1 GREATER MONTEREY COUNTY INTEGRATED REGIONAL WATER MANAGEMENT PROGRAM APPLICATION FORM FOR IMPLEMENTATION PROJECTS AND CONCEPT PROPOSALS 2018/2019 GENERAL INSTRUCTIONS: Both implementation project proposals and concept proposals are being accepted at this time. Only implementation projects, however, will be eligible for IRWM Implementation Grant funds. For concept proposals: If you would like to submit a concept proposal, you need only complete Section I of this application. For implementation projects: There will be two rounds of Proposition 1 IRWM Implementation Grant solicitations (Round 1 in early 2019, Round 2 in 2020). If you are interested in having your project considered for Round 1 of the Prop 1 Implementation Grant round, you must complete all sections of this application. If you are not interested in having your project considered for Round 1, you need only complete Sections I and II. For those interested in applying for Round 1: In addition to this application form, stakeholders who are interested in having their projects considered for Round 1 must also complete DWR s Project Information Form. The Project Information Form will be due on January 7, The form can be downloaded at: Both this form ( GMC Project Application Form ) and DWR s form ( Project Information Form ) should be submitted to: Susan Robinson, Greater Monterey County IRWM Program Director, srobinsongs@frontier.com. THIS APPLICATION FORM IS DUE DECEMBER 3, 2018 THE PROJECT INFORMATION FORM IS DUE JANUARY 7, 2019 SECTION I. PROJECT SUMMARY AND IRWM OBJECTIVES 1. Project Proponent (Name of Organization Applying): 2. Type of Entity: Local Public agency Nonprofit organization Public Utility Mutual Water Company Federally Recognized or State Indian Tribe 3. Name and Title of Contact Person: Heidi Niggemeyer, NPDES Program Manager 4. Phone: heidin@ci.salinas.ca.us 6. Project Title: Lincoln Avenue Green/Complete Street 1
2 7. Type of Proposal: Is your project an implementation project (developed, with budget) or a concept proposal? Implementation project Concept proposal 8. Project Summary: Briefly describe your project (one paragraph): Completion of design/construction of a green/complete street for an approximate 1/3 mile length of Lincoln Street, Salinas, between Alisal and Market Streets. The project design will include multiple community, water resource and other environmental benefits. The concept design, initial sizing, initial quantified performance and cost have been completed and are attached with this proposal. The project will be integrated with the City s Regional Surface Transportation Program grant for Complete Streets and includes retrofit of the existing street condition to integrate green infrastructure elements such as bioretention/biofiltration and permeable pavement. COST SUMMARY: Requested funds: $1,290,000 Match: $140,000 TOTAL: $1,430, Project Location: Projects must be located within the Greater Monterey County IRWM region, 1 or otherwise be of direct benefit to the Greater Monterey County IRWM region. Where is your project located? The project is located with the urban boundary of the City of Salinas along Lincoln Avenue for approximately three and a half blocks between Alisal and Market Streets. 10. IRWM Criteria To be eligible for inclusion in the IRWM Plan, projects must include one or more of the following elements. Please check all that apply: Water reuse and recycling for non-potable reuse and direct and indirect potable reuse Water-use efficiency and water conservation Local and regional surface and underground water storage, including groundwater aquifer cleanup or recharge projects Regional water conveyance facilities that improve integration of separate water systems Watershed protection, restoration, and management projects, including projects that reduce the risk of wildfire or improve water supply reliability Storm water resource management, including, but not limited to, the following: Projects to reduce, manage, treat, or capture rainwater or storm water Projects that provide multiple benefits such as water quality, water supply, flood control, or open space Decision support tools that evaluate the benefits and costs of multi-benefit storm water projects Projects to implement a storm water resource plan Conjunctive use of surface and groundwater storage facilities Water desalination projects Decision support tools to model regional water management strategies to account for climate change and other changes in regional demand and supply projections 1 The Greater Monterey County IRWM region includes most of Monterey County, with the exception of areas that are already included in other IRWMPs (specifically, the Pajaro River Watershed IRWM region and Monterey Peninsula, Carmel Bay, and South Monterey Bay IRWM region). These exceptions include: land areas within the San Jose Creek and Carmel River watersheds, land areas within the Pajaro River watershed, and most of the Monterey Peninsula (the Greater Monterey County region includes and runs north from Marina). For a map of the Greater Monterey County IRWM region, please go to: 2
3 Improvement of water quality, including drinking water treatment and distribution, groundwater and aquifer remediation, matching water quality to water use, wastewater treatment, water pollution prevention, and management of urban and agricultural runoff Regional projects or programs as defined by the IRWM Planning Act 3
4 11. IRWM Plan Objectives The following objectives have been identified for the Greater Monterey County IRWM Plan. Please select all of the objectives that the project will address, and very briefly explain (unless it is entirely obvious) how your project will address each objective. (For concept proposals, you need not provide the justification.) Objective Water Supply Goal Increase groundwater recharge and protect groundwater recharge areas. Optimize the use of groundwater storage with infrastructure enhancements and improved operational techniques. Increase and optimize water storage and conveyance capacity through construction, repair, replacement, and augmentation of infrastructure. Diversify water supply sources, including but not limited to the use of recycled water. Maximize water conservation programs. Capture and manage storm water runoff. Optimize conjunctive use where appropriate. Support research and monitoring to better understand water supply needs. Support the creation of water supply certainties for local production of agricultural products. Promote public education about water supply issues and needs. Promote planning efforts to provide emergency drinking water to communities in the region in the event of a disaster. Water Quality Goal Promote practices necessary to meet, or where practicable, exceed all applicable water quality regulatory standards (for drinking water, surface and groundwater quality). Promote projects to prevent seawater intrusion. Incorporate or promote principles of low impact development where feasible, appropriate, and cost effective. Protect surface waters and groundwater basins from contamination and the threat of contamination. Support research and pilot projects for the co-management of food safety and water quality protection. Improve septic systems, sewer system infrastructure, wastewater treatment systems, and manure management programs to prevent water quality contamination. Support research and other efforts on salinity management. Support monitoring to better understand major sources of erosion, and implement a comprehensive erosion control program. Promote programs and projects to reduce the quantity and improve the quality of urban and agricultural runoff and/or Justification SHOULDN T THIS BE CHECKED, or is this not a recharge area? Reduced need for irrigation (potable water) on green streets that use stormwater resources. Green street and LID facilities will capture, treat and infiltrate stormwater Project signage and outreach will increase public knowledge/awareness concerning stormwater and other water resource issues. Regional and decentralized strategies are needed to progress toward water quality standards. This project uses decentralized LID facilities (e.g., bioretention) to reduce urban pollutant loading to receiving waters. The project is a LID/Green/Complete street project. The project will reduce pollutant loading and excess volumes of stormwater to receiving waters. The project is a stormwater treatment project that addresses urban runoff pollutant loading 4
