 INSTALLATION OF SUBDRAINS TABLE OF CONTENTS 1. DESCRIPTION...1 1.1 General...1 1.3 Referenced Standard Construction Specifications...1 1.4 Referenced Standard Details...1 2. MATERIALS...1
More informationCONSTRUCTION SPECIFICATION FOR CONCRETE UNIT PAVERS
CITY OF TORONTO STANDARD CONSTRUCTION SPECIFICATIONS FOR ROADS TS 3.80 November 2010 CONSTRUCTION SPECIFICATION FOR CONCRETE UNIT PAVERS INDEX TS 3.80.01 SCOPE... 2 TS 3.80.02 REFERENCES... 2 TS 3.80.03
More informationMagnumStone Specifications Gravity
MagnumStone Specifications Gravity SPECIFICATION FOR MAGNUMSTONE GRAVITY MECHANICALLY STABILIZED EARTH SYSTEM PART 1: GENERAL.01Description The work consists of supplying and installing all aspects of
More informationEXCAVATION & BACKFILLING GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013
GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 PART 1 GENERAL 1.1 Description The Work of this Section shall be all labour, materials, equipment and supervision necessary
More informationSection 404. UNDERDRAINS
404.01 Section 404. UNDERDRAINS 404.01. Description. This work consists of constructing and installing underdrains, foundation underdrains, Prefabricated Drainage Systems (PDS), and underdrain outlets.
More informationCONSTRUCTION SPECIFICATION FOR EXCAVATING, BACKFILLING AND COMPACTING FOR MAINTENANCE HOLES, CATCH BASINS, DITCH INLETS AND VALVE CHAMBERS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 516 APRIL 1999 CONSTRUCTION SPECIFICATION FOR EXCAVATING, BACKFILLING AND COMPACTING FOR MAINTENANCE HOLES, CATCH BASINS, DITCH INLETS AND VALVE CHAMBERS
More informationSPECIAL SPECIFICATION 4425 Thermoplastic Pipe
2004 Specifications CSJ 0264-07-028 SPECIAL SPECIFICATION 4425 Thermoplastic Pipe 1. Description. Furnish and install thermoplastic pipe for constructing thermoplastic pipe culverts or thermoplastic storm
More informationAMENDMENTS TO OPSS 408 (OCT 89) CONSTRUCTION SPECIFICATION FOR ADJUSTING OR REBUILDING MANHOLES, CATCH BASINS, DITCH INLETS AND VALVE CHAMBERS
Works and Emergency Services CITY OF TORONTO WATER AND WASTEWATER SERVICES STANDARD CONSTRUCTION SPECIFICATIONS TS 408 November 2010 AMENDMENTS TO OPSS 408 (OCT 89) CONSTRUCTION SPECIFICATION FOR ADJUSTING
More informationCONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 APRIL 2004 (Reissued November 2010) CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT TABLE OF
More informationCONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS IN OPEN CUT
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 November 2015 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS IN OPEN CUT TABLE OF CONTENTS D 422.01 D 422.02 D 422.03
More informationCONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 492 NOVEMBER 2010 CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES TABLE OF
More informationConstruction Specification for Concrete Unit Pavers
Engineering & Construction Services Division Standard Specifications for Road Works TS 3.80 September 2017 for Concrete Unit Pavers Table of Contents TS 3.80.01 SCOPE... 2 TS 3.80.02 REFERENCES... 2 TS
More informationB512 - GABIONS - OPSS 512
B512 - - OPSS 512 512.1 GENERAL Gabions are contained rectangular units made of steel wire mesh and filled with stone. The double twisted wire mesh is galvanized and PVC (polyvinyl chloride) coated. Gabions
More informationSPECIAL SPECIFICATION 4xxx Thermoplastic Pipe
2004 Specifications SPECIAL SPECIFICATION 4xxx Thermoplastic Pipe 1. Description. Furnish and install thermoplastic pipe for constructing thermoplastic pipe culverts or thermoplastic storm sewer mains,
More informationConstruction Specification for Utility Adjustments
Engineering & Construction Services Division Standard Specifications for Road Works TS 4.50 September 2017 for Utility Adjustments Table of Contents TS 4.50.01 SCOPE... 2 TS 4.50.02 REFERENCES... 2 TS
More informationSECTION STORM SEWER COLLECTION SYSTEM
