1 Thank you for downloading this file. If you would like further information on water jetting visit the Lydia Frenzel Conference Series. The Advisory Council is a nonprofit, privately funded membership organization that provides a forum for dialogue and the dissemination of information pertaining to the economic and social effects of technological development throughout the world. The Council solicits and makes available pertinent information from both private and public sources, seeks expression of points of view from all who may wish to contribute, advances consensus opinions and selected issues of standards and standards organizations, develops networking to match speaking and information resources with the needs and demands of the community, and promotes specific seminars and symposia. A Primary Mission of the Council is to promote effective means of surface preparation in the maintenance industry using water and water/abrasive blasting techniques. This mission is viewed as important because the conservation of resources, particularly the public infrastructure, has a significant and long lasting economic impact on the well-being of every citizen. The Advisory Council is a sponsor of the Lydia Frenzel Conference Series.

2 PPI NBR: () DATE: August 26, 2002 PRESERVATION PROCESS INSTRUCTION (PPI) for STEEL and ALUMINUM DECKS WITH LOW SOLAR ABSORBING / UV RESISTANT NON-SKID AND DECK GREY COATING SYSTEMS Surface Preparation Method of Abrasive Blasting or UHP Water Jetting Steel / Aluminum Deck PPI, August 26,

3 1. SCOPE: 1.1 Cleaning, Surface Preparation and Painting Requirements for Steel & Aluminum Deck Non-Skid Areas. 1.2 If the PPI checkpoint criteria are met, the following table provides service life expectancy for the listed systems: Coating System Life Expectancy: Area Surface Preparation Method System Life Expectancy Exterior Ship SSPC-SP-12 ASTI MS 660G LSA 2-3 years Non-Skid Areas SSPC-SP-12 International 2-3 years Intershield 556 LSA 2. REFERENCES: 2.a. Systems and Specifications, Steel Structures Painting Council, Volume 2 2.b. SSPC-PA 2, Measurement of Dry Coating Thickness with Magnetic Gages 2.c. MSDS and manufacturer s ASTM F 718 sheets, Shipbuilders and Marine Paints and Coating Product / Procedure Data Sheet for QPL Coating System Being Applied. 2.d. 2.e. 2.f. 2.g. 2.h. 2.i. ASTM D 4417, Method C, Standard Test Methods for Field Measurement of Surface Profile of Blast Cleaned Steel OSHA 29 CFR 1915 Subparts C and Z SSPC-VIS-1-89 Visual Standard For Abrasive Blast Cleaned Steel SSPC-VIS-4 (I) Visual Reference Photographs for Steel Cleaned by Water Jetting SSPC-VIS-3 Visual Standard For Power and Hand Tool Cleaned Steel NACE-ENG-7576, Standard Aviation Facilities Resume 2.j REF. P, Visual Landing Aids Installation and Clearance Requirements 3. APPENDICES: APPENDICES Steel / Aluminum Deck PPI, August 26, APPENDIX TITLE 1A QA INSPECTION FORM - ENVIRONMENTAL READINGS SURFACE PREPARATION 1B QA INSPECTION FORM - ENVIRONMENTAL READINGS PRIMER COAT 1C QA INSPECTION FORM - ENVIRONMENTAL READINGS STRIPE COAT 1D QA INSPECTION FORM - ENVIRONMENTAL READINGS 1 ST INTERMEDIATE COAT 1E QA INSPECTION FORM - ENVIRONMENTAL READINGS LSA/UV RESISTANT NON-SKID 1F QA INSPECTION FORM - ENVIRONMENTAL READINGS 2 ND INTERMEDIATE COAT 1G QA INSPECTION FORM - ENVIRONMENTAL READINGS DECK GREY TOPCOAT 1H QA INSPECTION FORM - ENVIRONMENTAL READINGS COLOR TOPPING 2 QA INSPECTION FORM - SURFACE SOLUBLE SALT CONDUCTIVITY LOG 3 QA INSPECTION FORM SURFACE PROFILE LOG 4 QA INSPECTION FORM DRY FILM THICKNESS MEASUREMENTS 5 CHECKPOINTS & MILESTONES COMPLETION LOG 6 CERTIFIED COATING INSPECTOR S CHECKPOINT SIGN OFF LOG 7 PAINT APPLICATION EQUIPMENT & PAINT CONSUMPTION LOG 8 SURFACE CONDUCTIVITY TESTING PROCEDURE 9 QA INSPECTION FORM WET FILM THICKNESS MEASUREMENTS

4 4. REQUIREMENTS: 4.1 SAFETY: Accomplish the safety precautions as specified in NSTM 634, Section 1.4, OSHA 29 CFR 1915 Subparts C and Z (Ref. 2.e), and the Job Order during surface preparation and the application of marine coatings. 4.2 WORK NOTICE: The contractor shall post the notice at the ship s quarterdeck or other designated location for each job or separate area at least four hours, but not more than 24 hours, prior to the start of work. The notice shall contain the following information: ship s name and hull number, work item number, compartment or frame number, identification of hazard, date and time of work process and identification of engineering and work practice controls. Deliver notification of work planned for a weekend or Monday following that weekend to the Commanding Officer s representative not later than 0900 on the Friday immediately preceding that weekend. Deliver notification of work planned on a federal holiday and on the day following the federal holiday to the Commanding Officer s representative not later than 0900 on the last working day preceding the federal holiday. 4.3 QUALITY ASSURANCE REQUIREMENTS: REQUIREMENTS FOR COATED AREAS. Surface preparation shall be accomplished by certified blasters. Coating systems shall be applied by certified painters and test / inspection records maintained IAW NSTM 634, Section 3.35 (Quality Assurance Checklist). Checkpoints and final inspections shall be signed off by certified coating inspectors BLASTERS AND PAINTER CERTIFICATION. The implementing contractor shall maintain a certification program for blasters and painters working on the project. The program shall include minimum training requirements and provide for adequate records verifying the completion and currency of training for each blaster or painter involved in surface preparation and application of the coatings. Documentation shall be maintained verifying that only certified blasters and painters are used for preservation work. Training shall include all blasting and paint application techniques and procedures appropriate to the surface preparation and coating materials used COATING INSPECTOR CERTIFICATION: Documentation shall be maintained verifying that only certified paint inspectors are used for inspecting preservation work. Training shall include all techniques and procedures appropriate to inspecting the surface preparation and coating application being used. These techniques and procedures include determining the acceptability of surface preparation prior to commencement of paint application; determining the degree of compliance with painting procedures appropriate to the surface preparation and coating materials being used; and determining the acceptability of finished products IAW established standardized acceptance criteria. At a minimum, coating inspectors shall be certified and maintain certification to the National Association of Corrosion Engineers (NACE) Session I, or the NAVSEA Basic Paint Inspector Course (NBPI) COATING INSPECTOR RESPONSIBILITIES: Coating inspectors are responsible for providing reasonable confidence that material storage, surface preparation, paint system application and curing are accomplished IAW the manufacturer s requirements. These responsibilities require the coating inspector to: inspect material storage facilities; ensure all inspection equipment requiring calibration certification is certified under organization metrology calibration programs; perform in-process inspections of surface preparation, painting and verify successful completion of checkpoints in the application process; and inspect and accept or reject final paint systems Responsible Government Representative certified coating inspector shall verify checkpoints and sign all applicable Appendices Implementing Contractor shall perform all in-process inspections and checkpoints The Responsible Government Representative shall be present for and verify all in-process inspections / checkpoints. Steel / Aluminum Deck PPI, August 26,

5 Implementing Contractor shall participate in a joint Ship s Force and SUPSHIP personnel safety brief, when directed by the SUPERVISOR, prior to the start of recommended PCP IN-PROCESS INSPECTIONS: Responsible Government Representative certified coating inspector shall be given prior notice and shall perform an inspection of each coated area when the following checkpoints are reached: process control procedure, pre-surface preparation & cleaning, contamination containment and masking, surface preparation, paint storage area, prime coat, between successive coats of paint, topcoat of paint applied, marking layout, color topping and area ready for final inspection. The inspector is required to examine all data maintained by the paint foremen concerning environmental conditions, surface cleanliness, surface profile, and paint / non-skid thickness. Data shall be verified, depending on the checkpoint in question, including surface cleanliness, surface profile, wet film thickness, dry film thickness and workmanship. Environmental data, such as temperatures, relative humidity and dew point need only be verified if the inspector is doubtful of the recorded values. Deficiencies in personnel training, certification, record maintenance, equipment maintenance or any matter that is not IAW good painting practice shall be recorded. The coating inspector shall verify the successful completion of each checkpoint and sign and date the applicable spaces on Appendix DEVIATIONS: All surface preparation, coating applications shall be IAW delineated guidance herein. Any deviation will require NAVSEA approval and Contracting Officer (or representative) sign-off A TYCOM / NAVSEA authorized representative will provide QA oversight of this process. Implementing Contractor shall provide the Government QA inspector a minimum of four (4) hour notification of all checkpoints prior to accomplishing the checkpoint is MANDATORY DEVELOP AND ACCOMPLISH PROCESS CONTROL PROCEDURE (PCP): Submit two legible copies of each PCP not later than seven working days prior to start of the process required by the procedure to the SUPERVISOR. The procedure shall contain the following minimum information: -Contractor s name and address, -Process title, number, and date developed, -Description of process, including critical factors which have direct bearing on the process quality and safety, -Qualification requirements for the personnel performing the work, -Inspection and documentation forms, -Acceptance and rejection criteria for checkpoints, -The method utilized to ensure personnel accomplishing the procedure have direct knowledge of the requirements prior to beginning work. A copy of the procedure shall be at the work site during the performance of work, -Develop PCP matrix to include the entire job process with start dates, surface preparation dates, coating application dates, etc. -Weekly, update matrix as needed based on schedule changes, until completion / closure of each space or job item. -The method utilized to control the procedure, -Identification of hazardous materials which will be used in the process or hazardous waste that will be generated by the accomplishment of the process and the methodology, which will be utilized to minimize the quantity of these materials which will require control and disposal, -Approval signature and title of the contractor s representative and the date of submission, CHECKPOINT (PCP): Provide to responsible QA representative for review and comment on the PCP five (5) days prior to commencement of this process Ensure process control documentation provides a record of the data required to control and determine satisfactory completion of the process Submit updated or changed PCP procedures to the SUPERVISOR at least three working days prior to implementation. Steel / Aluminum Deck PPI, August 26,

