1 PPI NBR: L-A (REV 01) DATE: September 08, 2005 LOW DURABILITY PRESERVATION PROCESS INSTRUCTION (PPI) for RECOVERY, ASSIST, SECURING, AND TRAVERSING (RAST) TRACK SYSTEM to be used in conjunction with CORE PPI with a Cleanliness Level of SSPC-SP-11 (Minimum) (RAST Track Trough) and Cleanliness Level of SSPC-SP-10 (RAST Track Cover/Side Plates) Surface Preparation LOW DURABILITY USE OF THIS PPI REQUIRES A DEVIATION FROM SPECIFICATION RAST Track PPI 1
2 1. SCOPE: 1.1 Cleaning, Surface Preparation and Painting Requirements for RAST Track. 1.2 RISK STATEMENT: Risk for installation. If proper surface preparation and application procedures are not adhered to, coating system failure can occur within 3-6 months Risk for curing. If overcoat window timeframes are not adhered to, coating system failure is possible within the first 6-9 months of application If the PPI checkpoint criteria are met, the following table provides service life expectancy for the listed systems: Coating System Life Expectancy: Specific Area Surface Preparation Method RAST Track Trough, Cleanliness Support Blocks, Level of Pulleys and Operating SSPC-SP-11 Mechanisms Normally (Minimum) Painted RAST Track Cover Plates and Track Side Plates Cleanliness Level of SSPC-SP-10 Specific Coat System Life Expectancy Prime, Stripe, Topcoat of Deck Gray MIL-DTL-24441, Type IV or MIL-PRF , Types IV, V, or VI 1-3 years Nonskid MIL-PRF years 2. REFERENCES: (REFER TO CORE PPI EXCEPT FOR THE FOLLOWING) 2.a. Systems and Specifications, Steel Structures Painting Council, Volume 2 2.c. MSDS and NAVSEA approved manufacturer s ASTM F 718 sheets, Shipbuilders and Marine Paints and Coating Product / Procedure Data Sheet for Coating System Being Applied. RAST Track Trough, Support Blocks, Pulleys, MIL-DTL or MIL-PRF-23236, Types IV, V, and Other Installed Operating Mechanisms or VI Normally Painted RAST Track Cover Plates & Track Side Plates MIL-PRF k. ISO Assessment of dust on steel surfaces prepared for painting (pressure sensitive tape method) 2.o. NSTM 631, Preservation of Ships in Service, Volumes 1, 2, and 3 2.s. NSTM 634, Deck Coverings 2.t. a. NAWC-AD Class Guidance Drawing (s), b. Latest Air Capable Ship Aviation Facilities Bulletin (s), c. Latest Amphibious Assault Ship Aviation Facilities Bulletin (s), d. Shipboard Aviation Resume (NAEC-ENG-75756, Latest VLA General Service Bulletin) e REF. P. Visual Landing Aids Installation and Clearance Requirements. 3. APPENDICES: (REFER TO CORE PPI EXCEPT FOR APPENDICES 1A-1H, 3A, 3B, 5, 6A, 6B, & 8) 4. REQUIREMENTS: (REFER TO CORE PPI EXCEPT FOR THE FOLLOWING) REQUIREMENTS FOR COATED AREAS. In accordance with reference 2.s, all contractors applying nonskid to US Naval Vessels INCONUS are required to maintain an active SSPC-QP1 certification with the Society for Protective Coatings (SSPC). Surface preparation shall be accomplished by certified blasters. Coating systems shall be applied by certified painters and test / inspection records maintained IAW Ref. 2.s, Section RAST Track PPI 2
3 (Quality Assurance Checklist). Checkpoints and final inspections shall be signed off by certified coating inspectors IN-PROCESS INSPECTIONS: Inspections are to be completed IAW Ref. 2.o, NSTM 631, Section 11 and Ref. 2.s, NSTM 634, Section The Responsible Government Representative certified coating inspector shall be given prior notice and shall perform an inspection of each coated area when the following checkpoints are reached: pre-surface preparation & cleaning, contamination containment and masking, surface preparation, paint storage area, mixing, prime coat, between successive coats of paint, topcoat of paint applied, nonskid applied, marking layout, color topping and area ready for final inspection. The Responsible Government Representative is also required to examine all data maintained by the paint foremen concerning environmental conditions, surface cleanliness, surface profile, and paint / nonskid thickness. Data shall be verified, depending on the checkpoint in question, including surface cleanliness, surface profile, wet film thickness, dry film thickness and workmanship. Environmental data, such as temperatures, relative humidity and dew point need only be verified if the inspector is doubtful of the recorded values. Deficiencies in personnel training, certification, record maintenance, equipment maintenance or any matter that is not IAW good painting practice shall be recorded. The coating inspector shall verify the successful completion of each checkpoint and sign and date the applicable spaces on Appendix RECORD KEEPING DURING SURFACE PREPARATION / PAINT AND NONSKID SYSTEM APPLICATION: A permanent record of environmental conditions, surface preparation, and nonskid system operations shall be maintained IAW Ref. 2.o, Section (Quality Assurance for Critical Coated Areas) and Ref. 2.s, Section , (Quality Assurance Checklist). Data shall be entered on Appendices 1A - 5 and 7. The record shall include dates and times of surface preparations, nonskid system operations, air temperatures, wet bulb, surface temperature, relative humidity and dew point. Enter on Appendix 1A the abrasive blast media manufacturer, type and size of abrasive used. Attach on Appendix 3 the TESTEX PRESS-O-FILM tapes used to measure surface profile. All appendices and data logger information shall be provided to the Contracting Regional Maintenance Center upon completion of the coating system installation. This information shall be retained for 3 years REVIEW OF RECORDS FOR FINAL COATING EVALUATION: A certified paint inspector authorized to represent NAVSEA shall review the Appendices of each area to ensure adequate quality control of the surface preparation, painting, and nonskid application process. Records shall include test and inspection data required by NSTM 631 Table (Ref. 2.o), and NSTM 634, Section 3.35, (Quality Assurance Checklist) (Ref. 2.s). Failure to produce such records, or records which indicate that surface preparation, painting and nonskid system application were not done IAW governing specifications/instructions, will be grounds for rejection RECORD DECK MARKINGS: Before removal of RAST track cover plates and track side plates, provide a record of existing periphery lines, exact locations, colors and dimensions of nonskid and deck coatings and markings on deck surfaces. Submit a copy to the Contracting Regional Maintenance Center and NAVSEA Technical Representative before starting pre-surface preparation. 4.8 ENVIRONMENTAL CONDITION READINGS: Environmental information on Appendices 1A-H shall be manually measured and recorded every 8 hours. Environmental readings shall be posted at the job site at all times, and an updated copy provided to the coating inspector and the Responsible Government Representative at each checkpoint for review. At each 8-hour recording period the readings shall be reviewed to determine if the environmental conditions are suitable for continued coating system installation. Additionally, a data logger shall be used to continuously monitor environmental conditions (air temperature, % relative humidity, and dew point) from 12 hours prior to, 48 hours after the application of a coat of paint IAW Ref. 2.c and NSTM 631, Sections 6, 7, and 8 and NSTM 634, Section 3.26 (Environmental Conditions) (Ref. 2.s). 4.9 TEMPERATURES TO BE MAINTAINED FOR NONSKID COATING SYSTEMS: Immediately prior to application of each layer of the coating system substrate surface temperature shall be taken. Readings shall be taken in five randomly chosen locations on the layer within the space and the highest and lowest surface temperatures measured recorded in Appendices 1B-1H. Additionally, readings shall be taken in five randomly chosen locations on the layer within the space and the highest and lowest surface temperatures measured recorded prior to resuming application of a layer of the coating system when there has been a temporary work interruption. Application of the next layer of the coating system shall not commence (or recommence after a temporary work interruption) until all recorded surface temperature readings are within the required range as specified in Ref. 2.c and NSTM 631, Section 6.3 and Ref. 2.s, Section (Environmental Conditions). If any reading is outside of the required range, the contractor must take additional action to control the temperature in the space and return the surface temperature readings to within the required range. Additional readings shall be RAST Track PPI 3
