This introductory chapter of the EIS is divided into the following sub sections and provides background information on the proposed development:

Size: px
Start display at page:

Download "This introductory chapter of the EIS is divided into the following sub sections and provides background information on the proposed development:"

Transcription

1 1. Introduction 1.1 Introduction Greener Ideas Limited commissioned Mott MacDonald Ireland Limited to undertake an Environmental Impact Assessment (EIA) for the proposed development of a 100 MW Open Cycle Gas Turbine (OCGT) mid-merit power plant. The proposed development is located in the townland of Purcellsinch, Kilkenny City (OS Grid Reference: N & E) as shown on Figure 1.1 Site Location Plan. EIA is a process for identifying, describing and assessing the potential direct and indirect impacts of a particular development on the environment. An Environmental Impact Statement (EIS) is the document produced as a result of that process. This introductory chapter of the EIS is divided into the following sub sections and provides background information on the proposed development: 1.1 Introduction 1.2 Greener Ideas Limited Company Profile 1.3 Description of 1.4 Planning History 1.5 Consultations 1.6 Preparation of EIS 1.2 Greener Ideas Limited Company Profile Greener Ideas Limited (hereafter referred to as GIL) is a joint venture company between Bord Gáis and Mountside Properties Limited. The company was established in March 2008 to develop and operate a number of OCGT projects throughout Ireland, including Kilkenny. Bord Gáis was established in 1976 and is a commercial State body operating in the energy industry. Bord Gáis is a leading energy provider, serving approximately 1 million customers including 650,000 gas users in 152 population centres in Ireland and 350,000 electricity customers. Bord Gáis is majority owned by the Irish Government. Bord Gáis Energy is responsible for pursuing and developing growth opportunities in assets in the energy markets in Ireland, their strategy to become a leading energy company. Bord Gáis Energy currently operates the 445 MW gas-fired power plant at Whitegate in Cork, 235 MW of wind generation and has a further 565 MW of wind generation in development. Mountside Properties Limited has secured planning permission for a number of OCGT power plants in Ireland and are also shareholders in the operation of the 400 MW Combined Cycle Gas Turbine (CCGT) in Tynagh, County Galway. 1-1

2 n se n Co y. y nl r an o s o se ed f o rp uir pu req n io r ct wne e sp o in ght r i Fo pyr o fc to he ot e. s ru

3 1.3 Description of The proposed power plant will provide approximately 100 MW of electricity to the national electricity grid. The development will consist of one open-cycle gas turbine (OCGT) electricity generating unit. This unit consists of a gas compressor, fuel combustor and a gas expansion turbine coupled to an electric generator. Air is compressed in the gas compressor and energy is added to the compressed air by combusting gas or liquid fuel in the combustor producing power to drive the turbine rotor. The turbine is highly efficient, clean and will provide energy to the Irish market in times of high demand. Other ancillary structures include an inlet air filter, an exhaust stack, a cooling system, a water treatment system, compressed air system, natural gas supply system, a distillate fuel oil supply system, fire protection system, wastewater collection/treatment system, generator step-up and auxiliary transformers, fuel storage tank, water storage tanks, administration building and an electrical substation. The development will also include construction of site drainage systems, a site entrance, boundary fencing, tank bunding, landscaping features and access roads. Localised refurbishment of a pumphouse and river abstraction facilities are also proposed. An application for a road opening licence will be submitted to Kilkenny County Council to facilitate pumping river water to the main development site. The layout of the proposed development is outlined in Figures 1.2, and The electrical generator will connect to a single common main transformer where the voltage will be increased to 110 kv. Electrical power will then be exported from the plant s main transformer to Kilkenny 110 kv sub-station where the electricity will be exported to the national electricity grid. Natural gas, supplied from the Bord Gáis Eireann (BGE) network, will be the primary fuel source for the facility. In order to comply with Commission for Energy Regulation (CER) Decision Paper Secondary Fuel Obligations on Licensed Generation Capacity in the Republic of Ireland (January 2009), low sulphur diesel oil will be used as a backup fuel in the event of interruption to the natural gas supply. It is expected that 72 hours (3 days) maximum running capacity of diesel will be stored on site (approximately 1,610m 3 ) in a bunded tank to meet this requirement. Subject to securing the necessary planning approval the construction phase is expected to commence in The construction to commercial operation phase is expected to last approximately 14 months. The plant is scheduled to be operational in An Integrated Pollution Prevention and Control Licence (IPPC) will be required for the operation of the proposed power plant and an application for same has been submitted to the Environmental Protection Agency (EPA) (EPA ref: P ). This application is currently being assessed by the EPA. The IPPC licence will stipulate appropriate levels for all environmental emissions from the plant (e.g. noise, air and wastewater discharges). A more detailed description of the site, principal plant components, processes and materials is provided in Chapter 3 Description of. 1.4 Planning History Original Planning Application (December 2007) In December 2007, Mountside Properties Limited submitted a planning application for the development of a 100 MW mid-merit power station at Purcellsinch, Kilkenny (Kilkenny County Council Reference 07/2164). The development consisted of a gas turbine hall, maintenance bay, 20 metre exhaust stack, 20 metre air vent, an air cooler, water cooler, power control module, main transformer, auxiliary transformer, bunded fuel oil tank, raw water tank, water treatment system, firewater system, tanker unloading area, office/workshop, access road and associated site development works. 1-2

4

5

6

7 An Environmental Report accompanied the planning application and contained information on the proposed technology as well as a summary of the potential impacts on the human environment, landscape and visual, flora and fauna, geology, soils and hydrogeology, surface water, air quality, climate, noise and material assets (including archaeology, traffic and transport and utilities). Planning permission was granted by Kilkenny County Council in July Subsequent appeals against Kilkenny County Council s decision to grant planning permission were made to An Bord Pleanála (An Bord Pleanála Reference PL ). An Bord Pleanála granted planning permission in February The reasons and considerations were given as follows (subject to 13 No. planning conditions):..having regard to the relative proximity of the site to a high pressure gas supply and to its location within an established industrial estate, adjoining a municipal sewage treatment facility, it is considered that the proposed development (which comprises an activity requiring an IPPC license) would be compatible with the Industrial / Technology Park zoning designation for the area, as set out in the current Kilkenny City and Environs Development Plan. Furthermore, it is considered that, subject to compliance with the conditions...the proposed development would not seriously injure the visual amenities of the area, would not endanger the health or safety of persons in the vicinity and would be acceptable on environmental grounds. The proposed development would, therefore, accord with the proper planning and sustainable development of the area. Copies of the original Kilkenny County Council and An Bord Pleanála planning permissions and associated conditions are contained in Appendix A Original Planning Permissions Second Planning Application (November 2010) Planning Application 10/627 Mott MacDonald Ireland Limited were appointed by GIL as Owner s Engineer and instructed to assess the permitted layout in the context of ensuring the design was the most efficient possible for operational and maintenance purposes. Having reviewed the permitted design and assessed the technical characteristics of the chosen power plant technology, Mott MacDonald Ireland revised the site layout. Various design iterations were considered as part of the design process. The final revised layout was the subject of a new planning application which was submitted to Kilkenny County Council on the 5 th November 2010 (Kilkenny County Council Reference 10/627). The main differences between the revised layout and the layout permitted in the original planning application submitted by Mountside Properties were as follows: The gas turbine was located more centrally within the site. The siting of the gas turbine at this location ensured more efficient access for maintenance than the location originally approved; Ancillary gas turbine plant not previously included in the original planning permission was included in the revised application and was located within the turbine island area. This plant included the following: Substation control building (6 metres height, 12.6 metres length); 110kV substation (5 metres height, 20 metres length); Low voltage (LV) substation (4.5 metres height, 12.6 metres length); Emissions control building (4.5 metres height, 5 metres length); 1-3