6 4.4 RECORD KEEPING: RECORD KEEPING DURING SURFACE PREPARATION / NON-SKID SYSTEM APPLICATION: A permanent record of environmental conditions, surface preparation, and non-skid system operations shall be maintained IAW NSTM 634, Section 3.35, (Quality Assurance Checklist). Data shall be entered on Appendices 1A - 5, and 9. Environmental information on Appendices 1A-1H shall be updated hourly, posted at the job site and an updated copy provided to the coating inspector at each checkpoint for review. The record shall include dates and times of surface preparations, non-skid system operations, air temperatures, wet bulb, surface temperature, relative humidity and dew point. Enter on Appendix 1A the abrasive blast media manufacturer, type and size of abrasive used. Attach on Appendix 3 the TESTEX PRESS-O-FILM tapes used to measure surface profile REVIEW OF RECORDS FOR FINAL COATING EVALUATION: A certified paint inspector authorized to represent NAVSEA shall review the Appendices of each area to ensure adequate quality control of the surface preparation, and non-skid system application process. Records shall include all the test and inspection data required by NSTM 634, Section 3.35, (Quality Assurance Checklist). Failure to produce such records, or records which indicate that surface preparation, painting and non-skid system installation were not done IAW governing specifications/instructions, will be grounds for rejection. 4.5 TEMPORARY SERVICES: The project will require temporary services such as, but not limited to, lighting, compressed air, ventilation, portable head, fresh water, electrical services, and crane service. Ensure all equipment is IAW safety requirements delineated in this instruction RECORD DECK MARKINGS: Before removal of deck coating systems, provide a record of existing periphery lines, exact locations, colors and dimensions on non-skid and deck gray deck coatings and markings on deck surfaces. Submit a copy to the SUPERVISOR and NAVSEA Technical Representative before starting pre-surface preparation. 4.6 FORWARDING APPENDICES AND RETENTION OF RECORDS: After the project is completed, forward two copies of the completed Appendix forms to the TYCOM, Supervisor of Shipbuilding and Implementing Authority as specified in NSTM 634, Section Records shall be maintained by the Supervisor for a period of 3 years. 4.7 LOG OF EQUIPMENT & MATERIAL USED: Record equipment information and material used in Appendix 7. Compare materials used, to paint material and abrasive blast media (when used), specified in work order or contract. 4.8 Accomplish visual inspection of the following systems as applicable prior to surface preparation and submit four legible copies to supervisor, reporting conditions found: Control Station s to include glass, wipers, and sprayer apparatus, Fueling Stations, Tail Guide Sheave Trunk, Catapult Track, RAST Track, Hanger Door Track, Deck Elevator Coamings. 4.9 ENVIRONMENTAL CONDITIONS: Maintain environmental conditions IAW Ref. 2.c and NSTM 634, Section 3.26 (Environmental Conditions). Record measurements in Appendices 1A-1H Maximum Relative Humidity requirement of 85% is to be maintained from surface preparation operations through the final curing of the color-topping coat If environmental conditions are not provided or are unclear, contact Responsible Implementing Authority for resolution TEMPERATURES TO BE MAINTAINED FOR NON-SKID SYSTEM: Ensure temperatures are within acceptable limits as specified IAW Ref. 2.c and NSTM 634, Section 3.26 (Environmental Conditions). If inconsistencies in temperatures exist, NSTM 634 will supersede Ref. 2.c. If temperatures are not provided or are unclear, contact Responsible Implementing Authority for resolution CONTAMINATION CONTAINMENT AND MASKING FOR SURFACE PREPARATION, AND NON-SKID SYSTEM OPERATIONS: The following requirements shall be observed, in addition to the specific requirements of the Job Order, for maintaining cleanliness of the ship, ship s equipment, components, and spaces for the duration of the availability. Steel / Aluminum Deck PPI, August 26,

7 Prevent contamination and surface damage of the ship s equipment, components, and spaces during contamination-producing operations Plug, blank, wrap, cover, seal, and mask equipment, components, cables, wire ways, boats and openings using fire retardant/ water repellent materials, and prevent entry of contaminants to machinery, winches, rigging, machinery surfaces, weapons systems, electrical equipment, electronic equipment, valves, vents not in use, and other openings Install covering as needed, conforming to A-A and/or fire retardant plywood Install fire retardant industrial filter material on the intake of supply and exhaust end of ventilation systems which will be in use Remove existing and install new filter or clean the filter material when airflow is restricted All protective measures are to be in place prior to start of any contamination-producing operations and shall remain in place until the contamination-producing operations are complete Install double curtain baffles at the entrances of each access door where airborne contamination could occur during contamination-producing operations. Install a dirt-collecting mat on the deck directly inside each door. The SUPERVISOR will select a maximum of four doors. Tag out doors not designated for access Temporary coverings shall not be removed during contamination-producing operations without permission of the SUPERVISOR PROTECTIVE COVERING: Inspect the integrity of the protective covering at the beginning of each shift in which contamination-producing operations will be accomplished. Ensure that equipment and machinery have not been infiltrated by contaminants. Notify the SUPERVISOR immediately by verbal means, followed on the next workday in writing, if contamination or surface damage has occurred. Reseal to prevent further entry of contaminants or surface damage Maintain cleanliness of the work site free from accumulation of industrial debris caused by contractor and / or subcontractor employees on a continuous basis throughout the availability. Workspaces include those areas immediately under and adjacent, and those areas where service lines are run in the vicinity of the work site Area cleaning shall be accomplished no later than at the end of each shift, on a daily basis and prior to any checkpoints Remove and dispose of industrial debris from the ship on a daily basis Accomplish an initial walk-through of all locations aboard ship where contractor responsible work will take place, to observe cleanliness conditions. The inspection shall be made jointly with the SUPERVISOR and the ship s Commanding Officer s representative, and shall take place prior to the commencement of any work by the contractor Submit four legible copies of a written report of any unclean sites/spaces to the SUPERVISOR and Commanding Officer of the ship within 72 hours after completion of the inspection Accomplish a cleanliness inspection on a daily basis whenever work is in progress. The inspection shall be made jointly with the SUPERVISOR and the designated representative of the ship s Commanding Officer. During inspection the responsible party shall be assigned. A written report of any unclean work sites/spaces shall be prepared by the contractor and copies distributed to the SUPERVISOR and Commanding Officer of the ship within four hours after completion of the inspection. The inspection report shall list the responsible activity (contractor, ship, etc.) for each unclean site/area. Unclean sites/areas determined as contractor responsible shall be immediately cleaned Inspections and reporting shall be accomplished during the daily fire prevention and housekeeping inspections. Steel / Aluminum Deck PPI, August 26,

8 COVERING REMOVAL: Remove protective covering upon completion of contamination-producing operations and inspect for presence of contamination or surface damage. Notify the SUPERVISOR immediately by verbal means, followed on the next workday in writing, if contamination or surface damage has occurred, prior to removal of the contamination and repair of damage Remove from the ship and dispose of debris and foreign matter generated because of work being accomplished on this ship and from work being accomplished on other naval and private ships. Comply with the requirements of federal, state, and local laws, codes, regulations, and ordinances or as specified elsewhere in the Job Order ISOLATION, BLANKING AND TAGGING REQUIREMENTS: Notify the Commanding Officer s representative in writing of equipment, systems, circuits, components, piping, and valves that require isolation to accomplish work in the Work Item before any work is started on each individual Work Item so that tag-outs can be accomplished as required by ship s instructions After ship s force install tags; verify use of sufficient tags to prevent operation of equipment, systems, circuits, components, piping, or valves from all stations that could exercise control A contractor s representative shall print name, badge number, identify company, and sign on a ship s tag-out record sheet and tags after installation, indicating repair activity satisfaction with the completeness of the tag-out and alerting personnel removing tags that contractor concurrence is required Post warning signs and barriers and install temporary positive means to prevent closure or movement of component that create a safety hazard Do not disturb, modify, remove, energize, or operate any switch, fitting, valve, or other equipment affixed with a ship s isolation or DANGER tag Do not remove or relocate ship s isolation or DANGER tags Notify the Commanding Officer s representative immediately when the contractor s work is complete and the system, piping, or circuit is ready for activation to accomplish removal of tags The contractor s representative shall sign the ship s tag-out log sheet to show concurrence in tag removal and clearance before removal Verify removal and clearance of all isolation or DANGER tags in accordance with ship s instruction before the equipment is operationally tested or operated. 5. PRE-SURFACE PREPARATION: 5.1 STRUCTURAL INSPECTION: Prior to commencement of work, the government will provide an authorized representative to conduct a structural inspection for the entire area to be prepared. Heavily rusted or corroded area, damaged metal and holes in the structure or piping shall be documented and provided to ship s force and Responsible Contracting Authority to determine if further structural evaluation or NDT is warranted and for possible repair before surface preparation. 5.2 PRE-SURFACE CONDITIONING WHEN USING NON-EDGE RETENTIVE COATINGS: Before surface preparation the Responsible Implementing Authority shall have all welds, protrusions, projections and spikes ground smooth; pits in the welds shall be ground out; all weld splatter shall be removed; radius all edges, flanges, angles, pipe hangers to a minimum radius of 3mm. Radiusing of edges is not required when using approved edge retentive coatings, all other requirements apply. Steel / Aluminum Deck PPI, August 26,

9 5.3 DEGREASE / FRESH WATER WASH DOWN: Prior to surface preparation, remove all surface contaminants such as sea salts, grease and oil (hydrocarbons), loose rust; mud and marine growth with 3,000-PSI minimum fresh water wash down. Use vacuum to remove standing water followed by an adequate period of time to allow the surface to dry prior to surface preparation. SSPC-SP-1 requirements shall be met. Enter on Appendix 1A method used for degreasing. 5.4 CHECKPOINT (Pre-Surface Preparation Inspection): NOTE: ULTRAVIOLET LIGHTS SHALL NOT BE USED IN MERCURY EXCLUSION AREAS. (Visual and Ultraviolet (UV) Light): Conduct a visual inspection to verify all surfaces within the scope of the project are free of hydrocarbons, and other contaminants such as sea salts, loose rust, mud, and marine growth, which could become imbedded in the surface to be prepared. Inspect surface using a UV light (approx. 60 Å) to detect hydrocarbons on the surface. The ultraviolet light will not allow the proper detection of hydrocarbons on the surface if the surface being inspected is exposed to day or artificial light. Therefore for proper UV light hydrocarbon detection, lights must be off, and the inspection must be conducted during darkness for surfaces exposed to sunlight. Take appropriate safety measures to prevent worker hazards in the darkened areas When hydrocarbons are present, the hydrocarbons will fluoresce as bright green, lime green, or blue/violet on the surface To remove detected contaminants and hydrocarbons, accomplish a solvent wipe on affected areas. Follow SSPC-SP-1 to remove contaminants and hydrocarbons If contaminants or hydrocarbons are detected on the surface after attempting to solvent spot repair, the Responsible Implementing Authority shall require the surface be de-greased again as directed in paragraph (Structural and Pre-Surface Conditioning): Verify all surfaces within the scope of the project are IAW paragraphs 5.1 and (Contamination Containment and Masking): Verify all surfaces within the scope of the project are IAW paragraphs 4.11 through (Flow Test): Conduct Unobstructed Flow Test on deck drains and counter measure washdown (CMW) nozzles prior to blasting. Document and submit four legible copies of a report to supervisor listing quantity and location of each drain and nozzle tested that is blocked or damaged. (CMW nozzles test may be conducted using water or 90 PSIG compressed air). 6. SURFACE PREPARATION: 6.1 Monitor environmental conditions throughout surface preparation operations to ensure they meet requirements as specified in paragraphs 4.9 and 4.10 Record measurements in Appendix 1A. NOTE: IMPLEMENTING AUTHORITY WILL DESIGNATE SURFACE PREPARATION METHOD TO USE, ABRASIVE BLASTING OR UHP WATER JETTING. 6.2 SURFACE PREPARATION AND CLEANING PRIOR TO PAINT APPLICATION: Prepare all surfaces for painting IAW Ref. 2.a for the methods specified in NSTM 634; Section ; Section (Steel Surfaces), or Section (Aluminum Surfaces) The conductivity level of the water is to be checked daily prior to the start of UHP water jetting to ensure levels are below 70 microsiemens/cm For UHP water jetted area a blow down is required; using dry, oil free compressed air, blow down all surfaces. Steel / Aluminum Deck PPI, August 26,