5 mitigate their effects in surface waters, groundwater, and the marine environment. Promote regional monitoring and analysis to better understand water quality conditions. Support research and utilization of emerging technologies (enzymes, etc.) to develop effective water pollution prevention and mitigation measures, and source tracking. Promote public education about water quality issues and needs. Flood Protection & Floodplain Management Goal Promote projects and practices to protect infrastructure and property from flood damage. Improve flood management infrastructure and operational techniques/strategies. Implement flood management projects that provide multiple benefits such as public safety, habitat protection, recreation, agriculture, and economic development. Develop and implement projects to protect, restore, and enhance the natural ecological and hydrological functions of rivers, creeks, streams, and their floodplains. Support research and monitoring efforts to understand the effects of flooding on transport and persistence of pathogens in food crop production areas. Support management of flood waters so that they do not contaminate fresh produce in the field. Promote public education about local flood management issues and needs. Environment Goal Support science-based projects to protect, improve, enhance, and/or restore the region s ecological resources, while providing opportunities for public access and recreation where appropriate. Protect and enhance state and federally listed species and their habitats. Minimize adverse environmental impacts of water resource management projects. Support applied research and monitoring to better understand environmental conditions, environmental water needs, and the impacts of water-related projects on environmental resources. Implement fish-friendly stream and river corridor restoration projects. Reduce adverse impacts of sedimentation into streams, particularly from roads and non-point sources. Promote efforts to prevent, control, reduce, and/or eradicate high priority invasive species. Promote native drought-tolerant plantings in municipal and residential landscaping. Consider opportunities to purchase fee title or conservation and volume issues. Project outreach/engagement will provide an opportunity to provide public education. Reduction of stormwater volumes using LID practices will reduce the burden on the existing conventional stormwater infrastructure and thereby decrease risk to public safety and property. Use of LID/green infrastructure provides a means to provide multiple economic, social and environmental benefits beyond flood management. The project will use LID techniques the mimic natural watershed processes (e.g., infiltration) as promoted/encouraged by the Water Board. The project uses LID techniques that mimic natural hydrologic processes in an urban setting so that both ecological benefits and public benefits are realized (e.g. urban greening, reduced heat island effect, improved air quality) The project will capture Total Suspended Solids (TSS) that contribute to sediment issues in the local receiving water. The project will focus on use of native, droughttolerant and non-invasive plant species as part of the landscape design. 5
6 easements on lands from willing sellers that provide integrated water resource management benefits. Ensure adequate funding and infrastructure to manage properties and/or monitor easements. Support research and monitoring efforts to understand the effects of wildfire events on water resources. Regional Communication and Cooperation Goal Facilitate dialogue and reduce inconsistencies in water management strategies/regulations between local, regional, state, and federal entities. Promote dialogue between federal and state regulators and small water system managers to facilitate water quality regulation compliance. Foster collaboration between regional entities to minimize and resolve potential conflicts and to obtain support for responsible water supply solutions and improved water quality. Build relationships with federal, state, and local regulatory agencies and other water agencies to facilitate the permitting, planning, and implementation of water-related projects. Increase stakeholder input and public education about the need, complexity, and cost of strategies, programs, plans, and projects to improve water supply, water quality, flood management, coastal conservation, and environmental protection. Disadvantaged Communities Goal Seek funding opportunities to ensure all communities have a water system with adequate, safe, high-quality drinking water. Seek funding opportunities to ensure all communities have adequate wastewater treatment. Ensure that disadvantaged communities are adequately protected from flooding and the impacts of poor surface and groundwater quality. Provide support for the participation of disadvantaged communities in the development, implementation, monitoring, and long-term maintenance of water resource management projects. Promote public education in disadvantaged communities about water resource protection, pollution prevention, conservation, water quality, and watershed health. Climate Change Goal Plan for potential impacts of future climate change. Support increased monitoring and research to obtain greater understanding of long-term impacts of climate change in the Greater Monterey County region. Support efforts to research alternative energy and to diversify energy sources appropriate for the region, and consider options for using renewable energy where such options are integrally tied to supporting IRWM Plan objectives. Seek long-term solutions to reduce energy consumption, especially the energy embedded in water use, with a goal to reducing greenhouse gas (GHG) emissions Seek long-term solutions to maintain and protect existing pristine The project will provide an opportunity to build better relationships with water regulatory agencies concerning the balance between growth and water protection. Will also improve the planning process for the integration of stormwater elements into transportation Complete Street projects. The project outreach will increase stakeholder knowledge concerning stormwater strategies and costs. Project outreach/engagement will target underserved populations within Salinas. As a DAC, the project will promote and implement actions that serve and education the DAC community. 6