8 Gas compressor building (5 metres height, 13 metres length); Air compressor building (5 metres height, 6 metres length); and Emergency diesel generator (2.8 metres height, 4 metres length). In the original planning permission the gas turbine was located within a housing enclosure. This enclosure was approximately 12.2 metres in height and 42 metres in length. In the revised application the gas turbine was located within its own acoustic enclosure; Dimensions for the exhaust stack height, air vent stack, cooling tower area, raw water tank, and administration building were revised as follows: A new exhaust stack height of 26 metres was determined through detailed air dispersion modelling. The width of the stack was 3.6 metres. In the original Mountside Properties Limited planning permission the stack height was 20 metres and the width 4 metres; The air vent stack was reduced in height from 20 metres to 15 metres; The area reserved for the cooling tower was reduced from 340m² to 146m² with the height of the cooling tower retained at 8.3 metres; The power plant required a larger volume of raw water so a more substantial raw water storage tank was required on site. The raw water supply demand was significantly more than outlined in the original application (90m³/hr v 20m³/hr). The height of the new raw water tank was 19 metres; and A two-storey administration building was proposed instead of a single storey building. This building was proposed to serve as a workshop, stores and control building. There were minor material amendments to the size and scale of other plant structures including the water treatment building, gas turbine modular control room, fuel oil unloading bay, fire pump station, car parking and heat exchanger; Gas and electrical compounds were included as part of the revised application. These compounds were originally to be the subject of separate applications by Bord Gáis and EirGrid respectively. GIL considered that including both the gas and electrical compounds in a single planning application to Kilkenny County Council would facilitate the complete assessment of the full extent of the development proposed; and Inclusion of river water abstraction and the reuse of treated wastewater from the Purcellsinch Wastewater Treatment Plant within the scope of the planning application. It is also important to note that the main principal elements of the proposal remained the same as the original permitted development, notably: The site boundary for the main power plant development area was unchanged; The gas turbine technology (i.e. open-cycle gas turbine technology) was unchanged, the output of the proposed power plant remained at 100 MW; The land use planning policy of Kilkenny County Council remained unchanged. The site was still zoned Industrial Technology Park which includes public service installations such as power plants 1-4

9 as developments open for consideration. Both An Bord Pleanála and Kilkenny County Council had previously considered that the proposed development in this location is acceptable; Predicted environmental emissions/ambient concentrations relating to noise and air quality were within the regulatory threshold limits. It should be noted emission limit values are specified by the Environmental Protection Agency (EPA) through the Integrated Pollution Prevention and Control (IPPC) licensing regime. This licence will stipulate appropriate levels and operational control/monitoring requirements for all environmental emissions; No direct discharges to watercourses were proposed. All process and domestic wastewater would be discharged to the foul sewer in the IDA Business and Technology Park. Surface water would be discharged to the surface water drainage system in the IDA Business and Technology Park; The visual impact was considered neutral in the context of the permitted layout and also given the existing industrial development already present within the area; and No access was proposed to the site from the Sion Road during either the construction or operational phases of development. All traffic to the site would be through the IDA Business and Technology Park Request for Environmental Impact Statement On the 6 th January 2011 Kilkenny County Council requested that an Environmental Impact Statement (EIS) be submitted stating the following: Article 103(1) of the Planning and Development Regulations states that where a planning application for sub threshold development is not accompanied by an Environmental Impact Statement and the Planning Authority considers that the development would be likely to have significant effects on the environment, it shall, by notice in writing request the applicant to submit an EIS. Having regard to (i) the material differences between the proposed development and the permitted development of the site P.07/2164, (ii) the characteristics of the proposed development, (iii) the location of the proposed development and nature of surrounding uses, and (iv) the characteristics of the potential impacts, it is considered that the proposed development would be likely to have significant effects on the environment and will require a Environmental Impact Statement. Notice under Article 103(1) of the Planning and Development Regulations is hereby served. In the accompanying Planner s Report to the request, it was noted that the following technical issues associated with the new planning application necessitated the requirement for an EIS: There was a four fold increase in the water demand for the current proposal over the original application; There were additional components to the revised application, i.e. the gas and electrical compounds; There was uncertainty in relation to water supply for the proposed operation the power plant; The was potential for impacts on the groundwater regime of the area and potential adverse impacts on the River Barrow and River Nore Candidate Special Area of Conservation (csac); There was potential atmospheric impacts associated with the use of wastewater from the Purcellsinch Wastewater Treatment Plant as a coolant in the operation of the power plant; 1-5

10 Concerns were raised by the Department of Arts, Heritage and the Gaeltacht regarding the Screening for Appropriate Assessment Report; and Concerns were raised by Kilkenny County Council on some of the technical issues noted by objectors in the original planning application by Mountside Properties which not been addressed in the revised application. Kilkenny County Council s Planner s Report and the statutory consultee responses to the revised planning application are contained in Appendix B KCC Planners Report and Statutory Consultee Responses. The EIS was received by Kilkenny County Council on the 12 th December On 10 th February 2012 Kilkenny County Council contacted Mott MacDonald Ireland to advise that a typographical error had been identified on the Site Notice. As such the planning application was invalidated This Planning Application (October 2012) This EIS has been completed to support a new planning application to Kilkenny County Council. The principal design characteristics of the power plant remains unchanged from the application considered under Kilkenny County Council planning register 10/627. As part of pre-application consultations Kilkenny County Council provided a copy of each of the statutory consultee responses to the most recent planning application (Kilkenny County Council Reference 10/627). These responses are also included in Appendix B. Details of consolidated consultee responses to this application (during both the original planning application and RFI consultation periods) are listed in Table 1.1 which also references the appropriate Chapter of the EIS where there comments are addressed. Table 1.1: Statutory Consultee Responses Statutory Consultee Issues Raised EIS Chapter Section Inland Fisheries Ireland (IFI) Requested the following: Proposals for the collection and storage of contaminated firewater and the impact of osmotic issues and F:M ratios on the operation of Purcellsinch Wastewater Treatment Plant Kilkenny County Council Roads Design Office Kilkenny County Council Environment Section Clarification on raw water tank details. Inclusion in EIS text of the River Nores designation as salmonid water under S of 1988 the European Communities (Quality of Salmonid Waters) Regulations, EIS should include provision for alarm facilities on petrol interceptors. Construction Environmental Management Plan (CEMP) should reference Inland Fisheries Ireland as a statutory consultee. 1-6 Chapter 3 Description of Appendix H Preliminary Construction Environmental Management Plan Recommended planning conditions Confirmed that the site had been inspected and there was no Chapter 6 Human Beings objection to the proposed development on the basis of the Land Use and Material submitted information Assets Advised that there were no objections to the proposed development. Also requested that planning conditions should include the following: The operational phase of development should be carried out in accordance with the IPPC Licensing regime. Chapter 3 Description of Chapter 8 Noise & Vibration 2.2 Various

11 Statutory Consultee Issues Raised EIS Chapter Section The Construction Environmental Management Plan (CEMP) and methodology for same should be agreed with Kilkenny Appendix H Preliminary Construction County Council prior to the commencement of construction. Environmental Management Plan Details of bunding and drainage. Chapter 3 Description of 3.9 All noise, air emissions and odours should not result in significant impairment of, or significant interference with amenities or the environment beyond the site. Chapter 3 Description of Chapter 8 Noise & Vibration 11.8 Various Kilkenny County Council Parks Section Requested that GIL should submit the following: Tree and Hedgerow Survey. Chapter 13 Landscape & Visual Various Details of fencing for landscaping works. Detailed Landscaping Plan. Maintenance and Management Plan. Methodology for works with potential to impact on Root Protection Areas (RPSs) of a number of trees. Details of a bond. Appendix T Tree and Hedgerow Survey Planning Application Landscape Drawings No: Chapter 13 Landscape & Visual Planning Application Landscape Drawings No s: , 301, 302, 303, 304, 305, 306. Appendix U Maintenance, Management and Specification Plan Appendix T Tree and Hedgerow Survey Chapter 13 Landscape & Visual Various Kilkenny County Council Water Services Section Landscaping Plan for the Pumphouse site. Requested provision of the following: A detailed hydrogeological report indicating the potential of onsite groundwater supply. Appendix V Landscape Budget Costs Planning Application Landscape Drawings No: Chapter 12 Soils, Geology and Hydrogeology An assessment of potential public health and odour issues that may arise from using a grey water supply from the Wastewater Treatment Plant. Identify the characteristics and strength of all wastewater to be discharged to the Wastewater Treatment Plant. Evidence of statutory consents to permit a sustainable water supply. Details of third party agreements and permissions required to ensure a sustainable water supply. Appendix R Section 10 and 23 Notice Response Chapter 15 Health and Safety Chapter 3 Description of Chapter 3 Description of