4 taken a minimum of hourly until the readings are returned to within the required range. If inconsistencies between the acceptable ambient and surface temperature ranges in Ref. 2.c, NSTM 631, Section 6.3, and Ref. 2.s, Section (Environmental Conditions) exist, the more stringent requirements shall be followed. If required ambient and surface temperatures are not provided or are unclear, contact Responsible Contracting Authority for resolution. 5. PRE-SURFACE PREPARATION: (REFER TO CORE PPI) 6. SURFACE PREPARATION: (REFER TO CORE PPI EXCEPT FOR THE FOLLOWING) NOTE: NOTE: CONTRACTING REGIONAL MAINTENANCE CENTER SHALL DESIGNATE ONE OF THE FOLLOWING METHODS TO ACHIEVE A CLEANLINESS LEVEL OF SSPC-SP-11 (MINIMUM) SURFACE PREPARATION TO SUPPORT POSTS AND BLOCKS, INTERIOR SURFACE OF THE RAST TRACK TROUGH, DECK AREAS WHERE COVER & SIDE PLATES WERE REMOVED ON EACH SIDE OF TROUGH, PULLEYS AND OTHER INSTALLED OPERATING MECHANISMS NORMALLY PAINTED: 1) POWER TOOL TO BARE METAL (SSPC-SP-11) 2) ABRASIVE BLASTING WITH ABRASIVE SPONGE MEDIA CONTRACTING REGIONAL MAINTENANCE CENTER SHALL DESIGNATE ONE OF THE FOLLOWING METHODS TO ACHIEVE A CLEANLINESS LEVEL OF SSPC-SP-10 SURFACE PREPARATION TO THE RAST TRACK COVER PLATES / TRACK SIDE PLATES: 1) Dry abrasive blasting 2) Dry abrasive blasting with abrasive sponge media 3) Wet abrasive blasting followed by dry abrasive blasting to remove flash rust 4) Wet abrasive blasting followed by dry abrasive blasting with abrasive sponge media to remove flash rust 5) UHP water jetting followed by dry abrasive blasting to remove flash rust and ensure a mil surface profile 6) UHP water jetting followed by dry abrasive blasting with abrasive sponge media to remove flash rust and ensure a mil surface profile 7. PAINTING REQUIREMENTS: (REFER TO CORE PPI EXCEPT FOR THE FOLLOWING) NOTE: CONTRACTING REGIONAL MAINTENANCE CENTER SHALL DESIGNATE COATING SYSTEM TO BE APPLIED. 7.1 WET FILM MEASUREMENTS: During application, applicators shall monitor wet film thickness using wet film gauges IAW Refs. 2.o and 2.s. Random wet film thickness (WFT) measurements shall be taken and recorded in Appendix 7 during the application process to ensure the specified dry film thickness (DFT) is achieved. Submit Appendix 7 at each checkpoint to QA Receipt inspection of contractor-furnished MIL-PRF coatings (primer, stripe, intermediate) are the same requirements as specified under MIL-PRF in the CORE PPI paragraphs and MIXING: PAINT AND NONSKID (Paint): Mix all paint thoroughly in their individual container to disperse pigments and assure homogeneity. Combine and thoroughly mix epoxy components prior to use IAW Ref. 2.c and Ref. 2.s, Section (Nonskid): Mix all nonskid thoroughly in their individual container to disperse pigments and assure homogeneity. Combine and thoroughly mix epoxy components prior to use IAW Ref. 2.c and Ref. 2.s, (erature): Verify paint and nonskid are within the mixing temperature as specified IAW Refs. 2.c, 2.o, and 2.s. If inconsistencies exist between the above documents, the more stringent guideline will be followed. Record mixing temperatures in Appendices 1B-1H (Mixing): Verify paint and nonskid are mixed thoroughly prior to use IAW Refs. 2.c, 2.o, and 2.s. Record satisfactory completion in Appendix SECTION 8 REFERS TO COATING SYSTEM APPLICATION TO THE INTERIOR SURFACE OF THE RAST TRACK TROUGH, INCLUDING DECK AREAS WHERE COVER & SIDE PLATES WERE REMOVED ON RAST Track PPI 4
5 EACH SIDE OF TROUGH, SUPPORT POSTS AND BLOCKS, PULLEYS AND OTHER INSTALLED OPERATING MECHANISMS NORMALLY PAINTED 8.1 PRIMER COAT APPLICATION: (REFER TO SECTION 8 OF CORE PPI) 8.2 STRIPE COAT APPLICATION: (REFER TO SECTION 9 OF CORE PPI) 8.3 TOPCOAT DECK GRAY APPLICATION: (REFER TO SECTION 12 OF CORE PPI) 9. SECTION 9 REFERS TO COATING SYSTEM APPLICATION TO RAST TRACK COVER PLATES AND TRACK SIDE PLATES 9.1 PRIMER COAT APPLICATION: CHECKPOINT (Test for Assessment of Surface Cleanliness): Immediately prior to prime coat application the surface shall be checked for dust IAW Ref 2.k. The dust rating shall be no greater than Rating 1, Class 2. For structures up to 1,000 ft 2, three readings shall be taken. No reading shall be taken in the same 100 ft 2 area as another reading. For every additional 100 ft 2 above 1,000 ft 2, one additional measurement shall be taken. Document readings on Appendix Apply prime coat specified in Appendix 8, IAW Ref. 2.c, and Ref. 2.s, Section During application, immediately brush out any drips or puddles CHECKPOINT (Prime Coat): Verify prime coat is applied IAW Ref. 2.c, and Ref. 2.s, Section (Holiday Inspection): Accomplish a visual holiday inspection of prime coat (Dry Film Thickness): Accomplish dry film thickness measurements IAW Ref. 2.b and Ref. 2.s, Section All tests and inspections noting unsatisfactory conditions shall result in the termination and rescheduling of the checkpoint. At rescheduled checkpoint, QA will document satisfactory corrective actions taken to correct discrepancy In order to pass the checkpoint, Appendices 1C, 4, 5, 6B and 7 shall be up to date and submitted to QA. QA shall sign in the appropriate areas on Appendix STRIPE COAT APPLICATION: CHECKPOINT (Test for Assessment of Surface Cleanliness): Immediately prior to stripe coat application the primer coat surface shall be checked for dust IAW Ref 2.k. The dust rating shall be no greater than Rating 1, Class 2. For structures up to 1,000 ft 2, three readings shall be taken. No reading shall be taken in the same 100 ft 2 area as another reading. For every additional 100 ft 2 above 1,000 ft 2, one additional measurement shall be taken. Document readings on Appendix Check for evidence of Amine Bloom such as discoloration of paint coating or clear oily film. If evidence of Amine Bloom is present, perform low-pressure water wash or wipe surfaces clean using ethanol/water mixture Apply Stripe Coat specified in Appendix 8, with typical paint equipment IAW Ref. 2.c, and Ref. 2.s, Section Stripe coat by brush in areas not accessible by paint spray equipment. During application, immediately brush out any runs, drips, sags or puddles CHECKPOINT (Stripe Coat): Verify stripe coat is applied IAW Ref. 2.c, and Ref. 2.s, Section (Holiday Inspection): Accomplish a visual holiday inspection of Stripe coat All tests and inspections noting unsatisfactory conditions shall result in the termination and rescheduling of the checkpoint. At rescheduled checkpoint, QA will document satisfactory corrective actions taken to correct discrepancy In order to pass the checkpoint, Appendices 1D, 4, 5, 6B and 7 shall be up to date and submitted to QA. QA shall sign in the appropriate areas on Appendix INTERMEDIATE COAT APPLICATION (OPTIONAL): RAST Track PPI 5
6 9.3.1 CHECKPOINT (Test for Assessment of Surface Cleanliness): Immediately prior to intermediate coat application the stripe coat surface shall be checked for dust IAW Ref 2.k. The dust rating shall be no greater than Rating 1, Class 2. For structures up to 1,000 ft 2, three readings shall be taken. No reading shall be taken in the same 100 ft 2 area as another reading. For every additional 100 ft 2 above 1,000 ft 2, one additional measurement shall be taken. Document readings on Appendix Check for evidence of Amine Bloom such as discoloration of paint coating or clear oily film. If evidence of Amine Bloom is present, wipe surfaces clean using approved solvent Super High Flash Naphtha, unless there is a compatibility issue, in which coating manufacturer shall be contacted for resolution Apply intermediate coat specified in Appendix 8, IAW Ref. 2.c, and Ref. 2.s, Section During application, immediately brush out any drips or puddles CHECKPOINT (Intermediate Coat): Verify intermediate coat is applied IAW Ref. 2.c, and Ref. 2.s, Section (Holiday Inspection): Accomplish a visual holiday inspection of Intermediate coat (Dry Film Thickness): Accomplish dry film thickness measurements IAW Ref. 2.b and Ref. 2.s, Section All tests and inspections noting unsatisfactory conditions shall result in the termination and rescheduling of the checkpoint. At rescheduled checkpoint, QA will document satisfactory corrective actions taken to correct discrepancy In order to pass the checkpoint, Appendices 1E, 4, 5, 6B and 7 shall be up to date and submitted to QA. QA shall sign in the appropriate areas on Appendix NONSKID APPLICATION: NOTE: PERFORM NONSKID COATING SYSTEM APPLICATION TO TOP OF RAST TRACK COVER PLATES & TRACK SIDE PLATES CHECKPOINT (Test for Assessment of Surface Cleanliness): Immediately prior to nonskid application the preceding coat surface shall be checked for dust IAW Ref 2.k. The dust rating shall be no greater than Rating 1, Class 2. For structures up to 1,000 ft 2, three readings shall be taken. No reading shall be taken in the same 100 ft 2 area as another reading. For every additional 100 ft 2 above 1,000 ft 2, one additional measurement shall be taken. Document readings on Appendix Apply LSA / UV resistant nonskid specified in Appendix 8, IAW Ref. 2.c, and Ref. 2.s, Section Apply to specified areas IAW paragraph of this PPI record of deck markings, and Ref. 2.s, Figure CHECKPOINT (Nonskid): Verify nonskid is applied IAW Ref. 2.c, and Ref. 2.s, Section (Holiday Inspection): Accomplish a visual holiday inspection of nonskid coat All tests and inspections noting unsatisfactory conditions shall result in the termination and rescheduling of the checkpoint. At rescheduled checkpoint, QA will document satisfactory corrective actions taken to correct discrepancy In order to pass the checkpoint, Appendices 1F, 5 and 6B shall be up to date and submitted to QA. QA shall sign in the appropriate areas on Appendix Remove all masking material immediately following nonskid application. 9.5 TOPCOAT DECK GRAY APPLICATION: NOTE: PERFORM TOPCOAT APPLICATION TO THE EXPOSED DECK SURFACES NOT RECEIVING NONSKID CHECKPOINT (Test for Assessment of Surface Cleanliness): Immediately prior to topcoat deck gray application the preceding coat surface shall be checked for dust IAW Ref 2.k. The dust rating shall be no greater than Rating 1, Class 2. For structures up to 1,000 ft 2, three readings shall be taken. No RAST Track PPI 6