7 natural resources from the impacts of climate change. Address adapting to changes in the amount, intensity, timing, quality, and variability of runoff and recharge. Consider the effects of sea level rise on water supply conditions and identify suitable adaptation measures. In considering ways to address IRWM Plan objectives and implement the Plan, consider where practical the strategies adopted by California Air Resources Board (CARB) in its AB 32 Scoping Plan. Support research and/or implementation of land-based efforts such as carbon-sequestration on working lands and wildlands in the Greater Monterey County region. Promote public education about impacts of climate change, particularly as it relates to water resource management in the Greater Monterey County region. As a decentralized management approach, the project will help to improve system resiliency through small scale capture and infiltrate facilities along Lincoln Ave. 7
8 SECTION II. RESOURCE MANAGEMENT STRATEGIES AND CLIMATE CHANGE This section is required for all implementation projects. If your project is a concept proposal, there is no need to complete this section (or any of the following sections of this application form). 12. Do you want your project to be considered for Round 1 of the Proposition 1 IRWM Implementation Grant Program? Yes No 13. Resource Management Strategies One of the goals of integrated regional water management planning is to encourage diversification of water management approaches. Please select the strategies that your project will use (check all that apply): Reduce Water Demand Agricultural Water Use Efficiency Urban Water Use Efficiency Improve Operational Efficiency and Transfers Conveyance System Reoperation Water Transfers Infrastructure Reliability Increase Water Supply Conjunctive Management & Groundwater Storage Desalination Precipitation Enhancement Recycled Municipal Water Surface Storage Storm Water Capture and Management Improve Water Quality Drinking Water Treatment and Distribution Groundwater/Aquifer Remediation Matching Water Quality to Use Pollution Prevention Salt and Salinity Management Urban Runoff Management Water and Wastewater Treatment Practice Resources Stewardship Agricultural Lands Stewardship Ecosystem Restoration Forest Management Land Use Planning and Management Recharge Area Protection Sediment Management Watershed Management Environmental and Habitat Protection and Improvement Wetlands Enhancement and Creation Improve Flood Management Flood Management People and Water Economic Incentives (Loans, Grants, and Water Pricing) Outreach, Engagement, and Education Water and Culture Water-Dependent Recreation Regional Cooperation Recreation and Public Access Other Resource Management Strategies Dewvaporation or Atmospheric Pressure Desalination Fog Collection Rainfed Agriculture Monitoring and Research 8
9 14. Climate Change Adaptation a) Does your project contribute to climate change adaptation? If so, what climate change vulnerabilities in the region does your project respond to, specifically? (For vulnerabilities in the Greater Monterey County IRWM region, see Chapter R Climate Change of the IRWM Plan, specifically Section R6, available at: Please describe how, and to what extent. Precipitation patterns appear to be evolving toward short-duration, high-intensity events. There appears to be a change in the amount, intensity and quality of stormwater runoff. Consequently, stormwater management strategies and associated infrastructure require increased system capacity and design to increase overall system resiliency. Decentralized stormwater designs using LID practices such as the Lincoln Avenue project, create a broader system of facilities that can capture and infiltrate stormwater at the neighborhood scale to minimize the volume and conveyance of pollutants. The volume aspect in particular is a need addressed by the project to increase capacity throughout the City. b) Does your project consider the effects of sea level rise on water supply conditions and identify suitable adaptation measures? No. c) Does the project take into consideration changes in the amount, intensity, timing, quality and variability of runoff and recharge? See (a). The project design includes decentralized facilities to help dampen the effects of high-intensity precipitation events by capturing a portion of the stormwater runoff and providing infiltration function. 15. Reduction of Greenhouse Gas Emissions a) Please describe the extent to which your project will help reduce greenhouse gas (GHG) emissions, compared to project alternatives. To assist you in estimating GHG emissions, please use the California Emissions Estimator Tool (CalEEMod) available for download at Guidance documents to help you use the tool are available on the Greater Monterey County IRWM website at: The project, through the vegetative component, will act a carbon sink and will help to reduce overall greenhouse gas emission impacts. The project alternative, as represented by conventional urban street stormwater management (i.e., pipes, curb, gutter) does not provide any benefit to greenhouse gas reductions. b) If appropriate, describe the extent to which the project will help the region reduce GHG emissions over the next 20 years. Not quantified. c) To what extent will the project help reduce energy consumption, especially the energy embedded in water use, and ultimately reduce GHG emissions? Use of stormwater to offset irrigation needs of the LID facilities provides a reduction in the need to provide an irrigation system and associated delivery of potable water for irrigation use. 9
10 SECTION III. PROJECT NARRATIVE AND BUDGET Complete this and the following sections only if you would like your project to be considered for Round 1 Implementation Grant funds. 16. Project Description (1 page or so): Please describe the proposed project. Provide a general discussion of the problem the project addresses, and describe major tasks/activities. Include any other information that supports the justification for this project, including how the project can achieve any claimed benefits. The project represents a retrofit of an existing collector street, Lincoln Avenue, to integrate LID features such as bioretention that will address multiple city needs including flood control, water quality, receiving water protection and regulatory compliance. City Hall is located within the project area and the serves a diverse and large portion of the City population and as such, the project can act a catalyst for green street implementation for the City. The project would include building upon the concept design to full design and construction. Stakeholder outreach, including the public, would be an integral part of the project. The City of Salinas has not yet conducted a green/complete street retrofit and understands the multi-benefit value these type of green street projects can provide to the community and environment. The project can serve as a catalyst for the City to further implement LID/Green Infrastructure practices. As part of the concept design development, quantification of benefits was estimated including: 1. Average annual stormwater volume reduced/infiltrated. 2. Average annual pollutant load reductions (e.g., TSS, metals) 3. Event-based facility capacity (e.g., 85 th percentile, 24-hr storm event) 4. Increased number of native, drought-tolerant plants and trees. 