12 Statutory Consultee Issues Raised EIS Chapter Section Details of infrastructural works on third party lands. A full breakdown of the volume of water required from each individual source. Appendix F IDA Land Ownership Chapter 3 Description of Chapter 3 Description of Kilkenny County Council Fire and Rescue Service Health and Safety Executive (HSE) Location of connection (if any) to public water mains and evidence that this supply can deliver the volume required for development. Advised that there were no objections to the proposed development and included a list of recommended planning conditions. EIS should include more detail on public health issues associated with the use of wastewater from the Wastewater Treatment Plant and in particular regarding potential pathogens and possible odours. Chapter 3 Description of Chapter 3 Description of Appendix B KCC Planners Report and Statutory Consultee Responses Chapter 15 Health and Safety Development Application Unit (DAU)(formerly part of the Department of Environment, Heritage and Local Government now within the Department of Arts, Heritage and the Gaeltacht)(DAHG) Heritage and Planning Division (DEHLG now within DAHG) An Taisce Advised that the Appropriate Assessment (AA) screening was not adequate as it was not clear whether the proposed groundwater abstraction will have a significant effect or not on the River Barrow and Nore csac Stated possibility that sub surface materials may be encountered during the construction phase of development. The need for the power plant is questioned given the surplus in capacity in the Irish energy sector Appendix G.1 Specifications for Demineralisation Water Treatment Appendix G.2 Specification for Make Up Water for the Cooling Towers Appendix G.3 Additional Raw Water Treatment Details Appendix G.4 Bord na Mona Water Quality Analysis Appendix N.1 Stage 1 Screening for Appropriate Assessment Appendix N.2 Natura Impact Statement Chapter 14 Archaeology, Architectural Heritage and Cultural Heritage Chapter 2 Justification for Consultations Historical Consultations on 2010 Planning Application A pre-application meeting was held with Kilkenny County Council on the 26 th August 2010 to discuss the planning history of the site and the rationale for the new planning application. A second meeting was held with Kilkenny County Council on the 19 th January 2011 to discuss the request for EIS and the technical scope of this document. Kilkenny County Council agreed that these meetings and the availability of current and historical consultee responses to the proposed power plant development constituted adequate EIA 1-8

13 scoping. A final meeting was held on the 19 th October 2011 to discuss progress on the project since the time of the RFI and GILs programme for submitting the EIS. A consultation meeting was also held with Inland Fisheries Ireland (IFI) on the 4 th February 2011 to discuss IFI comments on GIL s planning application (Kilkenny County Council Reference 10/627) as well as proposals for the use of a water abstraction from the River Nore. Further and letter correspondence was undertaken in October and November 2011 in respect of incorporating IFI mitigation measures into the power plant design. Mott MacDonald Ireland also met with the National Parks and Wildlife Services (NPWS) on the 13 th October 2011 to discuss proposals for a water abstraction from the River Nore Consultations on this Planning Application A pre-application meeting was held with Kilkenny County Council on the 22 nd February 2012 to discuss the new planning application. Kilkenny County Council provided Mott MacDonald Ireland with a copy of the statutory consultee responses to the most recent planning application (Kilkenny County Council Reference 10/627) and the technical scope of the revised planning application was discussed. It was agreed that this meeting and the provision of the consultee responses (as well as the public availability of historical consultee responses on the proposed development) constituted appropriate EIS scoping for the new planning application. A final meeting was held with Kilkenny County Council on the 19 th September 2012 to advise of the new planning application. Telephone consultations were also undertaken with the following consultees to ensure that their comments on the proposed development are considered in this EIS: National Parks and Wildlife Services, 20/03/12 (Conservation Ranger), 22/03/12 (District Conservation Officer), 28/03/12 (Divisional Ecologist); Health and Safety Executive, 12/03/12 (Environmental Health Officer); Kilkenny County Council Water Services Department 3/04/12 (Senior Engineer); and Kilkenny County Council Park Department 01/03/12 (Parks Officer). GIL has considered all statutory consultee responses to the original planning application by Mountside Properties (Kilkenny County Council Reference 07/2164), submissions to An Bord Pleanála as part of the original application (An Bord Pleanála Reference PL ) and submissions to the most recent planning application (Kilkenny County Council Reference 10/627) and has addressed the matters raised within this EIS Local Consultations There were a total of 28 objectors to the original planning application (Kilkenny County Council Reference 07/2164), submitted by Mountside Properties to Kilkenny County Council. These concerns are addressed in detail in specific sections of the EIS, as detailed in Table 1.2 Original Objector Concerns: Table 1.2: Original Objector Concerns Original Objector Concern Provision of technical information on the proposed power plant Health and safety EIS Chapter All EIS Chapters and Technical Appendices Chapter 3 Description of Chapter 15 Health and Safety 1-9

14 Original Objector Concern Risk of fire and explosion Property devaluation Details on noise, atmospheric and water emissions Impact on residential amenity Potential impacts on flora and fauna Potential impact on groundwater Potential for ground contamination Visual impact EIS Chapter Appendix I Major Accident Risk Assessment Chapter 3 Description of Chapter 15 Health and Safety Appendix I Major Accident Risk Assessment Chapter 7 Human Beings Socio Economics Chapter 8 Noise & Vibration Chapter 15 Health and Safety Chapter 6 Human Beings Land Use and Material Assets Chapter 8 Noise & Vibration Chapter 13 Landscape & Visual Chapter 10 Flora and Fauna, Appendix N.1 Stage 1 Screening for Appropriate Assessment Appendix N.2 Natura Impact Statement Chapter 3 Description of Chapter 12 Soils, Geology & Hydrogeology Appendix R Section 10 and 23 Notice Response Chapter 12 Soils, Geology & Hydrogeology Chapter 13 Landscape & Visual GIL wrote to each of the 28 objectors in November 2010 providing information on the forthcoming new planning application (subsequently identified as Kilkenny County Council Reference 10/627). This letter was accompanied by a brochure containing information on the following: Greener Ideas Limited the company; Objectives of the power plant; Why a new planning application is required; The need for the proposed power plant; Power plant technology and processes; and Local environmental impacts. Contact details and opportunities to meet with the GIL Project Team were also provided. A copy of this correspondence is included in Appendix C Local Consultations. In addition, GIL set up a project specific website for the proposed power plant and advised all objectors of same which is available at This website also contains a Frequently Asked Questions (FAQ) document, which is contained in Appendix D of this EIS. There were a total of thirteen objections to the most recent planning application (Kilkenny County Council Reference 10/627). The concerns raised in the objections were similar in nature to the original application and included additional concerns which are detailed in Table 1.3 Additional Objector Concerns below. This table also includes reference to the relevant sections of the EIS where these concerns are discussed in detail. 1-10

15 Table 1.3: Objector Concerns The need for an EIS Additional Objector Concerns Lack of information regarding alternative sites Construction phase disruption to neighbouring commercial properties Unproven gas turbine technology Property devaluation Suitability of Kilkenny for a power plant Planning and zoning Impact on residential amenity Odour Risk of major accidents Lack of information regarding water supply and potential impacts on groundwater Structural damage to neighbouring commercial properties EIS Chapter Chapter 1 Introduction Chapter 2 Justification for Chapter 3 Description of Appendix H Preliminary Construction Environmental Management Plan Chapter 2 Justification for Chapter 3 Description of Chapter 7 Human Beings Socio Economics Chapter 2 Justification for Chapter 4 Planning and Policy Context Chapter 4 Planning and Policy Context Chapter 6 Human Beings Land Use and Material Assets Chapter 6 Human Beings Land Use and Material Assets Chapter 7 Human Beings Socio-economics Chapter 8 Noise & Vibration Chapter 13 Landscape & Visual Chapter 3 Description of Chapter 3 Description of Chapter 15 Health and Safety Appendix I Major Accident Risk Assessment Chapter 3 Description of 1.6 Preparation of the EIS Structure of the EIS Chapter 12 Soils, Geology & Hydrogeology Chapter 12 Soils, Geology & Hydrogeology The structure of this EIS is presented in Table 1.4. Table 1.4: Structure of EIS Chapter No EIS Chapter Title 1 Introduction 2 Need for 3 Description of 4 Planning and Policy Context 5 EIA Methodology 6 Human Beings Land Use and Material Assets 7 Human Beings Socio Economic 8 Noise & Vibration 9 Air Quality 10 Flora and Fauna 11 Water 12 Soils, Geology and Hydrogeology 1-11