7 reading shall be taken in the same 100 ft 2 area as another reading. For every additional 100 ft 2 above 1,000 ft 2, one additional measurement shall be taken. Document readings on Appendix Check for evidence of Amine Bloom such as discoloration of paint coating or clear oily film. If evidence of Amine Bloom is present, wipe surfaces clean using approved solvent Super High Flash Naphtha, unless there is a compatibility issue, in which coating manufacturer shall be contacted for resolution Apply topcoat specified in Appendix 8, IAW Ref. 2.c, and Ref. 2.s, Section During application, immediately brush out any drips or puddles CHECKPOINT (Topcoat): Verify topcoat is applied IAW Ref. 2.c, and Ref. 2.s, Section (Holiday Inspection): Accomplish a visual holiday inspection of topcoat (Dry Film Thickness): Accomplish dry film thickness measurements IAW Ref. 2.b and Ref. 2.s, Section All tests and inspections noting unsatisfactory conditions shall result in the termination and rescheduling of the checkpoint. At rescheduled checkpoint, QA will document satisfactory corrective actions taken to correct discrepancy In order to pass the checkpoint, Appendices 1G, 4, 5, 6B and 7 shall be up to date and submitted to QA. QA shall sign in the appropriate areas on Appendix HARDWARE INSTALLATION: 10.1 Install RAST Track Cover Plates, Track Side Plates and associated hardware and fasteners. 11. LAYOUT OF MARKING: 11.1 Layout deck marking IAW Ref. 2.t and as designated by the NAVAL Air Engineering Representative via the Contracting Regional Maintenance Center CHECKPOINT (Marking Layout): Accomplish layout inspection with the NAWC Representative. Notify the Contracting Regional Maintenance Center a minimum of 24 hours, but not more than 2 working days prior to the lay out inspection. 12. COLOR TOPPING APPLICATION: 12.1 CHECKPOINT (Test for Assessment of Surface Cleanliness): Immediately prior to color topping application the nonskid surface will be visually checked for dust and debris Check for evidence of Amine Bloom such as discoloration of paint coating or clear oily film. If evidence of Amine Bloom is present, wipe surfaces clean using approved solvent Super High Flash Naphtha, unless there is a compatibility issue, in which coating manufacturer shall be contacted for resolution Apply LSA color topping specified in Appendix 8, IAW Ref. 2.c, and Ref. 2.s, Section Apply to specified areas IAW paragraph of this PPI record of deck markings, and Ref. 2.s, Figure During application, immediately brush out any drips or puddles CHECKPOINT (Color Topping): Verify color topping is applied IAW Ref. 2.c, and Ref. 2.s, Section (Holiday Inspection): Accomplish a visual holiday inspection of color topping All tests and inspections noting unsatisfactory conditions shall result in the termination and rescheduling of the checkpoint. At rescheduled checkpoint, QA will document satisfactory corrective actions taken to correct discrepancy In order to pass the checkpoint, Appendices 1H, 5 and 6B shall be up to date and submitted to QA. QA shall sign in the appropriate areas on Appendix Remove all masking material immediately following color topping installation. 13. FINAL INSPECTION: 14.1 CHECKPOINT (Finished Painted Surfaces): RAST Track PPI 7
8 (Holiday Inspection): Perform a visual holiday check on the finished painted/coated system. Any holiday found shall be touched up (Dry Film Thickness): Accomplish final dry film thickness measurements on painted surfaces IAW Ref. 2.b and Ref. 2.s, Section Coating imperfections found, which may cause premature coating failure, shall be corrected before the paint and nonskid systems are accepted. Slight imperfections in the coating system are allowable, as long as they are not below minimum mils, and will not result in premature failure of the coating in the immediate vicinity of the imperfection. Such slight imperfections should be left intact, as trying to correct them could result in damage to the surrounding coating system In order to pass the checkpoint, any Appendices required by the certified coating inspector shall be up to date or completed and submitted to QA. QA shall sign in the appropriate areas on Appendix 5. All test inspections noting unsatisfactory conditions shall be corrected. APPENDIX 1A: QA INSPECTION FORM - ENVIRONMENTAL READINGS SURFACE (REFER TO THIS PPI) PREPARATION SSPC-SP-11 (SUPPORT POSTS AND BLOCKS, INTERIOR SURFACE OF THE RAST TRACK TROUGH AND DECK AREAS) APPENDIX 1B: QA INSPECTION FORM - ENVIRONMENTAL READINGS SURFACE (REFER TO THIS PPI) PREPARATION SSPC-SP-10 (RAST TRACK COVER PLATES / TRACK SIDE PLATES APPENDIX 1C: QA INSPECTION FORM - ENVIRONMENTAL READINGS PRIMER COAT (REFER TO THIS PPI) APPENDIX 1D: QA INSPECTION FORM - ENVIRONMENTAL READINGS STRIPE COAT (REFER TO THIS PPI) APPENDIX 1E: QA INSPECTION FORM - ENVIRONMENTAL READINGS INTERMEDIATE (REFER TO THIS PPI) COAT APPENDIX 1F: QA INSPECTION FORM - ENVIRONMENTAL READINGS LSA/UV (REFER TO THIS PPI) RESISTANT NONSKID APPENDIX 1G: QA INSPECTION FORM - ENVIRONMENTAL READINGS DECK (REFER TO THIS PPI) GREY TOP COAT APPENDIX 1H: QA INSPECTION FORM - ENVIRONMENTAL READINGS COLOR (REFER TO THIS PPI) TOPPING APPENDIX 2: QA INSPECTION FORM SURFACE SOLUBLE SALT CONDUCTIVITY LOG (REFER TO CORE PPI) APPENDIX 3A: QA INSPECTION FORM SURFACE PROFILE LOG SSPC-SP-11 (REFER TO THIS PPI) (SUPPORT POSTS AND BLOCKS, INTERIOR SURFACE OF THE RAST TRACK TROUGH AND DECK AREAS) APPENDIX 3B: QA INSPECTION FORM SURFACE PROFILE LOG SSPC-SP-10 (REFER TO THIS PPI) (RAST TRACK COVER PLATES / TRACK SIDE PLATES) APPENDIX 4: QA INSPECTION FORM DRY FILM THICKNESS MEASUREMENTS (REFER TO CORE PPI) APPENDIX 5: CHECKPOINTS & MILESTONES COMPLETION & SIGN OFF LOG (REFER TO THIS PPI) APPENDIX 6A: PAINT APPLICATION EQUIPMENT & PAINT CONSUMPTION LOG (REFER TO THIS PPI) FOR MIL-PRF-23236, TYPE VII, CLASS 17 COATING SYSTEMS APPENDIX 6B: PAINT APPLICATION EQUIPMENT & PAINT CONSUMPTION LOG (REFER TO THIS PPI) FOR LSA/UV RESISTANT NONSKID SYSTEM APPENDIX 7: WET FILM THICKNESS MEASUREMENTS (REFER TO CORE PPI) APPENDIX 8: COATING SYSTEM (S) (REFER TO THIS PPI) APPENDIX 9: QA INSPECTION FORM TEST FOR ASSESSMENT OF SURFACE (REFER TO CORE PPI) CLEANLINESS ENCLOSURE 1: SURFACE CONDUCTIVITY TESTING PROCEDURE (REFER TO CORE PPI) RAST Track PPI 8
9 APPENDIX 1A Q.A. INSPECTION FORM - ENVIRONMENTAL READINGS SURFACE PREPARATION SSPC-SP-11 - SUPPORT POSTS AND BLOCKS, INTERIOR SURFACE OF THE RAST TRACK TROUGH, INCLUDING DECK AREAS WHERE COVER & SIDE PLATES HAVE BEEN REMOVED FROM EACH SIDE OF TROUGH. SHIP: JOB ORDER: DATE: LOCATION: WORK ITEM: PARA. NO.: (I) (V) (G) PRODUCT BEING APPLIED: MAINTAIN SEPARATE LOG FOR EACH AREA/LOCATION, PREPARED OR PAINTED SURFACE, WHEN AN AREA IS DIVIDED INTO SEPARATE SECTIONS MAINTAIN A SEPARATE LOG FOR EACH SECTION. ACCEPT CRITERIA: % RH DEW POINT TEMP. PARTIAL FINAL NOTE: SURFACE TEMP. MUST BE A MINIMUM OF 5 DEG. F. ABOVE DEW POINT TEMP. DATE TIME Enter Activity Paint Facility, Surface Preparation, Prime, Stripe, Intermediate Tack, Top Coat, Etc. Measurement Location Highest & Lowest Surface. (ºF) Wet Bulb (ºF) % RH Dew Point (ºF) Gage # Gage Calibration Due Date Each Entry Shall be Signed by Trade Monitor, Foreman or Certified Paint Inspector Sat Unsat Sat Unsat Sat Unsat Sat Unsat Contractor (Print): Govt. Insp. (Print): Contractor (Signature): Govt. Insp. (Signature): Sat Unsat Sat Unsat Sat Unsat Sat Unsat Contractor (Print): Govt. Insp. (Print): Contractor (Signature): Govt. Insp. (Signature): Sat Unsat Sat Unsat Sat Unsat Sat Unsat Contractor (Print): Govt. Insp. (Print): Contractor (Signature): Govt. Insp. (Signature): Sat Unsat Sat Unsat Sat Unsat Sat Unsat Contractor (Print): Govt. Insp. (Print): Contractor (Signature): Govt. Insp. (Signature): SAT UNSAT SOURCE DOCUMENT (e.g. NSTM 631, 634, PPI, NAVSEA STANDARD ITEM) AS APPROPRIATE TABLE LINE COLUMNS COMMENTS: RAST Track PPI 9
10 APPENDIX 1B QA INSPECTION FORM - ENVIRONMENTAL READINGS SURFACE PREPARATION SSPC-SP-10 RAST TRACK COVER PLATES / TRACK SIDE PLATES Ship Name and Hull Number: Location (including frame numbers): Area (square feet): Nonskid Applicator: Date: Inspector: Time: Pre-inspection Comments: Blasting Method: Type/Size of Abrasive: Abrasive Blast Manufacturer: Abrasive Blast QPL and Revision #: Degreasing Method Used: Time Start Air Relative Humidity Surface Dew Point Inspector Stop Surface Cleanliness: SSPC-SP-10 Deck Profile Average: Conductivity Readings Average: Comments: Signature of Inspector: Date: Signature of Quality Assurance Officer: Date: RAST Track PPI 10