SECTION 02722 STORM SEWER COLLECTION SYSTEM PART 1 GENERAL 1.01 SUMMARY A. This section addresses the installation of storm sewer collection mains and includes the acceptable products, materials, and construction
More informationConstruction Specification for General Excavation
Engineering & Construction Services Division Standard Specifications for Road Works TS 2.10 September 2018 for General Excavation Table of Contents TS 2.10.01 SCOPE... 2 TS 2.10.02 REFERENCES... 2 TS 2.10.03
More informationCONSTRUCTION SPECIFICATION FOR NEW MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 407 NOVEMBER 2015 CONSTRUCTION SPECIFICATION FOR NEW MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION TABLE OF CONTENTS 407.01
More informationCONSTRUCTION SPECIFICATION FOR PIPE CULVERT INSTALLATION IN OPEN CUT
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 421 NOVEMBER 2012 CONSTRUCTION SPECIFICATION FOR PIPE CULVERT INSTALLATION IN OPEN CUT TABLE OF CONTENTS 421.01 SCOPE 421.02 REFERENCES 421.03 DEFINITIONS
More informationCONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 507 JULY 1991 CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES 507.01 SCOPE 507.02 REFERENCES 507.03 Not Used 507.04 Not Used
More informationCONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 616 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT TABLE OF CONTENTS 616.01 SCOPE 616.02 REFERENCES 616.03
More information410 PIPE SEWERS- OPSS 410
410 - OPSS 410 410.1 GENERAL A storm sewer network is required in an urban setting or where open ditches in combination with pipe culverts due to restricted property limits or susceptibility of a terrain
More informationCONSTRUCTION SPECIFICATION FOR WICK DRAIN INSTALLATION
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 220 NOVEMBER 2014 CONSTRUCTION SPECIFICATION FOR WICK DRAIN INSTALLATION TABLE OF CONTENTS 220.01 SCOPE 220.02 REFERENCES 220.03 DEFINITIONS 220.04
More informationB441 - WATERMAINS - OPSS GENERAL
B441 - - OPSS 441 441.1 GENERAL Watermains are a component of a water supply network. Watermains are a system of engineered hydraulic components designed for the conveyance of water from storage to consumption.
More informationTown of New Tecumseth Engineering Design Criteria and Standards for Subdivisions and Capital Works Projects
2.0 ROADWAYS 2.1 Road Classification 2.1.1 Standard Drawing Classification All Road Widths and Road Allowances shall be designed in accordance with the most recent Town of New Tecumseth Standards: TNT.SD
More informationB410 - PIPE SEWERS - OPSS 410
B410 - - OPSS 410 410.1 GENERAL A sewer network is required in an urban setting or where open ditches in combination with pipe culverts cannot accomplish drainage of a roadway system, due to restricted
More informationTS 803 DUCTS DUCT INSTALLATION, PROTECTION AND MARKING WITHIN A TRENCH OPEN TRENCH DUCT INSTALLATION PROFILE
TORONTO TRANSPORTATION March 2012 TS 803 DUCTS TABLE OF CONTENTS 1. DRAWINGS TTD 803.001 TTD 803.010 DUCT INSTALLATION, PROTECTION AND MARKING WITHIN A TRENCH OPEN TRENCH DUCT INSTALLATION PROFILE 2. CONSTRUCTION
More informationCONSTRUCTION SPECIFICATION FOR PIPE CULVERT INSTALLATION IN OPEN CUT
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 421 NOVEMBER 2007 CONSTRUCTION SPECIFICATION FOR PIPE CULVERT INSTALLATION IN OPEN CUT TABLE OF CONTENTS 421.01 SCOPE 421.02 REFERENCES 421.03 DEFINITIONS
More informationB410 - PIPE SEWERS OPSS.PROV 410
B410 - OPSS.PROV 410 410.1 GENERAL A sewer network is required in an urban setting or where open ditches in combination with pipe culverts cannot accomplish drainage of a roadway system, due to restricted
More informationCONSTRUCTION SPECIFICATION FOR UNTREATED GRANULAR, SUBBASE, BASE, SURFACE SHOULDER AND STOCKPILING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 314 DECEMBER 1993 CONSTRUCTION SPECIFICATION FOR UNTREATED GRANULAR, SUBBASE, BASE, SURFACE SHOULDER AND STOCKPILING 314.01 SCOPE 314.02 REFERENCES
More informationITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS
ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS 701-1 DESCRIPTION 701-1.1 This item shall consist of the construction of pipe culverts, and storm drains, removal of existing storm pipes, connections to existing
More informationCONSTRUCTION SPECIFICATION FOR TUNNELLING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 415 FEBRUARY 1990 CONSTRUCTION SPECIFICATION FOR TUNNELLING 415.01 SCOPE 415.02 REFERENCES 415.03 DEFINITIONS TABLE OF CONTENTS 415.04 SUBMISSION AND
More informationCONSTRUCTION SPECIFICATION FOR WICK DRAIN INSTALLATION
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.MUNI 220 NOVEMBER 2014 CONSTRUCTION SPECIFICATION FOR WICK DRAIN INSTALLATION TABLE OF CONTENTS 220.01 SCOPE 220.02 REFERENCES 220.03 DEFINITIONS 220.04
More informationMunicipal Inspection and Construction Guidelines Section I Roadworks SECTION I ROADWORKS I-1 GENERAL
I-1 GENERAL SECTION I ROADWORKS The Consultant Engineer is to monitor all specified asphalt, granular materials and sub-grade preparation to ensure all road and curb construction is undertaken as outlined
More informationCONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT
ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 616 APRIL 2018 CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT TABLE OF CONTENTS 616.01 SCOPE 616.02 REFERENCES 616.03 DEFINITIONS
More informationCONSTRUCTION SPECIFICATION FOR UNTREATED SUBBASE, BASE, SURFACE, SHOULDER, SELECTED SUBGRADE, AND STOCKPILING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 314 NOVEMBER 2015 CONSTRUCTION SPECIFICATION FOR UNTREATED SUBBASE, BASE, SURFACE, SHOULDER, SELECTED SUBGRADE, AND STOCKPILING TABLE OF CONTENTS
More informationCONSTRUCTION SPECIFICATION FOR WICK DRAIN INSTALLATION
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 220 NOVEMBER 2012 CONSTRUCTION SPECIFICATION FOR WICK DRAIN INSTALLATION TABLE OF CONTENTS 220.01 SCOPE 220.02 REFERENCES 220.03 DEFINITIONS 220.04
More informationSPECIFICATION FOR MAGNUMSTONE GEOGRID REINFORCED Mechanically Stabilized Earth (MSE) SYSTEM
MagnumStone Specifications Geogrid Reinforced SPECIFICATION FOR MAGNUMSTONE GEOGRID REINFORCED Mechanically Stabilized Earth (MSE) SYSTEM PART 1: GENERAL 1.01 Description The work consists of supplying
More informationCONSTRUCTION SPECIFICATION FOR GUIDE RAIL ENERGY ABSORBING TERMINALS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 554 NOVEMBER 1989 CONSTRUCTION SPECIFICATION FOR GUIDE RAIL ENERGY ABSORBING TERMINALS 554.01 SCOPE 554.02 REFERENCES 554.05 MATERIALS 554.05.01 Concrete.02
More informationB701 WATERMAINS- OPSS 701
B701 - OPSS 701 701.1 GENERAL Watermains are a component of a water supply network. Watermains are a system of engineered hydraulic components designed for the conveyance of water from storage to consumption.
More informationSection 401. PIPE CULVERTS
401.02 Section 401. PIPE CULVERTS 401.01. Description. This work consists of constructing pipe culverts of the size and class required, including excavation and backfill. 401.02. Materials. Provide materials
More informationSpecial Provision No. 399F01 December 2014
FULL DEPTH CRACK REPAIRS Item No. Special Provision No. 399F01 December 2014 1.0 SCOPE This Special Provision covers the requirements for full depth crack repairs in asphaltic concrete pavements. 2.0 REFERENCES
More informationBIG O HDPE TUBING HDPE CORRUGATED TUBING FOR AGRICULTURAL, RESIDENTIAL AND HIGHWAY DRAINAGE INCREASE CROP YIELDS LOWER PRODUCTION COSTS
DRAINAGE SOLUTIONS SINCE 1908 BIG O HDPE TUBING HDPE CORRUGATED TUBING FOR AGRICULTURAL, RESIDENTIAL AND HIGHWAY DRAINAGE INCREASE CROP YIELDS LOWER PRODUCTION COSTS PROTECT FOUNDATIONS IMPROVE HIGHWAY
More informationSECTION STORM DRAINAGE SYSTEM Excavating, Backfilling, and Compaction for Utilities Cast-in-place Concrete.