16 Chapter No EIS Chapter Title 13 Landscape and Visual 14 Archaeology, Architecture and Cultural Heritage 15 Health and Safety 16 Interactions of the Foregoing Consultants This EIS was prepared by Mott MacDonald Ireland Limited. In addition, the following subconsultants were engaged to undertake specialist technical assessments: Brady Shipman Martin Landscape and Visual; Kilkenny Archaeology Archaeology; Whitewater Specialist Water Treatment Advice; Ecofact Environmental Consultants; and Tíros Planning Advice and Assessment Difficulties Encountered No significant difficulties were encountered in the course of the EIA that could not be appropriately addressed in the design development process or in this environmental impact assessment. 1-12

Proposed Power Plant at Derrygreenagh, Co. Offaly Environmental Impact Statement N

Proposed Power Plant at Derrygreenagh, Co. Offaly Environmental Impact Statement N 1 Introduction 1.1 Introduction Bord Na Móna Energy Ltd () commissioned Limited (MMP) to prepare an (EIS) and planning application for the proposed construction of a power plant development at Derrygreenagh,

More information

PLATIN PEAKER PLANT PROPOSAL

PLATIN PEAKER PLANT PROPOSAL PLATIN PEAKER PLANT PROPOSAL PUBLIC INFORMATION EVENT - 25 SEPTEMBER 2018 Thank you for coming to our information evening for SSE s proposed new peaker power generation plant at Platin, Carranstown, Duleek,

More information

Appendix 3.1 Sample Scoping Letter, Newspaper Advertisement and Summary of Responses

Appendix 3.1 Sample Scoping Letter, Newspaper Advertisement and Summary of Responses Environmental Impact Statement Appendices for Laois-Kilkenny Reinforcement Project Appendix 3.1 Sample Scoping Letter, Newspaper Advertisement and Summary of Responses SAMPLE SCOPING LETTER Dear Sir/Madam,

More information

Community Update. Draft. North-South 400kV Interconnection Development. Application for Planning Approval to An Bord Pleanála

Community Update. Draft. North-South 400kV Interconnection Development. Application for Planning Approval to An Bord Pleanála North-South 400kV Interconnection Development Draft Community Update Part Funded by the EU-TEN-E Initiative Application for Planning Approval to An Bord Pleanála Project Background The North-South 400kV

More information

Welcome to the Lyrenacarriga Wind Farm public information event

Welcome to the Lyrenacarriga Wind Farm public information event Welcome to the Lyrenacarriga Wind Farm public information event Innogy Renewables Ireland Ltd (innogy) is investigating the potential for developing Lyrenacarriga Wind Farm in the vicinity of Lyrencarriga

More information

A. Non-technical Summary

A. Non-technical Summary A. Non-technical Summary A non-technical summary of the application is to be included here. The summary should identify all environmental impacts of significance associated with the carrying on of the

More information

DREHID MECHANICAL BIOLOGICAL TREATMENT FACILITY WASTE LICENCE APPLICATION ATTACHMENTS JUNE 2012

DREHID MECHANICAL BIOLOGICAL TREATMENT FACILITY WASTE LICENCE APPLICATION ATTACHMENTS JUNE 2012 DREHID MECHANICAL BIOLOGICAL TREATMENT FACILITY WASTE LICENCE APPLICATION ATTACHMENTS JUNE 2012 TOBIN CONSULTING ENGINEERS ATTACHMENTS TO WASTE LICENCE APPLICATION Prepared on behalf of: Bord na Móna Plc.

More information

An Bord Pleanála PLANNING AND DEVELOPMENT ACTS 2000 TO Offaly County. Planning Register Reference Number: PL2/15/129

An Bord Pleanála PLANNING AND DEVELOPMENT ACTS 2000 TO Offaly County. Planning Register Reference Number: PL2/15/129 An Bord Pleanála PLANNING AND DEVELOPMENT ACTS 2000 TO 2015 Offaly County Planning Register Reference Number: PL2/15/129 An Bord Pleanála Reference Number: PL 19.245295 APPEAL by An Taisce of The Tailors

More information

Mayo Renewable Power IPPC Licence Application. ATTACHMENT No. A NON- TECHNICAL SUMMARY TABLE OF CONTENTS

Mayo Renewable Power IPPC Licence Application. ATTACHMENT No. A NON- TECHNICAL SUMMARY TABLE OF CONTENTS Mayo Renewable Power IPPC Licence Application Attachment No. A ATTACHMENT No. A NON- TECHNICAL SUMMARY TABLE OF CONTENTS A.1. Installation and its Activities... 2 A.2. Raw and Auxilliary Materials... 2

More information

Clane Local Area Plan Plean Cheantair Áitiúil Claonadh SEA STATEMENT

Clane Local Area Plan Plean Cheantair Áitiúil Claonadh SEA STATEMENT Clane Local Area Plan 2017-2023 Plean Cheantair Áitiúil Claonadh SEA STATEMENT Planning Department Kildare County Council June 2017 Clane Local Area Plan 2017-2023 SEA Statement Client: Kildare County

More information

2 ENVIRONMENTAL IMPACT ASSESSMENT

2 ENVIRONMENTAL IMPACT ASSESSMENT 2 ENVIRONMENTAL IMPACT ASSESSMENT Introduction 2.1 Environmental Impact Assessment (EIA) is required for certain categories of projects and involves a process of drawing together, in a systematic way,

More information

INSPECTORS REPORT ON A LICENCE APPLICATION

INSPECTORS REPORT ON A LICENCE APPLICATION OFFICE OF LICENSING & GUIDANCE INSPECTORS REPORT ON A LICENCE APPLICATION To: Directors From: Aoife Loughnane - Licensing Unit th Date: 20 July 2006 RE: Application for an IPPC Licence Review from Huntstown

More information

ATTACHMENT E.2 EMISSIONS TO SURFACE WATERS SITE SERVICES LAYOUT SHEET 1 OF 2 (IE DR-0021)

ATTACHMENT E.2 EMISSIONS TO SURFACE WATERS SITE SERVICES LAYOUT SHEET 1 OF 2 (IE DR-0021) ATTACHMENT E.2 EMISSIONS TO SURFACE WATERS SITE SERVICES LAYOUT SHEET 1 OF 2 (IE0310818-30-DR-0021) SITE SERVICES LAYOUT SHEET 2 OF 2 (IE0310818-30-DR-0022) LOCATION OF EMISSION TO SURFACE WATER (IE0310818-22-DR-

More information

GREATER DUBLIN DRAINAGE PROJECT: PUBLIC CONSULTATION REPORT ON THE ISSUES TO BE CONSIDERED IN THE ENVIRONMENTAL IMPACT STATEMENT

GREATER DUBLIN DRAINAGE PROJECT: PUBLIC CONSULTATION REPORT ON THE ISSUES TO BE CONSIDERED IN THE ENVIRONMENTAL IMPACT STATEMENT GREATER DUBLIN DRAINAGE PROJECT: PUBLIC CONSULTATION REPORT ON THE ISSUES TO BE CONSIDERED IN THE ENVIRONMENTAL IMPACT STATEMENT EXECUTIVE SUMMARY DECEMBER 2013 EXECUTIVE SUMMARY 1. PROJECT BACKGROUND

More information

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) AND THE ENVIRONMENTAL IMPACT STATEMENT (EIS) 2.0 Developments requiring preparation of an EIS

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) AND THE ENVIRONMENTAL IMPACT STATEMENT (EIS) 2.0 Developments requiring preparation of an EIS ENVIRONMENTAL IMPACT ASSESSMENT (EIA) AND THE ENVIRONMENTAL IMPACT STATEMENT (EIS) 1.0 Background 2.0 Developments requiring preparation of an EIS 3.0 The contents of an EIS 4.0 Exemption from the requirement