11 APPENDIX 1C QA INSPECTION FORM - ENVIRONMENTAL READINGS PRIMER COAT APPLICATION Ship Name and Hull Number: Location (including frame numbers): Date: Inspector: Time: Pre-inspection Comments: Number of Hours Deck Uncovered: Brush Blast Performed? Yes / No: Primer Coat Manufacturer: Product Name: Batch Number: Storage erature: Induction Time: Time Start Air Relative Humidity Surface Dew Point Inspector Primer Coat Mixing Stop Application Method: Airless Spray, Conventional Spray, and Rolled Wet Film Thickness (WFT) Average: Comments: Signature of Inspector: Date: Signature of Quality Assurance Officer: Date: RAST Track PPI 11
12 APPENDIX 1D QA INSPECTION FORM - ENVIRONMENTAL READINGS STRIPE COAT APPLICATION Ship Name and Hull Number: Location (including frame numbers): Date: Inspector: Time: Pre-inspection Comments: Number of Hours Since Prime Coat Applied: Reactivation Performed? Yes / No: Stripe Coat Manufacturer: Product Name: Batch Number: Storage erature: Induction Time: Time Start Air Relative Humidity Surface Dew Point Inspector Stripe Coat Mixing Stop Application Method: Airless Spray, Conventional Spray, and Rolled Wet Film Thickness (WFT) Average: Comments: Signature of Inspector: Date: Signature of Quality Assurance Officer: Date: RAST Track PPI 12
13 APPENDIX 1E QA INSPECTION FORM - ENVIRONMENTAL READINGS INTERMEDIATE COAT APPLICATION (OPTIONAL) Ship Name and Hull Number: Location (including frame numbers): Date: Inspector: Time: Pre-inspection Comments: Number of Hours Since Stripe Coat Applied: Reactivation Performed? Yes / No: Intermediate Coat Manufacturer: Product Name: Batch Number: Storage erature: Induction Time: Time Start Air Relative Humidity Surface Dew Point Inspector Intermediate Coat Mixing Stop Application Method: Airless Spray, Conventional Spray, and Rolled Wet Film Thickness (WFT) Average: Comments: Signature of Inspector: Date: Signature of Quality Assurance Officer: Date: RAST Track PPI 13
14 APPENDIX 1F QA INSPECTION FORM - ENVIRONMENTAL READINGS NONSKID APPLICATION Ship Name and Hull Number: Location (including frame numbers): Date: Inspector: Time: Pre-inspection Comments: Primer Dry Film Thickness (DFT): Number of Hours Before Applied: Reactivation Performed? Yes / No: Nonskid Coat Manufacturer: Product Name: Batch Number: Storage erature: Induction Time: Time Start Air Relative Humidity Surface Dew Point Inspector Nonskid Mixing Nonskid Mixing Duration Stop Application Method: Rolled, Trowelled, Sprayed Spread Rate (sq. ft/gal): Trowel Size, if Applicable: Comments: Signature of Inspector: Date: Signature of Quality Assurance Officer: Date: RAST Track PPI 14
15 APPENDIX 1G QA INSPECTION FORM - ENVIRONMENTAL READINGS TOPCOAT DECK GRAY APPLICATION Ship Name and Hull Number: Location (including frame numbers): Date: Inspector: Time: Pre-inspection Comments: Number of Hours Since 2 nd Intermediate Coat Applied: Reactivation Performed? Yes / No: Topcoat Manufacturer: Product Name: Batch Number: Storage erature: Induction Time: Time Start Air Relative Humidity Surface Dew Point Inspector Topcoat Deck Gray Mixing Stop Application Method: Airless Spray, Conventional Spray, and Rolled Wet Film Thickness (WFT) Average: Comments: Signature of Inspector: Date: Signature of Quality Assurance Officer: Date: RAST Track PPI 15
16 APPENDIX 1H QA INSPECTION FORM - ENVIRONMENTAL READINGS COLOR TOPPING APPLICATION Ship Name and Hull Number: Location (including frame numbers): Date: Inspector: Time: Pre-inspection Comments: Number of Hours Since Topcoat Applied: Reactivation Performed? Yes / No: Color Topping Coat Manufacturer: Product Name: Batch Number: Storage erature: Induction Time: Time Start Air Relative Humidity Surface Dew Point Inspector Color Topping Coat Mixing Stop Application Method: Airless Spray, Conventional Spray, and Rolled Wet Film Thickness (WFT) Average: Comments: Signature of Inspector: Date: Signature of Quality Assurance Officer: Date: RAST Track PPI 16
17 APPENDIX 3A QA INSPECTION FORM - SURFACE PROFILE-SURFACE PREPARATION-SURFACE CLEANLINESS LOG SURFACE PREPARATION SSPC-SP-11 SUPPORT POSTS AND BLOCKS, INTERIOR SURFACE OF THE RAST TRACK TROUGH, INCLUDING DECK AREAS WHERE COVER & SIDE PLATES HAVE BEEN REMOVED FROM EACH SIDE OF TROUGH, PULLEYS AND OTHER INSTALLED OPERATING MECHANISMS NORMALLY PAINTED. SHIP: JOB ORDER: DATE: LOCATION: WORK ITEM: PARA. NO.: (I) (V) (G) PRODUCT BEING APPLIED: ACCEPT CRITERIA: PROFILE RANGE MILS TO MILS PARTIAL FINAL MAINTAIN SEPARATE LOG FOR EACH AREA/LOCATION, PREPARED OR PAINTED SURFACE. WHEN AN AREA IS DIVIDED INTO SEPARATE SECTIONS MAINTAIN A SEPARATE LOG FOR EACH SECTION. Gage DATE TIME Place TESTEX PRESS-O-FILM In Spaces Below, Retain As Permanent QA Record Gage # Calibration Due Date Average Mils Place PRESS-O-FILM Here Place PRESS-O-FILM Here Place PRESS-O-FILM Here Place PRESS-O-FILM Here Reading: mils Reading: mils Reading: mils Reading: mils Contractor (Print): Govt. Insp. (Print): Contractor (Signature): Govt. Insp. (Signature): Place TESTEX PRESS-O-FILM In Spaces Below, Retain As Permanent QA Record Place PRESS-O-FILM Here Place PRESS-O-FILM Here Place PRESS-O-FILM Here Place PRESS-O-FILM Here Reading: mils Reading: mils Reading: mils Reading: mils Contractor (Print): Govt. Insp. (Print): Contractor (Signature): Govt. Insp. (Signature): Place TESTEX PRESS-O-FILM In Spaces Below, Retain As Permanent QA Record Place PRESS-O-FILM Here Place PRESS-O-FILM Here Place PRESS-O-FILM Here Place PRESS-O-FILM Here Reading: mils Reading: mils Reading: mils Reading: mils Contractor (Print): Govt. Insp. (Print): Contractor (Signature): Govt. Insp. (Signature): Abrasive Manufacturer: (If Applicable) Type: (If Applicable) Mesh Size: (If Applicable) SAT UNSAT TYPE OF SURFACE PREPARATION: CLEANLINESS COMMENTS: RAST Track PPI 17
18 APPENDIX 3B SURFACE PROFILE READINGS SURFACE PREPARATION SSPC-SP-10 RAST TRACK COVER PLATES / TRACK SIDE PLATES SHIP: DATE: LOCATION: PRODUCT BEING APPLIED: Average Blast Profile: Signature of Inspector: Date: Signature of Quality Assurance Officer: Date: RAST Track PPI 18
19 APPENDIX 5 CHECKPOINTS & MILESTONES COMPLETION & SIGN OFF LOG SHIP: JOB ORDER: DATE: LOCATION: WORK ITEM: PARA. NO.: PRODUCT BEING APPLIED: MAINTAIN SEPARATE LOG FOR EACH AREA/LOCATION, PREPARED OR PAINTED SURFACE. WHEN AN AREA IS DIVIDED INTO SEPARATE SECTIONS MAINTAIN A SEPARATE LOG FOR EACH SECTION. Date Pre-Surface Preparation and Cleaning Begins Date of Pre-Surface Preparation and Cleaning Checkpoint --Date of Visual and UV Light or Water-Break Inspection Check --Date of Structural and Pre-Surface Conditioning (ensuring de-burring and grinding) Check --Date of Contamination Containment and Masking Check ACTIVITY TIME DATE Date Surface Preparation Begins to Rast Track Trough, Support Blocks, Pulleys & Operating Mechanisms Date of Surface Preparation Checkpoint for Rast Track Trough, Support Blocks, Pulleys & Operating Mechanisms --Date of Surface Profile Measurement Check --Date of Soluble Salt Measurement Check --Date of Environmental Check --Date of Contamination Containment and Masking Check --Date of Inspection of Prepared area (ensuring all areas are properly prepared) Check --Date of Inspection of area cleanliness prior to primer coat application Check Date Surface Preparation Begins to Rast Track Cover Plates & Track Side Plates Date of Surface Preparation Checkpoint for Rast Track Cover Plates & Track Side Plates --Date of Surface Profile Measurement Check --Date of Soluble Salt Measurement Check --Date of Environmental Check --Date of Contamination Containment and Masking Check --Date of Inspection of Prepared area (ensuring all areas are properly prepared) Check --Date of Inspection of area cleanliness prior to primer coat application Check Date Material Storage Area Inspected RAST Track PPI 19
20 APPENDIX 5 (CONTINUED) CHECKPOINTS & MILESTONES COMPLETION LOG SHIP: JOB ORDER: DATE: LOCATION: WORK ITEM: PARA. NO.: PRODUCT BEING APPLIED: MAINTAIN SEPARATE LOG FOR EACH AREA/LOCATION, PREPARED OR PAINTED SURFACE. WHEN AN AREA IS DIVIDED INTO SEPARATE SECTIONS MAINTAIN A SEPARATE LOG FOR EACH SECTION. Date Paint Mixing Inspected --Date of Shelf Life Check --Date of erature Check --Date of Mixing Check Date NonSkid Mixing Inspected --Date of Shelf Life Check --Date of erature Check --Date of Mixing Check ACTIVITY TIME DATE Date Prime Coat is Applied to Rast Track Trough, Support Blocks, Pulleys & Operating Mechanisms Date of Prime Coat Checkpoint for Rast Track Trough, Support Blocks, Pulleys & Operating Mechanisms Date of Surface Cleanliness Inspection Checkpoint Date of Amine Bloom Inspection Checkpoint Date Stripe Coat Applied to Rast Track Trough, Support Blocks, Pulleys & Operating Mechanisms Date of Stripe Coat Checkpoint for Rast Track Trough, Support Blocks, Pulleys & Operating Mechanisms Date of Surface Cleanliness Inspection Checkpoint RAST Track PPI 20