5. Length of street modified to provide community urban greening benefits. These estimates will be further refined as part of the full design process. Qualitative benefits were also estimated and are provided with this proposal. Please see attached: Project Concept Design (Attachment A) Project Qualitative Benefits (Attachment B) Project Quantified Benefits (Attachment C) 17. Project Need/Urgent Need: Is there a special, urgent, or critical need for your project? If so, explain. Yes. There is time-sensitive opportunity to leverage existing federal transportation funds that were awarded to the City through a TAMC Regional Surface Transportation Program grant for Complete Streets. Due to budget limitations the City is challenged to meet the Proposition 1 grant match without use of existing funding that is eligible for match. 18. Budget: Please complete the following budget table. While only a high level budget is required at this time, please provide as much detail as possible. (The Regional Water Management Group is mainly interested in knowing that your budget is realistic and is based on actual costs.) Non-State Requested Other State Total Cost 10
11 Cost Share Grant Amount Cost Share (a) Project Admin $2,500 $47,500 0 $50,000 (b) Land Purchase/Easement (c) Planning/Design/ $2,500 $137,500 0 $140,000 Engineering/Environmental (d) Construction/ $135,000 1,105,000 0 $1,240,000 Implementation (e) Total $140,000 1,290,000 $1,430, Cost Share: DWR requires that proposals provide at minimum 50% non-state cost share. DWR awards additional points for proposals that provide more than the required 50% non-state cost share. Describe your cost share, and sources of cost share funds. In August of 2017, the City was awarded a $2,970,000 Downtown Complete Streets grant from the Transportation Agency of Monterey County (TAMC) as part of their Regional Surface Transportation Program grant for Complete Streets. The City intends to use these federal funds as match for the project. Additionally, inkind staff time for the project will be included as match funds. 20. Disadvantaged Communities: Does the project provide direct water-related benefits to a project area entirely comprised of Disadvantaged Communities (DACs) and/or Economically Distressed Areas (EDAs)? If so, explain. (If you need help with this question, contact Susan at srobinsongs@frontier.com) The project location is entirely within a DAC Block and will benefit 100% of the DAC community. Additionally, the City as a whole is comprised of DAC Places, Tracks and Blocks and those using Lincoln Avenue for shopping and business will benefit from the project. The project location also falls entirely within an EDA area. Will you be requesting a full or partial cost-share waiver based on DAC/EDA status? Yes. The City will be seeking a reduction from 50% match to 10% match based on DAC and EDA benefits and Guideline definition. 21. Operations and Maintenance: Please describe how operations and maintenance of the project will be supported. The operations and maintenance of the project, which is fully located within the City s street right-of-way, will be the responsibility of the City and conducted as part of route stormwater infrastructure asset management either by City staff and/or contracted landscape businesses. 22. Storm Water Resource Plan Requirements: Is the project a storm water or dry weather runoff capture project? If so, is it included in a Storm Water Resource Plan? The project is a stormwater runoff capture, treat and infiltrate project and is included in the Greater Monterey County SWRP. 23. Groundwater: Will the project affect groundwater levels? (yes or no) No. 24. AB 1249 Requirements: Does the project address nitrate, arsenic, or hexavalent chromium contamination in the region? If so, how? 11
12 No 25. Stakeholder Coordination: Please briefly describe the nature of stakeholder coordination for planning, developing, and implementing the project. The City intends to build upon its recently completed Neighborhood Vibrancy - Urban Greening Plan (January 2017), which included significant outreach and engagement with City neighborhoods including the project area, to identify community needs and priorities. Urban Greening and LID stormwater management principles and techniques were identified in Plan as a means to improve the livability of neighborhoods. Project implementation would use the Plan information with additional project-specific design input (e.g., public meetings, design charettes, brochures, surveys) to result in a project design that serves the community and meets Proposition 1 Guidelines for multi-benefit stormwater management projects. 12
13 SECTION IV. COMPLIANCE Complete this section only if you would like your project to be considered for Round 1 Implementation Grant funds. To be eligible for IRWM Implementation Grant funds, project proponents must comply with the following. 26. Adoption of IRWM Plan Proposition 1 IRWM Program Guidelines require that each project proponent named in an IRWM Grant application adopt the IRWM Plan. Please check if your agency/organization: Has already adopted the IRWM Plan Hereby commits to adopting the IRWM Plan, if the project is selected for submission in an IRWM Grant application 27. Urban Water Management Compliance If your agency meets the definition of an urban water supplier ( supplier, either publicly or privately owned, that provides water for municipal purposes, either directly or indirectly, to more than 3,000 customers or supplying more than 3,000 acre-feet of water annually ), you must demonstrate compliance with certain requirements. These include: DWR-approved 2015 Urban Water Management Plan Verification from DWR that your agency submitted a validated water loss audit report (SB 555). Compliance with the water metering requirements (CWC section 525) Is your agency an urban water supplier, and if so, can it meet these requirements? Yes, my agency is an urban water supplier and I can demonstrate compliance with these requirements. No, my agency is an urban water supplier but I cannot demonstrate compliance with these requirements. N/A: My agency is not an urban water supplier. 28. Agricultural Water Management and Measure Compliance If your agency/organization is an agricultural water supplier? If your agency/organization is an agricultural water supplier that supplies more than 2,000 acre-feet of water or water to more than 2,000 irrigated acres, excluding recycled water, you must demonstrate compliance with certain requirements. (And if you supply less than that, you must provide documentation stating as such.) The requirements depend on the amount of irrigated acreage that you supply water to. Please see the IRWM Implementation Grant Program 2018 Draft PSP, pp , for a list of those requirements (available at: Programs/Proposition-1/Implementation-Grants. Yes, my agency is an agricultural water supplier and I can supply these documents. No, my agency is an agricultural water supplier but I cannot supply these documents at this time. N/A: My agency is not an agricultural water supplier. 29. Surface Water Diverter Compliance If your agency/organization is a surface water diverter, you must state whether your agency/organization has submitted to the State Water Resources Control Board your annual surface water diversion reports. Is your agency/organization a surface water diverter, and if so, can it meet this requirement? Yes, my agency is a surface water diverter and I can verify that we meet this requirement. No, my agency is a surface water diverter but we have not met this requirement. 13