SECTION 02720 STORM DRAINAGE SYSTEM PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02221 - Excavating, Backfilling, and Compaction for Utilities. 2. 03300 - Cast-in-place Concrete. 1.02 REFERENCES
More informationDISTRICT OF HOPE SUPPLEMENTARY SPECIFICATIONS
DISTRICT OF HOPE SUPPLEMENTARY SPECIFICATIONS SUPPLEMENTARY CONSTRUCTION SPECIFICATIONS The District of Hope has adopted the Master Municipal Construction Document and Standard Detail Drawings, printed
More informationSECTION EROSION CONTROL DEVICES
SECTION 02374 PART 1 GENERAL EROSION CONTROL DEVICES 1.1 SUMMARY A. Section Includes: 1. Diversion Channels. 2. Rock Energy Dissipator. 3. Paved Energy Dissipator. 4. Rock Basin. 5. Rock Barriers. 6. Sediment
More informationCONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 353 NOVEMBER 2006 CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS TABLE OF CONTENTS 353.01 SCOPE 353.02 REFERENCES 353.03 DEFINITIONS
More informationCONSTRUCTION SPECIFICATION FOR PIPE SEWER INSTALLATION IN OPEN CUT
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 410 NOVEMBER 2006 CONSTRUCTION SPECIFICATION FOR PIPE SEWER INSTALLATION IN OPEN CUT TABLE OF CONTENTS 410.01 SCOPE 410.02 REFERENCES 410.03 DEFINITIONS
More information***************************************************************************************************************
02720 STORM DRAINAGE SYSTEM *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 33 40 00. ***************************************************************************************************************
More informationBIG 'O' HDPE Tubing CORRUGATED TUBING FOR AGRICULTURAL, RESIDENTIAL AND HIGHWAY DRAINAGE. Proudly owned and operated in Canada. aquaq.
BIG 'O' HDPE Tubing CORRUGATED TUBING FOR AGRICULTURAL, RESIDENTIAL AND HIGHWAY DRAINAGE aquaq.ca Proudly owned and operated in Canada. BIG 'O' HDPE TUBING The most recognized brand name for HDPE TUBING
More informationC231 Subsoil and Foundation Drains
CONSTRUCTION SPECIFICATION FOR DEVELOPMENTS AND SUBDIVISIONS C231 Subsoil and Foundation Drains Tamworth Regional Council Page :1 TABLE OF CONTENTS CLAUSE CONTENTS PAGE ORIGIN OF DOCUMENT, COPYRIGHT...
More informationSECTION STORM DRAINAGE AND STORMWATER MANAGEMENT
SECTION 322 - STORM DRAINAGE AND STORMWATER MANAGEMENT 322.01 DESCRIPTION Work includes all labor, material and equipment to construct storm drain systems and stormwater management facilities, including
More informationSPECIAL SPECIFICATION 4653 Polypropylene Pipe
2004 Specifications CSJ 2158-01-013, Etc. SPECIAL SPECIFICATION 4653 Polypropylene Pipe 1. Description. Furnish and install polypropylene pipe for constructing polypropylene pipe culverts or polypropylene
More informationPERMEABLE INTERLOCKING PAVERS
PERMEABLE INTERLOCKING PAVERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subgrade Preparation B. Placement of Storage Aggregate C. Placement of Filter Aggregate D. Placement of Bedding Course E. Placement
More informationCONSTRUCTION SPECIFICATION FOR INERTIAL BARRIER MODULES
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 550 JUNE 1995 CONSTRUCTION SPECIFICATION FOR INERTIAL BARRIER MODULES 550.01 SCOPE 550.02 REFERENCES 550.03 DEFINITIONS 550.04 Not Used 550.05 MATERIALS
More informationDEPARTMENT OF TRANSPORTATION STATE OF GEORGIA SPECIAL PROVISION. Section 550 Storm Drain Pipe, Pipe-Arch Culverts, and Side Drain Pipe
Revised: October 25, 2007 Revised: June 11, 2010 DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA SPECIAL PROVISION Section 550 Storm Drain Pipe, Pipe-Arch Culverts, and Side Drain Pipe Delete Section 550
More informationConstruction Specification for Concrete Curb and Concrete Curb and Gutter
Engineering & Construction Services Division Standard Specifications for Road Works TS 3.50 September 2017 for Concrete Curb and Table of Contents TS 3.50.01 SCOPE... 3 TS 3.50.02 REFERENCES... 3 TS 3.50.03
More informationCONSTRUCTION SPECIFICATION FOR WICK DRAIN INSTALLATION