21 RAST Track PPI 21 APPENDIX 5 (CONTINUED) CHECKPOINTS & MILESTONES COMPLETION LOG SHIP: JOB ORDER: DATE: LOCATION: WORK ITEM: PARA. NO.: PRODUCT BEING APPLIED: MAINTAIN SEPARATE LOG FOR EACH AREA/LOCATION, PREPARED OR PAINTED SURFACE. WHEN AN AREA IS DIVIDED INTO SEPARATE SECTIONS MAINTAIN A SEPARATE LOG FOR EACH SECTION. Date of Amine Bloom Inspection Checkpoint (if applicable) Date Topcoat Applied to Rast Track Trough, Support Blocks, Pulleys & Operating Mechanisms Date of Topcoat Checkpoint for Rast Track Trough, Support Blocks, Pulleys & Operating Mechanisms Date of Surface Cleanliness Inspection Checkpoint Date of Amine Bloom Inspection Checkpoint Date Prime Coat Applied to Rast Track Cover Plates & Track Side Plates Date of Prime Coat Checkpoint for Rast Track Cover Plates & Track Side Plates Date of Surface Cleanliness Inspection Checkpoint Date of Amine Bloom Inspection Checkpoint Date Stripe Coat Applied to Rast Track Cover Plates & Track Side Plates ACTIVITY TIME DATE
22 RAST Track PPI 22 APPENDIX 5 (CONTINUED) CHECKPOINTS & MILESTONES COMPLETION LOG SHIP: JOB ORDER: DATE: LOCATION: WORK ITEM: PARA. NO.: PRODUCT BEING APPLIED: MAINTAIN SEPARATE LOG FOR EACH AREA/LOCATION, PREPARED OR PAINTED SURFACE. WHEN AN AREA IS DIVIDED INTO SEPARATE SECTIONS MAINTAIN A SEPARATE LOG FOR EACH SECTION. Date of Stripe Coat Checkpoint for Rast Track Cover Plates & Track Side Plates Date of Surface Cleanliness Inspection Checkpoint Date of Amine Bloom Inspection Checkpoint Date Intermediate Coat (Optional) Applied to Rast Track Cover Plates & Track Side Plates Date of Intermediate Coat (Optional) Checkpoint for Rast Track Cover Plates & Track Side Plates Date of Surface Cleanliness Inspection Checkpoint Date of Amine Bloom Inspection Checkpoint Date NonSkid Applied to Rast Track Cover Plates & Track Side Plates Date of NonSkid Checkpoint for Rast Track Cover Plates & Track Side Plates Date of Surface Cleanliness Inspection Checkpoint ACTIVITY TIME DATE
23 RAST Track PPI 23 APPENDIX 5 (CONTINUED) CHECKPOINTS & MILESTONES COMPLETION LOG SHIP: JOB ORDER: DATE: LOCATION: WORK ITEM: PARA. NO.: PRODUCT BEING APPLIED: MAINTAIN SEPARATE LOG FOR EACH AREA/LOCATION, PREPARED OR PAINTED SURFACE. WHEN AN AREA IS DIVIDED INTO SEPARATE SECTIONS MAINTAIN A SEPARATE LOG FOR EACH SECTION. Date of Amine Bloom Inspection Checkpoint Date Topcoat Deck Gray Applied Date of Topcoat Deck Gray Checkpoint Date Marking Layout Begins Date of Marking Layout Checkpoint Date of Surface Cleanliness Inspection Checkpoint Date of Amine Bloom Inspection Checkpoint Date Color Topping Applied Date of Color Topping Checkpoint Date Finished Painted/Coated Surfaces Checkpoint ACTIVITY TIME DATE
24 APPENDIX 6A CERTIFIED COATING INSPECTOR'S CHECKPOINT SIGN-OFF LOG PAINT APPLICATION EQUIPMENT AND PAINT CONSUMPTION LOG SUPPORT POSTS AND BLOCKS, INTERIOR SURFACE OF THE RAST TRACK TROUGH, INCLUDING DECK AREAS WHERE COVER & SIDE PLATES HAVE BEEN REMOVED FROM EACH SIDE OF TROUGH. SHIP: JOB ORDER: DATE: LOCATION: WORK ITEM: PARA. NO.: PRODUCT BEING APPLIED: MAINTAIN SEPARATE LOG FOR EACH AREA/LOCATION, PREPARED OR PAINTED SURFACE. WHEN AN AREA IS DIVIDED INTO SEPARATE SECTIONS MAINTAIN A SEPARATE LOG FOR EACH SECTION. Prime Coat Stripe Coat Topcoat Airless Paint Hose Size Airless Paint Hose Length Airless Tip Orifice Diameter / Fan Width Airless Pump Used & Model Airless Pump Ratio If plural component: Fixed or Variable If Using Inline Heater erature in Fº (Fahrenheit) Plural Airless Conventional Airless erature Setting At Heater erature At Tip Product Applied Product Manufacturer Expiration Date Color Applied Product VOC Base Portion Batch (Part A) Hardener Portion Batch (Part B) Gallons Used per Coat Square Feet Painted RAST Track PPI 24
25 APPENDIX 6B CERTIFIED COATING INSPECTOR'S CHECKPOINT SIGN-OFF LOG PAINT APPLICATION EQUIPMENT AND PAINT CONSUMPTION LOG RAST TRACK COVER PLATES / TRACK SIDE PLATES SHIP: JOB ORDER: DATE: LOCATION: WORK ITEM: PARA. NO.: PRODUCT BEING APPLIED: MAINTAIN SEPARATE LOG FOR EACH AREA/LOCATION, PREPARED OR PAINTED SURFACE. WHEN AN AREA IS DIVIDED INTO SEPARATE SECTIONS MAINTAIN A SEPARATE LOG FOR EACH SECTION. Prime Coat Stripe Coat Intermediate Coat Nonskid Topcoat Color Topping Airless Paint Hose Size Airless Paint Hose Length Airless Tip Orifice Diameter / Fan Width Airless Pump Used & Model Airless Pump Ratio If plural component: Fixed or Variable If Using Inline Heater erature in Fº (Fahrenheit) Plural Airless Conventional Airless erature Setting At Heater erature At Tip Product Applied Product Manufacturer Expiration Date Color Applied Product VOC Base Portion Batch (Part A) Hardener Portion Batch (Part B) Gallons Used per Coat Square Feet Painted RAST Track PPI 25
26 APPENDIX 8 COATING SYSTEMS RAST Track Trough, Support Blocks, Pulleys & Other Installed Operating Mechanisms Normally Painted Prime Coat Stripe Coat Topcoat System DFT MIL-DTL-24441, Type IV or MIL-PRF-23236, Types IV, V, or VI 4 6 mils DFT 4 6 mils DFT 4 6 mils DFT 8 12 mils DFT mils DFT with stripe coat ITW American Safety Technologies & Ameron International Prime Stripe 1 ST Intermediate (Optional) 2 ND Intermediate (if applicable) Nonskid Deck Grey LSA Color Topping RAST TRACK COVER PLATES & TRACK SIDE PLATES NONSKID AREAS Product Name DFT Mils / Spread Rate ft 2 /gal MS-10C or MS- 7C or MS 7CZ 4 6 MS-10C or MS- 7C or MS 7CZ 4 6 MS-10C or MS- 7C or MS 7CZ 4 6 MS-10C or MS- 7C or MS 7CZ MS-400G or MS-440G or * MS-660G MS-180 or MS- 200 N/A 1 2 AREAS ADJACENT TO NONSKID AREA Product Name DFT Mils / Spread Rate ft 2 /gal RAST TRACK COVER PLATES & TRACK SIDE PLATES NONSKID AREAS Product Name DFT Mils / Spread Rate ft 2 /gal AREAS ADJACENT TO NONSKID AREA Product Name DFT Mils / Spread Rate ft 2 /gal MS-10C or MS- 7C or MS 7CZ 4 6 Amercoat Amercoat MS-10C or MS- 7C or MS 7CZ 4 6 Amercoat Amercoat MS-10C or MS- 7C or MS 7CZ 4 6 Amercoat Amercoat MS-10C or MS- 7C or MS 7CZ 1 2 N/A N/A N/A N/A N/A Amercoat 138 HR G N/A MIL-PRF-24635, # (a) 2 3 N/A MIL-PRF-24635, # (a) 1.5 N/A Amercoat N/A 2 3 *Approval as Type I, Composition G nonskid for exterior ship decks with the exception of CV, CVN, LHA, & LHD hanger decks and flight decks (a) To peripheral deck edging and areas not receiving nonskid apply a MIL-PRF-24635C qualified silicon alkyd topcoat matching the color Deck Gray (FED-STD-595 No ) or the manufacturer's deck gray color topping may be substituted for MIL-PRF RAST Track PPI 26
27 Texas Research Institute-Austin APPENDIX 8 COATING SYSTEMS (CONTINUED) RAST TRACK COVER PLATES & TRACK SIDE PLATES NONSKID AREAS Product Name DFT Mils / Spread Rate ft 2 /gal AREAS ADJACENT TO NONSKID AREA Product Name DFT Mils / Spread Rate ft 2 /gal Prime T T-4906P 5-10 Stripe T T-4906P 5-10 Intermediate T T-4906P 1-2 (Optional) Nonskid T-4926G N/A Deck Grey LSA MIL-PRF-24635, N/A 2 3 # (a) Color Topping MIL-PRF-24667A IAW Ref. 2.c N/A International Paint RAST TRACK COVER PLATES & TRACK SIDE PLATES NONSKID AREAS Product Name Prime Intergard 264 (FP Series) Stripe Intergard 264 (FP Series) Intermediate Intergard 264 (Optional) (FP Series) Nonskid * Intershield 556 G (LSA / UV) Deck Grey LSA N/A Color Topping Interthane 990 (PH Series) DFT Mils / Spread Rate ft 2 /gal AREAS ADJACENT TO NONSKID AREA Product Name Intergard 264 (FP Series) Intergard 264 (FP Series) Intergard 264 (FP Series) N/A MIL-PRF , # (a) 2 N/A DFT Mils / Spread Rate ft 2 /gal *Approval as Type I, Composition G nonskid for exterior ship decks with the exception of CV, CVN, LHA, & LHD hanger decks and flight decks (a) To peripheral deck edging and areas not receiving nonskid apply a MIL-PRF-24635C qualified silicon alkyd topcoat matching the color Deck Gray (FED-STD-595 No ) or the manufacturer's deck gray color topping may be substituted for MIL-PRF NAVSEA APPROVED ASTM-F-718 SHEETS MAY BE OBTAINED BY SELECTING THE NAVY COMMUNITY TAB ON THE WEBSITE AND FOLLOWING THE DIRECTIONS. RAST Track PPI 27
PPI NBR: D REV (03) T and E PPI for Midwest Thermal Spray NTNS DATE: November 19, 2010
PPI NBR: 63421-001D REV (03) T and E PPI for Midwest Thermal Spray NTNS DATE: November 19, 2010 PRESERVATION PROCESS INSTRUCTION (PPI) for Application to be used in conjunction with CORE PPI 63101-000
More informationMEDIUM DURABILITY MEDIUM DURABILITY
PPI NBR: 63001-004M (REV 00) DATE: May 27, 2004 MEDIUM DURABILITY PRESERVATION PROCESS INSTRUCTION (PPI) for WELL DECK OVERHEAD to be used in conjunction with CORE PPI 63101-000 with a Surface Preparation
More informationAPPENDIX 1 QA INSPECTION FORM - ENVIRONMENTAL READINGS & PAINT/NONSKID STORAGE
APPENDIX 1 QA INSPECTION FORM - ENVIRONMENTAL READINGS & PAINT/NONSKID STORAGE REQ'T DOCUMENT: /FY: TABLE: LINE: COLUMN: MAINTAIN SEPARATE LOG FOR EACH AREA/LOCATION, PREPARED OR COATED SURFACE. WHEN AN
More informationThank you for downloading this file. If you would like further information on water jetting visit the Lydia Frenzel Conference Series.