10 6.3 POWER TOOL CLEANING ON SURFACES INACCESSIBLE TO ABRASIVE BLASTING OR UHP WATER JETTING Accomplish the requirements of SSPC-SP-11 Power Tool Cleaning to Bare Metal to remove all the existing coating and corrosion products IAW NSTM 634; Table (SSPC POWER TOOL CLEANING STANDARDS), and Table (POWER TOOLS); Section (Steel Surfaces), or Section (Aluminum Surfaces). Surface preparation accomplished using a surface preparation device such as a disk sander or power wire wheel that burnishes, polishes or smoothes the surface is not authorized Feather edges of adherent paint in adjacent areas remaining after cleaning The Responsible Implementing Authority shall have the authority to reject this method in any area if the surface can be shown to have adequate accessibility for Abrasive Blasting or UHP Water Jetting. 6.4 SURFACE PROFILE: Accomplish a surface profile of mils IAW NSTM Waterjet surfaces will retain the surface profile of prior surface treatments. In areas where the substrate may have been smoothed, abrasive blasting or profile producing power tooling may be required to achieve the required profile For areas prepared to SSPC-SP-11, accomplish a surface profile of 1 mil minimum For areas prepared to an SSPC-SP-11, feather edges of well-adhered paint in adjacent areas remaining after cleaning. 6.5 CHECKPOINT (Surface Preparation): Accomplish IAW NSTM 634, Section 3.35, (Quality Assurance Checklist). The record shall show the extent of the inspection and detailed results. The degree of surface cleanliness shall be IAW the NACE/SSPC surface preparation standard specified; surface profile, soluble salt measurements, and adequacy of cleanup operations shall be recorded. The inspections shall be conducted to standardized acceptance criteria. Visual aids, such as SSPC-VIS-1-89 (Visual Standard for Abrasive Blast Cleaned Steel) (Ref. 2. f) or SSPC-SP-12 visual surface preparation of WJ- 2 with light flash rust (Ref. 2.g) or SSPC-VIS 3, (Visual Standard for Power and Hand Tool Cleaned Steel, SSPC 93-04) (Ref. 2.h) may be used to ensure quality standards are met. Enter data on all applicable Appendices. NOTE: Flash rusting shall not exceed a degree equal to SSPC-VIS 4 (Visual Reference for Steel Cleaned by Water Jetting) Standard WJ-2L. If flash rusting occurs, the extent of the flash rust will determine the correct method of managing the flash rust. Methods to reduce the flash rust to acceptable levels include UHP Water Jetting to WJ-2L, SSPC-SP-12, solvent wiping or HAND wire brushing the surface to the satisfaction of the Responsible Implementing Authority (Surface Profile Measurements): Accomplish IAW Ref. 2.d and NSTM 634, Section Enter on Appendix 1A the abrasive media QPL, manufacturer, type and mesh size used. Enter on Appendix 3 the TESTEX PRESS-O-FILM tapes used to measure surface profile (Soluble Salt Measurements Conductivity Testing): Accomplish conductivity tests IAW the method described in Appendix 8. Use HORIBA B-173 or equivalent NAVSEA approved test equipment. Measurements shall be made randomly over the prepared surface. Take five (5) measurements every 1,000 ft² (90m²). Areas less than 1,000 ft² (90m²) shall have (5) measurements made. For nonimmersed applications soluble salts (total ionic) shall not exceed 70µS/cm (microsiemens/cm). Steel / Aluminum Deck PPI, August 26,

11 If conductivity measurements for surfaces prepared to an SSPC-SP-10 exceed the respective values, water wash using a minimum of 3,000 PSI fresh water. Soluble salt conductivity limit of the fresh water shall not exceed 200µS/cm (microsiemens/cm). To ensure effective low-pressure water washing, the operator shall maintain the wand within a maximum distance of 12 inches to the substrate. The angle of the wand relative to the substrate shall be maintained between 45º - 90º. Remove all standing water, dry the area, and retest. If flash rusting has occurred, or/and soluble salt conductivity still exceed limits rewash, dry the area and retest. If the soluble salt conductivity limit is not reached after 2 washes, then perform water wash to the affected areas using water that is below 70µS/cm (microsiemens/cm). Repeat water wash and retest until satisfactory levels are obtained. If flash rusting has occurred, reblast the area and retest If conductivity measurements for surfaces prepared to an SSPC-SP-12 exceed the respective values, repeat SSPC-SP-12 to the affected areas. Remove all standing water, dry the area, and retest. If flash rusting has occurred, reblast the area and retest. Repeat SSPC-SP-12 until satisfactory levels are obtained. If flash rusting has occurred, reblast the area and retest If conductivity measurements for areas prepared to an SSPC-SP-11 in an isolated area exceed the respective values, circle area and perform spot solvent cleaning (Super High Flash Naphtha) followed by retest For SSPC-SP-11 prepared surfaces not practical for the spot cleaning method, water wash with copious amounts of fresh water using hand scrub brush. Soluble salt conductivity limit of the fresh water shall not exceed 200µS/cm (microsiemens/cm). Remove all standing water and dry the affected area. Disk sand using # 36 disk to remove all rust. Perform an SSPC-SP-1 solvent wipe on all sanded areas and retest. If the soluble salt conductivity limit is not reached after 2 washes, then perform water wash to the affected areas using water that is below 70µS/cm (microsiemens/cm). Repeat necessary steps until satisfactory levels are obtained (Environmental): Verify environmental conditions were monitored and maintained IAW paragraphs 4.9 and (Contamination Containment and Masking): Verify all surfaces within the scope of the project are IAW paragraph 4.11 prior to the application of paint. Surfaces must be clean and free of debris and dust HIDDEN CORROSION: Check underside of all aircraft securing fittings with a dental mirror, or similar instrument, to ensure that all corrosion has been removed IAW NSTM 634; Section (Steel Surfaces), or Section (Aluminum Surfaces) All tests and inspections noting unsatisfactory conditions shall result in the termination and rescheduling of the checkpoint. At rescheduled checkpoint, QA will document satisfactory corrective actions taken to correct the discrepancy In order to pass the checkpoint, Appendices 1A-3 and 5 shall be up to date and submitted to QA. QA will update Appendix PAINTING REQUIREMENTS: NOTE: NOTE: IMPLEMENTING AUTHORITY WILL DESIGNATE COATING SYSTEM TO BE APPLIED. TO PREVENT EXCEEDING THE OVERCOAT WINDOWS OF THE NON-SKID SYSTEMS, NON-SKID SYSTEM APPLICATION AREA MAY NEED TO BE BROKEN DOWN INTO ZONES. 7.1 WET FILM MEASUREMENTS: During application, applicators shall monitor wet film thickness using wet film gauges IAW NSTM 634, Section Random wet film thickness (WFT) measurements shall be taken and recorded in Appendix 9 during the application process to ensure the specified dry film thickness (DFT) is achieved. Submit Appendix 9 at each checkpoint to QA. 7.2 DRY FILM THICKNESS MEASUREMENTS: Accomplish IAW Ref. 2.b and NSTM 634, Section Record measurements in Appendix RE-COAT PERIODS: Applicator will not exceed manufacturer s maximum re-coat periods IAW Ref. 2.c. Steel / Aluminum Deck PPI, August 26,

12 7.4 DRY PAINT FOR CHECKPOINTS: Paint shall be dry prior to all paint related checkpoints. Dry shall be defined as fingernail hard. 7.5 OUT OF SPECIFICATION DRY FILM THICKNESS: Failure to meet minimum dry film thickness requirements will result in application of an additional coat or coats of paint in deficient areas before the coat can pass the DFT checkpoint. 7.6 CHECKPOINT (Material Storage): Accomplish a visual inspection of material storage facilities 24 hours prior to material being mixed to verify the storage temperature complies within the minimum and maximum range allowed IAW Ref. 2.c. and NSTM 634, Sections and The material storage temperature shall be monitored and recorded once per shift for 24 hours prior to the material being used. Record measured temperatures in Appendices 1B-1H. 7.7 PAINT APPLICATION: The use of brush, rollers, single or plural component spray equipment is acceptable for application of the paint coat specified below. 7.8 When applying prime, stripe, intermediate and topcoat, each must be of a contrasting color. 7.9 MIXING: If single or plural component spray paint equipment is used mix primer, successive coatings, non-skid and color topping IAW Ref. 2.c and NSTM 634, Section and Monitor environmental conditions throughout painting operations to ensure they meet requirements as specified in paragraphs 4.9 and Record measurements in Appendices 1B-1H. 8. PRIMER COAT APPLICATION: 8.1 Apply prime coat to the specified dry film thickness IAW NSTM 634, Section 3.28 using coating system selected in Section During application, immediately brush out any drips or puddles. 8.2 CHECKPOINT (Prime Coat): Verify prime coat is applied IAW manufacturer s ASTM F-718 sheet, Ref. 2.c, and NSTM 634, Section (Holiday Inspection): Accomplish a visual holiday inspection of prime coat (Dry Film Thickness): Accomplish dry film thickness measurements IAW Ref. 2.b and NSTM 634, Section All tests and inspections noting unsatisfactory conditions shall result in the termination and rescheduling of the checkpoint. At rescheduled checkpoint, QA will document satisfactory corrective actions taken to correct discrepancy In order to pass the checkpoint, Appendices 1B, 4, 5, 7, and 9 shall be up to date and submitted to QA. QA will update Appendix STRIPE COAT APPLICATION: 9.1 Check for evidence of Amine Bloom such as discoloration of paint coating or clear oily film. If evidence of Amine Bloom is present, wipe surfaces clean using approved solvent Super High Flash Naphtha, unless there is a compatibility issue, in which coating manufacturer shall be contacted for resolution. 9.2 Apply stripe coat with typical paint equipment IAW NSTM 634, Section 3.28 using coating system selected in Section Stripe coat by brush in areas not accessible by paint spray equipment. During application, immediately brush out any runs, drips, sags or puddles. 9.3 CHECKPOINT (Stripe Coat): Verify stripe coat is applied IAW manufacturer s ASTM F-718 sheet, Ref. 2.c, and NSTM 634, Section (Holiday Inspection): Accomplish a visual holiday inspection of stripe coat (Dry Film Thickness): Accomplish dry film thickness measurements IAW Ref. 2.b. Steel / Aluminum Deck PPI, August 26,