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 220 NOVEMBER 2007 CONSTRUCTION SPECIFICATION FOR WICK DRAIN INSTALLATION TABLE OF CONTENTS 220.01 SCOPE 220.02 REFERENCES 220.03 DEFINITIONS 220.04
More informationCONSTRUCTION SPECIFICATION FOR NOISE BARRIER SYSTEMS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 760 NOVEMBER 2014 CONSTRUCTION SPECIFICATION FOR NOISE BARRIER SYSTEMS TABLE OF CONTENTS 760.01 SCOPE 760.02 REFERENCES 760.03 DEFINITIONS 760.04 DESIGN
More informationCONSTRUCTION SPECIFICATION FOR INERTIAL MODULE SYSTEM
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 550 NOVEMBER 2006 CONSTRUCTION SPECIFICATION FOR INERTIAL MODULE SYSTEM TABLE OF CONTENTS 550.01 SCOPE 550.02 REFERENCES 550.03 DEFINITIONS - Not Used
More informationSECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS
SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19.1 19-1.01 Exploratory Excavation... 19.1 19-1.02 Trench Width... 19.1 19-1.02.A Storm Drain
More informationCONSTRUCTION SPECIFICATION FOR EXCAVATING AND BACKFILLING - STRUCTURES
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 902 DECEMBER 1983 CONSTRUCTION SPECIFICATION FOR EXCAVATING AND BACKFILLING - STRUCTURES 902.01 SCOPE 902.02 REFERENCES 902.03 DEFINITIONS TABLE OF
More informationSPECIFICATION FOR REINFORCED SOIL WALL
SPECIFICATION FOR REINFORCED SOIL WALL 1.0 EXTENT OF WORK The work shall consist of Reinforced Soil walls built in accordance with this specification and in conformity with the lines, levels and details
More informationSPECIFICATION FOR CORNERSTONE GEOGRID REINFORCED SEGMENTAL RETAINING WALL SYSTEM
CornerStone Specifications Geogrid Reinforced SPECIFICATION FOR CORNERSTONE GEOGRID REINFORCED SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL 1.01 Description The work consists of supplying and installing
More informationSUPPLEMENTARY SECTION: STANDARD SPECIFICATIONS PAGE 1 STORMWATER MAINS & CULVERTS MAY 2018
STANDARD SPECIFICATIONS PAGE 1 STORMWATER MAINS & CULVERTS MAY 2018 PART 1 - GENERAL... 2 1.1 Work Included... 2 1.2 Related Sections... 2 1.3 Reference Standards... 2 1.4 Shop Drawings... 3 1.5 Certificates...
More informationSummary of the 2011 Changes
The following is a list of amendments to the Residential Site Improvement s, N.J.A.C. 5:21, adopted in 2011. The Notice of Adoption of these changes appeared in the New Jersey Register on May 16, 2011.
More information1. Division 01 Section General Requirements - Temporary Facilities and Controls. 2. Division 31 Section Earthwork.
PAGE 334000-1 SECTION 334000 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,
More informationSection 5 Specification 5.22 Supply and Install Smooth Wall Steel Pipes TABLE OF CONTENTS
TABLE OF CONTENTS 5.22 SUPPLY AND INSTALL SMOOTH WALL STEEL PIPES... 1 5.22.1 GENERAL... 1 5.22.2 MATERIALS... 1 5.22.2.1 Culvert Material... 1 5.22.2.2 Material for Bedding, Backfill and Sealing... 1
More informationSpecial Provision No. 799S15 December 2016
HIGH TENSION THREE CABLE GUIDE RAIL SHOULDER INSTALLATION - Item No. HIGH TENSION THREE CABLE GUIDE RAIL SLOPE INSTALLATION - Item No. HIGH TENSION CABLE GUIDE RAIL TERMINAL SYSTEM - Item No. Special Provision
More informationAMENDMENTS TO OPSS 410 (DEC 88) CONSTRUCTION SPECIFICATION FOR PIPE SEWER CONSTRUCTION BY OPEN CUT METHOD
Works and Emergency Services CITY OF TORONTO WATER AND WASTEWATER SERVICES STANDARD CONSTRUCTION SPECIFICATIONS TS 410 November 2010 AMENDMENTS TO OPSS 410 (DEC 88) CONSTRUCTION SPECIFICATION FOR PIPE
More informationCONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 353 NOVEMBER 2010 CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS TABLE OF CONTENTS 353.01 SCOPE 353.02 REFERENCES 353.03 DEFINITIONS
More informationSPECIFICATION FOR PIPE CULVERT CONSTRUCTION
SPECIFICATION FOR PIPE CULVERT CONSTRUCTION 1. SCOPE Pipe culverts shall be constructed in accordance with this specification and in conformity with the lines, levels and cross-sections shown on the drawings.
More information