Thank you for downloading this file. If you would like further information on water jetting visit the Lydia Frenzel Conference Series. The Advisory Council is a nonprofit, privately funded membership organization
More informationPPI NBR: H (REV 01) DATE: September 02, 2005
PPI NBR: 60-00H (REV 0) DATE: September 0, 00 PRESERVATION PROCESS INSTRUCTION (PPI) for MCM and MHC Class Propeller and Metallic Underwater Hull Appendages to be used in conjunction with CORE PPI 60-000
More informationFOR SHIP'S FORCE INSTALLATION ONLY
PPI NBR: 63411-004SF (REV 02) DATE: November 16, 2007 PRESERVATION PROCESS INSTRUCTION (PPI) for SELF-ADHESIVE, PEEL AND STICK NONSKID SECTIONS Cleanliness Level of SSPC-SP-3 Surface Preparation FOR SHIP'S
More informationPPI NBR: Z (REV 01) DATE: September 23, 2009
PPI NBR: 63101-001Z (REV 01) DATE: September 23, 2009 PRESERVATION PROCESS INSTRUCTION (PPI) for WELL DECK OVERHEAD to be used in conjunction with CORE PPI 63101-000 with a Cleanliness Level of SSPC-SP-10
More informationThank you for downloading this file. If you would like further information on water jetting visit the Lydia Frenzel Conference Series.
Thank you for downloading this file. If you would like further information on water jetting visit the Lydia Frenzel Conference Series. The Advisory Council is a nonprofit, privately funded membership organization
More informationPRESERVATION PROCESS INSTRUCTION (PPI) for UNDERWATER HULL to be used in conjunction with CORE PPI
PPI NBR: 63101-001Y T&E Intersleek 970 ( REV 01) DATE: February 27, 2009 PRESERVATION PROCESS INSTRUCTION (PPI) for UNDERWATER HULL to be used in conjunction with CORE PPI 63101-000 with Surface Preparation
More informationAppendix 1 - Quality Assurance Inspection Form Environmental Readings
Appendix 1 - Quality Assurance Inspection Form Environmental s NAME & HULL #: CONTRACT/TASK ORDER/CLIN/TWD: LOCATION OR TANK: WORK ITEM: REQ T DOCUMENT: FY: TABLE: LINE: COLUMN: (I) (V) (G) (N/A) CONTRACTOR:
More informationPPI NBR: H (REV 04) DATE: October 28, 2008
PPI NBR: 63421-007H (REV 04) DATE: October 28, 2008 PRESERVATION PROCESS INSTRUCTION (PPI) for COSMETIC POLYMERIC DECK COVERINGS TYPE III for WET and DRY INTERIOR SPACES to be used in conjunction with
More informationITW- American Safety Technologies
ITW- American Safety Technologies Application Specification Specification No AST5162008-400G LSA May 16, 2008 NON-SKID COATING SYSTEM MS-7CZ Primer - MS-400G LSA Non-skid MS-200 Color Topping Applied to
More informationNAVSEA REVIEWED ASTM F-718. Interline 783 Finish, Ultra High Solids Two-Pack Fast Cure Solvent-Free Coating
ASTM F-71 International Paint, LLC Interline 73 Finish, Ultra High Solids Two-Pack Fast Cure Solvent-Free Coating PRODUCT DESIGNATIONS Part A: THA72/THA73/THA7/THA79/THA Series Part B: THA75 MIL-PRF-23236
More informationAPPLICATION GUIDELINE FOR
APPLICATION GUIDELINE FOR Company Name M/V SEA-SPEED V 10 X (100 % solids) (Hard film siloxane hybrid foul release coating) SCOPE This specification, together with the Product Data Sheet, defines the minimum
More informationNAVSEA STANDARD ITEM. 1.1 Title: Thermal Spray Nonskid Application; accomplish
NAVSEA STANDARD ITEM ITEM NO: 009-124 DATE: 26 MAR 2018 CATEGORY: II 1. SCOPE: 1.1 Title: Thermal Spray Nonskid Application; accomplish 2. REFERENCES: 2.1 Standard Items 2.2 T9074-AA-GIB-010/1687, Thermal
More informationAPPLICATION GUIDELINE FOR
APPLICATION GUIDELINE FOR Company Name M/V SEA-SPEED V 10 X (100 % solids) (Hard film siloxane hybrid foul release coating) SCOPE This specification, together with the Product Data Sheet, defines the minimum
More informationAviox CF Primer 37124
AkzoNobel Aerospace Coatings Technical Data Sheet Product Group Epoxy Primers Characteristics Product Information is a 2-component amine cured epoxy primer for exterior use. - Developed as a refresh primer,
More informationAerowave Technical Data Sheet. Product Group. Epoxy topcoats. Characteristics
AkzoNobel Aerospace Coatings Technical Data Sheet Product Group Epoxy topcoats Characteristics Product Information is a water-based, 2-component, amine cured epoxy finish. - Water based technology - Compatible
More informationMeasured in accordance with ASTM D 2697.
SELECTION & SPECIFICATION DATA Generic Type Description Features Color Finish Primer Service Temperature Solvent Based Inorganic Zinc Ultra-low VOC member of the Carbozinc family with extraordinary corrosion
More informationPolyurethane Topcoats
AkzoNobel Aerospace Coatings Technical Data Sheet Product Group Polyurethane Topcoats Characteristics Product Information is a 3-component durable high gloss polyurethane clear-coat for application on
More informationAerodur CF Primer 37047
AkzoNobel Aerospace Coatings Technical Data Sheet Product Group Polyurethane Primers Characteristics Product Information is a 3-component chromate free isocyanate cured modified polyurethane primer for
More informationNAVSEA REVIEWED ASTM F-718. Tenacious One Step Epoxy Flooring
ASTM F-718 International Diverse Flooring Tenacious One Step Epoxy Flooring MIL-PRF-24613 If this product is to be applied as part of a coating system, all components of the system must be as listed on
More informationMeasured in accordance with ASTM D 2697.
SELECTION & SPECIFICATION DATA Generic Type Description Features Color Finish Primer Service Temperature Solvent Based Inorganic Zinc Ultra-low VOC member of the Carbozinc family with extraordinary corrosion
More informationRust-Oleum Industrial Brands Specification
Rust-Oleum Industrial Brands Specification Coating Specification for Rust-Oleum Virtual Solutions Coating Solution 44 A solvent based coating system High Performance 7400 System 450 VOC DTM Alkyd Enamel
More informationAerodur HS Primer 37092
AkzoNobel Aerospace Coatings Technical Data Sheet Product Group Epoxy Primers Characteristics Product Information is a 2 component amine cured epoxy primer with improved adhesion properties for interior
More informationFood Service FDA Title 21 CFR
1.0 Scope 1.1 This recommendation covers the requirements for the surface preparation, application of primers and finish coats of resin linings to the interior surfaces of carbon/stainless steel vessels.
More informationApplication. Fuselage Fuselage Fuselage. Decoration Decoration
Product Group Polyurethane Topcoats Characteristics Product Information is a 3 component durable high gloss finish for exterior use. - Extended durability / UV resistance - High solids - Resistance to
More informationNAVSEA REVIEWED ASTM F-718. If this product is to be applied as part of a coating system, all components of the system must be as listed on the QPL.
ASTM F-718 EuroNavy/Sherwin-Williams EuroBasic ES301K Epoxy MIL-PRF-23236 If this product is to be applied as part of a coating system, all components of the system must be as listed on the QPL. This NAVSEA-REVIEWED
More informationRust-Oleum Industrial Brands Specification
Rust-Oleum Industrial Brands Specification Coating Specification for Rust-Oleum Virtual Solutions Coating Solution 2 A solvent based coating system High Performance 9100/9800 System DTM Epoxy Mastic/DTM
More informationPROLINE MID-TEMPERATURE VINYL ESTER LINING INSTALLATION GUIDE ProLine 4865T with optional 4822S Gel Coat Food Service FDA Title 21 CFR 175.
1.0 Scope 1.1 This recommendation covers the requirements for the surface preparation, application of primers and finish coats of resin linings to the interior surfaces of carbon/stainless steel vessels.
More informationSECTION INTUMESCENT FIREPROOFING
SECTION 078123 INTUMESCENT FIREPROOFING PART 1 GENERAL 1.1 GENERAL REQUIREMENTS A. Work of this Section, as shown or specified, shall be in accordance with the requirements of the Contract Documents. 1.2
More informationAlumigrip 10P8-11 VOC Compliant Epoxy Primer
Technical Data Sheet Product Group Epoxy primer Characteristics - This two component, VOC compliant epoxy primer will provide a very Product smooth finish optimizing the appearance of the subsequent topcoat.