13 9.3.3 All tests and inspections noting unsatisfactory conditions shall result in the termination and rescheduling of the checkpoint. At rescheduled checkpoint, QA will document satisfactory corrective actions taken to correct discrepancy In order to pass the checkpoint, Appendices 1C, 4, 5 and 7 shall be up to date and submitted to QA. QA will update Appendix st INTERMEDIATE COAT APPLICATION: 10.1 Check for evidence of Amine Bloom such as discoloration of paint coating or clear oily film. If evidence of Amine Bloom is present, wipe surfaces clean using approved solvent Super High Flash Naphtha, unless there is a compatibility issue, in which coating manufacturer shall be contacted for resolution Apply Intermediate Coat to the specified dry film thickness IAW NSTM 634, Section 3.28 using coating system selected in Section During application, immediately brush out any drips or puddles CHECKPOINT (Intermediate Coat): Verify intermediate coat is applied IAW manufacturer s ASTM F-718 sheet, Ref. 2.c, and NSTM 634, Section (Holiday Inspection): Accomplish a visual holiday inspection of 1st intermediate coat (Dry Film Thickness): Accomplish dry film thickness measurements IAW Ref. 2.b and NSTM 634, Section All tests and inspections noting unsatisfactory conditions shall result in the termination and rescheduling of the checkpoint. At rescheduled checkpoint, QA will document satisfactory corrective actions taken to correct discrepancy In order to pass the checkpoint, Appendices 1D, 4, 5, 7, and 9 shall be up to date and submitted to QA. QA will update Appendix nd INTERMEDIATE COAT APPLICATION: NOTE: NOTE: APPLICATION OF 2 ND INTERMEDIATE COAT IS ONLY REQUIRED IF THE 72 HOUR OVERCOAT WINDOW FOR NON-SKID IS EXCEEDED. APPLICATION OF 2 ND INTERMEDIATE COAT IS ALSO FOR AREAS SURROUNDING NON-SKID THAT WILL BE TOPCOATED IN DECK GRAY Check for evidence of Amine Bloom such as discoloration of paint coating or clear oily film. If evidence of Amine Bloom is present, wipe surfaces clean using approved solvent Super High Flash Naphtha, unless there is a compatibility issue, in which coating manufacturer shall be contacted for resolution Apply Intermediate Coat to the specified dry film thickness IAW NSTM 634, Section 3.28 using coating system selected in Section During application, immediately brush out any drips or puddles CHECKPOINT (Intermediate Coat): Verify intermediate coat is applied IAW manufacturer s ASTM F-718 sheet, Ref. 2.c, and NSTM 634, Section (Holiday Inspection): Accomplish a visual holiday inspection of 2nd intermediate coat (Dry Film Thickness): Accomplish dry film thickness measurements IAW Ref. 2.b and NSTM 634, Section Steel / Aluminum Deck PPI, August 26,

14 All tests and inspections noting unsatisfactory conditions shall result in the termination and rescheduling of the checkpoint. At rescheduled checkpoint, QA will document satisfactory corrective actions taken to correct discrepancy In order to pass the checkpoint, Appendices 1F, 4, 5, 7, and 9 shall be up to date and submitted to QA. QA will update Appendix NON-SKID APPLICATION: 12.1 Apply LSA / UV Resistant Non-Skid IAW NSTM 634, Section 3.29 using non-skid selected in Section 3.25 to the specified spread rates CHECKPOINT (Non-Skid): Verify non-skid is applied IAW manufacturer s ASTM-F-718 sheet, Ref. 2.c, and NSTM 634, Section (Holiday Inspection): Accomplish a visual holiday inspection of the non-skid All tests and inspections noting unsatisfactory conditions shall result in the termination and rescheduling of the checkpoint. At rescheduled checkpoint, QA will document satisfactory corrective actions taken to correct discrepancy In order to pass the checkpoint, Appendices 1E, 5, and 7 shall be up to date and submitted to QA. QA will update Appendix Remove all masking from horizontal surfaces. 13. TOPCOAT DECK GRAY APPLICATION: NOTE: Ensure 2 nd intermediate coat is tacky prior to application of topcoat Check for evidence of Amine Bloom such as discoloration of paint coating or clear oily film. If evidence of Amine Bloom is present, wipe surfaces clean using approved solvent Super High Flash Naphtha, unless there is a compatibility issue, in which coating manufacturer shall be contacted for resolution Apply Topcoat to the specified dry film thickness IAW NSTM 634, Section 3.28 using coating system selected in Section During application, immediately brush out any drips or puddles CHECKPOINT (Topcoat): Verify topcoat is applied IAW manufacturer s ASTM F-718 sheet, Ref. 2.c, and NSTM 634, Section (Holiday Inspection): Accomplish a visual holiday inspection of topcoat deck gray (Dry Film Thickness): Accomplish dry film thickness measurements IAW Ref. 2.b and NSTM 634, Section All tests and inspections noting unsatisfactory conditions shall result in the termination and rescheduling of the checkpoint. At rescheduled checkpoint, QA will document satisfactory corrective actions taken to correct discrepancy In order to pass the checkpoint, Appendices 1G, 4, 5, 7, and 9 shall be up to date and submitted to QA. QA will update Appendix LAYOUT OF MARKING: Layout deck marking IAW Ref. 2.i and Ref. 2.j, and as designated by the NAVAL Air Engineering Representative via the Supervisor CHECKPOINT (Marking Layout): 14.2 Accomplish layout inspection with the NAWC Representative. Notify the SUPERVISOR a minimum of 24 hours, but not more than 2 working days prior to the lay out inspection. Steel / Aluminum Deck PPI, August 26,

15 15. COLOR TOPPING APPLICATION: 15.1 Check for evidence of Amine Bloom such as discoloration of paint coating or clear oily film. If evidence of Amine Bloom is present, wipe surfaces clean using approved solvent Super High Flash Naphtha, unless there is a compatibility issue, in which coating manufacturer shall be contacted for resolution Apply LSA Color Topping to the specified dry film thickness IAW NSTM 634, Section by following the spread rate IAW Ref. 2.c. Utilize coating system selected in Section During application, immediately brush out any drips or puddles CHECKPOINT (Color Topping): Verify color topping is applied IAW manufacturer s ASTM-F-718 sheet, Ref. 2.c, and NSTM 634, Section (Holiday Inspection): Accomplish a visual holiday inspection of color topping All tests and inspections noting unsatisfactory conditions shall result in the termination and rescheduling of the checkpoint. At rescheduled checkpoint, QA will document satisfactory corrective actions taken to correct discrepancy In order to pass the checkpoint, Appendices 1H, 4, 5, and 7 shall be up to date and submitted to QA. QA will update Appendix Remove all masking material. 16. FINAL INSPECTION: 16.1 CHECKPOINT (Finished Painted Surfaces): (Holiday Inspection): Perform a visual holiday check on finish coat system. Any holiday found shall be touched up (Dry Film Thickness): Accomplish final dry film thickness measurements IAW Ref. 2.b Coating imperfections found, which may cause premature coating failure, shall be corrected before the non-skid system is accepted. Slight imperfections in the coating system are allowable, as long as they are not below minimum mils, and will not result in premature failure of the coating in the immediate vicinity of the imperfection. Such slight imperfections should be left intact, as trying to correct them could result in damage to the surrounding coating system (Flow Test): Conduct Unobstructed Flow Test on deck drains and counter measure washdown (CMW) nozzles. Document and submit four legible copies of a report to supervisor listing quantity and location of each drain and nozzle tested that is blocked or damaged. (CMW nozzles test may be conducted using water or 90 PSIG compressed air) Repair and repeat test to contaminated or damaged deck drains and counter measure washdown nozzles that previously worked in flow test, from paragraph In order to pass the checkpoint, any Appendices required by the certified coating inspector shall be up to date or completed and submitted to QA. QA will update Appendix 6. All test inspections noting unsatisfactory conditions shall be corrected. Steel / Aluminum Deck PPI, August 26,

16 APPENDIX 1A SURFACE PREPARATION Ship Name and Hull Number: Location (including frame numbers): Area (square feet): Non-Skid Applicator: Date: Inspector: Time: Pre-inspection Comments: Blasting Method: Type/Size of Abrasive: Abrasive Blast Manufacturer: Abrasive Blast QPL and Revision #: Degreasing Method Used: Time Start Air Temp Wet Bulb Relative Humidity Deck Temp Dew Point Inspector Stop Deck Cleanliness: SSPC-SP 10 or SSPC-SP 12 Deck Profile Average: Conductivity Readings Average: Comments: Signature of Inspector: Date: Signature of Quality Assurance Officer: Date: Steel / Aluminum Deck PPI, August 26,

17 APPENDIX 1B PRIMER COAT APPLICATION Ship Name and Hull Number: Location (including frame numbers): Date: Inspector: Time: Pre-inspection Comments: Number of Hours Deck Uncovered: Brush Blast Performed? Yes / No: Primer Coat Manufacturer: Product Name: Batch Number: Storage Temperature: Induction Time: Time Start Air Temp Wet Bulb Relative Humidity Deck Temp Dew Point Inspector Stop Application Method: Airless Spray, Conventional Spray, and Rolled Wet Film Thickness (WFT) Average: Comments: Signature of Inspector: Date: Signature of Quality Assurance Officer: Date: Steel / Aluminum Deck PPI, August 26,

18 APPENDIX 1C STRIPE COAT APPLICATION Ship Name and Hull Number: Location (including frame numbers): Date: Inspector: Time: Pre-inspection Comments: Number of Hours Since Prime Coat Applied: Reactivation Performed? Yes / No: Stripe Coat Manufacturer: Product Name: Batch Number: Storage Temperature: Induction Time: Time Start Air Temp Wet Bulb Relative Humidity Deck Temp Dew Point Inspector Stop Application Method: Airless Spray, Conventional Spray, and Rolled Wet Film Thickness (WFT) Average: Comments: Signature of Inspector: Date: Signature of Quality Assurance Officer: Date: Steel / Aluminum Deck PPI, August 26,

19 APPENDIX 1D 1 ST INTERMEDIATE COAT APPLICATION Ship Name and Hull Number: Location (including frame numbers): Date: Inspector: Time: Pre-inspection Comments: Number of Hours Since Stripe Coat Applied: Reactivation Performed? Yes / No: Intermediate Coat Manufacturer: Product Name: Batch Number: Storage Temperature: Induction Time: Time Start Air Temp Wet Bulb Relative Humidity Deck Temp Dew Point Inspector Stop Application Method: Airless Spray, Conventional Spray, and Rolled Wet Film Thickness (WFT) Average: Comments: Signature of Inspector: Date: Signature of Quality Assurance Officer: Date: Steel / Aluminum Deck PPI, August 26,