14 Attachment C: Estimated Lincoln Avenue Quantified Benefits and Asset Improvements Stormwater Volume and Pollutant Reduction Estimates Stormwater Capture and Infiltration Capacity (cu.ft.) Average Annual Volume Captured and Infiltrated (cu.ft.) Average Annual Pollutant Reduction Total Susp ende d Solid s (kg) Copper (g) Nitrate (kg) 27, ,000 Fecal Coliform (cfu) 1, E+12 Stormwater Asset Benefit Elements The project will retrofit approximately 3 1/2 blocks of urban street right-of-way to integrate multibenefit stormwater elements. Concept design new infrastructure to provide these benefits include: Assset Type Bioretention facilities Permeable Pavement Trees 55 New Conventional native, droughttolerant Landscape Trash Capture Devices 2 Number # Area (sq. ft.) 8,266 25, Lincoln Avenue Green Street Project Implementation Proposal_IRWM_Prop. 1
GREATER MONTEREY COUNTY INTEGRATED REGIONAL WATER MANAGEMENT PROGRAM APPLICATION FORM FOR IMPLEMENTATION PROJECTS AND CONCEPT PROPOSALS 2018/2019
GREATER MONTEREY COUNTY INTEGRATED REGIONAL WATER MANAGEMENT PROGRAM APPLICATION FORM FOR IMPLEMENTATION PROJECTS AND CONCEPT PROPOSALS 2018/2019 GENERAL INSTRUCTIONS: Both implementation project proposals
More informationGREATER MONTEREY COUNTY INTEGRATED REGIONAL WATER MANAGEMENT PROGRAM APPLICATION FORM FOR IMPLEMENTATION PROJECTS AND CONCEPT PROPOSALS 2018/2019
GREATER MONTEREY COUNTY INTEGRATED REGIONAL WATER MANAGEMENT PROGRAM APPLICATION FORM FOR IMPLEMENTATION PROJECTS AND CONCEPT PROPOSALS 2018/2019 GENERAL INSTRUCTIONS: Both implementation project proposals
More informationGREATER MONTEREY COUNTY INTEGRATED REGIONAL WATER MANAGEMENT PROGRAM APPLICATION FORM FOR IMPLEMENTATION PROJECTS AND CONCEPT PROPOSALS 2018/2019
GREATER MONTEREY COUNTY INTEGRATED REGIONAL WATER MANAGEMENT PROGRAM APPLICATION FORM FOR IMPLEMENTATION PROJECTS AND CONCEPT PROPOSALS 2018/2019 GENERAL INSTRUCTIONS: Both implementation project proposals
More informationGREATER MONTEREY COUNTY INTEGRATED REGIONAL WATER MANAGEMENT PROGRAM APPLICATION FORM FOR IMPLEMENTATION PROJECTS AND CONCEPT PROPOSALS 2018/2019
GREATER MONTEREY COUNTY INTEGRATED REGIONAL WATER MANAGEMENT PROGRAM APPLICATION FORM FOR IMPLEMENTATION PROJECTS AND CONCEPT PROPOSALS 2018/2019 GENERAL INSTRUCTIONS: Both implementation project proposals
More informationGREATER MONTEREY COUNTY INTEGRATED REGIONAL WATER MANAGEMENT PROGRAM APPLICATION FORM FOR IMPLEMENTATION PROJECTS AND CONCEPT PROPOSALS 2018/2019
GREATER MONTEREY COUNTY INTEGRATED REGIONAL WATER MANAGEMENT PROGRAM APPLICATION FORM FOR IMPLEMENTATION PROJECTS AND CONCEPT PROPOSALS 2018/2019 GENERAL INSTRUCTIONS: Both implementation project proposals
More informationGREATER MONTEREY COUNTY INTEGRATED REGIONAL WATER MANAGEMENT PROGRAM APPLICATION FORM FOR IMPLEMENTATION PROJECTS AND CONCEPT PROPOSALS 2018/2019
GREATER MONTEREY COUNTY INTEGRATED REGIONAL WATER MANAGEMENT PROGRAM APPLICATION FORM FOR IMPLEMENTATION PROJECTS AND CONCEPT PROPOSALS 2018/2019 GENERAL INSTRUCTIONS: Both implementation project proposals
More informationPajaro River Watershed Integrated Regional Water Management Plan Update Project Solicitation Form
Pajaro River Watershed Integrated Regional Water Management Plan Update PROJECT OVERVIEW General Project Information Project Title: South County Recycled Water Pipeline - Short-Term CIP Implementation
More informationPajaro River Watershed Integrated Regional Water Management Plan Update Project Solicitation Form
PROJECT OVERVIEW General Project Information Project Title: Conservation Planning and On-farm Irrigation Efficiency support Project Location: Pajaro Basin Estimated Cost: $896,452 Brief Project Description
More informationDRAFT 2018 MAC IRWMP Update Policies, Goals, Objectives
DRAFT 2018 MAC IRWMP Update Policies, Goals, Objectives Policy Goals Objectives Performance Measures Maintain and Improve Water Quality Improve Water Supply Reliability and Ensure Long-Term Balance of
More informationTahoe Sierra IRWM Please submit by 17 January 2014 to Project Template
Please submit by 17 January 2014 to AraceliCazarez@KennedyJenks.com Project Template Please provide information in the tables below: I. Project Proponent Information Agency/ Organization Town of Truckee
More informationSan Diego IRWM Project Scoring Guidelines for Prop 84 Round 3 Drought Relief Grant Cycle. Scoring Guidelines
San Diego IRWM Project for Prop 84 Round 3 Drought Relief Grant Cycle Pass/Fail Criteria Meets Objective A, Objective B, and at least one other Objective Objective A: Encourage the development of integrated
More informationPacific Grove Garbage Disposal Buy-Back Program
PROJECT OVERVIEW General Project Information Project Title: Pacific Grove Garbage Disposal Buy-Back Program Project Location: City of Pacific Grove Estimated Cost: $, Brief Project Description ( to 2 sentences):
More informationGREATER MONTEREY COUNTY INTEGRATED REGIONAL WATER MANAGEMENT PROGRAM
GREATER MONTEREY COUNTY INTEGRATED REGIONAL WATER MANAGEMENT PROGRAM APPLICATION FORM FOR IMPLEMENTATION PROJECTS AND CONCEPT PROPOSALS 2018/2019 GENERAL INSTRUCTIONS: Both implementation project proposals
More informationPacific Grove ASBS Storm Water Diversions to MRWPCA
PROJECT OVERVIEW General Project Information Project Title: Pacific Grove ASBS Storm Water Diversions to MRWPCA Project Location: City of Pacific Grove Estimated Cost: $4,000,000 Brief Project Description
More informationLocal, State and Federal Funding Opportunities
Local, State and Federal Opportunities MWD Accelerated Recycled Water Retrofit Program MWD Local Resource Program Water Savings Incentive Program So Cal Water$mart $10M $10M Provides financial incentives
More informationStorm Water Resource Plan Criteria and Metrics Checklist
APPENDIX F Storm Water Resource Plan Criteria and Metrics Checklist Prepared for: San Diego Regional Storm Water Copermittee County of San Diego Department of Public County of San Diego, Department of
More informationUPPER FEATHER RIVER IRWM PROJECT INFORMATION FORM
featherriver.org UPPER FEATHER RIVER IRWM UPPER FEATHER RIVER IRWM PROJECT INFORMATION FORM PROJECT INFORMATION FORM Please submit by 5: p.m. on August 3, 215, to UFR.contact@gmail.com Please provide information
More informationPriorities & Metrics Workgroup Proposed Vision, Mission, Goals, Objectives, and Targets
Priorities & Workgroup Proposed Vision, Mission, Goals, Objectives, and November 28, 2012 Vision: An integrated, balanced, and consensus-based approach to ensuring the long-term sustainability of the Region
More informationDRAFT ANNOTATED OUTLINE 12/4/2006
DRAFT ANNOTATED OUTLINE 12/4/2006 INTEGRATED WATER MANAGEMENT PLAN SAN DIEGO REGION A. INTRODUCTION AND REGIONAL WATER MANAGEMENT GROUP Summary This Integrated Regional Water Management Plan (IRWM Plan)
More informationOverview of Conjunctive Management in California Let s Have a Frank Discussion
Overview of Conjunctive Management in California Let s Have a Frank Discussion Mark S. Nordberg, P.G. Division of Integrated Regional Water Management North Central Region Office Geology and Groundwater
More information5. RESOURCE MANAGEMENT STRATEGIES
Central Orange County Integrated Regional Water Management Plan 5. RESOURCE MANAGEMENT STRATEGIES 5.1 STRATEGIES INAPPLICABLE TO REGION Nearly all types of resource management strategies are applicable