More information

Combined Cycle Gas Turbine Power Plant Project at Fort George, Mauritius

Combined Cycle Gas Turbine Power Plant Project at Fort George, Mauritius Combined Cycle Gas Turbine Power Plant Project at Fort George, Mauritius CONTENTS Chapter Description Page 1 NON-TECHNICAL SUMMARY 17 1 INTRODUCTION 18 2 PROPOSED PROJECT IN FORT GEORGE 18 3 METHODOLOGY

More information

CALLAN. LOCAL AREA PLAN SEA STATEMENT

CALLAN.   LOCAL AREA PLAN SEA STATEMENT www.cbuchanan.com Kilkenny County Council PLANNING ENVIRONMENTAL PLANNING URBAN DESIGN TRAFFIC TRANSPORT ECONOMICS MARKET RESEARCH CALLAN LOCAL AREA PLAN 2009-2015 SEA STATEMENT Project No: 137941 April

More information

Appendix A Schedule of Amendments to the EIAR

Appendix A Schedule of Amendments to the EIAR Appendix A Schedule of Amendments to the EIAR EIAR Chapter Page Number Changes Made to the Original EIS Submitted Chapter 1 Introduction Update of all references from EIS to EIAR Update of references to

More information

Heckington Fen Onshore Wind Farm Application to Vary Existing Consent

Heckington Fen Onshore Wind Farm Application to Vary Existing Consent FAO Mr Keith Welford Department of Energy & Climate Change 3 Whitehall Place London SW1A 2AW 18th October 2016 By Email Only : keith.welford@decc.gsi.gov.uk Dear Mr Welford, Heckington Fen Onshore Wind

More information

Wicklow Wind Energy Strategy

Wicklow Wind Energy Strategy Wicklow County Development Plan 2016-2022 Appendix 6 Wicklow Wicklow Wicklow County Development Plan 2016-2022 Appendix 6 2 1. Introduction Wicklow County Council recognises the need to reduce dependence

More information

SEA OF EDENDERRY LOCAL AREA PLAN

SEA OF EDENDERRY LOCAL AREA PLAN EDENDERRY LOCAL AREA PLAN 2017-2023 Strategic Environmental Assessment Environmental Report CLIENT Offaly County Council DATE September 2017 P a g e Contents Amendment Record This report has been issued

More information

Environmental Impact Assessment Report

Environmental Impact Assessment Report Environmental Impact Assessment Report Volume I (Main Document) Residential Development at Barnhall Leixlip Co. Kildare on behalf of Ardstone Homes Ltd. December 2017 Volume I (Main Document) December

More information

The Energy Supply and Purchase Agreement (ESPA) was signed between Solar Energy Ltd and the Central Electricity Board on 28 November 2014.

The Energy Supply and Purchase Agreement (ESPA) was signed between Solar Energy Ltd and the Central Electricity Board on 28 November 2014. EXECUTIVE SUMMARY E1 Introduction The proponent is SOLAR FIELD LTD, a consortium between 1. Dhamma Energy, a company based in Spain, specialised in photovoltaic projects 2. Harel Mallac & Co. Ltd, a company

More information

4.3 Consultation on Scoping

4.3 Consultation on Scoping 22 Topics in the EIA Regulations Topics in this EIS Fauna Chapter 9 ecology Soil Scoped Out see Chapter 10 Water Air Chapter 11 water environment Chapter 13 air quality (including odour and dust) Climatic

More information

IEMA ES Review Criteria

IEMA ES Review Criteria IEMA ES Review Criteria Structure of the Criteria The criteria are split into three sections and a review report is structured accordingly: Section 1 addresses all of the information contained within an

More information

9.3.9 Industry uses code

9.3.9 Industry uses code 9.3.9 Industry uses code 9.3.9.1 Application (1) This code applies to accepted development and assessable development identified as requiring assessment against the Industry uses code by the tables of

More information

Construction Activities

Construction Activities Operator numbers are estimated at 34 operating over three shifts 20 by day and two different night shifts with 7 operators on each shift. Again assuming that all 34 operators drive to work (a conservative

More information

PERMITTING ENERGY PROJECTS ENGINEERS IRELAND CPD SEMINAR. Presented by Alice Whittaker 2 0 O c t o b e r

PERMITTING ENERGY PROJECTS ENGINEERS IRELAND CPD SEMINAR. Presented by Alice Whittaker 2 0 O c t o b e r PERMITTING ENERGY PROJECTS ENGINEERS IRELAND CPD SEMINAR Presented by Alice Whittaker 2 0 O c t o b e r 2 0 1 4 Energy Policy Drivers 1. Security of energy supply self-sufficiency, reliability 2. Competitiveness

More information

Getting your planning application right! Nuala O Connell, Senior Executive Planner. Tipperary County Council

Getting your planning application right! Nuala O Connell, Senior Executive Planner. Tipperary County Council Getting your planning application right! Nuala O Connell, Senior Executive Planner Tipperary County Council Planning Consent One Piece in Financial Planning and Business Case. Legal Agreements Grants Environmental

More information

28 JULY 2015 PLANNING COMMITTEE. 5i 14/1315 Reg d: Expires: Ward: OW. of Weeks on Cttee Day:

28 JULY 2015 PLANNING COMMITTEE. 5i 14/1315 Reg d: Expires: Ward: OW. of Weeks on Cttee Day: 5i 14/1315 Reg d: 25.11.2014 Expires: 29.04.15 Ward: OW Nei. Con. Exp: 14.01.15 BVPI Target Minor (13) Number of Weeks on Cttee Day: 21/8 On Target? No LOCATION: PROPOSAL: TYPE: London House, 134 High

More information

Standard rules SR2010No2 - discharge to surface water: cooling water and heat exchangers

Standard rules SR2010No2 - discharge to surface water: cooling water and heat exchangers Standard rules Chapter 4, The Environmental Permitting (England and Wales) Regulations 2010 Standard rules SR2010No2 - discharge to surface water: cooling water and heat exchangers Introductory note This

More information

Table of Contents. O Devaney Gardens. Page i. Page Number. Section. 1 Introduction

Table of Contents. O Devaney Gardens. Page i. Page Number. Section. 1 Introduction Section 1 Introduction Page Number 1.1 Introduction 2 1.2 Screening - Requirement for an EIA 5 1.3 Purpose of this EIA 6 1.4 Objectives of this EIA 6 1.5 Scoping 10 1.6 Format and Structure of this EIS

More information

A proposed new gas-fired power station on the Wilton International site

A proposed new gas-fired power station on the Wilton International site TEES CCPP PROJECT A proposed new gas-fired power station on the Wilton International site Welcome This event is intended to provide you with information about the proposed Tees Combined Cycle Power Plant

More information

MEMO DATE: 15/10/02. SUBJECT : Organic Kompost Ltd. Technical Committee Report

MEMO DATE: 15/10/02. SUBJECT : Organic Kompost Ltd. Technical Committee Report TO: CC: MEMO Board of Directors FROM: Brian Donlon DATE: 15/10/02 SUBJECT : Organic Kompost Ltd. Technical Committee Report Application details Application Details Applicant: Location of Activity: Reg.

More information

Additional information relevant to Section 1 is presented in Appendix A in Volume 2 of 3 of the EIS.