20 APPENDIX 1E NON-SKID APPLICATION Ship Name and Hull Number: Location (including frame numbers): Date: Inspector: Time: Pre-inspection Comments: Primer Dry Film Thickness (DFT): Number of Hours Before Applied: Reactivation Performed? Yes / No: Non-Skid Coat Manufacturer: Product Name: Batch Number: Storage Temperature: Induction Time: Time Start Air Temp Wet Bulb Relative Humidity Deck Temp Dew Point Inspector Stop Application Method: Rolled, Trowelled, Sprayed Spread Rate (sq. ft/gal): Trowel Size, if Applicable: Comments: Signature of Inspector: Date: Signature of Quality Assurance Officer: Date: Steel / Aluminum Deck PPI, August 26,

21 APPENDIX 1F 2 ND INTERMEDIATE COAT APPLICATION Ship Name and Hull Number: Location (including frame numbers): Date: Inspector: Time: Pre-inspection Comments: Number of Hours Since 1 st Intermediate Coat Applied: Reactivation Performed? Yes / No: Intermediate Coat Manufacturer: Product Name: Batch Number: Storage Temperature: Induction Time: Time Start Air Temp Wet Bulb Relative Humidity Deck Temp Dew Point Inspector Stop Application Method: Airless Spray, Conventional Spray, and Rolled Wet Film Thickness (WFT) Average: Comments: Signature of Inspector: Date: Signature of Quality Assurance Officer: Date: Steel / Aluminum Deck PPI, August 26,

22 APPENDIX 1G TOPCOAT DECK GRAY APPLICATION Ship Name and Hull Number: Location (including frame numbers): Date: Inspector: Time: Pre-inspection Comments: Number of Hours Since 2 nd Intermediate Coat Applied: Reactivation Performed? Yes / No: Top Coat Manufacturer: Product Name: Batch Number: Storage Temperature: Induction Time: Time Start Air Temp Wet Bulb Relative Humidity Deck Temp Dew Point Inspector Stop Application Method: Airless Spray, Conventional Spray, and Rolled Wet Film Thickness (WFT) Average: Comments: Signature of Inspector: Date: Signature of Quality Assurance Officer: Date: Steel / Aluminum Deck PPI, August 26,

Thank you for downloading this file. If you would like further information on water jetting visit the Lydia Frenzel Conference Series.

Thank you for downloading this file. If you would like further information on water jetting visit the Lydia Frenzel Conference Series. Thank you for downloading this file. If you would like further information on water jetting visit the Lydia Frenzel Conference Series. The Advisory Council is a nonprofit, privately funded membership organization

More information

LOW DURABILITY LOW DURABILITY

LOW DURABILITY LOW DURABILITY PPI NBR: 63001-017L-A (REV 01) DATE: September 08, 2005 LOW DURABILITY PRESERVATION PROCESS INSTRUCTION (PPI) for RECOVERY, ASSIST, SECURING, AND TRAVERSING (RAST) TRACK SYSTEM to be used in conjunction

More information

FOR SHIP'S FORCE INSTALLATION ONLY

FOR SHIP'S FORCE INSTALLATION ONLY PPI NBR: 63411-004SF (REV 02) DATE: November 16, 2007 PRESERVATION PROCESS INSTRUCTION (PPI) for SELF-ADHESIVE, PEEL AND STICK NONSKID SECTIONS Cleanliness Level of SSPC-SP-3 Surface Preparation FOR SHIP'S

More information

MEDIUM DURABILITY MEDIUM DURABILITY

MEDIUM DURABILITY MEDIUM DURABILITY PPI NBR: 63001-004M (REV 00) DATE: May 27, 2004 MEDIUM DURABILITY PRESERVATION PROCESS INSTRUCTION (PPI) for WELL DECK OVERHEAD to be used in conjunction with CORE PPI 63101-000 with a Surface Preparation

More information

PPI NBR: H (REV 01) DATE: September 02, 2005

PPI NBR: H (REV 01) DATE: September 02, 2005 PPI NBR: 60-00H (REV 0) DATE: September 0, 00 PRESERVATION PROCESS INSTRUCTION (PPI) for MCM and MHC Class Propeller and Metallic Underwater Hull Appendages to be used in conjunction with CORE PPI 60-000

More information

PPI NBR: D REV (03) T and E PPI for Midwest Thermal Spray NTNS DATE: November 19, 2010

PPI NBR: D REV (03) T and E PPI for Midwest Thermal Spray NTNS DATE: November 19, 2010 PPI NBR: 63421-001D REV (03) T and E PPI for Midwest Thermal Spray NTNS DATE: November 19, 2010 PRESERVATION PROCESS INSTRUCTION (PPI) for Application to be used in conjunction with CORE PPI 63101-000

More information

NAVSEA STANDARD ITEM. 1.1 Title: Maintaining Protection and Cleanliness from Non-Radioactive Operations; accomplish

NAVSEA STANDARD ITEM. 1.1 Title: Maintaining Protection and Cleanliness from Non-Radioactive Operations; accomplish NAVSEA STANDARD ITEM ITEM NO: 009-06 DATE: 30 JUL 2015 CATEGORY: I 1. SCOPE: 1.1 Title: Maintaining Protection and Cleanliness from Non-Radioactive Operations; accomplish 2. REFERENCES: 2.1 Standard Items

More information

NAVSEA Documents. Topics. Scope. Learning Outcome. Relevant Documents. NAVSEA Basic Paint Inspector Training: NAVSEA Documents

NAVSEA Documents. Topics. Scope. Learning Outcome. Relevant Documents. NAVSEA Basic Paint Inspector Training: NAVSEA Documents NAVSEA Basic Paint Inspector Training: NAVSEA Documents NAVSEA Documents Topics l NAVSEA documents related to preservation of ships l Practical exercise on use of these document NAVSEA Basic Paint Inspector

More information

PPI NBR: Z (REV 01) DATE: September 23, 2009

PPI NBR: Z (REV 01) DATE: September 23, 2009 PPI NBR: 63101-001Z (REV 01) DATE: September 23, 2009 PRESERVATION PROCESS INSTRUCTION (PPI) for WELL DECK OVERHEAD to be used in conjunction with CORE PPI 63101-000 with a Cleanliness Level of SSPC-SP-10

More information

NAVSEA STANDARD ITEM. 1.1 Title: Maintaining Protection and Cleanliness from Non-Radioactive Operations; accomplish

NAVSEA STANDARD ITEM. 1.1 Title: Maintaining Protection and Cleanliness from Non-Radioactive Operations; accomplish NAVSEA STANDARD ITEM ITEM NO: 009-06 DATE: 06 MAR 2018 CATEGORY: I 1. SCOPE: 1.1 Title: Maintaining Protection and Cleanliness from Non-Radioactive Operations; accomplish 2. REFERENCES: 2.1 Standard Items

More information

ITW- American Safety Technologies

ITW- American Safety Technologies ITW- American Safety Technologies Application Specification Specification No AST5162008-400G LSA May 16, 2008 NON-SKID COATING SYSTEM MS-7CZ Primer - MS-400G LSA Non-skid MS-200 Color Topping Applied to

More information

TNEMEC ELEVATED TEMERATURE VINYL ESTER LINING INSTALLATION GUIDE ProPolymer Series 1402, 1422 and 1432 Direct Food Contact FDA Title 21 CFR 175.

TNEMEC ELEVATED TEMERATURE VINYL ESTER LINING INSTALLATION GUIDE ProPolymer Series 1402, 1422 and 1432 Direct Food Contact FDA Title 21 CFR 175. 1.0 Scope 1.1 This recommendation covers the requirements for the surface preparation and the application of primers and finish coat linings for the interior surfaces of carbon/stainless steel vessels

More information

Protective Industrial Polymers - USA Manufacturer s Specification February 11, 2015

Protective Industrial Polymers - USA Manufacturer s Specification February 11, 2015 This specification covers InhibiChem SR-GF-L Enhanced Chemical and Solvent-Resistant Glass-Flake Reinforced Steel Tank Lining System. This system consists of a vinyl ester primer, and two troweled coats

More information

Food Service FDA Title 21 CFR

Food Service FDA Title 21 CFR 1.0 Scope 1.1 This recommendation covers the requirements for the surface preparation, application of primers and finish coats of resin linings to the interior surfaces of carbon/stainless steel vessels.

More information

PROLINE MID-TEMPERATURE VINYL ESTER LINING INSTALLATION GUIDE ProLine 4865T with optional 4822S Gel Coat Food Service FDA Title 21 CFR 175.

PROLINE MID-TEMPERATURE VINYL ESTER LINING INSTALLATION GUIDE ProLine 4865T with optional 4822S Gel Coat Food Service FDA Title 21 CFR 175. 1.0 Scope 1.1 This recommendation covers the requirements for the surface preparation, application of primers and finish coats of resin linings to the interior surfaces of carbon/stainless steel vessels.

More information

1.04 REFERENCES STANDARDS.1 For reference standards tests & results refer to Manufactures Product Data Sheets

1.04 REFERENCES STANDARDS.1 For reference standards tests & results refer to Manufactures Product Data Sheets This specification covers InhibiChem CR-GF-L Chemical-Resistant Glass Flake-Reinforced Steel Tank Lining System. This system consists of a vinyl ester primer, and two troweled coats of glass flake filled

More information

DURASHIELD 210 &

DURASHIELD 210 & DURASHIELD 210 & 210-61 I. Scope A. This specification defines application requirements of DuraShield 210 & DuraShield 210-61 plural-component 100% solids, 2:1 volumetric mix ratio polyurethane to steel

More information

DURASHIELD 110 &

DURASHIELD 110 & DURASHIELD 110 & 110-61 EFFECTIVE: 3/01/19 I. Scope A. This specification defines application requirements of DuraShield 110/110-61 plural-component, 100% solids, 1:1 volumetric mix ratio polyurethane

More information

APPLICATION GUIDELINE FOR

APPLICATION GUIDELINE FOR APPLICATION GUIDELINE FOR Company Name M/V SEA-SPEED V 10 X (100 % solids) (Hard film siloxane hybrid foul release coating) SCOPE This specification, together with the Product Data Sheet, defines the minimum

More information

Rust-Oleum Industrial Brands Specification

Rust-Oleum Industrial Brands Specification Rust-Oleum Industrial Brands Specification Coating Specification for Rust-Oleum Virtual Solutions Coating Solution 23 A solvent based coating system High Performance 4315 High Heat Aluminum For service