More informationIntegrated Regional Water Management
Integrated Regional Water Management California Watershed Network March 20, 2007 John Woodling California Dept. of Water Resources Integrated Regional Water Management A cornerstone of the California Water
More informationClimate Change Workgroup Meeting No. 3
Climate Change Workgroup Meeting No. 3 Attendees August 23, 2012 9:00am - 11:00am San Diego County Water Authority, Library Conference Room 4677 Overland Avenue, San Diego 92123 Linda Flournoy, Planning
More informationNapa Watershed Symposium. Factors affecting future water quantity and quality in Napa County, and strategies for adaptation
Napa Watershed Symposium Factors affecting future water quantity and quality in Napa County, and strategies for adaptation Pierre Stephens California Department of Water Resources May 21, 2009 Source:
More informationSanta Ana River Watershed. SAWPA Celeste Cantú April 17, 2012
Santa Ana River Watershed SAWPA Celeste Cantú April 17, 2012 What is SAWPA? SAWPA Member Agencies & Other Stakeholders Other Stakeholders 97 Water-related Agencies 4 Counties 59 Cities State water, environmental,
More informationPROJECT INFORMATION FORM Project Review Process is described by Chapter 7 of the IRWMP Form Revised
Name Proponent(s) Location Description Status Background (75) Tertiary Treatment at Fresno/Clovis Regional Reclamation Facility City of Fresno 36.70201, -119.89517 This project is for the construction
More informationWORK COMPLETED TO DATE
2018 Merced SWRP/IRWMP Update Regional Advisory Committee Meeting #3 August 30, 2018 Presenters: Leslie Dumas woodardcurran.com WORK COMPLETED TO DATE Work to Date Held RAC meetings (May 24 th ; June 27
More informationStakeholder Meeting #1
Santa Clara Basin Stormwater Resource Plan Stakeholder Meeting #1 October 4, 2017 Jill Bicknell, P.E. SCVURPPP Presentation Overview Background SCVURPPP Green Infrastructure Stormwater Resource Plan (SWRP)
More informationPajaro River Watershed Integrated Regional Water Management Plan Update Project Solicitation Form
PROJECT OVERVIEW General Project Information Project Title: College Lake Project Location: Santa Cruz County, City of Watsonville Estimated Cost: $ Brief Project Description (1 to 2 sentences): College
More informationSan Diego IRWMP Public Meeting. Agenda. Morning Agenda
San Diego IRWMP Public Meeting June 29, 2007 Agenda Morning Background Outline of IRWM Plan Overview of IRWM Plan Prioritization Process Approach to Funding Application Prioritization Afternoon Explanation
More informationSection 6 Resource Management Strategies
Section 6: Resource Management Strategies 6.1 Introduction The Goals and Objectives presented in Section 5 for the T-S IRWM Plan describe a range of areas in which regional stakeholders intend to improve
More informationWater and Environment. Monterey Peninsula, Carmel Bay and South Monterey Bay Integrated Regional Water Management Draft Plan
Water and Environment Monterey Peninsula, Carmel Bay and South Monterey Bay Integrated Regional Water Management Draft Plan December 11, 2006 Presentation Outline Purpose of IRWM Planning Status of Plan
More informationIntegrated Regional. South Tahoe Public Utility District. Water Management Plan. July 2014 K/J Prepared By Kennedy/Jenks Consultants
Tahoe-Sierra Integrated Regional Water Management Plan July 2014 K/J 1270036 Photo courtesy of Matthew Grimm South Tahoe Public Utility District Prepared By Kennedy/Jenks Consultants 10850 Gold Center
More informationWastewater Treatment Plant Improvement Project
Wastewater Treatment Plant Improvement I. Sponsor Contact Information WTLD-06 Lead Agency/Organization City of Wheatland Name of Primary Contact(s) Dane Schilling Mailing Address 111 C Street, Wheatland,
More informationA10. Cost and Benefits Summary
A10. Cost and Benefits Summary The goals of the Proposal are to increase regional self-sufficiency through water conservation and water reuse; more efficiently manage water supplies; improve water quality
More informationSouth Orange County Watershed Management Area Public Workshop. September 19, 2012
South Orange County Watershed Management Area Public Workshop September 19, 2012 AGENDA 8:00 8:45 Purpose of the IRWMP Regional Goals Prop 84 Implementation $ Results of Project Self Scoring Process for
More informationSouth Orange County Watershed Management Area Stakeholder Workshop. April 30, 2013
South Orange County Watershed Management Area Stakeholder Workshop April 30, 2013 Agenda Schedule of Review and Approval Process Overview Overview of the Proposition 84 Guidelines Overview of the Contents
More informationNorth Monterey County Drought Contingency Plan
North Monterey County Water Total Water Management Evaluating Options for a Reliable Water Future North Monterey County Drought Contingency Plan May 31, 2018 Meeting Topics Overview of Drought Contingency
More informationTahoe Sierra IRWM Please submit by 17 January 2014 to Project Template
Please submit by 17 January 2014 to AraceliCazarez@KennedyJenks.com Project Template Please provide information in the tables below: I. Project Proponent Information Agency/ Organization Tahoe City Public
More informationSanta Barbara County IRWM
Santa Barbara County IRWM Cooperating Partners of the Santa Barbara County IRWM South Coast Watersheds Meeting Tuesday, June 13, 2017, 1:00 am to 3:00 pm 619 Garden Street, Santa Barbara, CA 93101 Agenda
More informationAMENDED Memorandum of Understanding for Integrated Regional Water Management in the Monterey Peninsula, Carmel Bay, and South Monterey Bay Region
AMENDED Memorandum of Understanding for Integrated Regional Water Management in the Monterey Peninsula, Carmel Bay, and South Monterey Bay Region 1. PURPOSE The purpose of this Memorandum of Understanding
More informationIRWMP UPDATE IC Presentation May 2013 Harry Seraydarian & Jennifer Krebs
IRWMP UPDATE 2013 IC Presentation May 2013 Harry Seraydarian & Jennifer Krebs Outline IRWMP Plan Update - Jennifer IRWMP Implementation Grants (proposed & ongoing) - Harry Round 3 Implementation Grant
More information2 Vision and Objectives
2 Vision and Objectives This chapter addresses requirements set forth in the Objectives Standard included in the 2016 IRWM Program Guidelines (DWR, 2016). Consistent with DWR s 2016 Guidelines, the objectives
More information2009 Comprehensive Water Package
DWR, 2009 Comprehensive Water Package, Special Session Policy Bills and Bond Summary, Special Session Policy Bills and Bond Summary The California Depa r t men t of W ater R eso u rce s Bill Summary SB
More informationDeveloping Metrics & Indicators for the California Water Plan. CA Sustainability Indictors Symposium February 23, 2011
Developing Metrics & Indicators for the California Water Plan CA Sustainability Indictors Symposium February 23, 2011 1 Update 2009 State s Blueprint Integrated Water Management & Sustainability 2 Update
More informationFEMA s Mitigation Support for Resiliency: Innovative Drought and Flood Mitigation Projects
FEMA s Mitigation Support for Resiliency: Innovative Drought and Flood Mitigation Projects Jordan Williams, CFM Eric Kenney, PE, CFM May 4, 2017 2 Hazard Mitigation Purpose: Research climate resilient
More informationSanta Clara Valley Water District 2017 Water Supply Master Plan Planning Objectives