Additional information relevant to Section 1 is presented in Appendix A in Volume 2 of 3 of the EIS. 1. INTRODUCTION Additional information relevant to Section 1 is presented in Appendix A in Volume 2 of 3 of the EIS. 1.1 SCOPE 1.1.1 The Project This Environmental Impact Statement (EIS) has been prepared

More information

5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT. The scope of the EIA falls under three broad categories:

5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT. The scope of the EIA falls under three broad categories: 5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT 5.1 INTRODUCTION The scope of the EIA falls under three broad categories: technical scope; spatial scope; and temporal scope. The scoping process for the

More information

4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT

4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT 4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT 4.1 INTRODUCTION This section describes the broad principles of the methodology adopted for the EIA of the Proposed Development. EIA is a procedure required

More information

Northacre Renewable Energy

Northacre Renewable Energy Northacre Renewable Energy Revision of the layout and design of the Advanced Thermal Treatment Facility permitted under consent 14/12003/WCM at Stephenson Road, Northacre Trading Estate, Westbury, BA13

More information

GROUSEMOUNT WIND FARM County Kerry

GROUSEMOUNT WIND FARM County Kerry GROUSEMOUNT WIND FARM County Kerry ENVIRONMENTAL IMPACT STATEMENT VOLUME 1 - NON-TECHNICAL SUMMARY & EIS TEXT ESB WIND DEVELOPMENT Report No. QR-320171-11-GK0715-R01 ESB WIND DEVELOPMENT LIMITED GROUSEMOUNT

More information

In compliance with Art October 2001 PD issued: First party objection received: Third party objections: One, An Taisce,

In compliance with Art October 2001 PD issued: First party objection received: Third party objections: One, An Taisce, M E M O R A N D U M DATE: 1 March 2002 TO: FROM: RE: The Members of the Board Technical Committee Objection to a Proposed Determination (PD) for Electricity Supply Board Shannonbridge, Co Offaly. IPC Register

More information

UISCE ÉIREANN : IRISH WATER. Stillorgan Reservoir Upgrade Project

UISCE ÉIREANN : IRISH WATER. Stillorgan Reservoir Upgrade Project UISCE ÉIREANN : IRISH WATER Stillorgan Reservoir Upgrade Project Environmental Impact Statement Scoping Report IRISH WATER STILLORGAN RESERVOIR UPGRADE PROJECT ENVIRONMENTAL IMPACT STATEMENT SCOPING REPORT

More information

Land to the South of Old Mill Road, Sandbach Environmental Impact Assessment Environmental Statement: Non-Technical Summary

Land to the South of Old Mill Road, Sandbach Environmental Impact Assessment Environmental Statement: Non-Technical Summary Environmental Impact Assessment Report prepared by: Ecus Ltd. Brook Holt 3 Blackburn Road Sheffield S61 2DW 0114 266 9292 September 2013 Page Left Intentionally Blank 2 INTRODUCTION This Non Technical

More information

Planning, Taxi Licensing and Rights of Way Committee Report. Application No: P/2018/0067 Grid Ref:

Planning, Taxi Licensing and Rights of Way Committee Report. Application No: P/2018/0067 Grid Ref: Planning, Taxi Licensing and Rights of Way Committee Report Application No: P/2018/0067 Grid Ref: 296632.9 267941.51 Community Council: Newtown Valid Date: 28/09/2015 Officer: Robin Wynne Williams Applicant:

More information

1 INTRODUCTION 1.1 TERMS OF REFERENCE FOR THIS ENVIRONMENTAL IMPACT ASSESSMENT REPORT

1 INTRODUCTION 1.1 TERMS OF REFERENCE FOR THIS ENVIRONMENTAL IMPACT ASSESSMENT REPORT 1 INTRODUCTION 1.1 TERMS OF REFERENCE FOR THIS ENVIRONMENTAL IMPACT ASSESSMENT REPORT This Environmental Impact Assessment Report (EIA Report) has been prepared by Environmental Resources Management Ltd

More information

CHAPTER 8 Energy Efficiency, and Renewable Energy. Kildare County Development Plan , Volume 1

CHAPTER 8 Energy Efficiency, and Renewable Energy. Kildare County Development Plan , Volume 1 Chapter 6 Rural Housing Strategy CHAPTER 8 Energy Efficiency, and Renewable Energy 157 8 ENERGY EFFICIENCY AND RENEWABLE ENERGY 8.1 Background The development of renewable energy sources is a priority

More information

Appropriate Assessment under Article 6 of the Habitats Directive: guidance for Planning Authorities

Appropriate Assessment under Article 6 of the Habitats Directive: guidance for Planning Authorities For the attention of the County / City Manager 11 March 2010 Circular NPW 1/10 & PSSP 2/10 Appropriate Assessment under Article 6 of the Habitats Directive: guidance for Planning Authorities I refer to

More information

Code of Practice between Bord Gáis Éireann and The Minister for Arts, Heritage, Gaeltacht and the Islands

Code of Practice between Bord Gáis Éireann and The Minister for Arts, Heritage, Gaeltacht and the Islands bord gais english pdf 10/5/02 1:11 pm Page 1 Code of Practice between Bord Gáis Éireann and The Minister for Arts, Heritage, Gaeltacht and the Islands bord gais english pdf 10/5/02 1:11 pm Page 2 1 Foreword

More information

Tullynahaw Wind Energy Project County Roscommon ENVIRONMENTAL IMPACT STATEMENT

Tullynahaw Wind Energy Project County Roscommon ENVIRONMENTAL IMPACT STATEMENT HIBERNIAN WIND POWER LIMITED Tullynahaw Wind Energy Project County Roscommon ENVIRONMENTAL IMPACT STATEMENT NON-TECHNICAL SUMMARY September 2003 Report P04E311A-R2 Stephen Court, 18/21 St. Stephen's Green,

More information

Irish Water VARTRY WATER SUPPLY UPGRADE PROJECT. EIS Screening Report

Irish Water VARTRY WATER SUPPLY UPGRADE PROJECT. EIS Screening Report Irish Water VARTRY WATER SUPPLY UPGRADE PROJECT IRISH WATER Vartry Water Supply Upgrade Project Environmental Impact Assessment Screening Report Nicholas O Dwyer Ltd Consulting Engineers Nutgrove Office

More information

Ferrybridge Multifuel 2 (FM2) Power Station

Ferrybridge Multifuel 2 (FM2) Power Station Welcome Multifuel Energy Ltd is proposing to build a second multifuel power station at Ferrybridge (FM2). This formal consultation is an opportunity for you to provide feedback and comment on the Proposed

More information

Proposed Blackhillock Substation Expansion. Public Exhibition

Proposed Blackhillock Substation Expansion. Public Exhibition Proposed Blackhillock Substation Expansion Public Exhibition 9 February 2012 Blackhillock Substation Expansion: Pre Application Consultation The proposals are for the redevelopment of the existing substation

More information

Interrelationships & Cumulative Effects

Interrelationships & Cumulative Effects Chapter 18 Interrelationships & Cumulative Effects 18.1. Introduction In addition to the assessment of impacts on individual topics presented in the previous chapters of this (EIAR), the interaction between

More information

The rezoning application and proposed transportation facility warrants consideration.

The rezoning application and proposed transportation facility warrants consideration. Date: November 11, 2014 To: Re: Chair and Members Planning & Development Committee PDE File Number: REZ1400020 275 Conception Bay South Bypass Road, Ward 5 Application to Rezone Land to Industrial General

More information

19. INTERACTION OF IMPACTS

19. INTERACTION OF IMPACTS 19. INTERACTION OF IMPACTS 19.1 INTRODUCTION In addition to the requirement to describe the likely significant effects of the proposed development on the different elements of the environment, it is also

More information

Chief Executives, City and County Councils, Directors of Planning Services, City and County Councils, An Bord Pleanála,

Chief Executives, City and County Councils, Directors of Planning Services, City and County Councils, An Bord Pleanála, To: CC: Chief Executives, City and County Councils, Directors of Planning Services, City and County Councils, An Bord Pleanála, Senior Planners, City and County Councils Circular Letter PL 01/2018 9 February

More information

5. ENVIRONMENTAL IMPACT ASSESSMENT

5. ENVIRONMENTAL IMPACT ASSESSMENT 5. ENVIRONMENTAL IMPACT ASSESSMENT 5.1 INTRODUCTION Environmental Impact Assessment (EIA) is a process that considers how a proposed development will change existing environmental conditions, and what

More information

Project Update. Gas to Great Island Power Station

Project Update. Gas to Great Island Power Station Project Update Gas to Great Island Power Station Introduction The Transmission System Operator, Gaslink, on behalf of Endesa Ireland Ltd., has requested Bord Gáis Networks to design for a new gas supply

More information

18 Cumulative Impacts and Interaction of Effects

18 Cumulative Impacts and Interaction of Effects 18 Cumulative Impacts and Interaction of Effects 18.1 Introduction This chapter addresses the cumulative impacts and main interactions between different aspects of the environment likely to be significantly