More information

DURASHIELD JARS APPLICATION SPECIFICATION SHEET FIELD-APPLIED JOINT & REPAIR SYSTEM (JARS) EFFECTIVE: 6/2/15

DURASHIELD JARS APPLICATION SPECIFICATION SHEET FIELD-APPLIED JOINT & REPAIR SYSTEM (JARS) EFFECTIVE: 6/2/15 DURASHIELD 310-61 JARS FIELD-APPLIED JOINT & REPAIR SYSTEM (JARS) I. Scope A. This specification defines application requirements of DuraShield 310-61 Joint and Repair System (JARS) plural-component 100%

More information

Appendix 1 - Quality Assurance Inspection Form Environmental Readings

Appendix 1 - Quality Assurance Inspection Form Environmental Readings Appendix 1 - Quality Assurance Inspection Form Environmental s NAME & HULL #: CONTRACT/TASK ORDER/CLIN/TWD: LOCATION OR TANK: WORK ITEM: REQ T DOCUMENT: FY: TABLE: LINE: COLUMN: (I) (V) (G) (N/A) CONTRACTOR:

More information

APPENDIX 1 QA INSPECTION FORM - ENVIRONMENTAL READINGS & PAINT/NONSKID STORAGE

APPENDIX 1 QA INSPECTION FORM - ENVIRONMENTAL READINGS & PAINT/NONSKID STORAGE APPENDIX 1 QA INSPECTION FORM - ENVIRONMENTAL READINGS & PAINT/NONSKID STORAGE REQ'T DOCUMENT: /FY: TABLE: LINE: COLUMN: MAINTAIN SEPARATE LOG FOR EACH AREA/LOCATION, PREPARED OR COATED SURFACE. WHEN AN

More information

APPLICATION GUIDELINE FOR

APPLICATION GUIDELINE FOR APPLICATION GUIDELINE FOR Company Name M/V SEA-SPEED V 10 X (100 % solids) (Hard film siloxane hybrid foul release coating) SCOPE This specification, together with the Product Data Sheet, defines the minimum

More information

NAVSEA STANDARD ITEM. 1.1 Title: Thermal Spray Nonskid Application; accomplish

NAVSEA STANDARD ITEM. 1.1 Title: Thermal Spray Nonskid Application; accomplish NAVSEA STANDARD ITEM ITEM NO: 009-124 DATE: 26 MAR 2018 CATEGORY: II 1. SCOPE: 1.1 Title: Thermal Spray Nonskid Application; accomplish 2. REFERENCES: 2.1 Standard Items 2.2 T9074-AA-GIB-010/1687, Thermal

More information

COATING NEW STRUCTURAL STEEL SIGN SUPPORT STRUCTURES - Item No. Special Provision No. 911S09 November 2006

COATING NEW STRUCTURAL STEEL SIGN SUPPORT STRUCTURES - Item No. Special Provision No. 911S09 November 2006 COATING NEW STRUCTURAL STEEL SIGN SUPPORT STRUCTURES - Item No. Special Provision No. 911S09 November 2006 Amendment to OPSS 911, November 2004 for hot dip galvanizing and subsequent painting, where required,

More information

PPI NBR: H (REV 04) DATE: October 28, 2008

PPI NBR: H (REV 04) DATE: October 28, 2008 PPI NBR: 63421-007H (REV 04) DATE: October 28, 2008 PRESERVATION PROCESS INSTRUCTION (PPI) for COSMETIC POLYMERIC DECK COVERINGS TYPE III for WET and DRY INTERIOR SPACES to be used in conjunction with

More information

TECHNICAL REQUIREMENTS AND SPECIFICATIONS. PROTECTIVE COATING OF STEEL (As Provided by Raven Lining Systems) FOREWORD

TECHNICAL REQUIREMENTS AND SPECIFICATIONS. PROTECTIVE COATING OF STEEL (As Provided by Raven Lining Systems) FOREWORD TECHNICAL REQUIREMENTS AND SPECIFICATIONS PROTECTIVE COATING OF STEEL (As Provided by Raven Lining Systems) FOREWORD This specification covers work, materials and equipment required for protecting and/or

More information

POLYURETHANE COATINGS ON STEEL OR DUCTILE IRON PIPE

POLYURETHANE COATINGS ON STEEL OR DUCTILE IRON PIPE Section 02527 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Two-component polyurethane coating system for use as external coating for steel or ductile iron pipe. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices.

More information

PPG HI-TEMP 1000 VS. PRODUCT DATA SHEET December 10, 2014 (Revision of June 30, 2014) DESCRIPTION

PPG HI-TEMP 1000 VS. PRODUCT DATA SHEET December 10, 2014 (Revision of June 30, 2014) DESCRIPTION DESCRIPTION One-component, heat-resistant silicone topcoat for use in an elevated temperature coating system, primarily for application over PPG HI-TEMP 1027 primer PRINCIPAL CHARACTERISTICS Heat-resistant

More information

NAVSEA STANDARD ITEM. 1.1 Title: Asbestos-Containing Material (ACM); control

NAVSEA STANDARD ITEM. 1.1 Title: Asbestos-Containing Material (ACM); control NAVSEA STANDARD ITEM ITEM NO: 009-10 DATE: 18 NOV 2016 CATEGORY: I 1. SCOPE: 1.1 Title: Asbestos-Containing Material (ACM); control 2. REFERENCES: 2.1 29 CFR 1915.1001, Occupational Safety and Health Standards

More information

PPG HI-TEMP 1000 V (AMERCOAT 873) PRODUCT DATA SHEET December 10, 2014 (Revision of June 30, 2014) DESCRIPTION

PPG HI-TEMP 1000 V (AMERCOAT 873) PRODUCT DATA SHEET December 10, 2014 (Revision of June 30, 2014) DESCRIPTION DESCRIPTION One-component, heat-resistant silicone topcoat for use in an elevated temperature coating system PRINCIPAL CHARACTERISTICS Heat-resistant topcoat with highly engineered silicone resin; able

More information

GUIDE SPECIFICATION SECTION 07576

GUIDE SPECIFICATION SECTION 07576 GUIDE SPECIFICATION SECTION 07576 TRAFFIC DECK MEMBRANE SYSTEM NOTE TO ARCHITECTS & ENGINEERS: The Oak Ridge traffic membrane system provides for applied high build, durable and waterproof membrane consisting

More information

1.4 kg/l (11.4 lb/us gal) Maximum 272 g/kg (Directive 1999/13/EC, SED) Maximum 420 g/l (3.5 lb/gal) To 650 C (1200 F) To 538 C (1000 F)

1.4 kg/l (11.4 lb/us gal) Maximum 272 g/kg (Directive 1999/13/EC, SED) Maximum 420 g/l (3.5 lb/gal) To 650 C (1200 F) To 538 C (1000 F) DESCRIPTION One component heat resistant silicone topcoat for use in an elevated temperature coating system, primarily for application over PPG HI-TEMP 1027 primer PRINCIPAL CHARACTERISTICS Heat resistant

More information

Application Guide for Internal Flow Efficiency Coating

Application Guide for Internal Flow Efficiency Coating Jotapipe FC 407 Application Guide for Internal Flow Efficiency Coating Jotapipe FC 407 Date of Last Revision: March 2015 Page 1 of 6 Contents 1.0 Product Description... 2 2.0 Surface preparation and cleanliness...

More information

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM Tunnel Painting

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM Tunnel Painting 1993 Specifications CSJ 8075-18-005 SPECIAL SPECIFICATION ITEM 4514 Tunnel Painting 1. Description. This Item shall govern for the painting of the walls and ceiling of a tunnel. The intent is to provide

More information

NAVSEA REVIEWED ASTM F-718. Interline 783 Finish, Ultra High Solids Two-Pack Fast Cure Solvent-Free Coating

NAVSEA REVIEWED ASTM F-718. Interline 783 Finish, Ultra High Solids Two-Pack Fast Cure Solvent-Free Coating ASTM F-71 International Paint, LLC Interline 73 Finish, Ultra High Solids Two-Pack Fast Cure Solvent-Free Coating PRODUCT DESIGNATIONS Part A: THA72/THA73/THA7/THA79/THA Series Part B: THA75 MIL-PRF-23236

More information

Rust-Oleum Industrial Brands Specification

Rust-Oleum Industrial Brands Specification Rust-Oleum Industrial Brands Specification Coating Specification for Rust-Oleum Virtual Solutions Coating Solution 2 A solvent based coating system High Performance 9100/9800 System DTM Epoxy Mastic/DTM

More information

PRESERVATION PROCESS INSTRUCTION (PPI) for UNDERWATER HULL to be used in conjunction with CORE PPI

PRESERVATION PROCESS INSTRUCTION (PPI) for UNDERWATER HULL to be used in conjunction with CORE PPI PPI NBR: 63101-001Y T&E Intersleek 970 ( REV 01) DATE: February 27, 2009 PRESERVATION PROCESS INSTRUCTION (PPI) for UNDERWATER HULL to be used in conjunction with CORE PPI 63101-000 with Surface Preparation

More information

A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents.

A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents. POLYURETHANE COATING ON STEEL PIPE PART 1 -- GENERAL 1.1 THE REQUIREMENT A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents. 1.2 REFERENCE SPECIFICATIONS,

More information

Tnemec Fluid Applied Thermal Break Long Form Specification

Tnemec Fluid Applied Thermal Break Long Form Specification PART 1 GENERAL 1.01 DESCRIPTION Tnemec Fluid Applied Thermal Break Long Form Specification A. This specification covers labor, materials, equipment, and application necessary for, and incidental to, the

More information

Application Guide for Internal Flow Efficiency Coating Jotapipe FC 400

Application Guide for Internal Flow Efficiency Coating Jotapipe FC 400 Jotapipe FC 400 Application Guide for Internal Flow Efficiency Coating Jotapipe FC 400 Date of Last Revision: February 2014 Page 1 of 6 Contents 1.0 Product Description... 2 2.0 Surface preparation and

More information

One-component, heat-resistant silicone acrylic topcoat primarily for the PPG HI-TEMP 1027 primer or the PPG HI-TEMP 222 G primer

One-component, heat-resistant silicone acrylic topcoat primarily for the PPG HI-TEMP 1027 primer or the PPG HI-TEMP 222 G primer DESCRIPTION One-component, heat-resistant silicone acrylic topcoat primarily for the PPG HI-TEMP 1027 primer or the PPG HI-TEMP 222 G primer PRINCIPAL CHARACTERISTICS Heat-resistant silicone acrylic topcoat

More information

1.4 kg/l (11.4 lb/us gal) Maximum 295 g/kg (Directive 1999/13/EC, SED) Maximum 420 g/l (3.5 lb/gal) 50 to 63 μm (2.0 to 2.