More informationApplication. Fuselage Fuselage Fuselage. Decoration Decoration
Product Group Polyurethane Topcoats Characteristics Product Information is a 3 component durable high gloss finish for exterior use. - Extended durability / UV resistance - High solids - Resistance to
More informationTested in accordance with ISO , high expected durability in corrosivity category C5-I. Property Test/Standard Description
Approved 7461;7680 1,2 7680 zinc epoxy ^(ValidationDate) 1 Product description This is a two component polyamide cured zinc rich epoxy coating. It is a high solids, high zinc dust containing product. It
More informationARCHITECTURAL SPECIFICATION
THERMO-SORB ARCHITECTURAL SPECIFICATION PART 1 GENERAL 1.1 SECTION INCLUDES Spray applied, subliming / thin film intumescent, fire resistive coating for interior structural steel framing. Fire resistive
More informationProperty Test/Standard Description. calculated US EPA method 24 (tested) (CARB(SCM)2007, SCAQMD rule 1113, Hong Kong)
Approved 2124;7720 1,2 7720 zinc epoxy ^(ValidationDate) 1 Product description This is a two component polyamide cured zinc epoxy coating. It provides corrosion protection as part of a complete coating
More informationRust-Oleum Industrial Brands Specification
Rust-Oleum Industrial Brands Specification Coating Specification for Rust-Oleum Virtual Solutions Coating Solution 3 A solvent based coating system High Performance 9300/9800 System Extended Recoat Epoxy
More informationUnderstanding new Acceptance Criteria of Alternative Assemblies Thermal and Ignition Barriers over SPF
Understanding new Acceptance Criteria of Alternative Assemblies Thermal and Ignition Barriers over SPF Why do we need to cover the SPF Spray Polyurethane Foam (SPF) is combustible As the SPF burns and
More informationRust-Oleum Industrial Brands Specification
Rust-Oleum Industrial Brands Specification Coating Specification for Rust-Oleum Virtual Solutions Coating Solution 65 A solvent based coating system High Performance 9100 System 100 VOC DTM Epoxy Mastic
More informationApproved. Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method F (29 C) calculated VOC-US/Hong Kong
Approved 20920;16620 1 20920 epoxy ^(ValidationDate) 1 Product description This is a two component amine cured epoxy coating. It is a fast drying, zinc phosphate pigmented, high solids, high build product.
More informationPPI NBR: H (REV 04) DATE: October 28, 2008
PPI NBR: 63421-005H (REV 04) DATE: October 28, 2008 PRESERVATION PROCESS INSTRUCTION (PPI) for COSMETIC POLYMERIC DECK COVERINGS TYPE I, CLASSES 1, 2, & 3 for WET and DRY INTERIOR SPACES to be used in
More informationDURASHIELD 110 &
DURASHIELD 110 & 110-61 EFFECTIVE: 3/01/19 I. Scope A. This specification defines application requirements of DuraShield 110/110-61 plural-component, 100% solids, 1:1 volumetric mix ratio polyurethane
More informationNote: Epoxies will chalk and change color with exterior exposure. Colors are approximately and will tend to change over time.
DESCRIPTION Solvent Free Cycloaliphatic Amine Tank Lining PRINCIPAL CHARACTERISTICS Excellent chemical, solvent, and water immersion resistance Meets NSF/ANSI Standard 61 for potable water when applied
More informationProtective Industrial Polymers - USA Manufacturer s Specification February 11, 2015
This specification covers InhibiChem SR-GF-L Enhanced Chemical and Solvent-Resistant Glass-Flake Reinforced Steel Tank Lining System. This system consists of a vinyl ester primer, and two troweled coats
More informationAMERLOCK 2 AL. PRODUCT DATA SHEET September 12, 2018 (Revision of May 2, 2018) DESCRIPTION. Fast Dry Aluminum Epoxy Mastic Coating
DESCRIPTION Fast Dry Aluminum Epoxy Mastic Coating PRINCIPAL CHARACTERISTICS Fast drying properties Good drying properties even at low temperatures Low VOC High performance coating for new or old steel
More informationProperty Test/Standard Description. US EPA method 24 (tested) (CARB(SCM)2007, SCAQMD rule 1113, Hong Kong)
Approved 402;2522 1,2 2522 zinc epoxy ^(ValidationDate) 1 Product description This is a two component polyamide cured zinc rich epoxy coating. It is a high zinc dust containing product. It conforms to
More informationApproved. Property Test/Standard Description STANDARD GRADE. semi gloss (35-70) Flash point ISO 3679 Method 1
Approved 4860;523;527;1549 1,2 523 epoxy mastic ^(ValidationDate) 1 Product description This is a two component polyamine cured epoxy mastic coating. It is a surface tolerant, high solids, high build product.
More informationGanicin 2.8 ZR-E Zinc-Rich Epoxy Primer
Ganicin 2.8 ZR-E Zinc-Rich Epoxy Primer GENERAL DESCRIPTION A three-package, VOC conforming (2.8 lbs/gal) low HAPS, zinc-rich epoxy primer based on Axalta epoxy amine technology. The resulting organic
More informationof the relevant primer. - Apply
Product Group Polyurethane topcoat Characteristics Product Information 4200 is a 3-component high solid durable polyurethane topcoat that provides premium gloss and distinctness of image (DOI) designed
More informationApproved. Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method F (30 C) calculated VOC-US/Hong Kong
Approved 15360;15380 1,2 15360 epoxy ^(ValidationDate) 1 Product description This is a two component polyamine cured pure epoxy coating. It is a fast drying, abrasion resistant, high solids, high build
More informationProperty Test/Standard Description. matt (0-35) Flash point ISO 3679 Method 1
7461;7680 1 7680 zinc silicate VValidationDate). 1 Product description This is a two component polyamide cured zinc rich epoxy coating. It is a high solids, high zinc dust containing product. It conforms
More informationRefer to Substrates & Surface Preparation.
SELECTION & SPECIFICATION DATA Generic Type Description Features Color Finish Primer Dry Film Thickness Aliphatic Acrylic Polyurethane Thin film, high gloss finish with exceptional weathering performance
More informationAMERSHIELD VOC. PRODUCT DATA SHEET April 20, 2015 DESCRIPTION. Low VOC Polyester Acrylic Polyurethane PRINCIPAL CHARACTERISTICS
DESCRIPTION Low VOC Polyester Acrylic Polyurethane PRINCIPAL CHARACTERISTICS Unique, high-solids, high build coating Outstanding weather resistance with excellent color and gloss retention Tough, flexible
More informationDURASHIELD 210 &
DURASHIELD 210 & 210-61 I. Scope A. This specification defines application requirements of DuraShield 210 & DuraShield 210-61 plural-component 100% solids, 2:1 volumetric mix ratio polyurethane to steel
More information10P20-14 High Solids Low IR Primer
Technical Data Sheet Product Group Epoxy Primer Characteristics Product Information - A high solids primer for aircraft exteriors meeting the low infrared reflectance requirements of the referenced specification.
More informationPolyurethane topcoats
AkzoNobel Aerospace Coatings Aerowave 5001 Technical Data Sheet Product Group Polyurethane topcoats Characteristics Product Information Aerowave 5001 is a water-based, 3-component, isocyanate cured polyurethane
More informationOne component, heat-resistant, universal silicone topcoat for use in elevated temperature systems. Replaces HI-TEMP 1000 V / VS / VHA
DESCRIPTION One component, heat-resistant, universal silicone topcoat for use in elevated temperature systems. Replaces HI-TEMP 1000 V / VS / VHA PRINCIPAL CHARACTERISTICS Heat-resistant topcoat with highly
More informationTNEMEC ELEVATED TEMERATURE VINYL ESTER LINING INSTALLATION GUIDE ProPolymer Series 1402, 1422 and 1432 Direct Food Contact FDA Title 21 CFR 175.
1.0 Scope 1.1 This recommendation covers the requirements for the surface preparation and the application of primers and finish coat linings for the interior surfaces of carbon/stainless steel vessels
More information1.04 REFERENCES STANDARDS.1 For reference standards tests & results refer to Manufactures Product Data Sheets
This specification covers InhibiChem CR-GF-L Chemical-Resistant Glass Flake-Reinforced Steel Tank Lining System. This system consists of a vinyl ester primer, and two troweled coats of glass flake filled
More informationPRODUCT GUIDE: ZINC-RICH COATINGS. Version:
PRODUCT GUIDE: ZINC-RICH COATINGS Version: 08.07.17 305 Zinc Rich Epoxy Polyamide Primer Description: 305 is a user friendly zinc-rich epoxy primer formulated for use as a primer under acrylic, epoxy,
More informationAliphatic Acrylic-Polyester Polyurethane
SELECTION & SPECIFICATION DATA Generic Type Description Features Color Finish Primer Dry Film Thickness Aliphatic Acrylic-Polyester Polyurethane High build, low sheen finish that has excellent resistance
More informationRust-Oleum Industrial Brands Specification
Rust-Oleum Industrial Brands Specification Coating Specification for Rust-Oleum Virtual Solutions Coating Solution 23 A solvent based coating system High Performance 4315 High Heat Aluminum For service
More informationProperty Test/Standard Description. US EPA method 24 (tested) (CARB(SCM)2007, SCAQMD rule 1113, Hong Kong)
Approved 343 1,2 343 alkyd ^(ValidationDate) 1 Product description This is a one component oxidatively drying alkyd coating. Can be used as primer or mid coat in atmospheric environments. Suitable for
More informationTnemec Fluid Applied Thermal Break Long Form Specification
PART 1 GENERAL 1.01 DESCRIPTION Tnemec Fluid Applied Thermal Break Long Form Specification A. This specification covers labor, materials, equipment, and application necessary for, and incidental to, the
More informationGanicin 2.8 ZR- U Zinc-Rich Polyurethane Primer
Ganicin 2.8 ZR- U Zinc-Rich Polyurethane Primer GENERAL DESCRIPTION A three-package, VOC conforming (2.8 lbs/gal) low HAPS, zinc-rich urethane primer based on Axalta polyurethane technology. The resulting
More information1.4 kg/l (11.4 lb/us gal) Maximum 295 g/kg (Directive 1999/13/EC, SED) Maximum 420 g/l (3.5 lb/gal) 50 to 63 μm (2.0 to 2.