More information

INTENSIFICATION OF USE AT AN EXISTING MEAT PROCESSING PLANT AT PAINESTOWN, BEAUPARC, NAVAN,CO. MEATH

INTENSIFICATION OF USE AT AN EXISTING MEAT PROCESSING PLANT AT PAINESTOWN, BEAUPARC, NAVAN,CO. MEATH INTENSIFICATION OF USE AT AN EXISTING MEAT PROCESSING PLANT AT PAINESTOWN, BEAUPARC, NAVAN,CO. MEATH ENVIRONMENTAL IMPACT STATEMENT NON-TECHNICAL SUMMARY SEPTEMBER 2014 SLR Ref: 501.00213.00007 Rev0 SLR

More information

In-combination and Cumulative Effects Assessment

In-combination and Cumulative Effects Assessment P O R T I S H E A D B R A N C H L I N E P R E L I M I N A R Y ENV I R O N M E N T A L I N F O R M A T I O N R E P O R T V O L U M E 2 C H A P T E R 18 In-combination and Cumulative Effects Assessment Table

More information

IWEA Annual Conference, Dublin, 27-28th March 2013 Delivering Local Renewable Energy Strategies

IWEA Annual Conference, Dublin, 27-28th March 2013 Delivering Local Renewable Energy Strategies IWEA Annual Conference, Dublin, 27-28th March 2013 Delivering Local Renewable Energy Strategies Kevin O Rourke Overview A methodology for Local Authority Renewable Energy Strategies: WHY? The planning

More information

TABLE OF CONTENTS. Title page Table of contents List of tables List of figures Non- technical summary

TABLE OF CONTENTS. Title page Table of contents List of tables List of figures Non- technical summary TABLE OF CONTENTS Title page Table of contents List of tables List of figures Non- technical summary Page i ii vii viii ix CHAPTER 1: INTRODUCTION 1 1.1 Project Background 1 1.2 Aims and Objectives 3 1.3

More information

IPPC Licence No: W Company. Re: Request for Technical Amendment

IPPC Licence No: W Company. Re: Request for Technical Amendment RILTA Environmental Ref: ENV3216.epa 14 th October 2016 E-Mail: conor_wall@clearcircle.com IPPC Licence No: W0192-03 Company RILTA Environmental Limited Subject Re: Request for Technical Amendment Dear

More information

DATE: 27 th March, 2002

DATE: 27 th March, 2002 MEMO TO: CC: Board of Directors FROM: Dara Lynott DATE: 27 th March, 2002 SUBJECT : Waste Recovery Services (Fermoy) Ltd. Application details Application Details Applicant: Waste Recovery Services (Fermoy)

More information

2. TECHNICAL DESCRIPTION OF THE PROJECT

2. TECHNICAL DESCRIPTION OF THE PROJECT 2. TECHNICAL DESCRIPTION OF THE PROJECT 2.1. What is a Combined Cycle Gas Turbine (CCGT) Plant? A CCGT power plant uses a cycle configuration of gas turbines, heat recovery steam generators (HRSGs) and

More information

Amherst Island Wind Energy Project - Renewable Energy Approval Amendment Modification Report #3

Amherst Island Wind Energy Project - Renewable Energy Approval Amendment Modification Report #3 Amherst Island Wind Energy Project - Renewable Energy Approval Amendment Modification Report #3 Prepared for: Windlectric Inc. 354 Davis Road, Oakville, ON L6J 2X1 Prepared by: Stantec Consulting Ltd.

More information

DUBLIN WASTE TO ENERGY PROJECT

DUBLIN WASTE TO ENERGY PROJECT South Dublin County Council DUBLIN WASTE TO ENERGY PROJECT www.dublinwastetoenergy.ie Response to An Bord Pleanála Request for Clarification Reference EF2022 November 2006 EPA Export 25-07-2013:21:19:52

More information

An Bord Pleanála Oral Hearing. Irish Water. Greater Dublin Drainage. Brief of Evidence. Regional Biosolids Storage Facility.

An Bord Pleanála Oral Hearing. Irish Water. Greater Dublin Drainage. Brief of Evidence. Regional Biosolids Storage Facility. An Bord Pleanála Oral Hearing Irish Water Greater Dublin Drainage Brief of Evidence Ross Kinsella Qualifications and Role on the Proposed Project 1 My name is Ross Kinsella and I am an Associate with J.

More information

Garvagh Glebe Wind Energy Project County Leitrim

Garvagh Glebe Wind Energy Project County Leitrim HIBERNIAN WIND POWER LIMITED & COILLTE Garvagh Glebe Wind Energy Project County Leitrim ENVIRONMENTAL IMPACT STATEMENT NON-TECHNICAL SUMMARY March 2003 Report P04J004 R3 Stephen Court, 18/21 St. Stephen's

More information

ATTACHMENT D.4. Leachate Management Plan

ATTACHMENT D.4. Leachate Management Plan ATTACHMENT D.4 Leachate Management Plan EPA Export 26-07-2013:01:31:32 Corranure Landfill Waste Licence No. W0077-02 Client Project Title DOCUMENT CONTROL SHEET Cavan County Council Corranure Landfill

More information

Kerry Ingredients Ireland Ltd. Rathgoggan Middle, Charleville Co. Cork

Kerry Ingredients Ireland Ltd. Rathgoggan Middle, Charleville Co. Cork Kerry Ingredients Ireland Ltd. Rathgoggan Middle, Charleville Co. Cork Environmental Impact Assessment Report Volume IV: Non-Technical Summary June 2017 LoCall 1890 130 007 OES Consulting Dublin Newry

More information

GRID Implementation Plan SEA Screening Statement

GRID Implementation Plan SEA Screening Statement GRID Implementation Plan 2017-2022 SEA Screening Statement 27 July 2016 GRID Implementation Plan 2017-2021 Project No: 32106700 Document Title: Document No.: Revision: 1 SEA Screening Statement 32106700_01_1

More information

Wellington Dock Planning Application, Liverpool. Non-Technical Summary for Environmental Statement

Wellington Dock Planning Application, Liverpool. Non-Technical Summary for Environmental Statement Wellington Dock Planning Application, Liverpool Non-Technical Summary for Environmental Statement INTRODUCTION United Utilities PLC (UU) has applied for planning permission for an extension to Liverpool

More information

26 th October 2016 IPPC Licence No: W Company. Re: Request for Technical Amendment

26 th October 2016 IPPC Licence No: W Company. Re: Request for Technical Amendment RILTA Environmental Ref: ENV3716.epa E-Mail: conor_wall@clearcircle.com 26 th October 2016 IPPC Licence No: W0192-03 Company RILTA Environmental Limited Subject Re: Request for Technical Amendment Dear

More information

Standard rules SR2012 No13 Treatment of Incinerator Bottom Ash (IBA)

Standard rules SR2012 No13 Treatment of Incinerator Bottom Ash (IBA) Standard rules Chapter 4, The Environmental Permitting (England and Wales) Regulations 2016 Standard rules SR2012 No13 Treatment of Incinerator Bottom Ash (IBA) Part A Installation - treatment capacity

More information

Executive Summary 1. 1 Project Background 6

Executive Summary 1. 1 Project Background 6 Contents Executive Summary 1 1 Project Background 6 Page 1.1 Project Overview 6 1.2 Hotel Concept 6 1.3 Justification of the Project 8 1.3.1 Foreign Currency Earnings 8 1.3.2 Tourism Developments in Mauritius

More information

RECOMMENDED Outline Application - Approval recommended. That Planning Permission be granted subject to completing a S106 agreement the following:

RECOMMENDED Outline Application - Approval recommended. That Planning Permission be granted subject to completing a S106 agreement the following: Item No. 10 APPLICATION NUMBER CB/16/03885/OUT LOCATION Land at East Lodge, Hitchin Road, Stotfold, Hitchin, SG5 4AA PROPOSAL Outline Application: 18 No. 2 storey family houses on area of open land, former

More information

TABLE OF CONTENTS. 3.1 Project Justification Project Description 21

TABLE OF CONTENTS. 3.1 Project Justification Project Description 21 TABLE OF CONTENTS Title Page Table of Contents (ii) List of Tables (iv) List of Plates (v) List of Annexes (vi) Executive Summary (vii) Chapter 1. Introduction & Methods of Assessment of Impact 1 1.1 The

More information

RURAL CONSERVATION ZONE

RURAL CONSERVATION ZONE Chapter 37 RURAL CONSERVATION ZONE INTRODUCTION This Chapter contains rules managing land uses in the. The boundaries of this zone are shown on the Planning Maps. All rules apply throughout the unless

More information

FILE NUMBER APP. TYPE APPLICANTS NAME

FILE NUMBER APP. TYPE APPLICANTS NAME : 26/08/2008 TIME : 09:58:33 PAGE : 1 FURTHER INFORMATION /VALID APPLICATIONS 08/100 Mary Donnellan, P 21/08/2008 F For the removal of existing septic tank and percolation area and connection of existing

More information

Northacre Renewable Energy

Northacre Renewable Energy Northacre Renewable Energy Revision of the layout and design of the Advanced Thermal Treatment Facility permitted under consent 14/12003/WCM at Stephenson Road, Northacre Trading Estate, Westbury, BA13

More information

Hazardous Substances Hazardous Substances Explanatory Statement Significant Issues Objective and Policies...