1.4 kg/l (11.4 lb/us gal) Maximum 295 g/kg (Directive 1999/13/EC, SED) Maximum 420 g/l (3.5 lb/gal) 50 to 63 μm (2.0 to 2. DESCRIPTION One-component, heat-resistant silicone acrylic topcoat primarily for the PPG HI-TEMP 1027 primer or the PPG HI-TEMP 222 G primer. PRINCIPAL CHARACTERISTICS Heat-resistant silicone acrylic topcoat

More information

PPI NBR: K-B (REV 00) DATE: February 26, 2010

PPI NBR: K-B (REV 00) DATE: February 26, 2010 PPI NBR: 63421-001K-B (REV 00) DATE: February 26, 2010 PRESERVATION PROCESS INSTRUCTION (PPI) for NON-AIRCRAFT CARRIER NON-SKID SYSTEMS AND DECK SAM 2x5 COATING SYSTEMS to be used in conjunction with CORE

More information

Note: This specification was written for Clarabelle Mill's flotation cells but may have other applications.

Note: This specification was written for Clarabelle Mill's flotation cells but may have other applications. 017/03/3 1/7 1.0 PURPOSE This specification describes the minimum application and performance requirements for a field-applied, elastomer spray coating either polyurethane or polyurea type. Note: This

More information

Application Guide HI-TEMP 1027 APPLICATION GUIDE. Number: AG-3001 Revision: Page 1 of Introduction. 2. Where to apply Hi-Temp 1027

Application Guide HI-TEMP 1027 APPLICATION GUIDE. Number: AG-3001 Revision: Page 1 of Introduction. 2. Where to apply Hi-Temp 1027 Page 1 of 7 This document provides information and details for the use and application of Hi-Temp 1027. It is designed to supplement the Hi-Temp 1027 Product Data sheet (PDS) and MSDS, not to replace them.

More information

Section Page 2 Specification No. PG F

Section Page 2 Specification No. PG F The contractor shall also be required to spot prime and apply a full intermediate and top coat to the outside surfaces and all related steel appurtenances of the tank as directed by this specification.

More information

Rust-Oleum Industrial Brands Specification

Rust-Oleum Industrial Brands Specification Rust-Oleum Industrial Brands Specification Coating Specification for Rust-Oleum Virtual Solutions Coating Solution 65 A solvent based coating system High Performance 9100 System 100 VOC DTM Epoxy Mastic

More information

Rust-Oleum Industrial Brands Specification

Rust-Oleum Industrial Brands Specification Rust-Oleum Industrial Brands Specification Coating Specification for Rust-Oleum Virtual Solutions Coating Solution 20 A solvent based coating system Concrete Saver Anti-Slip High Performance Epoxy AS9100

More information

Property Test/Standard Description. US EPA method 24 (tested) (CARB(SCM)2007, SCAQMD rule 1113, Hong Kong)

Property Test/Standard Description. US EPA method 24 (tested) (CARB(SCM)2007, SCAQMD rule 1113, Hong Kong) Approved 402;2522 1,2 2522 zinc epoxy ^(ValidationDate) 1 Product description This is a two component polyamide cured zinc rich epoxy coating. It is a high zinc dust containing product. It conforms to

More information

Application Procedures for RubberSource Precured Rubber Linings on Vessels

Application Procedures for RubberSource Precured Rubber Linings on Vessels Application Procedures for RubberSource Precured Rubber Linings on Vessels INDEX 1.0 GENERAL 2.0 SURFACE INSTRUCTIONS 3.0 CEMENTING INSTRUCTIONS 4.0 APPLICATION OF RUBBER LINING 5.0 INSPECTION 6.0 REPAIRS

More information

Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method 1

Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method 1 7461;7680 1 7680 zinc silicate VValidationDate). 1 Product description This is a two component polyamide cured zinc rich epoxy coating. It is a high solids, high zinc dust containing product. It conforms

More information

Tested in accordance with ISO , high expected durability in corrosivity category C5-I. Property Test/Standard Description

Tested in accordance with ISO , high expected durability in corrosivity category C5-I. Property Test/Standard Description Approved 7461;7680 1,2 7680 zinc epoxy ^(ValidationDate) 1 Product description This is a two component polyamide cured zinc rich epoxy coating. It is a high solids, high zinc dust containing product. It

More information

Application Procedures for Uncured Rubber Linings on Pipe

Application Procedures for Uncured Rubber Linings on Pipe Application Procedures for Uncured Rubber Linings on Pipe INDEX 1.0 GENERAL 2.0 SURFACE INSTRUCTIONS 3.0 CEMENTING INSTRUCTIONS 4.0 APPLICATION OF RUBBER LINING 5.0 CURING OF LINING 6.0 INSPECTION AFTER

More information

One component, heat-resistant, universal silicone topcoat for use in elevated temperature systems. Replaces HI-TEMP 1000 V / VS / VHA

One component, heat-resistant, universal silicone topcoat for use in elevated temperature systems. Replaces HI-TEMP 1000 V / VS / VHA DESCRIPTION One component, heat-resistant, universal silicone topcoat for use in elevated temperature systems. Replaces HI-TEMP 1000 V / VS / VHA PRINCIPAL CHARACTERISTICS Heat-resistant topcoat with highly

More information

PPG HI-TEMP PRODUCT DATA SHEET April 16, 2018 (Revision of September 5, 2017) DESCRIPTION

PPG HI-TEMP PRODUCT DATA SHEET April 16, 2018 (Revision of September 5, 2017) DESCRIPTION DESCRIPTION One-component, high-build heat-resistant inert multipolymeric matrix / inorganic ceramic coating PRINCIPAL CHARACTERISTICS Designed to prevent corrosion under insulation (CUI) of carbon steel

More information

Rust-Oleum Industrial Brands Specification

Rust-Oleum Industrial Brands Specification Rust-Oleum Industrial Brands Specification Coating Specification for Rust-Oleum Virtual Solutions Coating Solution 22 A solvent based coating system Concrete Saver AS5400Anti-Slip High One-Step Epoxy System

More information

HYDROJETTING INFORMATION. a six page issue October 1999

HYDROJETTING INFORMATION. a six page issue October 1999 a six page issue Hydrojetting is the surface preparation of steel using high-energy water to remove coatings, corrosion products and other surface contamination such as oil/grease etc. It relies totally

More information

QUALITY ASSURANCE MANUAL FOR APPLICATORS OF ELASTOMERIC SHEET LININGS

QUALITY ASSURANCE MANUAL FOR APPLICATORS OF ELASTOMERIC SHEET LININGS QUALITY ASSURANCE MANUAL FOR APPLICATORS OF ELASTOMERIC SHEET LININGS 1.0 Purpose To establish a recommended quality assurance program for applicators of elastomeric sheet linings. 2.0 Scope This bulletin

More information

Rust-Oleum Industrial Brands Specification

Rust-Oleum Industrial Brands Specification Rust-Oleum Industrial Brands Specification Coating Specification for Rust-Oleum Virtual Solutions Coating Solution 19 A 100% solids epoxy coating system Concrete Saver AS6500 System Anti-Slip 100% Solids

More information

SECTION WELDED STEEL PICKET FENCE. 1. Fusion welded and rackable ornamental steel picket fence system.

SECTION WELDED STEEL PICKET FENCE. 1. Fusion welded and rackable ornamental steel picket fence system. PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Fusion welded and rackable ornamental steel picket fence system. B. Related sections: 1. Section 03310 Concrete Work for post support. 2. Section 09960

More information

DURASHIELD 210 &

DURASHIELD 210 & DURASHIELD 210 & 210-61 I. Scope A. This specification defines application requirements of DuraShield 210 & DuraShield 210-61 plural-component 100% solids, 2:1 volumetric mix ratio polyurethane to steel

More information

Rust-Oleum Industrial Brands Specification

Rust-Oleum Industrial Brands Specification Rust-Oleum Industrial Brands Specification Coating Specification for Rust-Oleum Virtual Solutions Coating Solution 44 A solvent based coating system High Performance 7400 System 450 VOC DTM Alkyd Enamel

More information

SECTION INTUMESCENT FIREPROOFING

SECTION INTUMESCENT FIREPROOFING SECTION 078123 INTUMESCENT FIREPROOFING PART 1 GENERAL 1.1 GENERAL REQUIREMENTS A. Work of this Section, as shown or specified, shall be in accordance with the requirements of the Contract Documents. 1.2

More information

Joint Surface Preparation Standard. NACE No. 3/SSPC-SP 6 Commercial Blast Cleaning

Joint Surface Preparation Standard. NACE No. 3/SSPC-SP 6 Commercial Blast Cleaning Item No. 21067 Joint Surface Preparation Standard NACE No. 3/SSPC-SP 6 Commercial Blast Cleaning This NACE International (NACE)/SSPC: The Society for Protective Coatings standard represents a consensus

More information

SECTION POLYURETHANE MIC COATINGS. A. Furnish and install special coating systems in accordance with the Contract Documents.

SECTION POLYURETHANE MIC COATINGS. A. Furnish and install special coating systems in accordance with the Contract Documents. SECTION 09802 POLYURETHANE MIC COATINGS PART 1 -- GENERAL 1.01 THE REQUIREMENTS A. Furnish and install special coating systems in accordance with the Contract Documents. B. Polyurethane MIC Coating 1.

More information

APPLICATION SPECIFICATION SHEET GENERAL INDUSTRIAL EFFECTIVE: 01/09/12

APPLICATION SPECIFICATION SHEET GENERAL INDUSTRIAL EFFECTIVE: 01/09/12 I. Scope A. This specification defines application requirements of SpectraGarde NSF-61 plural-component 100% solids, 3:1 volumetric mix ratio polyurethane to concrete, ferrous and non-ferrous substrates

More information

Application Guidelines

Application Guidelines Application Guidelines 1.0 SCOPE This document contains general instructions and recommended practices for the application of the SERVIWRAP cold applied tape coating system. The various coating grades

More information

ZONE 7 WATER AGENCY CWS 5 TURNOUT REPLACEMENT PROJECT # ADDENDUM NO. 3 April 02, 2019

ZONE 7 WATER AGENCY CWS 5 TURNOUT REPLACEMENT PROJECT # ADDENDUM NO. 3 April 02, 2019 ZONE 7 WATER AGENCY CWS 5 TURNOUT REPLACEMENT PROJECT # 275-18 ADDENDUM NO. 3 April 02, 2019 This Addendum No. 3 ( Addendum ) is dated the date set forth above and modifies certain Bidding Documents issued

More information

Property Test/Standard Description. calculated US EPA method 24 (tested) (CARB(SCM)2007, SCAQMD rule 1113, Hong Kong)

Property Test/Standard Description. calculated US EPA method 24 (tested) (CARB(SCM)2007, SCAQMD rule 1113, Hong Kong) Approved 2124;7720 1,2 7720 zinc epoxy ^(ValidationDate) 1 Product description This is a two component polyamide cured zinc epoxy coating. It provides corrosion protection as part of a complete coating

More information

SECTION High Performance Coatings Field Applied Acrylic Urethanes (Solid Color, Pearl and Metallic Finishes)

SECTION High Performance Coatings Field Applied Acrylic Urethanes (Solid Color, Pearl and Metallic Finishes) - 1 - SECTION 099600 High Performance Coatings Field Applied Acrylic Urethanes (Solid Color, Pearl and Metallic Finishes) PART 1 GENERAL 1.1 SECTION INCLUDES A. Systems for field applied acrylic urethane

More information

Approved. Property Test/Standard Description STANDARD GRADE. semi gloss (35-70) Flash point ISO 3679 Method 1

Approved. Property Test/Standard Description STANDARD GRADE. semi gloss (35-70) Flash point ISO 3679 Method 1 Approved 4860;523;527;1549 1,2 523 epoxy mastic ^(ValidationDate) 1 Product description This is a two component polyamine cured epoxy mastic coating. It is a surface tolerant, high solids, high build product.