Santa Clara Valley Water District 2017 Water Supply Master Plan Planning Objectives The purpose of the Water Supply Master Plan (Water Master Plan) is to present the District s strategy for ensuring a
More informationProject Application Form
To have your project included in the IRWM Plan this form must be completed and returned to Emmalynne Hu (ehu@rmcwater.com; 408-240-8160) at RMC Water and Environment by 5:00 PM, May 9, 2007. A public workshop
More informationAppendix A. SWRP Self Certification Checklist
Appendix A SWRP Self Certification Checklist Storm Water Resource Plan Checklist and Self-Certification The following should be completed and submitted to the State Water Resources Control Board Division
More informationSANTA BARBARA COUNTY INTEGRATED REGIONAL WATER MANAGEMENT PLAN
SANTA BARBARA COUNTY INTEGRATED REGIONAL WATER MANAGEMENT PLAN UPDATE 2019 EXECUTIVE SUMMARY Prepared for : SANTA BARBARA COUNTY IRWM COOPERATING PARTNERS INTEGRATED REGIONAL WATER MANAGEMENT PLAN UPDATE
More information10/30/2018. Meeting Objectives. Agenda Merced SWRP/IRWMP Update Regional Advisory Committee Meeting #5
2018 Merced SWRP/IRWMP Update Regional Advisory Committee Meeting #5 October 31, 2018 Presenters: Leslie Dumas woodardcurran.com Meeting Objectives Discuss work completed to date and action items Review
More informationAppendix J. Existing Efforts for Identifying Multi-Benefit Projects
Appendix J Existing Efforts for Identifying Multi-Benefit Projects Water Purveyor Projects Existing Efforts for Identifying Multi Benefits Projects In-lieu groundwater recharge under RWA planning efforts
More informationPost-Development Stormwater Runoff Performance Standards
Post-Development Stormwater Runoff Performance Standards December 9, 2014 Topics Why performance standards? What practices/requirements are in effect in other States? The Workgroup s preliminary and final
More informationCentral Coast Climate Collaborative
Central Coast Climate Collaborative Water Panel August 23, 2017 Lynn Rodriguez Watersheds Coalition of Ventura County Topics Climate change vulnerabilities and impacts on water resources Integrated Regional
More informationRegional Feather River Diversion Feasibility Study
Regional Feather River Diversion Feasibility Study I. Project Sponsor Contact Information YCWA-13 Lead Agency/Organization Yuba County Water Agency Name of Primary Contact(s) Curt Aikens Mailing Address
More information-For SAC Discussion Purposes Only- Page 1 of 17
Project Scoring Criteria Framework The following describes project scoring criteria for the Safe, Clean Water Program. The Scoring Criteria within this framework is meant to evaluate the merit of every
More informationThe Future of Integrated Water Management: Moving the Program Forward
The Future of Integrated Water Management: Moving the Program Forward Gary Bardini, Deputy Director CA Department of Water Resources Santa Ana River Watershed 2013 Conference April 11, 2013 1 Today s Presentation
More informationDRAINAGE AND NATURAL AQUIFER GROUNDWATER RECHARGE ELEMENT
Goal 7.0. To optimize integrated stormwater management in order to reduce damage and impacts from sea level rise and flooding, promotes recharge to the Surficial Aquifer System (SAS), improve and protect
More informationSurface Water. Solutions for a better world
1 Surface Water Solutions for a better world Our Surface Water Services Expertise Growing worldwide awareness of water scarcity has encouraged water preservation programs, better irrigation techniques
More informationConservation, Open Space & Groundwater Recharge Element
Conservation, Open Space & Groundwater Recharge Element GOAL 1 ESTABLISH AND MAINTAIN AN INTEGRATED AND URBAN-DEFINING OPEN SPACE NETWORK THAT PROTECTS AND CONSERVES KEY ENVIRONMENTAL FEATURES. Objective
More informationSection 4 Regional Water Management Strategies
4.1 Water Management Strategies Proposition 50, Chapter 8 IRWM grant program guidelines (June 2007) identified 20 potential water management strategies, listed below, that could be implemented to meet
More informationDIVERSIFIED RURAL COMMUNITY ROLE COUNCIL ROLE DIVERSIFIED RURAL ALL COMMUNITIES
Orderly and Efficient Land Use Align land use, development patterns, and infrastructure to make the best use of public and private investment. Plan for growth not to exceed forecasts and in patterns that
More informationMADERA COUNTY STORM WATER RESOURCE PLAN. TAC Meeting #2. August 30th, 2017
MADERA COUNTY STORM WATER RESOURCE PLAN TAC Meeting #2 August 30th, 2017 Meeting Agenda 10:30 Introductions (10 mins) Meet the SWRP team and other TAC Members 10:40 Project Prioritization Approach with
More informationMunicipal Stormwater Management Plan Prepared For The Borough of Cape May Point By Van Note-Harvey Associates VNH File No.
Municipal Stormwater Management Plan Prepared For The Borough of Cape May Point By Van Note-Harvey Associates 2005 VNH File No. 35317-210-21 Table of Contents Introduction... 3 Goals... 3 Storm water Discussion...
More informationCannon River One Watershed, One Plan. POLICY COMMITTEE MEETING January 10, 2018 Rice County Government Center Faribault, MN
Cannon River One, One Plan POLICY COMMITTEE MEETING January 10, 2018 Rice County Government Center Faribault, MN TASK Task 1. Aggregate Existing Physical & Spatial Data 1A. Create project maps 1B. Meeting
More informationAttachment 7: Program Preferences
Merced Integrated Water Management Merced Region Drought Grant Proposal Attachment 7: Program Preferences Attachment 7 consists of the following item: Program Preferences This attachment contains information
More informationDEFINITION OF TERMS AND ACRONYMS 31 TAC EFFECTIVE DECEMBER 8, 2016
DEFINITION OF TERMS AND ACRONYMS 31 TAC 357.10 EFFECTIVE DECEMBER 8, 2016 The terms and acronyms used in this guidance document as defined in 31 TAC 357.10 have the following meanings: 1. Agricultural
More informationSustainable Water Resource Practices
Sustainable Water Resource Practices This section is related to and shoudl be read in conjunction with the Land Use Element, and Conservation Element. Implementing sustainable water resource practices
More informationBEE BRANCH WATERSHED GREEN INFRASTRUCTURE SUMMARY
BEE BRANCH WATERSHED GREEN INFRASTRUCTURE SUMMARY purpose & background PURPOSE & BACKGROUND Through the Bee Branch Watershed Green Infrastructure Project, the City proposes to install permeable interlocking
More informationMunicipal Stormwater Management Planning
Municipal Stormwater Management Planning Christopher C. Obropta, Ph.D., P.E. Water Resources Extension Specialist with Rutgers Cooperative Extension Assistant Professor with Department of Environmental
More informationProposed Sustainability Plan Changes Document
Proposed Sustainability Plan Changes Document July 22, 2016 Prepared by: Office of Sustainability How to use this document Contained in this document are all significant proposed language and text changes
More informationA Role for Dispersed Groundwater Recharge Systems to Balance the Effects of Hydromodification
ABSTRACT & POWERPOINT PRESENTATION A Role for Dispersed Groundwater Recharge Systems to Balance the Effects of Hydromodification Daniel B. Stephens, Ph.D. Principal Hydrologist Daniel B. Stephens & Associates,
More informationThere is a reliable, clean water supply for current and future generations.
E2 There is a reliable, clean water supply for current and future generations. E2.1. Current and future water supply for municipalities, industries, agriculture, and the environment is reliable. 2.1.1.