Hazardous Substances Hazardous Substances Explanatory Statement Significant Issues Objective and Policies... Section Contents Hazardous Substances... 2 9. Hazardous Substances... 2 Explanatory Statement... 2 9.1 Significant Issues... 3 9.2 Objective and Policies... 3 9.3 Activity Lists... 4 9.4 Quantity thresholds

More information

OFFICE OF LICENSING & GUIDANCE

OFFICE OF LICENSING & GUIDANCE OFFICE OF LICENSING & GUIDANCE INSPECTORS REPORT ON A LICENCE APPLICATION To: Directors From: MARIE O CONNOR - LICENSING UNIT Date: 19 April 2007 RE: Application for a Review of IPPC Licence from Cara

More information

Amherst Island Wind Energy Project - Renewable Energy Approval Amendment Modification Report #4

Amherst Island Wind Energy Project - Renewable Energy Approval Amendment Modification Report #4 Amherst Island Wind Energy Project - Renewable Energy Approval Amendment Modification Report #4 Prepared for: Windlectric Inc. 2845 Bristol Circle Oakville ON L9H 7H7 Prepared by: Stantec Consulting Ltd.

More information

EIA Screening. Proposed Mixed Use Development at Jacobs Island, Cork. Montip Horizon Limited

EIA Screening. Proposed Mixed Use Development at Jacobs Island, Cork. Montip Horizon Limited EIA Screening Proposed Mixed Use Development at Jacobs Island, Cork Montip Horizon Limited June 2018 1. Introduction This Environmental Impact Assessment Screening has been prepared to determine whether

More information

Hazardous Substances. 9. Hazardous Substances. Explanatory Statement

Hazardous Substances. 9. Hazardous Substances. Explanatory Statement Hazardous Substances 9. Hazardous Substances Explanatory Statement The Western Bay of Plenty District is predominantly rural land in farming and horticulture and has a number of small urban centres containing

More information

Cork County Development Plan Volume Three: SEA Statement and Natura Impact Report

Cork County Development Plan Volume Three: SEA Statement and Natura Impact Report Cork County Development Plan 2014 Volume Three: SEA Statement and Natura Impact Report 3 Volume 3: SEA Statement and Natura Impact Report Cork County Development Plan 2014 Contents Section 1 Strategic

More information

LKIL042 Kilkenny Linear Park Construction Environmental Management Plan Rev.B

LKIL042 Kilkenny Linear Park Construction Environmental Management Plan Rev.B LKIL042 Kilkenny Linear Park Construction Environmental Management Plan Rev.B November 2015 Contents 1.0 Introduction 1.1 Site Location 2.0 Proposed Development Description 3.0 Site Management 4.0 Construction

More information

This part of the Plan explains what a District Plan is and provides a user friendly guide.

This part of the Plan explains what a District Plan is and provides a user friendly guide. This part of the Plan explains what a District Plan is and provides a user friendly guide. If you have any questions about this Plan and how it might affect a project you are contemplating, then you are

More information

ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK. for the. Partial Risk Guarantees Project for Independent Power Producers in Kenya DRAFT

ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK. for the. Partial Risk Guarantees Project for Independent Power Producers in Kenya DRAFT ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK for the Partial Risk Guarantees Project for Independent Power Producers in Kenya DRAFT May 2011 INTRODUCTION The World Bank, through IDA funding, is proposing

More information

CARLOW COUNTY COUNCIL GUIDANCE NOTE FOR APPLICANT AIR LICENCE

CARLOW COUNTY COUNCIL GUIDANCE NOTE FOR APPLICANT AIR LICENCE CARLOW COUNTY COUNCIL GUIDANCE NOTE FOR APPLICANT AIR LICENCE AIR POLLUTION ACT, 1987 1. GENERAL Under the Air Pollution Act, 1987, certain industrial processes have been identified as having a potential

More information

Santoy 8 Satellite Mine at the Seabee Gold Mine. Technical Review Comments. on the. Environmental Impact Statement.

Santoy 8 Satellite Mine at the Seabee Gold Mine. Technical Review Comments. on the. Environmental Impact Statement. Environmental Impact Assessment Technical Review Comments on the Environmental Impact Statement as submitted by Claude Resources Inc. Saskatchewan Ministry of Environment December, 2009 1. INTRODUCTION

More information

Integrated Pollution Prevention & Control Licence Review

Integrated Pollution Prevention & Control Licence Review Integrated Pollution Prevention & Control Licence Review Johnson & Johnson Vision Care Ireland Attachment A1 Non Technical Summary This is a summary, in non-technical language, of the information provided

More information

Galway County Council Portumna Draft Local Area Plan Strategic Flood Risk Assessment of Material Alterations

Galway County Council Portumna Draft Local Area Plan Strategic Flood Risk Assessment of Material Alterations Galway County Council Portumna Draft Local Area Plan 2016-2022 Strategic Flood Risk Assessment of Material Alterations 4-04-03 Issue 1 23 February 2016 This report takes into account the particular instructions

More information

Management Plan: Hazardous Materials Removal & Demolition

Management Plan: Hazardous Materials Removal & Demolition Management Plan: Hazardous Materials Removal & Demolition Kingswood School (Upper Site), Corby 1.0 Introduction 1.1 Background Lambert Smith Hampton has been instructed by Northamptonshire County Council

More information

4 ADMINISTRATIVE FRAMEWORK 4.1 INTRODUCTION

4 ADMINISTRATIVE FRAMEWORK 4.1 INTRODUCTION 4 ADMINISTRATIVE FRAMEWORK 4.1 INTRODUCTION This section provides an overview of legislation, guidelines and information documents that have informed the scope and content of this report and the approach

More information

CONSENT UNDER SECTION 36 OF THE ELECTRICITY ACT one or more heat recovery steam generators;

CONSENT UNDER SECTION 36 OF THE ELECTRICITY ACT one or more heat recovery steam generators; Our ref: 01.08.10.04/415C DEPARTMENT OF ENERGY AND CLIMATE CHANGE CONSTRUCTION AND OPERATION OF A COMBINED CYCLE GAS TURBINE ELECTRICITY GENERATING STATION AT DAMHEAD CREEK, ISLE OF GRAIN, KENT CONSENT

More information

10 Network Utilities Introduction Kaipara District Council Engineering Standards Resource Management Act 1991 Requirements

10 Network Utilities Introduction Kaipara District Council Engineering Standards Resource Management Act 1991 Requirements 10 Network Utilities [ENV-2011-AKL-000250 Meridian Energy Ltd. renewable energy resources] 10.1 Introduction The Kaipara District provides for a range of important local and regional strategic assets including

More information

Andrew McDonough. Town and Country Planning Act 1990 Planning Permission

Andrew McDonough. Town and Country Planning Act 1990 Planning Permission Form PP1 Town and Country Planning Act 1990 Planning Permission Name and address of applicant Name and address of agent (if any) Ms Liz Wells National Grid Viking Link Ltd 35 Homer Road Solihull West Midlands

More information

Cork County Council. Strategic Environmental Assessment of Variation No. 2 to Cork County Council Development Plan Final Environmental Report

Cork County Council. Strategic Environmental Assessment of Variation No. 2 to Cork County Council Development Plan Final Environmental Report Cork County Council Strategic Environmental Assessment of Variation No. 2 to Cork County Council Development Plan 2009 Final Environmental Report Date: July 2011 WYG Ireland part of the WYG group creative

More information