More information

SSPC-SP7: Brush-Off Blast Cleaning..1 Minimum surface temperature: 2 C (35 F).2 Maximum surface temperature: 49 C (120 F)

SSPC-SP7: Brush-Off Blast Cleaning..1 Minimum surface temperature: 2 C (35 F).2 Maximum surface temperature: 49 C (120 F) City of Guelph Corporate Building Maintenance Contract: Exhibition Park Arena Open Web Steel Joists and Roof Decking Painting 1 GENERAL 1.1 Section Intent This Section describes products and procedures

More information

Rust-Oleum Industrial Brands Specification

Rust-Oleum Industrial Brands Specification Rust-Oleum Industrial Brands Specification Coating Specification for Rust-Oleum Virtual Solutions Coating Solution 3 A solvent based coating system High Performance 9300/9800 System Extended Recoat Epoxy

More information

Ganicin 2.8 ZR-E Zinc-Rich Epoxy Primer

Ganicin 2.8 ZR-E Zinc-Rich Epoxy Primer Ganicin 2.8 ZR-E Zinc-Rich Epoxy Primer GENERAL DESCRIPTION A three-package, VOC conforming (2.8 lbs/gal) low HAPS, zinc-rich epoxy primer based on Axalta epoxy amine technology. The resulting organic

More information

Approved. Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method F (29 C) calculated VOC-US/Hong Kong

Approved. Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method F (29 C) calculated VOC-US/Hong Kong Approved 20920;16620 1 20920 epoxy ^(ValidationDate) 1 Product description This is a two component amine cured epoxy coating. It is a fast drying, zinc phosphate pigmented, high solids, high build product.

More information

STANDARD PHRASEOLOGY SECTION B. 1. This section of standard phraseology is for general use in all disciplines.

STANDARD PHRASEOLOGY SECTION B. 1. This section of standard phraseology is for general use in all disciplines. STANDARD PHRASEOLOGY SECTION B 1. This section of standard phraseology is for general use in all disciplines. SHALL BE USED WHEN THE EXCEPTIONS LISTED IN 3.1 OF 009-23 ARE TO BE REMOVED/INSTALLED AS INTERFERENCES.

More information

SECTION PAVEMENT MARKINGS

SECTION PAVEMENT MARKINGS SECTION 32 17 23 SPEC WRITER NOTE: Use this section only for NCA projects. Delete text between // // not applicable to project. Edit remaining text to suit project. PART 1 - GENERAL 1.1 SUMMARY A. Section

More information

PERFORMANCE, 100% SOLIDS,

PERFORMANCE, 100% SOLIDS, FEATURES Meets all VOC Requirements Can Saturate 1 Ounce Fiberglass Mat Can be Filled with EA-1 Aggregate and Troweled at 1/4. Can be Seeded with Sand or Aluminum Oxide for Anti- Skid. RECOMMENDED APPLICATIONS

More information

Property Test/Standard Description. US EPA method 24 (tested) (CARB(SCM)2007, SCAQMD rule 1113, Hong Kong)

Property Test/Standard Description. US EPA method 24 (tested) (CARB(SCM)2007, SCAQMD rule 1113, Hong Kong) Approved 343 1,2 343 alkyd ^(ValidationDate) 1 Product description This is a one component oxidatively drying alkyd coating. Can be used as primer or mid coat in atmospheric environments. Suitable for

More information

SECTION INTUMESCENT MASTIC FIREPROOFING

SECTION INTUMESCENT MASTIC FIREPROOFING PART 1 GENERAL 1.01 SUMMARY SECTION 07 81 23 - INTUMESCENT MASTIC FIREPROOFING A. Section Includes: 1. Intumescent Mastic Fireproofing for Application to Exposed Steel 2. Protection of Adjacent Surfaces

More information

Approved. Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method F (29 C) calculated VOC-US/Hong Kong

Approved. Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method F (29 C) calculated VOC-US/Hong Kong Approved 20940;16620 1 20940 epoxy ^(ValidationDate) 1 Product description This is a two component amine cured epoxy coating. It is a fast drying, micaceous iron oxide (MIO) pigmented, high solids, high

More information

DIVISION 5 METALS SECTION STRUCTURAL STEEL

DIVISION 5 METALS SECTION STRUCTURAL STEEL DIVISION 5 METALS SECTION 05 12 00 PART 1 GENERAL 1.01 SUMMARY A. Section Includes: All labor and materials required to furnish and install the structural steel shown on the Drawings and required by these

More information

CARLISLE DECK COATING INSTALLATION OVER EXISTING POLYURETHANE COATINGS

CARLISLE DECK COATING INSTALLATION OVER EXISTING POLYURETHANE COATINGS CARLISLE DECK COATING INSTALLATION OVER EXISTING POLYURETHANE COATINGS 1. GENERAL A. When coating over existing coatings, Carlisle can not assume responsibility for the adhesion of the existing coating,

More information

ZINGA. Physical data and technical information

ZINGA. Physical data and technical information ZINGA 1/6 ZM-RE-PRO-04-A (01/08/06) The film galvanising system Zinga is a one pack coating that contains 96% zinc in the dry film and provides cathodic protection to ferrous metals. It can be used as

More information

NAVSEA REVIEWED ASTM F-718. Tenacious One Step Epoxy Flooring

NAVSEA REVIEWED ASTM F-718. Tenacious One Step Epoxy Flooring ASTM F-718 International Diverse Flooring Tenacious One Step Epoxy Flooring MIL-PRF-24613 If this product is to be applied as part of a coating system, all components of the system must be as listed on

More information

NAVSEA STANDARD ITEM. 1.1 Title: Asbestos-Containing Material (ACM); control

NAVSEA STANDARD ITEM. 1.1 Title: Asbestos-Containing Material (ACM); control NAVSEA STANDARD ITEM ITEM NO: 009-10 DATE: 30 APR 2018 CATEGORY: I 1. SCOPE: 1.1 Title: Asbestos-Containing Material (ACM); control 2. REFERENCES: 2.1 29 CFR 1915.1001, Occupational Safety and Health Standards

More information

HAMMERITE NO. 1 RUST BEATER PRIMER

HAMMERITE NO. 1 RUST BEATER PRIMER TECHNICAL DATA SHEET Version 2 2018 June THIS ISSUE SUPERSEDES ALL PREVIOUS PUBLICATIONS PRODUCT DESCRIPTION Hammerite No.1 Rust Beater provides a high build finish to heavily pitted areas of rust and

More information

NAVSEA STANDARD ITEM. 1.1 Title: Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness; accomplish

NAVSEA STANDARD ITEM. 1.1 Title: Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness; accomplish NAVSEA STANDARD ITEM ITEM NO: 009-24 DATE: 01 OCT 2017 CATEGORY: I 1. SCOPE: 1.1 Title: Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness; accomplish 2. REFERENCES: 2.1 Standard Items

More information

Approved. Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method F (30 C) calculated VOC-US/Hong Kong

Approved. Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method F (30 C) calculated VOC-US/Hong Kong Approved 15360;15380 1,2 15360 epoxy ^(ValidationDate) 1 Product description This is a two component polyamine cured pure epoxy coating. It is a fast drying, abrasion resistant, high solids, high build

More information

NAPCA Bulletin

NAPCA Bulletin NAPCA Bulletin 13-79-94 EXTERNAL APPLICATION PROCEDURES FOR COAL TAR EPOXY PROTECTIVE COATINGS TO STEEL PIPE 1. General a. These specifications may be used in whole or in part by anyone without prejudice,

More information

Rust-Oleum Industrial Brands Specification

Rust-Oleum Industrial Brands Specification Rust-Oleum Industrial Brands Specification Coating Specification for Rust-Oleum Virtual Solutions Coating Solution 14 A 100% solids epoxy coating system Concrete Saver 6500 System 100% Solids Epoxy For

More information

Solventless two-component crosslinked epoxy

Solventless two-component crosslinked epoxy SELECTION & SPECIFICATION DATA Generic Type Description Features Color Finish Primer Dry Film Thickness Solventless two-component crosslinked epoxy Solventless, clear, epoxy lining that can be applied

More information

PERFORMANCE OF COATINGS OVER WATERJETTED SURFACES J. PETER AULT, P.E. ELZLY TECHNOLOGY CORPORATION

PERFORMANCE OF COATINGS OVER WATERJETTED SURFACES J. PETER AULT, P.E. ELZLY TECHNOLOGY CORPORATION PERFORMANCE OF COATINGS OVER WATERJETTED SURFACES J. PETER AULT, P.E. ELZLY TECHNOLOGY CORPORATION LEARNING OBJECTIVES THIS WEBINAR WILL EXPLORE ISSUES ASSOCIATED WITH WATERJETTING SURFACE PREPARATION

More information

Interline 850 Working Procedures

Interline 850 Working Procedures INTRODUCTION: GENERAL REQUIREMENTS FOR TANK LINING: NEW CONSTRUCTION: TANK CONDITION PRE-CONTRACT: Installation of a lining system is the most effective method of protecting steel tanks and vessels from

More information

SECTION FLUID-APPLIED MEMBRANE AIR BARRIERS, VAPOR PERMEABLE

SECTION FLUID-APPLIED MEMBRANE AIR BARRIERS, VAPOR PERMEABLE PART 1 - GENERAL 1.1 SUMMARY SECTION 07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS, VAPOR PERMEABLE SPEC WRITER NOTE: 1. Delete text between // // not applicable to project. Edit remaining text to suit

More information

TL-250 Glass Flake Filled, Vinyl Ester Tank Lining System

TL-250 Glass Flake Filled, Vinyl Ester Tank Lining System TL-250 Glass Flake Filled, Vinyl Ester Tank Lining System PRODUCT DESCRIPTION TL-250 is a Vinyl Ester Tank Lining system based on a glass flake filled, trowel-on base coat and a spray applied glass flake

More information

4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: +44 (0) Fax: +44 (0)

4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: +44 (0) Fax: +44 (0) E 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: +44 (0)20 7735 7611 Fax: +44 (0)20 7587 3210 24 June 2013 UNIFIED INTERPRETATIONS OF THE PERFORMANCE STANDARD FOR PROTECTIVE COATINGS FOR DEDICATED SEAWATER

More information