DESCRIPTION One-component, heat-resistant silicone acrylic topcoat primarily for the PPG HI-TEMP 1027 primer or the PPG HI-TEMP 222 G primer. PRINCIPAL CHARACTERISTICS Heat-resistant silicone acrylic topcoat
More informationPPI NBR: K-B (REV 00) DATE: February 26, 2010
PPI NBR: 63421-001K-B (REV 00) DATE: February 26, 2010 PRESERVATION PROCESS INSTRUCTION (PPI) for NON-AIRCRAFT CARRIER NON-SKID SYSTEMS AND DECK SAM 2x5 COATING SYSTEMS to be used in conjunction with CORE
More informationMarine: Exterior and interior areas, including outside hulls, superstructures, decks, cargo holds and water ballast tanks.
478;479;4060 1,2 478 epoxy VValidationDate). 1 Product description This is a two component amine cured pure epoxy coating. It is a fast drying, abrasion resistant, high solids, high build product. Designed
More informationCOATING NEW STRUCTURAL STEEL SIGN SUPPORT STRUCTURES - Item No. Special Provision No. 911S09 November 2006
COATING NEW STRUCTURAL STEEL SIGN SUPPORT STRUCTURES - Item No. Special Provision No. 911S09 November 2006 Amendment to OPSS 911, November 2004 for hot dip galvanizing and subsequent painting, where required,
More informationProperty Test/Standard Description. calculated US EPA method 24 (tested) (CARB(SCM)2007, SCAQMD rule 1113, Hong Kong)
Approved 23680;1551 1,2 23680 epoxy mastic ^(ValidationDate) 1 Product description This is a two component amine cured epoxy mastic coating. It is a surface tolerant, high solids product. It is aluminum
More informationPU Anti Graffiti Polyurethane Finish
PRODUCT DESCRIPTION A two pack, aliphatic anti graffiti acrylic polyurethane INTENDED USES Used as a highly durable finish coat with excellent obliteration properties for exterior of tanks, equipment,
More information1.4 kg/l (11.4 lb/us gal) Maximum 272 g/kg (Directive 1999/13/EC, SED) Maximum 420 g/l (3.5 lb/gal) To 650 C (1200 F) To 538 C (1000 F)
DESCRIPTION One component heat resistant silicone topcoat for use in an elevated temperature coating system, primarily for application over PPG HI-TEMP 1027 primer PRINCIPAL CHARACTERISTICS Heat resistant
More informationSECTION STRUCTURAL METAL FRAMING
SECTION 05100 STRUCTURAL METAL FRAMING PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Structural steel framing including lintels, shelf angles, bearing plates, anchor bolts and other items as shown on
More informationApproved. Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method F (29 C) calculated VOC-US/Hong Kong
Approved 20940;16620 1 20940 epoxy ^(ValidationDate) 1 Product description This is a two component amine cured epoxy coating. It is a fast drying, micaceous iron oxide (MIO) pigmented, high solids, high
More informationHardener: at least 24 months when stored cool and dry
DESCRIPTION Two-component, high-build polyamide cured zinc phosphate epoxy primer/coating PRINCIPAL CHARACTERISTICS Good anticorrosive properties under atmospheric conditions Forms durable coating systems
More informationHardener: at least 24 months when stored cool and dry
DESCRIPTION Two-component, engineered siloxane coating PRINCIPAL CHARACTERISTICS Unique, high gloss, engineered siloxane Virtually HAPs free, ultra-low VOC High durability in challenging environments Tough
More informationAMERCOAT 235. PRODUCT DATA SHEET May 1, 2018 (Revision of October 26, 2016) DESCRIPTION. Two-component, multi-purpose phenalkamine epoxy
DESCRIPTION Two-component, multi-purpose phenalkamine epoxy PRINCIPAL CHARACTERISTICS Universal epoxy coating suitable for ballast tanks, decks, topside, superstructure, and underwater hull Exceptional
More informationCarboguard 890 PRODUCT DATA SHEET SELECTION & SPECIFICATION DATA. Generic Type. Cycloaliphatic Amine Epoxy
SELECTION & SPECIFICATION DATA Generic Type Description Features Color Finish Primer Cycloaliphatic Amine Epoxy Highly chemical resistant epoxy mastic coating with exceptionally versatile uses in all industrial
More informationSSPC-SP7: Brush-Off Blast Cleaning..1 Minimum surface temperature: 2 C (35 F).2 Maximum surface temperature: 49 C (120 F)
City of Guelph Corporate Building Maintenance Contract: Exhibition Park Arena Open Web Steel Joists and Roof Decking Painting 1 GENERAL 1.1 Section Intent This Section describes products and procedures
More informationAlumigrip Technical Data Sheet. Polyurethane Topcoat. Product Group. Characteristics
Technical Data Sheet Product Group Polyurethane Topcoat Characteristics Product Information is a 3-component high solid durable polyurethane topcoat that provides premium gloss and distinctness of image
More informationOne-component, heat-resistant silicone acrylic topcoat primarily for the PPG HI-TEMP 1027 primer or the PPG HI-TEMP 222 G primer
DESCRIPTION One-component, heat-resistant silicone acrylic topcoat primarily for the PPG HI-TEMP 1027 primer or the PPG HI-TEMP 222 G primer PRINCIPAL CHARACTERISTICS Heat-resistant silicone acrylic topcoat
More informationCorlar 2.1 PR-P High Solids Productive Epoxy Primer
Corlar 2.1 PR-P High Solids Productive Epoxy Primer GENERAL DESCRIPTION A high solids, two component, VOC conforming (2.1 lbs./gal.) Low HAPS productive primer based on Axalta modified polyamide epoxy
More informationAviox Advanced Mica Series
Product Group Polyurethane topcoats Characteristics Product Information Micas are fast becoming a favorite in creating a unique appearance on aircraft liveries. This repairable high solid formulation is
More informationPPG HI-TEMP 1000 VS. PRODUCT DATA SHEET December 10, 2014 (Revision of June 30, 2014) DESCRIPTION
DESCRIPTION One-component, heat-resistant silicone topcoat for use in an elevated temperature coating system, primarily for application over PPG HI-TEMP 1027 primer PRINCIPAL CHARACTERISTICS Heat-resistant
More informationCorlar 2.1 PR-P High Solids Productive Epoxy Primer For Use With FG-040, FG-041 or FG-042 Activators
Corlar 2.1 PR-P High Solids Productive Epoxy Primer For Use With FG-040, FG-041 or FG-042 Activators GENERAL DESCRIPTION A high solids, two component, high build, VOC conforming (2.1 lbs./gal.) Low HAPS
More informationNAPCA Bulletin
NAPCA Bulletin 13-79-94 EXTERNAL APPLICATION PROCEDURES FOR COAL TAR EPOXY PROTECTIVE COATINGS TO STEEL PIPE 1. General a. These specifications may be used in whole or in part by anyone without prejudice,
More informationPolyurethane Topcoats. Base material
AkzoNobel Aerospace Coatings Technical Data Sheet Product Group Polyurethane Topcoats Characteristics Product Information is a 3-component basecoat for use in the base coat clear coat decoration system
More informationDIMETCOTE 9 H. PRODUCT DATA SHEET May 2, 2018 (Revision of August 7, 2015) DESCRIPTION. Inorganic Zinc Silicate Primer PRINCIPAL CHARACTERISTICS
DESCRIPTION Inorganic Zinc Silicate Primer PRINCIPAL CHARACTERISTICS >85% zinc in dry film VOC Compliant
More informationPPG HI-TEMP 1000 V (AMERCOAT 873) PRODUCT DATA SHEET December 10, 2014 (Revision of June 30, 2014) DESCRIPTION
DESCRIPTION One-component, heat-resistant silicone topcoat for use in an elevated temperature coating system PRINCIPAL CHARACTERISTICS Heat-resistant topcoat with highly engineered silicone resin; able
More informationSYSTEMS
www.pfpsystems.com SYSTMS Chartek 79 a bcdefg Protective Coatings Pr oduct Descr ipt ion A high performance, high build, solvent free, epoxy intumescent fireproofing coating. Underwriters Laboratories
More informationNFCA 400 Field Quality Assurance Procedure for Application of Mastic and Thin-Film Intumescent Fire Resistive Coatings
NFCA 400 Field Quality Assurance Procedure for Application of Mastic and Thin-Film Intumescent Fire Resistive Coatings 1 Scope The application of mastic and thin-film intumescent fire resistive coatings
More informationDURASHIELD JARS APPLICATION SPECIFICATION SHEET FIELD-APPLIED JOINT & REPAIR SYSTEM (JARS) EFFECTIVE: 6/2/15
DURASHIELD 310-61 JARS FIELD-APPLIED JOINT & REPAIR SYSTEM (JARS) I. Scope A. This specification defines application requirements of DuraShield 310-61 Joint and Repair System (JARS) plural-component 100%
More informationPERFORMANCE, 100% SOLIDS,
FEATURES Meets all VOC Requirements Can Saturate 1 Ounce Fiberglass Mat Can be Filled with EA-1 Aggregate and Troweled at 1/4. Can be Seeded with Sand or Aluminum Oxide for Anti- Skid. RECOMMENDED APPLICATIONS
More informationA. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents.
POLYURETHANE COATING ON STEEL PIPE PART 1 -- GENERAL 1.1 THE REQUIREMENT A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents. 1.2 REFERENCE SPECIFICATIONS,
More informationAerodur Clearcoat UVR
AkzoNobel Aerospace Coatings Technical Data Sheet Product Group Polyurethane Topcoats Characteristics Product Information is a universal 3-component, UV Resistant, high gloss polyurethane topcoat for application
More informationZONE 7 WATER AGENCY CWS 5 TURNOUT REPLACEMENT PROJECT # ADDENDUM NO. 3 April 02, 2019
ZONE 7 WATER AGENCY CWS 5 TURNOUT REPLACEMENT PROJECT # 275-18 ADDENDUM NO. 3 April 02, 2019 This Addendum No. 3 ( Addendum ) is dated the date set forth above and modifies certain Bidding Documents issued
More informationApproved. Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method F (32 C) calculated VOC-US/Hong Kong
Approved 2920;2401 1 2920 epoxy ^(ValidationDate) 1 Product description This is a two component amine cured epoxy coating. It is a fast drying, zinc phosphate pigmented, high solids, high build product.