More informationSUBURBAN EDGE COMMUNITY ROLE COUNCIL ROLE ALL COMMUNITIES SUBURBAN EDGE
Orderly and Efficient Land Use Align land use, development patterns, and infrastructure to make the best use of public and private investment. Plan and stage development for forecasted growth through 2040
More informationRURAL CENTER COMMUNITY ROLE COUNCIL ROLE RURAL CENTER ALL COMMUNITIES
Orderly and Efficient Land Use Align land use, development patterns, and infrastructure to make the best use of public and private investment. Plan for forecasted population and household growth at overall
More informationRURAL RESIDENTIAL COMMUNITY ROLE COUNCIL ROLE RURAL RESIDENTIAL ALL COMMUNITIES
Orderly and Efficient Land Use Align land use, development patterns, and infrastructure to make the best use of public and private investment. Discourage future development of rural residential patterns
More informationState of the Estuary Report 2015
State of the Estuary Report 2015 Technical Appendix People Recycling Water Peter Vorster vorster@bay.org The Bay Institute TECHNICAL APPENDIX: RECYCLED WATER USE CONTEXT Most of the surface and ground
More informationNotice of Public Hearing. Notice of Public Hearing
2015 URBAN WATER MANAGEMENT PLAN Table 8-2: Notification to Cities and Counties Retail: Notification to Cities and Counties City Name 60 Day Notice Notice of Public Hearing Dana Point Mission Viejo County
More informationEffectiveness of Non-Structural Measures in Watershed Restoration
Effectiveness of Non-Structural Measures in Watershed Restoration Bill Frost, PE, D.WRE Sr. Water Resources Engineer KCI Technologies, Inc. Sparks, MD 2011 Low Impact Development Symposium Philadelphia,
More informationSAN MATEO PLAIN GROUNDWATER BASIN ASSESSMENT STAKEHOLDER WORKSHOP#2 SEPTEMBER 7, 2016
SAN MATEO PLAIN GROUNDWATER BASIN ASSESSMENT STAKEHOLDER WORKSHOP#2 SEPTEMBER 7, 2016 PRESENTATION OVERVIEW Introductions Project Overview Summary of Stakeholder Meeting #1 Feedback Snapshot of Results
More informationSanta Barbara County Region
Attachment 3 Santa Barbara County Region IRWM Implementation Grant Proposal Attachment 3 consists of the following items:. Attachment 3 provides a project description, estimated physical benefits, technical
More informationRegional Water Quality Control Board
Regional Water Quality Control Board Region 7 Policy Priorities California Regional Water Quality Control Board - Colorado River Basin Jose L. Angel, Interim Executive Officer, P.E. CA Regional Water Boards
More informationAPPENDIX A. Legislative Requirements. Urban Water Management Planning Act SBx7-7 Water Conservation Act of 2009 SB1478
APPENDIX A Legislative Requirements Urban Water Management Planning Act SBx7-7 Water Conservation Act of 2009 SB1478 Section K: California Water Code, Division 6, Part 2.6: Urban Water Management Planning
More informationAppendix A Stormwater Site Plan Report Short Form
Appendix A Stormwater Site Plan Report Short Form The Stormwater Site Plan Report Short Form may be used for projects that trigger only Minimum Requirements #1-#5. These projects typically fall within
More informationChapter 1 Introduction
Chapter 1 Introduction 1.1 Background and Purpose This Stormwater Resource Plan (SWRP) is the result of a collaborative process between local and regional agencies to develop a comprehensive plan that
More informationAntelope Valley. available. The State regional water. presented. is Desalination: Precipitation. and therefore it
Section 5 Resource Strategies The following section introduces a diversee menu of resource management strategies (RMS) available to meet the Objectives for the Antelope Valley Region,, and it goes on to
More informationWater Supply Water Quality Water Reuse and Conservation Watershed Management Interagency Coordination
WATER ELEMENT INTRODUCTION Water is one of the most critical resources for the Merced County economy and for the quality of life of its residents. Both surface water and groundwater supplies are an important
More informationProject Prioritization
Project Prioritization The Santa Ana Watershed Project Authority (SAWPA), as the regional watershed planning group for the Santa Ana River Watershed, has been facilitating efforts to implement a watershed
More informationUPPER FEATHER RIVER IRWM PROJECT INFORMATION FORM
featherriver.org UPPER FEATHER RIVER IRWM UPPER FEATHER RIVER IRWM PROJECT INFORMATION FORM PROJECT INFORMATION FORM Please submit by 5: p.m. on August 3, 215, to UFR.contact@gmail.com Please provide information
More informationORDINANCE # 854. Stormwater Management / Operation and Maintenance Requirements
ORDINANCE # 854 Stormwater Management / Operation and Maintenance Requirements Section 1. Purpose and Authority In accordance with the provisions of Chapters 98, 124, 126, 440, 444, and 446h of the General
More informationWater Supply and Delivery
Utilities Water Supply and Delivery Goal U-1 Availability of an adequate, safe, and sustainable water supply and maintenance of an efficient water system for residents and visitors. (Modified Goal 4.B)
More informationSection M: Technical Analysis
Section M: The purpose of the standard as stated in the Proposition 84/1E Integrated Regional Water Management (IRWM) Program Guidelines is to explain the technical information, methods, and analyses used
More informationScoping Study for Upper Petaluma River Watershed Flood Control Project. Frequently Asked Questions
Scoping Study for Upper Petaluma River Watershed Flood Control Project Frequently Asked Questions December 8, 2011 1. Why was the public not notified of the April 28 meeting? The April 28 meeting was intended
More informationAppendix J Project Funding Sources
Appendix J Funding Funding Planada Community Services (PCSD) Wastewater Treatment Plant Improvement Pre- Construction Mitigation Measures Planada Community Services $ 10,037,600 -- None $482,735 / SWRCB
More informationAppendix B Stormwater Site Plan Submittal Requirements Checklist
Stormwater Site Plan Submittal Requirements Checklist The Submittal Requirements Checklist is intended to aid the design engineer in preparing a Stormwater Site Plan. All items included in the following
More informationWATER SUPPLY POLICIES
WATER SUPPLY POLICIES The County will: GOALS AND OBJECTIVES 10.1 Coordinate Planning Coordinate water supply planning with land use and wastewater management planning to assure that the supply and quality
More informationLow Impact Development and Municipal Stormwater Permits in Southern California: What, Where, Why, and How
Low Impact Development and Municipal Stormwater Permits in Southern California: What, Where, Why, and How Matt A. Yeager, D.Env San Bernardino County Stormwater Program Coastal Coalition April 24, 2008
More informationSupplemental Supply Option: Desalination DEEP WATER DESAL PROJECT
Supplemental Supply Option: Desalination DEEP WATER DESAL PROJECT CONCEPT: The Deep Water Desalination (DWD) Project would consist of a Desalination Facility at the Moss Landing Area and co-located with
More informationCity of Tacoma Stormwater Management Program Assessment. Attachment B3
City of Tacoma Stormwater Management Program Assessment Attachment B3 Attachment B3. City of Tacoma Stormwater Management Program Assessment The following discussion includes an assessment of the appropriateness
More informationChapter 1. Introduction
Chapter 1 Introduction James P. Heaney, Robert Pitt, and Richard Field Introduction Stormwater has traditionally been considered a nuisance, requiring rapid and complete drainage from areas of habitation.